1 Upgrade to Facility Donohill Landfill Garryshane Donohill Co. Tipperary Project Summary Report (Planning Stage) November 206 TOBIN CONSULTING ENGINEERS

2 Report on Project Summary (Planning Stage) PROJECT: Upgrade to Facility Donohill Landfill Garryshane Donohill Co. Tipperary CLIENT: Tipperary County Council County Hall Emmet St Clonmel Co. Tipperary COMPANY: TOBIN Consulting Engineers Fairgreen House, Fairgreen Road, Galway Tel: galway@tobin.ie

3 Project Summary Report DOCUMENT AMENDMENT RECORD Tipperary County Council Upgrade to Facility Project Summary Report (Planning Stage) PROJECT NUMBER: 7604 DOCUMENT REF: 7604 Project Summary Report B Re-issued based on Comments AA Nov 206 Nov 206 C.McG Nov 206 A Part 8 Planning Report Oct 205 BD Oct 205 CMcG Oct 205 Revision Description & Rationale Originated Date Checked Date Authorised Date TOBIN Consulting Engineers i

4 Project Summary Report TABLE OF CONTENTS INTRODUCTION... 2 PROPOSED LAYOUT STORM DRAINAGE FOUL DRAINAGE TRAFFIC MANAGEMENT CONCLUSIONS... 3 APPENDIX A... 4 ii

5 Project Summary Report Introduction Tipperary County Council (TCC) requires upgrade works to their current (CA) facility at Donohill landfill. This is to improve health and safety of both employees and members of the public, enclose items to improve security and traffic management of the civic amenity area. This report has been prepared to detail the proposed development of upgrade works to the current civic amenity and should be read in conjunction with relevant drawings as outlined and noted herein. The proposed development will entail the demolishing of existing party walls to the civic amenity, construction of new civic amenity building, extending of existing concrete apron, rearrangement of existing civic amenity layout and all associated ground and civil works. Accompanying Drawings: Drawing No Drawing Title Site Location Map Site Layout Site Layout (Site Boundary to Public Road) Part Site Layout Proposed Site Layout Proposed Drainage Layout Proposed Site Layout Showing Autotrack Analysis () Proposed Site Layout Showing Autotrack Analysis (2) Proposed Site Layout Showing Autotrack Analysis (3) Proposed Elevations & Sections Proposed Portacabin Plan & Elevations

6 Project Summary Report 2 Proposed Layout Since waste for landfill is no longer accepted there is now an opportunity to revisit the layout of the civic amenity site. The existing facility was quite restricted in size and it is hoped the new layout will improve management of the facility, health and safety and improve security of certain items such as electrical and metal waste. The proposed layout will see the construction of a simple agriculture type store encompassing the existing concrete apron that is enclosed by walls. To facilitate this, intermediate walls will be demolished to utilise an open plan, the total plan area of the proposed building will be approximately 230m 2 and the general finish of the building will be part rendered building and part powder coated cladding. It is also proposed to fill a void to the east of the civic amenity and construct an extended concrete apron to use for a 40 yd 3 Municipal Waste skip (refer to the accompanying drawings). All new areas will be fenced and designated parking spaces will be provided for public use. site access to and from the waste disposal facility will remain untouched as shown in the accompanying drawings. The simple agriculture type store is not expected to visually impact on the surrounding landscape or environment (refer to drawing number ). Changes to the civic amenity site will enhance the use of the facility, improve safety for users and upgrade the appearance of the current waste disposal area. The current office for the civic amenity is in disrepair and it is proposed to replace this with another temporary unit. Autotrack analysis was carried out to ensure safe manoeuvring of vehicles, this included a 5.5m long articulated trucks. 3 Storm Drainage Currently storm water that falls on the civic amenity area is considered contaminated and is directed via a holding tank to the leachate lagoon for disposal off site to a treatment facility. With the new layout of the civic amenity there is now an opportunity to segregate any storm water from contaminated water. Rainwater falling on newly roofed areas and newly resurfaced roads will be collected and discharged to the surface water lagoon located to the west of the site. Rainwater falling on existing areas will continue to discharge to leachate lagoon. 2

7 Project Summary Report 4 Foul Drainage There are no proposed new foul sewers. 5 Traffic Management Due to the nature of the proposed changes, we believe that this shall have no measurable impact on the existing traffic movements to and from the site via the Regional Road R497. The civic amenity is only open to the public Monday Thursday: 0:00-6:30, closed for lunch 2:30 3:00, Friday: 0:00 5:30, closed for lunch 2:30 3:00, Saturday: 09:00 2:45 and closed Sunday. The civic amenity facility is seldom visited by more than 3 public vehicles at any given time. There will be sufficient turning space for a 5.5m long rigid truck to manoeuvre to skips for loading as shown by the auto-track analysis on the attached drawings. Pedestrians will be able to walk safely to each waste disposal zone via a dedicated pedestrian walkway. A new parking space will be provided for members of the public with staff using existing parking adjacent to the weighbridge. The site is staffed during opening hours and would assist any disabled person should they attend. 6 Conclusions The report should be read in conjunction with the associated drawings, layouts and specifications. We feel that changes to the site will only enhance the use of the civic amenity and improve safety for all users. We trust that adequate detail has been provided for wastewater drainage layout and traffic assessment. Should you require any further detail, we will be happy to meet and supply same, as you may deem appropriate. Signed: Alan Armstrong BE On behalf of Tobin Consulting Engineers Date: 8 th November 206 3

8 APPENDIX A DRAWINGS 4

9

10 THE INFORMATION ON THIS DRAWING IS TO THE ORDNANCE SURVEY IRELAND ITM COORDINATE SYSTEM APPLICATION SITE BOUNDARY Landholding Boundary (under Control of the Applicant) Area Civic Amenity Area Application Site Boundary Temporary Capping Area Boundary Site Fence Boundary Overliner Gas Extraction Pipe 250mm HDPE PE00 SDR 7.6 LANDHOLDING BOUNDARY FRENCH DRAIN RG 50mm Compressed Air Pipe 50mm Leachate Pipe Leachate Rising Main ALL INCOMING TRAFFIC TO PASS OVER WEIGH BRIDGE RG Knockout Pots Gas Extraction Manifold Leachate Composition RG Surface Water Monitoring Gas Migration Monitoring Wells Levels RG RG N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD OIL INTERCEPTOR 60mm SLOTTED HDPE B //206 Issued for Part VIII Planning AA (Minor Revisions) A 25/04/206 Issued for Part VIII Planning BD Rev Date Description By Chkd. 60mm SOLID HDPE TIPPERARY COUNTY COUNCIL Donohill Landfill Upgrade Works EXISTING OUTFALL STRUCTURE Site Layout STONE DRAIN ORIGINAL LEACHATE INTERCEPTOR TRENCH (2003) A: Prepared by: A3: :000 Checked: Date: CMcG November 206 Project Director: C. McGovern Drawing Status: Planning Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland Drawing No.: Revision: B

11 THE INFORMATION ON THIS DRAWING IS TO THE ORDNANCE SURVEY IRELAND ITM COORDINATE SYSTEM Civic Amenity Area Landholding Boundary (under Control of the Applicant) Area Application Site Boundary Temporary Capping Area Boundary Site Fence Boundary LANDHOLDING BOUNDARY FRENCH DRAIN RG Overliner Gas Extraction Pipe 250mm HDPE PE00 SDR mm Compressed Air Pipe 50mm Leachate Pipe Leachate Rising Main ALL INCOMING TRAFFIC TO PASS OVER WEIGH BRIDGE RG Knockout Pots Gas Extraction RG Manifold Leachate Composition Surface Water Monitoring Gas Migration Monitoring Wells Levels RG RG PROPOSED LOCATION OF SITE NOTICE OIL INTERCEPTOR N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD B //206 Issued for Part VIII Planning (Minor Revisions) A 24/05/206 Issued for Part VIII Planning BD AA Rev Date Description By Chkd. TIPPERARY COUNTY COUNCIL EXISTING OUTFALL STRUCTURE Donohill Landfill Upgrade Works Site Layout (Site Boundary to Public Road) A: A3: :000 Prepared by: Checked: Date: ORIGINAL LEACHATE CMcG November 206 INTERCEPTOR TRENCH (2003) Project Director: C. McGovern Drawing Status: Planning Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland Drawing No.: Revision: B

12 THE INFORMATION ON THIS DRAWING IS TO THE ORDNANCE SURVEY IRELAND ITM COORDINATE SYSTEM Landholding Boundary (under Control of the Applicant) Area Application Site Boundary Temporary Capping Area Boundary Site Fence Boundary Overliner Gas Extraction Pipe 250mm HDPE PE00 SDR mm Compressed Air Pipe 50mm Leachate Pipe Leachate Rising Main Civic Amenity Area.74m.25m DRAINAGE PIPES BETWEEN BAYS Knockout Pots Gas Extraction Manifold Leachate Composition Surface Water Monitoring Gas Migration Monitoring Wells Levels 5.7m 5.57m Proposed Building Boundary SURFACE WATER COLLECTION CHAMBER 3.68m 0.98m 33.00m 2.96m 6.52m N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD 0 B //206 Issued for Part VIII Planning AA (Minor Revisions) A 24/05/206 Issued for Part VIII Planning BD Rev Date Description By Chkd. TIPPERARY COUNTY COUNCIL Donohill Landfill Upgrade Works Proposed Part Site Layout A: A3: :000 Prepared by: Checked: Date: CMcG November 206 Project Director: C. McGovern Drawing Status: Planning Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland Drawing No.: Revision: B

13 Elevation 5 (Section) THE INFORMATION ON THIS DRAWING IS TO THE ORDNANCE SURVEY IRELAND ITM COORDINATE SYSTEM Elevation X Elevation Elevation Wall lowered to allow view of weighbridge Concrete Wall Proposed Temporary Office Relocation (Prefabricated Portacabin Unit) Elevation Elevation 734 Concrete Slab Floor Level to remain 2 yd³ Skip for Cardboard, side access 5 No. Bring Banks No. Cages for Electrical Appliances m² per cage 2 yd³ Skip for Paper, side access Concrete Slab Floor Level to remain Clothes Bank 4m² 2587 Floor Level Bins for Household Hazardous Waste 20m² Area for Large Electrical Items yd³ skip for scrap metal, side access 4m² Area with Bund for Engine Oil Floor Level No. 2m² Coffins for Fluorescent Tubes m² Caged Area for Tool Storage 4m² Area for Large Batteries 4m² Area for Weighing Scales 02.6 Floor Level Manhole yd³ skip for Garden Waste, side access Concrete Slab 20 yd³ skip for Treated Timber, side access Manhole yd³ skip for Mixed Dry Recycling, side access Extent of Concrete Area 84 Finish Floor Level = 02.7 Level Area to Be Filled Using Crushed stone, 75mm down compacted in layers of 225mm, Concrete apron to be extended. Fill not to be placed on Cell 3 Proposed Concrete Slab Extension Elevation 3 Elevation Gully Elevation 4 Elevation 6 3m² Area for Gas Cylinders Proposed.8m High Block Wall Gully 0.25 A X B C Road Level m High Chain Link Fence Elevation 2 Road Level No Public Entry No. Painted Car Parking Spaces yd³ skip for Mixed Municipal Waste Railed Access for Pedestrian Access Area between New Fence and Temporary Capping Boundary to be backfilled using topsoil to a gently sloped finish. Crushed stone not to be placed on Cell 3 or Temporary Capping Area Ground Floor Layout : 00 N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD Legend: Waste Licence W Boundary Designated Pedestrian Walkways Proposed.8m High Chain Link Fence Proposed Concrete Slab Extension Proposed Building Proposed.8m High Block Wall Concrete Slab Concrete Walls Level Proposed Level Previously Agreed Profile Level Temporary Capping Area Boundary Grid Lines References Elevation Drawing Number B B //206 Issued for Part VIII Planning (Minor Revisions) A 24/05/206 Issued for Part VIII Planning AD Rev Date Description By Chkd. AA Tipperary County Council Upgrade Works Proposed Site Layout Prepared by: Checked: Date: Project Director: BD November 206 C.McG Drawing Status: Planning A: A3: :200 Drawing No.: Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Revision: B Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland

14 THE INFORMATION ON THIS DRAWING IS TO THE ORDNANCE SURVEY IRELAND ITM COORDINATE SYSTEM 260 Spur from Manhole to Rising Main. Non Return Valve to be located on Cell 3 side of Rising Main Inspection Chamber RWP /50 RWP New Aco HexDrain with D400 grates Discharging to Manhole 200mmØ Manhole Proposed Temporary Office (Prefab Unit) / Area to Be Filled Using Crushed stone, 75mm down compacted in layers of 225mm New Aco HexDrain with D400 grates New Aco HexDrain with D400 grates New Aco HexDrain with D400 grates New Aco Gully New Aco Gully 800 Gully Gully 200mmØ Manhole /50 New Aco Gully 200mmØ Manhole Discharge to Surface Water Drain No Public Entry New Aco HexDrain with D400 grates Discharging Leachate Lagoon via existing Rising Main Area between New Fence and Temporary Capping Boundary to be backfilled using topsoil to a gently sloped finish. Crushed stone not to be placed on Cell 3 or Temporary Capping Area Ground Floor Layout : 00 N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD Legend: Waste Licence W Boundary Designated Pedestrian Walkways Direction of Fall Proposed Surface Water Sewer Proposed Aco Drain Proposed Aco Discharging to New Manhole Proposed Sewer to Leachate Lagoon via Rising Main Sewer to Holding Tank/Cell 3 Leachate Rising Main B 2/09/206 Issued for Part VIII Planning (Minor Revisions) A 24/05/206 Issued for Part VIII AD Rev Date Description By Chkd. AA Tipperary County Council Upgrade Works Proposed Drainage Layout Prepared by: Checked: Date: Project Director: BD September 206 C.McG Drawing Status: Planning A: A3: :200 Drawing No.: Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Revision: B Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland

15 THE INFORMATION ON THIS DRAWING IS TO THE ORDNANCE SURVEY IRELAND ITM COORDINATE SYSTEM No Public Entry Ground Floor Layout : 00 N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD Legend: Waste Licence W Boundary Designated Pedestrian Walkways Proposed.8m High Chain Link Fence Temporary Capping Boundary B //206 Issued for Part VIII Planning (Minor Revisions) A 24/05/206 Issued for Part VIII Planning AD Rev Date Description By Chkd. AA Tipperary County Council Upgrade Works Proposed Site Layout Showing Autotrack Analysis () Prepared by: Checked: Date: Project Director: AD November 206 C.McG Drawing Status: Planning A: A3: :200 Drawing No.: Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Revision: B Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland

16 THE INFORMATION ON THIS DRAWING IS TO THE ORDNANCE SURVEY IRELAND ITM COORDINATE SYSTEM No Public Entry Ground Floor Layout : 00 N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD Legend Waste Licence W Boundary Designated Pedestrian Walkways Proposed.8m High Chain Link Fence Temporary Capping Boundary B //206 Issued for Part VIII Plannning (Minor Revisions) A 24/05/206 Issued for Part VIII Planning AD Rev Date Description By Chkd. AA Tipperary County Council Upgrade Works Proposed Site Layout Showing Autotrack Analysis (2) Prepared by: Checked: Date: Project Director: AD November 206 C.McG Drawing Status: Planning A: A3: :200 Drawing No.: Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Revision: B Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland

17 THE INFORMATION ON THIS DRAWING IS TO THE ORDNANCE SURVEY IRELAND ITM COORDINATE SYSTEM No Public Entry Ground Floor Layout : 00 N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD Legend Waste Licence W Boundary Designated Pedestrian Walkways Proposed.8m High Chain Link Fence Temporary Capping Boundary B //206 Issued for Part VIII Planning (Minor Revisiions) A 24/05/206 Issued for Part VIII Planning AD Rev Date Description By Chkd. AA Tipperary County Council Upgrade Works Proposed Site Layout Showing Autotrack Analysis (3) Prepared by: Checked: Date: Project Director: AD November 206 C.McG Drawing Status: Planning A: A3: :200 Drawing No.: Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Revision: B Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland

18 C B A Powder coated corrugated cladding Level Proposed.8m High Chain Link Fence Level Concrete Walls Concrete Wall Proposed Relocated Temporary Office (Prefab Unit) replacing existing temporary office 3950 Waste Skips North Elevation : 00 A B C Powder coated corrugated cladding Level Proposed Relocated Temporary Office (Prefab Unit) replacing existing temporary office Allow for New 25mm wide Block Wall to replace existing concrete bollard structure Proposed 2 No. 4m Wide x 4m High Gates clad with powder coated corrugated sheeting Concrete Wall Proposed.8m High Chain Link Fence Waste Skips Level 3950 Level South Elevation : 00 Concrete Slab Floor to remain for Building Concrete Slab Proposed Concrete Powder coated corrugated cladding Powder coated corrugated cladding Powder coated corrugated cladding East Elevation : 00 Level Level 3950 Level : 00 Concrete wall West Elevation Level 3950 Level Level Concrete Slab Floor to remain for Building Concrete wall to be recessed to allow view below 5 Concrete Wall Bins for Household Hazardous Waste Section X-X : 00 Paper Skip Steel Columns Bund for Engine Area for Large Oil Electrical Items 800mm Pedestrian Walkway Concrete Slab Floor to remain for Building Level Powder coated corrugated cladding Powder coated corrugated cladding Level N O T E S : Level 3950 Level East Elevation - Building : 00. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD Concrete wall 5 6 : 00 Legend Proposed.8m High Chain Link Fence Proposed Concrete Pad Extension Proposed Building Cladding/Roof Proposed Building Walls Proposed.8m High Block Wall Concrete Walls Concrete wall B 2/09/206 Issued for Part VIII Planning (Minor Revisions) Rev Date Description By Chkd. Level 3950 Level Concrete Slab Floor to remain for Building West Elevation - Building A 24/05/206 Issued for Part VIII Planning AD AA Tipperary County Council Upgrade Works Proposed Elevations & Sections Prepared by: Checked: Date: Project Director: BD September 206 C.McG Drawing Status: Planning A: A3: :200 Drawing No.: Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland Revision: B

19 Window to View Weightbridge Access Door South Elevation : 50 2 South Elevation : North Elevation : 50 3 : 50 4 East Elevation Office Area Canteen Portacabin Plan : 50 N O T E S :. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD A //206 Issued for Part VIII Planning JK AA Rev Date Description By Chkd. Tipperary County Council Upgrade Works Proposed Portacabin Plan & Elevations Prepared by: Checked: Date: Project Director: AD November 206 C.McG Drawing Status: Planning A: A3: :00 Drawing No.: Patrick J. Tobin & Co. Ltd. TOBIN Consulting Engineers, Fairgreen House, Fairgreen Road, Galway, Ireland. tel: +353-(0) fax:+353-(0) galway@tobin.ie Ordnance Survey Ireland Licence number EN Ordnance Survey Ireland Government of Ireland Revision: A

20 INTERNATIONAL NETWORK Galway Fairgreen House, Fairgreen Road, Galway. Ph +353 (0) Fax +353 (0) Dublin Block 0-4, Blanchardstown Corporate Park, Dublin 5. Ph +353 (0) Fax +353 (0) visit Castlebar Market Square, Castlebar, Co. Mayo. Ph +353 (0) Fax +353 (0) castlebar@tobin.ie

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

COMPILATION OF TENDER DOCUMENTS

COMPILATION OF TENDER DOCUMENTS COMPILATION OF TENDER DOCUMENTS Arc. Ibrahim A. Haruna, FNIA, PNIA, mni. -the familiar question!- Mr. Architect, after these your beautiful drawings, what next? ARCHITECT S PROCEDURE: -drawing board to

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

Last Name: First Name: M.I:

Last Name: First Name: M.I: ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS

INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS FINANCIAL SERVICES GROUP Supply Management INVITATION TO TENDER ITT / NO. PS20152055 QUESTIONS AND ANSWERS NO. 1 ISSUED ON MARCH 4, 2016 Q1 Would it be possible to schedule another site visit to allow

More information

YOU ARE ADVISED TO SUBMIT THIS CHECKLIST IN CONJUNCTION WITH YOUR PLANNING APPLICATION

YOU ARE ADVISED TO SUBMIT THIS CHECKLIST IN CONJUNCTION WITH YOUR PLANNING APPLICATION A Guide To Lodging Planning Applications Applicant s Checklist YOU ARE ADVISED TO SUBMIT THIS CHECKLIST IN CONJUNCTION WITH YOUR PLANNING APPLICATION It is important to note that this is for information

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

PHOTOGRAPHIC ARCHIVAL RECORDING. Former Reclamation Shed. North Eveleigh

PHOTOGRAPHIC ARCHIVAL RECORDING. Former Reclamation Shed. North Eveleigh PHOTOGRAPHIC ARCHIVAL RECORDING Former Reclamation Shed North Eveleigh WEIR PHILLIPS Architects and Heritage Consultants 69 Regent Street, Chippendale NSW 2008 9310 1010 July 2012 1.0 Archival Recording

More information

ACCESS TO HIGH VOLTAGE APPARATUS

ACCESS TO HIGH VOLTAGE APPARATUS CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved

More information

Heavy Civils and Bespoke Precast Specialists

Heavy Civils and Bespoke Precast Specialists Heavy Civils and Bespoke Precast Specialists Croom Concrete Ltd, Off Church Road, Croom, Co. Limerick, Ireland. Tel: +353 61 397479 Fax: +353 61 600719 UK Why Croom? Croom has long been acknowledged as

More information

HANSCOM FIELD ARFF AND CBP BUILDING

HANSCOM FIELD ARFF AND CBP BUILDING HANSCOM FIELD ARFF AND CBP BUILDING AERIAL VIEW OF AIRFIELD PROJECT SITE HANSCOM AIR FIELD CIVIL AIR TERMINAL HANSCOM AIR FORCE BASE 95 AIRFIELD MAIN ENTRY SITE AERIAL PLAN VIEW OF AIRFIELD N MASSACHUSETTS

More information

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925)

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925) STANDARD DETAILS 2401 Crow Canyon Road San Ramon, CA 94583 Telephone: (925) 973-2670 Fax: (925) 838-3937 CITY OF SAN RAMON STANDARD DETAILS INDEX CONCRETE WORK NAME DRAWING # Curb, Gutter & Sidewalk C-1

More information

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com

More information

REPORT PERIOD: JANUARY 01 MARCH

REPORT PERIOD: JANUARY 01 MARCH QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT PERIOD: JANUARY 01 MARCH 31 2018 IE LICENCE REF. NO. W0178-02 APRIL 2018 QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT

More information

civil product range JUNCTION BOXES DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS

civil product range JUNCTION BOXES DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS kilform civil product range ESB CCTV Eircom Services Lighting Risers DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS Untrapped Gully Trapped Gully Large Trapped Gully Headwalls

More information

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 8, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete. REQUIREMENTS (indicate with an "") 011100 1.4 Detailed Construction Phasing Plan 011100 1.4 Sub-Surface Utility Location Plan 013100 1.3 Letter Designating Project Superintendent 013100 1.3 Construction

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

STREETSCAPE FEASIBILITY TERMS OF REFERENCE

STREETSCAPE FEASIBILITY TERMS OF REFERENCE Introduction STREETSCAPE FEASIBILITY TERMS OF REFERENCE As outlined in the Official Plan, Section 9, Build A Desirable Urban Form, Mississauga will transform the public realm to create a strong sense of

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

Information package for obtaining a building permit

Information package for obtaining a building permit Information package for obtaining a building permit To apply for a building permit, you must be a licensed contractor or the legal property owner. Electrical, Mechanical, Plumbing and the Roofing subcontractors

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS

ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS DEVELOPMENT DESIGN REVIEW (DDR) Number of Copies Application Form 1 Supplemental Project Information Questionnaire 1 Assessor s Parcel Map (with property outlined)

More information

Tooker Family Residence

Tooker Family Residence 110 25 90 E B M U D (N) POP-UP DRAIN + DRAIN ROCK BASIN DISCHARGE OF SURFACE DRAINS AND DOWNSPOUTS - SHEET FLOW ACROSS LANDSCAPE NOTE: SEE SHEET S2.0.1 FOR FOUNDATION + RAIN WATER DRAINAGE DESIGN 143.57'

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

Yavapai County Development Services

Yavapai County Development Services Yavapai County Development Services Prescott Office 1120 Commerce Dr., Prescott, AZ 86305 (928) 771-3214 Fax: (928) 771-3432 Cottonwood Office 10 S. 6 th Street, Cottonwood, AZ 86326 (928) 639-8151 Fax:

More information

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

Updated Sheet Index for DRC Submittal A0.1

Updated Sheet Index for DRC Submittal A0.1 Sheet Index Landscape Architecture A0.0 Cover Sheet A0.1 Sheet Index A0.2 Enhanced Perspective A0.3 Enhanced Perspective A0.4 Enhanced Perspective A0.5 Enhanced Perspective A0.6 Enhanced Perspective A0.7

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

ANNEX Ground floor plan, elevations, sections and schedule of areas for:

ANNEX Ground floor plan, elevations, sections and schedule of areas for: ANNEX 11 1. Brochure of RES Q 2. Ground floor plan, elevations, sections and schedule of areas for: (a) (b) (c) (d) (e) (f) Villa Albatross Villa Lancelot Villa Eagle Villa Merlin Villa Birdie Villa Galahad

More information

Promontory Architectural Review Committee

Promontory Architectural Review Committee Promontory Architectural Review Committee Design Review Application Purpose The Design Review Process and Application have been established to insure that a proposed project is compatible with historical,

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

General Layout. Eng. Maha Moddather

General Layout. Eng. Maha Moddather General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS

More information

ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS

ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS SITE PLAN CONTROL ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS Site Plan Control is a process involving municipal approval of the lay-out, design and appearance of certain new developments, as authorized

More information

Basic Plan Set Requirements

Basic Plan Set Requirements Attachment Three Basic Plan Set Requirements DRAWING CATEGORY & CONTENT 35% 65%, 95% and Stamped GENERAL Cover Sheet & Sheet Inde General Legend & Vicinity Map Abbreviations & General Notes Scope of Work

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time) ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

RUGBY BUSINESS PARK NEW BUILD WAREHOUSE/INDUSTRIAL UNIT ON A SITE 0F 3 ACRES AVAILABLE NOW 59,489 SQ FT

RUGBY BUSINESS PARK NEW BUILD WAREHOUSE/INDUSTRIAL UNIT ON A SITE 0F 3 ACRES AVAILABLE NOW 59,489 SQ FT RUGBY BUSINESS PARK NEW BUILD WAREHOUSE/INDUSTRIAL UNIT ON A SITE 0F 3 ACRES AVAILABLE NOW 59,489 SQ FT RUGBY BUSINESS PARK, GORSE STREET, CHADDERTON, OLDHAM OL9 9RJ PHASE 2 CAN ACCOMMODATE FROM 25,000

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

L1702D-SW-PL-01 STORM LINES - PLANS (1 OF 3) L1702D-WW-PL-03 SEWER LINES - PLANS (3 OF 3) L1702D-SW-PL-02 STORM LINES - PLANS (2 OF 3)

L1702D-SW-PL-01 STORM LINES - PLANS (1 OF 3) L1702D-WW-PL-03 SEWER LINES - PLANS (3 OF 3) L1702D-SW-PL-02 STORM LINES - PLANS (2 OF 3) GENERAL DWG Nb. DRAWING TITLE L1702D-LOD- LIST OF DRAWINGS L1702D-GN- GENERAL & L1702D-WW-GNL-01 SEWER LINES - GENERAL LAYOUT L1702D-WW-KPL-01 SEWER LINES - GENERAL KEY PLAN L1702D-SW-GNL-01 STORM LINES

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report 2013 Licence Number: W0115-01 Report Date: 09 th July 2013 Report Number: 3220-13-03 Version 0 AXIS environmental services 40 Coolraine

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE No. 9197 REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers oard, 2008. All rights reserved. No part of this publication may be reproduced by any means

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 2 SDCC-TS-02 INDUCTIVE LOOPS & ABOVE GROUND DETECTION REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

Notice of Advice. RevA: 18-September-2017 RevB: 26-September Engineering Assessment of Aurizon network's Capital Claim

Notice of Advice. RevA: 18-September-2017 RevB: 26-September Engineering Assessment of Aurizon network's Capital Claim Notice of Advice AECOM Australia Pty Ltd Level 8 540 Wickham Street PO Box 1307 Fortitude Valley QLD 4006 Australia www.aecom.com +61 7 3553 3740 tel +61 7 3553 2050 fax ABN 20 093 846 925 Attention Graham

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE

24' - 0 99' - 0 B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE 5' ' 6 /4" RETAINING WALL ALONG BOUNDARY ILLUMINATED SIGNAGE TBD MOUNTED TO TOP AND/OR FACE OF RETAININGS WALL PROPERTIES FENCE TO REMAIN SIDEWALK ENTRY TIE NEW SIDE WALK INTO EXISTING SIDEWALKS AS CURRENTLY

More information

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2)

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2) THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2) Building Control Acts 1990 and 2007 Application for a Revised Disability Access Certificate Building Control

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation