1 Electricity Thank you for considering Western Power Distribution for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application to be processed easily. Section A Your details Please complete this section with your contact details as well as the site where the electricity connection is to take place. Please advise us of the builder/developer s details if you are applying on their behalf. Section B Number and type of connections required Please complete this section stating your connection requirements and if the application is for a Budget Estimate or firm Connection Offer. A Budget Estimate will be non-binding and for indicative costs only. A Connection Offer will set out detailed terms and conditions and once accepted will be binding on both parties. Section C Load requirements If you are connecting any motors or welders, please let us know about them. Please tell us the following: Motors Type, 1 or 3 phase, Rating kw/hp, DOL/Star Delta, Starting current, Starts per hour. Welders Input voltage, Rating, Phases, Welds per minute. The manufacturer or equipment installer should be able to help you with this. Off-peak means the heating that can only operate during a pre-arranged time (usually 7 hours) in the range of hours 23:00 07:00 and is usually controlled by the Meter Operator s time-switch. Section D - Generation Please tell us if there will be any on-site generation. Please note that if you require a Connection Offer we will require further technical information. Information and forms to download are available on our website at Section E Protective multiple earthing (PME) To find out if we can provide you with a PME, please advise us if the site consists of metal framed buildings. Section F Site conditions It is a requirement of the Compliance with the Construction (Design & Management) Regulations 2007 that a proper assessment is made of the risks on site. Please complete this section to help us process your application efficiently, in a way appropriate to the environmental and practical considerations on and around the site. Section G Additional information Please provide any additional information that may be relevant to your application. Section H Signature Please ensure you sign and date this form on page 4, and enclose one copy of the Location and Site Layout Plan. Guidance is given on pages 5-6. Important To prevent your application from being delayed, please ensure you have enclosed all the required information. Did you know? You can get a competitive quote from an Independent Connections Provider (ICP) for your electricity connection. We can provide you with a complete connection service but you may also ask an ICP or Independent Distribution Network Operator (IDNO) to undertake some of the works (known as the contestable works ). Find out more 1/6
2 Section A - Your details Address for correspondence Title, initials and surname Company name Building name/number Street Town Site address (where connection(s) required) Customer name Site name/plot numbers Street Town City City Postcode Postcode Contact details Please provide details of whom we should contact in the event of any queries Name Fax Telephone Mobile Section B Number and type of connections required Total number of dwellings requiring connection/increased supply. Connection requirements. New Increased load Decreased load Do you require a temporary supply? Yes No If temporary, duration required (months). If temporary, maximum power required in kva. Do you require an indicative Budget Estimate or a firm Connection Offer? Budget Estimate Connection Offer We will normally provide a Connection Offer that sets out the charge for WPD undertaking all of the connection works. If you prefer we can provide a Connection Offer for WPD undertaking only the non-contestable connection works, so that an ICP or IDNO can be appointed to undertake the design and construction of the contestable works. Do you require WPD to provide a Connection Offer for undertaking all work or an offer for non-contestable works only (POC)? All Works POC only 2/6
3 Section C Load requirements The normal maximum capacity for individual domestic properties is 15kW. If you require a greater capacity, please enter the capacity here: Date connection required: (We will do our best to meet your connection requirements but cannot guarantee to make this date. If you accept our Connection Offer we will agree a date to make the connection.) Disturbing loads If you are connecting any electrical equipment which may cause a disturbance on the electricity system (e.g. motors, welders), please provide us with details. The notes at the front of this form will advise you on what we need to know. Details of electrical loading Please choose your space heating type: Gas Electric (Storage and Direct) For electric storage heating total off peak load per property is For electric direct heating total load per property is kw kw kw D M Y Electric boiler Other Ground source heat pumps If other, please specify Note: For electric boilers and heat pumps, please provide the manufacturer s specification sheet. Please choose your water heating type: Gas Electric (Storage and Direct) Electric boiler Other Ground source heat pumps If other, please specify Please provide any further information in Section G Additional Information on page 4. Section D Generation Will there be any on-site electricity generation? Yes No Will generators be capable of operating in parallel with WPD s system? Yes No Please visit our website for information on connecting electricity generation. Section E Protective multiple earthing (PME) PME is normally provided for each supply. However, some methods of building, in particular multioccupancy steel framed buildings, do not allow this means of earthing. In such cases alternative earthing solutions can be provided by your electrical contractor. Is your building steel framed and subdivided into units? Yes No Section F Site conditions 3/6 Are there any site conditions that you need to make us aware of (for example potential hazards such as asbestos, air pollution, ground contamination). If so, please include in the Additional information section. We may ask you for more information.
4 Section G Additional information Boundary Plan request Please provide a plan clearly showing the ownership and boundaries of your site. Where appropriate, we will design a cable route that is within the boundary of your land, avoiding the need for third party agreement. This can reduce legal costs and lead times required to complete the work. This information may be available from: The Land Registry your planning application your property deeds hand drawings on an existing plan. Note: This is the preferred option, but if a Boundary plan is not available, we ll accept the boundary being marked on the Location Plan instead. Please make sure the detail is accurate, so we can avoid delays later. Section H Signature Signature of applicant Date Print name Position in company Under section 16(1) of the 1989 Electricity Act, we are obliged to provide a Connection Offer to any person entitled to apply for a new, increased or reduced connection to our Distribution System. Applications for a connection to our Distribution System can either be made by the owner or occupier of the premises, or by an approved contractor, supplier or agent, acting with the consent of the owner or occupier. Our response time to any person seeking a new, increased or reduced capacity connection will be in accordance with our Licence, and the Electricity (Connection Standards of Performance) Regulations 2010 or, where we are providing only non-contestable services, Licence Condition 15. It will be no later than 3 months after the application date, except in cases where a longer period has been agreed with the applicant. Our Connection Charges Statement provides information on the typical costs involved in providing a connection and information on the standards of service to the provision of a connection. Further details about the Statement of Charges can be obtained at 4/6
5 Procedure for the submission of site plans for a new connection enquiry Introduction In order to provide a connection offer, we require one copy of the Location Plan and one copy of the Site Layout Plan, together with your. The Location Plan shows where to find the proposed site for the new connection. The Site Layout Plan provides further details on how the site is laid out and includes dimensions of the new connection. Location Plan 1 All applications should have one Location Plan enclosed. You must highlight the site location on the plan. 2 Location Plans can be obtained by using A-Z street maps or via the internet, which is now available at most public libraries. The following internet sites offer instant Location Plans: multimap.com ordsvy.gov.uk Diagram 1 - Example of a Location Plan 5/6
6 Procedure for the submission of the site plans for a new connection enquiry Site Layout Plan 1 In the absence of an architect s drawing, all applications need to have two Site Layout Plans enclosed. You must draw all proposed buildings and accesses onto the site plan showing accurate measurements. 2 The full site address and proposed meter position should be marked onto the plan with an X (see across for guidelines on meter positions). 3 The size of the new building should be shown on the plan as well as its position onsite in relation to existing features of the site plan using measurements. 4 Measurements should be taken and drawn on the plan to show the position and size of the new building to the nearest 0.1m. 5 Measurements should be taken from permanent features on-site eg existing buildings, boundaries, footpaths and kerb lines. Measurements should be legible and easy to read. 6 Any existing buildings to be demolished should also be marked on the plan. 7 Please include the site boundary. 8 Please mark any access roads and temporary accesses to the site. Please do not take measurements from doorways, gate posts, bay windows, temporary posts and garden gateways or street furniture eg lamps, signs and bollards. 3 Show the size and position of the new building 4 Measurements taken should be to the nearest 0.1m NEW HOUSE X Meter position New and re-serviced domestic housing services and commercial supplies (up to 100 Amps) should be installed in outdoor meter boxes. These should be mounted onto an external wall on the front or side elevation of the property in front of any fence or gates to allow unrestricted public access. They should be fitted at a minimum height of 400mm and a maximum height of 1,000mm from ground level to the bottom of the box. Properties converted into flats must have either external meter boxes where practcable or internal at a common area adjacent to the front door. The following meter positions are not permitted: at the rear of the property at the side of the property behind fences or gates facing or opening directly onto public footpaths or into alleyways or entries within a coal dustbin, refuse store, garage or porch under windows, unless minimum installation height can be achieved. Note: any proposal of indoor meter positions will only be accepted where the developer can demonstrate that the Local Planning Authority will not permit an outdoor meter box by virtue of the building being listed, in a conservation area, or for a commercial supply where a meter box is not feasible eg shop frontage. 1 Proposed buildings and their access must be shown on site layout (East ) plc Registered in England and Wales No (West ) plc Registered in England and Wales No () plc Registered in England and Wales No () plc Registered in England and Wales No Registered Office: Avonbank, Feeder Road, Bristol BS2 0TB 7 Mark the site boundary 5 Measurements to be taken from permanent features on site 2 Show the site address and meter position 8 Show the access roads and temporary accesses PROPOSED NEW PROPERTY 26 CHURCH STREET ANYTOWN TO BE DEMOLISHED 6 Show any existing buildings that are to be demolished X - METER POSITION Diagram 2 - Example of a Site Layout Plan 6/6 Note: Site Layout Plans can be obtained from Local Council offices, high street map shops and Ordnance Survey stockists. There is a charge for this service. Site plans are at a scale of 1:1250 or 1:500 and show the existing geographical area.
Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance
Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are
More informationCompany Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis
Company Directive STANDARD TECHNIQUE: SD5F Relating to connecting multiple small low voltage connections with limited network analysis Policy Summary This document specifies the procedure for connecting
More informationPlanning Department APPLICANT S CHECKLIST
Planning Department A GUIDE TO LODGING PLANNING APPLICATIONS APPLICANT S CHECKLIST You are advised to complete and submit this checklist in conjunction with your planning application form. It is important
More informationyour home What do you need to do? What s the cost*? nienetworks.co.uk Connecting your home Complete an application
DOMESTIC CONNECTION your home What do you need to do? Complete an application Complete your application and attach your plans listed in the checklist below (You can tear off and retain the guidance pages
More informationAPPENDIX A See rule 3(1) þþ APPLICATION UNDER SECTION 217-C OF THE TAMIL NADU DISTRICT MUNICIPALITIES ACT 1920 TAMIL NADU ACT V OF 1920.
APPENDIX A See rule 3(1) þþ APPLICATION UNDER SECTION 217-C OF THE TAMIL NADU DISTRICT MUNICIPALITIES ACT 1920 TAMIL NADU ACT V OF 1920. From To Sir I intend to construct/reconstruct a building or to put
More informationLast Name: First Name: M.I:
ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)
More informationJune 2014 For any information or queries relating to fundraising for headspace, please contact:
Fundraising Guidelines NSW June 2014 For any information or queries relating to fundraising for headspace, please contact: headspace Terms and Conditions for Collection in New South Wales Dear Supporter,
More informationJune 2014 For any information or queries relating to fundraising for headspace, please contact:
Fundraising Guidelines QLD June 2014 For any information or queries relating to fundraising for headspace, please contact: headspace Terms and Conditions for Conducting a Fundraising Event in Queensland
More informationELECTRIC NETWORK DESIGN APPROVAL APPLICATION
Please complete all sections of the application form and return to newconnections@ukpowerdistribution.co.uk Section 1 Site Details UKPD Reference Number: Energisation Date: Site Name/Address/Postcode:
More informationA Householder s Planning Guide for the Installation of Antennas, including Satellite Dishes
A Householder s Planning Guide for the Installation of Antennas, including Satellite Dishes Introduction This booklet is an outline of the planning regulations for antennas in England, and includes the
More informationLodgement checklist: water heater (solar or heat pump)
Lodgement checklist: water heater (solar or heat pump) GUIDANCE INFORMATION Please provide this checklist with your application Documentation must cover all aspects identified in this lodgement checklist.
More informationTHIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2)
THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2) Building Control Acts 1990 and 2007 Application for a Revised Disability Access Certificate Building Control
More informationExample Plans: Business Signs (Not For Construction)
Plans: Business s Site Plan 220 10 utility easement 120 40 50 Proposed Awning Proposed Freestanding 40 79 20 Street Name Proposed Wall C L N 123 Historic Way Indianapolis, IN 46000 Basic Elements of a
More informationPROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA
PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval
More informationCompany Directive STANDARD TECHNIQUE: SD5R/2. Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations
Company Directive STANDARD TECHNIQUE: SD5R/2 Earth Fault oop Impedances and Phase to Neutral oop Impedances at V Installations NOTE: The current version of this document is stored in the WPD Corporate
More informationCity of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:
City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS
More informationFor Office Use: Filing Date: Case Number: Zoning District: LIST ALL ADDRESSES INVOLVED IN YOUR PROJECT:
City of Syracuse Zoning Administration Application for CHANGE OF OCCUPANCY Review by the Planning Commission City Hall Commons * Room 101 * 201 E. Washington Street * Syracuse, NY 13202-1426 * 315-448-8640
More informationINCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $
CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Port Orchard, WA 98366 (360) 874-5533 permitcenter@cityofportorchard.us COMMERCIAL or MULTI-FAMILY
More informationSITE PLAN REVIEW GUIDELINES Rev. 2016
SITE PLAN REVIEW GUIDELINES Rev. 2016 The Site Plan Review process mandates that all information required in the Zoning Resolution and on the checklist be submitted and/or indicated on the site plan before
More informationResidential Plot Plans
Residential Plot Plans Planning & Development Services/Building Safety Division 1 Riverfront Plaza Ste. 110 Lawrence, KS 66044 (785)832-7700 Fax (785)832-3110 Email: buildinginspections@lawrenceks.org
More informationAPPLICATION FOR THE APPROVAL OF BUILDING PLANS (Complete in black ink)
APPLICATION FOR THE APPROVAL OF BUILDING PLANS (Complete in black ink) APPLICATION : OFFICE: PROPERTY PORTION TOWNSHIP ERF EXTENSION TYPE OF WORK TO BE EXECUTED TYPE OF BUILDING New Re-Roofing Preliminary
More informationGuidance for UK Fire and Rescue Services. Dealing with incidents on or near National Grid high voltage overhead lines
Guidance for UK Fire and Rescue Services Dealing with incidents on or near National Grid high voltage overhead lines This document offers guidance to the UK s Fire and Rescue Services for dealing with
More informationThe standards you can expect. The level of service that we provide and what you're entitled to if we don't.
The standards you can expect The level of service that we provide and what you're entitled to if we don't. Contents Standards that apply to Domestic Customers... 3 Standards that apply to Micro-Business
More informationDETERMINATION OF POPULATION REGULATION
Province of Alberta MUNICIPAL GOVERNMENT ACT DETERMINATION OF POPULATION REGULATION Alberta Regulation 63/2001 With amendments up to and including Alberta Regulation 198/2017 Office Consolidation Published
More informationREPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY (COUNCILLOR RAMESH PATEL)
CITY OF CARDIFF COUNCIL CYNGOR DINAS CAERDYDD CABINET MEETING: 14 JULY 2016 CARDIFF STATUE AND MONUMENT PROTOCOL REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY
More informationHAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review
HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationHarwell Cemetery Regulations
Harwell Cemetery Regulations REGULATIONS FOR THE MANAGEMENT OF HARWELL PARISH CEMETERY The Council adopted these Regulations by resolution at its meeting on 10 th July 2012 under the powers conferred by
More informationApplication Form for a GNSS Repeater Licence
Ofcom application form OfW523 Application Form for a GNSS Repeater Licence Page 1 of 8 www.ofcom.org.uk 1. Before filling out this form, please read these notes. If you are unsure how to complete any part
More informationEDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS
ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of
More informationClear Creek County Site Development
Clear Creek County Annex Community Development Clear Creek County Site Development The Clear Creek Board of County Commissioners has adopted design standards for the construction of driveways. These design
More informationTS RES - OUTSTANDING ISSUES
TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next
More informationEDS LV ELECTRICAL SERVICE DRAWINGS
Document Number: EDS 08-2110 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2110 LV ELECTRICAL SERVICE DRAWINGS EPN, LPN, SPN This standard details the drawings for service positions and connection
More informationMinor Site Plan Review Process
Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice
More informationPermit Application. General Information
Town of Permit Application Application Date: / /20 Permit Type Requested: [ ] New Construction [ ] Expansion [ ] Accessory Building [ ] Reconstruction [ ] Earth Moving [ ] Dock/Deck [ ] Fence [ ] Foundation
More informationService Altera on Guide to applying online for a Quota on
If you need any more help to complete this enquiry, please contact us: getconnected@northernpowergrid.com 0845 070 2703 Opening hours: Monday Friday 8:00am 8:00pm Saturday 9:00am 5:00pm Before you start
More informationMailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:
/ Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax
More informationTown of Skowhegan Application For Development Review
Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:
More informationG81 PART 1 FRAMEWORK APPENDIX
G81 PART 1 FRAMEWORK APPENDIX Housing Development design framework appendix to be read in conjunction with the latest version of: ENA Engineering Recommendation G81 Part 1 Framework for design and planning,
More informationAPPLICATION FOR SITE PLAN REVIEW
APPLICATION FOR SITE PLAN REVIEW ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fees (Nonrefundable) $ Arch.: $ (772) 871-5212 FAX: (772) 871-5124
More informationREQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)
REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation) The following materals shall be submitted and reviewed
More informationProcedure to Petition for Plat Review and Site Plan Review
Economic Development Department (734) 676-7104 or (734) 676-7109 Procedure to Petition for Plat Review and Site Plan Review All site plans shall be submitted to the Economic Development Department to be
More informationEstimated Cost of Project Contractor License No. Contractor Qualifier No.
Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your
More informationNon-Police Personnel Vetting - (NPPV) Basic
RESTRICTED - STAFF (WHEN COMPLETE) FORCE VETTING UNIT Non-Police Personnel Vetting - (NPPV) Basic Form No.: 330(g) Rev. 02/2014 White Please complete ALL of the following questionnaire IN FULL. We have
More informationSPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS
Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized
More informationBERKELEY COUNTY ENGINEERING AND
BERKELEY COUNTY ENGINEERING AND BUILDING INSPECTIONS 400 West Stephen Street - Suite 202, Martinsburg, WV 25401-3838 Telephone: 304-264-1966, Fax: 304-262-3128 Web Page: www.berkeleywv.org I. WHAT ARE
More informationRANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile
1 RANDY SCHMELING INSPECTIONS 10884 HARDER ROAD THREE RIVERS, MI 49093 Home 269-244-5184 Mobile 269-625-3260 Before a permit may be issued, ALL of the following documentation must be submitted or justified
More informationNational Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy
National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out
More informationWESTERN POWER DISTRIBUTION
WESTERN POWER DISTRIBUTION Framework Document on cable recording techniques to be read in conjunction with other Western Power Distribution Framework Document Appendices relating to Housing and to Industrial
More informationMussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:
135 N. Main, P.O. Box 118 Capac, MI 48014 Phone: 810-395-4915 Fax: 810-395-7182 www.musseytownship.org Building Administrator: Cindy Zehnder Mussey Township: 810-395-4915 Building Inspector: James Newberry
More informationDOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION
This application, including the Conceptual Review Presentation, must be completed and submitted to the Downtown Development Review Board (DDRB) Staff twenty (20) business days prior to the upcoming DDRB
More informationNEW SINGLE FAMILY HOMES
NEW SINGLE FAMILY HOMES Your submission must include the following to be accepted as a complete application: 1 copy of the deed and / or purchase and sales agreement if you have owned the property less
More informationTOWN OF NORTH BRANFORD
TOWN OF NORTH BRANFORD Town Hall 909 Foxon Road P.O. Box 287 North Branford, Connecticut 06471 Planning & Zoning (203) 484-6010 Building Department (203) 484-6008 Department Fax (203) 484-6018 INSTRUCTIONS
More informationBusiness radio light licence application form OfW432
Business radio light licence application form OfW432 For a quicker service you can make changes directly online at https://ofcom.force.com/licensingcomlogin. Registering is easy and we have published guidance
More informationRemotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application
General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application
More informationTenant Sign Criteria. Guidelines. Requirements. Braelinn Village, Peachtree City
Guidelines Requirements The purpose of sign criteria is to establish certain parameters for sign design, locations, materials, size, construction and installation. As a quality development within Peachtree
More informationYOU ARE ADVISED TO SUBMIT THIS CHECKLIST IN CONJUNCTION WITH YOUR PLANNING APPLICATION
A Guide To Lodging Planning Applications Applicant s Checklist YOU ARE ADVISED TO SUBMIT THIS CHECKLIST IN CONJUNCTION WITH YOUR PLANNING APPLICATION It is important to note that this is for information
More informationRequest for Modification Review Information DO NOT COMMENCE ANY WORK PRIOR TO WRITTEN APPROVAL BY THE BOARD IF DIRECTORS
Helpful Hints Request for Modification Review Information DO NOT COMMENCE ANY WORK PRIOR TO WRITTEN APPROVAL BY THE BOARD IF DIRECTORS Please review instructions carefully. Send complete packages only.
More informationLAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha
LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha OPPORTUNITY TO ACQUIRE AN IMMEDIATE RESIDENTIAL DEVELOPMENT SITE BY INFORMAL TENDER. DEADLINE 12 NOON TUESDAY 16 th FEBRUARY 2016. LONG BUCKBY CONSENTED
More informationCITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS
DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public
More informationCity of Thousand Oaks
TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity
More informationTemporary Sign Permit
36725 Division Road, P.O. Box 457, Richmond, MI 48062 Building and Planning Department 586-727-7571 ext. 228 586-727-2489 Fax Temporary Sign Permit Application and Regulations Page 1 Updated: 15OCT15 Temporary
More informationA guidance note on the national standards for the validation and determination of planning applications and other related consents in Scotland
HO OS Heads of lanning Scotland A guidance note on the national standards for the validation and determination of planning applications and other related consents in Scotland Reviewed by Contents 1. Background
More informationACCESS TO HIGH VOLTAGE APPARATUS
CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved
More informationINFORMATION FOR OBTAINING A BUILDING PERMIT
INFORMATION FOR OBTAINING A BUILDING PERMIT To apply for a building permit, you must be a licensed contractor or the legal property owner. (Commercial permits can only be obtained by a licensed Contractor).
More informationCITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS
DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical
More informationSUBDIVISION PLAT APPLICATION
SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................
More informationRESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST
RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;
More informationWhite Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)
White Lake Township Building Dept. 7525 Highland Rd. (248) 698-3300 SUBMITTAL REQUIREMENTS FOR SINGLE FAMILY HOMES, ADDITIONS, GARAGES AND RENOVATIONS --NEW-- Package for new residences must include $
More informationConceptual, Preliminary and Final Site Plan Review in Holladay City
Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made
More informationSUBMIT YOUR PIC APPLICATION:
INTRODUCTION TO PROPERTY IMPROVEMENT COMMITTEE ( PIC ) APPLICATION FOR REDMOND RIDGE EAST HOMEOWNERS ASSSOCIATION Welcome to the Property Improvement Committee (PIC) Application process. The PIC must approve
More informationPlanning and Zoning Application & Checklist
City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW
More informationOVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION
OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION Application information below to be completed by Applicant/Agent//Owner APN PROPERTY ADDRESS PROPERTY LOCATION (if no address) APPLICANT S NAME
More informationRequest for Proposals: Beacon Hill Pump House Mural Project
Request for Proposals: This is an open call to Canada-based artists issued by the Regional Municipality of Wood Buffalo, for a temporary public mural project in Fort McMurray. This project is part of a
More informationC I T Y O F M c K I N N E Y PLANNING
C I T Y O F M c K I N N E Y PLANNING 221 N. TENNESSEE STR EE T, McKI NNEY, TEXA S 75069 CONTENTS Approval Process Flowchart FAQs Letter of Intent Requirements Façade Plan Submittal Checklist Non-Residential
More informationCITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS
CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS Development Services Department Building Division 500 East Third Street, Suite 110 Loveland, CO 80537 (970) 962-2505 FAX (970)
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationCompany Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes
Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation
More informationSite Plans. City of Hopkins Inspections Division st Street South, Hopkins, MN Fax
Site Plans A Guide To Requirements & Example Plans City of Hopkins Inspections Division 1010 1st Street South, Hopkins, MN 55343 952.548.6320 952.935.1834 Fax www.hopkinsmn.com Notice: This handout is
More informationCommunity & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS
Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project
More informationArchitectural Review Application
Architectural Review Application City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 Tel. (310) 285 1141 Fax. (310) 858 5966 Architectural Review Overview: The Architectural
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationSMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)
REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X
More informationSection 1.0: Introduction. Section 3.0: Planning. Section 4.0: Power Quality. Manual 0295 Supply & Planning Manual Updated: 01/08/2017
SUPPLY & PLANNING MANUAL TABLE OF CONTENTS Section 1.0: Introduction Section 2.0: Supply Section 3.0: Planning Section 4.0: Power Quality Energex 2017 Page: 1 of 223 TABLE OF CONTENTS 1 INTRODUCTION...
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More informationDeveloper Services. Developers Guide to the Adoption and Vesting of a Development Site. November 2017
Developer Services Developers Guide to the Adoption and Vesting of a Development Site November 2017 Yorkshire Water Developer Services 1 Developers Guide to the Adoption and Vesting of a Development Site
More informationProcedure for Obtaining Design Review Committee Approval
Procedure for Obtaining Design Review Committee Approval The Declarations, Restrictions & Covenants of Hallbrook require that approval of the HOA DRC Committee must be obtained prior to commencing certain
More informationNSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy
Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid
More informationTelecommunication Application Form
Page 1 of 5 Fees Total Fee $1130.00 Processing Fee $330.00 *Advertising Deposit $800.00 *Where costs differ from the deposit, the balance will be charged or refunded to the applicant. Description of proposed
More informationRELEVANT ELECTRICAL STANDARDS
RELEVANT ELECTRICAL STANDARDS Issue 2 October 2014 Issue 2 September 2014 National Grid 2014 2014 Copyright owned by National Grid Electricity Transmission plc, all rights reserved. No part of this publication
More informationOAK RUN BUILDING PERMIT
OAK RUN BUILDING PERMIT (DOCK APPLICATION) ALL PERMIT APPLICATIONS MUST BE SUBMITTED AT THE POA OFFICE A MINIMUM OF 48 HOURS BEFORE THE SCHEDULED MEETING. ALL INFORMATION MUST BE SUPPLIED AND HAVE PROPER
More informationHartwell Lake Application for Dry Dredging
Hartwell Lake Application for Dry Dredging Applicant: Mailing Address: E-Mail Address: Day Time Phone Number/s: Dredging Site Address: Subdivision: Lot #: Shoreline Use Permit #: Next Upstream Permit #,
More informationSIGN PERMIT APPLICATION
SIGN PERMIT APPLICATION City of Hawaiian Gardens Community Development Department 21815 Pioneer Boulevard, Hawaiian Gardens, CA 90716 Ph: (562) 420-2641 Fax: (562) 420-8521 www.hgcity.org Please complete
More informationCity of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT
City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,
More informationCITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION
CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com
More information2014 NEC Changes Part 1
www.garyklinka.com Page 1 of 8 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationCHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.
CHECK LIST MOBILEHOME PERMANENT FOUNDATION BUILDING PERMIT SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 BUSINESS PHONE: (209) 468-3121 INSPECTION REQUEST-24
More informationEE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17
Office of Communications (Ofcom) Wireless Telegraphy Act 2006 EE Limited - Public Wireless Network Licence PUBLIC WIRELESS NETWORK LICENCE This Licence document replaces the version of the Licence issued
More informationSVRA ARCHITECTURAL PERMIT
SVRA ARCHITECTURAL PERMIT NEW HOME, REMODEL, & LANDSCAPING Documents provided by SVRA: Improvement Request Form Materials Description/Certification and Agreement of Owner Sample Plot Plan Current SVRA