1 KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender for rehabilitation of protection equipment for Masinga hydro power station, KenGen hereby issues Addendum No. 1 Amended Clauses The clauses listed have been amended to read as written in the amended article column CLAUSE TENDER ARTICLE NO. INVITATION FOR TENDERS: Tenders will be opened in the presence of tenderer s representatives who choose to attend on 8th July 2016 at a.m. at Stima Plaza III, Executive Committee Room, 7 th Floor. AMENDED ARTICLE Tenders will be opened in the presence of tenderer s representatives who choose to attend on 22 nd July 2016 at a.m. at Stima Plaza III, Executive Committee Room, 7 th Floor. SECTION V: SPECIFICATIONS 2.1 STANDARDS The bidder shall submit copies of the relevant standards applicable to the offered equipment. 4.2 SCOPE OF WORKS delete clause of specifications Page 1 of 8
2 Supply, installation and testing of Generator power transducer with 1A CT & 110V VT inputs and 4-20mA outputs for generator active power and generator reactive power one for each unit. Any other works and supply which are not specified above but are necessary to complete the job shall be the responsibility of the contractor. The contractor shall itemize these equipment and services in the offer 4.4 DESCRIPTION OF THE REQUIRED PROTECTION SYSTEM (g) Panel 7 will host alternative supply transformer protection set, emergency diesel generator protection set and bus section protection set. (h) Panel 8 will host SCADA interface equipment Panels and wiring The existing panels dimensions are: (a) Generator Transformer protection panels Height = 2300mm, Length = 610mm, Width = 620mm. (b) Generator protection panels Height = 2300mm, Length = 910mm, Width = 620mm. (c) Interposing CT s panel Height = 2300mm, Length = 910mm, Width = 620mm. Supply, installation and testing of two Generator power transducers one for each unit with three phase 1A CTs & 110V VT inputs and 4 (four) 4-20mA outputs for: generator active power, generator reactive power, generator current and generator voltage. Transducers to be installed in the generator protection panels. One spare transducer shall be supplied for each transducer installed. Any other services or requirements not mentioned or included in this tender but are critical for the completion of the contract shall be itemized by the bidder in the offer. (g) Panel 7 will host alternative supply transformer protection set, emergency diesel generator protection set and LV bus bar protection set. (h) Panel 8 will host SCADA interface equipment and GPS receiver clock system Panel dimensions are per drawing S5256L329. Bidders should note that the Kamburu feeder protection panel shall remain in its current position and it s not part of this tender scope. The bidder/contractor shall design the new panels to ensure that panels for unit 1 protection are on the right side of Kamburu feeder panel and unit 2 protection panels are on the left side of Kamburu feeder panel as shown on the drawing. Common panels can be on either side of Kamburu feeder panel. Common panels are the ones hosting alt Page 2 of 8
3 (d) Local supply transformers protection panel Height = 2300mm, Length = 910mm, Width = 620mm. transformer, EDG and bus bar protection and SCADA interface equipment Generator Transformer Protection Numerical Relays Specifications At least 20 Binary inputs, 20 Binary Outputs, 1 life contact (watchdog) The number of inputs and outputs shall be flexible and adaptable in a modular system. The relays shall have at least: 12 current inputs, 4 voltage inputs, 20 Binary inputs, 20 Binary Outputs and 1 life contact (watchdog), At least 12 current inputs, 4 voltage inputs. Voltage transformer inputs shall be rated at nominal voltage of 110VAC Station Load supplies & LV bus bar Protection Numerical Relays Specifications Numerical relays shall be supplied for metering and protection of station low voltage loads supplies which are station transformer 1&2, alternative supply transformer and emergency diesel generator. These supplies are connected to two bus sections which supply the station; two numerical relays shall be used to protect these bus sections also At least 20 Binary inputs, 16 Binary Outputs, 1 life contact (watchdog) Numerical relays shall be supplied for metering and protection of station low voltage loads supplies which are station transformer 1&2, alternative supply transformer and emergency diesel generator. These supplies are connected to two bus sections which supply the station; a numerical relay shall be used to protect these two bus sections also. The number of inputs and outputs shall be flexible and adaptable in a modular system. The relays shall have at least: 8 current inputs, 4 voltage inputs, 20 Binary inputs, 16 Binary Outputs and 1 life contact (watchdog), Page 3 of 8
4 At least 4 current inputs, 4 voltage inputs Generator Protection Schemes: Generator Transformer Protection Schemes: Dual protection functions shall be provided. There shall be two independent protection sets set A and set B for each generator transformer. Each set shall comprise of a numerical protection relay; a lockout relay; two circuit breaker trip coil supervision relays and auxiliary input/output relays Station Transformer Protection Schemes: Voltage transformer inputs shall be rated at nominal voltage of 400/415 VAC. If the relay shall be rated for any other input voltage then instrument transformers shall be supplied and installed in the protection panels to convert the available 415VAC instrument voltage supply to the relay rated voltage input. Dual protection functions shall be provided. There shall be two independent protection sets set A and set B for each generator transformer. Each set shall comprise of a numerical protection relay; two lockout relays; two circuit breaker trip coil supervision relays and auxiliary input/output relays The contractor shall study the existing protection scheme, station transformers and associated equipment data and come up with a comprehensive protection scheme Alternative Supply Transformer Protection Scheme Numerical protection relay with the following metering values on transformer HV side: RMS current, I; RMS voltage, U; Active power, p/p; Reactive power, Q/-Q; Apparent power, S; Energy, KWH (four quadrants) and frequency. Transmittal of this values to SCADA shall be configured via communication interface. Display of these metering values on the relay LCD shall be configured for easy viewing of values Emergency Diesel Generator (EDG) Protection Scheme The contractor shall study the existing protection scheme, station transformers and associated equipment data and come up with a comprehensive protection scheme. All existing protection functions shall be implemented in the new scheme. Numerical protection relay with the following metering values on transformer LV side: RMS current, I; RMS voltage, U; Active power, p/p; Reactive power, Q/-Q; Apparent power, S; Energy, KWH (four quadrants) and frequency. Transmittal of this values to SCADA shall be configured via communication interface. Display of these metering values on the relay LCD shall be configured for easy viewing of values Page 4 of 8
5 Field inputs to the protection system shall be wired to auxiliary relays which will do contact multiplication for input to the two numerical relays. The auxiliary relays shall be compliant with specifications given in section Field inputs to the protection system shall be wired to auxiliary relays which will do contact multiplication for input to the numerical relay and common PLC. The auxiliary relays shall be compliant with specifications given in section Page 5 of 8
6 1 New clauses: Insert the clauses below Panels and wiring approximate cable route distances from the protection relay panels to all other devices are as per table below. The approximate distances are along the cable routes (cable trays, trench and conduits). The tenderer shall be required to carry out a detailed study of existing cable routing during the preliminary site visit and get accurate details. Location Equipment of interest at the Location Approximate cable route distance 1 Battery room 110V DC distribution board 25m 2 Low voltage Switch board 3 Unit 1 Generator circuit breaker & Station transformer 11KV CB room 4 Unit1 Main transformer 5 Unit 1 Generator pit (Gen Neutral ) 6 Unit 1 excitation panels 7 unit 2 Generator circuit breaker & Station transformer 11KV CB 8 Unit 2 Main transformer 9 unit 2 Generator pit (Gen Neutral) All station loads incomers. The CT's, 415 VAC instrument voltage supply (no VT's) and ACB's are in this locale. Incomers are: EDG, station transformers and alternative supply transformers. Bus coupler ACB and LV bus bar protection CT's are in this location unit 1 generator circuit breaker, Station transformer 1 11KV CB, Station 1 transformer 11KV side CT's, Generator transformer 1 LV side (running/grid) VT s, Generator 1 bus bar side CT's Generator transformer 1 HV side CT's and Generator transformer 1 temperature, bucholz and other monitoring devices Generator 1 neutral side CT's, and generator earthing transformer Generator 1 VT's, unit 1 Field circuit breaker, excitation controller (AVR) and new unit 1 excitation transformer HV side CT's. unit 2 generator circuit breaker, Station 2 transformer 11KV CB, Station 2 transformer 11KV side CT's, Generator transformer 2 LV side (running/grid) VT s, Generator 2 bus bar side CT's Generator transformer 2 HV side CT's and Generator transformer 2 temperature, bucholz and other monitoring devices Generator 2 neutral side CT's, and generator earthing transformer 35m 60m 100m 60m 40m 50m 100m 70m Page 6 of 8
7 10 unit 2 excitation panels Generator 2 VT's, unit 2 Field circuit breaker, excitation controller (AVR) and new unit 2 excitation transformer HV side CT's. 35m 11 Diesel generator Diesel generator monitoring and control auxiliary contacts (relays) 35m 12 Station transformer 1 13 Station transformer 2 Station transformer 1 on load tap changer and its control devices and station transformer 1 temperature, bucholz and other monitoring devices Station transformer 2 on load tap changer and its control devices and station transformer 2 temperature, bucholz and other monitoring devices KV isolators (switch yard) 132 KV isolators status auxiliary contacts 90m 132KV Line breakers (switch KV Line breakers coils and contacts 75m yard) 16 Alternative supply 33KV circuit breaker (switchyard) Alternative supply 33KV circuit breaker,alt supply transformer HV side CT's, 33KV line earthing switch, 33KV line isolator, Alt supply transformer monitoring devices 17 Unit 1 Control panels unit 1 PLC & unit 1 manual control system 40m 18 Unit 2 Control panels unit 2 PLC & unit 2 manual control system 35m 65m 55m 75m 19 Control room KenGen SCADA server, common PLC, station switchgear control mimic board, existing station transformer tap changer controls, metering panels and the proposed new DC distribution board 10m Generator Protection Schemes: New dry type CT's (1-2 cores) shall be supplied and installed on the 11kV side in the Excitation transformer panel. The current transformers shall be resin encapsulated and comply with IEC One spare CT of similar rating shall be supplied. Shall be rated as follows: (i) Insulation 12 KV, (ii) Ratio: 50/1A (or other suitable ratio for 280KVA, 11KV excitation transformer), (iii) Class: 5P20, (iv) Burden: 15VA or higher depending on relay burden. Page 7 of 8
8 All other terms and conditions remain unchanged ACKOWLEDGEMENT OF ADDENDUM NO. 1 We, the undersigned hereby certify that the addendum is an integral part of the document and has been incorporated in the tender Document. Signed Tenderer: Date Page 8 of 8
VI 3 - i TABLE OF CONTENTS
VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3
More informationMV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer
PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with
More informationSYNCHRONISING AND VOLTAGE SELECTION
SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any
More informationN. TEST TEST DESCRIPTION
Multi function system for testing substation equipment such as: current, voltage and power transformers, over-current protection relays, energy meters and transducers Primary injection testing capabilities
More informationSubstation Preventive Maintenance
Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS
More informationCEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant
CEYLON ELECTRICITY BOARD SRI LANKA GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAMME (TRANCHE 2) PACKAGE 2: LOT A MANNAR NADUKUDA TRANSMISSION DEVELOPMENT (ADB LOAN NO: 47037-SRI)
More informationImpact Assessment Generator Form
Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project
More informationN. TEST TEST DESCRIPTION
Multi function system for testing substation equipment such as: current, voltage and power transformers, all type of protection relays, energy meters and transducers Primary injection testing capabilities
More informationSCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH
SCHEDULE OF WORK Supply, Installation, Testing & Commissioning (SITC) of 33KV Electrical Substation for Multi Modal Logistics Hub at Visakhapatnam, Andhra Pradesh. Tender No. MMLH /HTELEC/PT /18 dated
More informationPOWER TRANSDUCERS ACTIVE AND REACTIVE SERIES: T-W WATT T-V VAR
POWER TRANSDUCERS ACTIVE AND REACTIVE SERIES: T-W WATT T-V VAR The T-W or T-V power transducer converts ac current and voltage signals into a load independent dc signal proportional to active power (watts)
More informationSECTION - II BID DATA SHEET
SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or
More informationPC IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases
PC57.13.3 IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases OUTLINE Scope References Need for grounding; Warning Definition of Instrument transformers Grounding secondary
More informationAdvanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing
Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear
More informationPower Meter Series PM3200 Functions and characteristics
Functions and characteristics PB108433 This PowerLogic Power meter offers basic to advanced measurement capabilities. With compact size and DIN rail mounting, the PM3200 allows mains and feeders monitoring
More informationAppendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS
Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements
More informationProtection of Electrical Networks. Christophe Prévé
Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationTable of Contents. Introduction... 1
Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...
More informationTransformer Trainer. Electrical Power Systems PSL20. Learning Outcomes. Key Features. Key Specifications
Electrical Power Systems PSL2 Investigates the principles and operating characteristics of single-phase and three-phase power and distribution transformers Key Features Educational transformers with fully
More informationNEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :
NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE
More informationDistribution transformers Part 2 Ground mounted transformers not closecoupled
PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING
More informationGENERAL TECHNICAL SPECIFICATION (Turnkey Work)
GENERAL TECHNICAL SPECIFICATION (Turnkey Work) March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar,
More informationELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction
More informationTABLE OF CONTENT
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES
More informationUBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5
Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS
More informationDMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)
DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date
More informationELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER
Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...
More informationSTS Fully automatic. Large graphic display. Primary injection testing capabilities: up to 3000 A, with the optional module BUX 3000
STS 4000 Multifunction substation maintenance & commissioning test system for current, voltage and power transformers. Capacitance / Tan Delta diagnostic system with the optional module TD 5000. w w w.
More informationGENERAL TECHNICAL SPECIFICATION
GENERAL TECHNICAL SPECIFICATION September 2017 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.
More informationExcitation Systems THYRIPART. Compound-Excitation System for Synchronous Generators. Power Generation
Excitation Systems Compound-Excitation System for Synchronous Generators Power Generation Operating Characteristics Load dependent Short circuit supporting Low voltage gradient dv/dt Black start capability
More informationComplex Solution for the Distribution Substation REF 542plus. Application and Setting Guide
Complex Solution for the Distribution Substation REF 542plus 1MRS756412 Complex Solution for the Distribution Substation REF 542plus Copyrights The information in this document is subject to change without
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationUtility Interconnection and System Protection
Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing
More informationECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE
ENGINEERING COMMISSIONING PROCEDURE ECP 11-0512 GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning
More informationRI-F200 Series. Single and Three Phase Multifunction Energy Meter. Telephone : +44 (0) Displayed Parameters
RI-F200 Series Single and Three Phase Multifunction Energy Meter DIN 96 panel mounted -/1A or -/5A current transformer input Single phase or three phase network compatible Programmable voltage and current
More informationECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11-0515 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0515 HV METERING EQUIPMENT COMMISSIONING PROCEDURE
More informationHamdy Faramawy Senior Application Specialist ABB Sweden
Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy
More informationRemotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application
General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application
More informationPRELIMINARY DATA SHEET RI-D140. Three Phase Multifunction DIN Rail Energy Meter (MID Certified) MID
RI-D140 Three Phase Multifunction DIN Rail Energy Meter (MID Certified) Four module DIN rail mounted Energy pulse LED True RMS measurement Cost effective and accurate Modbus communication -/1A or -/5A
More informationELECTRICAL POWER TRANSMISSION TRAINER
ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER This training system has been designed to provide the students with a fully comprehensive knowledge in Electrical Power Engineering
More informationTypes CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay
Types CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay Types CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay Relay withdrawn from case Application The type CDG 11 relay
More informationTECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES
INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION October 2014 TECHNICAL DESCRIPTION 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES I. SCOPE This
More informationProtection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin
Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad
More informationشركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.
Our Ref : 2/2018- Date : Messrs: Dear Sir, Tender 2/2018 Main Transformers You are kindly requested to quote for the supply and delivery DDP to our stores the transformers detailed in the attached schedules
More informationCEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant
CEYLON ELECTRICITY BOARD SRI LANKA GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAMME (TRANCHE 2) (ADB LOAN NO:3483/3484) PACKAGE 3: LOT B Procurement of Plant Design, Supply
More informationPRODUCT TEST MANUAL 2SY110K28 SYNCHRONISM CHECK RELAY
Sheet 1 of 7 Order Number Serial Number PRODUCT TEST MANUAL 2SY110K28 SYNCHRONISM CHECK RELAY Issue Date Level D 12/12/1996 Initial issue. Summary of changes Due to RMS continuous product improvement policy
More informationGeneral Requirements. Technical Specification LVAC Systems
Islamic Republic of Iran Vice Presidency for Strategic Planning and Supervision General Technical Specification and Execution Procedures for Transmission and Subtransmission Networks LVAC Systems NO: 423-1
More informationPROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA
PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval
More informationNumbering System for Protective Devices, Control and Indication Devices for Power Systems
Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements
More informationExcitation Systems RG3 - T4. Transistorized Excitation Systems for Synchronous Generators. Power Generation
Excitation Systems RG3 - T4 Transistorized Excitation Systems for Synchronous Generators Power Generation Operating Characteristics Reliability High availability Digital control facilities Very good control
More informationSUPPLY OF CARRIER PROTECTION COUPLER TYPE NSD-50
(I) GENERAL : Indoor PLCC Equipments are required for important 400KV, 220KV and 132KV Sub/station for Speech, Data Transmission, Protection and Teleprinter Links. (II) GENERAL REQUIREMENT : The equipments
More informationCONTROL & RELAY PANEL
CONTROL & RELAY PANEL March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091. CIN: U40101WB2007SGC113474;
More information50-SDMS-01 SPECIFICATIONS FOR
SPECIFICATIONS FOR CURRENT TRANSFORMERS UP TO 36 KV This specification is property of SEC and subject to change or modification without any notice C O N T E N T S CLAUSE TITLE PAGE NO. ------------ --------
More informationRI-D440. Three Phase easywire Multifunction DIN Rail Energy Meter. Telephone : +44 (0) Displayed Parameters
RI-D440 Three Phase easywire Multifunction DIN Rail Energy Meter Four module DIN rail mounted Energy pulse LED 330mV Input from easywire CTs (or -/1A and -/5A current transformer input with TAS-SCTEWA
More informationMESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION
Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:
More informationProtective Relays Digitrip 3000
New Information Technical Data Effective: May 1999 Page 1 Applications Provides reliable 3-phase and ground overcurrent protection for all voltage levels. Primary feeder circuit protection Primary transformer
More informationALPHA 50 MULTIFUNCTION METER (ALPHA SERIES)
Alpha Series www.sifamtinsley.co.uk Multifunction Meters Transducers & Isolators Temperature Controllers Converters & Recorders Digital Panel Meters Current Transformers Analogue Panel Meters Shunts ALPHA
More informationENGINEERING DATA SUBMITTAL For the Interconnection of Generation System
WHO SHOULD FILE THIS SUBMITTAL: Anyone in the final stages of interconnecting a Generation System with Nodak Electric Cooperative, Inc. This submittal shall be completed and provided to Nodak Electric
More informationActi 9 Energy Meters. iem3000 Series. Technical data sheet
Acti 9 Energy Meters iem3000 Series Technical data sheet 1 PB108410 b The Acti 9 iem3000 Energy Meter Series offers a cost-attractive, competitive range of DIN rail-mounted energy meters ideal for sub-billing
More informationIntegration between the MV protection and control unit REF542 and the LV protection trip unit PR123: selectivity and earth fault 1SDC007402G0201
1SDC007402G0201 Index 1. Introduction... 2 2. Theoretical outline 2.1 Restricted earth fault... 3 2.2 Selectivity between medium and low voltage... 4 3. Application examples and wiring logic 3.1 Restricted
More informationMESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER
Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT
More informationSYSTEM MONITORING FAULT RECORDING
* SYSTEM MONITORING FAULT RECORDING Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses arising under or in connection with this information. This
More informationNotes 1: Introduction to Distribution Systems
Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission
More informationTransformer Fault Categories
Transformer Fault Categories 1. Winding and terminal faults 2. Sustained or uncleared external faults 3. Abnormal operating conditions such as overload, overvoltage and overfluxing 4. Core faults 1 (1)
More informationSECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL
PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.
More informationCompany Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes
Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation
More information36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)
CEB STANDARD 022 : 1994 Specification for 36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE) CEYLON ELECTRICITY BOARD SRI LANKA Specification for 36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE) CEB Standard 022 : 1994
More informationT/3000 T/3000. Substation Maintenance and Commissioning Test Equipment
T/3000 Substation Maintenance and Commissioning Test Equipment MULTI FUNCTION SYSTEM FOR TESTING SUBSTATION EQUIPMENT SUCH AS: CURRENT, VOLTAGE AND POWER TRANSFORMERS, ALL TYPE OF PROTECTION RELAYS, ENERGY
More informationMT 560/UMT TRANSDUCER & ANALYZER
MT 560/UMT 560 - TRANSDUCER & ANALYZER USE The MT 560/UMT 560 multi transducer and analyzer is used for a permanent analysis of electricity supply quality in compliance with the SIST EN 50160 standard.
More informationCompany Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions
Company Directive STANDARD TECHNIQUE: TP6F/1 Power Measurement Conventions Summary This document specifies the conventions that are used for the direction of Power Flow within Western Power Distribution
More information1M122A Transformer Parallel Control System
Technical Bulletin 1M122A Transformer Parallel Control System Features CONTROL SYSTEM FEATURES Simple system wiring Scaleable up to 4 transformers Flexible control configuration Set transformers in any
More informationElectrical network management. Schneider Electric. PM3200 Technical Datasheet
Electrical network management Schneider Electric PM3200 Technical Datasheet Functions and characteristics PB108433 This PowerLogic Power meter offers basic to advanced measurement capabilities. With compact
More informationAPPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION
APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION This application should be completed and returned to in order to begin processing the request for interconnecting as required by
More informationMV network design & devices selection EXERCISE BOOK
MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester
More informationMultimeter 500CVD21 RTU500 series
Remote Terminal Units - Data sheet Multimeter 500CVD21 RTU500 series CT/VT interface with 4 voltage and 24 current inputs for direct monitoring of 3/4 wire 0 300 V AC (line to earth), 0...500 V AC (phase
More informationDraft Kenya Standard for Balloting Not to be Cited as Kenya Standard
KENYA STANDARD KS 1859-5:2010 ICS 29.240.01 Electrical power transmission and distribution High-voltage operating regulations Part 5: Standard procedure and terminology for the issuing of operating instructions
More informationPART 1 OWNER/APPLICANT INFORMATION
CALHOUN COUNTY ELECTRIC COOP. ASSN. Application for Operation of Customer-Owned Generation This application should be completed as soon as possible and returned to the Cooperative in order to begin processing
More informationStandard Prices for Generators 2010
Standard Prices for Generators 2010 Distribution System Operator ESB Networks Page 1 of 13 CONTENTS 1.0 Background...3 2.0 Standard Pricing Approach...3 Schedule of Charges for generators excluding VAT...6
More informationCUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv
CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv June 2016 Issue 1 1. INTRODUCTION Introduction of contestability and the ability of all major customers to become contestable
More informationSpecification for a Fully Automatic Meter Test Equipment for testing Three-phase/Single/Transformer operated/ reference Standard energy meters.
Specification for a Fully Automatic Meter Test Equipment for testing Three-phase/Single/Transformer operated/ reference Standard energy meters. Scope: This specification defines the requirement of a Three
More informationSUBJECT HEADING: Switching Programmes ISSUE: 18
SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme
More informationLine protection with transformer in the protection zone
Line protection with transformer in the protection zone www.siemens.com/siprotec5 Three-end line protection with transformer in the protection range SIPROTEC 5 Application Three-end line protection with
More informationPower Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.
Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the
More informationSGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:
SGMF(T) series Onsite Mobile AC High Voltage Test System On-site AC high voltage test systems are used for voltage withstanding test, partial discharge measurement, tan delta measurement on those instrument
More informationOnsite Mobile AC High Voltage Test System
TSGMF(T) series Onsite Mobile AC High Voltage Test System Onsite mobile AC high voltage test systems are used for withstand voltage testing, partial discharge measurement, tan delta measurement to instrument
More informationTechnical recommendation for the purchase of Real Time Thermal Rating for transformers
Version: 1.0 Date of Issue: December 2014 1 Technical recommendation for the purchase of Real Time Thermal Rating for transformers 1 Purpose The purpose of this document is to set out and describe the
More informationMESP TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER TRANSFORMER
Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER Version: 3 Issued: February 2018 Owner: Head of Engineering - Electrical Approved By: Andrew Russack Head
More informationPRELIMINARY DATA SHEET. RI-F300 Series. easywire Single and Three Phase Multifunction Energy Meter (MID Certified) MID
RIF300 Series easywire Single and Three Phase Multifunction Energy Meter (MID Certified) DI 96 panel mounted 330mV Input from easywire CTs (or /1A and /5A current transformer input with TASSCTEWA module)
More informationAutotransformer Condition Monitoring Systems
Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following
More informationMEDIUM VOLTAGE PRODUCT. PARAMETERS GUIDE How to specify the indoor instrument transformers correctly
MEDIUM VOLTAGE PRODUCT PARAMETERS GUIDE How to specify the indoor instrument transformers correctly The range of electric values in the power supply systems is very extensive. This is why it is necessary
More informationSECTION VI TECHNICAL SCHEDULES
SECTION VI TECHNICAL SCHEDULES Kenya Power and Lighting Company VI 4.3 - i Contract A36B TECHNICAL SCHEDULES 1 PREAMBLE...1 TECHNICAL SCHEDULES SUBSTATIONS...2 SCHEDULE VI-1a TECHNICAL GUARANTEES, OUTDOOR
More informationDATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO
PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %
More informationPowered by technology...driven by service CURRENT TRANSFORMERS. Multifunction Meters. Transducers & Isolators. Temperature Controllers
Multifunction Meters Transducers & Isolators Temperature Controllers Converters & Recorders Digital Panel Meters CURRENT TRANSFORMERS Current Transformers Analogue Panel Meters Shunts Digital Multimeters
More informationRUDOLF Digital power analyzer. Advanced Version
RUDOLF Digital power analyzer Advanced Version Digital power analyzer Advanced Version Company Introduction Bridex Singapore Pte Ltd is founded in 1978 as a manufacturer of instruments transformer for
More informationECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE
Document Number: ECP 11-0511 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0511 GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationsustainable savings that can be viewed directly on the internet
sustainable savings that can be viewed directly on the internet MEASUREMENT, METERING & DISPLAY VIA e COMMUNICATION Measurement, metering and display, the first step towards sustainable savings Measurement,
More informationSOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems
SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems This application should be completed as soon as possible and returned to the Cooperative in order to
More informationPosition Indicator model MFC-300/IP. Technical Manual. Licht
Position Indicator model MFC-300/IP Technical Manual Licht Contents 1 Introduction 2 2 Front panel indication 3 3 Error indication 4 4 Manual commands 5 5 Configuration 6 5.1 Parameter reset 6 6 Programmable
More information