1 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 01 THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE BID PACKAGE BID FORM FOR BID PACKAGE 114 This addendum forms a part of the Contract Documents and modifies the original bidding documents only to the extent specifically shown and noted below. All other conditions shall remain the same. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. BP 114 MECHANICAL SYSTEMS: 1. A Pre-Bid Walk was held on July 18, The agenda and sign-in sheets are included in this Addendum as an attachment. 2. Bid Date and Time for Bid Package 114 as listed in INVITATION TO BID shall change to August 09, 2012 at 2:00 PM. Location to remain the same. 3. Add the following paragraph to SUMMARY OF WORK, 2.04 Specific Exclusions: E. Furnish, Excavate, Install and Test Underslab Piping at Activated Sludge Basin #1, Activated Sludge Basin #2 and Secondary Clarifier #4, including associated thimbles and drains, as highlighted in Addendum #1 Underslab Piping Scope Drawings Revise the following paragraphs in INSTRUCTIONS TO BIDDERS, 0.11 Bidder Responsibility and Bid Responsiveness, D Supplemental Bidder Responsibility Criteria, 1. Criteria as follows (changes are italicized): ii. During the year 2002 or more recently, the Bidder shall have successfully completed through substantial completion at least three projects with at total mechanical subcontract value or General Contractor value (if Bidder was acting as General Contractor) of at least $8,000,000 performing work in an industrial/municipal facility that remained in operation during the construction period. iii. During the year 2002 or more recently, Bidder shall have successfully completed through substantial completion at least one project with a total mechanical subcontract cost of at least $2,000,000 performing work at a wastewater treatment facility or water treatment facility. v. During the year 2006 or more recently, Bidder or outside source to be hired by Bidder shall have used Building Information Modeling (BIM) for coordination purposes on at least three projects. 5. Drawings 030-Y-106 and 310-M-102 were not printed correctly in the Conformed Documents. Replace drawings 030-Y-106 and 310-M-102 with the corresponding drawings attached in this Addendum. ATTACHMENTS: 1. July 18, 2012 Pre-bid Walkthrough Agenda 2. July 18, 2012 Pre-bid Walkthrough Sign-in sheets 3. Underslab Piping Scope Drawings Drawing 030-Y Drawing 310-M-102 End of Addendum No. 01 ADDENDUM No. 01 Page 1 of 1
2 I. Introductions of Team City of Bellingham Carollo Engineers Mortenson AGENDA Post Point Wastewater Treatment Plant Improvements July 18, 2012 Bid Package Mechanical Systems PRE-BID INFORMATIONAL MEETING II. III. Project Description Overall project scope Work Restrictions Scope of BP 114 Demolition Equipment Process Piping Utility Piping Trenching Pipe Supports Fire Protection HVAC Storage and installation of PEPS Pumps Mechanical Tie-Ins PEPS Pump Replacement RAS Valve Replacement ASB 2&3 Effluent Box Secondary Effluent Tie In Bulkheads Coordination Between BP 114 & 115 3D Coordination Model Submittal Review Coordination of VFDs Installation of Instruments Startup & Testing GC/CM Process Description GC/CM role and responsibility Mortenson is the GC/CM for the project. Project administration of the Construction Contract Bid process / requirements (sealed bid, time & place, no exceptions / deviations, questions/substitution request 7 days prior) Supplemental Bidder Criteria Bidding a complete scope No proposals or exclusions Bid Form Bid security due at bid time Payment and Performance Bond within 7 calendar days of issuance of Subcontract Bid Alternate 1 - Headworks Bypass Explanation of Contract Documents (Conformed Set) Bidders Manual, Dated July 9, 2012 Volume 1: Project Manual - Div 00, Dated July 9, 2012 Volume 2: Technical Specs - Div Volume 3: Technical Specs - Div Volume 4: Contract Drawings
3 Additional Information: Geotechnical Report Hazardous Materials Reports As-Built Drawings Mortenson Safety Manuals Specific front end specs that bidders should read/understand IV. Site Specific Items of Interest Condition of existing operating plant Site Access Laydown Area Parking (requirement to carpool during peak construction loads) Contractors responsible for their own trailers V. Project Requirements Mortenson Zero Injuries program (stretch and bend, drug testing, safety plan, glasses, vests, gloves, hard hats) Live Utility Awareness Work Plans Last Planner: Constraint and Variance Tracking Prevailing Wage Requirements Exhibit F Collective Bargaining Agreements Good neighbor plan VI. VII. VIII. Upcoming Addendum Supplemental Bidder Criteria U/S Piping Contractor Questions Site Walk
4 Post Point Wastewater Treatment Plant Improvements BP 114 Pre-Bid Walkthrough July 18, 2012 mil1 Mortenson construction Sign in Sheet '''ti_ \),\val)!:-0~~ M.~S.>tJ C:?/e--M... L/2..S- ~17 >.1.fc»i CoM. = / )?: s ~ NN e,,.~45'& l'l ;J. $.,.,e..s' ~~ JIM/?QqQ,_ YJfk;,J,. _;.:a }tJi) A#el2.. 3tr UISf Q. ~ u.,..&. ~. ~ CJU6/J ~})~ 't& "'.,etj t'j!zr/ r1ri~._0:idk'.,jikud1'1tlj ~ l3<-y"a l-hai~\q_,~ \:;i(n'li+ ~ 'i2.s -~"iil-3l~j. _b~~~ ~ ;c.wif-.c.o"" o,:1-+ 5borv1 ~' ew i+ Me..c..h aolo- as5- <a t4(., A). a.+t~ 6loo"11@ \t'...ie."vi +. c \~'o~ ---~ ~ ~~,11~-~s~ -1~~~ ~~ _i{a.~\_l >vj:t_v G\( ~ 77t-- 7~ 53 ~CJJ rf Q-~. OR~_, C~-O~LOo..L._6' c,. p..,"to'-'o $/o-9l ~ - 'l ' 8? c.ofeo~-~c.c..._~. ~.f!\.
5 Post Point Wastewater Treatment Plant Improvements BP 114 Pre-Bid Walkthrough July 18, 2012 Sign in Sheet O<.; >ElLttY. ~v~c''$ U~ 7 - ~ ~ ~~~ Sl-J/NG-<._O -- Mortenson construction l~~~d '8 c~rr I t\ ' '- A " I ~' c /4,~ r St\\s= I t
6 Addendum 01 Underslab Piping Scope Drawing 1 of 7
7 Addendum 01 Underslab Piping Scope Drawing 2 of 7
8 Addendum 01 Underslab Piping Scope Drawing 3 of 7
9 Addendum 01 Underslab Piping Scope Drawing 4 of 7
10 Addendum 01 Underslab Piping Scope Drawing 5 of 7
11 Addendum 01 Underslab Piping Scope Drawing 6 of 7
12 Addendum 01 Underslab Piping Scope Drawing 7 of 7
13
14
ADDENDUM NO. 02 July 31, 2012
Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON
More informationCITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES
CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationWTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE
WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationHUSSEY GAY BELL SAVANNAH, GEORGIA
HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 PROJECT: Miraloma Elementary School DATE: March 24, 2016 175 Omar Way, SF,
More informationCITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT
CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:
More informationCONVEYANCE PIPELINE AND PUMP STATION
SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationAddendum No. 1 page 1
Addendum No. 1 page 1 Project: 2018 Interior Renovations Jeffersonville Township Public Library Jeffersonville Facility Jeffersonville, Indiana Project No.: 1723.01 Date: April 12, 2018 This addendum is
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationAddendum No. 4 page 1
Addendum No. 4 page 1 Project: Proj. No: 1541.01 Athletic Support Building and Site Improvements Woehrle Athletic Complex Jeffersonville, Indiana Date: December 11, 2015 This addendum is a part of the
More informationSoftware Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationState College of Florida, Manatee-Sarasota
State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE
More informationBid No. B14-02 Building 100 HVAC Improvements
Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationAnswer: Only to ChurchWoods, LLC.
ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements
More informationPALM COAST WASTEWATER TREATMENT PLANT NO. 2
ITB-CD-CME--0 ADDENDUM NO. PALM COAST WASTEWATER TREATMENT PLANT NO. ISSUE DATE: December 0, 0 BID DATE: January 0, 0 SUBJECT: Statements, Questions and Answers INTENT: This addendum is issued prior to
More informationADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01
ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014
More informationADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center
ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More informationADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions
More information2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS
PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationCity of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2
City of Waltham Purchasing Department Waltham, Massachusetts 02452 ADDENDUM NO. 2 Plans & Specifications for: Elsie Turner Field & Graverson Playground, Waltham, MA TO: ALL PLAN HOLDERS This Addendum No.
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationJune 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA
June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June
More informationSection XV - PER, Design, and Construction Submittal Requirements
Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department
More informationTELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationNEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017
NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon
More informationCHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO. 18-04 ADDENDUM NO. ONE DATE: September 07, 27 CLIENT / PROJECT: Chabot-Las Positas CCD Campus Master
More informationADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION
July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,
More informationSECTION SUBMITTALS
SECTION 01300 SUBMITTALS PART 1- GENERAL 1.01 SCOPE OF WORK A. This Section specifies the general methods and requirements of submissions applicable to Shop Drawings, Product Data, Samples and Operations
More informationCompany. Signed: Date:
ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET
More information05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:
ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,
More informationTaylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES
SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working
More informationAnswer: Qualification statement should be provided with the bid.
Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street
More informationFAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014
FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders
More informationRenewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.
Renewable Water Resources Greenville, South Carolina CONTRACT DOCUMENTS ADDENDUM III - CONTRACT REVISIONS Prepared by Black & Veatch Corporation Greenville, South Carolina B&V Project No. 192263 September
More informationREGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV
REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract
More informationSANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS
SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications
More information10930 W. Sam Houston Parkway N., Suite 900
ADDENDUM NO. 1 10930 W Sam Houston Pkwy. North Suite 900 Houston, Texas 77064 281.664.1900 281.664.1912 (f) www.salasobrien.com March 21, 2018 Project: Prepared by: Taylor Career Center Welding Labs Beaumont
More informationJanuary, 2014 Page 1 of 5
Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development
More informationCITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE
San Francisco Water Power Sewer CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE Seivices of the San Francisco Public Utilities Commission Signatures: OCEANSIDE WATER
More informationSECTION PROJECT MANAGEMENT AND COORDINATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationFAST TRACK WORKSHOP OBJECTIVES
1 FAST TRACKING FAST TRACK WORKSHOP OBJECTIVES TO UNDERSTAND: 1. WHY ARE CRITICAL PATH ( FAST TRACK ) DESIGN SUBMITTAL PACKAGES ALLOWED 2. WHEN IS FAST TRACK ALLOWED 3. WHEN IS THE CONTRACTOR ALLOWED TO
More informationCone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference
Cone HVAC Modernization Thursday, September 1, 2016 Pre Proposal Conference Meeting Agenda Part I: General Part II: Submittal Part III: Project Overview Part IV: Questions General Welcome Introductions
More informationSAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors
More informationAttached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.
Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.
More informationWATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:
WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced
More information[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]
SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each
More informationMontclair, NJ ADDENDUM NO. 2. Request for Proposal # 1144 Digital Printing Services and Photocopying June 17, 2014
Montclair, NJ 07043 ADDENDUM NO. 2 Request for Proposal # 1144 Digital Printing Services and Photocopying June 17, 2014 Date of Original Bidding Documents: May 16, 2014 Addendum No. 1: June 10, 2014 INTENT:
More informationSECTION OPERATION AND MAINTENANCE DATA
SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.
More informationScope of Work Temecula Valley Regional Water Reclamation Facility 23 MGD Expansion Engineering Services During Construction
CH2M HILL 6 Hutton Centre Drive Suite 700 Santa Ana, CA 92707 Phone: 714.429.2000 Fax: 714.429.2050 November 12, 2015 Mr. Erik Jorgensen, P.E. Eastern Municipal Water District 2270 Trumble Road Perris,
More informationJUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD
JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16
More informationTELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:
More informationRFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions
RFP #1587 - CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions 1. Question: Spec requires connects to bitrans, are you going to modify the specs? Answer: City of Culver City s ATCS
More informationSECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,
More informationChuck Caesar. VIA: /Webposting April 27, 2017
VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John
More informationTOWN of LAKESHORE SITE PLAN CHECKLIST
TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS
SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationProcurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202
Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 May 24, 2017 ADDENDUM NUMBER: Three (3) TITLE: Construction Services for Arlington
More informationADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement
ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR RFQ/RFP 15P40 Campus Center East HVAC Unit Replacement CHAFFEY COMMUNITY COLLEGE DISTRICT February 26, 2015 CHAFFEY COMMUNITY
More informationRenewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM IV - CONTRACT REVISIONS.
Renewable Water Resources Greenville, South Carolina CONTRACT DOCUMENTS ADDENDUM IV - CONTRACT REVISIONS Prepared by Black & Veatch Corporation Greenville, South Carolina B&V Project No. 192263 October
More informationINVITATION FOR BID (IFB) IFB NO. GSWA
INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST
More informationMPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts
MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors
More informationMerrick Pet Care New Distribution Center Hereford, Texas
Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationA. SAFETY B. SCHEDULE
O.A.C. WEEKLY CONSTRUCTION MEETING January 18, 2016 Meeting - #21 UCC Bonnie J. Ford Health, Nursing & Science Center - ACCO Job #14-0965 cc: file Weekly O.A.C. Meeting Held @ 1:00 PM in ACCO Job Trailer
More informationRE: City of Summersville, Glade Creek Phase llb
STAFFORD CONSULTANTS INCORPORATED Engineering, Design, and Consulting Planning and Environmental Services To: Armstrong Utilities Chojnacki Construction CI Thornburg Cooks Excavating Contractor s Association
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017
Procurement Services Lucas Administrative Center, 617 1 Nunn Drive Highland Heights, KY 41099 859.572.6605 FAX 859.572.6995 ADDENDUM NO: 1 IFB/RFP No: NKU-22-18 Commodity: Kentucky Hall Renovation Date:
More informationValley Road Main Replacement
Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not
More informationDIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationThis addendum forms a part of the Contract Documents dated: August 10, 2012.
Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911
More informationADDENDUM TO RFP DOCUMENTS
Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationADDENDUM NUMBER ONE (1) For. Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation
ADDENDUM NUMBER ONE (1) For Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation Addendum Date: Thursday, May 4, 2017 GENERAL: A. This addendum is hereby made a part
More informationSUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE
(Project) (Date) (Location) Turner Job # (TBD) Item No. 15 SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE (Location) TURNER CONTRACT
More informationSECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.
More informationADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)
ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation
More informationADDENDUM NO. 04 April 04, 2012
Post Point Wastewater Treatment Plant Improvements Owner: Engineer: CM/GC: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 04 April 04, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED
More informationCertificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.
INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More information