1 Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Standard Number: HPC-5DA

2 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document Owner (May also be the Process Owner) Name: Justin Murphy Position: Manager Asset & Works Approved By * Name: Justin Murphy Position: Manager Asset & Works Date Created/Last Updated December 2013 Review Frequency ** 5 yearly Next Review Date ** December 2018 * Shall be the Process Owner and is the person assigned authority and responsibility for managing the whole process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business results. ** Frequency period is dependent upon circumstances maximum is 10 years from last issue, review, or revision whichever is the latest. If left blank, the default shall be 1 year unless otherwise specified. Revision Control Revision Date Description 0 05/12/2013 Original Issue Manager Assets & Works Manager Engineering Services STAKEHOLDERS The following positions shall be consulted if an update or review is required: Manager Engineering Systems Planning DM# Page 2 of 12 Print Date 5/12/2013

3 TABLE OF CONTENTS 1 PURPOSE SCOPE DRAWINGS REVISION LIST... 4 DM# Page 3 of 12 Print Date 5/12/2013

4 1 PURPOSE 2 SCOPE This Standard specifies the revision notes for all changes to drawings used in DSM 1 to DSM 9. This Standard supersedes the Western Power Document (DMS# ] previously in use by Horizon Power since disaggregation. Not Applicable 3 DRAWINGS REVISION LIST Drawing Number Date Revision Description of Revision Section 1 Drawings All Section 1 Jan 2012 New Horizon Power Template Drawings DSM-1-01 sht 1 Jan 2012 A LV from LV Metering DSM-1-02 sht 1,2 and 3 Jan 2012 A 500 kva Transformer Air HRC Fuses Removed All references to Boric Acid fuses. DSM-1-03 sht 1 Jan 2012 A 500 kva Transformer DSM-1-04 sht 1 Jan 2012 A 500 kva Transformer Max customer load for wall pillar changed to 200 A DSM-1-05 sht 1 Jan 2012 A 500 kva Transformer DSM-1-07 sht 1 Jan 2012 A 500 kva Transformer DSM-1-10 sht 2 June 2013 A New sheet added to include outside metering arrangement where customer main switchgear is located > 5 m from HP switchgear Section 2 Drawings All Section 2 Drawings Section 3 Drawings All Section 3 Drawings Jan 2012 New Horizon Power Template. Reference added to DSM 1-10, WAER and WADCM for selected drawings Jul ) New Horizon Power Template 2) All drawings drawn to scale and Text reviewed 3) Panel doors added to Transformers and HV Switchgear 4) 600 mm Safety Clearance added 5) Earthing set at 750 mm from all equipment 6) Land Requirements have increased and are separate for individual voltage levels 7) Note added regarding use of dead end receptacles for 6 bushing transformer DSM-3-01 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Note ID changed to 150 ID 4) Note 3 Ducting added DSM-3-01 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer DM# Page 4 of 12 Print Date 5/12/2013

5 DSM-3-01 sht 4 Jul 2012 A Optional doors to swing either way DSM-3-02 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Notes Ducting added DSM-3-02 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer DSM-3-02 sht 4 Jul 2012 A Optional doors to swing either way DSM-3-03 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Note ID changed to 150 ID 4) Note 3 Ducting added DSM-3-03 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer DSM-3-03 sht 3 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer DSM-3-03 sht 4 Jul 2012 A 1) Legend Clearance required for Installation purposes DSM-3-03 sht 5 Jul 2012 A 1) Optional doors to swing either way DSM-3-04 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Notes Ducting added DSM-3-04 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer 4) Notes Additional information on LV Kiosk provided DSM-3-04 sht 3 Jul 2012 A 1) Legend Clearance required for Installation purposes DSM-3-04 sht 4 Jul 2012 A 1) Optional doors to swing either way DSM-3-05 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Note ID changed to 150 ID 4) Note 3 Ducting added DSM-3-05 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Add Additional information on LV Kiosk provided 4) LU 47 added on to drawing DSM-3-05 sht 3 Jul 2012 A Legend Clearance required for Installation purposes DSM-3-05 sht 4 Jul 2012 A Optional doors to swing either way DSM-3-06 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Notes Ducting added DM# Page 5 of 12 Print Date 5/12/2013

6 DSM-3-06 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Text on drawing incorporated 3) Notes Additional information on LV Kiosk provided DSM-3-06 sht 3 Jul 2012 A Legend Clearance required for Installation purposes DSM-3-06 sht 4 Jul 2012 A Optional doors to swing either way DSM-3-07 sht 1 Jul 2012 A 1) Note 4 Ducting added 2) Note 8, 9 & ID changed to 150 ID 3) Note 11 Vent size changed from 600 x 800 mm 4) Note 14 & 15 - Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-07 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer 4) Notes Additional information on installation of Transformer, Switchgear and Trench Cover Supports provided DSM-3-07 sht 3 Jul 2012 A 1) Legend Clearance required for Installation purposes DSM-3-08 sht 1 Jul 2012 A 1) Right Hand Side Trench increased from 1000 mm 2) Note 4 Ducting added 3) Note 8, 9 & ID changed to 150 ID 4) Note 11 Vent size changed from 600 x 800 mm 5) Note 14 & 15 - Trench rebate changed from 40 mm wide and 25 mm deep 6) Title Block changed DSM-3-08 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Text on drawing incorporated 3) Notes Additional information on installation of Transformer, Switchgear and Trench Cover Supports provided DSM-3-08 sht 3 Jul 2012 A 1) Legend Clearance required for Installation purposes DSM-3-09 sht 1 Jul 2012 A 1) Note 4 Ducting added 2) Note 8, 9 & ID changed to 150 ID 3) Note 11 Vent size changed from 600 x 800 mm 4) Note 14 & 15 - Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-09 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Additional information on installation of Transformer, Switchgear and Trench Cover Supports provided 3) Notes Additional information on LV Kiosk provided 4) LU 47 added on to drawing DSM-3-09 sht 3 Jul 2012 A Legend Clearance required for Installation purposes DM# Page 6 of 12 Print Date 5/12/2013

7 DSM-3-10 sht 1 Jul 2012 A 1) Right Hand Side Trench increased from 1000 mm and change in layout 2) Note 4 Ducting added 3) Note 8, 9 & ID changed to 150 ID 4) Note 11 Vent size changed from 600 x 800 mm 5) Note 14 & 15 - Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-10 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Additional information on installation of Transformer, Switchgear and Trench Cover Supports provided 3) Notes Additional information on LV Kiosk provided 4) LU 47 & LU 45 added on to drawing DSM-3-10 sht 3 Jul 2012 A Legend Clearance required for Installation purposes DSM-3-13 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Note ID changed to 150 ID 4) Note 3 Ducting added DSM-3-13 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer DSM-3-13 sht 3 Jul 2012 A Title Block changed DSM-3-13 sht 4 Jul 2012 A 1) Optional doors to swing either way DSM-3-14 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Note 3 Ducting added DSM-3-14 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Text on drawing incorporated 3) Title Block changed DSM-3-14 sht 3 Jul 2012 A 1) Legend Clearance required for Installation purposes DSM-3-14 sht 4 Jul 2012 A 1) Optional doors to swing either way DSM-3-15 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Note ID changed to 150 ID 4) Note 3 Ducting added DSM-3-15 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Text on drawing incorporated DSM-3-15 sht 4 Jul 2012 A Optional doors to swing either way DSM-3-16 sht 1 Jul 2012 A 1) Land Requirement Table added 3) Note 3 Ducting added DSM-3-16 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Text on drawing incorporated DSM-3-16 sht 3 Jul 2012 A Legend Clearance required for Installation purposes DSM-3-16 sht 4 Jul 2012 A Optional doors to swing either way DM# Page 7 of 12 Print Date 5/12/2013

8 DSM-3-17 sht 1 Jul 2012 A 1) Note 4 Ducting added 2) Note 8 & ID changed to 150 ID 3) Note 11 Vent size changed from 600 x 800 mm 4) Note 14 Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-17 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer 3) Notes Additional information on installation of Transformer Trench Cover Supports provided DSM-3-17 sht 3 Jul 2012 A Title Block changed DSM-3-18 sht 1 Jul 2012 A 1) Note 4 Ducting added 2) Note 11 Vent size changed from 600 x 800 mm 4) Note 14 Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-18 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Additional information on installation of Transformer, Switchgear and Trench Cover Supports provided 3) Notes Additional information provided DSM-3-18 sht 3 Jul 2012 A 1) Legend Clearance required for Installation purposes DSM-3-19 sht 1 Jul 2012 A 1) Note 4 Ducting added 2) Note 8 & ID changed to 150 ID 3) Note 11 Vent size changed from 600 x 800 mm 4) Note 14 Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-19 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Additional information on installation of Transformer Trench Cover Supports provided 3) Notes Additional information provided DSM-3-20 sht 1 Jul 2012 A 1) Trench increased from 1000 mm and changed in layout 2) Note 4 Ducting added 3) Note 8 & ID changed to 150 ID 4) Note 11 Vent size changed from 600 x 800 mm 5) Note 14 Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-20 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Additional information on installation of Transformer, HV Switchgear and Trench Cover Supports provided 3) Notes Additional information provided DSM-3-20 sht 3 Jul 2012 A Legend Clearance required for Installation purposes DSM-3-21 sht 1 Jul 2012 A Right Hand Side Trench decreased from 1200 mm DSM-3-21 sht 2 Jul 2012 A 1) Bottom Trench decreased from 1000 mm 2) Trench change in layout 3) Note 4 Ducting added 4) Note ID ducting added 5) Note 11 Vent size changed from 600 x 800 mm 6) Note 10 - Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-21 sht 3 Jul 2012 A Notes Additional information provided DM# Page 8 of 12 Print Date 5/12/2013

9 DSM-3-21 sht 4 Jul 2012 A Legend Clearance required for Installation purposes DSM-3-22A sht 1 Jul 2012 A 1) Note 4 Ducting added 2) Note ID changed to 150 ID 3) Note 8 Vent size changed from 600 x 800 mm 4) Note 3 - Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-22A sht 2 Jul 2012 A Notes Additional information provided DSM-3-22B sht 1 Jul 2012 A 1) Note 4 Ducting added 2) Note ID changed to 150 ID 3) Note 8 Vent size changed from 600 x 800 mm 4) Note 3 - Trench rebate changed from 40 mm wide and 25 mm deep DSM-3-22B sht 2 Jul 2012 A Notes Additional information provided DSM-3-23 sht 1 Jul 2012 A Notes Ducting added DSM-3-23 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Additional information provided DSM-3-23 sht 3 Jul 2012 A Legend Clearance required for Installation purposes DSM-3-24 sht 1 Jul 2012 A Alteration to Surge Arrestors DSM-3-25 sht 1 Jul 2012 A 1) Dimensioning reference for Ducting changed 2) Note ID changed to 150 ID 3) Note 2 Ducting added DSM-3-25 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) Notes Additional information provided DSM-3-25 sht 3 Jul 2012 A Legend Clearance required for Installation purposes DSM-3-25 sht 4 Jul 2012 A Optional doors to swing either way DSM-3-26 sht 1 Jul 2012 A 1) Dimensioning reference for Ducting changed 2) Note ID changed to 150 ID 3) Note 2 Ducting added 4) Note 3 Conversion to MPS DSM-3-26 sht 2 Jul 2012 A Previously sheet 3, sheet 2 moved to Section 7 1) Dimensioning reference for positioning changed 2) Notes Additional information provided 3) MPS Conversion drawing DSM-3-26 sht 3 Jul 2012 A Previously sheet 4 1) Legend Clearance required for Installation purposes 2) MPS Conversion drawing DSM-3-26 sht 4 Jul 2012 A Previously sheet 5 1) Optional doors to swing either way 2) MPS Conversion drawing DSM-3-27 sht 1 Jul 2012 A 1) Dimensioning reference for Ducting changed 2) Note 2 Ducting added DSM-3-27 sht 2 Jul 2012 A 1) Dimensioning reference for positioning changed 2) 500 kva Transformer DSM-3-27 sht 4 Jul 2012 A Optional doors to swing either way DSM-3-28 sht 1 Jul 2012 A Moved to Section 7 DSM-3-28 sht 2 Jul 2012 A Moved to Section 7 DSM-3-28 sht 3 Jul 2012 A Moved to Section 7 DSM-3-28 sht 4 Jul 2012 A Moved to Section 7 DM# Page 9 of 12 Print Date 5/12/2013

10 Section 4 Drawings All Section 4 Jan ) New Horizon Power Template Drawings 2) All drawings drawn to scale and Text reviewed DSM-4-01 sht 1 Jan 2012 A 25 kva transformers and 50 kva included DSM-4-01 sht 2 Jan 2012 A Removed Equipment Weights DSM-4-02 sht 1 Jan 2012 A Removed Stock No Table DSM-4-02 sht 2 Jan 2012 A Removed Equipment Weights DSM-4-02 sht 3 Jan 2012 A Text adjustments DSM-4-03 sht 1 Jan 2012 A Moved to Section 7 DSM-4-03 sht 2 Jan 2012 A Moved to Section 7 DSM-4-04 sht 1 Jan 2012 A Text adjustments DSM-4-04 sht 2 Jan 2012 A Removed Equipment Weights DSM-4-05 sht 1 Jan 2012 A Text adjustments DSM-4-05 sht 2 Jan 2012 A No Changes DSM-4-06 sht 1 Jan 2012 A Removed Stock No Table DSM-4-06 sht 2 Jan 2012 A Removed Equipment Weights DSM-4-06 sht 3 Jan 2012 A Text adjustments DSM-4-07 sht 1 Jan 2012 A Moved to Section 7 Section 5 Drawings All Section 5 Drawings Dec ) New Horizon Power Template 2) All drawings drawn to scale and Text reviewed DSM-5-01 sht 1 Dec 2012 A 1) Insert Dimension Table 2) Changed Dimension DSM-5-02 sht 1 Dec 2012 A 1) Insert Dimension Table 2) Changed Dimension DSM-5-03 sht 1 Dec 2012 A 1) Insert Dimension Table 2) Changed Dimension DSM-5-04 sht 1 Dec 2012 A 1) Insert Dimension Table 2) Changed Dimension & Text adjustments DSM-5-05 sht 1 Dec 2012 A 1) Insert Dimension Table 2) Changed Dimension & Text adjustments DSM-5-06 sht 1 Dec 2012 A 1) Insert Dimension Table 2) Changed Dimension Section 6 Drawings All Section 5 Sep ) New Horizon Power Template Drawings DSM-6-01 sht 1 Sep 2012 A 1) Note regarding derating of cables included 2) Minimum depth of duct increased to 800 DSM-6-01 sht 2 Sep 2012 A 1) Note regarding derating of cables included 2) Minimum depth of duct increased to 800 DSM-6-02 sht 1 Sep 2012 A No changes DSM-6-03 sht 1 Sep 2012 A Drawing details added. DSM-6-04 sht 1 Sep 2012 A Drawing updated to show new indoor switchgear support design DSM-6-04 sht 2 Sep 2012 A Drawing updated to show new indoor switchgear support design DSM-6-04 sht 3 Sep 2012 A Drawing updated to show new indoor switchgear support design DM# Page 10 of 12 Print Date 5/12/2013

11 DSM-6-05 sht 1 Sep 2012 A No changes DSM-6-05 sht 2 Sep 2012 A No changes DSM-6-06 sht 1 Sep 2012 A Earthing detail and reference created to DSM 6-11 DSM-6-06 sht 2 Sep 2012 A Earthing detail and reference created to DSM Drawing updated to show new indoor switchgear support. DSM-6-06 sht 3 Sep 2012 A Earthing detail and reference created to DSM Drawing updated to show new indoor switchgear support. DSM 6-07 all drawings Sep 2013 A Redrawn to show new indoor switchgear support design. Extra drawing added for 3-4 to 5 way connection. DSM-6-08 sht 1 Sep 2012 A Drawing as supports have changed DSM-6-08 sht 2 Sep 2012 A Drawing as supports have changed DSM-6-10 sht 1 to 6 Sep 2012 A New drawing showing Trench cover support for transformers DSM-6-10 sht 6 to 10 Sep 2012 A New drawing showing Trench cover support for switchgear DSM-6-11 sht 1 to 9 Sep 2012 A New drawing showing earthing requirements for outdoor substation arrangements. DSM-6-12 sht 1 to 10 Sep 2012 A New drawing showing earthing requirements for indoor substation arrangements. DSM 6-13 sht 1 to 4 Sep 2012 A Screening for outdoor substation Section 7 Drawings Section 7 Drawings Nov 2013 New Horizon Power Template DSM-7-05 sht 1 Nov 2013 A Minor format changes DSM-7-06 sht 1 Nov 2013 A Minor format changes DSM-7-07 sht 1-4 Nov New drawing included to show Areva switchgear indoor installation DSM-7-08 sht 1-2 Nov New drawing included to show Areva FBE switchgear installation guide Section 8 Drawings Section 8 Drawings Mar 2013 New Horizon Power Template DSM-8-01 Mar 2013 Removed from new version DSM-8-02 Mar 2013 Removed from new version DSM-8-03 Mar 2013 Removed from new version DSM-8-04 Mar 2013 Removed from new version DSM-8-05 Mar 2013 Removed from new version DSM-8-06 Mar 2013 Removed from new version DSM-8-07 sht 1 Mar 2013 A Additional detail on cut out fuse included DSM-8-07 sht 2 Mar 2013 A Mini pillar termination details and reference created to DCSH. Section 9 Drawings Old DSM 9 drawings Nov 2013 DSM 9 is now renamed as Environmental Protection for Substation Standard. All old 33 kv drawings have been. DSM-9-01 sht 1 Nov 2013 A New drawing Oil containment for MPS Substation DM# Page 11 of 12 Print Date 5/12/2013

12 DSM-9-02 sht 1 Nov 2013 A New drawing Oil containment for non- MPS Substation DSM-9-03 sht 1-3 Nov 2013 A New drawing Flood prevention Limestone retaining walls DSM-9-04 sht 1-3 Nov 2013 A New drawing Flood prevention Panel & Post retaining walls DM# Page 12 of 12 Print Date 5/12/2013

WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction

WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction Manual: Distribution Substation Manual (DSM) Section I: Introduction Standard Number: HPC-5DA-07-0010-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document Owner Name:

More information

DISTRIBUTION DESIGN CATALOGUE

DISTRIBUTION DESIGN CATALOGUE DISTRIBUTION DESIGN CATALOGUE Section 15 LM Low Voltage Metering HPC-1DC-07-0015-2014 For application to Horizon Power Electricity Distribution Networks Document Control Author Name: Paul Savig Position:

More information

Interim Distribution Substation Manual (DSM)

Interim Distribution Substation Manual (DSM) Interim Distribution Substation Manual (DSM) Section 4 Kiosk General Arrangements and Installation Guides Original Issue: June 1997 This Revision: 6 th - June 2018 EDM# 22966949 (Published) EDM# 23581608

More information

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for

More information

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION Please complete all sections of the application form and return to newconnections@ukpowerdistribution.co.uk Section 1 Site Details UKPD Reference Number: Energisation Date: Site Name/Address/Postcode:

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

EDS LV ELECTRICAL SERVICE DRAWINGS

EDS LV ELECTRICAL SERVICE DRAWINGS Document Number: EDS 08-2110 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2110 LV ELECTRICAL SERVICE DRAWINGS EPN, LPN, SPN This standard details the drawings for service positions and connection

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

G81 PART 1 FRAMEWORK APPENDIX

G81 PART 1 FRAMEWORK APPENDIX G81 PART 1 FRAMEWORK APPENDIX Housing Development design framework appendix to be read in conjunction with the latest version of: ENA Engineering Recommendation G81 Part 1 Framework for design and planning,

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS AS 2067 1984 Australian Standard Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv [Title allocated by Defence Cataloguing Authority: SWITCHGEAR ASSEMBLIES, ELECTRICAL AND

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

ECP DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE

ECP DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE Document Number: ECP 11-0506 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0506 DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning

More information

Neutral Earthing. For permanent or temporary neutral earthing in HV systems

Neutral Earthing. For permanent or temporary neutral earthing in HV systems Neutral Earthing Resistors RESISTORS For permanent or temporary neutral earthing in HV systems For continuous or temporary low-resistance neutral grounding in medium voltage systems Neutral point connection

More information

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:

More information

MEDIUM VOLTAGE. For your projets where the low voltage is limited. 3200V 5500V 6600V Energy distribution

MEDIUM VOLTAGE. For your projets where the low voltage is limited. 3200V 5500V 6600V Energy distribution MEDIUM VOLTAGE For your projets where the low voltage is limited 3200V 5500V 6600V Energy distribution YOUR EXISTING CONSTRAINTS Example 1: FROM LV EXISTING ELECTRICAL SOURCES : Transport the LV to the

More information

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method

More information

Comment. Updated note for clearance to gas Updated pillar entry conduits to allow for 1200mm 45 o radius bends C3 Padmount Transformers

Comment. Updated note for clearance to gas Updated pillar entry conduits to allow for 1200mm 45 o radius bends C3 Padmount Transformers Amendment Record 19/10/2018 Version 22 Section C3 Padmount Transformers Drawing Number and Revision C3-1-3C C3-1-4C C3-2.1-2 B C3-2.7-2B C3-3.1-1 B Comment C6 - Cables C6-2.4-2C Change to plastic cover

More information

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

Introduction to Substation Design TADP 542

Introduction to Substation Design TADP 542 Introduction to Substation Design TADP 542 Distribution Substations- Drawings and Documentation Instructor: Richard Snell Transmission & Distribution Program Drawings Drawings are prime method for communicating

More information

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis Company Directive STANDARD TECHNIQUE: SD5F Relating to connecting multiple small low voltage connections with limited network analysis Policy Summary This document specifies the procedure for connecting

More information

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A Group F : No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS Table : A No. Description 1. Make & Manufacturer 2. Place of Manufacturer 3. Voltage Ratio 4. Rating

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

SECTION 5 TRANSFORMERS

SECTION 5 TRANSFORMERS SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE ENGINEERING COMMISSIONING PROCEDURE ECP 11-0512 GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning

More information

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

List of Item Codes of Various Materials Purchased by Materials Management Cell(H.O.,Mumbai) through e-tender website https://cpa1.mahadiscom.

List of Item Codes of Various Materials Purchased by Materials Management Cell(H.O.,Mumbai) through e-tender website https://cpa1.mahadiscom. List of Item Codes of Various Materials Purchased by Materials Management Cell(H.O.,Mumbai) through e-tender website https://cpa1.mahadiscom.in : M.M. PURCHASE GROUP-I : New Service Connection (N.S.C.)

More information

CHAPTER-E-21. T1 Column With Beam Arrangement in Substation. T2 Column With Beam Arrangement in Substation

CHAPTER-E-21. T1 Column With Beam Arrangement in Substation. T2 Column With Beam Arrangement in Substation CHAPTER-E-21 Sl No Drawing Name Drawing Number 1 Single Line Diagram (GIS S/s) ODSSP/SS/SLD/1-REV-C 2 Single Line Diagram (Outdoor S/s) ODSSP/SS/SLD/3 3 Sub- station Layout for GIS Type ODSSP/SS/SLY/1

More information

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Issued by: Approved by: Engineering Department Energy+ Inc. September 2016 Shawn Jackson, P.Eng. Approval is given in accordance with

More information

Company Directive STANDARD TECHNIQUE: SD5R/2. Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations

Company Directive STANDARD TECHNIQUE: SD5R/2. Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations Company Directive STANDARD TECHNIQUE: SD5R/2 Earth Fault oop Impedances and Phase to Neutral oop Impedances at V Installations NOTE: The current version of this document is stored in the WPD Corporate

More information

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

Power Frequency Withstand Voltage On-site testing of 400 kv GIS Power Frequency Withstand Voltage On-site testing of 400 kv GIS D. Anaraki Ardakani, A. Omidkhoda, M. Solati High Voltage Engineering Center ACECR Tehran, Iran Da_ardakani@yahoo.com Paper Reference Number:

More information

Company Directive ENGINEERING SPECIFICATION EE SPEC: 5/5. Relating to 11kV Distribution Transformers

Company Directive ENGINEERING SPECIFICATION EE SPEC: 5/5. Relating to 11kV Distribution Transformers Company Directive ENGINEERING SPECIFICATION EE SPEC: 5/5 Relating to 11kV Distribution Transformers Policy Summary This specification covers the requirements for Distribution Transformers from 16kVA single

More information

Reference Number PCP 02 (RIC Standard: EP SP)

Reference Number PCP 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PCP 02 (RIC Standard: EP 20 00 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

DESIGN STANDARD NO. DS 21

DESIGN STANDARD NO. DS 21 Assets Delivery Group Infrastructure Design Branch DESIGN STANDARD NO. DS 21 Major Pump Station Electrical VERSION 1 REVISION 7 JUNE 2017 FOREWORD The intent of Design Standards is to specify requirements

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

Technical Series Edition 5

Technical Series Edition 5 Totally Integrated Power Technical Series Edition 5 Load Impact in the Feed-in Circuit on Life Cycle Energy Costs Answers for infrastructure. Contents Introduction 4 Power Loss Calculation 5 Determining

More information

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it. 1. SCOPE The requirements of this document apply to all Plant, Equipment and Apparatus that are part of, or are Directly connected to, the Company network. Requirements contained herein may be modified

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

Connection of Embedded Generating Plant up to 5MW

Connection of Embedded Generating Plant up to 5MW Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi

More information

Kiosk Solution W1000. Installation and Assembly Instructions July 2015 Edition

Kiosk Solution W1000. Installation and Assembly Instructions July 2015 Edition Kiosk Solution W1000 Installation and Assembly Instructions July 2015 Edition All product names mentioned in this document are the trademarks, brands or registered trademarks of their respective owner.

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

700 Series AC Dielectric Test Sets

700 Series AC Dielectric Test Sets 700 Series AC Dielectric Test Sets AC Test Systems HAEFELY HIPOTRONICS standard line of AC Test Systems is designed to perform high voltage AC tests on electrical apparatus in accordance with IEC60, IEEE

More information

51-SDMS-04 SPECIFICATIONS FOR. DISTRIBUTION TRANSFORMERS UP TO 36 kv WITH ALUMINUM WINDINGS FOR DUAL SECONDARY 400/230 V AND 230/133 V

51-SDMS-04 SPECIFICATIONS FOR. DISTRIBUTION TRANSFORMERS UP TO 36 kv WITH ALUMINUM WINDINGS FOR DUAL SECONDARY 400/230 V AND 230/133 V SPECIFICATIONS FOR DISTRIBUTION TRANSFORMERS UP TO 36 kv WITH ALUMINUM WINDINGS FOR DUAL SECONDARY 400/230 V AND 230/133 V This specification is property of SEC and subject to change or modification without

More information

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Transformer Trainer. Electrical Power Systems PSL20. Learning Outcomes. Key Features. Key Specifications

Transformer Trainer. Electrical Power Systems PSL20. Learning Outcomes. Key Features. Key Specifications Electrical Power Systems PSL2 Investigates the principles and operating characteristics of single-phase and three-phase power and distribution transformers Key Features Educational transformers with fully

More information

ECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE

ECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE Document Number: ECP 11-0511 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0511 GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and

More information

Kansas City Power & Light Company. Transmission Facility Rating Methodology

Kansas City Power & Light Company. Transmission Facility Rating Methodology Company Prepared by: KCP&L Transmission Planning December 6, 2017 Table of Contents 1. Purpose...4 2. Generator Rating Methodology...4 3....4 3.1. Equipment Rating Methodology...4 3.2. Items considered

More information

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions Company Directive STANDARD TECHNIQUE: TP6F/1 Power Measurement Conventions Summary This document specifies the conventions that are used for the direction of Power Flow within Western Power Distribution

More information

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Company 5701 Smithway Street Commerce, CA 90040 www.mgmtransformer.com Phone: 323.726.0888

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 October 2014 Issue 2 September 2014 National Grid 2014 2014 Copyright owned by National Grid Electricity Transmission plc, all rights reserved. No part of this publication

More information

500 kva Dry-type Isolation Transformer V-Delta to 208Y/120V 3PH - NEMA 1/Indoor

500 kva Dry-type Isolation Transformer V-Delta to 208Y/120V 3PH - NEMA 1/Indoor 500 kva Dry-type Isolation Transformer - 13200V-Delta to 208Y/120V 3PH - NEMA 1/Indoor Part #: MT-DOE16-3P-13200D-500KVA-208Y.120-N1 Page: 1 The MT-DOE16-3P-13200D-500KVA-208Y.120-N1 Dry-type Isolation

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety 8.22 Switching Activities Purpose This instruction provides a safe system for switching on Horizon Powers Low Voltage, High Voltage and or Transmission electrical apparatus/network, where switching operations

More information

KENYA ELECTRICITY GENERATING COMPANY LTD

KENYA ELECTRICITY GENERATING COMPANY LTD KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD-014-2016 TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender

More information

EDS LV WAVEFORM MAINS CABLE RATINGS

EDS LV WAVEFORM MAINS CABLE RATINGS Document Number: EDS 02-0033 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 02-0033 LV WAVEFORM MAINS CABLE RATINGS EPN, LPN, SPN This standard details the technical and practical information required

More information

Ansi Drawing Standards Electrical

Ansi Drawing Standards Electrical Ansi Free PDF ebook Download: Ansi Download or Read Online ebook ansi drawing standards electrical in PDF Format From The Best User Guide Database This section applies to the requirements for identification

More information

BIRD ISLAND FLATS SUBSTATION (BUILDING 67) ONE LINE DIAGRAM SET# 23 LEGEND DRAW-OUT CIRCUIT BREAKER DRAW-OUT CIRCUIT BREAKER, DRAW-OUT FUSES DRAW-OUT FUSES AND POTENTIAL TRANSFORMERS CABLE CONNECTION POTENTIAL

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

PAPER. Dry-type transformer innovation: HiDry 72 for subtransmission lines

PAPER. Dry-type transformer innovation: HiDry 72 for subtransmission lines PAPER Title Dry-type transformer innovation: HiDry 72 for subtransmission lines Registration Nº: (Abstract) Authors of the paper Name Country e-mail Martin Carlen Switzerland martin.carlen@ch.abb.com Mariano

More information

General Electricity Company of Libya

General Electricity Company of Libya GES 22214 Technical Specification of GECOL 11/0.4kV Oil Immersed Ground Mounted Three Phase Sealed Type Distribution Transformers (Revision history) Issued on: Jan. 01, 2007 General Electricity Company

More information

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction

More information

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 21 25 Sep $3,750 Dubai, UAE In any of the 5 star

More information

HPC-9DJ

HPC-9DJ Manual: Distribution Design Manual Volume 1 Quality of Electricity Supply Standard Number: HPC-5DC-07-0001-2012 Document Control Author Name: Anthony Seneviratne Position: Senior Standards Engineer Document

More information

An Effective Cable Sizing Procedure Model for Industries and Commerial Buildings

An Effective Cable Sizing Procedure Model for Industries and Commerial Buildings International Journal of Electrical and Computer Engineering (IJECE) Vol. 6, No. 1, February 2016, pp. 34~39 ISSN: 2088-8708, DOI: 10.11591/ijece.v6i1.8391 34 An Effective Cable Sizing Procedure Model

More information

SaskPower Electric Service Requirements Revision 0 November 24, Electric Service Requirements

SaskPower Electric Service Requirements Revision 0 November 24, Electric Service Requirements Electric Service Requirements 1 Table of Contents 1. General Requirements...7 1.1 Electric Service Requirements Review Committee... 7 1.2 Introduction... 7 1.3 Definitions... 8 1.4 Standard Supply... 9

More information

Recreation Facility Hours

Recreation Facility Hours NORMAL HOURS Recreation Facility Hours August 1, 2016 July 31, 2017 Last Revised: July 29, 2016 Effective Dates 2016: AUG 23 31, SEP 1 2, SEP 6 16, SEP 18 23, SEP 25 30, OCT 1 7, OCT 9 18, OCT 24 30, NOV

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Equipment Description Quantity as per drawings Actual quantity

Equipment Description Quantity as per drawings Actual quantity NOTE: SAFETY: Tests must be carried out after the installation, alteration or repair and before putting back to service. At all times maintain suitable clearance to all other electrical equipment and verify

More information

Indonesia s Preparation for WRC-19

Indonesia s Preparation for WRC-19 Indonesia s Preparation for WRC-19 ITU International Satellite Symposium 2016 Bali, Indonesia, 7 September 2016 Ministry of Communication and Information Technology Republic of Indonesia World Radiocommunication

More information

NPS/002/016 Technical Specification for 33 kv Cable Joints and Terminations

NPS/002/016 Technical Specification for 33 kv Cable Joints and Terminations Version: 3.1 Date of Issue: September 2016 Page: 1 of 21 NPS/002/016 Technical Specification for 33 kv Cable Joints and Terminations 1. Purpose The purpose of this document is to detail the technical requirements

More information

Miniature substations: What they are really capable of delivering

Miniature substations: What they are really capable of delivering Miniature substations: What they are really capable of delivering by Rhett Kelly and Greg Whyte, ACTOM Medium Voltage Switchgear The latest edition of the South African national standard for miniature

More information

Capacitive voltage transformers

Capacitive voltage transformers Capacitive voltage transformers Outdoor operation Oil-paper insulated ECF (72 550) kv General description Capacitive voltage transformers of type ECF are used in high-voltage switchgears from 72 to 550

More information

Substation HV Cables. Document Number: 1-11-FR-07

Substation HV Cables. Document Number: 1-11-FR-07 Substation HV Cables Document Number: 1-11-FR-07 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-07 Substation HV Cables Asset Class Strategy Intellectual

More information

CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv

CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv June 2016 Issue 1 1. INTRODUCTION Introduction of contestability and the ability of all major customers to become contestable

More information

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11-0515 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0515 HV METERING EQUIPMENT COMMISSIONING PROCEDURE

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

Section 1.0: Introduction. Section 3.0: Planning. Section 4.0: Power Quality. Manual 0295 Supply & Planning Manual Updated: 01/08/2017

Section 1.0: Introduction. Section 3.0: Planning. Section 4.0: Power Quality. Manual 0295 Supply & Planning Manual Updated: 01/08/2017 SUPPLY & PLANNING MANUAL TABLE OF CONTENTS Section 1.0: Introduction Section 2.0: Supply Section 3.0: Planning Section 4.0: Power Quality Energex 2017 Page: 1 of 223 TABLE OF CONTENTS 1 INTRODUCTION...

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION-16075 ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Electrical identification to identify all electrical items for easy operation and maintenance including, but not limited

More information