1 9/28/2016 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI H & H GENERAL CONTRACTORS, INC. 1 MOBILIZATION L.S. 1 $50, $50, $106, $106, $180, $180, WATER CONTROL L.S. 1 $10, $10, $7, $7, $6, $6, TRAFFIC CONTROL L.S. 1 $10, $10, $15, $15, $16, $16, CLEARING AND MISCELLANEOUS L.S. 1 $25, $25, $40, $40, $61, $61, WORK 5 EXCAVATION C.Y $15.00 $255, $9.50 $161, $11.00 $187, ASPHALT CONCRETE EXCAVATION S.F $1.00 $20, $0.40 $8, $0.55 $11, CONSTRUCTION DEBRIS AND C.Y $18.00 $36, $90.00 $184, $23.00 $47, UNSUITABLE MATERIAL REMOVAL 8 BACKFILL C.Y $15.00 $210, $10.00 $140, $15.50 $217, CONTROLLED LOW STRENGTH C.Y $80.00 $268, $98.00 $328, $ $381, MATERIAL (CLSM) BACKFILL 10 FILTER MATERIAL C.Y. 450 $35.00 $15, $35.00 $15, $41.00 $18, TRENCH SAFETY SYSTEM AND L.S. 1 $100, $100, $15, $15, $35, $35, FALSEWORK 12 CLASS "A" CONCRETE, REINFORCED L.F. 35 $ $26, $1, $43, $1, $52, CONCRETE BOX 13 CLASS "A" CONCRETE, MINOR C.Y. 160 $ $112, $ $136, $ $118, STRUCTURES 14 CLASS "B" CONCRETE, C.Y. 40 $ $16, $ $18, $ $27, MISCELLANEOUS 15 TRANSITION STRUCTURE NO. 1 EACH 1 $7, $7, $21, $21, $21, $21, JUNCTION STRUCTURE NO. 2 EACH 4 $2, $8, $8, $32, $5, $23, MANHOLE NO. 1 EACH 1 $4, $4, $6, $6, $4, $4, MANHOLE NO. 2 EACH 3 $5, $15, $8, $25, $7, $21, MANHOLE NO. 2 WITH SAFETY LEDGE EACH 1 $7, $7, $6, $6, $14, $14, MANHOLE NO. 4 WITH SAFETY LEDGE EACH 3 $8, $25, $16, $48, $17, $51, " RCP, CLASS IV L.F. 151 $ $18, $77.00 $11, $ $20, " RCP, CLASS V L.F. 119 $ $16, $79.00 $9, $ $13, " RCP, CLASS IV L.F. 147 $ $20, $90.00 $13, $ $21, " RCP, 1250D L.F. 71 $ $11, $ $8, $ $9, " RCP, 1400D L.F. 55 $ $13, $ $10, $ $11,770.00
2 9/28/2016 Page 2 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI H & H GENERAL CONTRACTORS, INC " RCP, 1400D L.F. 11 $ $3, $ $3, $ $4, " RCP, 1800D L.F. 8 $ $2, $ $2, $ $4, " RCP, 2000D L.F $ $871, $ $1,099, $ $1,085, " RCP, CLASS V L.F. 351 $ $156, $ $259, $ $259, AGGREGATE BASE, CLASS 2 C.Y. 215 $70.00 $15, $48.00 $10, $ $26, HOT MIX ASPHALT (HMA) TONS 475 $ $47, $ $71, $ $83, TEMPORARY RESURFACING TONS 120 $ $12, $25.00 $3, $ $13, CHAIN LINK FENCE L.F. 490 $50.00 $24, $35.00 $17, $25.00 $12, TEMPORARY FENCING L.F. 938 $6.00 $5, $8.00 $7, $9.00 $8, MISCELLANEOUS IRON AND STEEL LBS $2.00 $19, $2.60 $25, $2.00 $19, REMODEL 4-INCH VITRIFIED CLAY L.F. 50 $90.00 $4, $40.00 $2, $ $5, PIPE (VCP) HOUSE CONNECTION 37 RELOCATE WATERLINE HOUSE EACH 1 $1, $1, $2, $2, $4, $4, SERVICE CONNECTION 38 EXTRA DIRECTED WORK L.S. 1 $100, $100, $100, $100, $100, $100, DUST ABATEMENT L.S. 1 $15, $15, $3, $3, $10, $10, HYDROSEEDING ACRE 2 $4, $8, $2, $4, $2, $4, STORMWATER AND NON- STORMWATER POLLUTION CONTROL 42 NON-STORMWATER DISCHARGE OR DEWATERING L.S. 1 $10, $10, $20, $20, $15, $15, L.S. 1 $5, $5, $1.00 $1.00 $10, $10, $2,603, $3,044, $3,234,880.00
3 9/28/2016 Page 3 of 10 KEC ENGINEERING DDH APPLE VALLEY CONSTRUCTION, INC. C.P. CONSTRUCTION CO., INC. 1 MOBILIZATION L.S. 1 $20, $20, $186, $186, $25, $25, WATER CONTROL L.S. 1 $20, $20, $9, $9, $15, $15, TRAFFIC CONTROL L.S. 1 $10, $10, $13, $13, $20, $20, CLEARING AND MISCELLANEOUS L.S. 1 $60, $60, $51, $51, $29, $29, WORK 5 EXCAVATION C.Y $8.40 $142, $2.72 $46, $15.00 $255, ASPHALT CONCRETE EXCAVATION S.F $1.30 $26, $0.95 $19, $1.00 $20, CONSTRUCTION DEBRIS AND C.Y $85.00 $174, $97.60 $200, $6.00 $12, UNSUITABLE MATERIAL REMOVAL 8 BACKFILL C.Y $10.20 $142, $2.27 $31, $15.00 $210, CONTROLLED LOW STRENGTH C.Y $ $375, $99.40 $332, $82.00 $274, MATERIAL (CLSM) BACKFILL 10 FILTER MATERIAL C.Y. 450 $30.00 $13, $35.50 $15, $28.00 $12, TRENCH SAFETY SYSTEM AND L.S. 1 $48, $48, $45, $45, $165, $165, FALSEWORK 12 CLASS "A" CONCRETE, REINFORCED L.F. 35 $1, $38, $2, $85, $1, $38, CONCRETE BOX 13 CLASS "A" CONCRETE, MINOR C.Y. 160 $1, $192, $ $126, $ $136, STRUCTURES 14 CLASS "B" CONCRETE, C.Y. 40 $1, $44, $1, $71, $ $22, MISCELLANEOUS 15 TRANSITION STRUCTURE NO. 1 EACH 1 $16, $16, $27, $27, $19, $19, JUNCTION STRUCTURE NO. 2 EACH 4 $1, $6, $3, $14, $1, $6, MANHOLE NO. 1 EACH 1 $3, $3, $7, $7, $6, $6, MANHOLE NO. 2 EACH 3 $6, $18, $8, $26, $7, $23, MANHOLE NO. 2 WITH SAFETY LEDGE EACH 1 $16, $16, $13, $13, $16, $16, MANHOLE NO. 4 WITH SAFETY LEDGE EACH 3 $28, $84, $28, $85, $21, $64, " RCP, CLASS IV L.F. 151 $90.00 $13, $ $22, $85.00 $12, " RCP, CLASS V L.F. 119 $85.00 $10, $ $16, $86.00 $10, " RCP, CLASS IV L.F. 147 $ $17, $ $22, $95.00 $13, " RCP, 1250D L.F. 71 $ $9, $ $15, $ $8, " RCP, 1400D L.F. 55 $ $12, $ $15, $ $11,440.00
4 9/28/2016 Page 4 of 10 KEC ENGINEERING DDH APPLE VALLEY CONSTRUCTION, INC. C.P. CONSTRUCTION CO., INC " RCP, 1400D L.F. 11 $ $3, $ $5, $ $3, " RCP, 1800D L.F. 8 $ $3, $ $2, $ $2, " RCP, 2000D L.F $ $1,182, $ $1,162, $ $1,406, " RCP, CLASS V L.F. 351 $ $280, $ $293, $ $295, AGGREGATE BASE, CLASS 2 C.Y. 215 $83.00 $17, $62.60 $13, $60.00 $12, HOT MIX ASPHALT (HMA) TONS 475 $ $85, $ $94, $ $59, TEMPORARY RESURFACING TONS 120 $ $15, $ $17, $65.00 $7, CHAIN LINK FENCE L.F. 490 $40.00 $19, $38.00 $18, $30.00 $14, TEMPORARY FENCING L.F. 938 $16.00 $15, $17.50 $16, $10.00 $9, MISCELLANEOUS IRON AND STEEL LBS $3.20 $31, $1.47 $14, $2.00 $19, REMODEL 4-INCH VITRIFIED CLAY L.F. 50 $73.00 $3, $ $11, $ $6, PIPE (VCP) HOUSE CONNECTION 37 RELOCATE WATERLINE HOUSE EACH 1 $3, $3, $6, $6, $1, $1, SERVICE CONNECTION 38 EXTRA DIRECTED WORK L.S. 1 $100, $100, $100, $100, $100, $100, DUST ABATEMENT L.S. 1 $10, $10, $7, $7, $15, $15, HYDROSEEDING ACRE 2 $2, $4, $2, $4, $3, $7, STORMWATER AND NON- STORMWATER POLLUTION CONTROL 42 NON-STORMWATER DISCHARGE OR DEWATERING L.S. 1 $6, $6, $22, $22, $22, $22, L.S. 1 $5, $5, $15, $15, $3, $3, $3,303, $3,308, $3,415,168.00
5 9/28/2016 Page 5 of 10 LEATHERWOOD CONSTRUCTION, INC. WEKA, INC. HEMET MFG. CO., INC. dba GENESIS CONSTRUCTION 1 MOBILIZATION L.S. 1 $50, $50, $151, $151, $145, $145, WATER CONTROL L.S. 1 $10, $10, $10, $10, $20, $20, TRAFFIC CONTROL L.S. 1 $10, $10, $25, $25, $30, $30, CLEARING AND MISCELLANEOUS L.S. 1 $30, $30, $40, $40, $33, $33, WORK 5 EXCAVATION C.Y $15.00 $255, $5.00 $85, $9.00 $153, ASPHALT CONCRETE EXCAVATION S.F $1.50 $30, $0.50 $10, $1.50 $30, CONSTRUCTION DEBRIS AND C.Y $70.00 $143, $34.00 $69, $83.00 $170, UNSUITABLE MATERIAL REMOVAL 8 BACKFILL C.Y $7.00 $98, $10.00 $140, $15.00 $210, CONTROLLED LOW STRENGTH C.Y $ $335, $ $485, $65.00 $217, MATERIAL (CLSM) BACKFILL 10 FILTER MATERIAL C.Y. 450 $41.00 $18, $40.00 $18, $27.00 $12, TRENCH SAFETY SYSTEM AND L.S. 1 $25, $25, $59, $59, $115, $115, FALSEWORK 12 CLASS "A" CONCRETE, REINFORCED L.F. 35 $2, $70, $1, $52, $1, $56, CONCRETE BOX 13 CLASS "A" CONCRETE, MINOR C.Y. 160 $ $114, $1, $160, $ $147, STRUCTURES 14 CLASS "B" CONCRETE, C.Y. 40 $1, $47, $ $33, $ $19, MISCELLANEOUS 15 TRANSITION STRUCTURE NO. 1 EACH 1 $35, $35, $24, $24, $20, $20, JUNCTION STRUCTURE NO. 2 EACH 4 $4, $17, $5, $20, $2, $8, MANHOLE NO. 1 EACH 1 $9, $9, $5, $5, $6, $6, MANHOLE NO. 2 EACH 3 $10, $30, $9, $27, $9, $28, MANHOLE NO. 2 WITH SAFETY LEDGE EACH 1 $21, $21, $17, $17, $13, $13, MANHOLE NO. 4 WITH SAFETY LEDGE EACH 3 $38, $115, $37, $111, $24, $74, " RCP, CLASS IV L.F. 151 $75.00 $11, $ $31, $ $60, " RCP, CLASS V L.F. 119 $70.00 $8, $ $25, $ $48, " RCP, CLASS IV L.F. 147 $90.00 $13, $ $32, $ $69, " RCP, 1250D L.F. 71 $ $8, $ $15, $ $36, " RCP, 1400D L.F. 55 $ $13, $ $24, $ $30,250.00
6 9/28/2016 Page 6 of 10 LEATHERWOOD CONSTRUCTION, INC. WEKA, INC. HEMET MFG. CO., INC. dba GENESIS CONSTRUCTION 26 60" RCP, 1400D L.F. 11 $ $6, $ $4, $ $6, " RCP, 1800D L.F. 8 $ $6, $ $4, $ $4, " RCP, 2000D L.F $ $1,276, $ $1,319, $ $1,245, " RCP, CLASS V L.F. 351 $ $286, $ $298, $ $224, AGGREGATE BASE, CLASS 2 C.Y. 215 $ $27, $55.00 $11, $55.00 $11, HOT MIX ASPHALT (HMA) TONS 475 $ $125, $ $64, $ $111, TEMPORARY RESURFACING TONS 120 $77.00 $9, $ $13, $ $19, CHAIN LINK FENCE L.F. 490 $39.00 $19, $28.00 $13, $22.00 $10, TEMPORARY FENCING L.F. 938 $3.00 $2, $9.00 $8, $9.00 $8, MISCELLANEOUS IRON AND STEEL LBS $2.00 $19, $2.00 $19, $4.50 $43, REMODEL 4-INCH VITRIFIED CLAY L.F. 50 $85.00 $4, $ $8, $43.00 $2, PIPE (VCP) HOUSE CONNECTION 37 RELOCATE WATERLINE HOUSE EACH 1 $3, $3, $2, $2, $1, $1, SERVICE CONNECTION 38 EXTRA DIRECTED WORK L.S. 1 $100, $100, $100, $100, $100, $100, DUST ABATEMENT L.S. 1 $7, $7, $10, $10, $15, $15, HYDROSEEDING ACRE 2 $2, $5, $2, $4, $2, $4, STORMWATER AND NON- STORMWATER POLLUTION CONTROL 42 NON-STORMWATER DISCHARGE OR DEWATERING L.S. 1 $8, $8, $7, $7, $10, $10, L.S. 1 $7, $7, $10, $10, $5, $5, $3,437, $3,576, $3,580,720.00
7 9/28/2016 Page 7 of 10 GWINCO CONSTRUCTION & ENGINEERING, INC. LONEROCK, INC. T.B.U., INC. 1 MOBILIZATION L.S. 1 $108, $108, $180, $180, $70, $70, WATER CONTROL L.S. 1 $4, $4, $10, $10, $10, $10, TRAFFIC CONTROL L.S. 1 $4, $4, $5, $5, $15, $15, CLEARING AND MISCELLANEOUS L.S. 1 $55, $55, $10, $10, $10, $10, WORK 5 EXCAVATION C.Y $21.00 $357, $10.00 $170, $12.00 $204, ASPHALT CONCRETE EXCAVATION S.F $0.20 $4, $0.50 $10, $13.50 $277, CONSTRUCTION DEBRIS AND C.Y $93.00 $191, $25.00 $51, $55.00 $112, UNSUITABLE MATERIAL REMOVAL 8 BACKFILL C.Y $26.00 $364, $5.00 $70, $8.00 $112, CONTROLLED LOW STRENGTH C.Y $ $350, $ $435, $85.00 $284, MATERIAL (CLSM) BACKFILL 10 FILTER MATERIAL C.Y. 450 $30.50 $13, $45.00 $20, $ $112, TRENCH SAFETY SYSTEM AND L.S. 1 $20, $20, $85, $85, $25, $25, FALSEWORK 12 CLASS "A" CONCRETE, REINFORCED L.F. 35 $1, $46, $1, $52, $2, $87, CONCRETE BOX 13 CLASS "A" CONCRETE, MINOR C.Y. 160 $ $147, $ $128, $ $80, STRUCTURES 14 CLASS "B" CONCRETE, C.Y. 40 $ $4, $ $30, $ $26, MISCELLANEOUS 15 TRANSITION STRUCTURE NO. 1 EACH 1 $20, $20, $20, $20, $35, $35, JUNCTION STRUCTURE NO. 2 EACH 4 $18, $73, $8, $32, $22, $88, MANHOLE NO. 1 EACH 1 $7, $7, $12, $12, $24, $24, MANHOLE NO. 2 EACH 3 $11, $33, $16, $48, $12, $37, MANHOLE NO. 2 WITH SAFETY LEDGE EACH 1 $19, $19, $20, $20, $23, $23, MANHOLE NO. 4 WITH SAFETY LEDGE EACH 3 $35, $107, $50, $150, $25, $75, " RCP, CLASS IV L.F. 151 $ $30, $ $18, $ $22, " RCP, CLASS V L.F. 119 $ $24, $ $15, $ $17, " RCP, CLASS IV L.F. 147 $ $31, $ $22, $ $27, " RCP, 1250D L.F. 71 $ $17, $ $17, $ $15, " RCP, 1400D L.F. 55 $ $9, $ $19, $ $19,250.00
8 9/28/2016 Page 8 of 10 GWINCO CONSTRUCTION & ENGINEERING, INC. LONEROCK, INC. T.B.U., INC " RCP, 1400D L.F. 11 $ $2, $ $4, $ $5, " RCP, 1800D L.F. 8 $ $1, $ $3, $ $4, " RCP, 2000D L.F $ $1,033, $ $1,618, $ $1,556, " RCP, CLASS V L.F. 351 $ $245, $ $333, $ $263, AGGREGATE BASE, CLASS 2 C.Y. 215 $ $37, $25.00 $5, $75.00 $16, HOT MIX ASPHALT (HMA) TONS 475 $ $105, $ $71, $ $71, TEMPORARY RESURFACING TONS 120 $ $20, $50.00 $6, $ $15, CHAIN LINK FENCE L.F. 490 $22.00 $10, $30.00 $14, $40.00 $19, TEMPORARY FENCING L.F. 938 $9.00 $8, $10.00 $9, $6.00 $5, MISCELLANEOUS IRON AND STEEL LBS $2.00 $19, $2.00 $19, $7.00 $67, REMODEL 4-INCH VITRIFIED CLAY L.F. 50 $38.00 $1, $70.00 $3, $ $10, PIPE (VCP) HOUSE CONNECTION 37 RELOCATE WATERLINE HOUSE EACH 1 $2, $2, $2, $2, $3, $3, SERVICE CONNECTION 38 EXTRA DIRECTED WORK L.S. 1 $100, $100, $100, $100, $100, $100, DUST ABATEMENT L.S. 1 $3, $3, $1, $1, $5, $5, HYDROSEEDING ACRE 2 $4, $8, $2, $4, $3, $7, STORMWATER AND NON- STORMWATER POLLUTION CONTROL 42 NON-STORMWATER DISCHARGE OR DEWATERING L.S. 1 $2, $2, $2, $2, $8, $8, L.S. 1 $2, $2, $2, $2, $5, $5, $3,648, $3,833, $3,976,438.00
9 9/28/2016 Page 9 of 10 BOUDREAU PIPELINE CORPORATION GRANITE CONSTRUCTION COMPANY MIKE BUBALO CONSTRUCTION CO., INC. 1 MOBILIZATION L.S. 1 $109, $109, $343, $343, $500, $500, WATER CONTROL L.S. 1 $54, $54, $14, $14, $30, $30, TRAFFIC CONTROL L.S. 1 $39, $39, $44, $44, $20, $20, CLEARING AND MISCELLANEOUS L.S. 1 $61, $61, $24, $24, $80, $80, WORK 5 EXCAVATION C.Y $5.90 $100, $12.00 $204, $60.00 $1,020, ASPHALT CONCRETE EXCAVATION S.F $1.60 $32, $0.35 $7, $15.00 $307, CONSTRUCTION DEBRIS AND C.Y $83.00 $170, $30.00 $61, $ $205, UNSUITABLE MATERIAL REMOVAL 8 BACKFILL C.Y $11.90 $166, $14.00 $196, $30.00 $420, CONTROLLED LOW STRENGTH C.Y $ $512, $ $636, $80.00 $268, MATERIAL (CLSM) BACKFILL 10 FILTER MATERIAL C.Y. 450 $ $117, $70.00 $31, $50.00 $22, TRENCH SAFETY SYSTEM AND L.S. 1 $90, $90, $55, $55, $100, $100, FALSEWORK 12 CLASS "A" CONCRETE, REINFORCED L.F. 35 $1, $49, $1, $43, $2, $70, CONCRETE BOX 13 CLASS "A" CONCRETE, MINOR C.Y. 160 $ $157, $1, $160, $ $128, STRUCTURES 14 CLASS "B" CONCRETE, C.Y. 40 $ $22, $1, $60, $ $24, MISCELLANEOUS 15 TRANSITION STRUCTURE NO. 1 EACH 1 $21, $21, $19, $19, $25, $25, JUNCTION STRUCTURE NO. 2 EACH 4 $2, $9, $7, $31, $6, $24, MANHOLE NO. 1 EACH 1 $10, $10, $6, $6, $12, $12, MANHOLE NO. 2 EACH 3 $12, $36, $12, $36, $18, $54, MANHOLE NO. 2 WITH SAFETY LEDGE EACH 1 $29, $29, $16, $16, $35, $35, MANHOLE NO. 4 WITH SAFETY LEDGE EACH 3 $36, $108, $35, $105, $50, $150, " RCP, CLASS IV L.F. 151 $ $23, $ $24, $ $18, " RCP, CLASS V L.F. 119 $ $19, $ $19, $ $16, " RCP, CLASS IV L.F. 147 $ $24, $ $26, $ $26, " RCP, 1250D L.F. 71 $ $12, $ $17, $ $15, " RCP, 1400D L.F. 55 $ $14, $ $19, $ $13,200.00
10 9/28/2016 Page 10 of 10 BOUDREAU PIPELINE CORPORATION GRANITE CONSTRUCTION COMPANY MIKE BUBALO CONSTRUCTION CO., INC " RCP, 1400D L.F. 11 $ $5, $ $4, $ $4, " RCP, 1800D L.F. 8 $ $3, $ $3, $ $4, " RCP, 2000D L.F $ $1,504, $ $1,473, $ $1,245, " RCP, CLASS V L.F. 351 $ $340, $ $280, $ $280, AGGREGATE BASE, CLASS 2 C.Y. 215 $ $23, $ $22, $40.00 $8, HOT MIX ASPHALT (HMA) TONS 475 $ $86, $ $47, $ $57, TEMPORARY RESURFACING TONS 120 $ $41, $ $20, $70.00 $8, CHAIN LINK FENCE L.F. 490 $37.00 $18, $35.00 $17, $40.00 $19, TEMPORARY FENCING L.F. 938 $15.00 $14, $14.00 $13, $20.00 $18, MISCELLANEOUS IRON AND STEEL LBS $1.00 $9, $2.50 $24, $3.00 $29, REMODEL 4-INCH VITRIFIED CLAY L.F. 50 $ $5, $72.00 $3, $ $10, PIPE (VCP) HOUSE CONNECTION 37 RELOCATE WATERLINE HOUSE EACH 1 $6, $6, $2, $2, $8, $8, SERVICE CONNECTION 38 EXTRA DIRECTED WORK L.S. 1 $100, $100, $100, $100, $100, $100, DUST ABATEMENT L.S. 1 $8, $8, $9, $9, $8, $8, HYDROSEEDING ACRE 2 $2, $4, $2, $4, $2, $4, STORMWATER AND NON- STORMWATER POLLUTION CONTROL 42 NON-STORMWATER DISCHARGE OR DEWATERING L.S. 1 $42, $42, $15, $15, $12, $12, L.S. 1 $14, $14, $1, $1, $6, $6, $4,219, $4,244, $5,409,420.00
Riverside County Flood Control & Water Conservation District
10/11/2018 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI G.J. GENTRY GENERAL ENGINEERING, INC. 1 MOBILIZATION L.S. 1 $100,000.00 $100,000.00 $48,000.00 $48,000.00 $88,580.77 $88,580.77 2 WATER
More informationMiscellaneous. Demolition
Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt
More informationSTANDARD BID ITEM NUMBERS
10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation
More informationValley Road Main Replacement
Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not
More informationCITY OF DANA POINT DEVELOPMENT REVIEW
Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...
More informationMunicipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS
Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS 2016 20.02 M 20.03 M 20.03 SP 20.04 M 20.04 M 20.04 M 20.06 M 20.06 M 20.07 M 20.07 M 20.08 M 20.08
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More information11/06/2014 Pay Items - 1
Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...
More informationVILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.
Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND
More informationROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationRECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.
CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM
More informationDIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS
DIVISION 400 - APPROVED MATERIAL LIST AND STANDARD DETAILS Section 403 - STANDARD DETAILS TABLE OF CONTENTS DIVISION 400, Section 403 - STANDARD DETAILS SECTION DETAIL NOS. Application Table 403-1 I. Concrete
More informationTAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:
CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS
More informationImmediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court
Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board
More informationBID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM
PATTERSON AVENUE 101 Mobilization, Bonds, Insurance LS 1 $40,000.00 $40,000.00 $22,072.00 $22,072.00 102 18-Inch SDR-26 PVC Sanitary Sewer Line Installation LF 1048 $275.00 $288,200.00 $334.00 $350,032.00
More informationMSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY
MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationUPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS
Date 6/1/18 STANDARD DRAWINGS UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed WATER STANDARD DRAWINGS Title Drawing Number Current Date Fire Hydrant and Appurtenance Locations, Improved Streets with Curb
More informationSECTION MANHOLES
SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.
More informationSTANDARD AND EXAMPLE DRAWINGS
STANDARD AND EXAMPLE DRAWINGS DRAWING ISSUE TITLE GENERAL CA01-1-1 E EXAMPLE CATCHMENT PLAN - DESIGN BASIS CA01-1-2 D EXAMPLE PRESSURE MAIN CHARACTERISTIC CURVE CA01-1-3-1 B TYPE 10, 40 AND 90 PUMPING
More informationCITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK
PROJECT LOCATION FOR 3MG ELEVATED STORAGE TANK AT SAN ISIDRO SUBDIVISION CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK engineers architects surveyors below. Knowwhat's Call beforeyoudig.
More informationSECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS
9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a
More informationStandard Specifications
Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for
More informationSECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER
SECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER SECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER The Developer's engineer shall prepare system improvement plans that are clear, concise,
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017 Letting Location: SCDOT Headquarters Building Conference Room 332 955 Park Street Columbia, SC
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationSECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS
UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationSEWER CORRECTION SHEET
Engineering Services Division 23920 Valencia Boulevard, Suite 300 Santa Clarita, California 91355 (661) 255-4942 SEWER CORRECTION SHEET MC# Master Case No. Assessor s Parcel No. Tract / Parcel No. / Address
More informationSUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.
REQUIREMENTS (indicate with an "") 011100 1.4 Detailed Construction Phasing Plan 011100 1.4 Sub-Surface Utility Location Plan 013100 1.3 Letter Designating Project Superintendent 013100 1.3 Construction
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationREGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV
REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract
More informationM I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)
BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND
More informationTO: All Recipients Date: March 20, 2015
CITY OF VALDEZ Project Title: Valdez Museum, Library, Elementary School roof replacements Project No.: 15-310-4250, 15-310-4260, 15-310-9513 Contract No.: 1214 TO: All Recipients Date: March 20, 2015 SUBJECT:
More informationItem 550 Chain Link Fence
Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating
More informationCONSTRUCTION CERTIFICATION PACKAGE
Purpose: The intent of this Construction Certification Package is to ensure that acceptable documentation is maintained during the construction of stormwater management practices (SMPs). For general information
More informationSAUDI COMMITTEE FOR PALESTINIAN RELEIF
SAUDI COMMITTEE FOR PALESTINIAN RELEIF ITB 2014-042 PAL 10-49740 /Construction of 300 Residential Units in Rafah Package #12: Electrical and Telecommunication Works Part C. SECTION 9: PRICE SCHEDULE (Bill
More informationEXTERIOR BUILDING, ROOFING, AND SITE IMPROVEMENTS
CONTRACT NUMBER: IFB-8-B006 ARCHITECT / ENGINEER : HURST-ROSCHE, INC. NO. LINOIS 62203 (68) 398-0890 -7 E. RANDLE ST./ N. FRITZ ST. 402 CHERRY ST., 404-406 ST. LOUIS ST. 502-506 DEE ST. 50-505 PLUM ST.
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS
More informationAppendix C Construction Details
7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses
More informationCITY OF VISTA STANDARD DRAWINGS
CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationCITY OF VISTA STANDARD DRAWINGS
CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated
More informationSUPPLEMENTARY STANDARD DETAIL DRAWINGS
CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary
More informationRenewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.
Renewable Water Resources Greenville, South Carolina CONTRACT DOCUMENTS ADDENDUM III - CONTRACT REVISIONS Prepared by Black & Veatch Corporation Greenville, South Carolina B&V Project No. 192263 September
More informationThis addendum forms a part of the Contract Documents dated: August 10, 2012.
Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911
More informationSECTION TRACER WIRE FOR NONMETALLIC PIPE
PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationSTANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018
SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic
More informationThe Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8
September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers
More informationFINAL ENGINEERING FOR 11 W. HOME AVE. VILLA PARK, IL LOCATION MAPS VICINITY SITE LOCATION SUMMARY OF QUANTITIES 67 FT. 32 FT. 92 SQ.-FT.
FINAL FOR W. HOME AVE., IL 608 LEGEND DESCRIPTION SANITARY SEWER STORM SEWER PROPOSED COMBINED SEWER WATERMAIN GAS TELEPHONE ELECTRIC OVER HEAD WIRE CURB FENCE STORM CATCHBASIN OR MANHOLE, OPEN LID STRUCTURE
More informationCITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting
More informationGovernment Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications
PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............
More informationCONTINUOUS COUNTERPOISE ON POLES
Project Procedure CONTINUOUS COUNTERPOISE ON POLES 07/25/2011 PAGE 1 OF 5 1.0 PURPOSE The purpose of this procedure is to provide guidance and direction for the installation of continuous counterpoise
More informationAPPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION February 10, 2017 LETTING
COUNTY: BLEDSOE, GRUNDY, MARION, SEQUATCHIE (CNR914) 001 PROJECT: 98029-4230-04 TYPE: Mowing and/or Litter Removal LENGTH: Project Length: 364.990 miles WRK DAY: On or before December 31, 2017 806-01 MOWING
More informationOakdale Primary School, Peterborough Civil Engineering NBS Specification
Oakdale Primary School, Peterborough Civil Engineering NBS Specification Prepared for Hamson Barron Smith Revision Schedule 171046 Civil Engineering NBS Specification May 2017 Rev Date Details Prepared
More informationSection 808. FENCING
808.01 Section 808. FENCING 808.01. Description. This work consists of providing and erecting, or moving existing, woven wire fence, temporary fence, protective fence, chain link fence, high-tensile wire
More informationLETTING : CALL : 029 COUNTIES : GOODHUE
PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO. 25024. CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO
More informationSUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard
More informationStormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17
StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications
More informationA. Suggested Tool List
These instructions are intended to be a basic guide to the installation and assembly of plate structures. Job site specific conditions may require other procedures. A Statement on Safety The assembly procedure
More informationL1702D-SW-PL-01 STORM LINES - PLANS (1 OF 3) L1702D-WW-PL-03 SEWER LINES - PLANS (3 OF 3) L1702D-SW-PL-02 STORM LINES - PLANS (2 OF 3)
GENERAL DWG Nb. DRAWING TITLE L1702D-LOD- LIST OF DRAWINGS L1702D-GN- GENERAL & L1702D-WW-GNL-01 SEWER LINES - GENERAL LAYOUT L1702D-WW-KPL-01 SEWER LINES - GENERAL KEY PLAN L1702D-SW-GNL-01 STORM LINES
More informationSTRUCTURES FOR SANITARY AND STORM SEWERS
SUDAS Standard Specifications Division 6 - Structures for Sanitary and Storm Sewers Section 600 - Structures for Sanitary and Storm Sewers STRUCTURES FOR SANITARY AND STORM SEWERS PART - GENERAL.0 SECTION
More informationPlan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA
Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit
More informationMemorandum. Mayor and Board of Aldermen. Benjamin Requet, Senior Planner. Date: February 21, Request for Water and Sewer Service for Clay Canvas
Memorandum To: From: Mayor and Board of Aldermen Benjamin Requet, Senior Planner February 21, 2017 Re: Request for Water and Sewer Service for Clay Canvas Please consider this request for granting water
More informationEcological Restoration Drafting & Design Guidelines
Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN
More informationEast-West Gas Pipeline. Construction Project of 45km Section of Qubuleti (Dn500) Branch Pipeline Cost Estimate Ref.: KOBU -GE05-CM-BOQ-0001-ENG-A01
1 ROW Preparation 1.1 Topsoil stripping and storage along the pipeline ROW m 42788 2 Transportation of Pipes and other Fittings to the Construction Site 2.1 Transportation and stringing of DN500 pipes
More informationPlate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST.
DISTRIBUTION: 7 MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Design Services Section TRANSMITTAL LETTER NO. (0-0) MANUAL: Standard Plates DATED: January 9, 00 SUBJECT:
More informationStandard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.
DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard
More information1170 W. 3rd Street, 2nd Floor San Bernardino, CA Phone: (909) Fax: (909) Web:
Governments SANBAG Working Together San Bernardino Associated Governments 1170 W. 3rd Street, 2nd Floor San Bernardino, CA 92410-1715 Phone: (909) 884-8276 Fax: (909) 885-4407 Web: www.sanbag.ca.gov I
More informationCONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01
More informationEngineering Standards & Specifications November 2016 Edition
G:\INFRASTRUCTURE PLANNING\STANDARDS & PRODUCTS\MOESS\EDITION NO11\FINAL DRAFT\FINAL DRAFT STANDARD CAD DRAWINGS\SECTION 1 DWGS\G-1 T H E H A R B O U R C I T Y STANDARD LAYER NAMES SHEET 1 OF 3 G-1 LAYER
More informationi. Shoring layout. ii. Shoring sections and details (including anchor details, if required).
1. Design NOC 1.1 Shoring Design NOC: b. Required Drawings (DLTM COORDINATES) i. Shoring layout. ii. Shoring sections and details (including anchor details, if required). 1. Shoring Works NOC should be
More informationATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES
ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES The Tacoma Hydroelectric Project is located about 20 miles north of Durango, Colorado, on a high intermountain plateau west of
More informationSHLDR + + Ê HOMINY TRAIL #4 REBAR 24"O.C. 4" TYPE 5 AGG. BASE TRAIL WALL 9 5' SHLDR 2' SHLDR Ê TRAIL #4 24" O.C.
WO20-1 WO20-1 2' 10' 2' 2' 8' 2' RT. EDGE OF TRAIL 2' RT. SHLD. BREAK MAX SLOPE AT FILL MAX SLOPE AT FILL SHLDR TRAIL SHLDR + + 1% +/- 0.5% SEE NOTE 1 Ê HOMINY TRAIL MAX SLOPE AT CUT MAX SLOPE AT FILL
More informationMONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2
MONTH : December 2015 PHOTOGAPH NO: 000587 DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2 MONTH : December 2015 PHOTOGRAPH NO: 000588 DESCRIPTION : Concrete Casting for
More informationAPPENDIX FENCE GENERAL NOTES
APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.
More informationMILL HILL ARTS VILLAGE
OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE,
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationLASERS, TRANSITS & LOCATORS AIR TEST EQUIPMENT
LASERS, TRANSITS & LOCATORS AUTO LEVEL $40 $160 $480 BLOWER 12 VOLT W/ HOSE $25 $100 $300 GAS DETECTOR $55 $220 $660 GRADE POLE $5 $20 $60 LOCATOR $20 $80 $240 LOCATOR SIGNAL GENERATOR $20 $80 $240 MAGNETIC
More informationSOUTH AFRICAN NATIONAL STANDARD
ISBN 978-0-626-27370-5 SOUTH AFRICAN NATIONAL STANDARD Precast concrete manhole sections and components Published by SABS Standards Division 1 Dr Lategan Road Groenkloof Private Bag X191 Pretoria 0001
More informationCHAPTER F IVE ROBOTIC TOTAL STATION
CHAPTER F IVE ROBOTIC TOTAL STATION 5 ROBOTIC TOTAL STATION 5 OVERVIEW If necessity is the mother of invention, then the invention of the Total Station robotic instrument truly fits the requirements of
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More information7000 Fifteen Mile Road Sterling Heights, Michigan
7000 Fifteen Mile Road Sterling Heights, Michigan Industrial Building With Excess Land and Rail Access As exclusive agents, we are pleased to offer the following property for lease: 128,648 Sq. Ft. Completely
More informationSUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationAPPENDIX E CIVIL DESIGN (QUANTITY CALCULATION)
APPENDIX E CIVIL DESIGN (QUANTITY CALCULATION) LOWER CACHE RIVER 1135 CIVIL DESIGN CALCULATIONS R2200, R90, & FILTER MATERIAL VOLUME CALCULATIONS FOR WEIR STRUCTURES EMBEDDED RIPRAP THICKNESS 4' 6'
More informationWATER STRUCTURE LEGAL & SURVEY TOPOGRAPHY/GRADING LANDSCAPE/VEGETATION
REVISION IDENTIFIER DETAIL LABEL CALLOUT LABEL 1 SHEET ABANDONED ASBESTOS CEMENT BALK OF WALK BEGINNING OF CURVE BENCH MARK BUILDING CAPACITY CAST IRON CATCH BASIN CATCH BASIN MANHOLE CENTER LINE CERTIFICATE
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard
More informationSOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department
SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 2 SDCC-TS-02 INDUCTIVE LOOPS & ABOVE GROUND DETECTION REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationProject Summary Report (Planning Stage)
Upgrade to Facility Donohill Landfill Garryshane Donohill Co. Tipperary Project Summary Report (Planning Stage) November 206 TOBIN CONSULTING ENGINEERS Report on Project Summary (Planning Stage) PROJECT: