TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES

Size: px
Start display at page:

Download "TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES"

Transcription

1

2 TABLE OF CONTENTS 1.0 SCOPE 2.0 BURIAL DEPTH 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 5.0 PARAMETERS OF CABLE PULLING 6.0 DIRECT BURIED CABLE INSTALLATION 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES 8.0 CABLE TRENCH DESIGN PARAMETERS PAGE NO. 2 OF 26

3 TABLES Minimum Cover Requirement in mm from Grade Level to the Top Surface of a Cable or Duct Minimum Bending Radius for Power Cables Coefficient of Friction Minimum Allowable Percent Conductor Cross-Section Within a Conduit or Duct Clearances of SEC Cables and other utilities PAGE NO. 3 OF 26

4 FIGURES Typical Cross-Section of Trench for 110 kv, 115 kv or 132 kv XLPE Power Cable; Single Circuit, Trefoil Formation, Direct Burried Typical Cross-Section of Trench for 110 kv, 115 kv or 132 kv XLPE Power Cable; Single Circuit, Trefoil Formation, Concrete Ductbank Typical Cross-Section of Trench for 110 kv, 115 kv or 132 kv XLPE or LPOF Power Cable; Single Circuit, Flat Formation, Direct Burried Typical Cross-Section of Trench for 230 kv or 380 kv XLPE or LPOF Power Cable; Single Circuit, Flat Formation, Direct Burried Typical Cross-Section of Trench for 110 kv, 115 kv or 132 kv XLPE or LPOF Power Cable; Single Circuit, Flat Formation, Concrete Ductbank Typical Cross-Section of Trench for 230 kv or 380 kv XLPE or LPOF Power Cable; Single Circuit, Flat Formation, Concrete Ductbank Recommended Clearances Between SEC Underground Power Cables 110kV to 132kV and Other Utilities's Lines Recommended Clearances Between SEC Underground Power Cables 110kV to 380kV and Other Utilities's Lines PAGE NO. 4 OF 26

5 1.0 SCOPE The purpose of this section is to provide design considerations of cable installation for direct buried or duct applications in the system of Transmission Business Unit (TBU) of Saudi Electricity Company (SEC), Kingdom of Saudi Arabia. 2.0 BURIAL DEPTH 2.1 Unless otherwise required at greater depths by Agency/Ministry having right-of-way jurisdiction, or due to adjacent utilities limitations or ampacity requirements, the burial depths for conduit and cable shall be as shown in Table Table 05-01: Minimum Cover Requirements in mm From Grade Level To the Top Surface of a Cable or Duct Voltage Direct Buried Cables Direct Buried Conduit Direct Buried Rigid Steel Conduit (kv) Type A Type B 110 to Type A: Type B: Light Traffic Areas Heavy Traffic Areas 2.2 For paved roads, the grade level is the surface immediately below the concrete or asphalt pavement. Subgrade is another term for this surface. For unpaved roads or areas, the grade level is the road shoulder surface or natural ground level. 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 3.1 Bending of Power Cable at a short radius may damage the insulation, shielding or jacket of the cable, therefore, during cable installations, care must be taken that no sharp bends or sharp twists are made. Whenever angles and/or bends in the route are encountered, care shall be taken to ensure that the rollers are properly positioned so that the allowable bending radius of the cable is not exceeded. 3.2 The rollers shall be adequately braced against tensions and side pressure that will be encountered during the cable pull. The transition through the angle and/or bend shall be uniformed to conform to the arc of a circle. Radii at the angles shall be as large as practical to minimize pulling tensions and sidewall pressures. The bending radii shall match those used in tension and sidewall pressure calculations. 3.3 Power Cable's bending radius shall not be less, under any circumstances, than the recommended values given by the power cable's manufacturer. 3.4 The cable shall not be bent to less radius than the drum's radius of the cable reel on which it was shipped. PAGE NO. 5 OF 26

6 3.5 Minimum bending radius (r) to which cables may be bent refers to the inner surface of the cable and not to the axis of the cable at the bend as shown in the below figure: The minimum bending radius for permanent training during cable installation shall be as shown in Table During cable installation, large diameter wheels, pulling sheaves, and cable guides shall be used to maintain the specified bending radius. Larger radii are recommended wherever the cable is being pulled under tension, preferably not less than twice the values for permanent training. Table 05-2: Minimum Bending Radius for power cables Type of Cable Minimum Bending Radius (r) as a multiple of Cable Diameter (d)* Permanent Training Radius(mm) Pulling Under Tension Radius(mm) Single Core Cable - Shielded r = 8 d r =16 d Single Core Cable- Non shielded r =10 d r =20 d Multi Core Cable - Shielded r = 6 d r =12 d Multi Core Cable- Non shielded r = 8 d r =16 d Single Core Cable with segmental r =12 d r =24 d Conductor Armored Cable r =12 d r =24 d Corrugated Al. Sheathed r =15 d r =30 d * Note : In case the cable manufacturer recommends larger bending radius, his recommendation shall be complied with. PAGE NO. 6 OF 26

7 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 4.1 General The axial and tangential forces applied during the pulling process shall not damage any component of the cable assembly during the installation of XLPE, UGNMFOC and LPOF Cables When installing cable in vertical runs, pulling the cable from the top of the run rather than the bottom will greatly reduce the pulling tension, and reduce mechanical forces on the cable accordingly Detailed maximum pulling tension and sidewall pressure calculations with the route drawings showing bending radii, roller placement and dimensions shall be developed and submitted to SEC (TBU) for each specific cable pull section within the cable route. The maximum values shall not exceed the values specified and recommended by the cable manufacturer Detailed cable pulling calculations shall be submitted to SEC (TBU) for approval and review prior to all cable pulling operations Pulling calculations and drawings which indicate the maximum allowable pulling tensions and sidewall pressure, shall be provided to pulling crews prior to all cable pulls The placement of all rollers that conforms to the radii bends and degree angle curves shall be verified prior to commencing the cable pull The tensile capability of every cable formation is dependent upon the tensile limitations of the conductor plus the overall integrity of the cable design. Each factor has finite limitations which shall not be exceeded. 4.2 The maximum pulling tension placed on a cable shall not exceed the following For cable equipped with a pulling eye or bolt attached to the conductor. a. For copper of any temper and hard-drawn aluminum, maximum tension in newtons (N) is equal to times the cross-sectional area of the conductor in square millimeters (mm 2 ). b. For 75% hard-drawn aluminum, maximum tension in newtons (N) is equal to times the cross-sectional area of the conductor in square millimeters(mm 2 ). PAGE NO. 7 OF 26

8 4.2.2 For cable to be pulled with a cable grip over the sheath: a. For a cable with a lead sheath, maximum tension in newtons (N) is equal to times the lead cross-sectional area in square millimeters(mm 2 ). b. For cable with copper or aluminum sheath, the maximum pulling tension shall not exceed 4.45kN newtons and, shall not exceed the maximum tension calculated in accordance with paragraph above. c. If manufacturer recommends less maximum tension to be placed than the specified above, his recommendation shall be followed The pulling tension (T) for a given installation shall be calculated from the following formulas or shall be as per manufacturer s requirements: For a straight section: T = 9.8 x L x W x f x OF x N (Eq.05-1) Where: T = Pulling tension in newtons L = Length of duct run in m W = Weight of cable plus 1% allowance per single core cable in Kg/m f = Coefficient of friction (generally assumed as 0.5) OF = Occupancy factor N = Number of cables per duct Coefficient of friction shall be usually taken as 0.5. For new installations where ducts are well aligned and clean and the cable well lubricated, a value lower than 0.5 shall be used. Table 05-03: Co-efficient of Friction Jacket Pulling on Roller Pulling into duct Material Without Lubricant With Lubricant Polyethylene 0.1~ ~ ~ 0.25 PVC 0.1 ~ ~ ~ 0.35 a. For single-core cable per duct, equation becomes: T = 9.8 x L x W x f (Eq.05-2) Where: OF = 1 N = 1 PAGE NO. 8 OF 26

9 b. For three single-core cables in trefoil formation: For a duct with a bend: 1 OF = (Eq.05-03) 2 d 1 D d Where: d = Outside diameter of each cable in mm D = Inside diameter of duct in mm T Te fa 2 = 1 (Eq.05-4) Where: T 2 = Tension for the straight section following the bend in newtons T 1 = Tension for the straight section proceeding the bend in newtons e = Naperian log base (2.718) f = Coefficient of friction a = Angle of bend in radians 4.4 The maximum sidewall pressure shall not exceed kn/m, i.e. the tension in the cable in kilonewtons as it leaves the bend shall not exceed times the radius of the bend in meters. 4.5 The following example outlines the applicable tensile considerations for duct installation. Similar factors are applicable for direct buried cables. For a sample calculations, assume the following: Example: A duct with the following layout: Cable: Three single-core, 240 mm², copper, shielded, triplexed Conduit inside diameter = 154 mm Dimension: Weight = 3.15 kg/m per core Outside diameter = 41.3 mm per core Insulation thickness = 4. mm Assume f = 0.5 PAGE NO. 9 OF 26

10 4.5.1 Pull from point (A) to point (F) in Newtons (N) and meters (m): Normally the tension calculation is a progressive one as follows: 1 OF = = T B = 9.8 x 60 x (3.15 x 1.01) x 0.5 x 1.07 x 3 = 3002 N T C = 3002 x 1.48 = 4442 N T D = [9.8 x 20 x (3.15 x 1.01) x 0.5 x 1.07 x 3] = 5442 N T E = 5442 x 2.19 = N T F = [9.8 x 30 x (3.15 x 1.01) x 0.5 x 1.07 x 3] = 13418N Maximum permissible pulling tension on this cable equipped with pulling eye bolt is ( x 240) x 3 = 50,555 N. Sidewall Pressure (at C) = -3 T C in Newton = Bend Radius, m 3 = 1.48 kn/m 4.371kN/m Sidewall Pressure (at E) = -3 T E in newton = Bend Radius, m 3 = 3.97 kn/m 4.371kN/m Because the sidewall pressure at point (E) is rather high (though not outside design limits) it would be desirable to investigate the results if the cable is pulled from at point (F) to at point (A). 3 3 T E = 9.8 x 30 x (3.15 x 1.01) x 0.5 x 1.07 x 3 T D = 1501 x 2.19 T C = [9.8 x 20 x (3.15 x 1.01) x 0.5 x 1.07 x 3) T B = 4287 x 1.48 T A = [9.8 x 60 x (3.15 x 1.01) x 0.5 x 1.07 x 3] = 1501N = 3287 N = 4287 N = 6244 N = 9246 N Pulling from at point (F) to at point (A) results in considerably less tension both at the bends and overall. While, in this case, it would be acceptable to pull from either direction, it is prudent design to select the direction which results in the least stress on the cable and equipment provided there are no extenuating circumstances such as limited set up or working space at one end or the other. 4.6 During pulling operations, it is frequently necessary to re-reel the cable or pass it over pulleys or sheaves, to avoid damage to the cable. It is imperative that the cable shall not be bent over the minimum radius of the cable which may cause damage. PAGE NO. 10 OF 26

11 4.7 For direct buried, or a combination of direct buried and ducts, cable installations where the length of the circuit must be pulled in, SEC (TBU) approved rollers, shall be used. 5.0 PARAMETERS OF CABLE PULLING 5.1 General The following parameters shall be considered during the course of cable pulling: Conduit or Duct Fill (refer to paragraph 5.2) Jam Ratio (refer to paragraph 5.3) Clearance (refer to paragraph 5.4) Maximum Pulling Tension (refer to section 4.0) Maximum Sidewall Bearing Pressure (refer to paragraph 4.4) Minimum Bending Radii (refer to Table 05-02) For Bending Radii related to communication cables, refer to TCS-T Conduit or Duct Fill The size of the inner diameter of the conduit and the outer diameter of the cable will determine the percentage fill of the conduit. Conduit or Duct Fill is based on the percentage-fill of the cross sectional area of the conduit/duct. The number of conductors shall not exceed the percentage fill specified in Table Jam Ratio (JR) Table 05-04: Maximum Allowable Percentage-Fill of the Conductor Cross Section Within a Conduit or Duct Number of Conductors In Conduit/Duct Maximum Percentage- Fill (%) When three or more single or multicore cables are being pulled into a conduit, their relative position in the conduit, when being pulled around bends can change, causing a condition of Jamming. If the cables jam in the conduit during pulling, the likelihood of cable damage is high. The Jam Ratio (JR) is defined as the ratio of the PAGE NO. 11 OF 26

12 conduit Inner diameter (D) to cable overall diameter (d). The following formula is used to evaluate the jamming potential: D If JR = is larger than 3.0, jamming cannot occur. d D If JR = is between 2.8 and 3.0 jamming is likely to occur and should be d avoided, but clearance must be checked (see paragraph 5.4). D If JR = is less than 2.8, jamming is not likely. d Where: D = Conduit Inner Diameter in millimeters (mm) d = Cable Overall Diameter in millimeters (mm) 5.4 Cable Clearances (CL) in Conduit Clearances must be checked to ensure that the top conductor will not press against the top of the conduit. Clearance shall be between 6 mm and 25 mm. The larger value is used for large cables and severe bends and pulls. The formulae for calculating clearance are as follows: Parallel (Triplexed) Cables CL = 0.5D d + 0.5(D-d) (1-[d/(D-d)]²)½ Multi Conductor Cable CL = D-d 6.0 CABLES INSTALLATION IN DIRECT BURIED 6.1 In the event of minor damage to outer jacket during installation, heat shrinkable split sleeve shall be applied to repair the jacket. 6.2 Cables shall be placed in trenches in a single horizontal tier without crossings except at transition to multi-tier duct banks. Multi-tier direct buried cable arrangements in trenches are not allowed. 6.3 The route of cable trenches shall avoid above ground and below ground obstructions so as to maintain a reasonable access to the buried cables. Trenches in unpaved areas are preferred. A minimum clearance shall be maintained between underground runs and parallel runs of underground piping. Cables shall not be located under present or future parallel runs of low level underground piping which could block access to the cables. Recommended clearances are shown on Fig through Fig PAGE NO. 12 OF 26

13 6.4 Power and associated control circuits can be laid adjacent. Three single conductor cables comprising one three phase circuit (trefoil) shall be laid without spacing. In order to achieve a reasonable derating factor, a minimum spacing shall be determined between all 3-phase power circuits. Refer TES-P-104 for derating effects of adjacent circuits. 6.5 Where cables cross under main roads, concrete slabs, paved areas, railroad, or any areas that would require extensive or impractical excavations to replace, then they shall be run in ducts. Where such duct runs exceed 3 meters, overall cable ampacity shall be based on the duct portion of the run. Bell end or protective bushings shall be provided on each duct where it terminates. 6.6 If underground cables are routed through a concrete encased ductbank, PVC conduits shall be of encased-in type and when routed through direct buried PVC conduit, they shall be of direct buried (DB) type. All conduits shall have bell ends or protective bushings where the conduits terminate underground. 6.7 Riser Cables Protection of Riser Cables Riser cables from underground to overhead systems shall be protected by a covering that gives suitable mechanical protection up to a point at least 3.7 m above the ground and at least 0.3 m below ground level. However, it is desirable that the protective covering be extended as high as practicable. The use of a plastic or steel guard is generally recommended for protecting riser cables. The use of a blackplate on all cable riser shield installations will assure that the cable is completely covered on all sides. Metallic guard shall be effectively grounded. Riser shield sizes shall be determined by table Support of Riser Cables Riser cables shall be supported by suitable clamps fixed on the cable support structure. They shall not be supported by cable termination devices such as cutouts, cable terminal connectors, etc. 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES 7.1 Underground structures, as defined in this Standard, shall include manholes, vaults, substation basements, duct banks, cable trays, handholes and pullboxes. 7.2 All cables installed in underground structures shall be adequately supported and secured to withstand forces caused by the maximum short circuit current to which they may be subjected. 7.3 Adequate access space shall be provided to maintain and operate equipment. PAGE NO. 13 OF 26

14 7.4 Power and communication cables shall be racked from separate walls. Crossing of the two circuits shall be avoided. 7.5 All cables which exit from transformer, switchgear, vault, manhole, handhole or switch enclosures and terminal structures shall be tagged for identification. Tags shall be permanent, non-corrodible and clearly readable. The following minimum information shall be put in English and Arabic on the tag: a. Transmission and Sub-transmission: Voltage and Insulation Material Phase Identification (R, Y, B) for Single Core Cables Destination (From To) b. Distribution: i. Primary: Feeder Name Voltage Phase for Single Core Cables Destination ii. Secondary: Voltage Phase for Single Core Cables Destination iii. Service: Destination or Customer Address c. Communication and Control: Circuit Type Destination 7.6 Cables shall not be laid on top of other cables. 7.7 All cables shall be installed under applicable requirements of Standard IEEE/ANSI C Unless, otherwise specified, all cable installations in substation basements, vaults and manholes shall be fire proofed. PAGE NO. 14 OF 26

15 7.8.1 Power cables shall be fire proofed, except where fireproofing is not necessary according to or In manholes and other structures containing no oil filled equipment (i.e. where no oil fire hazard is involved), fireproofing is only necessary where separation between cables is 45 cm or less Fireproofing is not necessary on single conductor primary cable connections between various items of equipment in transformer vaults. However, fire proofing shall be installed on primary supply cables, including a single supply cable, and any other primary or transmission cables in vault or other structures containing oil filled equipment. 8.0 CABLE TRENCH DESIGN PARAMETERS 8.1 Figure through indicate standard design parameters for the cable trench depth, width, backfill and circuit separation. 8.2 Right-of-Way Requirement Underground Cable s Route a. Parameters of Right-of-Way shall be applicable for both existing and new road/streets. b. The route of the underground cable shall be considered as the shortest route and avoid or minimize: Communication facilities such as telephone cables. Thrust boring. Gas pipelines, water or sewerage pipelines New roads where reasphalting is required. c. The location of the underground cables for new road/streets shall be as shown in drawings no.se and SE for 69kV to 380 kv Duct Location a. Unless otherwise specified, the duct for underground cable shall not be located in the main (busy) lane of the street/road and to be far away from the median bay at least 1.5 m. b. Refer to Figures 05-1 through for the required width and depth of cables trench. c. Bending radius (refer to section 3.0). PAGE NO. 15 OF 26

16 d. Unless otherwise specified, separate communication handholes shall be provided for the underground optical fiber. Communication Handholes shall be provided at every change of direction, crossing, start and end of duct bank system and at every 500 m of continuous cable run. e. Unless otherwise specified, separation distance between fiber optic cables and power cables shall be 300 mm minimum.as per standard drawing no.sb For lower distance, ampacity adequacy shall be verified Thrust Boring/Directional Drilling Requirements a. Thrust boring or directional drilling shall be used only if other alternative means of crossing are not possible. b. Ampacity adequacy shall be verified where thrust boring or directional drilling is required. c. Thrust boring for 69 kv to 380 kv Underground cables: i. The minimum depth of the thrust boring shall be 2.0 m measured from top of the pipe unless otherwise required at greater depth by the Agency/Ministry having Right-of-Way jurisdiction. ii. iii. The pipe shall be made of steel. The nominal size of the pipe shall be minimum of 1067 mm. The number of Thrustbore shall depend on required number of cable circuits and available Right-of-Way. The spacing between the pipes shall be 2.0 m center-to-center. For more details, refer to standard drawing no. SA d. Horizantal Directinal Drilling for 69 kv to 380 kv Underground cables: i. The process of directional drilling shall be as per contractor s procedure and requirements. ii. iii. The number of directional drilling condiuts shall also depend on required number of cable circuits and available Right-of- Way The CONTRACTOR shall submit his proposal for the directional drilling method. The CONTRACTOR or the CONTRACTOR S approved SUBCONTRACTOR, specialized in the art of directional drilling, shall conduct the PAGE NO. 16 OF 26

17 same. Drawing and procedures shall be submitted to the COMPANY for approval prior to start of construction. iv. The details of the directional drilling method along with description of the machinery that will be used shall be submitted for COMPANY review and approval. The CONTRACTOR shall explain in details, how the required clearance between each circuit and other circuit and other utilities will be maintained. v. Prior to commitment of any directional drilling work, the CONTRACTOR shall get approval and permission from the concerned ROW approving agencies. vi. All the above requirements shall be submitted for COMPANY review and approval. e. Backfilling and Reinstatement shall be in accordance of the requirements of appropriate authority Recommended Clearances between SEC Underground Power Cables and Other Utilities' Lines Unless otherwise specified by the Design Engineer in the SOW/PTS after consultation with relevant facility, the following clearances between U/G power cable and other facilities such as water, sewer, gas, telephone shall be used: Table 05-05: Clearances of SEC U/G Cables & Other Utilities lines SEC UNDERGROUND CABLES Utility 110 kv to 380 kv Horizontal Clearance (mm) Vertical Clearance (mm) Water & Sewer Telephone Gas Cable Route Marker Warning posts shall be installed along the center line of the trench at not over 50 m intervals on congested areas and not over 90 m intervals on open areas and at all locations where the trench changes direction On straight route, the warning post shall have a two-arrow sign to indicate cable route direction. PAGE NO. 17 OF 26

18 8.3.3 On right angle turn, the warning post shall have two signs each having an arrow pointing to the cable route direction. The signs will be placed on the applicable side of the post On oblique turn, the cable route direction shall be indicated by two warning posts each having an arrow. 8.4 Concrete Encased Ducts Refer to standard drawing SA for U/G power cables. PAGE NO. 18 OF 26

19 FIGURE kv, 115 kv or 132 kv XLPE STANDARD TRENCH PAGE NO. 19 OF 26

20 FIGURE kv, 115 kv or 132 kv XLPE STANDARD TRENCH PAGE NO. 20 OF 26

21 FIGURE kv, 115 kv or 132 kv XLPE or LPOF STANDARD TRENCH PAGE NO. 21 OF 26

22 FIGURE kv or 380 kv XLPE or LPOF STANDARD TRENCH PAGE NO. 22 OF 26

23 FIGURE kv, 115 kv or 132 kv XLPE or LPOF STANDARD TRENCH PAGE NO. 23 OF 26

24 FIGURE kv or 380 kv XLPE or LPOF STANDARD TRENCH PAGE NO. 24 OF 26

25 Figure Recommended Clearances Between SEC Underground Power Cables 110kV to 132kV and Other Utilities's Lines PAGE NO. 25 OF 26

26 Figure Recommended Clearances Between SEC Underground Power Cables 110kV to 380kV and Other Utilities's Lines PAGE NO. 26 OF 26

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION-16075 ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Electrical identification to identify all electrical items for easy operation and maintenance including, but not limited

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation 7 Backfilling

More information

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS 1.0 SCOPE 2.0 BONDING METHODS 2.1 Introduction 2.2 Design 2.3 Single-Point Bonding 2.4 Cross Bonding 2.5 Sheath Sectionalizing Joints 2.6 Sheath Standing Voltage 2.7 Sheath Voltage at Through Fault 2.8

More information

Page Electric Utility Service Specifications

Page Electric Utility Service Specifications T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum

More information

6419X Conduit Cable. Dungannon Electrical Wholesale Tel: Page 1 of 10

6419X Conduit Cable. Dungannon Electrical Wholesale Tel: Page 1 of 10 6419X Conduit Cable Application: Industrial and commercial wiring, these cables are intended for installation in trunking and conduit. They may also be used inside fixed, protected installations such as

More information

SPECIFICATION SS-140/9. 0.6/1 (1.2) kv CONTROL AND POWER UNDERGROUND CABLES WITH PVC OR XLPE INSULATION AND PVC JACKET

SPECIFICATION SS-140/9. 0.6/1 (1.2) kv CONTROL AND POWER UNDERGROUND CABLES WITH PVC OR XLPE INSULATION AND PVC JACKET INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION December 2016 SPECIFICATION 0.6/1 (1.2) kv CONTROL AND POWER UNDERGROUND CABLES WITH PVC OR XLPE INSULATION

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

11-SDMS-03 REV. 02 SPECIFICATIONS FOR

11-SDMS-03 REV. 02 SPECIFICATIONS FOR 11-SDMS-03 REV. 02 SPECIFICATIONS FOR XLPE INSULATED POWER CABLES FOR RATED VOLTAGES FROM 15 KV UP TO 36 KV (U m ) This specification is property of SEC and subject to change or modification without notice

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 2 SDCC-TS-02 INDUCTIVE LOOPS & ABOVE GROUND DETECTION REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

14 AWG 2 AWG: 600 Volt

14 AWG 2 AWG: 600 Volt INDUSTRIAL AUTOMATION & PROCESS CONTROL CABLES 18.70 600V Type MC Metal Clad and Teck-Style Cables Overview Metal Clad Interlocked PVC Outer Jacket Teck-Style PVC Outer Jacket Introduction Polyester Wrap

More information

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM Technical Specification of Back Clamp for LT Cross Arm (MS) Back clamp for LT Cross Arm made out of 50 x 6mm MS Flat suitable for 8m X 300 Kg PSC poles. After fabrication the cross arm shall be painted

More information

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting SECTION 33 71 19 UNDERGROUND POWER DUCT AND SUB-STRUCTURES PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 33: Trenching, Backfilling, and Compacting B. Section 32 01 00: Site Restoration and Rehabilitation

More information

THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE. Contents

THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE. Contents Document Number: EOS 09-0100a Contents 1 Introduction... 2 2 Cable Routes/Joints... 2 3 Cable Details... 2 4 Cable Warning Markers... 4 5 Cable Drum Numbers... 4 6 Ducts - Including those used in a Directional

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

Cable Hanging Instruction Manual

Cable Hanging Instruction Manual Tri-States Grain Conditioning, Inc. Cable Hanging Instruction Manual There are several types of grain storage tanks and bins. Parts of these instructions may be modified to fit the circumstances. Care

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

Medium Voltage Power Cables

Medium Voltage Power Cables N2XSY 6/0, /20, /30 NA2XSY 6/0, /20, /30 N2XS2Y 6/0, /20, /30 NA2XS2Y 6/0, /20, /30 N2XS(F)2Y 6/0, /20, /30 NA2XS(F)2Y 6/0, /20, /30 N2XSEY 3 x 6/0 Medium Voltage Power Cables Photo: HELUKABEL Q 47 Medium

More information

SECTION MEDIUM-VOLTAGE CABLES

SECTION MEDIUM-VOLTAGE CABLES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 13 MEDIUM-VOLTAGE CABLES SPEC WRITER NOTE: Delete between //-----// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

Amtrak s 138 kv Transmission System that supplies traction power to electric locomotives traveling on the

Amtrak s 138 kv Transmission System that supplies traction power to electric locomotives traveling on the Word Count: 3039 Replacement of Amtrak s 138 KV Cable through the Baltimore Tunnels Raymond G. Verrelle, PE Amtrak Engineering Department 30 th St. Station, 4 th Floor South Fourth Floor, South Tower Philadelphia,

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

SECTION TRACER WIRE FOR NONMETALLIC PIPE

SECTION TRACER WIRE FOR NONMETALLIC PIPE PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities

More information

Page 1 of 5 Application Engineering Note Proc. 001 Interlock Armor and Corrugated Steel Tape Cables Pulling Grip Installation Procedure Rev.

Page 1 of 5 Application Engineering Note Proc. 001 Interlock Armor and Corrugated Steel Tape Cables Pulling Grip Installation Procedure Rev. Page 1 of 5 Scope: The scope of this procedure is to describe how to properly install a cable pulling grip on an Optical Cable Corporation interlocked armor (ILA) and corrugated steel tape (CST) fiber

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents.

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. SECTION 26 05 19 PART 1 - GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. 1.2 CONTRACTOR SUBMITTALS A. The

More information

TRANSACTION RECORD TR

TRANSACTION RECORD TR COMMON GROUND ALLIANCE BEST PRACTICES COMMITTEE Proposal Form Revision to Best Practice Name: Ralph Graeser Date: 03/09/2015 Affiliation: PA PUC/NAPSR/GPTC Member. Phone: 717-554-3666 E-Mail: rgraeser@pa.gov

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

General Technical Specification and Execution Procedures for Transmission and Subtransmission Networks Cables

General Technical Specification and Execution Procedures for Transmission and Subtransmission Networks Cables Islamic Republic of Iran Vice Presidency for Strategic Planning and Supervision General Technical Specification and Execution Procedures for Transmission and Subtransmission Networks Cables NO: 452-1 Office

More information

Underground System Design TADP 547

Underground System Design TADP 547 Underground System Design TADP 547 Industry Standards, Specifications and Guides Presentation 6.4 Instructor: Frank Frentzas Industry Organizations Several professional organizations develop standards

More information

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

SECTION COMMUNICATIONS COPPER BACKBONE CABLING SECTION 27 13 13 COMMUNICATIONS COPPER BACKBONE CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such

More information

1.1_KV PVC insulated PVC sheathed multicore Aluminium Cable (armoured & unarmoured)

1.1_KV PVC insulated PVC sheathed multicore Aluminium Cable (armoured & unarmoured) WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (A Govt. of West Bengal Enterprise) Office of the Chief Engineer, Procurement & Contracts Department Vidyut Bhavan, 4 th. floor, Bidhannagar,

More information

TECHNICAL SPECIFICATION FOR 11KV, 3C x95mm mm 2 AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED)

TECHNICAL SPECIFICATION FOR 11KV, 3C x95mm mm 2 AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) TECHNICAL SPECIFICATION FOR 11KV, 3C x95mm 2 + 80mm 2 AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of, 3C x95mm 2 +

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01 SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC

More information

Construction Specification for Watermain and Water Service Tracer Wire

Construction Specification for Watermain and Water Service Tracer Wire Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 7.40 April 2013 for Watermain and Water Service Tracer Wire Table of Contents TS 7.40.01 SCOPE... 2 TS

More information

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are

More information

Customer Requirements Commercial Secondary Service

Customer Requirements Commercial Secondary Service Application Installation requirements for commercial services from Tacoma Power overhead or underground facilities. It applies to new construction or upgrades of older services. Electrical service may

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

SECTION COMMUNICATIONS COPPER OSP CABLING

SECTION COMMUNICATIONS COPPER OSP CABLING SECTION 27 13 14 COMMUNICATIONS COPPER OSP CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction,

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

TECHNICAL SPECIFICATION FOR. CONTACT WIRE HARD-DRAWN COPPER 161mm2

TECHNICAL SPECIFICATION FOR. CONTACT WIRE HARD-DRAWN COPPER 161mm2 Engineering Specification Electrical TECHNICAL SPECIFICATION FOR CONTACT WIRE HARD-DRAWN COPPER 161mm2 Version: 2 Issued: May 2018 Owner: Engineering Approved by: Andrew Russack, Head of Engineering Electrical

More information

Technical Specification. for 1.1 KV Copper Control Cable

Technical Specification. for 1.1 KV Copper Control Cable WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (A Govt. of West Bengal Enterprise) Office of the Chief Engineer, Procurement & Contracts Department Vidyut Bhavan, 4 th. floor, Bidhannagar,

More information

MESP TECHNICAL SPECIFICATION FOR CATENARY WIRE HARD-DRAWN COPPER 37/ mm 2

MESP TECHNICAL SPECIFICATION FOR CATENARY WIRE HARD-DRAWN COPPER 37/ mm 2 Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR CATENARY WIRE HARD-DRAWN COPPER 37/2.5 181mm 2 Version: 3 Issued: February 2017 Owner: Engineering Division Approved By: Andrew

More information

JULY Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum.

JULY Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum. FOREWORD This Standard is intended to be used within and for Iranian Ministry of Petroleum (N.I.O.C, N.I.G.C, N.P.C., N.I.O.R.D.C. and other affiliate organizations and companies) and has been prepared

More information

ÖLFLEX. Lift & Crane Cable LIFT & CRANE CABLE

ÖLFLEX. Lift & Crane Cable LIFT & CRANE CABLE LIFT & CRANE CABLE Reference Quick Select Chart 132 Crane Cable Installation Instructions 133 Lift Cable Installation Instructions 134 ÖLFLEX ÖLFLEX CRANE NSHTÖU 135 Reelable Cable for Low to Medium Mechanical

More information

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002 National Radio Astronomy Observatory Socorro, NM 87801 EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable T. Baldwin June 05, 2002 Summary Double-armor triple-sheath fiber optic cable will be

More information

DESIGN OF A 45 CIRCUIT DUCT BANK

DESIGN OF A 45 CIRCUIT DUCT BANK DESIGN OF A 45 CIRCUIT DUCT BANK Mark COATES, ERA Technology Ltd, (UK), mark.coates@era.co.uk Liam G O SULLIVAN, EDF Energy Networks, (UK), liam.o sullivan@edfenergy.com ABSTRACT Bankside power station

More information

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division Guidelines and Checklist For SAWS Sanitary Sewer Developmental Engineering Division INITIAL CONSIDERATIONS UTILITY SERVICE AGREEMENT Utility Service Agreement A Utility Service Agreement (USA) will be

More information

IEC Standard Caledonian Offshore & Marine Cables

IEC Standard Caledonian Offshore & Marine Cables Power Copper s According to IEC 60228 Tinned conductors Cross section cl.2 cl.5 Cross section cl.2 cl.5 mm² Ohm/km Ohm/km mm² Ohm/km Ohm/km 1.0 18.2 20 70 0.270 0.277 1.5 12.2 13.7 95 0.195 0.210 2.5 7.56

More information

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

SECTION COMMUNICATIONS COPPER BACKBONE CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

SECTION BUILDING WIRE AND CABLE

SECTION BUILDING WIRE AND CABLE SECTION 260519 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Building wire and cable. 2. Wiring connectors and connections. B. RELATED SECTIONS 1. Section 26 05 53 Electrical Identification. 2. Section

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

Section. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS

Section. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS Section 8 City of Ellensburg ILLUMINATION STANDARDS Table of Contents STREET ILLUMINATION...3-5 GENERAL NOTES...3 INSTALLATION AND CONNECTIONS...3 MARKING...3 STAKING...3-4 TRENCH REQUIREMENTS...4 ILLUMINATION

More information

.1 Applicability: These criteria shall be applied as follows:

.1 Applicability: These criteria shall be applied as follows: DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

9. Pay for the power consumed until the project has been accepted as substantially complete.

9. Pay for the power consumed until the project has been accepted as substantially complete. 9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:

More information

Installation Recommendations

Installation Recommendations Installation Recommendations Cable pulling recommendations The process of pulling electrical cables on board marine vessels is a relatively standard procedure. Nevertheless, NEXANS would suggest the following

More information

SECTION 7. SAFETYING

SECTION 7. SAFETYING 9/8/98 AC 43.13-1B SECTION 7. SAFETYING 7-122. GENERAL. The word safetying is a term universally used in the aircraft industry. Briefly, safetying is defined as: Securing by various means any nut, bolt,

More information

CORFLEX VFD CORFLEX VFD Part Number: Drive Cable

CORFLEX VFD CORFLEX VFD Part Number: Drive Cable Part Number: Drive Cable Armored Variable Frequency Drive Cable UL Type MC HL, 600V, 90 C rated - LEAD FREE Description 3 conductor with 3 ground wires, continuous corrugated and welded, impervious aluminum

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

Article 250 Grounding & Bonding

Article 250 Grounding & Bonding Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education

More information

6B.6 Substation Grounding

6B.6 Substation Grounding 1 No v 1 6 1 No v 1 6 Iu d a Mo r a r a n d ma n a g e r R a c h e le Ha n n o n Vo l.6 -S u b s ta tio n a n d Hig h Vo lta g e E q u ip me n t;p a r tb -S u b s ta tio n Co n fig u r a tio n s 1. Scope

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

MESP TECHNICAL SPECIFICATION FOR TRANSMISSION WIRE HARD-DRAWN COPPER 19/ mm 2

MESP TECHNICAL SPECIFICATION FOR TRANSMISSION WIRE HARD-DRAWN COPPER 19/ mm 2 Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR TRANSMISSION WIRE HARD-DRAWN COPPER 19/2.14 70mm 2 Version: 1 Issued: January 2015 Owner: Engineering Division Approved By: Pat

More information

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete

More information

Telephone Cable Locating Techniques

Telephone Cable Locating Techniques Chapter 2 Telephone Cable Locating Techniques Introduction Read Chapter One of this manual to learn more general information about each of the following signal application methods. The following paragraphs

More information

MESP TECHNICAL SPECIFICATION FOR MURL JUMPER WIRE HARD-DRAWN COPPER 19/ mm 2

MESP TECHNICAL SPECIFICATION FOR MURL JUMPER WIRE HARD-DRAWN COPPER 19/ mm 2 Engineering Specification Electrical Networks MESP 130400-07 TECHNICAL SPECIFICATION FOR Version: 1 Issued: February 2017 Owner: Engineering Division Approved By: Andrew Russack Head of Engineering (Electrical)

More information

EDS KV TRIPLEX CABLE RATING

EDS KV TRIPLEX CABLE RATING Document Number: EDS 02-0027 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 02-0027 11KV TRIPLEX CABLE RATING This engineering design standard provides the cable ratings and important

More information

Substation HV Cables. Document Number: 1-11-FR-07

Substation HV Cables. Document Number: 1-11-FR-07 Substation HV Cables Document Number: 1-11-FR-07 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-07 Substation HV Cables Asset Class Strategy Intellectual

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

MGVCL/MM/ /2082/11KV AB CABLE TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES

MGVCL/MM/ /2082/11KV AB CABLE TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES 1. Qualifying Requirement of AB Cable Manufacture/Supplier The manufacturer should have manufactured, successfully type tested

More information

Standard Technical Specifications for Electrical Works CABLES AND ACCESSORIES. 11 kv XLPE-Insulated Three-Core Underground Cables

Standard Technical Specifications for Electrical Works CABLES AND ACCESSORIES. 11 kv XLPE-Insulated Three-Core Underground Cables Standard Technical Specifications for Electrical Works CABLES AND ACCESSORIES ( Data Sheets ) 11 kv XLPE-Insulated Three-Core Underground Cables (3x240 mm 2 ) ADWEA/ADDC/AADC STANDARD : D-AAA-CAB-11-3Cx240

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION TITLE: RECOMMENDED: P. Lemay NO: APPROVED: C. Malone, P.Eng. REV. DATE: 2015-11-02 Working Procedure GCG0001 REV: 3 INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

More information

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM 600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn

More information

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

American Electrical Institute

American Electrical Institute American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

OPERATION, PARTS & MAINTENANCE MANUAL MODELS HB73-16 HB97-18 HB97-16 HB97-12 HB HB HB HB145-18

OPERATION, PARTS & MAINTENANCE MANUAL MODELS HB73-16 HB97-18 HB97-16 HB97-12 HB HB HB HB145-18 OPERATION, PARTS & MAINTENANCE MANUAL MODELS HB73-16 HB97-18 HB97-16 HB97-12 HB121-18 HB121-16 HB121-14 HB145-18 Proudly Made in the USA 2 3 4 FOREWORD This manual has been prepared for the owner and operators

More information

1. ASME A Scheme for the Identification of Piping Systems.

1. ASME A Scheme for the Identification of Piping Systems. SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

C-L-X ARMOR REMOVAL PROCEDURES

C-L-X ARMOR REMOVAL PROCEDURES C-L-X ARMOR REMOVAL PROCEDURES USING THE KETT MODEL #KS-226 CABLE SAW The procedure listed below details Okonite s recommended method for removing C-L-X armor from large and small diameter cables. These

More information

SECTION BASIC MATERIALS AND METHODS

SECTION BASIC MATERIALS AND METHODS SECTION 15050 BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and Fittings. 1.02 RELATED SECTIONS A. Basic Mechanical Requirements: Section 15010. B. Supports, Anchors, and Seals:

More information

MESP TECHNICAL SPECIFICATION FOR FLEXIBLE DROPPER WIRE TIN-BEARING COPPER 7/7/ mm 2

MESP TECHNICAL SPECIFICATION FOR FLEXIBLE DROPPER WIRE TIN-BEARING COPPER 7/7/ mm 2 Engineering Specification Electrical Networks MESP 130400-02 TECHNICAL SPECIFICATION FOR FLEXIBLE DROPPER WIRE TIN-BEARING COPPER Version: 1 Issued: November 2015 Owner: Engineering Division Approved By:

More information