1

2 TABLE OF CONTENTS 1.0 SCOPE 2.0 BURIAL DEPTH 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 5.0 PARAMETERS OF CABLE PULLING 6.0 DIRECT BURIED CABLE INSTALLATION 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES 8.0 CABLE TRENCH DESIGN PARAMETERS PAGE NO. 2 OF 26

3 TABLES Minimum Cover Requirement in mm from Grade Level to the Top Surface of a Cable or Duct Minimum Bending Radius for Power Cables Coefficient of Friction Minimum Allowable Percent Conductor Cross-Section Within a Conduit or Duct Clearances of SEC Cables and other utilities PAGE NO. 3 OF 26

4 FIGURES Typical Cross-Section of Trench for 110 kv, 115 kv or 132 kv XLPE Power Cable; Single Circuit, Trefoil Formation, Direct Burried Typical Cross-Section of Trench for 110 kv, 115 kv or 132 kv XLPE Power Cable; Single Circuit, Trefoil Formation, Concrete Ductbank Typical Cross-Section of Trench for 110 kv, 115 kv or 132 kv XLPE or LPOF Power Cable; Single Circuit, Flat Formation, Direct Burried Typical Cross-Section of Trench for 230 kv or 380 kv XLPE or LPOF Power Cable; Single Circuit, Flat Formation, Direct Burried Typical Cross-Section of Trench for 110 kv, 115 kv or 132 kv XLPE or LPOF Power Cable; Single Circuit, Flat Formation, Concrete Ductbank Typical Cross-Section of Trench for 230 kv or 380 kv XLPE or LPOF Power Cable; Single Circuit, Flat Formation, Concrete Ductbank Recommended Clearances Between SEC Underground Power Cables 110kV to 132kV and Other Utilities's Lines Recommended Clearances Between SEC Underground Power Cables 110kV to 380kV and Other Utilities's Lines PAGE NO. 4 OF 26

5 1.0 SCOPE The purpose of this section is to provide design considerations of cable installation for direct buried or duct applications in the system of Transmission Business Unit (TBU) of Saudi Electricity Company (SEC), Kingdom of Saudi Arabia. 2.0 BURIAL DEPTH 2.1 Unless otherwise required at greater depths by Agency/Ministry having right-of-way jurisdiction, or due to adjacent utilities limitations or ampacity requirements, the burial depths for conduit and cable shall be as shown in Table Table 05-01: Minimum Cover Requirements in mm From Grade Level To the Top Surface of a Cable or Duct Voltage Direct Buried Cables Direct Buried Conduit Direct Buried Rigid Steel Conduit (kv) Type A Type B 110 to Type A: Type B: Light Traffic Areas Heavy Traffic Areas 2.2 For paved roads, the grade level is the surface immediately below the concrete or asphalt pavement. Subgrade is another term for this surface. For unpaved roads or areas, the grade level is the road shoulder surface or natural ground level. 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 3.1 Bending of Power Cable at a short radius may damage the insulation, shielding or jacket of the cable, therefore, during cable installations, care must be taken that no sharp bends or sharp twists are made. Whenever angles and/or bends in the route are encountered, care shall be taken to ensure that the rollers are properly positioned so that the allowable bending radius of the cable is not exceeded. 3.2 The rollers shall be adequately braced against tensions and side pressure that will be encountered during the cable pull. The transition through the angle and/or bend shall be uniformed to conform to the arc of a circle. Radii at the angles shall be as large as practical to minimize pulling tensions and sidewall pressures. The bending radii shall match those used in tension and sidewall pressure calculations. 3.3 Power Cable's bending radius shall not be less, under any circumstances, than the recommended values given by the power cable's manufacturer. 3.4 The cable shall not be bent to less radius than the drum's radius of the cable reel on which it was shipped. PAGE NO. 5 OF 26

6 3.5 Minimum bending radius (r) to which cables may be bent refers to the inner surface of the cable and not to the axis of the cable at the bend as shown in the below figure: The minimum bending radius for permanent training during cable installation shall be as shown in Table During cable installation, large diameter wheels, pulling sheaves, and cable guides shall be used to maintain the specified bending radius. Larger radii are recommended wherever the cable is being pulled under tension, preferably not less than twice the values for permanent training. Table 05-2: Minimum Bending Radius for power cables Type of Cable Minimum Bending Radius (r) as a multiple of Cable Diameter (d)* Permanent Training Radius(mm) Pulling Under Tension Radius(mm) Single Core Cable - Shielded r = 8 d r =16 d Single Core Cable- Non shielded r =10 d r =20 d Multi Core Cable - Shielded r = 6 d r =12 d Multi Core Cable- Non shielded r = 8 d r =16 d Single Core Cable with segmental r =12 d r =24 d Conductor Armored Cable r =12 d r =24 d Corrugated Al. Sheathed r =15 d r =30 d * Note : In case the cable manufacturer recommends larger bending radius, his recommendation shall be complied with. PAGE NO. 6 OF 26

7 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 4.1 General The axial and tangential forces applied during the pulling process shall not damage any component of the cable assembly during the installation of XLPE, UGNMFOC and LPOF Cables When installing cable in vertical runs, pulling the cable from the top of the run rather than the bottom will greatly reduce the pulling tension, and reduce mechanical forces on the cable accordingly Detailed maximum pulling tension and sidewall pressure calculations with the route drawings showing bending radii, roller placement and dimensions shall be developed and submitted to SEC (TBU) for each specific cable pull section within the cable route. The maximum values shall not exceed the values specified and recommended by the cable manufacturer Detailed cable pulling calculations shall be submitted to SEC (TBU) for approval and review prior to all cable pulling operations Pulling calculations and drawings which indicate the maximum allowable pulling tensions and sidewall pressure, shall be provided to pulling crews prior to all cable pulls The placement of all rollers that conforms to the radii bends and degree angle curves shall be verified prior to commencing the cable pull The tensile capability of every cable formation is dependent upon the tensile limitations of the conductor plus the overall integrity of the cable design. Each factor has finite limitations which shall not be exceeded. 4.2 The maximum pulling tension placed on a cable shall not exceed the following For cable equipped with a pulling eye or bolt attached to the conductor. a. For copper of any temper and hard-drawn aluminum, maximum tension in newtons (N) is equal to times the cross-sectional area of the conductor in square millimeters (mm 2 ). b. For 75% hard-drawn aluminum, maximum tension in newtons (N) is equal to times the cross-sectional area of the conductor in square millimeters(mm 2 ). PAGE NO. 7 OF 26

8 4.2.2 For cable to be pulled with a cable grip over the sheath: a. For a cable with a lead sheath, maximum tension in newtons (N) is equal to times the lead cross-sectional area in square millimeters(mm 2 ). b. For cable with copper or aluminum sheath, the maximum pulling tension shall not exceed 4.45kN newtons and, shall not exceed the maximum tension calculated in accordance with paragraph above. c. If manufacturer recommends less maximum tension to be placed than the specified above, his recommendation shall be followed The pulling tension (T) for a given installation shall be calculated from the following formulas or shall be as per manufacturer s requirements: For a straight section: T = 9.8 x L x W x f x OF x N (Eq.05-1) Where: T = Pulling tension in newtons L = Length of duct run in m W = Weight of cable plus 1% allowance per single core cable in Kg/m f = Coefficient of friction (generally assumed as 0.5) OF = Occupancy factor N = Number of cables per duct Coefficient of friction shall be usually taken as 0.5. For new installations where ducts are well aligned and clean and the cable well lubricated, a value lower than 0.5 shall be used. Table 05-03: Co-efficient of Friction Jacket Pulling on Roller Pulling into duct Material Without Lubricant With Lubricant Polyethylene 0.1~ ~ ~ 0.25 PVC 0.1 ~ ~ ~ 0.35 a. For single-core cable per duct, equation becomes: T = 9.8 x L x W x f (Eq.05-2) Where: OF = 1 N = 1 PAGE NO. 8 OF 26

9 b. For three single-core cables in trefoil formation: For a duct with a bend: 1 OF = (Eq.05-03) 2 d 1 D d Where: d = Outside diameter of each cable in mm D = Inside diameter of duct in mm T Te fa 2 = 1 (Eq.05-4) Where: T 2 = Tension for the straight section following the bend in newtons T 1 = Tension for the straight section proceeding the bend in newtons e = Naperian log base (2.718) f = Coefficient of friction a = Angle of bend in radians 4.4 The maximum sidewall pressure shall not exceed kn/m, i.e. the tension in the cable in kilonewtons as it leaves the bend shall not exceed times the radius of the bend in meters. 4.5 The following example outlines the applicable tensile considerations for duct installation. Similar factors are applicable for direct buried cables. For a sample calculations, assume the following: Example: A duct with the following layout: Cable: Three single-core, 240 mm², copper, shielded, triplexed Conduit inside diameter = 154 mm Dimension: Weight = 3.15 kg/m per core Outside diameter = 41.3 mm per core Insulation thickness = 4. mm Assume f = 0.5 PAGE NO. 9 OF 26

10 4.5.1 Pull from point (A) to point (F) in Newtons (N) and meters (m): Normally the tension calculation is a progressive one as follows: 1 OF = = T B = 9.8 x 60 x (3.15 x 1.01) x 0.5 x 1.07 x 3 = 3002 N T C = 3002 x 1.48 = 4442 N T D = [9.8 x 20 x (3.15 x 1.01) x 0.5 x 1.07 x 3] = 5442 N T E = 5442 x 2.19 = N T F = [9.8 x 30 x (3.15 x 1.01) x 0.5 x 1.07 x 3] = 13418N Maximum permissible pulling tension on this cable equipped with pulling eye bolt is ( x 240) x 3 = 50,555 N. Sidewall Pressure (at C) = -3 T C in Newton = Bend Radius, m 3 = 1.48 kn/m 4.371kN/m Sidewall Pressure (at E) = -3 T E in newton = Bend Radius, m 3 = 3.97 kn/m 4.371kN/m Because the sidewall pressure at point (E) is rather high (though not outside design limits) it would be desirable to investigate the results if the cable is pulled from at point (F) to at point (A). 3 3 T E = 9.8 x 30 x (3.15 x 1.01) x 0.5 x 1.07 x 3 T D = 1501 x 2.19 T C = [9.8 x 20 x (3.15 x 1.01) x 0.5 x 1.07 x 3) T B = 4287 x 1.48 T A = [9.8 x 60 x (3.15 x 1.01) x 0.5 x 1.07 x 3] = 1501N = 3287 N = 4287 N = 6244 N = 9246 N Pulling from at point (F) to at point (A) results in considerably less tension both at the bends and overall. While, in this case, it would be acceptable to pull from either direction, it is prudent design to select the direction which results in the least stress on the cable and equipment provided there are no extenuating circumstances such as limited set up or working space at one end or the other. 4.6 During pulling operations, it is frequently necessary to re-reel the cable or pass it over pulleys or sheaves, to avoid damage to the cable. It is imperative that the cable shall not be bent over the minimum radius of the cable which may cause damage. PAGE NO. 10 OF 26

11 4.7 For direct buried, or a combination of direct buried and ducts, cable installations where the length of the circuit must be pulled in, SEC (TBU) approved rollers, shall be used. 5.0 PARAMETERS OF CABLE PULLING 5.1 General The following parameters shall be considered during the course of cable pulling: Conduit or Duct Fill (refer to paragraph 5.2) Jam Ratio (refer to paragraph 5.3) Clearance (refer to paragraph 5.4) Maximum Pulling Tension (refer to section 4.0) Maximum Sidewall Bearing Pressure (refer to paragraph 4.4) Minimum Bending Radii (refer to Table 05-02) For Bending Radii related to communication cables, refer to TCS-T Conduit or Duct Fill The size of the inner diameter of the conduit and the outer diameter of the cable will determine the percentage fill of the conduit. Conduit or Duct Fill is based on the percentage-fill of the cross sectional area of the conduit/duct. The number of conductors shall not exceed the percentage fill specified in Table Jam Ratio (JR) Table 05-04: Maximum Allowable Percentage-Fill of the Conductor Cross Section Within a Conduit or Duct Number of Conductors In Conduit/Duct Maximum Percentage- Fill (%) When three or more single or multicore cables are being pulled into a conduit, their relative position in the conduit, when being pulled around bends can change, causing a condition of Jamming. If the cables jam in the conduit during pulling, the likelihood of cable damage is high. The Jam Ratio (JR) is defined as the ratio of the PAGE NO. 11 OF 26

12 conduit Inner diameter (D) to cable overall diameter (d). The following formula is used to evaluate the jamming potential: D If JR = is larger than 3.0, jamming cannot occur. d D If JR = is between 2.8 and 3.0 jamming is likely to occur and should be d avoided, but clearance must be checked (see paragraph 5.4). D If JR = is less than 2.8, jamming is not likely. d Where: D = Conduit Inner Diameter in millimeters (mm) d = Cable Overall Diameter in millimeters (mm) 5.4 Cable Clearances (CL) in Conduit Clearances must be checked to ensure that the top conductor will not press against the top of the conduit. Clearance shall be between 6 mm and 25 mm. The larger value is used for large cables and severe bends and pulls. The formulae for calculating clearance are as follows: Parallel (Triplexed) Cables CL = 0.5D d + 0.5(D-d) (1-[d/(D-d)]²)½ Multi Conductor Cable CL = D-d 6.0 CABLES INSTALLATION IN DIRECT BURIED 6.1 In the event of minor damage to outer jacket during installation, heat shrinkable split sleeve shall be applied to repair the jacket. 6.2 Cables shall be placed in trenches in a single horizontal tier without crossings except at transition to multi-tier duct banks. Multi-tier direct buried cable arrangements in trenches are not allowed. 6.3 The route of cable trenches shall avoid above ground and below ground obstructions so as to maintain a reasonable access to the buried cables. Trenches in unpaved areas are preferred. A minimum clearance shall be maintained between underground runs and parallel runs of underground piping. Cables shall not be located under present or future parallel runs of low level underground piping which could block access to the cables. Recommended clearances are shown on Fig through Fig PAGE NO. 12 OF 26

13 6.4 Power and associated control circuits can be laid adjacent. Three single conductor cables comprising one three phase circuit (trefoil) shall be laid without spacing. In order to achieve a reasonable derating factor, a minimum spacing shall be determined between all 3-phase power circuits. Refer TES-P-104 for derating effects of adjacent circuits. 6.5 Where cables cross under main roads, concrete slabs, paved areas, railroad, or any areas that would require extensive or impractical excavations to replace, then they shall be run in ducts. Where such duct runs exceed 3 meters, overall cable ampacity shall be based on the duct portion of the run. Bell end or protective bushings shall be provided on each duct where it terminates. 6.6 If underground cables are routed through a concrete encased ductbank, PVC conduits shall be of encased-in type and when routed through direct buried PVC conduit, they shall be of direct buried (DB) type. All conduits shall have bell ends or protective bushings where the conduits terminate underground. 6.7 Riser Cables Protection of Riser Cables Riser cables from underground to overhead systems shall be protected by a covering that gives suitable mechanical protection up to a point at least 3.7 m above the ground and at least 0.3 m below ground level. However, it is desirable that the protective covering be extended as high as practicable. The use of a plastic or steel guard is generally recommended for protecting riser cables. The use of a blackplate on all cable riser shield installations will assure that the cable is completely covered on all sides. Metallic guard shall be effectively grounded. Riser shield sizes shall be determined by table Support of Riser Cables Riser cables shall be supported by suitable clamps fixed on the cable support structure. They shall not be supported by cable termination devices such as cutouts, cable terminal connectors, etc. 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES 7.1 Underground structures, as defined in this Standard, shall include manholes, vaults, substation basements, duct banks, cable trays, handholes and pullboxes. 7.2 All cables installed in underground structures shall be adequately supported and secured to withstand forces caused by the maximum short circuit current to which they may be subjected. 7.3 Adequate access space shall be provided to maintain and operate equipment. PAGE NO. 13 OF 26

14 7.4 Power and communication cables shall be racked from separate walls. Crossing of the two circuits shall be avoided. 7.5 All cables which exit from transformer, switchgear, vault, manhole, handhole or switch enclosures and terminal structures shall be tagged for identification. Tags shall be permanent, non-corrodible and clearly readable. The following minimum information shall be put in English and Arabic on the tag: a. Transmission and Sub-transmission: Voltage and Insulation Material Phase Identification (R, Y, B) for Single Core Cables Destination (From To) b. Distribution: i. Primary: Feeder Name Voltage Phase for Single Core Cables Destination ii. Secondary: Voltage Phase for Single Core Cables Destination iii. Service: Destination or Customer Address c. Communication and Control: Circuit Type Destination 7.6 Cables shall not be laid on top of other cables. 7.7 All cables shall be installed under applicable requirements of Standard IEEE/ANSI C Unless, otherwise specified, all cable installations in substation basements, vaults and manholes shall be fire proofed. PAGE NO. 14 OF 26

15 7.8.1 Power cables shall be fire proofed, except where fireproofing is not necessary according to or In manholes and other structures containing no oil filled equipment (i.e. where no oil fire hazard is involved), fireproofing is only necessary where separation between cables is 45 cm or less Fireproofing is not necessary on single conductor primary cable connections between various items of equipment in transformer vaults. However, fire proofing shall be installed on primary supply cables, including a single supply cable, and any other primary or transmission cables in vault or other structures containing oil filled equipment. 8.0 CABLE TRENCH DESIGN PARAMETERS 8.1 Figure through indicate standard design parameters for the cable trench depth, width, backfill and circuit separation. 8.2 Right-of-Way Requirement Underground Cable s Route a. Parameters of Right-of-Way shall be applicable for both existing and new road/streets. b. The route of the underground cable shall be considered as the shortest route and avoid or minimize: Communication facilities such as telephone cables. Thrust boring. Gas pipelines, water or sewerage pipelines New roads where reasphalting is required. c. The location of the underground cables for new road/streets shall be as shown in drawings no.se and SE for 69kV to 380 kv Duct Location a. Unless otherwise specified, the duct for underground cable shall not be located in the main (busy) lane of the street/road and to be far away from the median bay at least 1.5 m. b. Refer to Figures 05-1 through for the required width and depth of cables trench. c. Bending radius (refer to section 3.0). PAGE NO. 15 OF 26

16 d. Unless otherwise specified, separate communication handholes shall be provided for the underground optical fiber. Communication Handholes shall be provided at every change of direction, crossing, start and end of duct bank system and at every 500 m of continuous cable run. e. Unless otherwise specified, separation distance between fiber optic cables and power cables shall be 300 mm minimum.as per standard drawing no.sb For lower distance, ampacity adequacy shall be verified Thrust Boring/Directional Drilling Requirements a. Thrust boring or directional drilling shall be used only if other alternative means of crossing are not possible. b. Ampacity adequacy shall be verified where thrust boring or directional drilling is required. c. Thrust boring for 69 kv to 380 kv Underground cables: i. The minimum depth of the thrust boring shall be 2.0 m measured from top of the pipe unless otherwise required at greater depth by the Agency/Ministry having Right-of-Way jurisdiction. ii. iii. The pipe shall be made of steel. The nominal size of the pipe shall be minimum of 1067 mm. The number of Thrustbore shall depend on required number of cable circuits and available Right-of-Way. The spacing between the pipes shall be 2.0 m center-to-center. For more details, refer to standard drawing no. SA d. Horizantal Directinal Drilling for 69 kv to 380 kv Underground cables: i. The process of directional drilling shall be as per contractor s procedure and requirements. ii. iii. The number of directional drilling condiuts shall also depend on required number of cable circuits and available Right-of- Way The CONTRACTOR shall submit his proposal for the directional drilling method. The CONTRACTOR or the CONTRACTOR S approved SUBCONTRACTOR, specialized in the art of directional drilling, shall conduct the PAGE NO. 16 OF 26

17 same. Drawing and procedures shall be submitted to the COMPANY for approval prior to start of construction. iv. The details of the directional drilling method along with description of the machinery that will be used shall be submitted for COMPANY review and approval. The CONTRACTOR shall explain in details, how the required clearance between each circuit and other circuit and other utilities will be maintained. v. Prior to commitment of any directional drilling work, the CONTRACTOR shall get approval and permission from the concerned ROW approving agencies. vi. All the above requirements shall be submitted for COMPANY review and approval. e. Backfilling and Reinstatement shall be in accordance of the requirements of appropriate authority Recommended Clearances between SEC Underground Power Cables and Other Utilities' Lines Unless otherwise specified by the Design Engineer in the SOW/PTS after consultation with relevant facility, the following clearances between U/G power cable and other facilities such as water, sewer, gas, telephone shall be used: Table 05-05: Clearances of SEC U/G Cables & Other Utilities lines SEC UNDERGROUND CABLES Utility 110 kv to 380 kv Horizontal Clearance (mm) Vertical Clearance (mm) Water & Sewer Telephone Gas Cable Route Marker Warning posts shall be installed along the center line of the trench at not over 50 m intervals on congested areas and not over 90 m intervals on open areas and at all locations where the trench changes direction On straight route, the warning post shall have a two-arrow sign to indicate cable route direction. PAGE NO. 17 OF 26

18 8.3.3 On right angle turn, the warning post shall have two signs each having an arrow pointing to the cable route direction. The signs will be placed on the applicable side of the post On oblique turn, the cable route direction shall be indicated by two warning posts each having an arrow. 8.4 Concrete Encased Ducts Refer to standard drawing SA for U/G power cables. PAGE NO. 18 OF 26

19 FIGURE kv, 115 kv or 132 kv XLPE STANDARD TRENCH PAGE NO. 19 OF 26

20 FIGURE kv, 115 kv or 132 kv XLPE STANDARD TRENCH PAGE NO. 20 OF 26

21 FIGURE kv, 115 kv or 132 kv XLPE or LPOF STANDARD TRENCH PAGE NO. 21 OF 26

22 FIGURE kv or 380 kv XLPE or LPOF STANDARD TRENCH PAGE NO. 22 OF 26

23 FIGURE kv, 115 kv or 132 kv XLPE or LPOF STANDARD TRENCH PAGE NO. 23 OF 26

24 FIGURE kv or 380 kv XLPE or LPOF STANDARD TRENCH PAGE NO. 24 OF 26

25 Figure Recommended Clearances Between SEC Underground Power Cables 110kV to 132kV and Other Utilities's Lines PAGE NO. 25 OF 26

26 Figure Recommended Clearances Between SEC Underground Power Cables 110kV to 380kV and Other Utilities's Lines PAGE NO. 26 OF 26

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION-16075 ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Electrical identification to identify all electrical items for easy operation and maintenance including, but not limited

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation 7 Backfilling

More information

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS 1.0 SCOPE 2.0 BONDING METHODS 2.1 Introduction 2.2 Design 2.3 Single-Point Bonding 2.4 Cross Bonding 2.5 Sheath Sectionalizing Joints 2.6 Sheath Standing Voltage 2.7 Sheath Voltage at Through Fault 2.8

More information

11-SDMS-03 REV. 02 SPECIFICATIONS FOR

11-SDMS-03 REV. 02 SPECIFICATIONS FOR 11-SDMS-03 REV. 02 SPECIFICATIONS FOR XLPE INSULATED POWER CABLES FOR RATED VOLTAGES FROM 15 KV UP TO 36 KV (U m ) This specification is property of SEC and subject to change or modification without notice

More information

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM Technical Specification of Back Clamp for LT Cross Arm (MS) Back clamp for LT Cross Arm made out of 50 x 6mm MS Flat suitable for 8m X 300 Kg PSC poles. After fabrication the cross arm shall be painted

More information

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

Page 1 of 5 Application Engineering Note Proc. 001 Interlock Armor and Corrugated Steel Tape Cables Pulling Grip Installation Procedure Rev.

Page 1 of 5 Application Engineering Note Proc. 001 Interlock Armor and Corrugated Steel Tape Cables Pulling Grip Installation Procedure Rev. Page 1 of 5 Scope: The scope of this procedure is to describe how to properly install a cable pulling grip on an Optical Cable Corporation interlocked armor (ILA) and corrugated steel tape (CST) fiber

More information

Medium Voltage Power Cables

Medium Voltage Power Cables N2XSY 6/0, /20, /30 NA2XSY 6/0, /20, /30 N2XS2Y 6/0, /20, /30 NA2XS2Y 6/0, /20, /30 N2XS(F)2Y 6/0, /20, /30 NA2XS(F)2Y 6/0, /20, /30 N2XSEY 3 x 6/0 Medium Voltage Power Cables Photo: HELUKABEL Q 47 Medium

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

SECTION COMMUNICATIONS COPPER OSP CABLING

SECTION COMMUNICATIONS COPPER OSP CABLING SECTION 27 13 14 COMMUNICATIONS COPPER OSP CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction,

More information

Customer Requirements Commercial Secondary Service

Customer Requirements Commercial Secondary Service Application Installation requirements for commercial services from Tacoma Power overhead or underground facilities. It applies to new construction or upgrades of older services. Electrical service may

More information

Construction Specification for Watermain and Water Service Tracer Wire

Construction Specification for Watermain and Water Service Tracer Wire Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 7.40 April 2013 for Watermain and Water Service Tracer Wire Table of Contents TS 7.40.01 SCOPE... 2 TS

More information

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

SECTION COMMUNICATIONS COPPER BACKBONE CABLING SECTION 27 13 13 COMMUNICATIONS COPPER BACKBONE CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such

More information

1.1_KV PVC insulated PVC sheathed multicore Aluminium Cable (armoured & unarmoured)

1.1_KV PVC insulated PVC sheathed multicore Aluminium Cable (armoured & unarmoured) WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (A Govt. of West Bengal Enterprise) Office of the Chief Engineer, Procurement & Contracts Department Vidyut Bhavan, 4 th. floor, Bidhannagar,

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Technical Specification. for 1.1 KV Copper Control Cable

Technical Specification. for 1.1 KV Copper Control Cable WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (A Govt. of West Bengal Enterprise) Office of the Chief Engineer, Procurement & Contracts Department Vidyut Bhavan, 4 th. floor, Bidhannagar,

More information

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

SECTION COMMUNICATIONS COPPER BACKBONE CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002 National Radio Astronomy Observatory Socorro, NM 87801 EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable T. Baldwin June 05, 2002 Summary Double-armor triple-sheath fiber optic cable will be

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION TITLE: RECOMMENDED: P. Lemay NO: APPROVED: C. Malone, P.Eng. REV. DATE: 2015-11-02 Working Procedure GCG0001 REV: 3 INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

More information

Telephone Cable Locating Techniques

Telephone Cable Locating Techniques Chapter 2 Telephone Cable Locating Techniques Introduction Read Chapter One of this manual to learn more general information about each of the following signal application methods. The following paragraphs

More information

ACCESS TO HIGH VOLTAGE APPARATUS

ACCESS TO HIGH VOLTAGE APPARATUS CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Tests on Extruded Cables

Tests on Extruded Cables Tests on Extruded Cables Pierre Argaut Chairman of CIGRE SC B1 October 26 th, 2011 At least, once in your life, you have heard these words: Development Tests Long-term Tests Prequalification Tests Extension

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

Foundation Specifications for Type ES45T-T and ES45T-R 4.5-Meter Earth Station Antennas

Foundation Specifications for Type ES45T-T and ES45T-R 4.5-Meter Earth Station Antennas Installation Instructions Foundation Specifications for Type ES45T-T and ES45T-R 4.5-Meter Earth Station Antennas Bulletin 37690B Revision F 1.0 INTRODUCTION 1.1 This document specifies typical foundation

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

OPERATION, PARTS & MAINTENANCE MANUAL MODELS HB73-16 HB97-18 HB97-16 HB97-12 HB HB HB HB145-18

OPERATION, PARTS & MAINTENANCE MANUAL MODELS HB73-16 HB97-18 HB97-16 HB97-12 HB HB HB HB145-18 OPERATION, PARTS & MAINTENANCE MANUAL MODELS HB73-16 HB97-18 HB97-16 HB97-12 HB121-18 HB121-16 HB121-14 HB145-18 Proudly Made in the USA 2 3 4 FOREWORD This manual has been prepared for the owner and operators

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 200-215.3 CHANGES FROM 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 200 Use and Identification of Grounded Conductors 200.2 General Grounded Conductors

More information

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

3.1 Overview of ATCO Electric s URD System Design

3.1 Overview of ATCO Electric s URD System Design Page: 3-1 3.0 URD DESIGN GUIDELINES 3.1 Overview of ATCO Electric s URD System Design ATCO Electric s design for distribution power supply to URD areas is a primary looped supply system. This is generically

More information

LV AIRGUARD. P r o ble m. ife? No S. a proven, rugged product for harsh environments

LV AIRGUARD. P r o ble m. ife? No S. a proven, rugged product for harsh environments ife? No S n K P r o ble m! No? aw a proven, rugged product for harsh environments No LV AIRGUARD LV AIRGUARD Low Voltage Cables for Harsh Environments FEATURES - No Knife? No Saw? No Problem! installation

More information

Project: # Solano Community College District

Project: # Solano Community College District ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS SECTION 15062 NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS For best results, display hidden notes to specifier. PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe supports. B. Conduit supports. C. Duct supports,

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

ENERGY CORDAFLEX (SMK) (N)SHTOEU Low Voltage Reeling Cable

ENERGY CORDAFLEX (SMK) (N)SHTOEU Low Voltage Reeling Cable ENERGY (N)SHTOEU Low Voltage Reeling Cable Technical Data Type Type designation Approvals/standards Application (N)SHTOEU-J/-O DIN VDE 0250, Part 814; VDE-Reg.-Nr. 7519; GOST R Flexible reeling cable for

More information

C-L-X ARMOR REMOVAL PROCEDURES

C-L-X ARMOR REMOVAL PROCEDURES C-L-X ARMOR REMOVAL PROCEDURES USING THE KETT MODEL #KS-226 CABLE SAW The procedure listed below details Okonite s recommended method for removing C-L-X armor from large and small diameter cables. These

More information

Oil-Water Separator Design Checklist

Oil-Water Separator Design Checklist CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

METAL CLAD WIRING SYSTEM

METAL CLAD WIRING SYSTEM METAL CLAD WIRING SYSTEM The Preferred Cable for CLASS I, DIVISION 1 OR ZONE 1 Best Cable for PWM Circuits THE OKONITE COMPANY Ramsey, New Jersey 07446 METAL CLAD WIRING SYSTEM The Preferred Cable for

More information

Y O U R W A Y ENGINEERING PRODUCTS. adritec.com

Y O U R W A Y ENGINEERING PRODUCTS. adritec.com Y O U R W A Y 8 ENGINEERING PRODUCTS adritec.com Adriduct Ducting Pipes 8b2- Adrimicroduct Ducting Pipes 8b3- Adrimultiduct Ducting Pipes 8b8b1-8b4- Adrisil Ducting Pipes 8b1 ADRIDUCT Adriduct pipes are

More information

SAUDI COMMITTEE FOR PALESTINIAN RELEIF

SAUDI COMMITTEE FOR PALESTINIAN RELEIF SAUDI COMMITTEE FOR PALESTINIAN RELEIF ITB 2014-042 PAL 10-49740 /Construction of 300 Residential Units in Rafah Package #12: Electrical and Telecommunication Works Part C. SECTION 9: PRICE SCHEDULE (Bill

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

2017 NEC TABLE OF CONTENTS

2017 NEC TABLE OF CONTENTS Article 90 Introduction 90.1 Purpose (A) Practical Safeguarding (B) Adequacy (C) Relation to Other International Standards 90.2 Scope (A Covered (B) Not Covered (C) Special Permission 90.3 Code Arrangement

More information

Operating Instructions For Lockformer Button Punch Flanger

Operating Instructions For Lockformer Button Punch Flanger Capacity: 20 to 28 Gauge Galvanize Operating Instructions For Lockformer Button Punch Flanger To satisfactorily form the 90º button punch flange on light gauge materials, it was necessary to form the metal

More information

St. Monica Food Pantry Low Voltage (600V and less) Conductors and Cables sys-tek No

St. Monica Food Pantry Low Voltage (600V and less) Conductors and Cables sys-tek No St. Monica Food Pantry 26 0519-1 ELECTRICAL WORK DIVISION 26 SECTION 260519 LOW VOLTAGE (600V AND LESS) PART 1. GENERAL 1.1 WIRES (SINGLE CONDUCTOR) AND CABLES (MULTI-CONDUCTOR ASSEMBLIES) USED FOR THE

More information

2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"

2' x 3' Polymer Pull Box Cover 4'-0 7'-0 24 x 76 Access Opening 3'-6 Scope.1 Precast Concrete Equipment Slab Box 8' x 10' x Pad with 4' x 7' x 3'- Box for 5-Way RAM Gas Switch, 2-Way, 3-Way, and 4-Way Pad-Mounted RAG Gas Switches, VFI 9, VFI 12, Bypass Switch, and 33 kv

More information

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Nameplates. B. Tags. C. Stencils. D. Pipe Markers. 1.2 RELATED REQUIREMENTS A. Section 099123 - Interior

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

STANDARD SPECIFICATION FOR INSTRUMENT CABLES AND RELATED ACCESSORIES DOCUMENT NO : 44-LK /J.02/0014-A4

STANDARD SPECIFICATION FOR INSTRUMENT CABLES AND RELATED ACCESSORIES DOCUMENT NO : 44-LK /J.02/0014-A4 Page 1 of 12 STANDARD SPECIFICATION FOR INSTRUMENT CABLES DOCUMENT NO : 44-LK-5100-00/J.02/0014-A4 Rev No. Issue Date Pages Rev Description Prepared A 12-08-08 12 Issued for Comments / Approval By Checked

More information

Foundation Specifications for 5.6-Meter Modular Earth Station Antennas

Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

GUXW. Mini-Breakout Cables (Distribution) Universal Indoor/ Outdoor, Steel Wire Armor (SWA) A/I-VQ(ZN)HBH Full Rodent Protection v5.

GUXW. Mini-Breakout Cables (Distribution) Universal Indoor/ Outdoor, Steel Wire Armor (SWA) A/I-VQ(ZN)HBH Full Rodent Protection v5. GUXW Mini-Breakout Cables (Distribution) Universal Indoor/ Outdoor, Steel Wire Armor (SWA) A/I-VQ(ZN)HBH Full Rodent Protection 05--0 v5.0 Ordering Information Belden Part Numbers Fibre Description / count

More information

Unit IV Drawing of rods, wires and tubes

Unit IV Drawing of rods, wires and tubes Introduction Unit IV Drawing of rods, wires and tubes Drawing is a process in which the material is pulled through a die by means of a tensile force. Usually the constant cross section is circular (bar,

More information

FIELD LOK 350. Gasket 4" 24" JOINT RESTRAINT NSF FOR WATER & WASTEWATER, FIRE PROTECTION & INDUSTRIAL APPLICATIONS. Certified to ANSI/NSF 61

FIELD LOK 350. Gasket 4 24 JOINT RESTRAINT NSF FOR WATER & WASTEWATER, FIRE PROTECTION & INDUSTRIAL APPLICATIONS. Certified to ANSI/NSF 61 4" 24" FIELD LOK 350 JOINT RESTRAINT Gasket FOR WATER & WASTEWATER, FIRE ROTECTION & INDUSTRIAL ALICATIONS 4" 24" FIELD LOK 350 Gasket 2 Table of Contents FIELD LOK 350 Gasket 3 Assembly 4 Alternative

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

Low Voltage AIRGUARD. A proven, rugged product for harsh environments

Low Voltage AIRGUARD. A proven, rugged product for harsh environments Low Voltage AIRGUARD A proven, rugged product for harsh environments Linking the future As the worldwide leader in the cable industry, Prysmian Group believes in the effective, efficient and sustainable

More information

Electric cables. Cranes

Electric cables. Cranes Electric cables. Cranes Electric cables for mobile connections. Aristoncavi spa reserve the right to modify the data in this catalogue without notice. 01/2012 Copyright Drawings and technical descriptions

More information

Article 225: Outside Branch Circuits And Feeders

Article 225: Outside Branch Circuits And Feeders Part C: Code Book Questions Article 225: Outside Branch Circuits And Feeders 1.! Open (individual) aerial overhead conductors shall be insulated or covered when within! feet of a building.! (a) 10! (c)

More information

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications Minnesota Power Systems Conference November 3 5, 2009 Earl Brown Heritage Center University of

More information

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax: 6o ft (18.3 m) sectional MONOPOLE TOWER INSTALLATION MANUAL Southwest Windpower, Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA Phone: 928.779.9463 Fax: 928.779.1485 www.skystreamenergy.com 3-CMLT-1390-01

More information

TECHNICAL SPECIFICATION & DRAWINGS

TECHNICAL SPECIFICATION & DRAWINGS TENDER DOCUMENT NIT No.: BHI/PI(S)/665/1053 FOR Tender for Detail Engineering, Manufacturing, Testing and Supply of SNUB PULLEY PACKAGE AND ASSOCIATED WORKS for the project of Augmentation of Raw Material

More information

KC Water Rules and Regulations For Water Main Extensions and Relocations

KC Water Rules and Regulations For Water Main Extensions and Relocations KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made

More information

Armoured Power and Control Cables Fire Resistant

Armoured Power and Control Cables Fire Resistant Armoured Power and Control Cables Fire Resistant Low Smoke Zero Halogen TAC. MGT. EPR. ZH. GSWB. SW, 00/00V Application Armoured cables for fixed wiring in ships and offshore units where circuit integrity

More information

INDEX PREFACE... 1 CAUTIONS... 2 OPERATION ON SITE(9) STANDARD INSTRUMENT... 3 OPTIONAL ACCESSORIES... 4 OPERATION OF TRANSMITTER(3)...

INDEX PREFACE... 1 CAUTIONS... 2 OPERATION ON SITE(9) STANDARD INSTRUMENT... 3 OPTIONAL ACCESSORIES... 4 OPERATION OF TRANSMITTER(3)... INDEX PREFACE... 1 CAUTIONS... 2 STANDARD INSTRUMENT... 3 OPTIONAL ACCESSORIES... 4 OPERATION OF TRANSMITTER(1)... 5 (Transmitter Unit.) OPERATION OF TRANSMITTER(2)... 6 (Operation Panel, LCD Display of

More information

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) 0.415/33kV DESIGN AND CONSTRUCTION General 1. The transformer shall be three phase, oil immersed type, air cooled, core type, outdoor

More information

Agenda. Earthing of Telecom Installations using Single Point Earthing. Reference Documents. How many earths? Earthing Issue...

Agenda. Earthing of Telecom Installations using Single Point Earthing. Reference Documents. How many earths? Earthing Issue... Earthing of Telecom Installations using Single Point Earthing R. Saji Kumar DGM (IT) O/o The Chief General Manager Trivandrum Agenda Reference Documents Earthing Issue & the Problems Earthing Principle

More information

NORMATIVE REFERENCES

NORMATIVE REFERENCES American National Standards Institute NORMATIVE REFERENCES ANSI C135.30 1988 (expired 1993) Zinc-Coated Ferrous Ground Rod Electrodes for Overhead or Underground Lines American Society for Testing and

More information

RADIO AND TELEVISION SATELLITE EQUIPMENT

RADIO AND TELEVISION SATELLITE EQUIPMENT ARTICLE 810 RADIO AND TELEVISION SATELLITE EQUIPMENT Introduction to Article 810 Radio and Television Satellite Equipment This article covers transmitter and receiver (antenna) equipment and the wiring

More information

Article 700: Emergency Systems. 2.! Audible and visual signal devices shall be provided, where practicable to indicate.

Article 700: Emergency Systems. 2.! Audible and visual signal devices shall be provided, where practicable to indicate. Part N: Code Book Questions Article 700: Emergency Systems 1.! For emergency systems, the authority having jurisdiction shall conduct or witness a test on the! complete system upon installation and periodically

More information

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable: Reclosers NOVA Three-Phase Recloser Functional Specification Guide Functional specification for NOVA three-phase recloser 1. Scope This specification describes the features and ratings of the NOVA recloser.

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

Section 808. FENCING

Section 808. FENCING 808.01 Section 808. FENCING 808.01. Description. This work consists of providing and erecting, or moving existing, woven wire fence, temporary fence, protective fence, chain link fence, high-tensile wire

More information

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury. Integrity. Partnership. Quality. COMMERCIAL DOOR INSTALLATION INSTRUCTIONS SERIES 1900, 1950, 2000, 2250, 2500, 2750 Important Notice In the following text, the word: Warning: Indicates that serious injury

More information

Introduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5.

Introduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5. June 2015 Table of Contents Introduction 3 System Overview 3 Before Installation 3 Limitations and Warnings 4 Safety Statements 4 Parts Identification 5 Preparation 7 Soil Conditions 7 Tools Required 7

More information

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake Operating, Servicing, and Safety Manual Model # 2800 48 & 72 Ultimate Box & Pan Brake CAUTION: Read and Understand These Operating, Servicing, and Safety Instructions, Before Using This Machine. 1-800-467-2464

More information

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit Current will always try to return to its source In order for there to be current, there must be a complete circuit Current will take as many paths or circuits available to it to return to the source The

More information

EXCELLENT ELECTRICAL PERFORMANCES

EXCELLENT ELECTRICAL PERFORMANCES 50OHMS CORRUGATED COPPER TUBE COAXIAL CABLE PRODUCT INTRODUCTION 2 Hansen's manufacturing of wide-scope 50ohms corrugated copper coaxial Cable is the fruitful result of the engineers' diligent research

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

Tightening of Structural Joints

Tightening of Structural Joints The design, fabrication, assembly and inspection of steel structures using metric high strength structural bolts and nuts to AS 1252 are covered in AS 4100 - SAA Steel Structures Code which should be referred

More information

Dynatel. 2273M Cable/Pipe and Fault Locators 2273M-iD Cable/Pipe/Fault and Marker Locators with id Read/Write

Dynatel. 2273M Cable/Pipe and Fault Locators 2273M-iD Cable/Pipe/Fault and Marker Locators with id Read/Write 3 Dynatel 2273M Cable/Pipe and Fault Locators 2273M-iD Cable/Pipe/Fault and Marker Locators with id Read/Write Designed to be more accurate, faster and more integrated than any other locator on the market,

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

Thru Wall Floor Seals For New Installation

Thru Wall Floor Seals For New Installation The O-Z/Gedney Thruwall and Floor Seals provide a positive means of sealing pipe, conduit or tube where they pass through a concrete foundation of a structure below grade or below ground water level or

More information

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By: CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

TIE-ROD AND PIPE JOINTS

TIE-ROD AND PIPE JOINTS CHAPTER 5 Machines use various parts which are joined in several ways for the machine to function as whole. We have learnt about some devices like fasteners (temporary & permanent) and some simple joints

More information