MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2
|
|
- Randolf Owen
- 5 years ago
- Views:
Transcription
1 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Concrete Casting for 1 st Wall of Permanent Manhole at MH-G2
2 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Steel Pipe Sleeve Installation and Rectification of Premix Road Works at MH-G4 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Steel Pipe Sleeve Installation works at MH-G4a
3 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Preparation of Works for TBM Retrieval at MH-G4a MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Jacked In of 1 st to 11 th RC Pipe at MH-G5 to MH-G4a
4 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Jacked In of 22 nd to 27 th RC Pipe at MH-G5 to MH-G4a MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Jacked In of 35 th to 42 nd RC Pipe at MH-G5 to MH-G4a
5 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Jacked In of 47 th to 50 th RC Pipe at MH-G5 to MH-G4a MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : PJM Breakthrough at MH-G4a
6 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Soil Excavation, Fixing BRC and Casting of 11 th layer Caisson at MH-G5a MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Fixing BRC and Casting of Base Slab at MH-G5a
7 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Rebar Planting Preparation Works for Thrust Block at MH-G5b MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Rebar Installation for Thrust Block and launching Pad at MH-G5b
8 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Soil Excavation, Fixing BRC and Casting of 9 th layer Caisson at MH-G6 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Soil Excavation, Fixing BRC and Casting of 12 th layer Caisson at MH-G6
9 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Fixing BRC and Casting of Base Slab at MH-G6 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Jacked In of 192 nd to 206 th RC Pipe at MH-G8 to MH-G9
10 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION :PJM Breakthrough at MH-G9 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : TBM Retrieval Works at MH-G9
11 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Sheet Pile Installation Works for Temporary Drain at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Hacking of Existing Caisson Wall at MH-G10
12 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Soil Excavation for Temporary Drain at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Concrete Casting of Base Slab for Temporary Drain at MH-G10
13 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Fixing BRC, Formwork and Concrete Casting at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Decking Preparation Works at MH-G10
14 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Concrete Packing and Decking Installation at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Road Premix Laying at MH-G10
15 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Excavation and Casting of 1 st Layer Caisson at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Cycling Path Preparation Works at MH-G10
16 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Drain Pipe Laying and Slope Trimming Works at MH-G12 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Fixing BRC and Concrete Casting for Cycling Path at MH-G12
17 MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Cleaning of Construction Materials at MH-G12 MONTH : December 2015 PHOTOGRAPH NO: DESCRIPTION : Reinstatement Works at MH-G12
STANDARD AND EXAMPLE DRAWINGS
STANDARD AND EXAMPLE DRAWINGS DRAWING ISSUE TITLE GENERAL CA01-1-1 E EXAMPLE CATCHMENT PLAN - DESIGN BASIS CA01-1-2 D EXAMPLE PRESSURE MAIN CHARACTERISTIC CURVE CA01-1-3-1 B TYPE 10, 40 AND 90 PUMPING
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More informationPROGRESS REPORT CGEWHO CHENNAI PHASE-III PROJECT
30.04.2018 Piling work 51% completed. Balance Piling work on Progress A1 BLOCK Barbending work for pile on progress. Piling work 43% completed. Balance Piling work on Progress A2 BLOCK Barbending work
More informationPipe Product Catalog Table of Contents
Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"
More informationAnti-Trust Statement
Anti-Trust Statement http://www.concrete-pipe.org/ A joint effort of the Texas Concrete Pipe Association and the Texas Department of Transportation What brought this about? The TxDOT organization consists
More informationC-M TMR Products Index
C-M TMR Products Index TMR Dwg. No. Grate/Frames 9x6 Dwg. AS3996 Recessed Road Gully Units Dwg. 1443, 1444 Protruded Road Gully Units Dwg. 1443, 1444 1220 Road Gully Units Dwg. 1459 7x4 Road Gully Units
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationWelcome. Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR
Welcome Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR HKSAR Government, Highways Department s Contract HY/2011/09 Hong Kong Zhuhai Macao Bridge Hong Kong Link Road 1 Contents
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationMiscellaneous. Demolition
Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt
More informationTypical Drawings for Schools
0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)
More informationSYARIKAT BEKALAN AIR SELANGOR SDN BHD
NOTE : 1. FOR LEGEND, ABBREVIATION AND GENERAL NOTES SEE DRG. NO. SYA / STD / 001. 2. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED. 3. ACTUAL LENGTH OF PE COMMUNICATION PIPES SHALL BE DETERMINED ON
More informationModule 6 : Design of Retaining Structures. Lecture 30 : Dewatering [ Section 30.1 : Introduction ]
Lecture 30 : Dewatering [ Section 30.1 : Introduction ] Objectives In this section you will learn the following Introduction Lecture 30 : Dewatering [ Section 30.1 : Introduction ] Introduction Dewatering
More informationValley Road Main Replacement
Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not
More informationEngineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings
Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationTitle of Innovation: In-Line Inspection for Water Pipelines
Title of Innovation: In-Line Inspection for Water Pipelines Nominee(s) Margaret Hannaford, P.E., Division Manager, Hetch-Hetchy Water and Power Division of the San Francisco Public Utilities Commission
More informationDouble Storey HC Precast System Drawing - 3D
Double Storey HC Precast System Drawing - 3D Superstructure ( Frame & Wall ) : - By HC Precast System Sub- Structure By Other : - Appointed By Client 77 % 23 % INDUSTRIALISED BUILDING SYSTEM ( IBS ) is
More informationPOST FRAME CONSTRUCTION MANUAL
POST FRAME CONSTRUCTION MANUAL www.pole-barn.info www.apbbuildings.com TABLE OF CONTENTS 3. Jobsite Preparation 4. Setting Foundation Posts 5. Setting Corner Posts 6. Sidewall & Endwall Posts 7. Grade
More informationPrecast Concrete Pavement
Precast Concrete Pavement Phillip Sturdivant, P.E. Louisiana Department of Transportation and Development www.dotd.la.gov What is Precast Concrete Pavement? Precast concrete pavement is what it says it
More informationTYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.
FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationBreadth: Change CIP Structural Walls and Beams to Precast
Breadth: Change CIP Structural Walls and Beams to Precast Issue: One of the biggest problems facing construction companies in Richmond, Virginia is the lack of skilled labor. Currently, there are approximately
More informationi. Shoring layout. ii. Shoring sections and details (including anchor details, if required).
1. Design NOC 1.1 Shoring Design NOC: b. Required Drawings (DLTM COORDINATES) i. Shoring layout. ii. Shoring sections and details (including anchor details, if required). 1. Shoring Works NOC should be
More informationMSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY
MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION
More informationCity of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS
City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements
More informationEnsure there is reasonable access for materials and working space, ensure the shed site is level and consider the disposal of run-off water.
INSTALLATION GUIDE TM Flat Roof Homesheds THE POTTER BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Potter Flat Roof
More informationGABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 3 Step 2a Footing Set-Out for Concrete
More informationSYARIKAT BEKALAN AIR SELANGOR SDN BHD
NOTE : 1. FOR LEGEND, ABBREVIATION AND GENERAL NOTES SEE DRG. NO. SYA / STD / 001. 2. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED. 3. ACTUAL LENGTH OF PE COMMUNICATION PIPES SHALL BE DETERMINED ON
More information6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.
Kentucky Society of Professional Engineers May 23 rd, 2014 Lexington KY Milton Madison Bridge Slide Aaron L. Stover, PE, SE Michael Baker Jr., Inc. Project Partners The Challenge Milton, KY Existing Bridge
More informationPrecast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6
Precast Concrete at Paddington Rail Station, London By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station Project background. Reasons for using precast concrete and its
More informationIBS SCORING IN MALAYSIA
IBS SCORING IN MALAYSIA HOW CAN CIDB AND INDUSTRY PLAYERS WORK HAND IN HAND TO PROMOTE USAGE OF IBS IBS SCORING SYSTEM & CASE STUDY 1 CONTENT : 1) IBS SCORING SYSTEM 2) CASE STUDY 1 RESIDENTIAL 3) CASE
More informationIOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015
IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT No Record Drawing Comments by Veit for this Sheet! FOR FEBRUARY, 2015 VEIT Record Drawings Demolition Project Manager: Jason Mueller Demolition Superintendent:
More informationThis document downloaded from vulcanhammer.net vulcanhammer.info Chet Aero Marine
This document downloaded from vulcanhammer.net vulcanhammer.info Chet Aero Marine Don t forget to visit our companion site http://www.vulcanhammer.org Use subject to the terms and conditions of the respective
More informations23ss sloped bollard with reflective bands
s23ss sloped bollard with reflective bands Right, s23 brushed stainless steel bollards with sloped top and reflective band. Top, s23 bollard with sloped top. Above, with bespoke logo. description Brushed
More informationStandard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.
DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard
More informationAppendix C Construction Details
7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses
More informationROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS
More informationDIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS
DIVISION 400 - APPROVED MATERIAL LIST AND STANDARD DETAILS Section 403 - STANDARD DETAILS TABLE OF CONTENTS DIVISION 400, Section 403 - STANDARD DETAILS SECTION DETAIL NOS. Application Table 403-1 I. Concrete
More informationVINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS
P a g e 1 VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS Shown: 8' x 12' Vinyl Classic Pergola with 12" Top and Main Runner Spacing The design of this pergola is based on all posts being installed
More informationProConcrete. Gernot Jeromin Product Manager Bentley Systems, Incorporated
ProConcrete Gernot Jeromin Product Manager ProConcrete 3D CAD Software for Concrete and Reinforcement 2 WWW.BENTLEY.COM What is ProConcrete AutoCAD Application MicroStation V8i version will be available
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationLETTING : CALL : 029 COUNTIES : GOODHUE
PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO. 25024. CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO
More information1. In the Y direction: to the vertical axis of the wall (middle of the wall)
Installation of TENLOC Panel Connectors Precast Factory Installation of the TENLOC The is placed into the reinforcement of the wall and attached to the mold with nails. The wall thickness must be minimum
More informationSUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard
More information1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"
More informationBracket guide. LK Pipe Pole. LK Radiator fixture Uni
Bracket guide LK Radiator fixture Uni LK Radiator fixture Uni c/c 40 (Article no. 481 43 92) LK Radiator fixture Uni c/c 50 (Article no. 481 44 03) LK Pipe Pole (Article no. 481 43 91, 481 43 90) Used
More informationOverview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane
Overview of Precast ABC Projects in the Pacific Northwest Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane 1 Techniques Additional prefabrication of units to reduce field timeline Simplify deck installation
More informationCITY OF WAPATO NORTH WAPATO LIFT STATION REPLACEMENT CITY OFFICIALS. JUAN OROZCO Mayor. ROBERTO REYNA Mayor Pro Tem
YAKIMA COUNTY WASHINGTON CITY OFFICIALS JUAN OROZCO Mayor ROBERTO REYNA Mayor Pro Tem TONY GUZMAN RALPH SANCHEZ TONY GAYTAN DORA ALVAREZ-ROA FRANK JAIME City Council KEITH WORKMAN ROBIN CORDOVA Clerk-Treasurer
More informationDUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL
DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 4 Step 2a Footing Set-Out for Concrete
More informationConstruction Tolerances - The following tolerances apply to cast-in-place structures:
00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:
More informationPhase 2 Silver Line Update
Phase 2 Silver Line Update Committee for Dulles Leslie Pereira, Communications & Outreach Manager Capital Rail Constructors February 16, 2017 Safety Since Notice to Proceed: Manpower Hours: 3,280,898
More informationIMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible
More informationcivil product range JUNCTION BOXES DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS
kilform civil product range ESB CCTV Eircom Services Lighting Risers DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS Untrapped Gully Trapped Gully Large Trapped Gully Headwalls
More informationWELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1
WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1-2017 - Industrialised Building System ( IBS ) is a system not a machine or component. Open System and Proprietary System is a Technology.
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard
More informationMODEL AIRCRAFT STARTING BENCH
MODEL AIRCRAFT STARTING BENCH ft / in 6 ft in 8 FRONT VIEW PARTS LIST "x6" LUMBER PN CUT LENGTH QTY ' 8" 8 ' " ' 0-/" ' 8" (' start) ' 9" (' start) BILL OF MATERIALS "x6"x8' Wood 8 ea /" sq x ' Wood ea
More informationHUSSEY GAY BELL SAVANNAH, GEORGIA
HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
More informationUtility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles
Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect
More informationB17. Sewer Site Plans BULLETIN
BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in
More informationSubstation 33/11kV. General Notes. Drawn by: Hewa Qader Mustafa. Soran Rostam Aziz. C-For footings = 75 mm. B-For beams & columns = 40 mm.
General Notes Unless otherwise noted, All the dimensions are given in meter. Do not scale from these drawings. These drawings are proposed drawings. All structural drawings should be read in conjunction
More informationZ1035, Z1036, & Z1903 FLOOR DRAIN & CLEANOUT INSTALLATION STABILIZER
Z1035, Z1036, & Z1903 FLOOR DRAIN & CLEANOUT INSTALLATION STABILIZER The Zurn Drain Installation Stabilizer is a unique support plate designed to secure a drain in place and provide adjustment, rigidity,
More information2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"
Scope.1 Precast Concrete Equipment Slab Box 8' x 10' x Pad with 4' x 7' x 3'- Box for 5-Way RAM Gas Switch, 2-Way, 3-Way, and 4-Way Pad-Mounted RAG Gas Switches, VFI 9, VFI 12, Bypass Switch, and 33 kv
More information6 1/2 x 6 1/2 Flat Top Pergola
6 / x 6 / Flat Top Pergola A S S E M B L Y G U I D E Models: Portland, Liberty O P T I O N A L A C C E S S O R Y Bolt Down Bracket Kit V.-0506 Ta b l e o f Co n t e n t s PAGE The Introduction & Overview......................................................
More informationWALL TO FABRICATED FLOOR
WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN
More informationRiverside County Flood Control & Water Conservation District
10/11/2018 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI G.J. GENTRY GENERAL ENGINEERING, INC. 1 MOBILIZATION L.S. 1 $100,000.00 $100,000.00 $48,000.00 $48,000.00 $88,580.77 $88,580.77 2 WATER
More informationTHE ONTARIO CONCRETE PIPE ASSOCIATION
THE ONTARIO CONCRETE PIPE ASSOCIATION PRECAST BOX & CULVERT GUIDELINE Table of Contents 1 INTRODUCTION... 6 1.1 Background... 6 1.2 Existing Handbook and Drawings... 6 1.3 Distribution... 6 1.4 Revisions...
More informationInstallation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts
Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox
More informationSTANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN
CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D ASPHALT 20 GUTTER LINE CONCRETE CURB FINISHED GRADE PRECAST GRADE RINGS, 2 50 100 MAX PRECAST CB LID GROUT ALL AROUND CB LEAD, INSIDE & OUTSIDE OF
More informationadopted in Hong Kong
Prefabricated Construction Systems for Building and Civil works adopted in Hong Kong Presented by Raymond W M Wong Division of Building Science & Technology City University of Hong Kong The presentation
More informationUNDERGROUND UTILITY VAULTS
LEED Reference Guide For Precast Concrete Products Perfect for communications, electrical, gas or steam systems, precast concrete utility structures protect the vital connections and controls for utility
More informationSUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard
More information10x10 Trellis Pergola
0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................
More informationThe DFI Institute is organized to serve as a primary means through which members of the Institute may participate in improvement of the planning,
The DFI Institute is organized to serve as a primary means through which members of the Institute may participate in improvement of the planning, design and construction aspects of deep foundations and
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationNEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST
NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be
More informationSECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationThe Vienna Trellis. Tools You Will Need. General Information
A S S E M B LY I N S T R U C T I O N S www.newenglandarbors.com 8.7 in 9 in 6 in in Please read through before starting assembly. in 9 in IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS. Check
More informationExploration Beyond Expectation. Geo-Carte Radar Technology Pvt. Ltd.
Exploration Beyond Expectation Geo-Carte Radar Technology Pvt. Ltd. Problem Unknown distribution network of underground pipeline in India 32% Damage of pre-existing underground utilities during laying
More informationMEEVER BRACING 400 SERIES
Description The Meever Series bracing is very easy and straightforward to assemble, very adaptable, modular hydraulic bracing system that has interchangeable extension modules in various lengths. The 400
More informationSECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS
UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION
More information6 1/2 x 6 1/2 Wood Grain Flat Top Pergola
6 / x 6 / Wood Grain Flat Top Pergola A S S E M B LY G U I D E Models: Lakewood OPTIONAL ACCESSORY Bolt Down Bracket Kit Ver /AUG/0 Ta b l e o f Co n t e n t s PAGE The 6.5 x 6.5 Wo o d Grain Flat Top
More informationFireball Fab Welded Baluster Insert Panel System Installation Instructions
Fireball Fab Welded Baluster Insert Panel System Installation Instructions Prior to construction, check with your local regulatory agency for special code requirements in your area. Common railing height
More informationThe following are OSHA Construction Standards that require self-inspection, training, and written programs or are required to be posted.
The following are OSHA Construction Standards that require self-inspection, training, and written programs or are required to be posted. Legend: Y = Yes I = Initial AN = As Needed RF = Refresher P = Posted
More informationSECTION MANHOLES
SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.
More informationStandard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (13-03) MANUAL: Standard
More informationCENTRIFUGAL PUMPS FRAME MOUNT 13" FEATURES
FEATURES Volute: Cast iron for heavy-duty service; back pullout design; can be rotated for ease of installation; 6 x 8-13 and 8 x 10-13 are split volutes for reduction in radial bearing load Impeller:
More informationHSD-LD-US 06/13 Page 1/5. Components
Page 1/5 Components HSD-LD-Set: HSD-LD-S The HSD-LD-Set consists of HSD-LD-D Dowel Component, the HSD-LD-S Sleeve Component, the Locking Plate and the HSD-LD Epoxy Resin. HSD-LD-D Dowel Component HSD-LD-ULTRA-Set:
More informationFoundation Specifications for 5.6-Meter Modular Earth Station Antennas
Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationROOM smooth cement f.f FLOOR LAYOUT
3,300 3,600 4,100 2,159 1,000 1,241 ROOM smooth cement f.f 168 900 1,091 1,000 1,241 4,400 FLOOR LAYOUT FLOOR LAYOUT CARTAKERS ROOM 2,159 1,000 1,241 SOUTH ELEVATION EAST ELEVATION 1,241 1,000 1,091 900
More informationAPPENDIX 1: CONSTRUCTION PLAN CHECKLIST
APPENDIX 1: CONSTRUCTION PLAN CHECKLIST October 2017 APPENDIX A APPENDIX 1: CONSTRUCTION PLAN CHECKLIST ALL PLANS Plans on 24-inch by 36-inch paper (Originals shall be transmitted on a CD as an electronic
More informationSHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail
SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set Posts
More informationPERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE
MAGNETIC PRODUCTS FOR PRECASTING PERFORM WITH PRECISION CONCRETE CONSTRUCTION SOLUTIONS BROCHURE Form Magnets ON/OFF MAGNETS Strong adhesion and shear capacity -650# to 2500# adhesion Easy to turn on or
More informationFoundation Specifications for 7.6-Meter Modular Earth Station Antennas
Installation Instructions Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Bulletin 237186A Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationPVC Fencing Install Instructions
PVC Fencing Install Instructions Step 1-Pounding the Galvanized Steel Posts Call your local area utility company to come mark underground lines before any digging or pounding any posts into the ground.
More information