Interim Distribution Substation Manual (DSM)

Size: px
Start display at page:

Download "Interim Distribution Substation Manual (DSM)"

Transcription

1 Interim Distribution Substation Manual (DSM) Section 4 Kiosk General Arrangements and Installation Guides Original Issue: June 1997 This Revision: 6 th - June 2018 EDM# (Published) EDM# Page 1 of 22

2 Section 4 Kiosk General Arrangements and Installation Guides WP Document Control ABN Document release information Client Project name Document title Revision status Western Power Distribution Substation Manual Substation Arrangements 6 th Edition Document prepared by: Western Power ABN Wellington Street, Perth Edition/Revision Number Revision History Issue Date Description Endorsed By Approved By Second Edition February 2002 Revised from First Edition Ed Wilcox Robert Rogerson Third Edition March 2007 DSM split into 10 Sections Introduction and Sections 1 to 9 Fourth Edition November 2008 Drawings updated to suit Schneider RM6 switchgear Fifth Edition July 2015 Drawing format updated to include revision information and WADCM reference. References to F34 plywood removed. Sixth Edition June 2018 Purpose of this section now included DSM4-01, DSM4-02, DSM4-06 updated with Tyree and ETEL Transformers Sandeep Magan Sandeep Magan Revana Boodhraj Gareth Chadwick Robert Rogerson Robert Rogerson Herman Du Plessis Adele Wong Copyright of Western Power Any use of this material except in accordance with a written agreement with Western Power is prohibited. Apart from any fair dealing for the purposes of study, research, criticism or review, as permitted under the Copyright Act, no part may be reproduced by any process without written permission. Page 2 of 22

3 Contents Contents Introduction Disclaimer Information Provided on Drawings Sheet 1 General Arrangement Sheet 2 Installation Guide Sheet 3 Design Notes Sheet 4 Cabling arrangements Drawings Kiosk arrangements and installation guide DSM 4-01 SPUDS Transformer DSM 4-02 MPS Transformer DSM 4-03 No longer used DSM 4-04 Schneider RM6 switchgear kiosk DSM 4-05 LV Switchgear Kiosks DSM 4-06 Non-MPS Transformer EDM# (Published) EDM# Page 3 of 22

4 Section 4 Kiosk General Arrangements and Installation Guides 1 Introduction In the near future this Chapter of the Distribution Substation Manual will be republished as a Chapter within a new Distribution Substation Plant Manual and will only contain substation plant related information. This Chapter 4 of the Interim Distribution Substation Manual contains drawings showing the standard plant arrangements for distribution substations with Tyree and ETEL transformers that have recently been procured by Western Power. 2 Disclaimer The information contained within these drawings shall not be used for anything other than their intended purpose (as stated within this chapter). Other documents that refer to these drawings shall not change the intended purpose whether it is written or inferred. This chapter alone does not claim to demonstrate compliance with any Government Regulations or Industry Standards. These drawings are to be read in conjunction with the following Western Power documents: i. Western Australian Distribution Connections Manual (WADCM) ii. iii. iv. Underground Distribution Schemes Manual (UDSM) Overhead Line Design Manual (OHLDM) for DSM 3-24 drawing. Distribution Design Catalogue (DDC) The drawings within this Chapter are generic in nature and may not be suitable for all sites. It is the designer s responsibility to make sure that these drawings are suitable for the proposed substation site prior to use. 3 Information Provided on Drawings This Chapter of the Interim Distribution Substation Manual contains drawings showing the general arrangements (GA) for distribution substations and the requirements for installation. The equipment is to be installed onto a precast concrete culvert or metallic base that acts as a pre-manufactured foundation for the equipment. The following sections explain the typical information that is contained within each drawing sheet. Designer s Notes: 1. Where a customer s site requires a non-standard substation arrangement (for example where non-load bearing soils exists), the drawings within this section can be made available to the customer. It is then the customer s responsibility, in conjunction with their architect and civil / structural engineers, to prepare an alternative design. This design must meet all of Western Power s requirements and any relevant Australian Standards. The design must be submitted to Western Power for approval with an explanation of how the proposed substation design is safe, fit for purpose and will facilitate installation of standardised Western Power distribution equipment. Where non-load bearing soils exist a suitable road may also need to be constructed to allow unrestricted access for Western Power personnel and operational vehicles. 2. All dimensions shown on drawings have been rounded up to the nearest 50mm. An equivalent building tolerance of ± 50mm should be permitted. 3.1 Sheet 1 General Arrangement This sheet is to show the physical attributes of the equipment. The following information is provided on this drawing Page 4 of 22

5 Name Plate kva rating Voltage Number of HV bushings Dimensions Weight Oil quantity (if contains oil) Stock code Centre of gravity Lifting points LV Switchgear arrangements 3.2 Sheet 2 Installation Guide These drawing sheets show how to install the base or culvert within the substation site and how to position the equipment onto the base or culvert. These drawings show: The size of the excavation in typical sandy soil. The compaction of the subsoil. Compaction of backfill. The position of the equipment on the base or culvert. 3.3 Sheet 3 Design Notes Where provided, this drawing contains: Additional design notes that are to be read in conjunction with the information shown on drawing sheets 1 and 2. Applicable industry standards to be used where the standard design is not suitable due to the specific location. 3.4 Sheet 4 Cabling arrangements Where provided, this drawing contains: Maximum size and number of LV cables Details of the bushing palm or LV bus Wiring for single phase 240V or split phase 480V where this option is available. 4 Drawings Kiosk arrangements and installation guide This section contains drawings within the following categories: Single Phase Underground Rural Transformer (SPUDS) Modular Package Substation (MPS) Schneider RM6 Switchgear Kiosk EDM# (Published) EDM# Page 5 of 22

6 Section 4 Kiosk General Arrangements and Installation Guides Low Voltage Switchgear Non-Modular Package Substation (Non-MPS), cluster substation. Page 6 of 22

7 4.1 DSM 4-01 SPUDS Transformer EDM# (Published) EDM# Page 7 of 22

8 Section 4 Kiosk General Arrangements and Installation Guides Page 8 of 22

9 EDM# (Published) EDM# Page 9 of 22

10 Section 4 Kiosk General Arrangements and Installation Guides Page 10 of 22

11 4.2 DSM 4-02 MPS Transformer EDM# (Published) EDM# Page 11 of 22

12 Section 4 Kiosk General Arrangements and Installation Guides Page 12 of 22

13 EDM# (Published) EDM# Page 13 of 22

14 Section 4 Kiosk General Arrangements and Installation Guides 4.3 DSM 4-03 No longer used Page 14 of 22

15 4.4 DSM 4-04 Schneider RM6 switchgear kiosk EDM# (Published) EDM# Page 15 of 22

16 Section 4 Kiosk General Arrangements and Installation Guides Page 16 of 22

17 4.5 DSM 4-05 LV Switchgear Kiosks EDM# (Published) EDM# Page 17 of 22

18 Section 4 Kiosk General Arrangements and Installation Guides Page 18 of 22

19 4.6 DSM 4-06 Non-MPS Transformer EDM# (Published) EDM# Page 19 of 22

20 Section 4 Kiosk General Arrangements and Installation Guides Page 20 of 22

21 EDM# (Published) EDM# Page 21 of 22

22 Section 4 Kiosk General Arrangements and Installation Guides Page 22 of 22

WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction

WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction Manual: Distribution Substation Manual (DSM) Section I: Introduction Standard Number: HPC-5DA-07-0010-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document Owner Name:

More information

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Standard Number: HPC-5DA-07-0011-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer

More information

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Network Standard NS

Network Standard NS Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION

More information

Australian Standard. Precast reinforced concrete box culverts

Australian Standard. Precast reinforced concrete box culverts AS 1597.2 1996 Australian Standard Precast reinforced concrete box culverts Part 2: Large culverts (from 1500 mm span and up to and including 4200 mm span and 4200 mm height) This Australian Standard was

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

SUBSTATION SECURITY WALL INSTALLATION MANUAL

SUBSTATION SECURITY WALL INSTALLATION MANUAL SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 February 2014 National Grid 2014 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means electronic,

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

SECTION 5 TRANSFORMERS

SECTION 5 TRANSFORMERS SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established

More information

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER. Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the

More information

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION Please complete all sections of the application form and return to newconnections@ukpowerdistribution.co.uk Section 1 Site Details UKPD Reference Number: Energisation Date: Site Name/Address/Postcode:

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

Australian Standard. Precast reinforced concrete box culverts. Part 1: Small culverts (not exceeding 1200 mm width and 900 mm depth) AS 1597.

Australian Standard. Precast reinforced concrete box culverts. Part 1: Small culverts (not exceeding 1200 mm width and 900 mm depth) AS 1597. AS 1597.1 1974 Australian Standard Precast reinforced concrete box culverts Part 1: Small culverts (not exceeding 1200 mm width and 900 mm depth) The following industrial and governmental organizations

More information

UK Power Networks OPERATIONAL BULLETIN

UK Power Networks OPERATIONAL BULLETIN Document No: HSS 406 OB 160 Issue Date: 10 July 2018 Type: Operational Safety Subject: Changes to DSR procedures 2018/1 Applicable Areas: All Applicable Job Roles: All DSR holders Issued By: Dudley Sparks

More information

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control

More information

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area Guideline for Creating Disconnection Points and Establishing a Not Document Number: Authorised by: Issue Date: 29 June 2012 Previous Document: 12 February 2010 Principal Authors: J Dohmen Powerlink D Brown

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

Underground Distribution Construction Manual

Underground Distribution Construction Manual Underground Distribution Construction Manual Section C2 Excavation & Reinstatement Approved by: A Smith-de Perez Energex Limited 2014 ABN 40 078 849 055 MANUAL 00305 ± ± Uncontrolled document when

More information

Reference Number PDS 07 (RIC Standard: EP SP)

Reference Number PDS 07 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 07 (RIC Standard: EP 12 10 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Jan 05 Standards

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 October 2014 Issue 2 September 2014 National Grid 2014 2014 Copyright owned by National Grid Electricity Transmission plc, all rights reserved. No part of this publication

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design Company Directive POLICY DOCUMENT: SD4/7 Relating to 11kV and 6.6kV System Design Policy Summary This document describes the standard requirements for the design of the 11kV and 6.6kV systems. Reference

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

Substation HV Cables. Document Number: 1-11-FR-07

Substation HV Cables. Document Number: 1-11-FR-07 Substation HV Cables Document Number: 1-11-FR-07 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-07 Substation HV Cables Asset Class Strategy Intellectual

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

Cooke Precast Concrete

Cooke Precast Concrete Cooke Precast Concrete History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience within the precast

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 2394 Fourth edition 2015-03-01 General principles on reliability for structures Principes généraux de la fiabilité des constructions Reference number ISO 2015 COPYRIGHT PROTECTED

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard - NSW Category Signalling Title Power Supply Units for Signalling Equipment - DC Track Feeds Reference Number SPS 29 - (RIC Standard: SC 09 10 06 00 SP) Document Control

More information

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION TITLE: RECOMMENDED: P. Lemay NO: APPROVED: C. Malone, P.Eng. REV. DATE: 2015-11-02 Working Procedure GCG0001 REV: 3 INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

More information

Customer Requirements Commercial Secondary Service

Customer Requirements Commercial Secondary Service Application Installation requirements for commercial services from Tacoma Power overhead or underground facilities. It applies to new construction or upgrades of older services. Electrical service may

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard - NSW Category Signalling Title Reference Number SPS 19 - (RIC Standard: SC 07 40 04 00 SP) Document Control Status Date Prepared Reviewed Endorsed Approved May 05 Standards

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

Reference Number PCP 02 (RIC Standard: EP SP)

Reference Number PCP 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PCP 02 (RIC Standard: EP 20 00 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures

More information

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints

More information

THERMISTORS (THERMALLY SENSITIVE RESISTORS), NTC, RANGE 2000 TO OHMS AT +25 O C WITH A TEMPERATURE RANGE OF -60 O C TO +160 O C

THERMISTORS (THERMALLY SENSITIVE RESISTORS), NTC, RANGE 2000 TO OHMS AT +25 O C WITH A TEMPERATURE RANGE OF -60 O C TO +160 O C Page 1 of 13 THERMISTORS (THERMALLY SENSITIVE RESISTORS), NTC, RANGE 2000 TO 100000 OHMS AT +25 O C WITH A TEMPERATURE RANGE OF -60 O C TO +160 O C BASED ON TYPE G2K7D411, G4K7D421, G10K4D451, G10K4D453,

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS CISPR 11:2011 IEC CISPR 11, Ed. 5.1 (2010) AS/NZS CISPR 11:2011 Australian/New Zealand Standard Industrial, scientific and medical equipment Radio-frequency disturbance characteristics Limits and

More information

NOTICE. (Formulated under the cognizance of the CTA R4 Video Systems Committee.)

NOTICE. (Formulated under the cognizance of the CTA R4 Video Systems Committee.) ANSI/CTA Standard Antenna Control Interface ANSI/CTA-909-B (Formerly ANSI/) January 2011 NOTICE Consumer Technology Association (CTA) Standards, Bulletins and other technical publications are designed

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

Title Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI)

Title Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI) Discipline Engineering Standard - NSW Category Electrical Title Operating Work - Low Voltage Distribution System Reference Number POP 06 - (RIC Standard: EP 95 30 00 03 SI) Document Control Status Date

More information

DE-PRIME GLOBAL SERVICES LTD DE-PRIME GLOBAL SERVICES LTD. ADDRESS: 1 Echendu Chinwo Close, Chukwuodara Rumoudara, Port Harcourt, Rivers State.

DE-PRIME GLOBAL SERVICES LTD DE-PRIME GLOBAL SERVICES LTD. ADDRESS: 1 Echendu Chinwo Close, Chukwuodara Rumoudara, Port Harcourt, Rivers State. ADDRESS: 1 Echendu Chinwo Close, Chukwuodara Rumoudara, Port Harcourt, Rivers State. PHONE: 08140925499, 08068365019,0706856979 EMAIL: deprimegloballimited@yahoo.com WEBSITE: www.deprimelimitd.com MISSION

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Services Title Compilation of Historical Records of Buildings Scheduled for Demolition Reference Number EYP 01 (RIC Standard: G 2650) Document Control Status

More information

Product Dimensions (Width x Length x Height) (inches)

Product Dimensions (Width x Length x Height) (inches) Mr. Dennis Hallahan, P.E. Infiltrator Water Technologies 4 Business Park Road P.O. Box 768 Old Saybrook, CT 06475 RE: Product Registration Renewal #2 Notice of Proprietary Distribution Product Listing

More information

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 8, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

HV Substation Earthing Design for Mines

HV Substation Earthing Design for Mines International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 4, Issue 6 (October 2012), PP. 100-107 HV Substation Earthing Design for Mines M.

More information

Publishing date: 23/07/2015 Document title: We appreciate your feedback. Share this document

Publishing date: 23/07/2015 Document title: We appreciate your feedback. Share this document Publishing date: 23/07/2015 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Share this document REPORT ON UNIT

More information

Plain bearings Wrapped bushes

Plain bearings Wrapped bushes BRITISH STANDARD BS ISO 3547-3:2006 Plain bearings Wrapped bushes Part 3: Lubrication holes, grooves and indentations ICS 21.100.10 National foreword This British Standard was published under the authority

More information

Foundation Specifications

Foundation Specifications Installation Instructions Bulletin 237746 Foundation Specifications for High-Wind 4.5-Meter Earth Station Antennas Revision C 1.0 INTRODUCTION 1.1 This document specifies typical foundation characteristics,

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

Planned Obsolescence and Mid Life Updates -

Planned Obsolescence and Mid Life Updates - Planned Obsolescence and Mid Life Updates - Life of field is more than just existence Kevin Glanville, Design & Development Manager, Proserv [UK]; Presenting Paul Hunter, Subsea controls / Systems technical

More information

PME specialises in developing, implementing and maintaining solutions to the Mining industry.

PME specialises in developing, implementing and maintaining solutions to the Mining industry. +675 325 3533 PME specialises in developing, implementing and maintaining solutions to the industry. Our Services: Engineering & design EPC services High voltage design, installations and testing Installation

More information

AS/NZS :2013 (IEC , , MOD)

AS/NZS :2013 (IEC , , MOD) AS/NZS 60076.7:2013 (IEC 60076-7, Ed. 1.0 2005, MOD) Australian/New Zealand Standard Power transformers Part 7: Loading guide for oil-immersed power transformers AS/NZS 60076.7:2013 AS/NZS 60076.7:2013

More information

Item designation in electrotechnology

Item designation in electrotechnology AS 3702 1989 Australian Standard Item designation in electrotechnology This Australian Standard was prepared by Committee TE/13, Symbols, Units & Quantities for Electrotechnology. It was approved on behalf

More information

INTERPLANT STANDARD - STEEL INDUSTRY

INTERPLANT STANDARD - STEEL INDUSTRY INTERPLANT STANDARD - STEEL INDUSTRY IPSS GUIDELINES FOR ARRANGEMENT DRAWINGS AND DOCUMENTS TO BE SUBMITTED TO AN EOT CRANE CUSTOMER FOR APPROVAL No corresponding Indian Standard exits IPSS:2-02-011-02

More information

G81 PART 1 FRAMEWORK APPENDIX

G81 PART 1 FRAMEWORK APPENDIX G81 PART 1 FRAMEWORK APPENDIX Housing Development design framework appendix to be read in conjunction with the latest version of: ENA Engineering Recommendation G81 Part 1 Framework for design and planning,

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

25kV A.C. Electrified Lines - Traction Bonding

25kV A.C. Electrified Lines - Traction Bonding Date:MAR 94 25kV A.C. Electrified Lines - Traction Page 1 of 6 Part A Synopsis This is issued by the to define the Boards requirements for continuity bonding on railway systems. This will ensure a continuous

More information

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

Reference Number PPS 05 - (RIC Standard: EP SP)

Reference Number PPS 05 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Low Voltage Isolating Transformer Reference Number PPS 05 - (RIC Standard: EP 17 00 00 11 SP) Document Control Status Date Prepared Reviewed

More information

Cooke Precast Concrete

Cooke Precast Concrete Cooke Precast Concrete INSPECTION OPENINGS History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience

More information

EDS LV ELECTRICAL SERVICE DRAWINGS

EDS LV ELECTRICAL SERVICE DRAWINGS Document Number: EDS 08-2110 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2110 LV ELECTRICAL SERVICE DRAWINGS EPN, LPN, SPN This standard details the drawings for service positions and connection

More information

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis Company Directive STANDARD TECHNIQUE: SD5F Relating to connecting multiple small low voltage connections with limited network analysis Policy Summary This document specifies the procedure for connecting

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697.

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697. ADDENDUM No. AERC. 396/2012/Pt.-III/4.-Assam Electricity Regulatory commission (Terms and Conditions for determination of Multi Year tariff) Regulations, 2015 issued vide notification No. AERC.396/2012/Pt/-II/13

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Electric Service Guide. Residential Subdivision

Electric Service Guide. Residential Subdivision Electric Service Guide Residential Subdivision January 1, 2017 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website

More information

CONTINUOUS COUNTERPOISE ON POLES

CONTINUOUS COUNTERPOISE ON POLES Project Procedure CONTINUOUS COUNTERPOISE ON POLES 07/25/2011 PAGE 1 OF 5 1.0 PURPOSE The purpose of this procedure is to provide guidance and direction for the installation of continuous counterpoise

More information

580 - NOISE BARRIERS OPSS 580 INDEX

580 - NOISE BARRIERS OPSS 580 INDEX 580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading

More information

looking west looking east A0.6 Proposed Development Model Shots 1327 Marine Drive West Vancouver revision date fax (604) phone (604)

looking west looking east A0.6 Proposed Development Model Shots 1327 Marine Drive West Vancouver revision date fax (604) phone (604) THIS DRAWING IS THE EXCLUSIVE PROPERTY OF THE ARCHITECTS AND CAN BE REPRODUCED ONLY WITH THE PERMISSION OF THE ARCHITECTS, IN WHICH CASE THE REPRODUCTION MUST BEAR THEIR NAME AS ARCHITECTS. fax (604) 926-1059

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Reference Number SDS 17 (RIC Standard: SC 00 13 01 17 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

Arc Flash Analysis Training

Arc Flash Analysis Training Arc Flash Analysis Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq An arc flash analysis study is

More information

2016 3rd Conference on Power Engineering and Renewable Energy (ICPERE 2016)

2016 3rd Conference on Power Engineering and Renewable Energy (ICPERE 2016) 2016 3rd Conference on Power Engineering and Renewable Energy (ICPERE 2016) Yogyakarta, Indonesia 29-30 November 2016 IEEE Catalog Number: ISBN: CFP1646T-POD 978-1-5090-5109-0 Copyright 2016 by the Institute

More information

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021 TRANSMISSION AND SUBSTATION PROJECT S OPERATING COMPANY: EGSI-TX CUSTOMER: COTTONWOOD ENERGY COMPANY, LP EJO # GS0021 FACILITY STUDY OPTIONAL SYSTEM UPGRADES FOR 1240 MW, IPP PROJECT NEAR HARTBURG, TX

More information

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007. Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01 SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC

More information

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK LIMITS FOR TEMPORARY OEROLTAGES IN ENGLAND AND WALES NETWORK This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information