WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction

Size: px
Start display at page:

Download "WITHDRAWN JULY Manual: Distribution Substation Manual (DSM) Section I: Introduction"

Transcription

1 Manual: Distribution Substation Manual (DSM) Section I: Introduction Standard Number: HPC-5DA

2 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document Owner Name: Justin Murphy (May also be the Process Owner) Position: Manager Asset & Works Approved By * Name: Justin Murphy Position: Manager Asset & Works Date Created/Last Updated January 2014 Review Frequency ** 5 yearly Next Review Date ** January 2019 * Shall be the Process Owner and is the person assigned authority and responsibility for managing the whole process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business results. ** Frequency period is dependent upon circumstances maximum is 10 years from last issue, review, or revision whichever is the latest. If left blank, the default shall be 1 year unless otherwise specified. Revision Control Revision Date Description 0 14/01/2014 Original Issue Manager Assets & Works Manager Engineering Services STAKEHOLDERS The following positions shall be consulted if an update or review is required: Manager Engineering Systems Planning DM# Page 2 of 10 Print Date 3/07/2017

3 TABLE OF CONTENTS 1 PREFACE INTRODUCTION Format and Content of the Manual Section 1: Customer Supply Arrangements Section 2: MV Network Arrangements Section 3: Substation Arrangements Section 4: Kiosks Equipment Installation Guide Section 5: Substation Fire Protection Requirements Section 6: Miscellaneous Section 7: Superseded Equipment - Installation Guide Section 8: Distribution Automation Section 9: Environmental Protection for Substation Section D - Drawing Revision List Use of the Manual REFERENCE DOCUMENT REVISION INFORMATION DM# Page 3 of 10 Print Date 3/07/2017

4 1 PREFACE This Distribution Substation Manual (DSM) contains the approved standard arrangements for the design, construction and installation of distribution substations; connection of customers to these substations and interconnection of the substations to the surrounding MV and LV networks within Horizon Power s North-West Interconnected System (NWIS) and the Regional Non-Interconnected System (RNIS). It supersedes the Western Power Distribution Substation Manual previously applicable to Horizon Power networks. Although the design principles and arrangements contained in this Manual are intended to be generally applicable to all installations with Horizon Power s supply networks, there may be areas within the distribution network that require special consideration. This Manual does not contain any equipment fabrication drawings. These are now contained in a separate manual. This Manual is to be used in conjunction with the following documents: Horizon Power Technical Rules Distribution Design Manuals - Volumes 1 to 5 Field Instruction Practices and Standards Manual (FIPSM) WA Electrical Requirements Western Australian Distribution Connections Manual (WADCM) Underground Distribution Schemes Manual General Conditions for Individual Customers - DMS# [Formerly identified as General Conditions for Individual Customers - DSB 95/5] Substation Installation Requirements - DM# [Formerly identified as Substation Installation Requirements - DSB 95/6] DM# Page 4 of 10 Print Date 3/07/2017

5 2 INTRODUCTION This manual is intended to provide guidelines on the format, contents and use of the Distribution Substation Manual. In conjunction with the Substation Installation Requirements and WADCM (Western Australian Distribution Connections Manual), it describes the customer s responsibilities in relation to the design and installation of the substation. 2.1 Format and Content of the Manual This Manual is divided into nine Sections as listed below. Each Section contains its own drawing index, with revisions listed in Section D Drawing Revision List. In addition, some sections contain design notes. Section Description 1 Customer Supply Arrangements 2 MV Network Arrangements 3 Substation Arrangements 4 Kiosks Equipment Installation Guide 5 Substation Fire Protection Requirements 6 Miscellaneous 7 Superseded Equipment - Installation Guide 8 Distribution Automation 9 Environmental Protection for Substation D Drawing Revision List Table 1: Sections of the DSM Section 1: Customer Supply Arrangements Section 1 shows the standard arrangements for the connection of LV or MV customers to new or existing distribution substations. These drawings enable the designer to select the correct method for connection of a customer along with the appropriate fuse arrangements Section 2: MV Network Arrangements Section 2 shows the standard arrangements for the interconnection of a new distribution substation into the existing MV network. These drawings enable the designer to select the required substation arrangement and also the correct method of interconnecting the substation with the MV network. DM# Page 5 of 10 Print Date 3/07/2017

6 The standard also describes the philosophy associated with the design of MV network at the different voltage levels. Also there are guidelines that must be taken into consideration during the design of the network Section 3: Substation Arrangements Section 3 shows the standard arrangements in relation to land and clearances for distribution substations. The drawings are intended to be issued for the customer s reference. Each substation arrangement drawing has three sheets as described below: 1. Civil and Land Requirements shows the land area required for the substation and any civil construction requirements (but no civil design details). For substations which are required to be fire rated, this sheet will also show the requirements for the fire rated enclosure. 2. Equipment and Installation Details shows the equipment required within the substation and its physical arrangement on the site. All equipment shown is based on assemblies contained in the Distribution Design Catalogue (DDC). NOTE: 3. Operational Clearances Earthing layout shown on this drawing is indicative only. Detailed earthing drawings can be found in DSM 6. shows the operational clearances required for equipment within the substation. These drawings provide the designer with the basis of the substation site area requirements to allow flexibility if alternative site areas/shapes are required in specific cases to satisfy a customer s need. Where a customer requires a non-standard substation arrangement, (for example where an odd shape site exists), the above drawings shall be made available to the customer. It is the customer s responsibility, in conjunction with his architect, to prepare an alternative arrangement design. This design must meet all of HP s operational requirements and any relevant Australian Standards requirements. The design shall be submitted to HP for approval Section 4: Kiosks Equipment Installation Guide Section 4 shows the general outlay and installation guide for the kiosk enclosed distribution substation equipment used by HP. This includes MV ring main switchgear kiosks (RMU s), modular package substations (MPS s), non Modular package substations (non-mps s) and LV switchgear kiosks. Each kiosk arrangement drawing has the following details: 1. General Arrangement shows the physical arrangement and dimension references for the equipment. 2. Installation Guide shows the requirements for installation of the equipment, for example, lifting points, soil compaction and installation sequences. This sheet is for issue to stakeholders and external parties responsible for preparation of site and installation of the equipment. DM# Page 6 of 10 Print Date 3/07/2017

7 In addition the standard also provides guidelines on the various switchboard arrangements permissible for LV kiosks and the cable arrangements applicable for termination into a non-mps transformer Section 5: Substation Fire Protection Requirements Section 5 shows the fire protection requirements for distribution substations. These drawings are intended to provide designers with guidelines on determining the fire risk zones around a substation and what protection measures are necessary in the risk zones. These drawings can also be issued to customers for the same purpose Section 6: Miscellaneous Section 6 contains drawings relevant to distribution substations, which are of an ancillary nature and which are referenced on one or more of the above drawings. They include: 1. Substation Ducting Cross Sections shows the required cross sections of ducts into distribution substations. 2. Substation Exhaust Fan and Distribution Board Details shows the details and distribution board for the fan supply when required in a fully enclosed substation with no cross flow ventilation. 3. Indoor Substation Support shows the details of the trench and dimensions of support beams/stanchions required to install a district/sole use substation and MV switchgear inside a MV switchroom. 4. Extensible Switchgear Support shows the details of the support stanchion/beam for extensible type switchgear in a MV switchroom. 5. Transformer Lifting Details shows the detail for lifting transformers using lifting eyes or a monorail. 6. Earthing Requirements shows the earthing installation requirements for the distribution substation arrangements described by DSM 3 (indoor and outdoor). 7. Permissible Screening Arrangements shows what screening requirements are permissible around substations (only provided for substations which are not required to be fire rated). It details the customer s options and responsibilities in relation to the erection of screening around the substation site Section 7: Superseded Equipment - Installation Guide Section 7 shows the installation requirements for superseded equipment, specifically, the old style of transformers and associated medium voltage switchgear installed in non fire rated compounds, IPS transformers and IPS transformers with MV switchgear. DM# Page 7 of 10 Print Date 3/07/2017

8 These drawings align the installation of this superseded equipment with the current version of the DSM to avoid the potential problems when excavation occurs around the transformer during the installation of cables. In addition the drawings also show the superseded construction used in indoor support beam for substations Section 8: Distribution Automation Section 8 shows drawings relevant to the automation and typical configuration of Remote Terminal Units (RTU s) for switchgear units. [Note that most Drawings (DSM to DSM-08-06) are superseded, except for those relating to Schneider RM6 units (DSM-8-07) Section 9: Environmental Protection for Substation Section 9 shows requirements for substation installations in environmentally sensitive sites (Specifically areas that require oil containment and areas above the normal flood level ratings). This standard covers: 1. Standard arrangement in relation to land and clearances for distribution substations that require oil containment. 2. Land and construction requirements for areas with above normal flood levels Section D - Drawing Revision List Section D shows the list of the latest updates that have been made on all the drawings in the manual. 2.2 Use of the Manual The DSM documents described in Section 2.1 are discrete and can be referred to individually as per design requirements. The steps below illustrate the use of DSM s for a new distribution substation that is to be installed to meet the load requirement of customer. 1. Determine the customer s maximum load demand. This is discussed in detail in the Distribution Design Manual Volume 3 - Supply to Large Customer Installations. 2. Determine the type of substation required, i.e. District, Sole Use or Customer Owned. This is discussed in detail in the Distribution Design Manual Volume 3 - Supply to Large Customer Installations. It is also discussed briefly in the Substation Installation Requirements. 3. Check if any additional capacity is required to be fed back into the street. 4. Determine the minimum number and sizes of transformers required to be installed in the substation. In the case of a new discrete load, before this can be determined it may be necessary to discuss the level of security required by the customer (e.g. the customer may require 2 x 630 kva transformers rather than 1 x 1000 kva transformer). 5. Select the most appropriate Customer Supply Arrangement drawing (contained in Section 1 of this Manual) based on the above information. Note that the transformer size in conjunction with the customer s maximum load demand will DM# Page 8 of 10 Print Date 3/07/2017

9 determine the size of fuse, link or disconnect required for the customer and also whether or not the customer s switchboard must be contiguous. Also refer to the Substation Installation requirements. 6. Determine whether a modular package substation (MPS) arrangement or non MPS arrangement is required. Section 4 describes the various arrangements available for the installation of the equipment. 7. Select the most appropriate MV Network Arrangement drawing (contained in Section 2 of this Manual) based on the neighbouring MV network to which the substation will be connected. Note that MV transformer fuse sizes are provided in drawing DSM Determine the fire protection requirements for the substation based on the proposed location of the substation in relation other land uses in the vicinity (e.g. other structures or buildings) and the drawings contained in Section 5 of this Manual. See Substation Installation Requirements. 9. Select the correct Substation Arrangement drawing (contained in Section 3 of this Manual) from the table on the MV Network Arrangement drawing based on the substation type and fire protection requirements. If the substation is to be situated in an environmentally sensitive site then refer to arrangements in Section Based on the Substation Arrangement drawing and other information determined in previous steps (e.g. transformer size, type and size of customer fuse/link/disconnect, and need for a contiguous switchboard), finalise the design and prepare an assembly list for the substation. In the case of a non fire rated substation, the customer s requirements for screening of the substation should also be determined at this point. See Section 6-13 for more detailed discussion on substation screening. DM# Page 9 of 10 Print Date 3/07/2017

10 3 REFERENCE DOCUMENT The following Reference Documents have been used to prepare this Standard: Doc Ref. Document Title Record No DM# Distribution Substation Manual - Section 1 Customer Substation Arrangements Substation Installation Requirements Western Australian Distribution Connections Manual (Superseded) Publisher Horizon Power Horizon Power Horizon Power and Western Power 4 REVISION INFORMATION (Informative) Horizon Power has endeavoured to provide standards of the highest quality and would appreciate notification if any errors are found or even queries raised. Each Standard makes use of its own comment sheet which is maintained throughout the life of the standard, which lists all comments made by stakeholders regarding the standard. A comment sheet found in DM: can be used to record any errors or queries found in or pertaining to this standard, which can then be addressed whenever the standard gets reviewed. Date Rev No. Notes 0 14/01/2014 Original Issue DM# Page 10 of 10 Print Date 3/07/2017

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Standard Number: HPC-5DA-07-0011-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer

More information

DISTRIBUTION DESIGN CATALOGUE

DISTRIBUTION DESIGN CATALOGUE DISTRIBUTION DESIGN CATALOGUE Section 15 LM Low Voltage Metering HPC-1DC-07-0015-2014 For application to Horizon Power Electricity Distribution Networks Document Control Author Name: Paul Savig Position:

More information

Interim Distribution Substation Manual (DSM)

Interim Distribution Substation Manual (DSM) Interim Distribution Substation Manual (DSM) Section 4 Kiosk General Arrangements and Installation Guides Original Issue: June 1997 This Revision: 6 th - June 2018 EDM# 22966949 (Published) EDM# 23581608

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS AS 2067 1984 Australian Standard Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv [Title allocated by Defence Cataloguing Authority: SWITCHGEAR ASSEMBLIES, ELECTRICAL AND

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION

ELECTRIC NETWORK DESIGN APPROVAL APPLICATION Please complete all sections of the application form and return to newconnections@ukpowerdistribution.co.uk Section 1 Site Details UKPD Reference Number: Energisation Date: Site Name/Address/Postcode:

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

HPC-9DJ

HPC-9DJ Manual: Distribution Design Manual Volume 1 Quality of Electricity Supply Standard Number: HPC-5DC-07-0001-2012 Document Control Author Name: Anthony Seneviratne Position: Senior Standards Engineer Document

More information

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

ACCESS TO HIGH VOLTAGE APPARATUS

ACCESS TO HIGH VOLTAGE APPARATUS CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 October 2014 Issue 2 September 2014 National Grid 2014 2014 Copyright owned by National Grid Electricity Transmission plc, all rights reserved. No part of this publication

More information

NSP/007/028 Guidance On Substation Design: Drawing Submission Requirement

NSP/007/028 Guidance On Substation Design: Drawing Submission Requirement Version:- 1.0 Date of Issue:- January 2016 Page 1 of 25 NSP/007/028 Guidance On Substation Design: Drawing Submission Requirement 1. Purpose The purpose of this document is to provide guidance on the submission

More information

GENERAL TECHNICAL SPECIFICATION (Turnkey Work)

GENERAL TECHNICAL SPECIFICATION (Turnkey Work) GENERAL TECHNICAL SPECIFICATION (Turnkey Work) March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar,

More information

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE ENGINEERING COMMISSIONING PROCEDURE ECP 11-0512 GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions Company Directive STANDARD TECHNIQUE: TP6F/1 Power Measurement Conventions Summary This document specifies the conventions that are used for the direction of Power Flow within Western Power Distribution

More information

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:

More information

EDS LV ELECTRICAL SERVICE DRAWINGS

EDS LV ELECTRICAL SERVICE DRAWINGS Document Number: EDS 08-2110 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2110 LV ELECTRICAL SERVICE DRAWINGS EPN, LPN, SPN This standard details the drawings for service positions and connection

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Australian Standard. Electricity metering equipment (AC) Particular requirements

Australian Standard. Electricity metering equipment (AC) Particular requirements AS 62053.21 2005 AS 62053.21 2005 Australian Standard Electricity metering equipment (AC) Particular requirements Part 21: Static meters for active energy (classes 1 and 2) (IEC 62053-21, Ed.1.0 (2003)

More information

G81 PART 1 FRAMEWORK APPENDIX

G81 PART 1 FRAMEWORK APPENDIX G81 PART 1 FRAMEWORK APPENDIX Housing Development design framework appendix to be read in conjunction with the latest version of: ENA Engineering Recommendation G81 Part 1 Framework for design and planning,

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

Network Standard NS

Network Standard NS Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Miniature substations: What they are really capable of delivering

Miniature substations: What they are really capable of delivering Miniature substations: What they are really capable of delivering by Rhett Kelly and Greg Whyte, ACTOM Medium Voltage Switchgear The latest edition of the South African national standard for miniature

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 February 2014 National Grid 2014 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means electronic,

More information

Neutral Earthing. For permanent or temporary neutral earthing in HV systems

Neutral Earthing. For permanent or temporary neutral earthing in HV systems Neutral Earthing Resistors RESISTORS For permanent or temporary neutral earthing in HV systems For continuous or temporary low-resistance neutral grounding in medium voltage systems Neutral point connection

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Given Names: Date: Time: Location: Assessment Time (includes reading and preparation time): At the end of this time you will be asked to stop.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control

More information

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007. Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

ECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE

ECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE Document Number: ECP 11-0511 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0511 GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and

More information

GENERAL TECHNICAL SPECIFICATION

GENERAL TECHNICAL SPECIFICATION GENERAL TECHNICAL SPECIFICATION September 2017 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.

More information

DESIGN STANDARD NO. DS 21

DESIGN STANDARD NO. DS 21 Assets Delivery Group Infrastructure Design Branch DESIGN STANDARD NO. DS 21 Major Pump Station Electrical VERSION 1 REVISION 7 JUNE 2017 FOREWORD The intent of Design Standards is to specify requirements

More information

50-SDMS-01 SPECIFICATIONS FOR

50-SDMS-01 SPECIFICATIONS FOR SPECIFICATIONS FOR CURRENT TRANSFORMERS UP TO 36 KV This specification is property of SEC and subject to change or modification without any notice C O N T E N T S CLAUSE TITLE PAGE NO. ------------ --------

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

MERALCO Standards: Electrical Design. Engr. Eduard Mercado Electrical Design Team

MERALCO Standards: Electrical Design. Engr. Eduard Mercado Electrical Design Team MERALCO Standards: Electrical Design Engr. Eduard Mercado Electrical Design Team Electrical Design Standards SERVICE VOLTAGES SECONDARY METERED - 240 V, 400 V, 460 V PRIMARY METERING -34.5 kv, 13.8 kv

More information

DA - DISTRIBUTION AUTOMATION

DA - DISTRIBUTION AUTOMATION DA - DISTRIBUTION AUTOMATION DA Drawing & CU Revision List CU DATE REVISION OF REVISION DA5_RM6 DA6_RM6 DA6_RM6_T200 DA6_RM6_T200 DA6_RM6_T200 DA1 DA2 DA3 DA4 DA3_150MHZ DA3_450MHZ Sept 2002 July 2006

More information

Reference Number PPS 05 - (RIC Standard: EP SP)

Reference Number PPS 05 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Low Voltage Isolating Transformer Reference Number PPS 05 - (RIC Standard: EP 17 00 00 11 SP) Document Control Status Date Prepared Reviewed

More information

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis Company Directive STANDARD TECHNIQUE: SD5F Relating to connecting multiple small low voltage connections with limited network analysis Policy Summary This document specifies the procedure for connecting

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

Revision Control. 0 18/07/2012 Initial Document Creation. STAKEHOLDERS The following positions shall be consulted if an update or review is required:

Revision Control. 0 18/07/2012 Initial Document Creation. STAKEHOLDERS The following positions shall be consulted if an update or review is required: Standard: Technical Requirements for Bumpless Transfer of Customer Load between Embedded Generators and the Distribution Network Standard Number: HPC-9OJ-13-0001-2012 * Shall be the Process Owner and is

More information

MEDIUM VOLTAGE. For your projets where the low voltage is limited. 3200V 5500V 6600V Energy distribution

MEDIUM VOLTAGE. For your projets where the low voltage is limited. 3200V 5500V 6600V Energy distribution MEDIUM VOLTAGE For your projets where the low voltage is limited 3200V 5500V 6600V Energy distribution YOUR EXISTING CONSTRAINTS Example 1: FROM LV EXISTING ELECTRICAL SOURCES : Transport the LV to the

More information

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

Reference Number PDS 04 (RIC Standard: EP SP)

Reference Number PDS 04 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 04 (RIC Standard: EP 12 10 00 10 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it. 1. SCOPE The requirements of this document apply to all Plant, Equipment and Apparatus that are part of, or are Directly connected to, the Company network. Requirements contained herein may be modified

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3439.2:2002 IEC 60439-2:2000 AS/NZS 3439.2 Australian/New Zealand Standard Low-voltage switchgear and controlgear assemblies Part 2: Particular requirements for busbar trunking systems (busways)

More information

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design Company Directive POLICY DOCUMENT: SD4/7 Relating to 11kV and 6.6kV System Design Policy Summary This document describes the standard requirements for the design of the 11kV and 6.6kV systems. Reference

More information

PROJECT: SUPPLY & INSTALL ELECTRICAL SWITCHBOARD AT SENGKURONG EXCHANGE PHASE 1, JLN TUTONG, BSB. SCOPE OF WORK The scope of work under Electrical Services shall include but not limited to the supply,

More information

APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 1. BATTERIES, MODULAR FLOODED LEAD-ACID 2. BATTERIES, MODULAR VALVE REGULATED LEAD ACID

APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 1. BATTERIES, MODULAR FLOODED LEAD-ACID 2. BATTERIES, MODULAR VALVE REGULATED LEAD ACID APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 BIDDER INSTRUCTIONS: All Bidder pricing must be based on the Sample Product provided in Appendix H Mandatory Requirements. Any category in Appendix H that

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Date: Given Names: Time: Assessment Time (includes 10 minutes reading time): At the end of this time you will be asked to stop. 4 hours Have you

More information

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge

More information

City of San José, California CITY COUNCIL POLICY

City of San José, California CITY COUNCIL POLICY City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September

More information

CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv

CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv June 2016 Issue 1 1. INTRODUCTION Introduction of contestability and the ability of all major customers to become contestable

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 5070.2:2008 AS/NZS 5070.2:2008 Australian/New Zealand Standard Siting and operation of radiocommunications facilities Part 2: Guidelines for siting of radiocommunications facilities: VHF, UHF and

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

POWER SWITCHGEAR. ASC C37 Secretary 1300 NORTH 17TH STREET, SUITE 1847 ROSSLYN, VA TEL: (703) FAX: (703)

POWER SWITCHGEAR. ASC C37 Secretary 1300 NORTH 17TH STREET, SUITE 1847 ROSSLYN, VA TEL: (703) FAX: (703) ACCREDITED STANDARDS COMMITTEE, C37 POWER SWITCHGEAR ASC C37 Secretary 1300 NORTH 17TH STREET, SUITE 1847 ROSSLYN, VA 22209 TEL: (703) 841-3244 FAX: (703) 841-3344 http://forums.nema.org:8080/~ansic37

More information

IMP/007/011 - Code of Practice for the Application of Lightning Protection

IMP/007/011 - Code of Practice for the Application of Lightning Protection Version 1.1 of Issue Aug 2006 Page 1 of 11 IMP/007/011 - Code of Practice for the Application of Lightning Protection 1.0 Purpose The purpose of this document is to ensure the company achieves its requirements

More information

Scope of work of Architect (as per the agreement signed by the Architect)

Scope of work of Architect (as per the agreement signed by the Architect) Annexure I Scope of work of Architect (as per the agreement signed by the Architect) 3. DETAILED SCOPE OF WORK The detailed scope of works for Architect/ Consultant shall comprise of the following for

More information

Drawing Management Standard

Drawing Management Standard Record Number: R0000393979 Version Number: 1.0 Date: December 2015 Authorisations Action Name and title Date Prepared by TasNetworks 23/12/2015 Reviewed by David King With input from Rick Stevens, Jeshua

More information

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety 8.22 Switching Activities Purpose This instruction provides a safe system for switching on Horizon Powers Low Voltage, High Voltage and or Transmission electrical apparatus/network, where switching operations

More information

Trusted Versatile FTA

Trusted Versatile FTA PD-T8842 Trusted Product Overview The Trusted Versatile Field Termination Assembly (VFTA) T8842 is primarily designed to act as the main interface between field devices associated with the detection and

More information

CableTroll 2410 PN: /03. User Manual

CableTroll 2410 PN: /03. User Manual CableTroll 2410 PN: 01-2410- 02/03 User Manual UG CT 2410-RMU February 2010 This document describes the installation and configuration of the RMU Fault Indicator Product no: 01-2410- 02/03 Rev. 0.1 (21.01.09)

More information

SECTION 5 TRANSFORMERS

SECTION 5 TRANSFORMERS SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established

More information

MESP TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER TRANSFORMER Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER Version: 3 Issued: February 2018 Owner: Head of Engineering - Electrical Approved By: Andrew Russack Head

More information

PAPER. Dry-type transformer innovation: HiDry 72 for subtransmission lines

PAPER. Dry-type transformer innovation: HiDry 72 for subtransmission lines PAPER Title Dry-type transformer innovation: HiDry 72 for subtransmission lines Registration Nº: (Abstract) Authors of the paper Name Country e-mail Martin Carlen Switzerland martin.carlen@ch.abb.com Mariano

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

RISK MANAGEMENT IN A LOW VOLTAGE NETWORK ON SAFETY ISSUES FROM ASSET MANAGEMENT PERSPECTIVE

RISK MANAGEMENT IN A LOW VOLTAGE NETWORK ON SAFETY ISSUES FROM ASSET MANAGEMENT PERSPECTIVE RISK MANAGEMENT IN A LOW VOLTAGE NETWORK ON SAFETY ISSUES FROM ASSET MANAGEMENT PERSPECTIVE Sharmistha BHATTACHARYYA Endinet The Netherlands sharmirb@yahoo.com Thijs van DAEL Endinet The Netherlands thijs.van.dael@endinet.nl

More information

Standard Prices for Generators 2010

Standard Prices for Generators 2010 Standard Prices for Generators 2010 Distribution System Operator ESB Networks Page 1 of 13 CONTENTS 1.0 Background...3 2.0 Standard Pricing Approach...3 Schedule of Charges for generators excluding VAT...6

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 1102.111:1997 IEC 617-11:1996 Australian/New Zealand Standard Graphical symbols for electrotechnical documentation Part 111: Architectural and topographical installation plans and diagrams [ IEC

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013

ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013 ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013 This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the

More information

1960 Research Drive, Suite 100, Troy, Michigan with. REVISION: December 10, 2007 (Supersedes previous versions) Prepared by:

1960 Research Drive, Suite 100, Troy, Michigan with. REVISION: December 10, 2007 (Supersedes previous versions) Prepared by: ENGINEERING SERVICES 1960 Research Drive, Suite 100, Troy, Michigan 48083 ARC FLASH REDUCTION with SEPAM RELAY ZONE SELECTIVE INTERLOCKING REVISION: December 10, 2007 (Supersedes previous versions) Prepared

More information

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS PURCHASE SPECIFICATIONS OF 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS SPECIFICATION NO. : OR12423 REVISION NO. : Rev 00 DATE : 01.03.2011 DISTRIBUTION : PI - 4 copies O/C - 1 copy PREPARED BY

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web: Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation

More information

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment Mobility and Logistics Traffic Solutions Sopers Lane Poole, Dorset BH17 7ER SYSTEM/PROJECT/PRODUCT: Traffic Controllers Siemens ST950 & ST900 Statement of Against TR 2513 Issue A, September 2005 Performance

More information

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES I. PURPOSE AND COMPLIANCE In implementing City Code, Chapter 8, Section 815, the City Council of the City of Pine City (the City ) finds that

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

Final draft EN V1.5.2 ( )

Final draft EN V1.5.2 ( ) European Standard (Telecommunications series) Equipment practice; Engineering requirements for outdoor enclosures; Part 2: Unequipped enclosures 2 Reference DEN/EE-00001-2 (atoi0jpc.pdf) Keywords equipment

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information