1 Document Number: EOS a Contents 1 Introduction Cable Routes/Joints Cable Details Cable Warning Markers Cable Drum Numbers Ducts - Including those used in a Directional Drill Directional Drills Cut, Capped, Abandoned or Cables Removed completely from Site Job Project Number and RIG Driver Codes Taking Dimensions Cross Sections GPS. (Global Positioning Satellite Data) Ordnance Survey Details UK Power Networks Overhead Lines, Poles and Towers Overhead Towers and Poles Overhead Lines UK Power Networks Substations Substations THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE

2 1 Introduction This guide is to be used as an aid to site recording where the installation of Cables /Jointing or Ducting is carried out. This is in addition to any process documentation and further reference must be made to UKPN standard EOS Site Recording of Cables, Plant and Equipment. The task of Site recording should be undertaken by a suitably qualified person with experience in Drawing Office/Surveying techniques who will liaise with UKPN in providing the records required. All records must be provided to the satisfaction of UKPN. As always if in doubt Please ask These details must be supplied whenever Cables, Jointing or Ducting is used: 2 Cable Routes/Joints Dimensions are required from details and points shown on Ordnance Survey (O.S.) mapping to all the following point along a cable route: All changes in direction or depth along the cable route and every so often on a straight trench run. (The trench itself should not be used to measure along, unless it forms part of a convenient sightline that you are using). Long lengths of running dimensions must be avoided. Dimensions must be tied into O.S. map feature points. Any changes found during the excavation of the cable trench that do not appear on any record must be recorded / dimensioned and shown on the plan (such as other utilities plant). Joint positions. All joint positions must be dimensioned to the centre of the joint and the details of the joint supplied to UKPN, these must include (a) All details of all cables in the joint. (b) The type of joint i.e. Straight joint/branch Joint/Capped end or Pot End. (c) The jointing date. (d) The jointers name and employer. Start and stop positions of ducting with cross section details must be recorded. 3 Cable Details The cable type and voltage must be shown. Voltage rating i.e. 132KV, 33KV, 11KV, LV, Pilot. Size and description of cables. i.e. 300mm Al. or Cu and Triplex or XLPE etc. Whether the cable is a 3 core cable or 3 single cores or Multi cores for a Pilot. A typical 33kV cable description might be: 3x300mmAl.XLPE = 300mm Aluminium 3 single cores XLPE sheath. 3c 300mmAl.XLPE = 300mm 3 core cable. (As above but 3 cores in a single cable). A typical LV cable description will be 95Ew A typical Pilot cable description might be described in pairs or cores: 19pr (19 pairs) or 37 cores. UK Power Networks 2017 All rights reserved 2 of 12

3 A typical Fibre Optic cable description might be: 24 or 48 Fibres Displaying the Cable and Jointing details are very important as part of the site record, this can be shown as either: Details added to the plan; As a table in a spreadsheet and supplied with the route plan (as shown below) Example of 33kV Cable Route details in a table format. Example of 33kV Cable Jointing details in a table format. Example of Fibre Optic Cable Route details in a table format. UK Power Networks 2017 All rights reserved 3 of 12

4 4 Cable Warning Markers The presence of Tape, Steel Plates, Fibre Boards or any other protection should be described and shown in cross section details. The location of any ground level route markers or tombstones such as concrete marker posts should be identified on the plans and positioned using measurements. 5 Cable Drum Numbers Drum number for each cable or core used in any circuit used and between joints/terms on a project must be identified and supplied. (See details in a table format shown in 2) 6 Ducts - Including those used in a Directional Drill Size of all ducts (Internal Diameter) i.e. 160mm OD or ID (Please state) Start and End positions of all ducting Type of duct i.e. PVC, Steel or other. Position of duct in relation to other trench details. Depth of duct below ground level. Type of duct surround - if it has been encased in concrete or any other type of protection material. State if the duct has been filled with Bentonite or any other substance. Any changes in the duct route that deviate from a straight line between the start and exit positions. Sub ducts within a single duct may be used for Fibre Optic Cables These must be identified and shown on the plan cross section (See example below). Example of Sub Ducts used for Fibre Optic cables. UK Power Networks 2017 All rights reserved 4 of 12

5 7 Directional Drills Start and Exit positions (Launch & Exit Bays) of the ducts for each Directional Drill. Points at which the D.D ducts meet other open cut route ducting. Dimensions to points along the route that deviate from a straight line between the Start and Exit points of the D.D. (Drill Route Plan View) An AS BUILT longitudinal profile for the whole route of the D.D. showing depths at regular intervals below surface level. A cross section showing all the detail across the D.D. at the start and exit positions (Number and position of ducts, Number and position of cables), and an arrow on the plan to show direction of view. Type of ducting used and all the detail listed in section 5. (Ducts) UK Power Networks 2017 All rights reserved 5 of 12

6 Directional Drill (Example) UK Power Networks 2017 All rights reserved 6 of 12

7 8 Cut, Capped, Abandoned or Cables Removed completely from Site Any cable that has a cut or capped end must have the position recorded with dimensions and be noted on a copy of the Mains Record. Abandoned cables must be identified and recorded on a copy of the Mains Record. Cables that have been cut and completely removed from site must have the cut ends recorded with dimensions and the removed section of cable highlighted on a copy of the Mains Record and noted as such. Abandoned cables used for earth electrode must be recorded to ensure they are not cut and removed in future. 9 Job Project Number and RIG Driver Codes The UKPN Job Number MUST always be attached to the site sketch along with the correct RIG CODE (Regulatory Instruction & Guidance Codes) RIG CODES are used by OFGEM for Asset reporting and these codes must be attached to any work submitted to UKPN GIS Drawing Office. This includes dismantled overhead lines and underground cables removed from site which will need to be removed from NetMAP. (RIG Codes are reason codes why the work has been done). 10 Taking Dimensions Reference must be made to EOS Site Recording of Cables, Plant and Equipment. Dimensions should be taken from Ordnance Survey data points as shown in UKPN NetMAP database, to the centre of the trench or cable route change in direction from details that are shown on our 1/500 scale maps, blank O.S mapping or a Developers/Architects plan. Dimensions should be shown in red. Measurements along sightlines from O.S. data features should be employed when fixing points along the route of the cable trench. The use of sightlines, 90 degree angle offsets from a baseline and triangulation should be used to fix the position of points along the trench run. It is vital to place dimensions on the plan exactly where they have been taken on site. For instance, if you have taken dimensions along and around a road kerb edge on site, replicate that detail on the plan, then use offsets at 90 degrees from that point to fix the cable route etc. (See example below) Use a 1 to 500 scale plan to record the dimensions to the cable route from O.S Data. UK Power Networks 2017 All rights reserved 7 of 12

8 Example of a contractor s cable route site record. 11 Cross Sections Cross sections should be used where the formation of ducting, depths below ground level and any additional trench features need to be shown. A line across the trench with an arrowhead should be placed on the main record to indicate in which direction the section details have been viewed. Each cross section should be numbered on the main plan. This number should then match the section details to be drawn. UK Power Networks 2017 All rights reserved 8 of 12

9 Example of a Cross Section: For EHV routes, cross sections should be marked at regular intervals with section marker identifiers. Where many of these sections are identical the cross section should list all section identifiers to which it refers. 12 GPS. (Global Positioning Satellite Data) The standard for recording cable routes is by taking measurements on site and adding this detail to a plan. However, UKPN GIS Drawing Office in the eastern region, (UKPN) will accept GPS data as a means of positioning cable routes. In remote areas where O.S details are sparse, GPS data is acceptable as the standard for supplying this detail. GPS Data coordinates must be supplied on an excel spreadsheet with the eastings and northings data points identified in separate cells within the spreadsheet. Nine (9) digit references are required, point numbers and references must be shown beside the set of data point they relate to. The route must also be plotted onto a plan of the area with all the points and references shown. UK Power Networks 2017 All rights reserved 9 of 12

10 Example of GPS Data points in an Excel Spreadsheet. Please Note - Any GPS detail supplied may not match our older map base records system and if used, tie in points should be taken to verify the current O.S. data to GPS data relationship. 13 Ordnance Survey Details Any dimensions that are taken from items NOT shown on Ordnance Survey mapping cannot be used by UKPN GIS Drawing Office. The only time when non O.S. items can be used is when dimensions are required to remote areas where GPS Data would be more suitable or For example, If a new house has been used to take dimensions from that is not shown on OS Mapping, you will need a developer s plan or you will need to take dimensions on site to position the building. Any correction to O.S. details found on site, must be measured and positioned correctly, if it affects the details you are using on site during the site recording process. UK Power Networks 2017 All rights reserved 10 of 12

11 Example of Ordnance Survey background map found in NetMAP. 14 UK Power Networks Overhead Lines, Poles and Towers 14.1 Overhead Towers and Poles Towers are structures shown on O.S. and may be used for taking dimensions from. The positions of poles on any UKPN plan are not guaranteed, and any project involving new or existing poles will need their position dimensioned from O.S. mapping details Overhead Lines Where work has taken place on site that changes the overhead network. A drawing with details must be supplied to show: Changes in conductor size or type. Changes in pole numbering. Installed new poles/towers and conductors. Dismantled existing poles/towers and conductors. UK Power Networks 2017 All rights reserved 11 of 12

12 A plan should be submitted to GIS Drawing Office showing these changes The plan levels in NetMAP that shows overhead lines is: 1/10000 for HV/EHV overhead routes and 1/2500 which shows predominately LV overhead routes but on older maps may also show other overhead line voltages. Example of 1/10000 scale HV/EHV overhead line record in NetMAP. 15 UK Power Networks Substations 15.1 Substations Where substations are involved in a project, the position/size and shape should be dimensioned if there is evidence of a change to what is shown on UKPN NetMAP System. Details must also be supplied where work within the substation has taken place. UK Power Networks 2017 All rights reserved 12 of 12

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are

More information

WESTERN POWER DISTRIBUTION

WESTERN POWER DISTRIBUTION WESTERN POWER DISTRIBUTION Framework Document on cable recording techniques to be read in conjunction with other Western Power Distribution Framework Document Appendices relating to Housing and to Industrial

More information

EDS KV SINGLE CORE XLPE CABLES

EDS KV SINGLE CORE XLPE CABLES THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: EDS 02-0034 ENGINEERING DESIGN STANDARD EDS 02-0034 33KV SINGLE CORE XLPE CABLES Network(s): EPN, LPN,

More information

EDS LV WAVEFORM MAINS CABLE RATINGS

EDS LV WAVEFORM MAINS CABLE RATINGS Document Number: EDS 02-0033 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 02-0033 LV WAVEFORM MAINS CABLE RATINGS EPN, LPN, SPN This standard details the technical and practical information required

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

EDS KV TRIPLEX CABLE RATING

EDS KV TRIPLEX CABLE RATING Document Number: EDS 02-0027 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 02-0027 11KV TRIPLEX CABLE RATING This engineering design standard provides the cable ratings and important

More information

TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES

TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES TABLE OF CONTENTS 1.0 SCOPE 2.0 BURIAL DEPTH 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 5.0 PARAMETERS OF CABLE PULLING 6.0 DIRECT BURIED CABLE INSTALLATION

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another.

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another. TRANSMISSION LINES PRELIMINARIES Generators and loads are connected together through transmission lines transporting electric power from one place to another. Transmission line must, therefore, take power

More information

SECTION VI SCOPE OF WORK

SECTION VI SCOPE OF WORK SECTION VI SCOPE OF WORK Overhead Lines and Underground cables VI 5.2 - i TABLE OF CONTENTS 5.2 SCOPE OF WORKS... 1 5.2.1 General... 1 5.2.2 Factory Acceptance Test... 2 5.2.3 33KV Lines and Cables...

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

SECTION VI SCOPE OF WORK

SECTION VI SCOPE OF WORK SECTION VI SCOPE OF WORK Overhead Lines and Underground cables VI 5.2 - i TABLE OF CONTENTS 5.2 SCOPE OF WORKS... 1 5.2.1 General... 1 5.2.2 Factory Acceptance Test... 2 5.2.3 33KV Lines and Cables...

More information

NPS/002/003 Technical Specification for Protection Tile, Protection Tape, Cable Ducting and Route Markers

NPS/002/003 Technical Specification for Protection Tile, Protection Tape, Cable Ducting and Route Markers Version: 6.0 Date of Issue: March 2018 Page: 1 of 21 NPS/002/003 Technical Specification for Protection Tile, Protection Tape, Cable Ducting and Route Markers 1. Purpose The purpose of this specification

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

Guidance for UK Fire and Rescue Services. Dealing with incidents on or near National Grid high voltage overhead lines

Guidance for UK Fire and Rescue Services. Dealing with incidents on or near National Grid high voltage overhead lines Guidance for UK Fire and Rescue Services Dealing with incidents on or near National Grid high voltage overhead lines This document offers guidance to the UK s Fire and Rescue Services for dealing with

More information

Standard Prices for Generators 2010

Standard Prices for Generators 2010 Standard Prices for Generators 2010 Distribution System Operator ESB Networks Page 1 of 13 CONTENTS 1.0 Background...3 2.0 Standard Pricing Approach...3 Schedule of Charges for generators excluding VAT...6

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Fault location on power cables. Fault location on power cables

Fault location on power cables. Fault location on power cables Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 1. Introduction Fault location on communication and power cables

More information

DESIGN OF A 45 CIRCUIT DUCT BANK

DESIGN OF A 45 CIRCUIT DUCT BANK DESIGN OF A 45 CIRCUIT DUCT BANK Mark COATES, ERA Technology Ltd, (UK), mark.coates@era.co.uk Liam G O SULLIVAN, EDF Energy Networks, (UK), liam.o sullivan@edfenergy.com ABSTRACT Bankside power station

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

Mapping The Study Area

Mapping The Study Area While on the beach you will need to take some measurements to show where the study area is relative to the rest of the world and to show what is inside the study area. Once the measurements have been taken,

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION-16075 ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Electrical identification to identify all electrical items for easy operation and maintenance including, but not limited

More information

Stake-less earth / ground testing

Stake-less earth / ground testing APPLICATION NOTE Stake-less earth / ground testing NEW DET14C and DET24C CLAMPS GETTING-AROUND ANY CHALLENGE What is stake-less testing? How does it work? Where and how can it be used? What are the potential

More information

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards. 8.3 Induced Voltage Purpose The purpose of this instruction is to provide awareness of Electrostatic and Electromagnetic induced voltages and the method required to reduce or eliminate it. An induced voltage

More information

Figure 1. (b) (i) State what happens to the resistance of the filament lamp as the current increases.

Figure 1. (b) (i) State what happens to the resistance of the filament lamp as the current increases. Q1.(a) Sketch, on Figure 1, the current voltage (IV) characteristic for a filament lamp for currents up to its working power. Figure 1 (b) (i) State what happens to the resistance of the filament lamp

More information

CONTENTS AND SERVICES

CONTENTS AND SERVICES CONTENTS 1 LV MAINS AND SERVICES 1.1 Scope 1 1.2 Definitions 2 1.3 Introduction 3 1.4 Design Information 4 1.5 Construction Information 6 Appendix A GA Drawings and Materials Mains 11 Appendix B GA Drawings

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

IMP/007/011 - Code of Practice for the Application of Lightning Protection

IMP/007/011 - Code of Practice for the Application of Lightning Protection Version 1.1 of Issue Aug 2006 Page 1 of 11 IMP/007/011 - Code of Practice for the Application of Lightning Protection 1.0 Purpose The purpose of this document is to ensure the company achieves its requirements

More information

NJDEP GPS Data Collection Standards for GIS Data Development

NJDEP GPS Data Collection Standards for GIS Data Development NJDEP GPS Data Collection Standards for GIS Data Development Bureau of Geographic Information Systems Office of Information Resource Management April 24 th, 2017 Table of Contents 1.0 Introduction... 3

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING 1 PRACTICAL PROBLEMS WITH SUBSTATION EARTHING Dr Hendri Geldenhuys Craig Clark Eskom Distribution Technology This paper considers the issues around substation sites where the soil resistivity is of particularly

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

ELEC Transmission i and

ELEC Transmission i and ELEC-1104 Lecture 5: Transmission i and Distribution ib ti Power System Layout Transmission and Distribution The transmission system is to transmit a large amount of energy from the power stations s to

More information

PROTECT-A-POOL INGROUND REMOVABLE SAFETY FENCE

PROTECT-A-POOL INGROUND REMOVABLE SAFETY FENCE PROTECT-A-POOL INGROUND REMOVABLE SAFETY FENCE I N S T A L L A T I O N I N S T R U C T I O N S INSTALLATION TOOLS The following tools are required for installation. Chalk Pencil Utility Knife Tape Measure

More information

Record Drawing Standards for Projects Version 2.1

Record Drawing Standards for Projects Version 2.1 for Projects Version 2.1 Updated September 21, 2016 Department: Spatial Data Group Engineering & Maintenance 1. INTRODUCTION... 1 2. GENERAL STANDARDS... 1 2.1 Drawing Standards... 1 2.2 Digital Submission

More information

Transmission of Electrical Energy

Transmission of Electrical Energy Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors are usually aluminum cable steel reinforced (ACSR),

More information

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU Technology solutions and innovations for developing economies Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT

More information

Site Engineering Guide

Site Engineering Guide Site Engineering Guide TOOLS & MARKING OUT ACCESSORIES Updated: 07/01/13 Andrew Burgess B.Sc Hons www.ajb-settingout.co.uk This resource is protected by United Kingdom and International copyright laws

More information

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area Guideline for Creating Disconnection Points and Establishing a Not Document Number: Authorised by: Issue Date: 29 June 2012 Previous Document: 12 February 2010 Principal Authors: J Dohmen Powerlink D Brown

More information

OPERATIONAL ADVICE NOTICE (OAN) OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN with immediate effect.

OPERATIONAL ADVICE NOTICE (OAN) OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN with immediate effect. OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN 106-2018 with immediate effect. OAN REF:- 114/2018 DATE OF ISSUE:- 13/11/2018 EFFECTIVE DATE:- 13/11/2018 MANUAL REFERENCE(S):-

More information

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 2 SDCC-TS-02 INDUCTIVE LOOPS & ABOVE GROUND DETECTION REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC

More information

Instruction Manual VB /8 Diameter Floor Socket with or without Floor Plates for Floating Wood Floors

Instruction Manual VB /8 Diameter Floor Socket with or without Floor Plates for Floating Wood Floors Instruction Manual VB24 2-3/8 Diameter Floor Socket with or without Floor Plates for Floating Wood Floors Customer Service (800) 247-7668 P A R T S L I S T Item Qty Description Item Qty Description A 1

More information

3M Dynatel Locating and Marking Products

3M Dynatel Locating and Marking Products 3M Dynatel Locating and Marking Products 1420 Series ID Markers EMS 1420 Marker Locator 2200M Series Locators 2200M-iD Series Locators Dynatel Strengths 30+ years experience in locating Inventors of passive

More information

Emerging Subsea Networks

Emerging Subsea Networks FIBRE-TO-PLATFORM CONNECTIVITY, WORKING IN THE 500m ZONE Andrew Lloyd (Global Marine Systems Limited) Email: andrew.lloyd@globalmarinesystems.com Global Marine Systems Ltd, New Saxon House, 1 Winsford

More information

Power Quality. Case Study. Conrad Bottu Laborelec January 2008

Power Quality. Case Study. Conrad Bottu Laborelec January 2008 Case Study Electromagnetic compatibility (EMC) study Breakdown of low voltage electronic equipment in a 25 kv substation Conrad Bottu Laborelec January 2008 Power Quality Power Quality 1 Introduction Description

More information

1.1_KV PVC insulated PVC sheathed multicore Aluminium Cable (armoured & unarmoured)

1.1_KV PVC insulated PVC sheathed multicore Aluminium Cable (armoured & unarmoured) WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (A Govt. of West Bengal Enterprise) Office of the Chief Engineer, Procurement & Contracts Department Vidyut Bhavan, 4 th. floor, Bidhannagar,

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for

More information

3 Cross Sections. 1 Property Lines. 2 Datum References

3 Cross Sections. 1 Property Lines. 2 Datum References 1 Property Lines property line (PL), sometimes referred to as building line (BL), is the standard dimensioning reference point on all Ausgrid plans and represents property boundaries. Typically the PL

More information

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION Please complete all sections of the application form and return to newconnections@ukpowerdistribution.co.uk Section 1 Site Details UKPD Reference Number: Energisation Date: Site Name/Address/Postcode:

More information

Busbar and Modular Wiring Systems

Busbar and Modular Wiring Systems Chapter 11 Busbar and Modular Wiring Systems 11.1 BUSBAR SYSTEM The wide range of busbar system is available and can be used for single or three-phase distribution to many types of applications ranging

More information

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length

More information

Cable Management Solutions with DLP TM

Cable Management Solutions with DLP TM DLP trunking system P. 374-375 Selection chart for DLP trunking system P. 397 Floor boxes & Under floor boxes Technical data P. 373 DLP U-PVC adaptable trunking system Cable Management Solutions with DLP

More information

Engineering Surveying -1 CE212 Chain Survey

Engineering Surveying -1 CE212 Chain Survey Engineering Surveying -1 CE212 Chain Survey Lecture 2016, September 26-27 Muhammad Noman Chain Survey Chain survey is the simplest method of surveying. In this survey only measurements are taken in the

More information

IAN HUMBY TEACHING. List of Hand-Outs. Levelling

IAN HUMBY TEACHING. List of Hand-Outs. Levelling IAN HUMBY TEACHING List of Hand-Outs Levelling 6-1 Equipment List (Levelling) 11-1 to 11-3 Introduction to Levelling 11-4 Levelling Terminology 12-1 to 12-2 Measuring Height Change by Basic Methods 13-1

More information

PROJECT: SUPPLY & INSTALL ELECTRICAL SWITCHBOARD AT SENGKURONG EXCHANGE PHASE 1, JLN TUTONG, BSB. SCOPE OF WORK The scope of work under Electrical Services shall include but not limited to the supply,

More information

QUANTITY SURVEYS. Introduction

QUANTITY SURVEYS. Introduction QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

Tests on Extruded Cables

Tests on Extruded Cables Tests on Extruded Cables Pierre Argaut Chairman of CIGRE SC B1 October 26 th, 2011 At least, once in your life, you have heard these words: Development Tests Long-term Tests Prequalification Tests Extension

More information

Underground System Design TADP 547

Underground System Design TADP 547 Underground System Design TADP 547 Industry Standards, Specifications and Guides Presentation 6.4 Instructor: Frank Frentzas Industry Organizations Several professional organizations develop standards

More information

Thru Wall Floor Seals For New Installation

Thru Wall Floor Seals For New Installation The O-Z/Gedney Thruwall and Floor Seals provide a positive means of sealing pipe, conduit or tube where they pass through a concrete foundation of a structure below grade or below ground water level or

More information

The above deliverables are to be provided as a zip file to your ILAWC Engineering Project Manager.

The above deliverables are to be provided as a zip file to your ILAWC Engineering Project Manager. Water Main Construction Projects The requirements and deliverables identified below are those for water main construction projects performed by Developers, Contractors, and Internal Illinois-American Water

More information

kv AC substation

kv AC substation 132-400 kv AC substation Outdoor AC substations Earthing systems ETS-50-08-01, Rev. 0 technical standard Document no. 13/90592-127 ETS-50-08-01 v. 0 REVISION VIEW Document no.: 13/90592-127 Version Author

More information

Publishing date: 23/07/2015 Document title: We appreciate your feedback. Share this document

Publishing date: 23/07/2015 Document title: We appreciate your feedback. Share this document Publishing date: 23/07/2015 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Share this document REPORT ON UNIT

More information

Department of Civil and Environmental Engineering

Department of Civil and Environmental Engineering Department of Civil and Environmental Engineering CEE213L Surveying & Introduction to GIS Lab SURVEYING LABORATORY NORTH SOUTH UNIVERSITY Center of Excellence in Higher Education The First Private University

More information

Notes 3 Explanatory Information 4-10

Notes 3 Explanatory Information 4-10 Low Voltage Cables Section Three SECTION THREE - LOW VOLTAGE CABLES PAGE Notes 3 Explanatory Information 4-10 Construction 4 Current Ratings 5 Rating Factors 6 Voltage Drops 8 Selection Procedures 10 Minimum

More information

EDS LV ELECTRICAL SERVICE DRAWINGS

EDS LV ELECTRICAL SERVICE DRAWINGS Document Number: EDS 08-2110 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2110 LV ELECTRICAL SERVICE DRAWINGS EPN, LPN, SPN This standard details the drawings for service positions and connection

More information

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables 21, rue d Artois, F-75008 PARIS AUCKLAND 2013 http : //www.cigre.org Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables Michael Krüger, Rene Hummel, Stefan Böhler, OMICRON Austria

More information

Introduction to PPE and T&P

Introduction to PPE and T&P Introduction to PPE and T&P Learning Objective By the end of this session, you will be able to: Explain what safety PPE, tools and plants are, their purpose and their uses 2 Let s Discuss What do you mean

More information

SEL Phase Comparison Faulted Circuit Indicator (PC FCI) Communicates to line crews using the. Features and Benefits

SEL Phase Comparison Faulted Circuit Indicator (PC FCI) Communicates to line crews using the. Features and Benefits SEL-8 Phase Comparison ed Circuit Indicator (PC FCI) SEL-8 SEL-8 SEL-8 SEL-8 SEL-8 SEL-8 Communicates to line crews using the Features and Benefits Locates ed Cable Sections Quickly Locate cable failures

More information

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis Company Directive STANDARD TECHNIQUE: SD5F Relating to connecting multiple small low voltage connections with limited network analysis Policy Summary This document specifies the procedure for connecting

More information

Telephone Cable Locating Techniques

Telephone Cable Locating Techniques Chapter 2 Telephone Cable Locating Techniques Introduction Read Chapter One of this manual to learn more general information about each of the following signal application methods. The following paragraphs

More information

Session: Introduction to PPE and T&P

Session: Introduction to PPE and T&P Session: Introduction to PPE and T&P Learning Objectives Explain what safety PPE, tools and plants are, their purpose and their uses Evaluation Criteria Interactive Questioning Duration Resources Facilitator

More information

General Information...SA1-SA4

General Information...SA1-SA4 SECTION S INDEX Product Description Page Number General Information................................................................SA1-SA4 Type FSK Thruwall & Floor Seal For Conduit, Pipe or Tubing............................

More information

Accurate determination of distribution network losses

Accurate determination of distribution network losses Loughborough University Institutional Repository Accurate determination of distribution network losses This item was submitted to Loughborough University's Institutional Repository by the/an author. Citation:

More information

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect

More information

HV Substation Earthing Design for Mines

HV Substation Earthing Design for Mines International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 4, Issue 6 (October 2012), PP. 100-107 HV Substation Earthing Design for Mines M.

More information

MANUAL STANDARD. YAGI ELEMENTS 6-20m. Rev. 1.10

MANUAL STANDARD. YAGI ELEMENTS 6-20m. Rev. 1.10 MANUAL STANDARD YAGI 2-3-4-6 ELEMENTS 6-20m Rev. 1.10 1 INTRODUCTION UltraBeam produced its first antenna in 2008. Since then there was a progressive and continuous improvement in design and manufacturing

More information

Fatima Michael college of Engineering and Technology

Fatima Michael college of Engineering and Technology Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric

More information

Level: 3 Credit value: 9

Level: 3 Credit value: 9 Level: 3 Credit value: 9 UAN: J/602/2563 Unit aim This unit is designed to enable learners to understand and interpret the principles, practices and legislation associated with the termination and connection

More information

Application of Satellite Imagery for Rerouting Electric Power Transmission Lines

Application of Satellite Imagery for Rerouting Electric Power Transmission Lines Application of Satellite Imagery for Rerouting Electric Power Transmission Lines T. LUEMONGKOL 1, A. WANNAKOMOL 2 & T. KULWORAWANICHPONG 1 1 Power System Research Unit, School of Electrical Engineering

More information

DC utilization of existing LVAC distribution cables

DC utilization of existing LVAC distribution cables DC utilization of existing LVAC distribution cables D. Antoniou, A. Tzimas and S. M. Rowland The University of Manchester School of Electrical and Electronic Engineering M13 9PL, UK Abstract Low Voltage

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

URD Elbow Connectivity using the G3 Field Probe

URD Elbow Connectivity using the G3 Field Probe Origo Corporation Identify & Tag Energized URD Elbow Connectivity - Instruction Manual 1 URD Elbow Connectivity using the G3 Field Probe What is the Elbow Connectivity? Underground Residential Distribution

More information

Welcome to the Session on. HT Distribution Network

Welcome to the Session on. HT Distribution Network Welcome to the Session on HT Distribution Network Learning Objective By the end of this session you will be able to: Explain the HT distribution network breakdown maintenance - possible faults, identification

More information

EXTREMELY LOW MAGNETIC FIELD (ELMF) XLPE INSULATED CABLES, TYPE N2XY/FR1 0.6/1 KV

EXTREMELY LOW MAGNETIC FIELD (ELMF) XLPE INSULATED CABLES, TYPE N2XY/FR1 0.6/1 KV CABLE DESCRIPTION Single- or multi-phase electric cable for creating a weak external magnetic field,so as to obtain a cable wherein at last one of the conductors is assembled from two or more insulated

More information

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.

More information

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS General The exact position of the structure has to be established. Please note that the difference in height must not exceed 1.5% in longitudinal

More information

Standard Technical Specifications for Electrical Works CABLES AND ACCESSORIES. 11 kv XLPE-Insulated Three-Core Underground Cables

Standard Technical Specifications for Electrical Works CABLES AND ACCESSORIES. 11 kv XLPE-Insulated Three-Core Underground Cables Standard Technical Specifications for Electrical Works CABLES AND ACCESSORIES ( Data Sheets ) 11 kv XLPE-Insulated Three-Core Underground Cables (3x240 mm 2 ) ADWEA/ADDC/AADC STANDARD : D-AAA-CAB-11-3Cx240

More information

Earthing of Electrical Devices and Safety

Earthing of Electrical Devices and Safety Earthing of Electrical Devices and Safety JOŽE PIHLER Faculty of Electrical Engineering and Computer Sciences University of Maribor Smetanova 17, 2000 Maribor SLOVENIA joze.pihler@um.si Abstract: - This

More information

BVM Systems Limited. PQSensor MkIII Installation & Commissioning Manual - 1 -

BVM Systems Limited. PQSensor MkIII Installation & Commissioning Manual - 1 - BVM Systems BVM Systems Limited PQSensor MkIII Installation & Commissioning Manual Patents: 1295133, 6,919,717 BVM Systems LImited 21 Springvale Road Gilford Craigavon BT63 6EB United Kingdom Email: -

More information

INSTALLATION GUIDE. C20-NH STRAIGHT PARTITION Nissan NV ( Perforated Window, No Access, Steel )

INSTALLATION GUIDE. C20-NH STRAIGHT PARTITION Nissan NV ( Perforated Window, No Access, Steel ) INSTALLATION GUIDE C20-NH STRAIGHT PARTITION Nissan NV ( Perforated Window, No Access, Steel ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.1.1 Unpack components; compare with the bill of materials...

More information

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables William Higinbotham, Neil Davies and Victor Chan EA Technology LLC, New Jersey; USA, EA Technology Pty Ltd, Brisbane Australia; EA

More information

HZ301 & HZ321. Standard and Junior Flush Valve Installation Instructions

HZ301 & HZ321. Standard and Junior Flush Valve Installation Instructions TABLE OF CONTENTS Product Overview.. 2 How to Order.. 2 Product Specifications.. 2 Tools Required... 2 Safety Instructions. 3 Visual Check.. 3 Flush Pipe Installation 3 Hygihose Installation. 4 Duct Connection.

More information

AL AQTAAR AL ARBAAH EST. COMPANY PROFILE. Panel Boards, Substation, Instrumentation, Automation.

AL AQTAAR AL ARBAAH EST. COMPANY PROFILE. Panel Boards, Substation, Instrumentation, Automation. AL AQTAAR AL ARBAAH EST. COMPANY PROFILE Panel Boards, Substation, Instrumentation, Automation. Company Profile Al Aqtaar Al Arbaah Est. (formally known Asfar Al Jazirah Est.) was founded in Kingdom of

More information

Cleveland State University

Cleveland State University CVE 212 - Surveying Lab #4 LOCATION SURVEY EQUIPMENT Right angle mirror (pentaprism) Surveyor s tape Plumb bobs Range poles INTRODUCTION Many times the surveyor is called upon to catalog details of a project

More information

JULY Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum.

JULY Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum. FOREWORD This Standard is intended to be used within and for Iranian Ministry of Petroleum (N.I.O.C, N.I.G.C, N.P.C., N.I.O.R.D.C. and other affiliate organizations and companies) and has been prepared

More information

INSTALLATION GUIDE. C20-FTM STRAIGHT PARTITION Transit Partition ( Perforated Window, No Access, Steel )

INSTALLATION GUIDE. C20-FTM STRAIGHT PARTITION Transit Partition ( Perforated Window, No Access, Steel ) INSTALLATION GUIDE C20-FTM STRAIGHT PARTITION Transit Partition ( Perforated Window, No Access, Steel ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.1.1 Unpack components; compare with the bill

More information

INSTALLATION GUIDE. C30-NH STRAIGHT PARTITION Nissan NV ( Swing Door, Steel )

INSTALLATION GUIDE. C30-NH STRAIGHT PARTITION Nissan NV ( Swing Door, Steel ) INSTALLATION GUIDE C30-NH STRAIGHT PARTITION Nissan NV ( Swing Door, Steel ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Partition assembly... 3 to 4 5 to 6 Phase 2 - Installation q 2.1 Tips

More information