1 Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not provided Description Scheduled Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Value Unit Price Price Price Price Price Price Price Price Price Price Price Price Price Price 1. Mobilization, Bonds, and Insurance (See Note 2) 57, , , , , , , , , , , , , , Demobilization and Cleanup 7, , , , , , , , , , , , Sheet P-1, 12-inch Cl 350 Push-On ductile iron 450 pipe (transmission main - including excavation, bedding, polyethylene wrap, valves, fittings and backfill). LF , , , , , , , Sheet P-1, 12-inch Cl 350 Restrained ductile iron 100 LF , , , , , , , Sheet P-1, Additional Cost for 6-inch PE gas main in common trench with Item 3 (including material, excavation, bedding and backfill). 160 LF , , , , , , , Sheet P-1, 2-inch service tap and PE line to connect to existing 2-inch service at Sta 7+42 (installed complete in-place). 3, , , , , , , , , , , , , , Sheet P-2, 12-inch Cl 350 Push-On ductile iron 320 LF , , , , , , , Sheet P-2, 12-inch Cl 350 Restrained ductile iron 270 LF , , , , , , , Sheet P-2, Additional Cost for 6-inch PE gas main in common trench with Items 6 & 7 (incl material, excavation, bedding and backfill). 295 LF , , , , , , , Sheet P-2, 1-in Service Reconnection to 12-inch 2 EA 5, , , , , , , , , , , , , , Sheet P-2, 24-inch Steel Casing (complete inplace). 40 LF 1, , , , , , , , , , , Sheet P-2, Concrete Encasement of 12-inch line (complete in-place). 20 LF , , , , Sheet P-3, 12-inch Cl 350 Push-On ductile iron 22 LF , , , , , , , Page 1 of 5
2 14. Sheet P-3, 12-inch Cl 350 Restrained ductile iron 15. Sheet P-3, 3/4-in Service Reconnection to Sheet P-3, 1-1/2-in Service Reconnection to Sheet P-4, 12-inch Cl 350 Push-On ductile iron 18. Sheet P-4, 12-inch Cl 350 Restrained ductile iron 19. Sheet P-4, 24-inch Steel Casing (complete inplace). 20. Sheet P-4, 3/4-in Service Reconnection to Sheet P-4, 1-in Service Reconnection to 12-inch 22. Sheet P-4, 1-1/4-in Service Reconnection to Sheet P-5, 12-inch Cl 350 Push-On ductile iron 24. Sheet P-5, 12-inch Cl 350 Restrained ductile iron 25. Sheet P-5, 1-1/2-in Service Reconnection to Sheet P-5, 2-in Service Reconnection to 12-inch 27. Sheet P-6, 12-inch Cl 350 Push-On ductile iron 28. Sheet P-6, 12-inch Cl 350 Restrained ductile iron 29. Sheet P-6, 24-inch Steel Casing (complete inplace). 528 LF 12 EA 315 LF 235 LF 36 LF 5 EA 2 EA 331 LF 229 LF 75 LF 280 LF 98 LF Construction Co., Construction, Construction, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Page 2 of 5
3 30. Sheet P-6, 2-in Service Reconnection to 12-inch 31. Installation of Connection Detail 1 as shown on. 32. Installation of Connection Detail 2 as shown on. 33. Installation of Connection Detail 3 as shown on. Sta & Installation of Connection Detail 4 as shown on. 35. Installation of Connection Detail 5 as shown on. 36. Installation of Connection Detail 1 as shown on Sheet D-2 of the Drawings (including excavation, bedding, pipe,valves, fittings and backfill). 37. Installation of Connection Detail 2 as shown on Sheet D-2 of the Drawings (incl excavation, bedding,. 38. Installation of Connection Detail 3 as shown on Sheet D-2 of the Drawings (incl excavation, bedding,. 39. Installation of Connection Detail 1 as shown on Sheet D-3 of the Drawings (incl excavation, bedding, 40. Installation of Connection Detail 2 as shown on Sheet D-3 of the Drawings (incl excavation, bedding, encasement, 41. Installation of Connection Detail 1 as shown on Sheet D-4 of the Drawings (incl excavation, bedding, encasement, valves, fittings and backfill) 42. Installation of Connection Detail 2 as shown on Sheet D-4 of the Drawings (incl excavation, bedding, encasement, 2 LS Construction Co., Construction, Construction, 5, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Page 3 of 5
4 43. Installation of Connection Detail 1 as shown on Sheet D-5 of the Drawings (incl excavation, bedding, encasement, 44. Installation of Connection Detail 2 as shown on Sheet D-5 of the Drawings (incl excavation, bedding, 45. Installation of Connection Detail 1 as shown on 46. Installation of Connection Detail 2 as shown on 47. Installation of Connection Detail 3 as shown on 48. Installation of Connection Detail 1 as shown on Sheet D-7 of the Drawings (incl excavation, bedding, 49. Installation of Connection Detail 2 as shown on Sheet D-7 of the Drawings (incl excavation, bedding, 50. Installation of Connection Detail 1 as shown on Sheet D-8 of the Drawings (incl excavation, bedding, 51. Abandonment of Valley No. 1 Pump Station as shown on Sheet D-11 of the Drawings (including slurry filling of vault). 52. Conversion of Valley No. 1 Pump Station to a Pressure Reducing Station as shown on Sheet D-12 of the Drawings. 53. Abandonment of the Hood Regulator as shown on Sheet D-13 of the Drawings. 54. Abandonment of the Timber Regulator as shown on Sheet D-13 of the Drawings. 55. Furnish, Install and Maintain Temporary Asphalt Pavement Patch. 56. Furnish and Install Permanent Asphalt Pavement Patch in Depth Mill and Fill Asphalt Pavement Replacement (meeting City of Reno Requirements) 58. Furnish and Install 12-inch Check Valve in 60- inch Manhole Structure 12,750 SF 17,500 SF 39,000 SF Construction Co., Construction, Construction, 11, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Page 4 of 5
5 Construction Co., Construction, Construction, 59. Furnish and Install 14-inch Line Stop Incl 14, , , , , , , , , , , , , , Furnish and Install 12-inch Line Stop Incl. 12, , , , , , , , , , , , , , Furnish and Install 6-inch Line Stop Incl 6, , , , , , , , , , , , , , Type III Curb & Gutter (per the Standard 50 LF Specifications) , , , , , , , ft wide by 4-inch PCC Sidewalk (per Standard 200 SF Specifications , , , , , , , Furnish, Install and Maintain Traffic Control for the project during the duration of the Work. 120, , , , , , , , , , , , , , Installation of Connection Detail as described in Item 4 of Addendum 1 (incl excavation, bedding,. 9, , , , , , , , , , , , Installation of Temporary Flush Assembly as described in Item 5 of Addendum 1 (incl excavation, bedding,. 6, , , , , , , , , , , , Total Bid Price $1,376, $1,323, $1,395, $998, $950, $1,032, $1,152, Total Bid Price Written in Words? y/n * Bidder Information Provided Licensing Information Provided Disclosure of Principals Provided Referenced Provided Debarment & Safety Information Provided Labor and Equipment Rate Schedules Provided Subcontractors Listed Proposal Summary Executed *indicates corrected total Page 5 of 5
STANDARD BID ITEM NUMBERS
10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation
More informationBID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM
PATTERSON AVENUE 101 Mobilization, Bonds, Insurance LS 1 $40,000.00 $40,000.00 $22,072.00 $22,072.00 102 18-Inch SDR-26 PVC Sanitary Sewer Line Installation LF 1048 $275.00 $288,200.00 $334.00 $350,032.00
More informationRiverside County Flood Control & Water Conservation District
10/11/2018 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI G.J. GENTRY GENERAL ENGINEERING, INC. 1 MOBILIZATION L.S. 1 $100,000.00 $100,000.00 $48,000.00 $48,000.00 $88,580.77 $88,580.77 2 WATER
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 PROJECT: Miraloma Elementary School DATE: March 24, 2016 175 Omar Way, SF,
More informationMiscellaneous. Demolition
Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt
More informationBID SET C1.1 8 LEGEND UTILITY NOTES GENERAL NOTES CONCRETE & PAVEMENT NOTES DEMOLITION NOTES GENERAL NOTES UTILITY OWNERSHIP
GENERAL NOTES UTILITY NOTES DEMOLITION NOTES UTILITY OWNERSHIP LEGEND CONCRETE & PAVEMENT NOTES 1 1 Exp. 1-31-01 0-1-01 C1.1 GENERAL NOTES F ST. FROM ROCK BLVD TO 1TH ST. 1TH ST. FROM PRATER TO F ST. 110
More informationROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS
More informationAppendix C Construction Details
7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses
More informationREGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV
REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract
More informationRiverside County Flood Control & Water Conservation District
9/28/2016 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI H & H GENERAL CONTRACTORS, INC. 1 MOBILIZATION L.S. 1 $50,000.00 $50,000.00 $106,571.00 $106,571.00 $180,000.00 $180,000.00 2 WATER CONTROL
More informationVILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.
Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND
More informationImmediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court
Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board
More informationSECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS
9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a
More informationKC Water Rules and Regulations For Water Main Extensions and Relocations
KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made
More informationHUSSEY GAY BELL SAVANNAH, GEORGIA
HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in
More informationMunicipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS
Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS 2016 20.02 M 20.03 M 20.03 SP 20.04 M 20.04 M 20.04 M 20.06 M 20.06 M 20.07 M 20.07 M 20.08 M 20.08
More informationJune 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA
June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationDIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS
DIVISION 400 - APPROVED MATERIAL LIST AND STANDARD DETAILS Section 403 - STANDARD DETAILS TABLE OF CONTENTS DIVISION 400, Section 403 - STANDARD DETAILS SECTION DETAIL NOS. Application Table 403-1 I. Concrete
More informationCITY OF VISTA STANDARD DRAWINGS
CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated
More informationCITY OF VISTA STANDARD DRAWINGS
CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationM I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)
BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND
More informationMSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY
MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationSewer Line Extension Permit Design Checklist
CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line
More informationSAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationCITY OF DANA POINT DEVELOPMENT REVIEW
Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationINVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA
INVITATION TO BID TOWN OF CARY Cary, North Carolina Sealed bids must be submitted no later than 1:30 p.m. on October 1, 2018 to the Town of Cary at the office of the Transportation and Facilities Department],
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationEngineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings
Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting
More informationGrease Interceptor Design Checklist
CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private
More informationSECTION III SUBMITTALS AND APPROVALS
SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District
More informationSeptember 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP
CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled
More informationExisting and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.
PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS
ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationSoftware Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationUPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS
Date 6/1/18 STANDARD DRAWINGS UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed WATER STANDARD DRAWINGS Title Drawing Number Current Date Fire Hydrant and Appurtenance Locations, Improved Streets with Curb
More informationSUPPLEMENTARY STANDARD DETAIL DRAWINGS
CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary
More informationROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028
THE CENTER FOR RESEARCH AND EDUCATION IN ADVANCED TRANSPORTATION ENGINEERING SYSTEMS (CREATEs) ISSUED FOR BID - CONTRACT - 02 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028 ALL DIMENSIONS MUST BE VERIFIED
More informationTOWN of LAKESHORE SITE PLAN CHECKLIST
TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )
More informationTAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:
CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS
More informationOil-Water Separator Design Checklist
CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water
More informationRenewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.
Renewable Water Resources Greenville, South Carolina CONTRACT DOCUMENTS ADDENDUM III - CONTRACT REVISIONS Prepared by Black & Veatch Corporation Greenville, South Carolina B&V Project No. 192263 September
More information11/06/2014 Pay Items - 1
Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...
More informationThis addendum forms a part of the Contract Documents dated: August 10, 2012.
Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911
More informationWATER STRUCTURE LEGAL & SURVEY TOPOGRAPHY/GRADING LANDSCAPE/VEGETATION
REVISION IDENTIFIER DETAIL LABEL CALLOUT LABEL 1 SHEET ABANDONED ASBESTOS CEMENT BALK OF WALK BEGINNING OF CURVE BENCH MARK BUILDING CAPACITY CAST IRON CATCH BASIN CATCH BASIN MANHOLE CENTER LINE CERTIFICATE
More informationSECTION MANHOLES
SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.
More informationNORTH BEND WWTP 2018 CRITICAL IMPROVEMENTS CITY OFFICIALS. City Administrator BRENDEN ELWOOD TREVOR KOSTANICH ALAN GOTHELF. City Council.
NORTH BEND KING COUNTY WASHINGTON CITY OFFICIALS KENNETH G. HEARING Mayor LONDI LINDELL City Administrator BRENDEN ELWOOD TREVOR KOSTANICH ALAN GOTHELF City Council MARTIN VOLKEN MARK RIGOS, P.E. PUBLIC
More informationREQUEST FOR BIDS WELL #4 ABANDONMENT
REQUEST FOR BIDS WELL #4 ABANDONMENT Department of Public Services 1015 S Lincoln Avenue Three Rivers, MI 49093 (269) 273-1845 Table of Contents Well #4 Abandonment... 8 Performance Bids... 8 I. Instructions...
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More information9. Pay for the power consumed until the project has been accepted as substantially complete.
9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:
More informationSECTION 095 SPECIFICATIONS DETAIL DRAWINGS. Index of Detail Drawings
SECTION 095 SPECIFICATIONS DETAIL DRAWINGS Index of Detail Drawings Flat Top Manhole... 095-1 Splash Drop Manhole and Regular Drop Manhole... 095-2 Special Detail Splash Drop Manhole and Special Detail
More informationEXTERIOR BUILDING, ROOFING, AND SITE IMPROVEMENTS
CONTRACT NUMBER: IFB-8-B006 ARCHITECT / ENGINEER : HURST-ROSCHE, INC. NO. LINOIS 62203 (68) 398-0890 -7 E. RANDLE ST./ N. FRITZ ST. 402 CHERRY ST., 404-406 ST. LOUIS ST. 502-506 DEE ST. 50-505 PLUM ST.
More informationCITY OF MUSKEGO DRAFTING STANDARDS
CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under
More informationSANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS
SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting
More informationTRANSACTION RECORD TR
COMMON GROUND ALLIANCE BEST PRACTICES COMMITTEE Proposal Form Revision to Best Practice Name: Ralph Graeser Date: 03/09/2015 Affiliation: PA PUC/NAPSR/GPTC Member. Phone: 717-554-3666 E-Mail: rgraeser@pa.gov
More information9. Construction Activities
9. Construction Activities DIABLO WATER DISTRICT STANDARD SPECIFICATIONS AND DRAWINGS CONSTRUCTION ACTIVITIES I. Construction Sequence and Requirements II. Construction Submittal Checklist DIABLO WATER
More informationState College of Florida, Manatee-Sarasota
State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE
More informationACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).
ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan
More informationPlate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST.
DISTRIBUTION: 7 MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Design Services Section TRANSMITTAL LETTER NO. (0-0) MANUAL: Standard Plates DATED: January 9, 00 SUBJECT:
More informationA. Dewatering observation wells are part of dewatering allowance.
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationFIELD LOK 350 Gasket 4" 24"
FIELD LOK 350 Gasket JOINT RESTRAINT FOR WATER & WASTEWATER, FIRE PROTECTION & INDUSTRIAL APPLICATIONS NSF P 2 Table of Contents FIELD LOK 350 Gasket 3 Assembly 4 Alternative Assembly Methods 7 Pipe Diameters
More information5.0 PLAN FORMAT AND REQUIREMENTS WATER, RECYCLED WATER AND SEWER
5.0 PLAN FORMAT AND REQUIREMENTS WATER, RECYCLED WATER AND SEWER The Developer s engineer shall prepare system improvement plans that are clear, concise, and meet Western s standards. A set of plans that
More informationVICINITY MAP LOCATION MAP GRAPHIC SCALES
VICINITY MAP LOCATION MAP GI-01 LEGEND TABLE OF CONTENTS CONSTRUCTION SEQUENCE NOTES GENERAL NOTES SEDIMENTATION & EROSION CONTROL ABBREVIATIONS GI-02 M P P P P M EXISTING HYDRAULIC PROFILE AND DEMOLITION
More informationUNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1
Page 1 of 6 ADDENDUM #1 PART 1 GENERAL 1.01 PRINCIPAL WORK IN THIS SECTION A. The requirements of the Owner's General Conditions, Supplementary Conditions, Special Conditions, and Division 1 - General
More informationGovernment Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications
PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationI. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.
ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this
More informationSECTION TRACER WIRE FOR NONMETALLIC PIPE
PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities
More informationSECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More informationWork Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)
MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation
More informationSAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2
SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED DISTRICT, DESIGN AND ADDENDUM NO. PROJECT: ADA Site Improvements of April 0, 08 Upper Play Yard at Noriega EES 775 44 th -Avenue San Francisco, CA 94 SFUSD Project No. 004 OWNER:
More informationTYPE 4-C TYPE 6 TYPE 7 TYPE 8
````` Face of ase rad. 42 TYPE rad. " T T T 22.5 2'- unless otherwise shown on plans 5" 5" 5" Slope 2: TYPE 2 rad. Concrete TYPE 2-A rad. Wearing Course Concrete ase Course TYPE 2-0" rad. TYPE 3 As Shown
More informationEngineering Standards & Specifications November 2016 Edition
G:\INFRASTRUCTURE PLANNING\STANDARDS & PRODUCTS\MOESS\EDITION NO11\FINAL DRAFT\FINAL DRAFT STANDARD CAD DRAWINGS\SECTION 1 DWGS\G-1 T H E H A R B O U R C I T Y STANDARD LAYER NAMES SHEET 1 OF 3 G-1 LAYER
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationHorizontal Directional Drilling (HDD) with DI Pipe
Horizontal Directional Drilling (HDD) with DI Pipe To the man who only has a hammer in the tool kit, every problem looks like a nail. Abraham Maslow Pipe-on-Supports Fittings 1 Ball and Socket Joint Subaqueous
More informationSUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard
More informationStandard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.
DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard
More informationMARQUETTE GREENWAY TRAIL
------ ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A DESIGN DATA DESIGN SPEED DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN
More informationPublic Works City of Lebanon, Tennessee; Department of Public Works
SECTION 1 GENERAL 1. DEFINITIONS Public Works City of Lebanon, Tennessee; Department of Public Works City City of Lebanon, Wilson County, Tennessee City Engineer Employed by the City of Lebanon, Registered
More informationPlan Submittal and Review Checklist
Improving quality of life today creating a better tomorrow Plan Submittal and Review Checklist Version 1.2 September 4, 2017 Contents Overview... 2 Plan Submittal Checklist... 2 Plan Review Checklist -
More informationPrecast Concrete Pavement
Precast Concrete Pavement Phillip Sturdivant, P.E. Louisiana Department of Transportation and Development www.dotd.la.gov What is Precast Concrete Pavement? Precast concrete pavement is what it says it
More informationSurvey Control Point Observations
Level Name SURVEY_CTRL SURVEY_CTRL_CHK_NODE SURVEY_CTRL_NODE SURVEY_CTRL_OBS SURVEY_CTRL_REF_SYM SURVEY_CTRL_SETUPS SURVEY_CTRL_SYM SURVEY_CTRL_TXT SURVEY_DTM_BREAKLINE SURVEY_DTM_BREAKLINE_NODE SURVEY_DTM_CHECK_NODE
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationSECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation 7 Backfilling