1 Please complete all sections of the application form and return to Section 1 Site Details UKPD Reference Number: Energisation Date: Site Name/Address/Postcode: Project Description: Section 2 Independent Connection Provider (ICP) Details Your Site Reference Number: Designer: Section 3 Land Owner Details Contact Name: Page 1 of 5

2 Section 4 Land Owner Solicitor Details Contact Name: Section 5 Proposed Connection Load Details Plot Number or Name Quantity Supply Capacity (kva) Per Plot* Total 1Ph 3Ph LV HV Build Phase Total Load: *ADMD (After Diversity Maximum Demand) As a guide for gas heated semi detached domestic housing use 1.0 kva per plot (up to 3 bedrooms) and for detached domestic housing use 1.4 kva per plot (up to 5 bedrooms). As a guide for electric heated domestic apartments/housing use 3.4 kva per plot (up to 2 bedrooms and within a high density of units). For electric heated housing with restricted hours tariffs and all other scenarios please refer to UKPD for guidance. For electric heated domestic apartments use UKPD ADMD Ready Reckoner to calculate the rating of distribution transformers. Section 6 Proposed Generation and Export Details Maximum power output (phased if appropriate): Generation set specification type e.g. PV, CHP: Confirmation of plans to export back to network: Plans to run in parallel e.g. test back up generator: Completed ENA document e.g. G59, G83: Page 2 of 5

3 ELECTRIC NETWORK DESIGN APPROVAL APPLICATION Section 7 Proposed Materials and Equipment for Adoption Category Description Specification Supplier Note: If you need to provide any further materials and equipment details please provide on a separate sheet in the above format Page 3 of 5

4 Section 8 Other drawings and documents to be provided as indicated Please include the information below depending on the type of projects listed on the right. LV Networks LV supplies from a new standard substation LV supplies from a new non standard sub station HV Metered Supply 1 Site plan to include the following minimum information: Clearly defined site boundary Site location detail (can be provided on separate drawing if desired) 2 LV design drawing to include the following minimum information: Size/type and network asset owner of existing cable at the point of connection Link box and fuse sizes where required Substation location where required Proposed LV cable size/type and ducting size/type where required All joints, pot ends, terminations and earthing Detailed cross sections along the cable route Service load, termination, service fuse size, CT ratio and metering arrangements for each supply Kiosk/cabinet details, where required, including manufacturers specification For apartments include details of internal mains and service routes, cable ways, containment, multi metering layouts, distribution boards, fusing and service positions Street lighting connections where required Single line diagram (can be provided on separate drawing if desired) 3 HV design drawing to include the following minimum information: Size/type and network asset owner of existing cable at the point of connection Substation location, load and plant specification including manufacturers details Small power and lighting specification and details Proposed HV cable size/type and ducting size/type where required All joints and terminations Detailed cross sections along the cable route Customers transformer or HV network details for any HV metered supplies Emergency trip button and HV meter panel details where required Kiosk/cabinet details, where required, including manufacturers specification Single line diagram (can be provided on separate drawing if desired) HV Protection details and settings Ancillaries: Tripping battery, automation details, where required 4 Substation earthing drawing to include the following minimum information: Substation layout Earthing design Yes Yes Yes N/A N/A Yes Yes Yes N/A Yes Yes Yes Page 4 of 5

5 5 Substation with standard housing drawing to include the following minimum information: N/A Yes N/A Yes GRP specification and manufacturer or brick built housing specification Plinth construction details 6 Substation with non standard housing drawing to include the following minimum information: Architect proposals for substation room N/A N/A Yes Yes Substation layout including dimensions, doors, joint locking arrangement and ventilation details 7 IDNO legal drawing to include the following minimum information: Substation access Cable easements Street names Scale 1:1250 with insert at 1:500 to highlight any substation detail 8 Volt drop and earth loop impedance calculations for LV network Yes Yes Yes N/A 9 Drawing register confirming the following: Drawing numbers and revision details Drawing title Scheme title Section 9 Additional information/comments Section 10 ICP Declaration I confirm that by submitting this application we have been appointed as an ICP to design and install electrical networks to the above named development. I understand that failure to supply any of the required information may result in a delay in my application being processed. ICP Print Name: Signature: Date: UKPD exist to provide customers with a forward thinking, flexible and least hassle approach in the area of adoption of electricity distribution networks, which we will look to deliver through pioneering commercial solutions and the introduction of a more pragmatic and streamlined approach to the whole adoption process. Contact Us: Head Office, 6500 Daresbury Park, Warrington, Cheshire, WA4 4GE Phone number: E mail: newconnections@ukpowerdistribution.co.uk We are open: Main office is open from 8.30am to 5pm Monday to Friday Page 5 of 5

G81 PART 1 FRAMEWORK APPENDIX

G81 PART 1 FRAMEWORK APPENDIX G81 PART 1 FRAMEWORK APPENDIX Housing Development design framework appendix to be read in conjunction with the latest version of: ENA Engineering Recommendation G81 Part 1 Framework for design and planning,

More information

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis Company Directive STANDARD TECHNIQUE: SD5F Relating to connecting multiple small low voltage connections with limited network analysis Policy Summary This document specifies the procedure for connecting

More information

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are

More information

EDS LV ELECTRICAL SERVICE DRAWINGS

EDS LV ELECTRICAL SERVICE DRAWINGS Document Number: EDS 08-2110 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2110 LV ELECTRICAL SERVICE DRAWINGS EPN, LPN, SPN This standard details the drawings for service positions and connection

More information

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE ENGINEERING COMMISSIONING PROCEDURE ECP 11-0512 GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning

More information

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Standard Number: HPC-5DA-07-0011-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction

WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction Manual: Distribution Substation Manual (DSM) Section I: Introduction Standard Number: HPC-5DA-07-0010-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document Owner Name:

More information

Application for electricity connections Housing development for up to four dwellings

Application for electricity connections Housing development for up to four dwellings Electricity Thank you for considering Western Power Distribution for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information

More information

ECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE

ECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE Document Number: ECP 11-0511 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0511 GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Given Names: Date: Time: Location: Assessment Time (includes reading and preparation time): At the end of this time you will be asked to stop.

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11-0515 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0515 HV METERING EQUIPMENT COMMISSIONING PROCEDURE

More information

EDS FAULT LEVELS

EDS FAULT LEVELS Document Number: EDS 08-1110 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1110 FAULT LEVELS This standard provides guidance on the calculation, application and availability of

More information

your home What do you need to do? What s the cost*? nienetworks.co.uk Connecting your home Complete an application

your home What do you need to do? What s the cost*? nienetworks.co.uk Connecting your home Complete an application DOMESTIC CONNECTION your home What do you need to do? Complete an application Complete your application and attach your plans listed in the checklist below (You can tear off and retain the guidance pages

More information

ECP DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE

ECP DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE Document Number: ECP 11-0506 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0506 DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Date: Given Names: Time: Assessment Time (includes 10 minutes reading time): At the end of this time you will be asked to stop. 4 hours Have you

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

MV network design & devices selection EXERCISE BOOK

MV network design & devices selection EXERCISE BOOK MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester

More information

500 kva Dry-type Isolation Transformer V-Delta to 208Y/120V 3PH - NEMA 1/Indoor

500 kva Dry-type Isolation Transformer V-Delta to 208Y/120V 3PH - NEMA 1/Indoor 500 kva Dry-type Isolation Transformer - 13200V-Delta to 208Y/120V 3PH - NEMA 1/Indoor Part #: MT-DOE16-3P-13200D-500KVA-208Y.120-N1 Page: 1 The MT-DOE16-3P-13200D-500KVA-208Y.120-N1 Dry-type Isolation

More information

UK Power Networks OPERATIONAL BULLETIN

UK Power Networks OPERATIONAL BULLETIN Document No: HSS 406 OB 160 Issue Date: 10 July 2018 Type: Operational Safety Subject: Changes to DSR procedures 2018/1 Applicable Areas: All Applicable Job Roles: All DSR holders Issued By: Dudley Sparks

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

QUESTIONNAIRE for Wind Farm Power Stations only

QUESTIONNAIRE for Wind Farm Power Stations only TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21

More information

WESTERN POWER DISTRIBUTION

WESTERN POWER DISTRIBUTION WESTERN POWER DISTRIBUTION Framework Document on cable recording techniques to be read in conjunction with other Western Power Distribution Framework Document Appendices relating to Housing and to Industrial

More information

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge

More information

EDS LV NETWORK DESIGN

EDS LV NETWORK DESIGN Document Number: EDS 08-2000 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-2000 LV NETWORK DESIGN This standard defines UK Power Networks policy with regard to all aspects of the

More information

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation 2394 EXAM PAPER 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation 2. There are various documents that are relevant to the Inspection and

More information

Equipment Description Quantity as per drawings Actual quantity

Equipment Description Quantity as per drawings Actual quantity NOTE: SAFETY: Tests must be carried out after the installation, alteration or repair and before putting back to service. At all times maintain suitable clearance to all other electrical equipment and verify

More information

Connection Impact Assessment Application Form

Connection Impact Assessment Application Form Connection Impact Assessment Application Form This Application Form is for Generators applying for a Connection Impact Assessment (CIA). In certain circumstances, London Hydro may require additional information

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

EDS LV WAVEFORM MAINS CABLE RATINGS

EDS LV WAVEFORM MAINS CABLE RATINGS Document Number: EDS 02-0033 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 02-0033 LV WAVEFORM MAINS CABLE RATINGS EPN, LPN, SPN This standard details the technical and practical information required

More information

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

, Power Industries and Communications Industry Training Board

, Power Industries and Communications Industry Training Board , Power Industries and Communications Industry Training Board Suite 3 Level 22185 187 Boundary Boundary Rd Rd North Melbourne VIC 3051 Phone VIC 3051 (03) 9654 1299 Phone (03) 9654 1299 Facsimile (03)

More information

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number:  Address: NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information

More information

APPLICATION FORM FOR INFRASTRUCTURE NOC

APPLICATION FORM FOR INFRASTRUCTURE NOC APPLICATION FORM FOR INFRASTRUCTURE NOC Submission Type New Resubmission (Previous Reference No): Arch. Str. HVAC EHS Others Revision /Amendment (Infrastructure NOC Reference No): Arch. Str. HVAC EHS Others

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

Interim Distribution Substation Manual (DSM)

Interim Distribution Substation Manual (DSM) Interim Distribution Substation Manual (DSM) Section 4 Kiosk General Arrangements and Installation Guides Original Issue: June 1997 This Revision: 6 th - June 2018 EDM# 22966949 (Published) EDM# 23581608

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Wind. Farms. Purpose. recording Offshore. wind farms. the Transmission. the flows of voltages. the onshore. measuree and record. Agents.

Wind. Farms. Purpose. recording Offshore. wind farms. the Transmission. the flows of voltages. the onshore. measuree and record. Agents. Guidance Settlement Metering for Offshore Purpose Wind Farms This guidance note clarifies the Balancing and Settlementt Code (BSC) requirements for measuring and recording flows of electricity for Settlement

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

ENCORE 300 SERIES INSTALLATION AND OPERATING INSTRUCTIONS

ENCORE 300 SERIES INSTALLATION AND OPERATING INSTRUCTIONS ENCORE 300 SERIES INSTALLATION AND OPERATING INSTRUCTIONS Copyright 2002-2006 PRI Ltd. 9600-3004-2 Issue C Information contained within this document is subject to change without notice and does not represent

More information

THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE. Contents

THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE. Contents Document Number: EOS 09-0100a Contents 1 Introduction... 2 2 Cable Routes/Joints... 2 3 Cable Details... 2 4 Cable Warning Markers... 4 5 Cable Drum Numbers... 4 6 Ducts - Including those used in a Directional

More information

Connection Impact Assessment Application

Connection Impact Assessment Application Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,

More information

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design Company Directive POLICY DOCUMENT: SD4/7 Relating to 11kV and 6.6kV System Design Policy Summary This document describes the standard requirements for the design of the 11kV and 6.6kV systems. Reference

More information

PREMIER INSTALLATION AND OPERATING INSTRUCTIONS

PREMIER INSTALLATION AND OPERATING INSTRUCTIONS PREMIER INSTALLATION AND OPERATING INSTRUCTIONS Copyright 2002-2006, PRI Ltd. 9600-3003-2 Issue C Information contained within this document is subject to change without notice and does not represent a

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

Connection of Embedded Generating Plant up to 5MW

Connection of Embedded Generating Plant up to 5MW Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

BERKELEY COUNTY ENGINEERING AND

BERKELEY COUNTY ENGINEERING AND BERKELEY COUNTY ENGINEERING AND BUILDING INSPECTIONS 400 West Stephen Street - Suite 202, Martinsburg, WV 25401-3838 Telephone: 304-264-1966, Fax: 304-262-3128 Web Page: www.berkeleywv.org I. WHAT ARE

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

Section 1.0: Introduction. Section 3.0: Planning. Section 4.0: Power Quality. Manual 0295 Supply & Planning Manual Updated: 01/08/2017

Section 1.0: Introduction. Section 3.0: Planning. Section 4.0: Power Quality. Manual 0295 Supply & Planning Manual Updated: 01/08/2017 SUPPLY & PLANNING MANUAL TABLE OF CONTENTS Section 1.0: Introduction Section 2.0: Supply Section 3.0: Planning Section 4.0: Power Quality Energex 2017 Page: 1 of 223 TABLE OF CONTENTS 1 INTRODUCTION...

More information

Capacity Market Prequalification

Capacity Market Prequalification Capacity Market Prequalification T-4 Auction December 2016 Early Auction January 2017 Transitional Arrangement Auction March 2017 Guidance document for Capacity Market participants Capacity Market Prequalification

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Cymap Electrical. Reference: CYELEC_1117_v1. Page 1 of 15. Cymap Electrical

Cymap Electrical. Reference: CYELEC_1117_v1. Page 1 of 15. Cymap Electrical Page 1 of 15 Cymap Electrical Page 2 of 15 Contents Cymap Electrical Overview... 3 Electrics Program... 3 BS-EN Lightning Protection... 5 Lighting Program... 7 Wiring Program... 11 The Calculation Process...

More information

Office use only: Application Date: UT No.: EA No.: Property Address: ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK

Office use only: Application Date: UT No.: EA No.: Property Address: ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK Office use only: Application Date: UT No.: EA No.: Development Title: Property Address: Application for ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK The following to be completed

More information

Initial Application Form for Connection of Distributed Generation (>10kW)

Initial Application Form for Connection of Distributed Generation (>10kW) Please complete the following information and forward to Vector Contact Details Primary Contact (who we should contact for additional information) Contact person Company name Contact numbers Daytime: Cell

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

2018 Design Competition Frequently Asked Questions. Q: Are teams allowed to register in more than one category of the competition?

2018 Design Competition Frequently Asked Questions. Q: Are teams allowed to register in more than one category of the competition? 2018 Design Competition Frequently Asked Questions Q: Are teams allowed to register in more than one category of the competition? Q: How many students can participate in a team? A: There is no max for

More information

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY WN U-60 Attachment C to Schedule 152, Page 1 SCHEDULE 152 APPLICATION FOR INTERCONNECTING A GENERATING FACILITY TIER 2 OR TIER 3 This Application is considered complete when it provides all applicable

More information

SECTION 5 TRANSFORMERS

SECTION 5 TRANSFORMERS SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established

More information

Greenlining and Bluelining of Ergon Energy Substation Drawings

Greenlining and Bluelining of Ergon Energy Substation Drawings Greenlining and Bluelining of Ergon Energy Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 General... 1 Requirements... 3 Testing

More information

GUIDE TO COMPLETING THE TIER 4 APPLICATION FORM (Applications made in the UK only)

GUIDE TO COMPLETING THE TIER 4 APPLICATION FORM (Applications made in the UK only) GUIDE TO COMPLETING THE TIER 4 APPLICATION FORM (Applications made in the UK only) Updated May 2018 This booklet should not be used as a stand-alone guide. Before beginning your visa application you must

More information

The Upgradabilty of Conventional Three Phase Delta/Star Networks

The Upgradabilty of Conventional Three Phase Delta/Star Networks The Upgradabilty of Conventional Three Phase Delta/Star Networks WHY NEW STANDARDS? CAPITAL COSTS Initial Final OPERATIONAL COSTS UPGRADABILITY SAFETY MAINTAINANCE CONVENTIONAL CONFIGURATION Electrification

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books.

NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books. City & Guilds Fundamental Inspection & Testing 30 Question Test Sheet (2392-10 Paper No1.) NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 February 2014 National Grid 2014 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means electronic,

More information

KENYA ELECTRICITY GENERATING COMPANY LTD

KENYA ELECTRICITY GENERATING COMPANY LTD KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD-014-2016 TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender

More information

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH SCHEDULE OF WORK Supply, Installation, Testing & Commissioning (SITC) of 33KV Electrical Substation for Multi Modal Logistics Hub at Visakhapatnam, Andhra Pradesh. Tender No. MMLH /HTELEC/PT /18 dated

More information

Calculating and compensating for power transformer and cable (or line) losses - standard methods

Calculating and compensating for power transformer and cable (or line) losses - standard methods Guidance Calculating and compensating for power transformer and cable (or line) losses - standard methods Foreword This guidance sets out basic standard methods for calculating electrical loss compensation

More information

OPERATIONAL ADVICE NOTICE (OAN) OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN with immediate effect.

OPERATIONAL ADVICE NOTICE (OAN) OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN with immediate effect. OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN 106-2018 with immediate effect. OAN REF:- 114/2018 DATE OF ISSUE:- 13/11/2018 EFFECTIVE DATE:- 13/11/2018 MANUAL REFERENCE(S):-

More information

Revision Control. 0 18/07/2012 Initial Document Creation. STAKEHOLDERS The following positions shall be consulted if an update or review is required:

Revision Control. 0 18/07/2012 Initial Document Creation. STAKEHOLDERS The following positions shall be consulted if an update or review is required: Standard: Technical Requirements for Bumpless Transfer of Customer Load between Embedded Generators and the Distribution Network Standard Number: HPC-9OJ-13-0001-2012 * Shall be the Process Owner and is

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

Transformer Trainer. Electrical Power Systems PSL20. Learning Outcomes. Key Features. Key Specifications

Transformer Trainer. Electrical Power Systems PSL20. Learning Outcomes. Key Features. Key Specifications Electrical Power Systems PSL2 Investigates the principles and operating characteristics of single-phase and three-phase power and distribution transformers Key Features Educational transformers with fully

More information

* _Ver.1* GP8 Radio CPL Radio DRIVER Energy manager

* _Ver.1* GP8 Radio CPL Radio DRIVER Energy manager GP8 Radio CPL Radio DRIVER Energy manager Delta Dore hereby declares that the equipment complies with the essential requirements and other relevant provisions of the R&TTE Directive 1999/5/EC The EC declaration

More information

INSTALLATION & PROGRAMMING MANUAL PROGRAMMABLE TIMER (MODEL LP-2)

INSTALLATION & PROGRAMMING MANUAL PROGRAMMABLE TIMER (MODEL LP-2) INSTALLATION & PROGRAMMING MANUAL PROGRAMMABLE TIMER (MODEL LP-2) Copyright Lencore Acoustics Corp. All rights reserved. April 2000 CONTENTS Introduction 3 Display 3 Keyboard 4 Installation 4 Set Up 4

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Experience with VQM in Italy

Experience with VQM in Italy Experience with VQM in Italy Ferruccio Villa AEEG Head of Electricity Quality of Supply fvilla@autorita.energia.it Michele de Nigris ERSE Director - Dpt T&D Technologies michele.denigris@erse-web.it EURELECTRIC

More information

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Issued by: Approved by: Engineering Department Energy+ Inc. September 2016 Shawn Jackson, P.Eng. Approval is given in accordance with

More information

AC/DC Clamp Meter. Owner's Manual. Model No Safety Operation Maintenance Español

AC/DC Clamp Meter. Owner's Manual. Model No Safety Operation Maintenance Español Owner's Manual AC/DC Clamp Meter Model No. 82369 CAUTION: Read, understand and follow Safety Rules and Operating Instructions in this manual before using this product. Safety Operation Maintenance Español

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

HV Substation Earthing Design for Mines

HV Substation Earthing Design for Mines International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 4, Issue 6 (October 2012), PP. 100-107 HV Substation Earthing Design for Mines M.

More information

FINAL - ET 60 - Electrician Theory Examination Marking Schedule

FINAL - ET 60 - Electrician Theory Examination Marking Schedule FINAL - ET 60 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions.

More information

Company Directive STANDARD TECHNIQUE: TP14C. Distribution Business Provided Metering Facilities

Company Directive STANDARD TECHNIQUE: TP14C. Distribution Business Provided Metering Facilities Company Directive STANDARD TECHNIQUE: TP14C Distribution Business Provided Metering Facilities Summary This standard technique document details the metering facilities to be provided by the distribution

More information

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer Anura Perera, Paul Keller System Operator - Eskom Transmission Introduction During the design phase of

More information

Company Directive STANDARD TECHNIQUE: SD5R/2. Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations

Company Directive STANDARD TECHNIQUE: SD5R/2. Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations Company Directive STANDARD TECHNIQUE: SD5R/2 Earth Fault oop Impedances and Phase to Neutral oop Impedances at V Installations NOTE: The current version of this document is stored in the WPD Corporate

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

NATIONAL RULES FOR ELECTRICAL INSTALLATIONS. Fourth Edition. Extracts from Amendment No.1: June 2011

NATIONAL RULES FOR ELECTRICAL INSTALLATIONS. Fourth Edition. Extracts from Amendment No.1: June 2011 NATIONAL RULES FOR ELECTRICAL INSTALLATIONS Fourth Edition ET 101:2008 Extracts from Amendment No.1:2011 22 June 2011 Page vi: Insert after 1 st Paragraph: Section 710: Medical Locations was prepared by