L1702D-SW-PL-01 STORM LINES - PLANS (1 OF 3) L1702D-WW-PL-03 SEWER LINES - PLANS (3 OF 3) L1702D-SW-PL-02 STORM LINES - PLANS (2 OF 3)
|
|
- Violet Greene
- 5 years ago
- Views:
Transcription
1 GENERAL DWG Nb. DRAWING TITLE L1702D-LOD- LIST OF DRAWINGS L1702D-GN- GENERAL & L1702D-WW-GNL-01 SEWER LINES - GENERAL LAYOUT L1702D-WW-KPL-01 SEWER LINES - GENERAL KEY PLAN L1702D-SW-GNL-01 STORM LINES - GENERAL LAYOUT L1702D-SW-KPL-01 STORM LINES - GENERAL KEY PLAN PLANS DWG Nb. DRAWING TITLE L1702D-WW-PL-01 SEWER LINES - PLANS (1 OF 3) L1702D-WW-PL-02 SEWER LINES - PLANS (2 OF 3) L1702D-WW-PL-03 SEWER LINES - PLANS (3 OF 3) L1702D-SW-PL-01 STORM LINES - PLANS (1 OF 3) L1702D-SW-PL-02 STORM LINES - PLANS (2 OF 3) L1702D-SW-PL-03 STORM LINES - PLANS (3 OF 3) PROFILES DWG Nb. DRAWING TITLE L1702D-WW-PR-01 SEWER LINES - PROFILES (1 OF 3) L1702D-WW-PR-02 SEWER LINES - PROFILES (2 OF 3) L1702D-WW-PR-03 SEWER LINES - PROFILES (3 OF 3) L1702D-SW-PR-01 STORM LINES - PROFILES (1 OF 2) L1702D-SW-PR-02 STORM LINES - PROFILES (2 OF 2) L1702D-SW-PR-03 STORM LINES - PROFILES (3 OF 3) LIST OF DRAWINGS SEWER TYPICAL DETAILS DWG Nb. DRAWING TITLE L1702D-WW-DT-01 PIPE BEDDING DETAILS (1 of 3) L1702D-WW-DT-02 PIPE BEDDING DETAILS (2 of 3) L1702D-WW-DT-03 PIPE BEDDING DETAILS (2 of 3) L1702D-WW-DT-04 FLEXIBLE JOINT DETAILS - SEALING METHOD L1702D-WW-DT-05 MANHOLES DETAILS (1 OF 4) L1702D-WW-DT-06 MANHOLES DETAILS (2 OF 4) L1702D-WW-DT-07 MANHOLES DETAILS (3 OF 4) L1702D-WW-DT-08 MANHOLES DETAILS (4 OF 4) L1702D-WW-DT-09 CROSSINGS DETAILS L1702D-WW-DT-10 INSPECTION CHAMBER L1702D-WW-DT-11 HOUSE CONNECTION DETAILS (1 OF 3) L1702D-WW-DT-12 HOUSE CONNECTION DETAILS (2 OF 3) L1702D-WW-DT-13 HOUSE CONNECTION DETAILS (3 OF 3) L1702D-WW-DT-14 PIPE ANCHORING DETAILS STORM TYPICAL DETAILS DWG Nb. DRAWING TITLE L1702D-SW-DT-01 TYPICAL TRENCHES DETAILS L1702D-SW-DT-02 STORM WATER MANHOLE DETAIL L1702D-SW-DT-03 GULLY & GULLY MANHOLE DETAILS L1702D-SW-DT-04 PIPE BEDDING REQUIREMENTS MRAYJE ION DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE LIST OF DRAWINGS -- L1702D-LOD-
2 GENERAL 1- DO NOT FROM DRAWINGS, ALL DIMENSIONS SHOULD BE READ OR COMPUTED. 2- THE CONTRACTOR SHALL ENSURE THE STABILITY AND SAFETY OF EXCAVATIONS AND SHALL TAKE ALL MEASURES NECESSARY TO ENSURE THAT NO COLLAPSE OR SUBSIDENCE OCCURS. 3- THE SIDES OF ALL EXCAVATIONS SHALL BE KEPT TRUE AND SHALL WHERE NECESSARY BE ADEQUATELY SUPPORTED BY MEANS OF TIMBER, STEEL OR OTHER TYPE STRUTS, WALINGS POLING BOARDS, SHEETING, BRACING AND THE LIKE. SUPPORTING EXCAVATION COST SHALL BE DEEMED INCLUDED IN THE UNIT RATE. 4- EXCAVATIONS SHALL BE KEPT FREE FROM WATER AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONSTRUCT AND MAINTAIN TEMPORARY DIVERSION AND DRAINAGE WORKS AND TO CARRY OUT PUMPING AND TO TAKE ALL MEASURES NECESSARY TO COMPLY WITH THIS REQUIREM 5- THE CONTRACTOR SHALL COMPLETE DETAILED DESIGN OF STRUCTURAL COMPONENTS AND PREPARE CONSTRUCTION SHOP DRAWINGS FOR ALL WORKS GIVEN IN THE CONTRACT. THE CONTRACTOR SHALL SUBMIT HIS PROPOSAL FOR THE ENGINEER'S APPROVAL IN COMPLETE SUBMITTAL PACKAGES IN A FORM THAT CAN BE COMPREHENSIVELY IEWED BY THE ENGINEER. CONSTRUCTION SHALL NOT COMMENCE BEFORE THE RECEIPT OF APPROVAL OF THE RELEVANT CONSTRUCTION DOCUMENTS. 6- MAIN BACKFILLING MATERIALS: - BACKFILL SHALL BE LAID AND WELL COMPACTED IN LAYERS NOT EXCEEDING 2mm THICK. COMPACTED TO 95% OF PROCTOR MAXIMUM DRY DENSITY BY A COMPACTING MACHINES SUITABLE FOR TRENCH WIDTH. - DO NOT USE HEAVY COMPACTORS OVER PIPE TRENCH UNTIL THERE IS 60mm (OR REQUIRED BY THE PIPE SUPPLIER) COVER OVER THE PIPE. - IF THE COVER OVER THE TOP OF THE PIPE IS LESS THAN 10mm (OR AS REQUIRED BY THE PIPE SUPPLIER), USE CONCRETE ENCASEMENT AS SPECIFIED ON THE DRAWING AND DIRECTED BY THE ENGINEER. - WHEN BACKFILLING TO PIPES WITH CONCRETE BEDS AND SURROUNDS, DO NOT START BACKFILLING BEFORE 24 HOURS OR ALLOW HEAVY COMPACTORS AND TRAFFIC OVER THE PIPES BEFORE 72 HOURS OF PLACING CONCRETE. 7- REINFORCEMENT: - UNLESS OTHERWISE NOTED ON THE DRAWINGS, ALL REINFORCEMENT INCLUDING TIES AND STIRRUPS SHALL BE HIGH TENSILE, THE FOLLOWING STANDARD ABBIATIONS ARE USED IN CALLING UP GRADES OF REINFORCEMENT: - HIGH TENSILE STEEL BARS : HA or T - MILD STEEL BARS : Ø STEEL HAVING A MINIMUM YIELD STRESS = 42 Kg/cm2. - UNLESS OTHERWISE NOTED, SPLICE LENGTHS SHALL BE 50Ø. 8- CONCRETE COVER: - THE MINIMUM CONCRETE PROTECTIVE COVER FOR REINFORCEMENT SHALL BE AS FOLLOWS: a) 3 CM FOR DECK SLAB b) 5CM FOR ALL MANHOLES, FOUNDATIONS AND WALLS - CLASS F( 2FAIR FACING) FORM WORK SHALL BE APPLIED FOR ALL INTERNAL CONCRETE SURFACES, OTHER WISE AS SHOWN ON DRAWINGS OR AS DIRECTED BY THE ENGINEER. - TWO COATS OF BITUMINOUS PAINT SHALL BE APPLIED TO ALL EXTERNAL CONCRETE SURFACES IN DIRECT CONTACT WITH EARTH. - TWO COATS OF COAL TAR EPOXY PAINT SHALL BE APPLIED TO ALL INTERNAL CONCRETE SURFACES OF ALL TYPES OF SEWER MANHOLES, INSPECTION CHAMBERS. 9- GEOTECHNICAL INVESTIGATION: - THE CONTRACTOR HAS TO CONDUCT HIS OWN GEOTECHNICAL INVESTIGATIONS AND TO PROPOSE COMPLETE FINAL DESIGN WITH CALCULATION SHEETS AND DRAWINGS FOR ALL STRUCTURAL COMPONENTS TO BE APPROVED BY THE ENGINEER. - IF SOIL IS NOT SUITABLE FOR THE ALLOWABLE AVERAGE TOE PRESSURE, MASS CONCRETE TO REQUIRED DEPTH IS TO BE CAST UNDER FOOTING AS INSTRUCTED BY ENGINEER. 10- CONCRETE: - ALL CLASSES OF CONCRETE ARE TO BE NORMAL WEIGHT (25 kg/m3), WELL MADE AND EXECUTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. - REINFORCED CONCRETE SHOULD HAVE A MINIMUM 28 DAYS DESIGN COMPRESSIVE STRENGTH ON STANDARD 15 x 30cm CYLINDER 25MPa OTHERWISE AS INDICATED ON THE DRAWINGS. - BLINDING CONCRETE SHOULD HAVE A MINIMUM 28 DAYS DESIGN COMPRESSIVE STRENGTH ON STANDARD 15 x 30cm CYLINDER: F'c =11 Mpa. - FOR CYCLOPEAN CONCRETE, THE MINIMUM CEMENT CONTENT SHALL BE 150 kg/m.concrete FOR SCREENING SHALL HAVE A MINIMUM CEMENT CONTENT of 2 kg/m. - FOR STRUCTURAL CONCRETE, THE MINIMUM CEMENT CONTENT SHALL BE 350 kg/m. - ALL CEMENT FOR CONCRETE OTHER THAN SEWAGE STRUCTURES SHALL BE ORDINARY PORTLAND CEMENT TYPE I (ASTM). - ALL CEMENT FOR SEWAGE STRUCTURES SHALL BE SULFATE RESISTING CEMENT TYPE V (ASTM). 11- UTILITIES: - THE CONTRACTOR MUST IMMEDIATELY ON BEING AWARDED THE PROJECT, CONTACT ALL AUTHORITIES AND DEPARTMENTS CONCERNED IN LOCATING AND DIVERTING TEMPORARY OR PERMANENT EXISTING UTILITIES THAT WOULD INTERFERE WITH HIS WORK. THE CONTRACTOR MUST INSURE NO DAMAGE OF ANY NATURE OCCUR TO DISRUPT THEM. ANY DAMAGE DUE TO ANY REASON IS THE RESPONSIBILITY OF THE CONTRACTOR AND HE MUST IMMEDIATELY CORRECT AND BEAR ALL COSTS. THE CONCERNED UTILITIES ARE NAMELY: OVERHEAD OR UNDERGROUND ELECTRIC CABLES AND POLES, STREET LIGHTING CABLES AND POLES, MANHOLES AND PIPES, STORM WATER DRAINAGE INLETS, MANHOLES AND PIPES, TELEPHONE DUCTS, JUNCTION BOXES AND WATER SUPPLY PIPES AND VALVES. 12- ALL GRAVITY PIPES SHALL BE AS FOLLOWS: A. PIPES WITH INTERNAL DIAMETERS BETWEEN Ø150 MM TO Ø3MM INCLUSIVE, SHALL BE OF UPVC AS SPECIFIED. B. SEWER PIPES WITH INTERNAL DIAMETERS BETWEEN Ø4 MM TO Ø6MM INCLUSIVE, SHALL BE OF RC AS SPECIFIED. C. STORM PIPES WITH INTERNAL DIAMETERS BETWEEN Ø4 MM TO Ø6MM INCLUSIVE, SHALL BE OF GRP AS SPECIFIED. D. PIPES WITH INTERNAL DIAMETERS GREATER THAN 6MM SHALL BE GRP AS SPECIFIED AND TO BE APPROVED BY ENGINEER. 13- TOPOGRAPHY: - THE CONTRACTOR MUST SUBMIT A VERY DETAILED SURVEY FOR THE PROJECT AREA ESPECIALLY FOR EVERY LOCATION OF BRIDGES AND RETAINING WALLS TO DEFINE THE EXACT EXTENT AND HEIGHT. 14- THE GROUND ELEVATIONS SHOWN ON THE DRAWINGS REFLECT THE EXISTING SITUATION AT THE TIME THE SURVEYING WAS DONE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THIS DATA, AND NO ADDITIONAL COST WILL BE CONSIDERED IN RESPECT TO ANY INACCURACY OR OMISSION. SOME OF THE STREET LEVELS WILL BE SUBJECT TO MODIFICATIONS DEPENDING ON FINAL GRADING AND ASPHALTING OF STREETS WHICH IS BEING CARRIED OUT BY THE LOCAL AUTHORITIES, HENCE THE CONTRACTOR SHALL MODIFY MANHOLE COVER TO MATCH THE FINAL PAVED SURFACES WHICH SHALL BE INDICATED AT THE TIME OF THE EXECUTION OF THE WORKS, ALL AS DIRECTED AND APPROVED BY THE ENGINEER. 15- IN PRINCIPLE, GRAVITY PIPES ARE LOCATED AS SHOWN ON THE DETAILED DRAWINGS FOR LOCATION OF UTILITIES UNDER ROADS. FINAL LOCATIONS SHALL BE MODIFIED TO SUIT OTHER EXISTING UTILITIES IN THE STREET ALL AS DIRECTED BY THE ENGINEER 16- WHERE THE STREET LIMITS ARE NOT DEFINED ON THE SITE BY ACTUAL BUILDINGS OR REFERENCE POINTS, THE CONTRACTOR SHALL, BEFORE INSTALLING ANY PIPE OR STRUCTURE, CONSULT WITH THE MUNICIPALITY TO ESTABLISH THE NECESSARY REFERENCE POINTS. 17- ALL PIPE DIAMETERS AND OTHER DIMENSIONS ARE SHOWN IN MILLIMETERS UNLESS OTHERWISE INDICATED AND ALL ELEVATIONS ARE IN METERS. 18- WHENEVER THE DRAWINGS SHOW A FUTURE LINE CONNECTING TO A MANHOLE THE CONTRACTOR SHALL PROVIDE AND INSTALL A STUB WITH A REMOVABLE PLUG. THE STUB SHALL HAVE THE DIAMETER AND INVERT OF THE FUTURE LINE,ALL AS DIRECTED AND APPROVED BY THE ENGINEER. 19- FOR PRECAST REINFORCED CONCRETE MANHOLE BASES, OPENING FOR PIPES SHALL BE CAST IN THE BASE AT THE REQUIRED LOCATION DURING ITS MANUFACTURE. FIELD CUT OPENING WILL NOT BE PERMITTED. 20- MANHOLE STEPS AND HANDBAR SHALL BE GALVANIZED STEEL WITH 2 GRAMS OF ZINC PER SQUARE METER AND COVERED WITH TWO LAYERS OF POLYETHYLENE (PE) OR POLYPROPYLENE. 21- THE CONTRACTOR SHALL PROVIDE OPENING IN THE INSPECTION CHAMBER TO ACCOMMODATE FUTURE HOUSE CONNECTION AS APPROVED BY THE ENIGNEER. THIS OPENING WILL BE FITTED WITH A REMOVABLE PLUG.LOCATION OF INSPECTION CHAMBERS IS SUBJECT TO SUIT LOCAL CONDITIONS AND AS APPROVED BY THE ENGINEER. 22- Y-SERVICE CONNECTIONS TO BE USED ONLY IF APPROVED BY THE ENGINEER. 23- THE MINIMUM VERTICAL CLEARANCE BETWEEN STORM & SEWER PIPES AT CROSSINGS SHALL BE 30cm, OTHERWISE, CONCRETE ENCASEMENT SHALL BE IMPLEMENTED FOR THE STORM PIPE. 24- CONSTRUCTION METHOD: - THE CONTRACTOR HAS TO PREPARE CONSTRUCTION METHOD AND PROGRAM OF WORK TAKING INTO CONSIDERATION SAFETY AND NON-STOP TRAFFIC ALONG THE ROAD. - NO WORK WILL BE ALLOWED PRIOR TO PLACING ALL THE REQUIRED TEMPORARY AND SAFETY SIGNS, TRAFFIC LIGHTS,FLAGS ETC WHEER AND WHENEVER REQUIRED. N.B.: ALL DRAWINGS A2 HAVE THE RIGHT AS INDICATED IN THE DRAWINGS. N.B.: THE DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND THE CONTRACTOR SHALL READ THESE DRAWINGS IN CONJUNCTION WITH THE SPECIFICATIONS. NETWORK LABELS LABELS: LINE X : Pipe Label Ø : Pipe Diameter (mm) L : Pipe Length (m) S : Pipe Slope (%) UP.IL= Upstream invert level of pipe DN.I.L= Downstream invert level of pipe MH-X : Label G.L : ground level B.L : Bottom Level H : Depth to invert of pipe TOPOGAPHY Existing Sewer/Storm Line Existing Survey Point (Z: 22.30m) MRAYJE ION DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE GENERAL & --- L1702D-GN-
3 ﺷ ﺎﺭﻉ ﺃﺑ ﻲ ﻁﺎﻟ ﺏ ﻣﻧﻁﻘ ﺔ ﺍﻟﻣﺭﻳﺟ ﺔ Existing MH. (Ø6) G.L: I.L: LINE M-4 Ø2 LIN E Ø2 M-15 Ø4 LINE M LIN E Ø2 M-2 1 Rev. LINE M Ø4 Drawn Chkd. Appd. Ø3 LINE M Ø4 ﺍﺗﺣ ﺎﺩ ﺑﻠ ﺩﻳﺎﺕ ﺍﻟﺿ ﺎﺣﻳﺔ ﺍﻟﺟﻧﻭﺑﻳ ﺔ Revision Details Proposed Sewer Pipe Date A.S CHECKED BY: A.S APPROVED BY: MRAYJE ION H.I DESIGNED BY: 1/50 L01702 L1702D-WW-GNL-01 DATE JOB NUMBER : R.I A.S DRAWN BY: PROJECT MANAGER : SEWER LINES GENERAL LAYOUT LINE M Ø3 LINE M
4 C HEMIN C HEMIN T.L:33.34 I.L:30.79 D=6 T.L:33.17 I.L:30.77 D=9 Storm 44 wall P T.L:33.34 I.L:30.79 D=6 T.L:33.17 I.L:30.77 D=9 Storm Existing MH. G.L = m B.L = m H = 2.55 m power generator Ø4mm L = 17 m S = % UP.IL= m DN.IL= m MH-1 G.L = m B.L = m H = 1.91 m Ø4mm L = 22 m S = % UP.IL= m DN.IL= m MH-2 G.L = m B.L = m H = 1.91 m Ø4mm L = 15 m S = % UP.IL= m DN.IL= m MH G.L = m B.L = m H = 1.93 m Ø4mm L = m S = % UP.IL= m DN.IL= m -4 Ø2mm L = 17 m S = 1. % UP.IL= m DN.IL= m -4 Ø2mm L 159 = 21 m S = 1. % UP.IL= m DN.IL= m MH-4 G.L = m B.L = m H = 1.91 m Ø4mm L = 14 m S = % UP.IL= m DN.IL= m MH-1 G.L = m B.L = m H = 1.71 m MH-2 G.L = m B.L = m H = 1.70 m MH-5 G.L = m B.L = m H = 1.91 m Ø4mm L = 22 m S = % UP.IL= 33. m DN.IL= m MH-6 G.L = m B.L = 33. m H = 1.91 m Ø4mm L = 17 m S = 1. % UP.IL= m DN.IL= 33. m MH-7 G.L = m B.L = m H = 1.92 m Ø4mm L = 16 m S = 1. % UP.IL= m DN.IL= m MH-8 G.L = m B.L = m H = 1.90 m Ø4mm L = 16 m S = 1. % UP.IL= m DN.IL= m MH-9 G.L = m B.L = m H = 1.92 m Ø4mm L = m S = 1. % UP.IL= m DN.IL= m MH-10 G.L = m B.L = m H = 1.91 m Ø4mm L = 17 m S = 1. % UP.IL= m DN.IL= m 2386 MH-4 G.L = m 2384 B.L = m H = 1.70 m CHEMIN Ø2mm L = 19 m S = 1.84 % UP.IL= m DN.IL= m MH-3 G.L = m B.L = m H = 1.70 m -4 Ø2mm L = 26 m S = 2.12 % UP.IL= m DN.IL= 33.40m Pipe material shall be upvc for pipes smaller than or equal to 3 mm -Pipe material shall be RC for pipes equal to 4 mm as specified -Top of manhole cover shall match with finished grade -For manholes dimensions, refer to the corresponding details -All dimensions are in millimeters unless otherwise noted LABEL: LINE X : Pipe Label Ø : Pipe Diameter (mm) L : Pipe Length (m) S : Pipe Slope (%) UP.IL= Upstream invert level of pipe DN.I.L= Downstream invert level of pipe MH-X : Label G.L : ground level B.L : Bottom Level H : Depth KEY PLAN PL ش ارع ا ب ي طال ب PL-02 PL-03 MRAYJE ION SEWER LINES PLANS (1 OF 3) L1702D-WW-PL-01 1/5
5 1% 1% C HEMIN C HEMIN T.L:33.34 I.L:30.79 D=6 T.L:33.17 I.L:30.77 D=9 Storm 44 wall Ø4mm L = 22 m S = 1. % UP.IL= m DN.IL= m Ø3mm L = 25 m S = 0.88 % UP.IL= m DN.IL= m Ø2mm L = 20 m 3061 S = 0.50 % UP.IL= m DN.IL= m Ø3mm L = 25 m S = 0.88 % UP.IL= m DN.IL= m B.L = m Ø3mm L = 18 m S = 0.88 % UP.IL= m DN.IL= m MH-10 G.L = m B.L = m H = 1.91 m Ø4mm L = 17 m S = 1. % UP.IL= m DN.IL= m MH-11 G.L = m B.L = m H = 1.92 m MH-12 G.L = m B.L = m H = 1.91 m Ø4mm L = 24 m S = 1.40 % UP.IL= m DN.IL= m MH-13 G.L = m B.L = m H = 1.93 m Ø4mm L = 21 m S = 1. % UP.IL= m DN.IL= m MH-14 G.L = m B.L = m H = 2.13 m MH-15 G.L = m B.L = m H = 2.34 m MH-16 G.L = m B.L = m H = 2.23 m Ø4mm L = 19 m S = 1. % UP.IL= m DN.IL= m -15 Ø2mm L = 20 m S = 0.50 % UP.IL= m DN.IL= m MH-1 G.L = m B.L = m H = 2.41 m MH-2 G.L = m H = 2.22 m MH-17 G.L = m B.L = m H = 2.14 m MH-18 G.L = m B.L = m H = 2.06 m Ø3mm L = 24 m S = 1. % UP.IL= 35.72m DN.IL= m MH-19 G.L = m B.L = m H = 1.94 m Ø3mm L = 15 m S = 1. % UP.IL= m DN.IL= m Ø2mm L = 21 m S = 0.50 % UP.IL= m DN.IL= m MH-3 G.L = m B.L = m H = 1.94 m Ø2mm L = 28 m S = 0.50 % UP.IL= m DN.IL= m Ø2mm L = 29 m S = 1.66 % UP.IL= m DN.IL= 35.43m Pipe material shall be upvc for pipes smaller than or equal to 3 mm -Pipe material shall be RC for pipes equal to 4 mm as specified -Top of manhole cover shall match with finished grade -For manholes dimensions, refer to the corresponding details -All dimensions are in millimeters unless otherwise noted LABEL: LINE X : Pipe Label Ø : Pipe Diameter (mm) L : Pipe Length (m) S : Pipe Slope (%) UP.IL= Upstream invert level of pipe DN.I.L= Downstream invert level of pipe MH-X : Label G.L : ground level B.L : Bottom Level H : Depth KEY PLAN PL ش ارع ا ب ي طال ب PL-02 PL-03 MRAYJE ION SEWER LINES PLANS (2 OF 3) L1702D-WW-PL-02 1/5
6 0.50% % % 0.50% % % % C HEMIN C HEMIN T.L:33.34 I.L:30.79 D=6 T.L:33.17 I.L:30.77 D=9 Storm 44 wall wall Line 152 M-21 Ø2mm L = 13 m S = 0.50 % UP.IL= m DN.IL= m B.L 2.5% = m MH-2 Ø3mm G.L = m L = 18 m B.L = m S = 1.44 % 2771 H = 2.09 m UP.IL= m DN.IL= m Ø3mm L = 14 m S = 1.36 % UP.IL= m DN.IL= m 2564 Gr. Ø3mm L = 13 m S = 2.15 % 2560 UP.IL= m DN.IL= m MH-19 G.L = m B.L = m H = 1.94 m Ø3mm L = 15 m S = 1. % UP.IL= m DN.IL= m MH-20 G.L = m B.L = m H = 1.87 m Ø3mm L = 12 m S = 1. % UP.IL= m DN.IL= m -21 Ø2mm L = 7 m S = 0.50 % UP.IL= m DN.IL= m MH-21 G.L = m B.L = m H = 1.80 m MH-1 G.L = m H = 1.73 m MH-22 G.L = m B.L = m H = 1.80 m MH-23 G.L = m B.L = m H = 1.80 m Ø3mm L = 23 m S = 1.70 % UP.IL= 36.64m DN.IL= m Ø3mm L = 14 m S = 0.86 % UP.IL= m DN.IL= m MH-3 G.L = m B.L = m H = 1.88 m MH-24 G.L = m B.L = m H = 1.80 m MH-25 G.L = m B.L = m H = 1.80 m MH-26 G.L = m B.L = m H = 1.80 m Ø3mm L = 18 m S = 2.89 % UP.IL= 37.75m DN.IL= m MH-27 G.L = m B.L = m H = 1.80 m Ø3mm L = 18 m S = 3.17 % UP.IL= m DN.IL= m MH-28 G.L = m B.L = m H = 1.80 m Ø3mm L = 18 m S = 1.83 % UP.IL= m DN.IL= m MH-29 G.L = m B.L = m H = 1.80 m Ø2mm L = 15 m S = 0.50 % UP.IL= m DN.IL= m -21 Ø2mm L = 15 m S = 0.50 % UP.IL= m DN.IL= m MH-4 G.L = 38. m B.L = m H = 1.66 m Pipe material shall be upvc for pipes smaller than or equal to 3 mm -Pipe material shall be RC for pipes equal to 4 mm as specified -Top of manhole cover shall match with finished grade -For manholes dimensions, refer to the corresponding details -All dimensions are in millimeters unless otherwise noted LABEL: LINE X : Pipe Label Ø : Pipe Diameter (mm) L : Pipe Length (m) S : Pipe Slope (%) UP.IL= Upstream invert level of pipe DN.I.L= Downstream invert level of pipe MH-X : Label G.L : ground level B.L : Bottom Level H : Depth KEY PLAN PL ش ارع ا ب ي طال ب PL-02 PL-03 MRAYJE ION SEWER LINES PLANS (3 OF 3) L1702D-WW-PL-03 1/5
7 CONNECT TO EXITING MANHOLE (Ø6) MH MH MH Ø2 MH4 LINE M MH MH MH MH MH MH MH MH MH MH MH MH Ø2 MH15 LINE M MH16 1. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE INDICATED. 2. THE ACCURACY OF DIMENSIONS D FROM THE DRAWINGS IS NOT GUARANTEED. OBTAIN FROM THE ENGINEER ANY DIMENSIONS REQUIRED, BUT NOT GIVEN IN FIGURES ON THE DRAWINGS NOR CALCULABLE FROM FIGURES ON THE DRAWINGS. 3. ANY CONTRADICTION WITH OR DEVIATION FROM SUBMITTED DRAWINGS MUST BE PRESENTED FOR CONSENT BY THE ENGINEER. 4. THIS DRAWINGS SHALL NOT BE AMENDED, MODIFIED, OR ALTERED IN ANY WAY OR FORM WITHOUT PRIOR PERMISSION OF THE SUBURB UNION OF MUNICIPALITIES. 5. THE CONTRACTOR SHALL COORDINATE WITH THE MUNICIPALITY AND THE LOCAL AUTHORITIES IN ORDER TO IDENTIFY THE DISCHARGE POINTS OF THE SEWAGE NETWORKS ON THE EXISTING RELATED NETWORKS WITH ALL THE NEEDED DATA (LEVELS, DIAMETERS...). MRAYJE ION DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE SEWER LINES PROFILES (1 OF 3) H:1/10 - V:1/1 L1702D-WW-PR-01
8 MH MH MH MH MH MH21 LINE M Ø2 MH MH MH MH MH MH MH MH MH29 1. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE INDICATED. 2. THE ACCURACY OF DIMENSIONS D FROM THE DRAWINGS IS NOT GUARANTEED. OBTAIN FROM THE ENGINEER ANY DIMENSIONS REQUIRED, BUT NOT GIVEN IN FIGURES ON THE DRAWINGS NOR CALCULABLE FROM FIGURES ON THE DRAWINGS. 3. ANY CONTRADICTION WITH OR DEVIATION FROM SUBMITTED DRAWINGS MUST BE PRESENTED FOR CONSENT BY THE ENGINEER. 4. THIS DRAWINGS SHALL NOT BE AMENDED, MODIFIED, OR ALTERED IN ANY WAY OR FORM WITHOUT PRIOR PERMISSION OF THE SUBURB UNION OF MUNICIPALITIES. 5. THE CONTRACTOR SHALL COORDINATE WITH THE MUNICIPALITY AND THE LOCAL AUTHORITIES IN ORDER TO IDENTIFY THE DISCHARGE POINTS OF THE SEWAGE NETWORKS ON THE EXISTING RELATED NETWORKS WITH ALL THE NEEDED DATA (LEVELS, DIAMETERS...). MRAYJE ION DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE SEWER LINES PROFILES (2 OF 3) H:1/10 - V:1/1 L1702D-WW-PR-02
9 MH21 (LINE M) MH MH MH MH MH15 (LINE M) MH MH MH MH MH MH4 (LINE M) MH MH MH MH4 1. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE INDICATED. 2. THE ACCURACY OF DIMENSIONS D FROM THE DRAWINGS IS NOT GUARANTEED. OBTAIN FROM THE ENGINEER ANY DIMENSIONS REQUIRED, BUT NOT GIVEN IN FIGURES ON THE DRAWINGS NOR CALCULABLE FROM FIGURES ON THE DRAWINGS. 3. ANY CONTRADICTION WITH OR DEVIATION FROM SUBMITTED DRAWINGS MUST BE PRESENTED FOR CONSENT BY THE ENGINEER. 4. THIS DRAWINGS SHALL NOT BE AMENDED, MODIFIED, OR ALTERED IN ANY WAY OR FORM WITHOUT PRIOR PERMISSION OF THE SUBURB UNION OF MUNICIPALITIES. 5. THE CONTRACTOR SHALL COORDINATE WITH THE MUNICIPALITY AND THE LOCAL AUTHORITIES IN ORDER TO IDENTIFY THE DISCHARGE POINTS OF THE SEWAGE NETWORKS ON THE EXISTING RELATED NETWORKS WITH ALL THE NEEDED DATA (LEVELS, DIAMETERS...). MRAYJE ION DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE SEWER LINES PROFILES (3 OF 3) H:1/10 - V:1/1 L1702D-WW-PR-03
10 SERVICE PIPELINES AND HOUSE CONNECTIONS INSPECTION CHAMBER INSPECTION CHAMBER : 1. ALL DIMENSIONS ARE IN MILLIMETERS, PIPE DIAMETERS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. 2. THE CHOICE OF TYPE OF CONNECTION BETWEEN THE MAIN SEWER PIPELINE (SADDLE, "Y" OR SPECIAL GRP CONNECTION) WILL BE DECIDED ON SITE BY THE ENGINEER. MRAYJE ION GEOMETRIC PAVEMENT DRAINAGE STRUCTURAL P. MANAGER M.B A.S H.H A.SH A.S DRAWN : A.HJ. CHECKED : M.B. APPROVED : A.S. INSPECTION CHAMBER HOUSE CONNECTION DETAILS DATE L1702D-WW-DE-10 AS SHOWN
11 DETAIL OF CONNECTION OF A SERVICE PIPE OR BRANCH PIPE TO A MAIN SEWER PIPELINE CASE "1" CASE "2" : 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. MRAYJE ION GEOMETRIC PAVEMENT DRAINAGE STRUCTURAL P. MANAGER M.B A.S H.H A.SH A.S DRAWN : A.HJ. CHECKED : M.B. APPROVED : A.S. HOUSE CONNECTION DETAILS (1 OF 3) DATE L1702D-WW-DE-11 AS SHOWN
12 HOUSE BRANCH TO MAIN SEWER PIPELINE : 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. 2. FOR INSPECTION CHAMBER DETAIL REFER TO DRAWING N L1701D-WW-DT THE CHOICE OF TYPE OF CONNECTION BETWEEN THE MAIN SEWER PIPELINE AND THE SERVICE PIPELINE (SADDLE, "Y" OR SPECIAL CONNECTION) WILL BE DECIDED ON SITE BY THE ENGINEER. 4. THE UPPER END OF THE HOUSE CONNECTION SHALL BE SEALED BY INSTALLING A CAP AND SEALING THE CAP WITH 23mm THICK MORTAR AROUND CIRCUMFERENCE OF THE CAP. 5. PROVISION FOR FUTURE CONNECTIONS SHALL BE CONSTRUCTED WHERE DIRECTED BY THE ENGINEER. 6. 1/16 (22 1/2 ) OR 1/8 (45 ) BENDS SHALL BE USED TO REMODEL OR CONSTRUCT ANY SEWER ON A CURVE OR AT OR AT ANY CHANGE IN ALIGNM WHERE PHYSICAL OR GEOMETRIC LIMITATIONS PRECLUDE THE USE OF 1/16 OR 1/8 BENDS, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR FOR APPROVAL HIS PROPOSED METHOD OF REMODELING OR CONSTRUCTION. 7. IN CASE OF CONCRETE MAIN SEWER PIPELINE, ALL THE CONNECTIONS WITH THIS LINE SHOULD BE DONE IN THE MANHOLES LOCATIONS. NO DRILLING OF CONCRETE PIPE IS ALLOWED AND ALL CONNECTIONS SHOULD BE DONE WITH THE MANHOLES ONLY. 8. ALL HOUSE CONNECTION SEWERS CONSTRUCTED ON A SLOPE EXCEEDING 15% SHOULD BE ANCHORED. 9. ALL HOUSE CONNECTION SEWERS TO BE CONSTRUCTED UNDER A PROPOSED CONDUIT SHALL BE ENCASED IN CONCRETE. 10. ALL SEWER PIPE WITH COVER (LESS THAN 6mm IN SIDEWALK OR SHOULDER & 9mm IN ROAD) SHALL BE CONCRETE ENCASED. MRAYJE ION GEOMETRIC PAVEMENT DRAINAGE STRUCTURAL P. MANAGER M.B A.S H.H A.SH A.S DRAWN : A.HJ. CHECKED : M.B. APPROVED : A.S. HOUSE CONNECTION DETAILS (2 OF 3) DATE L1702D-WW-DE-12 AS SHOWN
13 SERVICE CONNECTION FROM INSPECTION CHAMBER TO MANHOLE CONNECTION OF A SERVICE LINE TO A MAIN SEWER PIPELINE : 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. 2. FOR INSPECTION CHAMBER DETAIL REFER TO DRAWING N L1701D-WW-DT THE CHOICE OF TYPE OF CONNECTION BETWEEN THE MAIN SEWER PIPELINE AND THE SERVICE PIPELINE (SADDLE, "Y" OR SPECIAL CONNECTION) WILL BE DECIDED ON SITE BY THE ENGINEER. 4. THE UPPER END OF THE HOUSE CONNECTION SHALL BE SEALED BY INSTALLING A CAP AND SEALING THE CAP WITH 23mm THICK MORTAR AROUND CIRCUMFERENCE OF THE CAP. 5. PROVISION FOR FUTURE CONNECTIONS SHALL BE CONSTRUCTED WHERE DIRECTED BY THE ENGINEER. 6. 1/16 (22 1/2 ) OR 1/8 (45 ) BENDS SHALL BE USED TO REMODEL OR CONSTRUCT ANY SEWER ON A CURVE OR AT OR AT ANY CHANGE IN ALIGNM WHERE PHYSICAL OR GEOMETRIC LIMITATIONS PRECLUDE THE USE OF 1/16 OR 1/8 BENDS, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR FOR APPROVAL HIS PROPOSED METHOD OF REMODELING OR CONSTRUCTION. 7. IN CASE OF CONCRETE MAIN SEWER PIPELINE, ALL THE CONNECTIONS WITH THIS LINE SHOULD BE DONE IN THE MANHOLES LOCATIONS. NO DRILLING OF CONCRETE PIPE IS ALLOWED AND ALL CONNECTIONS SHOULD BE DONE WITH THE MANHOLES ONLY. 8. ALL HOUSE CONNECTION SEWERS CONSTRUCTED ON A SLOPE EXCEEDING 15% SHOULD BE ANCHORED. 9. ALL HOUSE CONNECTION SEWERS TO BE CONSTRUCTED UNDER A PROPOSED CONDUIT SHALL BE ENCASED IN CONCRETE. 10. ALL SEWER PIPE WITH COVER (LESS THAN 6mm IN SIDEWALK OR SHOULDER & 9mm IN ROAD) SHALL BE CONCRETE ENCASED. MRAYJE ION GEOMETRIC PAVEMENT DRAINAGE STRUCTURAL P. MANAGER M.B A.S H.H A.SH A.S DRAWN : A.HJ. CHECKED : M.B. APPROVED : A.S. HOUSE CONNECTION DETAILS (3 OF 3) DATE L1702D-WW-DE-13 AS SHOWN
14 ﺷ ﺎﺭﻉ ﺃﺑ ﻲ ﻁﺎﻟ ﺏ ﻣﻧﻁﻘ ﺔ ﺍﻟﻣﺭﻳﺟ ﺔ Existing MH. (Ø9) G.L: I.L: Ø3 0 0 Rev. Ø6 Proposed Storm Pipe Ø5 Drawn Chkd. Appd. ﺍﺗﺣ ﺎﺩ ﺑﻠ ﺩﻳﺎﺕ ﺍﻟﺿ ﺎﺣﻳﺔ ﺍﻟﺟﻧﻭﺑﻳ ﺔ Revision Details Proposed Gully Pipe Date A.S CHECKED BY: A.S APPROVED BY: MRAYJE ION H.I DESIGNED BY: L /50 L1702D-SW-GNL-01 DATE JOB NUMBER : R.I A.S DRAWN BY: PROJECT MANAGER : STORM LINES GENERAL LAYOUT Ø6 Ø6 Ø4 Ø3
15 CHEMIN CHEMIN wall power generator Storm D=9 I.L:30.77 T.L:33.17 D=6 I.L:30.79 T.L:33.34 Gr. 0.50% % % % % % 0.50% % 2.27% 2.27% PL-01 PL-02 PL-03 ب لاط ي با عرا ش Ø2 Ø2 Ø2 Ø4 Ø4 Ø4 Ø3 Ø3 LINE M LINE M LINE M LINE M LINE M LINE M-4 LINE M-15 LINE M-21 ة جيرملا ة قطنم Existing MH. (Ø6) G.L: I.L: Y=-342 Y=-341 Y=-340 Y=-339 Y=-338 Y=-337 Y=-336 X= X= X= X= X= X= X= PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: ة يبونجلا ةيحا ضلا تايد لب دا حتا AS SHOWN MRAYJE ION SEWER LINES L1702D-WW-KPL-01 GENERAL KEY PLAN Proposed Sewer Pipe
16 CHEMIN CHEMIN wall power generator Storm D=9 I.L:30.77 T.L:33.17 D=6 I.L:30.79 T.L:33.34 Gr. 0.50% % % % % % 0.50% % 2.27% 2.27% PL-01 PL-02 PL-03 ب لاط ي با عرا ش ة جيرملا ة قطنم Existing MH. (Ø9) G.L: I.L: Y=-342 Y=-341 Y=-340 Y=-339 Y=-338 Y=-337 Y=-336 X= X= X= X= X= X= X= Ø6 Ø6 Ø6 Ø5 Ø4 Ø3 Ø3 PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: ة يبونجلا ةيحا ضلا تايد لب دا حتا AS SHOWN MRAYJE ION STORM LINES L1702D-SW-KPL-01 GENERAL KEY PLAN Proposed Storm Pipe Proposed Gully Pipe
17 C HEMIN C HEMIN T.L:33.34 I.L:30.79 D=6 T.L:33.17 I.L:30.77 D=9 Storm 44 wall P T.L:33.34 I.L:30.79 D=6 G-76 G.L = m B.L = m PG-76 L = 9.90 m S= 2.30 % UP.IL = m DN.IL = m T.L:33.17 I.L:30.77 D=9 Storm G-75 G.L = m B.L = m power generator PG-75 L = 6.50 m UP.IL = m DN.IL = m 2418 P-26 Ø6 mm L = m S = 1.30 % UP.IL= m DN.IL = m P-25 Ø6 mm L = m S = 1.30 % UP.IL= m DN.IL = m P-28 Ø6 mm L = m S = 1. % UP.IL= m DN.IL = m P-27 Ø6 mm L = m S = 1.30 % UP.IL= m DN.IL = m PG-70 L = 2.90 m S= 0.90 % UP.IL = m DN.IL = m PG-73 L = 4. m S= 0.80 % UP.IL = m DN.IL = m 2420 PG-67 L = 9.20 m S= 0.80 % UP.IL = m DN.IL = m PG-66 L = 3.80 m S= 0.80 % UP.IL = m DN.IL = m P-24 Ø6 mm L = m S = 1.20 % UP.IL= m DN.IL = m P G-70 G.L = m B.L = m G-63 G.L = m B.L = m G-61 G.L = 35. m B.L = m MH-26 G.L = m B.L = m H = 2. m PG-62 L = m S= 0.50 % UP.IL = m DN.IL = m PG-52 L = m S= 1.10 % UP.IL = m DN.IL = m MH-27 G.L = 34. m B.L = m H = 2.10 m G-73 G.L = 34. m B.L = m G-67 G.L = m B.L = m H = 1.58 m G-66 G.L = m B.L = m PG-61 L = 6.40 m S= 0.80 % UP.IL = m DN.IL = m G-53 G.L = m B.L = m MH-25 G.L = m B.L = m H = 2.06 m PG MH-24 G.L = m B.L = m H = 2.13 m G-62 G.L = m B.L = m PG-57 L = m UP.IL = m DN.IL = m P-22 Ø6 mm L = m S = 0.70 % UP.IL= m DN.IL = m G-57 G.L = m B.L = m H = 2.25 m L = 2.90 m S= 0.80 % UP.IL = m DN.IL = m B.L = m P-23 Ø6 mm L = m S = 1.30 % UP.IL= m DN.IL = m G-52 G.L = m B.L = m MH-28 G.L = m B.L = m PG-72 L = 7.50 m UP.IL = m DN.IL = m G-65 G.L = m PG-74 L = m UP.IL = m DN.IL = m G-74 G.L = m B.L = m G-71 G.L = m B.L = m PG L = 5.90 m PG-53 L = 2.80 m S= 0.80 % UP.IL = m DN.IL = m UP.IL = m DN.IL = m MH G-72 G.L = 34. m B.L = m PG-71 L = m UP.IL = m DN.IL = m G-64 G.L = m B.L = m G-58 G.L = m B.L = m G.L = m B.L = m H = 2. m G-60 G.L = m B.L = m PG-59 L = m UP.IL = m DN.IL = m G-59 G.L = m B.L = m MH-22 G.L = m B.L = m H = 2. m PG-50 PG-69 L = m UP.IL = m DN.IL = m PG-60 L = 7.10 m UP.IL = m DN.IL = m PG-56 L = m UP.IL = m DN.IL = m G-55 G.L = m B.L = m PG-54 L = 6.70 m UP.IL = m DN.IL = m PG-68 L = 5. m S= 2.20 % UP.IL = m DN.IL = m PG-64 L = m S= 1.70 % UP.IL = m DN.IL = m PG-58 L = m S= 1.70 % UP.IL = m DN.IL = m G-56 G.L = m B.L = m H = 1.63 m PG-55 L = m UP.IL = m DN.IL = m G-54 G.L = m B.L = m CHEMIN Pipe material shall be upvc for pipes smaller than or equal to 3 mm -Pipe material shall be GRP for pipes equal to or higher than 4 mm -Top of manhole cover shall match with finished grade -For manholes dimensions, refer to the corresponding details -All dimensions are in millimeters unless otherwise noted LABEL: LINE X : Pipe Label Ø : Pipe Diameter (mm) L : Pipe Length (m) S : Pipe Slope (%) UP.IL= Upstream invert level of pipe DN.I.L= Downstream invert level of pipe MH-X : Label G.L : ground level B.L : Bottom Level H : Depth KEY PLAN PL ش ارع ا ب ي طال ب PL-02 PL-03 MRAYJE ION STORM LINES PLANS (1 OF 3) L1702D-SW-PL-01 1/5
18 1% 1% C HEMIN C HEMIN T.L:33.34 I.L:30.79 D=6 T.L:33.17 I.L:30.77 D=9 Storm 44 wall P-10 Ø5 mm L = m S = 0.70 % UP.IL= m DN.IL = m DN.IL = m B.L = m H = 2.38 m G.L = m PG-52 L = m S= 1.10 % UP.IL = m DN.IL = m G.L = m B.L = m G-33 G.L = m B.L = m G-37 G.L = m B.L = m H = 1.58 m G-31 G.L = m B.L = 36. m G-52 G.L = m B.L = m P-21 Ø6 mm MH-21 L = m G.L = m S = 1. % B.L = m UP.IL= m H = 2. m DN.IL = m PG-51 L = 10. m UP.IL = m DN.IL = m PG-35 L = 5.50 m UP.IL = m DN.IL = m PG-31 L = 9.80 m S= 5.60 % UP.IL = m DN.IL = m G-51 G.L = m B.L = m P-20 Ø6 mm L = m S = 0.80 % UP.IL= m DN.IL = m G-46 G.L = m B.L = m PG-36 L = 5.50 m S= 0.50 % UP.IL = m DN.IL = m UP.IL = m DN.IL = m G-47 G.L = m B.L = m G-45 G.L = m B.L = m G-35 G.L = m B.L = m PG-25 L = 8.40 m PG-46 L = m S= 2.10 % UP.IL = m DN.IL = m PG-33 L = 6.70 m UP.IL = m DN.IL = m UP.IL = m DN.IL = m P-18 Ø6 mm L = m S = 1. % UP.IL= m DN.IL = m G-36 G.L = m B.L = m H = 1.62 m G-32 G.L = 37. m B.L = m H = 1.56 m PG-47 L = 2.90 m S= 0.80 % G-30 G.L = m B.L = m PG-26 L = m S= 0.50 % UP.IL = m DN.IL = m MH-19 G.L = m B.L = m H = 2. m PG-45 L = m S= % UP.IL = m DN.IL = m PG-32 L = 5.20 m S= 0.50 % UP.IL = m DN.IL = m G-24 G.L = m B.L = m PG-54 L = 6.70 m UP.IL = m PG-50 L = 5.90 m UP.IL = m DN.IL = m PG-30 L = 2.90 m S= 0.80 % PG-37 L = 3.10 m UP.IL = m S= 2.60 % P-11 Ø5 mm L = m S = 0.70 % UP.IL= m DN.IL = m UP.IL = m DN.IL = m G-28 G.L = m B.L = m G-26 G.L = m B.L = m H = 1.74 m DN.IL = m MH-20 G.L = m H = 2. m PG-48 L = 7.50 m S= 0.80 % UP.IL = m DN.IL = m PG-28 L = 2.80 m S= 2.10 % PG-44 L = 5.80 m UP.IL = m DN.IL = m G-49 G.L = m B.L = m G-48 G.L = m B.L = m UP.IL = m DN.IL = m G-54 G.L = m B.L = m G-50 G.L = m B.L = m PG-49 L = m S= 1.90 % UP.IL = m DN.IL = m MH-18 G.L = m B.L = m H = 2.26 m P-17 Ø6 mm L = m S = 0.60 % UP.IL= m DN.IL = m P-19 Ø6 mm L = m S = 1.80 % UP.IL= m DN.IL = m G-44 G.L = m B.L = m G-43 G.L = 37. m B.L = m PG-34 L = 9.40 m UP.IL = 36. m DN.IL = m MH-12 G.L = m B.L = m MH B.L = m H = 1.92 m PG-43 L = m S= 1.40 % UP.IL = m DN.IL = m MH-9 G-34 G.L = m B.L = m G.L = m B.L = m H = 1.90 m MH-11 G.L = m B.L = m H = 1.91 m G-29 G.L = m B.L = m PG-27 L = 7.50 m S= 1.10 % UP.IL = m DN.IL = m PG-38 L = m S= % UP.IL = m DN.IL = m P-16 Ø3 mm L = m S = 0.60 % UP.IL= m DN.IL = m MH-17 G.L = m B.L = m H = 2.20 m G-38 G.L = m B.L = m P-15 Ø3 mm L = m S = 0.60 % UP.IL= m DN.IL = m PG-29 L = 7.60 m UP.IL = m DN.IL = m P-9 Ø5 mm L = 20. m S = 0.50 % UP.IL= m DN.IL = m G-27 G.L = m B.L = m PG-22 L = 7.40 m S= 0.50 % UP.IL = m DN.IL = m MH-16 G.L = m B.L = m H = 2.05 m G-39 G.L = m B.L = m P-14 Ø3 mm L = m S = 0.60 % UP.IL= m DN.IL = m PG-39 L = 8.50 m S= 4.10 % UP.IL = m DN.IL = m P-13 Ø3 mm L = m S = 0.50 % UP.IL= m DN.IL = m G-41 G.L = m B.L = m MH-14 G.L = m B.L = m H = 1.70 m PG-41 L = 6.50 m S= 2.90 % UP.IL = m DN.IL = m P-12 Ø3 mm L = m S = 1.60 % UP.IL= m DN.IL = m MH-13 G.L = m B.L = m H = 1.70 m 156 G-42 G.L = m B.L = m PG-42 L = 6.60 m S= 2.90 % UP.IL = m DN.IL = m Pipe material shall be upvc for pipes smaller than or equal to 3 mm -Pipe material shall be GRP for pipes equal to or higher than 4 mm -Top of manhole cover shall match with finished grade -For manholes dimensions, refer to the corresponding details -All dimensions are in millimeters unless otherwise noted LABEL: LINE X : Pipe Label Ø : Pipe Diameter (mm) L : Pipe Length (m) S : Pipe Slope (%) UP.IL= Upstream invert level of pipe DN.I.L= Downstream invert level of pipe MH-X : Label G.L : ground level B.L : Bottom Level H : Depth KEY PLAN PL ش ارع ا ب ي طال ب PL-02 PL-03 MRAYJE ION STORM LINES PLANS (2 OF 3) L1702D-SW-PL-02 1/5
19 0.50% % % 0.50% % % % C HEMIN C HEMIN T.L:33.34 I.L:30.79 D=6 T.L:33.17 I.L:30.77 D=9 Storm 44 wall L = 8.40 m 3168 UP.IL = m DN.IL = m P-7 Ø4 mm L = m S = 0.80 % UP.IL= m DN.IL = m 2563 P-5 Ø4 mm L = 9. m S = 0.60 % UP.IL= m DN.IL = m P-4 Ø3 mm L = m S = 1.30 % UP.IL= 37. m DN.IL = m P-8 Ø5 mm L = m S = 0.50 % UP.IL= m DN.IL = m DN.IL = m Gr. 2.5% wall DN.IL = m PG-24 L = 3.70 m S= 0.50 % UP.IL = m DN.IL = m G-24 G.L = m B.L = m G-26 G.L = m B.L = m H = 1.74 m G-23 G.L = m B.L = m G-12 G.L = m B.L = m G-20 G.L = m B.L = m G-17 G.L = m B.L = m PG-9 L = 5.90 m UP.IL = m DN.IL = m PG-23 L = 5.60 m UP.IL = m DN.IL = m PG-20 L = 2.60 m S= 0.80 % UP.IL = m P-3 Ø3 mm L = m S = 1.90 % UP.IL= m DN.IL = 37. m P-2 Ø3 mm L = 28. m S = 3.90 % UP.IL= m DN.IL = m P-6 Ø4 mm L = m S = 0.50 % UP.IL= m DN.IL = m MH-5 G.L = m B.L = m H = 2.11 m G-10 G.L = m B.L = m PG-10 L = 2.60 m S= 1.10 % UP.IL = m DN.IL = m PG-12 L = 3.80 m S= 0.80 % G-6 G.L = m B.L = m PG-17 L = 2.90 m S= 0.90 % UP.IL = m DN.IL = m MH UP.IL = m DN.IL = m PG-6 L = 7. m S= 4.40 % UP.IL = m DN.IL = m MH-4 G.L = m B.L = 37. m H = 1.70 m G-9 G.L = m B.L = m G.L = m B.L = m H = 1.90 m MH-8 G.L = m B.L = m H = 1.90 m MH-3 G.L = m B.L = m H = 1.70 m PG-4 L = 2.90 m UP.IL = m DN.IL = m P-9 Ø5 mm L = 20. m S = 0.50 % UP.IL= m DN.IL = m G-22 G.L = m B.L = m H = 1.66 m MH-7 G.L = m B.L = m H = 2.05 m G-21 G.L = m B.L = m MH-6 G.L = m B.L = m H = 2.09 m G-19 G.L = m B.L = m G-18 G.L = m B.L = m G-16 G.L = m B.L = m PG-13 L = 7.90 m UP.IL = m DN.IL = m PG-18 L = m S= 2.70 % UP.IL = m DN.IL = m PG mm PG-16 L = 9.90 m UP.IL = 37. m DN.IL = m PG-14 L = m G-13 G.L = m UP.IL = m B.L = m DN.IL = m MH-2 G-11 G.L = m B.L = m L = 5.60 m UP.IL = m DN.IL = m G.L = m B.L = m H = 1.70 m PG-22 L = 7.40 m S= 0.50 % UP.IL = m DN.IL = m PG-19 L = 6.10 m UP.IL = m DN.IL = m G-15 G.L = m B.L = m G-14 G.L = m B.L = m PG-11 L = 8. m S= 0.50 % UP.IL = m DN.IL = m PG-21 L = m UP.IL = m DN.IL = m G-8 G.L = m B.L = m G-7 G.L = m B.L = m G-5 G.L = m B.L = m PG-15 L = 9.70 m UP.IL = m DN.IL = m PG-7 L = m S= 2.80 % UP.IL = m DN.IL = m PG-5 L = m S= 3.10 % UP.IL = m DN.IL = m PG-3 L = 8.70 m UP.IL = m DN.IL = m G-4 G.L = m B.L = m PG-1 L = 5.30 m S= 0.80 % UP.IL = m DN.IL = m P-1 Ø3 mm L = m S = 0.80 % UP.IL= m DN.IL = m G-1 G.L = m B.L = m MH-1 G.L = B.L = H = 1.70 m G-2 G.L = m B.L = m PG-2 L = 7.10 m UP.IL = m DN.IL = m G-3 G.L = m B.L = m Pipe material shall be upvc for pipes smaller than or equal to 3 mm -Pipe material shall be GRP for pipes equal to or higher than 4 mm -Top of manhole cover shall match with finished grade -For manholes dimensions, refer to the corresponding details -All dimensions are in millimeters unless otherwise noted LABEL: LINE X : Pipe Label Ø : Pipe Diameter (mm) L : Pipe Length (m) S : Pipe Slope (%) UP.IL= Upstream invert level of pipe DN.I.L= Downstream invert level of pipe MH-X : Label G.L : ground level B.L : Bottom Level H : Depth KEY PLAN PL ش ارع ا ب ي طال ب PL-02 PL-03 MRAYJE ION STORM LINES PLANS (3 OF 3) L1702D-SW-PL-03 1/5
20 PROFILE 1 (Part 1/2) Station Length Depth to Invert Invert Level Ground Level Slope 0.79% 3.86% 1.89% 1.25% 0.56% 0.54% 0.77% 0.51% 0.50% 0.69% 0.70% % Material UPVC GRP Section Size DATUM 32. I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= Ø3 I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= MH-1 MH-2 MH-3 MH-4 MH-5 MH-6 MH-7 MH-8 MH-9 MH-10 MH-11 MH-12 MH MH-19 I.L.= I.L.= ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE INDICATED. 2. THE ACCURACY OF DIMENSIONS D FROM THE DRAWINGS IS NOT GUARANTEED. OBTAIN FROM THE ENGINEER ANY DIMENSIONS REQUIRED, BUT NOT GIVEN IN FIGURES ON THE DRAWINGS NOR CALCULABLE FROM FIGURES ON THE DRAWINGS. 3. ANY CONTRADICTION WITH OR DEVIATION FROM SUBMITTED DRAWINGS MUST BE PRESENTED FOR CONSENT BY THE ENGINEER. 4. THIS DRAWINGS SHALL NOT BE AMENDED, MODIFIED, OR ALTERED IN ANY WAY OR FORM WITHOUT PRIOR PERMISSION OF THE SUBURB UNION OF MUNICIPALITIES. 5. THE CONTRACTOR SHALL COORDINATE WITH THE MUNICIPALITY AND THE LOCAL AUTHORITIES IN ORDER TO IDENTIFY THE DISCHARGE POINTS OF THE SEWAGE NETWORKS ON THE EXISTING RELATED NETWORKS WITH ALL THE NEEDED DATA (LEVELS, DIAMETERS...). MRAYJE ION DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE STORM LINES PROFILES (1 OF 3) H:1/10 - V:1/1 L1702D-SW-PR-01
21 PROFILE 1 (Part 2/2) Station Length Depth to Invert Invert Level Ground Level Slope 1.80% 0.84% 1.01% 0.71% 1.28% % % 1.05% Material GRP Section Size 6 DATUM 29. I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= MH-19 MH-20 MH-21 MH-22 MH-23 MH-24 MH-25 MH-26 MH-27 MH-28 O-1 I.L.= ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE INDICATED. 2. THE ACCURACY OF DIMENSIONS D FROM THE DRAWINGS IS NOT GUARANTEED. OBTAIN FROM THE ENGINEER ANY DIMENSIONS REQUIRED, BUT NOT GIVEN IN FIGURES ON THE DRAWINGS NOR CALCULABLE FROM FIGURES ON THE DRAWINGS. 3. ANY CONTRADICTION WITH OR DEVIATION FROM SUBMITTED DRAWINGS MUST BE PRESENTED FOR CONSENT BY THE ENGINEER. 4. THIS DRAWINGS SHALL NOT BE AMENDED, MODIFIED, OR ALTERED IN ANY WAY OR FORM WITHOUT PRIOR PERMISSION OF THE SUBURB UNION OF MUNICIPALITIES. 5. THE CONTRACTOR SHALL COORDINATE WITH THE MUNICIPALITY AND THE LOCAL AUTHORITIES IN ORDER TO IDENTIFY THE DISCHARGE POINTS OF THE SEWAGE NETWORKS ON THE EXISTING RELATED NETWORKS WITH ALL THE NEEDED DATA (LEVELS, DIAMETERS...). MRAYJE ION DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE STORM LINES PROFILES (2 OF 3) H:1/10 - V:1/1 L1702D-SW-PR-02
22 PROFILE 2 Station Length Depth to Invert Invert Level Ground Level Slope 1.64% 0.55% 0.58% 0.59% 0.57% Material UPVC Section Size 3 DATUM 32. I.L.= I.L.= I.L.= I.L.= I.L.= I.L.= MH-13 MH-14 MH-15 MH-16 MH-17 MH-12 I.L.= Ø5 I.L.= Ø6 I.L.= ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE INDICATED. 2. THE ACCURACY OF DIMENSIONS D FROM THE DRAWINGS IS NOT GUARANTEED. OBTAIN FROM THE ENGINEER ANY DIMENSIONS REQUIRED, BUT NOT GIVEN IN FIGURES ON THE DRAWINGS NOR CALCULABLE FROM FIGURES ON THE DRAWINGS. 3. ANY CONTRADICTION WITH OR DEVIATION FROM SUBMITTED DRAWINGS MUST BE PRESENTED FOR CONSENT BY THE ENGINEER. 4. THIS DRAWINGS SHALL NOT BE AMENDED, MODIFIED, OR ALTERED IN ANY WAY OR FORM WITHOUT PRIOR PERMISSION OF THE SUBURB UNION OF MUNICIPALITIES. 5. THE CONTRACTOR SHALL COORDINATE WITH THE MUNICIPALITY AND THE LOCAL AUTHORITIES IN ORDER TO IDENTIFY THE DISCHARGE POINTS OF THE SEWAGE NETWORKS ON THE EXISTING RELATED NETWORKS WITH ALL THE NEEDED DATA (LEVELS, DIAMETERS...). MRAYJE ION DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: PROJECT MANAGER : A.S JOB NUMBER : L01702 DATE STORM LINES PROFILES (3 OF 3) H:1/10 - V:1/1 L1702D-SW-PR-03
23 STORM WATER MANHOLE : 1-AN UP STAND MIN. HEIGHT 15cm IS TO BE EXECUTED WITH THE MANHOLE SLAB IN ORDER TO ENSURE A PROPER CONCRETE CONNECTION FOR THE MANHOLE WALLS. 2-REFER TO "GENERAL " DWG. 3-MANHOLES COVERS AND FRAMES TO BE RAISED SHALL BE PROPERLY REMOVED, AND RETURNED TO THE MUNICIPALITY IF DIRECTED BY THE ENGINEER. 4-BITUMINOUS SURFACES TO REACH MANHOLES COVERS EDGES AS SHOWN. HOWEVER, IF DIRECTED BY THE ENGINEER, ANTI ABRASION EPOXY MORTAR TO BE APPLIED ON TOP OF MANHOLES IF CONCRETE SURFACES ARE LEFT EXPOSED TO TRAFFIC. LEGEND: : CONSTRUCTION JOINT, JOINT INCLUDING HYDROSWELLING MASTIC PROPERTIES FOR HYDROSWELLING MASTIC Cured (7 days at 25 C, 10 mm thick) Elongation at break Approx. 625% DIN Tensile strength Approx. 2.2N/mm2 DIN Resistance to hydrostatic pressure Swelling capacity in contact with water Up to 150 meters of water column Swells to approx. 350% of its original dry volume Text DNC Test report KUL University MRAYJE ION GEOMETRIC PAVEMENT DRAINAGE STRUCTURAL P. MANAGER M.B A.S H.H A.SH A.S DRAWN : A.HJ. CHECKED : M.B. APPROVED : A.S. STORM WATER MANHOLE DETAILS DATE L1702D-SW-DE-02 AS SHOWN
24 TYPICAL TRENCHES AND PIPE BEDDING DETAILS FLEXIBLE JOINT DETAIL : 1-REFER TO SPECIFICATIONS FOR PIPE BEDDING REQUIREMENTS APPLICABLE TO EACH PIPE MATERIAL. 2-ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. 3-THE GRANULAR AND SAND FILL IN PIPE TRENCHES MUST BE COMPACTED ACCORDING TO SPECIFICATIONS. 4-THE CONTRACTOR SHALL IDENTIFY ALL THE EXISTING UTILITIES AND MANHOLES WITH THEIR LOCATIONS AND LEVELS, IN ORDER TO AVOID DAMAGE TO EXISTING WORKS. 5-CONCRETE ENCASEMENT FOR ALL PIPES MATERIALS IF THE HEIGHT OF FILLING OVER THE PIPE FROM GROUND LEVEL TO TO CROWN OF PIPE LESS THAN 1.0M AND MORE THAN 4.0M. 6-MINIMUM THICKNESS T1 OF COMPACTED MATERIAL UNDER BARREL BOTTOM: T1 = 150 FOR D<3mm T1 = 2 FOR 3<D<8mm T1 = D/4 FOR D>8 7-HEAVY COMPACTING EQUIPMENT SHALL NOT BE USED WITHIN 3mm OF PIPE CROWN. 8-ALL PIPES BUILT INTO STRUCTURES SHALL HAVE A FLEXIBLE JOINT AS DETAILED IN THIS DWG. 9-BACKFILL MATERIAL COMPACTED IN LAYERS NOT EXCEEDING 15cm OF COMPACTED THICKNESS. 10-SELECTED BACKFILL SHALL BE MATERIAL COMPLYING WITH SPECIFICATION EITHER SELECTED FROM THE EXCAVATION OR IMPORTED AS NECESSARY. 11-REFER TO DWG. "GENERAL AND LEGEND". 12- FOR TRENCH WIDTH REFER TO L1702-SW-DE-04. LEGEND: G.EL. : GROUND ELEVATION CONT. : CONTINUOUS LAP 50db AT SPLICES db : DEFORMED BAR DIAMETER IN mm DIA. : OUTSIDE DIAMETER D, Ø : PIPE DIAMETER THE MINIMUM THICKNESS " T " FOR CONCRETE ENCASEMENT TO PIPES SHALL BE AS FOLLOWS: - T = 150 FOR D<6 - T = 250 FOR 7<D<10 - T = D/4 FOR D> 10 WHERE THE DEPTH OF COVER OVER THE PIPES REQUIRES THICKER ENCASEM THE CONTRACTOR SHALL ACT AS DIRECTED BY THE ENGINEER. MRAYJE ION GEOMETRIC PAVEMENT DRAINAGE STRUCTURAL P. MANAGER M.B A.S H.H A.SH A.S DRAWN : A.HJ. CHECKED : M.B. APPROVED : A.S. TYPICAL TRENCHES DETAILS FOR STORM WATER NETWORK DATE L1702D-SW-DE-01 AS SHOWN
25 ROAD GULLY COVERED MANHOLE GRATED MANHOLE CHAIN AND STEPS DETAILS N.B: 1- MANHOLE DETAILS ARE SHOWN FOR TYPICAL 90 AND STRAIGHT PIPES CONNECTIONS, WHERE DIFFERENT JUNCTIONS OR BENDS ARE ENCOUNTERED THE MANHOLE BASE AND BENCHING SHALL BE MODIFIED TO SUIT EACH CONDITION AS DIRECTED BY THE ENGINEER AT NO EXTRA COST. 2- AL REINFORCED CONCRETE SHALL BE CLASS "A" AND CONCRETE FOR BLINDING SHALL BE CLASS"C". 3- GALVANIZED WROUGHT IRON CHAIN SHALL BE USED WHERE STORM WATER DIAMETER IS GREATER THAN 6mm. 4- EXTERNAL SURFACES OF MANHOLES SHALL BE PROTECTED WITH 2 COATS OF RC250 OR MC FOR PIPES PROTRUDING FROM ANY CONCRETE STRUCTURES TWO FLEXIBLE COUPLING SHALL BE PROVIDED FROM EACH SIDE. 6- THE CONTRACTOR SHALL IDENTIFY ALL THE EXISTING UTILITIES AND MANHOLES WITH THEIR LOCATIONS AND LEVELS, IN ORDER TO AVOID DAMAGE TO EXISTING WORKS. 7-20mm WIDE EXPANSION JOINT WITH BITUMINOUS FELT PAPER FILLER SHALL BE PROVIDED IN CONCRETE ENCASEMENT FOR ALL PIPE MATERIAL. JOINTS SHALL BE AT ALL PIPE JOINTS IN THE VICINITY AND WITHIN 5mm OR 1D FROM MANHOLES AND AT MAXIMUM INTERVALS OF ENCASEMENT BUT ALWAYS AT PIPE JOINTS, 8- ALL PIPES SHALL BE LAID ON THE APPROPRIATE TYPE OF BEDDING AND SHALL RECEIVE SELECTED FILL COMPACTED TO AT LEAST 3mm ABOVE CROWN OF PIPE. : 1-THE CONTRACTOR SHALL CLEAN ALL THE EXISTING STORM WATER NETWORK AS DIRECTED BY THE ENGINEER ON SITE. 2-CONCRETE ENCASEMENT SHALL BE PROVIDED WHEER THE COVER DEPTH FROM F.G.L TO CROWN OF PIPES IS LESS THAN 1.0m 3-EXACT LOCATIONS OF ROAD GULLIES AND INTERCEPTORS TO BE VERIFIED AND LOCATED BY THE CONTRACTOR ACCORDING TO THE EXISTING SITE CONDITIONS. 4-THE FINAL LEVEL ON TOP OF MANHOLE SHOULD BE VERIFIED BY THE CONTRACTOR PRIOR TO EXECUTION OF MANHOLES. 5-MANHOLE COVERS TO BE ADJUSTED ON SITE ACCORDING TO THE NEW ROADWAY FINAL GRADE LEVEL. 6-AL REINFORCED CONCRETE SHALL BE CLASS "A" AND CONCRETE FOR BLINDING SHALL BE CLASS"C". MRAYJE ION GEOMETRIC PAVEMENT DRAINAGE STRUCTURAL P. MANAGER M.B A.S H.H A.SH A.S DRAWN : A.HJ. CHECKED : M.B. APPROVED : A.S. GULLY & GULLY MANHOLE DETAILS DATE L1702D-SW-DE-03 AS SHOWN
26 DUCTILE IRON MANHOLE COVER PIPE BEDDING REQUIREMENTS LAYING OF DIFFERENT TYPES OF PIPES MUST BE ACCORDING TO THE TABLE BELOW & FRAME DETAILS UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER PIPE DIAMETER (mm) TRENCH WIDTH, mm (W) H<2m 2<H<3m 3<H<4m 4<H<5m H>5m PIPE MATERIAL HEIGHT OF FILLING OVER THE PIPE FROM GROUND ELEV. TO CROWN OF PIPE TYPE OF INSTALLATION CONSTRUCTION JOINT DETAIL N.B.: RAISING OF MANHOLE FRAME AND COVER JUNCTION MANHOLE COVER IN ASPHALT : 1-THE CONTRACTOR SHALL CLEAN ALL THE EXISTING STORM WATER NETWORK AS DIRECTED BY THE ENGINEER ON SITE. 2-CONCRETE ENCASEMENT SHALL BE PROVIDED WHEER THE COVER DEPTH FROM F.G.L TO CROWN OF PIPES IS LESS THAN 1.0m 3-EXACT LOCATIONS OF ROAD GULLIES AND INTERCEPTORS TO BE VERIFIED AND LOCATED BY THE CONTRACTOR ACCORDING TO THE EXISTING SITE CONDITIONS. 4-THE FINAL LEVEL ON TOP OF MANHOLE SHOULD BE VERIFIED BY THE CONTRACTOR PRIOR TO EXECUTION OF MANHOLES. 5-MANHOLE COVERS TO BE ADJUSTED ON SITE ACCORDING TO THE NEW ROADWAY FINAL GRADE LEVEL. 6-AL REINFORCED CONCRETE SHALL BE CLASS "A" AND CONCRETE FOR BLINDING SHALL BE CLASS"C". MRAYJE ION GEOMETRIC PAVEMENT DRAINAGE STRUCTURAL P. MANAGER M.B A.S H.H A.SH A.S DRAWN : A.HJ. CHECKED : M.B. APPROVED : A.S. PIPE BEDDING REQUIREMENTS FOR STORM NETWORK DATE L1702D-SW-DE-04 AS SHOWN
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationSECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS
UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION
More informationStormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17
StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications
More informationEXCAVATION AND BACKFILL
Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationSECTION MANHOLES
SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.
More informationCONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01
More informationGrease Interceptor Design Checklist
CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private
More informationOil-Water Separator Design Checklist
CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water
More informationStormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18
StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute
More informationDESIGN OF IRRIGATION CHANNELS IN MOHAMMARA AKKAR MOHAFAZA
DESIGN OF IRRIGATION CHANNELS IN MOHAMMARA AKKAR MOHAFAZA VOLUME 1 DETAILED DESIGN DRAWINGS JULY, 2017 X= 293500 Y=39500 X= 293000 X= 292500 X= 292000 X= 291500 X= 291000 X= 290500 PROPOSED IRRIGATION
More informationCITY OF MUSKEGO DRAFTING STANDARDS
CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationSECTION PRECAST CONCRETE SECTIONAL MANHOLES
SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,
More informationNEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST
NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationAnne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationKC Water Rules and Regulations For Water Main Extensions and Relocations
KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made
More informationSECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS
9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a
More informationSECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationSewer Line Extension Permit Design Checklist
CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line
More informationA. Dewatering observation wells are part of dewatering allowance.
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMANHOLES PART I: GENERAL. A. Precast Concrete Manholes
MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a
More informationStandard Specifications
Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and
More informationVILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.
Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND
More informationMINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS
Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS
More informationGuidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division
Guidelines and Checklist For SAWS Sanitary Sewer Developmental Engineering Division INITIAL CONSIDERATIONS UTILITY SERVICE AGREEMENT Utility Service Agreement A Utility Service Agreement (USA) will be
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationSECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationSECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS
SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation 7 Backfilling
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationTOWN of LAKESHORE SITE PLAN CHECKLIST
TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )
More informationB. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.
SAMPLING AND TESTING. The Sampling and Testing requirements contained in -03 shall apply. MARKING. The Marking requirements contained in -03 shall apply. FINAL PRODUCTION INSPECTION. The Final Production
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationAnne Arundel County Dept. of Inspections and Permits Storm Drain Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More informationSPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS
SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS
More informationSECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials.
SECTION 02082 PUBLIC UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Modular precast concrete manholes with tongue-and-groove joints, transition to cover frame, covers,
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationAppendix C Construction Details
7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION
More informationMAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX
407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure
More informationCustomer Connection Guide Updates Effective May 2017
This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services
More informationSeptember 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP
CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled
More informationACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).
ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan
More informationExisting and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.
PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationSTANDARD BID ITEM NUMBERS
10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation
More informationPage Electric Utility Service Specifications
T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum
More informationAPPENDIX 1: CONSTRUCTION PLAN CHECKLIST
APPENDIX 1: CONSTRUCTION PLAN CHECKLIST October 2017 APPENDIX A APPENDIX 1: CONSTRUCTION PLAN CHECKLIST ALL PLANS Plans on 24-inch by 36-inch paper (Originals shall be transmitted on a CD as an electronic
More informationREGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE
No. 9197 REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers oard, 2008. All rights reserved. No part of this publication may be reproduced by any means
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationINSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL
March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete
More informationB17. Sewer Site Plans BULLETIN
BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationTIMARU DISTRICT COUNCIL 2 King George Place P.O. Box 522 Timaru 7940 Telephone: Website:
INITIAL SURVEY ILE: CHANGES TO CORBEL DETAIL REVISION BY CHK APP. PLANNING.dwg 711696 AS SHOWN PERMISSION O THE CODE O PRACTICE TYPICAL PRECAST CONCRETE MANHOLE DETAILS 1 13 A B INITIAL SURVEY ILE: CHANGES
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS
More informationThis addendum forms a part of the Contract Documents dated: August 10, 2012.
Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911
More informationMaintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationSTORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC
01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationSTRUCTURES FOR SANITARY AND STORM SEWERS
SUDAS Standard Specifications Division 6 - Structures for Sanitary and Storm Sewers Section 600 - Structures for Sanitary and Storm Sewers STRUCTURES FOR SANITARY AND STORM SEWERS PART - GENERAL.0 SECTION
More informationMEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C
MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of
More informationSECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION
PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More information3. DESIGN SPECIFICATIONS
Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and
More informationThe Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8
September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers
More informationSECTION III SUBMITTALS AND APPROVALS
SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District
More informationGovernment Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications
PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............
More informationSTANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN
CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D ASPHALT 20 GUTTER LINE CONCRETE CURB FINISHED GRADE PRECAST GRADE RINGS, 2 50 100 MAX PRECAST CB LID GROUT ALL AROUND CB LEAD, INSIDE & OUTSIDE OF
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationRecord Drawing Standards for Projects Version 2.1
for Projects Version 2.1 Updated September 21, 2016 Department: Spatial Data Group Engineering & Maintenance 1. INTRODUCTION... 1 2. GENERAL STANDARDS... 1 2.1 Drawing Standards... 1 2.2 Digital Submission
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationLarge Scale CalArc Pavers for Sand-Set Pedestrian Use Installations
The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural
More informationTo: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:
To: New York State Department of Transportation ENGINEERING INSTRUCTION Title: PRECAST CONCRETE PAVEMENT SLAB SYSTEMS STANDARD SPECIFICATION Distribution: Manufacturers (18) Local Govt. (31) Agencies (32)
More informationWashington County Road Engineering Plan Submittal/Review Checklist
Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should
More informationSECTION TRACER WIRE FOR NONMETALLIC PIPE
PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationCITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS
CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment
More informationCITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationClarifications in italics added July 2018
SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,
More informationOakdale Primary School, Peterborough Civil Engineering NBS Specification
Oakdale Primary School, Peterborough Civil Engineering NBS Specification Prepared for Hamson Barron Smith Revision Schedule 171046 Civil Engineering NBS Specification May 2017 Rev Date Details Prepared
More informationCity of Vaughan Engineering Department DESIGN STANDARD DRAWINGS
City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard
More informationCONSULTANT ACCREDITATION SCHEME SEWER DESIGN
CONSULTANT ACCREDITATION SCHEME SEWER DESIGN DRAWING CRITERIA AND CHECKLIST Produced by SA Water Corporation Asset Management Group June 2013 Land Developer Agreements Contact Information Details Sharyn
More informationTABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES
TABLE OF CONTENTS 1.0 SCOPE 2.0 BURIAL DEPTH 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 5.0 PARAMETERS OF CABLE PULLING 6.0 DIRECT BURIED CABLE INSTALLATION
More informationFoundation Specifications for 5.6-Meter Modular Earth Station Antennas
Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationCity of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS
City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements
More informationSYARIKAT BEKALAN AIR SELANGOR SDN BHD
NOTE : 1. FOR LEGEND, ABBREVIATION AND GENERAL NOTES SEE DRG. NO. SYA / STD / 001. 2. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED. 3. ACTUAL LENGTH OF PE COMMUNICATION PIPES SHALL BE DETERMINED ON
More informationMAJOR GRADING PLAN CHECKLIST
MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading
More informationEngineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings
Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers
More informationConstruction Tolerances - The following tolerances apply to cast-in-place structures:
00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:
More informationFoundation Specifications for 7.6-Meter Modular Earth Station Antennas
Installation Instructions Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Bulletin 237186A Revision A Introduction This document specifies typical foundation characteristics, designs,
More information