Plate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST.

Size: px
Start display at page:

Download "Plate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST."

Transcription

1 DISTRIBUTION: 7 MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Design Services Section TRANSMITTAL LETTER NO. (0-0) MANUAL: Standard Plates DATED: January 9, 00 SUBJECT: Standard Plates Index (-4), Standard Plates 830E, 83A. Standard Plate 830E has been updated per request from The Office of Traffic Safety and Technology (OTST). See the attached Summary of Changes document for specifics. Plate 83A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST. INSTRUCTIONS: Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.. Remove from the manual: Standard Plate Index - Sheets -4 of 4, Numerical Index of Standard Plates, (June 009) Standard Plate 830D, Saw Cut Loop Detectors, (Approved-September 5, 978). Insert in the manual: Standard Plate Index - Sheets -4 of 4, Numerical Index of Standard Plates, (December 009) Standard Plate 830E Sheets -3 of 3, Saw Cut Loop Detectors, (Approved December, 009) Standard Plate 83A Sheets -3 of 3, Preformed Rigid PVC Conduit Loop Detector, (Approved December, 009) 3. Current Standard Plates, Standard Plates Index and Standard Plate Transmittal Letters are available on the web in PDF format at: 4. Any technical questions regarding this transmittal should be directed to Tim Brown, Design Standards Unit, at (65) Any questions concerning missing manual sheets or extra transmittal letters should be directed to: Map & Manual Sales M.S. 60, Transportation Building, 395 John Ireland Blvd., St. Paul, MN, Phone: (65) Any questions concerning mailing, including address changes, should be furnished in writing to: Mail Center M.S. 75, Transportation Building, 395 John Ireland Blvd., St. Paul, MN, Phone: (65) The last Standard Plate Transmittal Letter No. issued was (09-0), dated July, 009. Michael Elle, P.E. Design Standards Engineer

2 THIS PAGE INTENTIONALLY LEFT BLANK

3 SUMMARY OF CHANGES 830E Saw Cut Loop Detectors Transmittal Letter No. (0-0) Standard Plate 830D ( Sheet) is replaced by Standard Plate 830E (3 Sheets). The Roadway Edge Connection detail, the Curb Line Connection detail, and the notes on Plate 830D are replaced by the details on Sheet and the notes on Sheet 3 of Standard Plate 830E. The Single Loop Detector detail, the Multiple Loop Detector detail, the Loop Connection detail, the Joint Sleeve Installation detail, and the notes on Plate 830D are replaced by the details on Sheet and the notes on Sheet 3 of Standard Plate 830E.

4 THIS PAGE INTENTIONALLY LEFT BLANK

5 STANDARD PLATES BLANK SERIES PAVEMENT SERIES BLANK SERIES CULVERTS AND APPURTENANCES SERIES SEWER APPURTENANCES SERIES EROSION CONTROL STRUCTURES SERIES BLANK SERIES CURB, CURB AND GUTTER, SIDEWALK SERIES BARRICADES, SIGNALS, MARKERS, ETC SERIES MISCELLANEOUS SERIES PLATE NO SERIES BLANK 000 SERIES PAVEMENT 070L 03J 4D 50Q 0F Reinforced Panel Over Culverts Typical Dowel Bar Assembly Pavement Keyway For Keyed Joint Construction Construction of Header Joints Concrete Pavement Adjacent to Railway Crossing 000 SERIES BLANK 3000 SERIES CULVERTS AND APPURTENANCES 3000L Reinforced Concrete Pipe (5 Sheets) 300B Reinforced Concrete Reducer Pipe 300B Reinforced Concrete Increaser Pipe 3006G Gasket Joint for R.C. Pipe ( Sheets) 3007D Shear Reinforcement for Precast Drainage Structures 304J Reinforced Concrete Pipe Arch ( Sheets) 300F Reinforced Precast Concrete Cattle Pass (60" & 7") 30C Precast Concrete Safety Apron (3 Sheets) 3030A Precast Cattle Pass Transition Section 303B Connection between Existing 4 Ft. X 6 Ft. Cattle Pass and New Precast Transition Section 3040F Corrugated Metal Pipe Culvert (Standard -/3" x /" Corrugation) 304D Corrugated Metal Pipe (3" x " Corrugation) 3050B Design Data Structural Plate Structures (8" Corner Radius) 305B Design Data Structural Plate Structures (3" Corner Radius) 3065C Connection between Existing Culv. & New "C" Culv. Barrel ( Sheets) 3066A C.M. Extension for Box Culvert 300G Concrete Apron for Reinforced Concrete Pipe 30G Concrete Apron for Reinforced Concrete Pipe-Arch 34H Sectional Concrete Apron for Reinforced Concrete Pipe-Arch 3K Metal Apron for C.M. Pipe-Arch Culvert 33J Metal Apron for C.S. Pipe 34B Metal Apron Connection 35A Inlet Protection for Metal Culverts (90" dia. to 96" dia.) 36B Inlet Protection for Structural Plate Pipe (60" thru 96" dia. or span) 37A Inlet Protection for Structural Plate Pipe (0" thru 80" dia. or span) MINNESOTA DEPARTMENT OF TRANSPORTATION NUMERICAL INDEX OF STANDARD PLATES (Sheet of 4) December 009

6 PLATE NO. 38H 39A 33C 33A 333C 334C 335A 336B 337B 338B 339A 34A 343C 345F 346C 348A 3C Metal Safety Apron & Grate ( Sheets) Metal Apron for Corrugated Polyethylene Pipe (Use at Entrances and Driveways) Precast Concrete Headwall for Subsurface Drains Grate for :4 Precast Concrete Aprons Riprap at RCP Outlets Riprap at CMP Outlets Hand-Placed Riprap at Precast Concrete Cattle Pass Slotted Vane Drain for P.V.C. Pipe Slotted Drain for " thru 30" Dia. C.M. Pipe (Stackable) Slotted Drain for " thru 30" Dia. C.M. Pipe (Not Stackable) Riprap at Precast Concrete End Sections Outlet Screen for C.M. & S.C. Pipes Inspection Tees Concrete Pipe Ties Anti-Seepage Diaphragm (For CMP and CMP-A) Safety Slope Metal End Section for Circular & Arched Pipes ( Sheets) Corrugated Steel Pipe Coupling Band (3 Sheets) 4000 SERIES--SEWER APPURTENANCES List of Castings for Design Structures ( sheets) Standard Casting Assemblies Typical Concrete Manhole or Catch Basin and Casting Combinations 4000J Manhole or Catch Basin (Masonry, Field Constructed) - Design A 400F Manhole or Catch Basin (Masonry, Field Construction) - Design C 4003B 30" Precast Catch Basin Design N 4005L Manhole or Catch Basin Type A & B Cone Sections Precast - Design F 4006L Manhole or Catch Basin Precast - Designs G and H 4007C Precast Mechanical Joint Sewer Manhole 4008E Catch Basin (Sectional Concrete Pipe) - Design I 4009H Manhole or Catch Basin (Sectional Concrete Pipe) - Design J 400H Concrete Short Cone & Adjusting Ring (Sectional Concrete) 40E Precast Concrete Base 407C Catch Basin (Concrete Pipe and Metal Pipe) - Designs PC and PM 408A Manhole or Catch Basin (Reducer Cone Section Precast) Design D 400J Manhole or Catch Basin (For Use With or Without Traffic Loads) ( sheets) 40F Precast Curb Opening Catch Basin 40A Manhole or Catch Basin Cover (3 ft. X ft. Opening) 404A 48" Dia. Precast Shallow Depth Catch Basin - Design SD 405B Drop Inlets or Catch Basins - Design DI (Concrete & Metal) 406A Concrete Encased Concrete Adjusting Rings 40D Ring Casting For Manhole or Catch Basin 408F Adjusting Rings for Catch Basins and Manholes 40F Cover Casting for Manhole (For Use in all Traffic Areas) Casting No. 75 and 76 45D Catch Basin Frame Casting (For Square Grate) Casting No F Catch Basin Frame Casting Casting No G Catch Basin Frame Casting (For Square Grate) - Casting No. 80A 43F Catch Basin Frame Casting (For Square Grate) Casting No A Curb Box Casting for Catch Basin - Casting No A Curb Box Casting for Catch Basin (For Design B Curbs) - Casting No D Special Grate Castings for Catch Basin (Convex and Concave) - Casting No. 70 and 7 443E Stool Grate & Concrete Frame (Median Drains) - Casting No C Grate Casting for Catch Basin - Casting No. 80 MINNESOTA DEPARTMENT OF TRANSPORTATION NUMERICAL INDEX OF STANDARD PLATES (Sheet of 4) December 009

7 PLATE NO. 450C Grate Casting for All Pipe Drainage Structures 45B Grate Casting for Catch Basin (Square Type) - Casting No. 8 45C Catch Basin Grate Casting - Casting No. 84A 453A Catch Basin Grate Casting - Casting No B Catch Basin Grate Casting - Casting No D Curb Box Casting for Catch Basin - Casting No. 83A and 833A 46F Curb Box Casting for Catch Basin - Casting No. 8B, 8 and 83A 480J Manhole or Catch Basin Step 5000 SERIES--EROSION CONTROL STRUCTURES 500A Reinforced Concrete Pipe Energy Dissipator 6000 SERIES -- Blank 7000 SERIES--CURB, CURB AND GUTTER, SIDEWALK 7000E Integrant Curbs (Design B, Design V and Design D) 700J Concrete Curb (Design B, Design V, Design S, Design DR and Design BR) ( Sheets) 7035M Concrete Walk & Curb Returns at Entrances 7036F Pedestrian Curb Ramp (For the Handicapped) ( sheets) 7065C Bituminous Curb 700H Concrete Curb and Gutter (Design B and Design V) 70I Concrete Curb and Gutter (Design BR, D, S, B4, B5 and D3) ( Sheets) 705C Concrete Median (Mountable Type) 707H Entrance Nose (Urban Design) 708F Exit Nose (Urban Design) 709C Median Nose and Island (Undivided to Divided Roadway) 7J Installation of Catch Basin Castings (Concrete Curb and Gutter) 7C Installation & Reinforcement of Catch Basin & Manhole Castings (Concrete Integrant Curbs) 73A Concrete Approach Nose Detail 8000 SERIES -- BARRICADES, SIGNALS, MARKERS, ETC. 8000I 800G 805B 806B 80E 8E 8F 84A 87F 88D 89C 80N 8F 8E 83F 86I 87B 88B Standard Barricades Permanent Barricade Equipment Pad A (Cast-in-Place or Precast) Equipment Pad B (Cast-in-Place or Precast) Traffic Signal Bracketing (Pole Mounted) Traffic Signal Bracketing (Pedestal Mounted) (3 Sheets) Pedestal Foundation (Traffic Control Signals) P.V.C. Handhole/Pullbox (No Vehicle Load) ( Sheets) Precast Concrete Hand Hole (Or Pullbox) ( Sheets) Service Equipment & Pole Traffic Control Signals Ground Mounted Cabinet Foundation Pole Foundation (PA85) Transformer Base and Pole Base Plate (PA85M, PA90 and PA00) ( Sheets) Pedestal and Pedestal Base (For Traffic Control Signals Support) Pole and Mast Arm (Luminaires and Traffic Lights Assembly) For All Pole Types ( Sheets) Pole Foundation (PA90 and PA00) Light Base - Design E (40 ft. Pole or Less) Light Base - Design H (49 ft. Pole) MINNESOTA DEPARTMENT OF TRANSPORTATION NUMERICAL INDEX OF STANDARD PLATES (Sheet 3 of 4) December 009

8 PLATE NO. 830E 83A 850C 8307R 8308A 8309A 836C 838C 836D 839H 8330G 833B 833B 8333B 8337B 8338C 8339A 8340A 8400E 840C Saw Cut Loop Detectors Preformed Rigid PVC Conduit Loop Detector Installation of Culvert Markers W-Beam Guardrail & End Anchorages (Installation with Wood Posts) (4 Sheets) Reinforced Concrete Median Barrier Type F (Non-Glare Screen Type) Design 8308 (3 Sheets) Reinforced Concrete Median Barrier Type F & Glare Screen Design 8309 (3 Sheets) Post Seat for Anchorage on Footing or Box Culverts Guardrail Anchorage Plate for Bridges and BCT'S Flexible Plastic Glare Screen Eccentric Loader Breakaway Cable Terminal (ELT) (4 Sheets) 3-Cable Guardrail (With Wood Posts) (Assembly Details) ( Sheets) 3-Cable Guardrail (With Steel Posts) (3 Sheets) Anchor Bolt Cluster for Light Poles 3-Cable Guardrail Anchor (Anchor Details) (4 Sheets) Temporary Portable Precast Concrete Barrier (Type F ) ( Sheets) W-Beam Guardrail & End Anchorages (Installation with Steel Posts) (4 Sheets) 3-Cable (Steel Posts) to W Beam (Wood Posts) Guardrail Transition 3-Cable (Steel Posts) to W Beam (Steel Posts) Guardrail Transition Pipe Railing At Grade Pipe Railing (Adjacent to Sidewalk) 9000 SERIES--MISCELLANEOUS 9000D 90B 90D 9303B 9308A 9309G 930G 93E 93K 933D 934C 9350A Approaches and Entrances (Recommended Standards) Shaping and Sodding of Slopes at Box Culvert Ends Turf Establishment Areas (At Pipe Culvert Ends) Geodetic Survey Disks (Aluminum) ( Sheets) Survey Monument Cap ( Sheets) PLS (Public Land Survey) Monument ( Sheets) Woven Wire Fence (Wood Post) Woven Wire Fence (Steel Post) Chain Link Fence ( Sheets) Barbed Wire Fence (Wood Post) Barbed Wire Fence (Steel Post) Mailbox Support (Swing-Away Type) MINNESOTA DEPARTMENT OF TRANSPORTATION NUMERICAL INDEX OF STANDARD PLATES (Sheet 4 of 4) December 009

9 MILL & OVERLAY CONSTRUCTION LOOP DETECTOR CONDUCTORS PLUG CONDUIT WITH DUCT SEAL SHOULDER OR CONC. CURB/GUTTER SAW SLOT -/" DEEP 8" ATTACH SPLICE TO EYE BOLT 45^ TOP OF PVC " BELOW SAW CUT CONDUIT 8" HANDHOLE MIN. WEAR COURSE NON-WEAR COURSE TWIST CONDUCTORS THREE TURNS PER FOOT CONDUIT BUSHING FURNISH AND INSTALL CONDUIT IF INPLACE CONDUIT IS UNUSABLE WHEN REPLACING INPLACE LOOPS 3 OF SLACK INPLACE ROADWAYS LOOP DETECTOR CONDUCTORS SAW SLOT -/" DEEP PLUG CONDUIT WITH DUCT SEAL 8" SHOULDER OR CONC. CURB/GUTTER ATTACH SPLICE TO EYE BOLT 45^ TOP OF PVC " BELOW SAW CUT CONDUIT 8" MIN. HANDHOLE CONC. OR BIT. WEAR COURSE CONC. OR BIT. NON-WEAR COURSE CONDUIT BUSHING TWIST CONDUCTORS THREE TURNS PER FOOT FURNISH AND INSTALL CONDUIT IF INPLACE CONDUIT IS UNUSABLE WHEN REPLACING INPLACE LOOPS 3 OF SLACK NOTES: SEE SHEET 3 FOR ADDITIONAL NOTES SAW CUT LOOP DETECTOR BETWEEN NON-WEAR AND WEAR COURSES SAW CUT LOOP DETECTOR INTO WEAR COURSE OR CONC. SURFACE APPROVED DECEMBER, 009 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATION REFERENCE STANDARD PLATE STATE DESIGN ENGINEER SAW CUT LOOP DETECTORS LOOP/HANDHOLE INSTALLATION 565 NO. 830E OF 3

10 -/" DRILLED HOLES AT CORNERS LEAD-IN SAW SLOT DRILL SAW CUT CORNERS LOOP SAW SLOTS SAW SLOT AREA TO BE SMOOTHED AREA TO BE SMOOTHED /" REMOVABLE DOWEL -/" DRILLED HOLE CONDUCTORS SAW SLOT AREA TO BE SMOOTHED /" REMOVABLE DOWEL EXTEND SAW SLOT CUT ONE-HALF LENGTH OF SAW BLADE AREA TO BE SMOOTHED SAW SLOT TYPICAL APPROACH DETECTORS MEDIAN ISLAND MULTIPLE LOOP SERIES HOOKUP D D D D SHOULDER STOP LINE LANE D D JOINT/CRACK INSTALLATION SAW CUT LANE DOUBLE SAW CUT 6 6" 6" ALLOW SLACK CONDUCTOR IN SLOT RIGHT LANE NOTES: SEE SHEET 3 FOR ADDITIONAL NOTES. LOOP LEADS SHALL NOT CROSS TRANSVERSE JOINTS IN CONCRETE PAVEMENT. MOVE A LOOP TO THE NEXT SHOULDER PANEL AND INSTALL A SEPARATE CONDUIT TO THE HANDHOLE IF ALL LOOPS WILL NOT FIT ONE PANEL AND MAINTAIN SEPARATIONS SHOWN. SEE PLAN LAYOUT FOR ACTUAL DETECTOR SIZE AND PLACEMENT LOCATION. APPROVED DECEMBER, 009 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATION REFERENCE STANDARD PLATE SAW CUT LOOP DETECTORS DETAILS 565 NO. 830E STATE DESIGN ENGINEER OF 3

11 NOTES:. WHERE LOOP DETECTORS ARE TO BE FURNISHED AND INSTALLED AND THE ROADWAYS ARE TO BE SURFACED WITH NEW BITUMINOUS PAVEMENT, THE LOOP DETECTORS SHALL BE SAW CUT IN THE ROADWAY AND SEALANT MATERIAL PLACED TO THE SATISFACTION OF THE ENGINEER BEFORE THE BITUMINOUS WEARING COURSE IS PLACED BY THE BITUMINOUS PAVING CONTRACTOR; HOWEVER, THE ENGINEER MAY DIRECT THE CONTRACTOR NOT TO PLACE THE LOOP DETECTORS IN THE ROADWAY UNTIL PAVEMENT MARKINGS AND LANE STRIPING HAS BEEN DETERMINED AND/OR PLACED.. AREA TO BE SAW CUT SHALL BE THOROUGHLY CLEANED BY SWEEPING, WASHING, OR BLOWING SURFACE CLEAR OF DIRT AND DEBRIS. 3. LOOP DETECTORS AND LOOP DETECTOR HOME-RUN WILL BE MARKED ON PAVEMENT BY THE ENGINEER OR BY THE CONTRACTOR AS DIRECTED LOOP DETECTOR SAW CUTS SHALL BE A UNIFORM DEPTH OF -/" +/- /4" AND /8" WIDER THAN THE OUTER DIAMETER OF THE TUBING. THE CONTRACTOR SHALL AVOID CROSSING CONCRETE JOINTS OR CRACKS. HOWEVER, IF A CONCRETE JOINT OR CRACK MUST BE CROSSED, THE CONTRACTOR SHALL USE THE JOINT/CRACK DETAIL SHOWN ON SHEET OF ALL LOOP CORNERS SHALL BE SQUARE. CORNERS SHALL BE DRILLED WITH -/" DIAMETER DRILL TO A DEPTH OF /4" DEEPER THAN SAW CUT. CORNERS SHALL BE ROUNDED TO PREVENT DAMAGE TO THE CONDUCTORS OR TUBING. 7. ALL LOOP DETECTOR SAW CUTS SHALL BE CLEANED AND FLUSHED OF FOREIGN MATERIAL USING A COMBINATION OF AIR AND WATER, AND DRIED WITH COMPRESSED AIR PRIOR TO INSTALLATION OF LOOP DETECTOR CONDUCTORS. DRY SAWING DOES NOT REQUIRE WATER FLUSHING, HOWEVER, THE SAW CUT SHALL BE CLEANED OF ALL FOREIGN MATERIAL. 8. THE CONTRACTOR SHALL FURNISH AND INSTALL FROM THE END OF THE SAW-CUT TO THE ADJACENT HANDHOLE A MINIMUM OF A 3/4" CONDUIT FOR A SINGLE LOOP DETECTOR OR AN APPROPIATE SIZED CONDUIT BASED ON N.E.C. FILL RATIONS FOR OR MORE LOOP DETECTORS. 9. BEFORE INSTALLATION OF LOOP DETECTOR CONDUCTORS, THE CONTRACTOR SHALL PLACE A BEAD OF APPROVED LOOP DETECTOR SEALANT IN SAW CUT SLOT TO WITHIN 6" OF THE CONDUIT THAT RUNS FROM THE END OF THE SAW-CUT TO THE ADJACENT HANDHOLE THE CONTRACTOR SHALL PLACE THE CLEAN AND DRIED LOOP DETECTOR CONDUCTORS CONTINUOUS WITH 4 TURNS OF WIRE AND WOUND IN A CLOCKWISE DIRECTION. THE LOOP DETECTOR CONDUCTORS SHALL BE PUSHED TO THE BOTTOM OF THE SAW-CUT WITH A BLUNT INSTRUMENT TO AVOID DAMAGING TUBING OR CONDUCTORS. THE CONTRACTOR SHALL INSTALL 3/4" DIAMETER BY " BACKER ROD AT INTERVALS TO ENSURE THAT THE CONDUCTORS ARE AT THE BOTTOM OF THE SAW CUT. LOOP DETECTOR CONDUCTORS SHALL BE TWISTED 3 TURNS PER FOOT THROUGH THE CONDUIT TO THE SPLICE IN THE HANDHOLE. 3. LOOP DETECTOR LEAD-IN CONDUIT SHALL BE SEALED WITH DUCT SEAL OR OTHER APPROVED SEAL TO PREVENT LOOP DETECTOR SEALANT FROM ENTERING CONDUIT. 4. SEAL LOOP DETECTOR CONDUCTORS WITH A MN/DOT APPROVED LOOP DETECTOR SEALANT AS LISTED ON THE MN/DOT APPROVED PRODUCTS LIST (APL) AND IN ACCORDANCE WITH THE MANUFACTURER S INSTRUCTIONS. 5. THE LOOP DETECTOR ROADWAY CONDUCTORS AND THE LOOP DETECTOR LEAD-IN CABLE CONDUCTORS SHALL BE PROPERLY PREPARED AND CLEANED BEFORE SPLICING. ROUGHEN CABLE JACKET WITH SAND PAPER TO ENSURE GOOD ADHESION WITH SPLICE KIT. 6. LOOP DETECTORS SHALL BE SPLICED USING AN APPROVED SPLICE KIT AS LISTED ON THE MN/DOT APPROVED PRODUCTS LIST (APL). MN/DOT APPROVED SPLICE KITS SHALL BE INSTALLED, EITHER ACCORDING TO MANUFACTURES INSTRUCTIONS, OR BY AN ALTERNATE METHOD APPROVED BY THE ENGINEER. 7. PRIOR TO FURNISHING AND INSTALLING THE APPROVED LOOP DETECTOR SPLICE KIT, THE CONTRACTOR SHALL SOLDER THE ENDS OF THE LOOP DETECTOR LEAD-IN CONDUCTORS TO THE ROADWAY LOOP DETECTOR CONDUCTORS, AND SHALL FURNISH AND INSTALL AN APPROPRIATE SIZED WIRE NUT TO THE SOLDERED ENDS PRIOR TO INSTALLATION OF THE SPLICE KIT. 8. SPLICE KITS SHALL BE FURNISHED AND INSTALLED IN HANDHOLES IN SUCH A MANNER AS TO ENSURE THAT EACH SPLICE KIT IS SUSPENDED AND/OR SECURED NEAR THE TOP OF THE HANDHOLE TO THE SATISFACTION OF THE ENGINEER (PLACING SPLICE KITS ON TOP OF THE ELECTRICAL CABLES AND CONDUCTORS IS NOT ACCEPTABLE). APPROVED DECEMBER, 009 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATION REFERENCE STANDARD PLATE NO. SAW CUT LOOP DETECTORS 565 STATE DESIGN ENGINEER NOTES 3 OF 3

12 THIS PAGE INTENTIONALLY LEFT BLANK

13 TYPICAL CROSS STREET RIGID PVC LOOP DETECTOR LAYOUT STOP LINE OR CROSSWALK TYPICAL LEFT TURN LANE VARIABLE NUMBER OF CONDUITS WITHIN SAME TRENCH STACKED OR SIDE BY SIDE TYPICAL THRU LANE VARIABLE NUMBER OF CONDUITS WITHIN SAME TRENCH STACKED OR SIDE BY SIDE 3 5 TYPICAL RIGHT TURN LANE VARIABLE NUMBER OF CONDUITS WITHIN SAME TRENCH STACKED OR SIDE BY SIDE SHOULDER SEPARATE CONDUITS ENTERING HANDHOLE CONDUIT AND CABLES HANDHOLE TO CONTROLLER AS REQUIRED IN PLAN TYPICAL RIGID PVC LOOP DETECTOR DETAIL 90^ FACTORY ELBOW (TYPICAL) NOTES: SEE SHEET FOR ADDITIONAL NOTES. 6 DIMENSION SHOWN IS TYPICAL USE GIVEN DIMENSION INDICATED TEE CONDULET ON PLAN LAYOUT. (WITH ACCESS ORIENTED TO TOP) THIS DIMENSION MAY VARY 3/4 " RIGID PVC SHALL BE CONTINUOUS FROM ACCORDING TO LOOP SIZE ON TEE TO INSIDE OF HANDHOLE (LENGTH AS REQUIRED) PLAN LAYOUT. BELL END HANDHOLE COUPLING (TYPICAL) MINIMUM 6 OF CONDUCTOR IN HANDHOLE. SEE SPECIAL PROVISIONS FOR SPLICE TO LOOP DETECTOR LEAD-IN CABLE 3 6 x 6 RIGID PVC LOOP DETECTOR (CENTERED IN THE LANE). APPROVED DECEMBER, 009 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATION REFERENCE STANDARD PLATE STATE DESIGN ENGINEER PREFORMED RIGID PVC CONDUIT LOOP DETECTOR LAYOUT DETAILS NO. 83A OF 3

14 NOTES:. ROADWAY LOOP DETECTOR CONDUCTORS AND LOOP DETECTOR LEAD IN CABLES SHALL BE IN ACCORDANCE WITH MN/DOT SPEC THE 3/4" RIGID PVC CONDUIT AND FITTINGS SHALL BE SCHEDULE 40. SEE SPEC THREE CORNERS OF EACH LOOP DETECTOR SHALL BE A 90^ FACTORY ELBOW (6" RADIUS). THE FOURTH SHALL BE A RIGID PVC TEE CONDULET. 4. APPROVED RIGID PVC PRIMER AND CEMENT SHALL BE USED FOR THE RIGID PVC JOINTS. 5. ALL SLACK MUST BE REMOVED FROM LOOP DETECTOR CONDUCTORS WITHIN THE RIGID PVC. 6. THE ROADWAY LOOP DETECTOR CONDUCTORS (/C#4) SHALL BE TWISTED THREE TURNS PER FOOT FROM THE RIGID PVC TEE CONDULET TO THE HANDHOLE. 7. ATTACH A FERROUS METAL ITEM IN OR ADJACENT TO THE TEE CONDULET COVER OR AS DIRECTED BY THE ENGINEER. 8. EACH LOOP DETECTOR CONDUIT TO THE HANDHOLE SHALL BE SLOPED TOWARDS THE HANDHOLE. 9. LOOP DETECTOR CONDUITS TO THE HANDHOLE MAY BE PLACED WITHIN THE SAME TRENCH. 0. THE LOOP DETECTOR ROADWAY CONDUCTORS SHALL EXTEND 6 TO 0 INTO THE HAND HOLE FOR SPLICING.. NO SPLICES ALLOWED IN CONDUIT.. IF BENDING OF THE RIGID PVC LOOP LEAD-IN CONDUIT IS REQUIRED, AN APPROPRIATE HEATING BLANKET OR DEVICE APPROVED BY THE ENGINEER SHALL BE USED. EXPOSED FLAME OR TORCHES ARE NOT ALLOWED. 3. TYPICAL SIZE OF LOOP DETECTORS ARE 6 x 6 AND 6 x 0. REFER TO INTERSECTION LAYOUT FOR SPECIFIC LOOP DETECTORS TO BE PLACED. 4. ALL LOOP DETECTORS SHALL HAVE 4 TURNS OF CONDUCTORS. 5. THE LOOP DETECTOR ROADWAY CONDUCTORS AND THE LOOP DETECTOR LEAD-IN CABLE CONDUCTORS SHALL BE PROPERLY PREPARED AND CLEANED BEFORE SPLICING. 6. PRIOR TO FURNISHING AND INSTALLING THE APPROVED SPLICE KIT, THE CONTRACTOR SHALL SOLDER THE ENDS OF THE LOOP DETECTOR, LEAD IN CONDUCTOR AND SHALL FURNISH AND INSTALL AN APPROPRIATE SIZED WIRE NUT TO THE SOLDERED ENDS PRIOR TO THE INSTALLATION OF THE SPLICE KITS. 7. LOOP DETECTORS SHALL BE SPLICED USING A MN/DOT APPROVED SPLICE KIT AS LISTED ON THE MN/DOT APPROVED PRODUCTS LIST (APL). MN/DOT APPROVED SPLICE KITS SHALL BE FURNISHED AND INSTALLED, EITHER ACCORDING TO MANUFACTURERS INSTRUCTIONS, OR BY AN ALTERNATIVE METHOD APPROVED BY THE ENGINEER. 8. SPLICE KITS SHALL BE FURNISHED AND INSTALLED IN HANDHOLES IN SUCH A MANNER AS TO ENSURE THAT EACH SPLICE KIT IS SUSPENDED AND/OR SECURED NEAR THE TOP OF THE HANDHOLE TO THE SATISFACTION OF THE ENGINEER. (PLACING SPLICE KITS ON TOP OF THE ELECTRICAL CABLES AND CONDUCTORS IS NOT ACCEPTABLE). APPROVED DECEMBER, 009 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATION REFERENCE STANDARD PLATE STATE DESIGN ENGINEER PREFORMED RIGID PVC CONDUIT LOOP DETECTOR LAYOUT NOTES NO. 83A OF 3

15 INPLACE PAVEMENT TRAFFIC LANE TOP OF PAVEMENT 4" MIN 6" MAX 4" MIN 6" MAX GUTTER OR SHOULDER 6 C L TRENCH CL TRENCH TO HANDHOLE 5" (TOP OF LOOP ASSEMBLY OR AS TEE CONDULET CONTINUOUS RIGID PVC CONDUIT NOTES: DIRECTED BY THE ENGINEER) 6 X 6 RIGID PVC LOOP DETECTOR CENTERED IN DRIVING LANE TO HANDHOLE - SLOPE TO MAINTAIN DRAINAGE TO HANDHOLE. USE THE LOOP DETECTOR TO BE PLACED FOR THE PURPOSE OF MARKING THE PAVEMENT LOCATION FOR THE MILLING OPERATION.. TO ACHIEVE FULL TRENCH DEPTH FOR CONDUIT PLACEMENT, MILL BEYOND THE DESIRED PAVEMENT MARKING. 3. PROVIDE A MINIMUM 5" CLEARANCE, MEASURED FROM THE TOP OF THE FINISHED PAVEMENT TO HIGHEST POINT OF LOOP ASSEMBLY (INCLUDING CONDUIT). 4. AN AIR COMPRESSOR UNIT (50 HP) IS REQUIRED FOR REMOVING ALL LOOSE MATERIAL FROM TRENCH PRIOR TO TACK COAT APPLICATION. 5. APPLY A TACK COAT AT A UNIFORM RATE TO THE BOTTOM AND EDGES OF THE MILLED AREA. USE AN EMULSIFIED ASPHALT PER SPEC. 357.A SURFACE. NEW PAVEMENT TRAFFIC LANE TOP OF PAVEMENT 6 " TO HANDHOLE MIXTURE USED TO FILL THE RETROFIT LOOP DETECTOR TRENCHES SHALL MEET THE REQUIREMENTS OF MN/DOT SPECIFICATION 360. AGGREGATE SIZE A OR B WILL BE ALLOWED WHEN 360 IS UTILIZED. OTHER WEARING COURSE MIXTURE TYPES ARE ALLOWED WHEN APPROVED BY THE ENGINEER. COMPACTION SHALL BE OBTAINED BY THE ORDINARY COMPACTION METHOD. BACKFILL THE TRENCH WITH A MINIMUM OF TWO LIFTS AND COMPACT EACH LIFT. BEFORE COMPACTING THE FIRST LIFT ENSURE THAT THERE IS ADEQUATE MIXTURE ON EACH SIDE AND ABOVE THE CONDUIT SO THAT THE CONDUIT IS NOT DAMAGED DURING COMPACTION OPERATIONS. THE COMPACTED MIXTURE IN THE TRENCH SHOULD BE LEFT /4 " TO / " ABOVE THE ADJACENT PAVEMENT SURFACE TO PROVIDE FOR ADDITIONAL COMPACTION BY TRAFFIC. WHEN LOOP DETECTORS ARE MILLED INTO CONCRETE SURFACES, REMOVE RUBBLE, SANDBLAST AND AIR BLAST THE TRENCH TO REMOVE DEBRIS. FILL THE TRENCH WITH AN APPROVED MATERIAL LISTED ON THE MN/DOT CONCRETE UNIT S WEBSITE FOR: "PACKAGED DRY RAPID HARDENING CEMENTITIOUS MATERIALS FOR CONCRETE REPAIRS". MILLING IS REQUIRED FOR ALL RIGID PVC LOOP INSTALLATIONS. WHEN LOOPS ARE MILLED INTO EXISTING MILLED SURFACE THAT WILL BE OVERLAYED WITH BITUMINOUS, THE MINIMUM TRENCH DEPTH SHALL BE NO LESS THAN THE HIGHEST LOOP ASSEMBLY IN THE TRENCH. WHEN MILLING INTO EXISTING BITUMINOUS SURFACE, BE ADVISED THAT CONCRETE MAY BE ENCOUNTERED UNDER THE BITUMINOUS GUTTER OR SHOULDER PAVEMENT AGGREGATE BASE TEE CONDUIT 6 X 6 RIGID PVC LOOP DETECTOR CENTERED IN DRIVING LANE CONTINUOUS RIGID PVC CONDUIT TO HANDHOLE - SLOPE TO MAINTAIN DRAINAGE TO HANDHOLE NOTES:. OBTAIN THE REQUIRED COMPACTION OF THE AGGREGATE BASE AFTER PLACEMENT OF LOOP DETECTOR AND LEAD-IN CONDUIT.. THE DEPTH OF THE LOOP MEASURED FROM THE TOP OF THE AGGREGATE BASE TO THE TOP OF THE CONDUIT SHALL NOT EXCEED ". APPROVED DECEMBER, 009 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATION REFERENCE STANDARD PLATE STATE DESIGN ENGINEER PREFORMED RIGID PVC CONDUIT LOOP DETECTOR TYPICAL INSTALLATION NO. 83A 3 OF 3

16 THIS PAGE INTENTIONALLY LEFT BLANK

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard

More information

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office.

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (13-03) MANUAL: Standard

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018 SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

STORM M ANHOLE FOR 42 PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30MAX 3 OR 3.5 PRECAST ECCENTIC CONC 01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

LETTING : CALL : 029 COUNTIES : GOODHUE

LETTING : CALL : 029 COUNTIES : GOODHUE PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO. 25024. CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen

More information

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM 600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn

More information

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925)

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925) STANDARD DETAILS 2401 Crow Canyon Road San Ramon, CA 94583 Telephone: (925) 973-2670 Fax: (925) 838-3937 CITY OF SAN RAMON STANDARD DETAILS INDEX CONCRETE WORK NAME DRAWING # Curb, Gutter & Sidewalk C-1

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D ASPHALT 20 GUTTER LINE CONCRETE CURB FINISHED GRADE PRECAST GRADE RINGS, 2 50 100 MAX PRECAST CB LID GROUT ALL AROUND CB LEAD, INSIDE & OUTSIDE OF

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

Installation Instructions

Installation Instructions Installation Instructions SRT-350 8 POST Guardrail End Treatment Revised July 2005 TRINITY HIGHWAY SAFETY PRODUCTS, INC. BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY 2 SRT TM 8-POST SYSTEM FOR SPECIFIC

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND

More information

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

SUPPLEMENTARY STANDARD DETAIL DRAWINGS CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary

More information

Design and Construction of Highway Pavement Joint Systems

Design and Construction of Highway Pavement Joint Systems Design and Construction of Highway Pavement Joint Systems Troubleshooting Joint Design and Construction Issues Mark B. Snyder, Ph.D., P.E. Engineering Consultant to the American Concrete Pavement Association

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

Standard Details Index NWTP Improvements and MF System Installation

Standard Details Index NWTP Improvements and MF System Installation Detail Standard Details Index NWTP Improvements and MF System Installation Marco Island, Florida Description 0315-001 PLASTIC WATERSTOP 0315-003 HYDROPHILIC/GROOVE WATERSTOP 0315-011 WATERSTOP JOINT 0315-154

More information

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting SECTION 33 71 19 UNDERGROUND POWER DUCT AND SUB-STRUCTURES PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 33: Trenching, Backfilling, and Compacting B. Section 32 01 00: Site Restoration and Rehabilitation

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

TYPE 4-C TYPE 6 TYPE 7 TYPE 8

TYPE 4-C TYPE 6 TYPE 7 TYPE 8 ````` Face of ase rad. 42 TYPE rad. " T T T 22.5 2'- unless otherwise shown on plans 5" 5" 5" Slope 2: TYPE 2 rad. Concrete TYPE 2-A rad. Wearing Course Concrete ase Course TYPE 2-0" rad. TYPE 3 As Shown

More information

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION

More information

MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop

MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop 500 460 MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop Check if Applicable TRAFFIC SIGNAL SPECIAL DETAILS INDEX/CHECKLIST *One completed checklist required

More information

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

CHAPTER 29 PROJECT COMPLETION DOCUMENTS CHAPTER 29 PROJECT COMPLETION DOCUMENTS PROJECT COMPLETION Upon completion of traffic control signal system and lighting projects, there are forms and checklists to ensure that the project is closed out

More information

Section. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS

Section. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS Section 8 City of Ellensburg ILLUMINATION STANDARDS Table of Contents STREET ILLUMINATION...3-5 GENERAL NOTES...3 INSTALLATION AND CONNECTIONS...3 MARKING...3 STAKING...3-4 TRENCH REQUIREMENTS...4 ILLUMINATION

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

Page Electric Utility Service Specifications

Page Electric Utility Service Specifications T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Diamond Knowledge Base. Inductive Loop Guide. Introduction

Diamond Knowledge Base. Inductive Loop Guide. Introduction Diamond Knowledge Base Inductive Loop Guide Introduction An inductive loop is basically a metal detector installed in the surface of the roadway. It consists of electrical wire embedded in the roadway,

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in

More information

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 INSTALLATION GUIDE 2009-2017 PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 Table of Contents Project Overview Forward, Acceptability Criteria, Safety,

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure

More information

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST Tract Number and Subdivision Name: Engineering Firm: Contact Person: Address: City: State: Zip: Phone No. Fax No. Assessor s Parcel Number(s) Tentative

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

SIGNALS AND LIGHTING FIELD GUIDE

SIGNALS AND LIGHTING FIELD GUIDE CHAPTER 16 SIGNAL AND LIGHT POLES SIGNAL AND LIGHT POLES The standards and requirements for installing traffic control signal and light poles are presented in this chapter. 16.1 Traffic Control Signal

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) Page 500-20, subsection 502.2.

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted

More information

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by AMENDMENTS to 2012 Manual of STANDARD SPECIFICATIONS Adopted by Standard Specifications Committee Amendment No. 6 Published by Utah LTAP Center Utah State University 8305 Old Main Hill Logan UT 84322-8205

More information

Section 914. JOINT AND WATERPROOFING MATERIALS

Section 914. JOINT AND WATERPROOFING MATERIALS 914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.

More information

SKT-SP Tangent Terminal

SKT-SP Tangent Terminal Assembly Instructions for metric SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435

More information

1. MATERIALS SHALL CONFORM TO THE FOLLOWING: a) STEEL REINFORCING - WIRE FABRIC (4x4) GALVANIZED - G G REINFORCING EARS TO BE EPOXY CO

1. MATERIALS SHALL CONFORM TO THE FOLLOWING: a) STEEL REINFORCING - WIRE FABRIC (4x4) GALVANIZED - G G REINFORCING EARS TO BE EPOXY CO 1. MATERIALS SHALL CONFORM TO THE FOLLOWING: a) STEEL REINFORCING - WIRE FABRIC (4x4) GALVANIZED - G40.20-041G40.21-04 REINFORCING EARS TO BE EPOXY COATED - D3963/D3963M CEMENT - PORTLAND GU b) FINE AGGREGATE

More information

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction This standard developed by the International Grooving and Grinding Association (IGGA) specifies the procedures for construction of dowel

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised

More information

Silicoflex Joint Sealing System

Silicoflex Joint Sealing System Silicoflex Joint Sealing System SILICOFLEX GLAND ON WOODEN REEL P-200 Primer (A and B Components) Single Component Silicone Locking Adhesive Page 1 Preformed Silicone Gland Sizing Chart (5 Different Sizes)

More information

A. Deviation from this standard must be approved by the Project Architect.

A. Deviation from this standard must be approved by the Project Architect. September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation 7 Backfilling

More information

STRUCTURES FOR SANITARY AND STORM SEWERS

STRUCTURES FOR SANITARY AND STORM SEWERS SUDAS Standard Specifications Division 6 - Structures for Sanitary and Storm Sewers Section 600 - Structures for Sanitary and Storm Sewers STRUCTURES FOR SANITARY AND STORM SEWERS PART - GENERAL.0 SECTION

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

A. Suggested Tool List

A. Suggested Tool List These instructions are intended to be a basic guide to the installation and assembly of plate structures. Job site specific conditions may require other procedures. A Statement on Safety The assembly procedure

More information

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,

More information

DATE: April 22, 2016 (CPR Details Revised & Dated April 22, 2016)

DATE: April 22, 2016 (CPR Details Revised & Dated April 22, 2016) Minnesota Department of Transportation Office of Materials & Road Research 1400 Gervais Avenue, MS 645 Maplewood, MN 55109 Memo TO: FROM: Design Engineers Maintenance Engineers Materials Engineers Resident

More information

Manholes Table of Contents

Manholes Table of Contents Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................

More information

Cable Hanging Instruction Manual

Cable Hanging Instruction Manual Tri-States Grain Conditioning, Inc. Cable Hanging Instruction Manual There are several types of grain storage tanks and bins. Parts of these instructions may be modified to fit the circumstances. Care

More information

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

YUKON PATIO COVER INSTALLATION INSTRUCTIONS YUKON PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin: Consult your local building department for any required permits You may be required to obtain a building permit for this structure. Contact

More information

2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"

2' x 3' Polymer Pull Box Cover 4'-0 7'-0 24 x 76 Access Opening 3'-6 Scope.1 Precast Concrete Equipment Slab Box 8' x 10' x Pad with 4' x 7' x 3'- Box for 5-Way RAM Gas Switch, 2-Way, 3-Way, and 4-Way Pad-Mounted RAG Gas Switches, VFI 9, VFI 12, Bypass Switch, and 33 kv

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS

MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS 75m 70m 65m 60m DEFLECTION ANGLE C/L RADII OF CURVATURE 55m 50m 45m 40m 35m 30m 25m 20m 15m 90 80 70 60 50 40 30 20 10 0 DEFLECTION ANGLE - MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS

More information

Section 808. FENCING

Section 808. FENCING 808.01 Section 808. FENCING 808.01. Description. This work consists of providing and erecting, or moving existing, woven wire fence, temporary fence, protective fence, chain link fence, high-tensile wire

More information

ALUMINUM PIPE GUIDERAIL 01/01/

ALUMINUM PIPE GUIDERAIL 01/01/ NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy

More information

F-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg

F-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg Contents F-5-1a Concrete Bollards F-5-1b Concrete Bollards F-5-2 Concrete Bollards with City Logo F-5-3 Cast Iron Bollards F-5-4 Decorative Steel Bollard F-5-5 Swivel P Gate Steel Bollard F-5-6 Steel Bollard

More information

STEEL PIPE GUIDERAIL 01/01/

STEEL PIPE GUIDERAIL 01/01/ NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports

More information

Installation Instructions for. Handrail Component System

Installation Instructions for. Handrail Component System Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32

More information

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information