1 CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS) will provide professional engineering services described herein for final design of a grit system, site security improvements, and Supervisory Control and Data Acquisition (SCADA) improvements at the City of Baytown (City) Central District Wastewater Treatment Plant (WWTP). The scope of work for these services will include basic design services (detailed design drawings, technical specifications, cost estimates, and bid phase services), additional design services, and construction administration services. The scope is based on improvements for the following areas: 1. New bar screen 2. Demolition of existing grit basins and associated channels 3. New grit basins, grit removal and washing equipment 4. Associated civil, structural, electrical, and instrumentation for the grit system. 5. Addition of primary field instruments, analyzers, and controls for the aeration basins/blowers, secondary clarifiers, sludge pump station, sludge thickener, aerobic digesters, chlorine contact / chlorination/dechlorination facility, quiescent tanks, outlet structure, nonpotable water system, belt press facility, recycle pump station, and miscellaneous facilities. 6. New security gate on east entrance, site fencing, fencing around east end of final clarifier/aeration basin, and security cameras. 7. Facility improvements ranging from emergency generator, SCADA (primary field instruments, control panel, radio tower), or pump improvements for the following four lift stations: No. 46 Country Club (SCADA & Pump), No. 62 Rollingbrook (SCADA & Pump), No. 45 North Main #1 (SCADA & Generator), No. 73 Country Club Estates (SCADA & Pump). If the construction budget allows, the following lift stations and scope will be evaluated: No. 35 Big Missouri (SCADA & Generator), No. 41 Texas (SCADA & Generator), No. 43 Gulf Coast (SCADA), No. 47 Baker Road (SCADA & Generator). 8. Addition of an operator workstation in the Administration Building with human-machine interface (HMI), historian, printers, and ancillary routers, servers, and power supply. Improvements will be bid and constructed as a single package along with the flood improvements designed by ARCADIS under a separate authorization.

2 SERVICES TO BE PROVIDED BY ARCADIS Basic Services Task 1 Detailed Design 1.1 Kickoff Meeting ARCADIS will coordinate a kickoff meeting with key City of Baytown stakeholders to establish the goals, objectives, and expectations for the project. The meeting will be held at City facilities. Meeting agenda Meeting minutes to document key decisions and agreed action items Document Existing Treatment Processes and Equipment and Develop Control Strategies ARCADIS will conduct an initial workshop with COB operations staff to develop and document the current operational strategies for the plant. Once the existing treatment processes and equipment are documented on Process and Instrumentation Drawings (PIDs), ARCADIS will propose new primary field instruments, process analyzers, and operational strategies using the PIDs. A second workshop will be held to discuss the proposed PIDs. An Automation Control Strategy document will be developed documenting the proposed strategies for automated operations of each process area of the plant, and the requirements for the HMI. After review by the City, a third workshop will be held to review the Control Strategy document to gather feedback from operational staff. The results of this workshop will be used to finalize the PIDs and create a control narrative specification. Draft PIDs Draft Automation Control Strategy Final PIDs Contract Documents The scope of services will include detailed design drawings, bid documents, technical specifications, and cost estimates. The level of effort is based on the drawing list shown in Attachment A, for a single construction package. Definition of milestones and sequences for maintenance of plant operations during construction will be included in the technical specifications. ARCADIS will prepare a project manual that includes City-provided bidding documents, agreement, general and special conditions. ARCADIS will provide technical specifications based /31/2013 Page 2

3 on ARCADIS standard specifications. The Project Manual will be prepared in Microsoft Word format. Detailed design drawings and technical specifications signed and sealed by a Registered Professional in the State of Texas. Drawings will be developed using AUTOCAD. o 50% Design submittal Five half size 11x17 copies of 50% design drawings and draft specifications. AACE Class 3 estimate of probable construction costs. o 90% Design submittal Five half size 11x17 copies of 90% drawings and project manual. Two full size 22 x 34 drawings sets for submittal to Building Permits AACE Class 2 estimate of probable construction costs. o Bid-Ready Design submittal 3 full size 22x34 copies and 2 half size 11x17 copies of 100% drawings, and 5 copies of the project manual. Two disks with the documents saved in Adobe.pdf format. 1.4 Structural Design ARCADIS will retain the services of Stanley, Spurling & Hamilton, Inc. for the structural design of the grit facilities, security improvements, and emergency generator pads at the remote lift stations. 1.5 Design Submittal Workshops ARCADIS will coordinate two workshops with key City of Baytown stakeholders to review progress at the 50% and 90% milestone submittals. The purpose of the workshops will be to clarify design issues and to capture City comments to the design. The meetings will be held at City facilities. Workshop agenda Workshop comments recorded to document key decisions and agreed action items Regulatory Approval / Local Agency Approvals ARCADIS will submit a design report, drawings and specifications for review by TCEQ, and applicable local agencies. The general contractor will be responsible for obtaining permits as required to comply with the codes of the jurisdiction for the actual construction of the project. One set of a design report, specifications and 22 x 34 inch set of the drawings to TCEQ /31/2013 Page 3

4 Up to three sets of contract documents and 22 x 34 inch set of the drawings to local permitting agencies Task 2 Bid Phase Services Following the bid-ready design submittal, ARCADIS will provide Bid Phase services. The Bid Phase is expected to have a four-week duration. The following scope will be provided: Attend Pre-Bid meeting and site visit for prospective bidders Prepare and issue addenda Respond to bidder questions Bid evaluation / bid tabulation Recommendation of award Provide 3 copies of conformed contract documents to the City for its use in executing the construction contract Task 3 - Construction Phase Services Following award of the project and issuance of the Construction Notice to Proceed, ARCADIS will provide the following Construction Phase services scope over an 18-month construction period: Attend one pre-construction meeting Attend up to 18 periodic (monthly) construction progress meetings. Provide engineering services during construction for submittal reviews: approximately 100 submittals, technical operations and maintenance manuals, requests for information (RFIs), and contract change requests (CCRs). Participate in substantial and final completion inspections and punch lists. Prepare final acceptance certification. Prepare record drawings based on information provided by the construction contractor 3.2 Subconsultants Stanley, Spurling, and Hamilton will provide construction phase services as described in Subtask 3.1 for the structural portion of the work for which they performed the design. Additional Services Task 4 - Geotechnical Investigations Aviles Engineering, a professional geotechnical engineering firm registered in the State of Texas, will be retained to drill and collect soil borings, provide characterization of the subsurface soil /31/2013 Page 4

5 conditions, provide foundation construction recommendations, and provide an engineering report for the following areas: One 50-ft deep soil boring for the grit facility. One 25-ft deep soil boring for the described scope of work at each of the specified lift station sites. Task 5 Grit Characterization and Equipment Evaluation ARCADIS will collect samples of the WWTP influent following a rain event,and analyze the samples for grit particle size and settling characteristics. Using those results, ARCADIS will evaluate two alternative grit removal technologies (mechanical vortex PISTA type and gravity vortex HEADCELL type) with a cost comparison of the two alternatives. The City will assist in the collection of influent samples. Results of grit characterization testing Technical memorandum on vortex grit removal technology evaluation The services described in Tasks 1-5 constitute the complete scope of work to be performed by ARCADIS. Special Services The following services are not part of this scope of work, but may be performed by ARCADIS if requested by the City as an amendment to this scope. Resident project representative services on-site during construction Develop standard operating procedures Factory witness testing Additional site visits during construction Startup assistance Produce operations and maintenance manuals 11 th month warranty inspection Additional construction meetings Design of bid alternates Value engineering and re-design resulting from value engineering /31/2013 Page 5

6 SERVICES TO BE PROVIDED BY THE CITY The following services will be the responsibility of the City. Personnel and equipment for excavation to verify plant utilities and yard piping. Record drawings of existing plant buried utilities and process pipes. Participation in workshops. Timely review of milestone submittals. Coordination with other City departments (Flood Plain Management, Building Permits, Design Review Committee, Streets, etc ) On-site inspection of daily construction activities and coordination with the construction contractor, periodic construction meetings, review and approval of schedule and pay estimates, processing change orders, overall coordination with the contractor. SCHEDULE The services described herein will be completed according to the following milestones. Duration is in calendar days, starting from receipt of written notification-to-proceed. Milestone Complete 50% Design Duration 150 days 50% City Review and Workshop 21 days Complete 90% Design 90 days 90% City Review and Workshop 21 days Complete Bid Ready Contract Documents 40 days /31/2013 Page 6

7 COMPENSATION ARCADIS will provide the services described herein on a lump sum basis invoiced by phase (Design, Bid, Construction) with regular invoicing reflecting percent complete of each phase of work. The contract amount for the services described herein is $826,241.00, categorized as follows. A detailed summary is provided in Attachment C. Task Amount 1 Detailed Design $512, Bid Phase $13, Construction Administration $178, Geotechnical $ Grit Characterization and Evaluation $10, Reimbursable Expenses Design $11, Bid Phase $1, Construction $12, Subconsultants Design $79, Bid Phase $0.00 Construction $6, /31/2013 Page 7

8 CITY OF BAYTOWN Rev Date 1/13/2013 Central District WWTP Grit, SCADA, and Security Improvements Project No ATTACHMENT C FEE ESTIMATE FOR ARCADIS Prinicpal Project Manager Process Engr Civil Engr Electl Lead Elec Engr SCADA Lead I&C Engr SCADA Engr Sr CAD Jr Cad QC Admin Total Task Description Gr 11 Gr 10 Gr7 Gr8 Gr10 Gr7 Gr10 Gr9 Gr7 Gr6 Gr4 Gr10 Gr5 Labor Reimbursable Costs Subconsultants Total I. BASIC SERVICES 1 Detailed Design 1.1 Kickoff Mtg $ 1,899 $ - $ - $ 1, Doc Ex Processes & Equipment/Control Strategies $ 24,502 $ 5,122 $ - $ 29, Contract Documents Drawings $ 464,905 $ 960 $ - $ 465,865 Project Manual $ 9,591 $ 66 $ - $ 9,657 Cost Estimates $ 3,327 $ - $ - $ 3, Structural Design (Stanley Spurling & Hamilton) $ 1,297 $ 66 $ 22,000 $ 23, Workshops $ 4,466 $ 4,156 $ - $ 8, Regulatory Approvals $ 2,274 $ 66 $ - $ 2,340 Subtotal $ 512,262 $ 10,436 $ 22,000 $ 544,698 2 Bid Phase Services $ 13,819 $ 1,292 $ - $ 15,111 3 Services During Construction 3.1 Construction Administration $ 176,820 $ 12,496 $ 6,600 $ 195, Building SDC (Stanley Spurling & Hamilton) $ 1,297 $ 198 $ - $ 1,495 Subtotal $ 178,117 $ 12,694 $ 6,600 $ 197,411 Total $ 704,199 $ 24,422 $ 28,600 $ 757,221 II. ADDITIONAL SERVICES 4 Geotechnical $ 683 $ 204 $ 40,700 $ 41,587 5 Grit Characterization and Evaluation $ 10,527 $ 406 $ 16,500 $ 27,433 Total $ 11,210 $ 610 $ 57,200 $ 69,020 TOTAL AUTHORIZATION ,095 $ 715,409 $ 25,032 $ 85,800 $ 826,241

9 CITY OF BAYTOWN CENTRAL DISTRICT WWTP FEE ESTIMATE FOR ENGINEERING SERVICES FOR GRIT IMPROVEMENTS ATTACHMENT A LIST OF DRAWINGS No. Dwg No. DRAWING DESCRIPTION 1 G 1 Index of Drawings 2 C 1 Site Plan 3 C 2 Paving, Grading, and Drainage Plan 4 C 3 Yard Piping 5 C 4 Lift Station 1 Site Plan 6 C 5 Lift Station 2 Site Plan 7 C 6 Lift Station 3 Site Plan 8 C 7 Lift Station 4 Site Plan 9 D 1 Bar Screen Area Demolitin 10 D 2 Grit Chamber Area Demolition Structural 11 S 1 Grit Foundation Plan 12 S 2 Grit Intermediate Channel Plan 13 S 3 Grit Deck Plan 14 S 4 Lift Station 1 Structure 15 S 5 Lift Station 2 Structure 16 S 6 Lift Station 3 Structure 17 S 7 Lift Station 4 Structure 18 S 8 Sections 19 S 9 Sections 20 S 10 Details Process Mechanical 21 M 1 Overall Headworks Plan 22 M 2 Bar Screen Area Plan 23 M 3 Bar Screen Area Sections 24 M 4 Grit Area Plan 25 M 5 Grit Area Sections 26 M 6 Grit Area Sections 27 M 7 Grit Classifier/Wash Area Plan and Section 28 M 8 Lift Station 1 Plans & Details 29 M 9 Lift Station 2 Plans & Details 30 M 10 Lift Station 3 Plans & Details 31 M 11 Lift Station 4 Plans & Details 32 M 12 Sections 33 M 13 Details Electrical 34 E 1 Legend 35 E 2 Abbreviations 36 E 3 Overall Site Plan 37 E 4 Primary Elec Bldg Plan 38 E 5 Headworks Single Line Diagram 39 E 6 Bar Screen Area Power Plan 40 E 7 Grit Tank Area Plan A - 1

10 CITY OF BAYTOWN CENTRAL DISTRICT WWTP FEE ESTIMATE FOR ENGINEERING SERVICES FOR GRIT IMPROVEMENTS ATTACHMENT A LIST OF DRAWINGS No. Dwg No. DRAWING DESCRIPTION 41 E 8 Grit Classifer/Washer Area Plan 42 E 9 Aeration Basin 1 Plan 43 E 10 Aeration Basin 2 Plan 44 E 11 Final Clarifier 1 Plan 45 E 12 Final Clarifier 2 Plan 46 E 13 Chlorine Contact 47 E 14 Quiscent Basin 48 E 15 Outlet 49 E 16 Thickener 50 E 17 Sludge Pump Station 51 E 18 Aerobic Digesters 52 E 19 Nonpotable System 53 E 20 Blowers 54 E 21 Belt Press System 55 E 22 Plant Recycle Pump Station 56 E 23 Remote Site LS 1 57 E 24 Remote Site LS 2 58 E 25 Remote Site LS 3 59 E 26 Remote Site LS 4 60 E 27 Admin Bldg Plan 61 E 28 Control Schematics 62 E 29 Control Schematics 63 E 30 Control Schematics 64 E 31 Control Schematics 65 E 32 Control Schematics 66 E 33 Control Schematics 67 E 34 Panelboard Schedule 68 E 35 Panelboard Schedule 69 E 36 Conduit Schedule 70 E 37 Conduit Schedule 71 E 38 Conduit Schedule 72 E 39 Conduit Schedule 73 E 40 Conduit Schedule 74 E 41 Conduit Schedule 75 E 42 Details 76 E 43 Details Instrumentation 77 I 1 Legend 78 I 2 WWTP Network Architecture 79 I 3 Remote Sites Network Architecture 80 I 4 Security Block Diagram 81 I 5 PID Bar Screens 82 I 6 PID Headworks 83 I 7 PID Aeration Basins 84 I 8 PID Final Clarifiers / RAS A - 2

11 CITY OF BAYTOWN CENTRAL DISTRICT WWTP FEE ESTIMATE FOR ENGINEERING SERVICES FOR GRIT IMPROVEMENTS ATTACHMENT A LIST OF DRAWINGS No. Dwg No. DRAWING DESCRIPTION 85 I 9 PIDs Chlorine Contact 86 I 10 PID Quiscent Basin 87 I 11 PID Outlet 88 I 12 PID Thickener 89 I 13 PID Sludge Pump Station 90 I 14 PID Aerobic Digesters 91 I 15 PID Nonpotable System 92 I 16 PID Blowers 93 I 17 PID Belt Press System 94 I 18 PID Plant Recycle Pump Station 95 I 19 PID Remote Site LS 1 96 I 20 PID Remote Site LS 2 97 I 21 PID Remote Site LS 3 98 I 22 PID Remote Site LS 4 99 I 23 Installation Details I 24 Installation Details I 25 Control Panel Elevations I 26 Control Panel Elevations I 27 Control Panel Elevations 3 A - 3

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

Scope of Work Temecula Valley Regional Water Reclamation Facility 23 MGD Expansion Engineering Services During Construction

Scope of Work Temecula Valley Regional Water Reclamation Facility 23 MGD Expansion Engineering Services During Construction CH2M HILL 6 Hutton Centre Drive Suite 700 Santa Ana, CA 92707 Phone: 714.429.2000 Fax: 714.429.2050 November 12, 2015 Mr. Erik Jorgensen, P.E. Eastern Municipal Water District 2270 Trumble Road Perris,

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

Volume V of V SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER ELECTRICAL SYSTEM ASSESSMENT PROJECT SAWS JOB NO APRIL, 2012

Volume V of V SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER ELECTRICAL SYSTEM ASSESSMENT PROJECT SAWS JOB NO APRIL, 2012 in association with FINAL REPORT SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER ELECTRICAL SYSTEM ASSESSMENT PROJECT SAWS JOB NO. 11-6501 APRIL, 2012 Final Submittal This document is released

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

MnDOT Contract Exhibit A - Scope of Services

MnDOT Contract Exhibit A - Scope of Services Introduction Information Introduction This Scope of Services represents work on two individual highway improvement projects as described below. The State intends to let two of the projects as separate

More information

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum SECTION 013201 - SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum Pay Unit price breakdown) shall be developed and ultimately

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

ADDENDUM NO. 01 July 20, 2012

ADDENDUM NO. 01 July 20, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 01 THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE BID PACKAGE

More information

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

MnDOT Contract Exhibit A- Scope of Services. Project Information -

MnDOT Contract Exhibit A- Scope of Services. Project Information - Detail Design For Pedestrian Improvements on Trunk Highways 23, 59, and 68 In the Marshall Area Introduction and Project Information Introduction The purpose of this contract is to provide the State with

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

LIVELIFE.TRAVELWELL. DesignStandardsManual GeneralStandardsandCriteria DenverInterna onalairport AirportInfrastructureManagement

LIVELIFE.TRAVELWELL. DesignStandardsManual GeneralStandardsandCriteria DenverInterna onalairport AirportInfrastructureManagement LIVELIFE.TRAVELWELL. DesignStandardsManual GeneralStandardsandCriteria DenverInterna onalairport AirportInfrastructureManagement Copyright 1989-2017 by Denver International Airport All rights reserved

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Merrick Pet Care New Distribution Center Hereford, Texas

Merrick Pet Care New Distribution Center Hereford, Texas Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks. Scope of Services Project Understanding The City of Sparks (City) has also requested the HDR Engineering, Inc. (HDR) provided limited shop drawing review and periodic observation during construction and

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

Detail Design for State Project

Detail Design for State Project Introduction and Project Information Detail Design for State Project 4210-49 Introduction This contract includes detailed design to letting for the shoulder widening of Trunk Highway (TH) 68 between the

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

APPLICATION FORM FOR INFRASTRUCTURE NOC

APPLICATION FORM FOR INFRASTRUCTURE NOC APPLICATION FORM FOR INFRASTRUCTURE NOC Submission Type New Resubmission (Previous Reference No): Arch. Str. HVAC EHS Others Revision /Amendment (Infrastructure NOC Reference No): Arch. Str. HVAC EHS Others

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP

Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP PRESENTATION AGENDA Project Background and Goals for GR WWTP WAS

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

A. Dewatering observation wells are part of dewatering allowance.

A. Dewatering observation wells are part of dewatering allowance. SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

Construction Services Architect / Engineers Guidelines

Construction Services Architect / Engineers Guidelines Construction Services 2016 Architect / Engineers Guidelines TL Architect/Engineer Fee Proposal Format Fee proposals should be formatted in the following content order: Client Information: Project Name:

More information

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16

More information

Facility P&ID Drawings and why you need them!

Facility P&ID Drawings and why you need them! and why you need them! Graham Nasby City of Guelph Water Services Guelph, Ontario, Canada 2018 ISA Water/Wastewater & Automatic Controls Symposium (WWAC) 7-9 August 2018, Bethesda, Maryland, USA No part

More information

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

Document Archival System Guidelines

Document Archival System Guidelines Document Archival System Guidelines Engineering & Campus Planning Texas A&M University Kingsville Last Updated: January 13, 2009 Table of Contents I. Purpose II. III. Methodology Processing Project Documents

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

Thurston County Permitting System Policies &Procedures Page: 1 of 3

Thurston County Permitting System Policies &Procedures Page: 1 of 3 Thurston County Permitting System Policies &Procedures Page: 1 of 3 Number: Title: ONST.11.POL.802 APPLICATION OF RECOMMENDED STANDARDS AND GUIDANCE FOR PRESSURE DISTRIBUTION SEWAGE SYSTEMS July 2009 VERSION

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION / / Date Received by NSCA Office / / Submittal Expiration Date Owner s Name: Tract:

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 08/29/2016 Job #: 289-11150 Submittal #: D-11235-001-A

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

Vanderbilt University Standard Specification Revised 2/6/08

Vanderbilt University Standard Specification Revised 2/6/08 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides

More information

TAB B-9 RECORD DRAWINGS

TAB B-9 RECORD DRAWINGS TAB B-9 RECORD DRAWINGS Project record drawings and shall be prepared for all University of Arizona projects. The concept Record Drawings shall replace what has previously been called As-Builts. During

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS. Date: January 26, 2001

PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS. Date: January 26, 2001 PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS Date: January 26, 2001 Portage County Water Resources Drafting Standards. AutoCad 2000/Land Development Desktop R2 Friday, January 26, 2001 Preface: Part

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division Guidelines and Checklist For SAWS Sanitary Sewer Developmental Engineering Division INITIAL CONSIDERATIONS UTILITY SERVICE AGREEMENT Utility Service Agreement A Utility Service Agreement (USA) will be

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR ADDENDUM NO. 1 November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR North District Pre-Development Studies Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

I. MINUTES OF THE PRE-BID CONFERENCE

I. MINUTES OF THE PRE-BID CONFERENCE Addendum No. 1 June 8, 018 Allegany College of Maryland Softball Field Murphy & Dittenhafer Project No. 17118 1401 Willowbrook Road, Cumberland, MD 150 Abbreviations: ACM: Allegany College of Maryland,

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS 510.1 Emergency responder radio coverage in new buildings. Approved radio coverage for emergency responders shall be provided within all buildings meeting any one of the following conditions: 1. There

More information

Section XV - PER, Design, and Construction Submittal Requirements

Section XV - PER, Design, and Construction Submittal Requirements Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

Somerset Homeowners Association Board Meeting Minutes Tuesday, July 12, 2011

Somerset Homeowners Association Board Meeting Minutes Tuesday, July 12, 2011 Somerset Homeowners Association Board Meeting Minutes Tuesday, July 12, 2011 Board Members: Mike Atkins, Dave Edwards, Ajay Sreenivas Property Manager: Al Orendorff, Legal Mark Biddison Community: Garret

More information