1 MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting General Bids and or Filed Sub-Bids for the above referenced project is called to the following Responses to Questions and/or RFI s. Responses to Questions and/or RFI s: Item #7.2 Summary of Question: Spec section section 4 called for (1) LS low voltage duct bank and feeder but pay item # 82 & 83 called for underground feeder & conduits for Row D & E. Please clarify Design Team Response: Specification section , Part 4 indicates what is to be bid. Pay item #83 & #84 (on ADDENDUM NO. 03 BID PROPOSAL FORM) indicate how this is to be sub-divided. Bid per pay items #83 & #84 (on ADDENDUM NO. 03 BID PROPOSAL FORM). Item # Revised Summary of Question: Also, please clarify the quantity of the 8 bollards shown on S-502. On Reefer Rack Foundation Plan 1/S-502, there is a note that states Steel pipe bollard to be added at exterior racks only. What is an exterior rack and how many are there? Design Team Response: There is a total of 18 eighteen (8) inch diameter pipe bollards required on this project. These will be installed at the NE and NW corners of the reefer rack foundations adjacent to the reefer rack columns as shown in detail 2 on sheet S-509 and detail 6 on sheet S-510. There are also 18 eighteen (12) inch diameter pipe bollards required on this project. These 12-inch diameter bollards will be installed around the electrical gear pads as shown in detail 6 on sheet C-502 and detail 5 on sheet S-510. DRAWING S-510 to be re-issued with ADDENDUM NO. 03.
2 Item # Revised Summary of Question: Reference drawings E-103 and E-104. There are conduits labeled BB and BBC which run in the east-west direction. Also there are conduits labeled BBA which run in the north-south direction. Please clarify the purpose of these conduit. Also, what pay item are these conduits to be included with? Design Team Response: ADDENDUM NO. 03. Will re-issue the BID PROPOSAL FORM. Please refer to new BID PROPOSAL FORM when reading answer below. The pathway/manhole system is for future use by Massport but are used for the high mast lighting feeders and fiber optic cabling as shown on the drawings. Reference Unit Price Bid Form item numbers 30, 31 & 88. Item 88 is a new item on the amended bid form. Item #24.1 Summary of Question: Drawing CG103 shows bollards at all four corners of reefer rack foundations, drawing S-501 shows them at one end only. Please confirm the quantity of 8" bollards required for each reefer rack Design Team Response: There is a total of 18 eighteen (8) inch diameter pipe bollards required on this project. These will be installed at the NE and NW corners of the reefer rack foundations adjacent to the reefer rack columns as shown in detail 2 on sheet S-509 and detail 6 on sheet S-510. There are also 18 eighteen (12) inch diameter pipe bollards required on this project. These 12-inch diameter bollards will be installed around the electrical gear pads as shown in detail 6 on sheet C-502 and detail 5 on sheet S-510. Item #24.2 Summary of Question: Please provided an installation detail for 8" bollards in the 4'-0" thick reefer rack foundation, detail 6 S-501 does not cover this situation. Design Team Response: The thickness of the concrete foundation shown in detail 6 on sheet S-510 should be 4-0 to match the reefer rack foundation depth. The bollard and the 10-inch diameter insert pipe should extend the full depth of the foundation (4-0 ). Page 2 of 6
3 Item #24.3 Summary of Question: Please confirm steel edge armoring plates shown on drawing S-511 are installed at both ends of all reefer racks and bearing pads. Also that their 1-6" dimension is consistent regardless of concrete thickness. Design Team Response: DRAWING S-510 to be re-issued with ADDENDUM NO. 03. Detail 2 on sheet S-511 will be altered on Adjust thickness of the reefer rack foundation from 1-6 to 4-0 Change the 3/8 thick steel plate to a 4 x4 x 1/2 thick angle Add 6 long embedded headed stud (head towards angle) at 12 on center Headed stud to be welded to interior radius of steel angle for anchorage Item #25.1 Summary of Question: Can you please tell me where Detail 5 on C-503 is located on CG101 and CG102? It does not seem to be on the plan. Also where does it get paid if relevant to project Design Team Response: The drawing reference for Detail 5/C-503 is Drawing C503 itself and not CG101 or CG102. Please refer to Detail 4/C-503. Detail 5/C-503 is the concrete paving around the electrical and communication vaults to facilitate paving operations. Item #25.2 Summary of Question: Can you please tell me where the specification for the sub-base material for Detail 3 on C-503 is? Also where/what unit cost item on the bid form does it get paid from? Design Team Response: Sub-Base material as illustrated on the drawings is suitable material as defined in the specifications. The cost of this material is part of the overall earthwork operations quantified by the unit prices for: Excavations above Top of Subgrade, Borrow Material, and Fill and Backfill. Page 3 of 6
4 Item #25.3 Summary of Question: There is a noticeable quantity difference of 8" water pipe on the plans and the 8" water pipe on the bid form. If the items runs over will we be paid the plan quantity at the unit price provided? Design Team Response: Price bid based on the quantity shown on the unit price bid form. Additional required work will be based on the unit price for this item in the unit price bid form. Item #26.1 Summary of Question: On Drawing E-503, Details A,B,F & G indicates 6 #5 rebar continuous. The cross sections depict bar quantities different than shown in the labels. Please clarify. Design Team Response: Longitudinal reinforcing steel in these details shall be number 5 bar. The quantity shown in the details (rather than the call out) is correct. Specifically: 1. Detail A: nine (9) #5 bar 2. Detail B: nine (9) #5 bar 3. Detail F: eight (8) #5 bar 4. Detail G: sixteen (16) #5 bar Item #27.1 Summary of Question: There is discrepancy among drawings CU101/CU102 and E103/104. Where the E drawings shown more duct bank route than CU drawing. Please clarify Design Team Response: Whereas the E drawings sometimes have the communication and electrical duct banks illustrated together as one duct bank, the CU drawings always illustrate these two duct banks together. The preferred routing on duct banks are provided on the CU drawings (which considers water mains and other possible conflicts). The contents of duct banks whether illustrated together or separately are always defined by the E drawings. Page 4 of 6
5 Item #27.2 Summary of Question: It is unclear if 8-ay or 16 way duct bank run through drawing CU101. Please clarify Design Team Response: See response to question 27.1 Item #30.4 Summary of Question: After work at the new container yard site is complete, will there be a significant amount of time that the GC will have to wait to begin work at the reefer rack site, while MassPort relocates containers to the new container yard site? Design Team Response: Selected contractor shall maintain close coordination with Massport terminal operations as the new container yard site is approaching completion. Contractor shall notify Massport two weeks prior to anticipated completion date of the new container yard. Massport will take a maximum of four days to move containers from reefer rack site to clear the area for selected contractor. There shall be no additional mobilization demobilization charge for this four day period. Item #31.1 Summary of Question: Plan sheet C-503, detail 5 shows a 14 unreinforced pad adjacent to the communication and electrical vaults. Under which item is the pad paid? Design Team Response: The drawing reference for Detail 5/C-503 is Drawing C503 itself and not CG101 or CG102. Please refer to Detail 4/C-503. Detail 5/C-503 is the concrete paving around the electrical and communication vaults to facilitate paving operations. ADDENDUM NO. 03. Will re-issue the BID PROPOSAL FORM. Please refer to new ITEM #89 on the ADDENDUM NO. 03 BID PROPOSAL FORM. Page 5 of 6
6 Item #31.2 Summary of Question: Please refer to Cast-In-Place Concrete specification section , page 18. Under measurement and payment, the demolition of existing pavements is incidental to the item. Item C DEMOLITION OF PAVEMENT (NON CONTAINER YARD) includes the removal of pavement. Please clarify under which item the pavement removal is paid. Design Team Response: Payment clause number C, is payment item 5 in the unit price bid sheet. Item #31.3 Summary of Question: Plan sheet C-504. Detail 6 shows new standard concrete barriers with a note when directed by the engineer. Under which item is the barrier paid? Design Team Response: These barriers are on site and will be supplied by Massport. Contractor shall move these 12 barriers into position as directed by Massport. Include this cost in Mobilization fee. BIDDERS, PLEASE NOTE: 1) Massport is planning to mail via UPS Overnight Mail ADDENDUM NO. 03 on Thursday (12/7/17) evening. Plan Holders should receive on Friday, 12/8/17. 2) Also please submit all questions to CP Bid Questions by Noontime of Friday, 12/8/17. Massport cannot guarantee answers to questions submitted beyond this time. - End of Responses- Page 6 of 6
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationMPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts
MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationUtility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles
Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationBID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS
BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS March 17, 2016 To prospective bidders & others concerned: This addendum sets forth changes and/or information
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationJUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD
JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16
More informationTELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationSPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM
2004 Specifications CSJ 3622-01-001, ETC. SPECIAL SPECIFICATION 8398 LIGHTNING PROTECTION SYSTEM 1. Description. This Special Specification governs the design and installation of Lightning Protection System
More informationStormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18
StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute
More informationOFFICE OF MANAGEMENT AND FINANCE
CITY OF PORTLAND OFFICE OF MANAGEMENT AND FINANCE Charlie Hales, Mayor Fred Miller, Chief Administrative Officer Ken Rust, Director, Bureau of Revenue and Financial Services Christine Moody Chief Procurement
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More informationStormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17
StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationSeptember 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.
Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The
More informationValley Road Main Replacement
Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not
More informationCONTINUING EDUC ATION
3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com
More informationREGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV
REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationSECTION 5 TRANSFORMERS
SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established
More informationMAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX
407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure
More information1.1 RELATED DOCUMENTS
SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections
More informationMTJ Outdoor Baggage Claim
MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationADDENDUM NO. 3. Ellis County Elections Building
AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. December 8, 2014 to the BIDDING DOCUMENTS for Ellis County Elections Building Waxahachie, Texas By ARCHITEXAS
More informationALUMINUM PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy
More informationInstallation Instructions
Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The
More informationSTEEL PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports
More informationAppendix C Construction Details
7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses
More informationStudent ID: Exam: RR - Introduction to Print Reading
Student ID: 52989295 Exam: 186080RR - Introduction to Print Reading When you have completed your exam and reviewed your answers, click Submit Exam. Answers will not be recorded until you hit Submit Exam.
More informationTONOPAH AIRPORT RECONSTRUCT TAXIWAY A
RECONSTRUCT TAXIWAY A AIP NO. 3-32-0019-15 PWP-NY-2018-137 NYE COUNTY BID NUMBER 2018-01 NYE COUNTY, NEVADA MARCH 16, 2018 376 Coaldale 265 Silver Peak 6 95 Tonopah TONOPAH AIRPORT Goldfield Warm Springs
More informationTAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:
CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS
More informationHUSSEY GAY BELL SAVANNAH, GEORGIA
HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
More informationEXCAVATION AND BACKFILL
Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed
More informationMerrick Pet Care New Distribution Center Hereford, Texas
Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationSECTION 2 GENERAL REQUIREMENTS
SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall
More informationSECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting
SECTION 33 71 19 UNDERGROUND POWER DUCT AND SUB-STRUCTURES PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 33: Trenching, Backfilling, and Compacting B. Section 32 01 00: Site Restoration and Rehabilitation
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationMidwest Roadside Safety Facility
B 64" 1626 602'-8 1/16" 183695 548'-0" 167030 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 373839 40 25 IMPACT 1500A 48" 12 27'-5" 8355 [] 3x7 CL A Galvanized
More informationNational BIM Standard - United States Version 3
National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation
More informationW 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603
869 86 863 W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI 53703 ph 608-709-1250 Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 Re Submit/15002_Titleblock.dwg 868 SN LEGEND W 867
More informationFebruary 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida
February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following
More informationAttached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.
Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.
More informationSECTION D BIM COORDINATION DRAWINGS - CONTRACTORS
END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,
More informationCHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06
CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationCity of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2
City of Waltham Purchasing Department Waltham, Massachusetts 02452 ADDENDUM NO. 2 Plans & Specifications for: Elsie Turner Field & Graverson Playground, Waltham, MA TO: ALL PLAN HOLDERS This Addendum No.
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationArticle 250 Grounding & Bonding
Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education
More information1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series
SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance
More informationTABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES
TABLE OF CONTENTS 1.0 SCOPE 2.0 BURIAL DEPTH 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 5.0 PARAMETERS OF CABLE PULLING 6.0 DIRECT BURIED CABLE INSTALLATION
More information.1 Applicability: These criteria shall be applied as follows:
DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationAddendum No. 1 page 1
Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid
More informationTELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED DISTRICT, DESIGN AND ADDENDUM NO. PROJECT: ADA Site Improvements of April 0, 08 Upper Play Yard at Noriega EES 775 44 th -Avenue San Francisco, CA 94 SFUSD Project No. 004 OWNER:
More informationCHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.
14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic
More informationBarrier posts of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm
of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm Steel tube Ø 76, Ø 89, 70 x 70 mm with welded steel cap approx. 900 mm above ground, total length 1400 mm hot-dip galvanized and yellow coated with black stripes
More informationDigitally Signed 06/02/2015
Digitally Signed 06/0/05 Digitally Signed 06/0/05 Digitally Signed 06/0/05 FED. ROAD DIST. NO. STATE FED. AID PROJ. NO. SHEET NO. TOTAL SHEETS 6--5 6 ARK. JOB NO. 08057 6 8 075 QUANTITIES 5706 SUMMARY
More informationADDENDUM NO. 02 July 31, 2012
Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationREVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 4 DRAWINGS FOR ELECTRICAL WORK
Ontario Provincial Standards 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 Telephone: 905-704-2258 Fax: 905-704-2051 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND
More informationFAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014
FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders
More informationPLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS
PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS Project Design Services Unit June 2018 http://ihub/projectdelivery/design/index.html PROJECT RATING FORM This is filled out for ALL Process B projects.
More informationSECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS
9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More informationAmerican Electrical Institute
American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article
More informationOhio Department of Transportation Office of Roadway Engineering January 18, 2013
Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen
More informationSUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationCITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET
CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES
More informationChapter 25. Lighting Plans
Chapter 25 Lighting Plans The following are changes, additions or deletions to the January 2014, Topic #625-000-008, Plans Preparation Manual (PPM), for use on Turnpike projects only. 25.1 General Replace
More informationCan you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site
CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation
More informationStandard Details Index NWTP Improvements and MF System Installation
Detail Standard Details Index NWTP Improvements and MF System Installation Marco Island, Florida Description 0315-001 PLASTIC WATERSTOP 0315-003 HYDROPHILIC/GROOVE WATERSTOP 0315-011 WATERSTOP JOINT 0315-154
More informationSuggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations
Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations MDOT SUGGESTED TRAFFIC SIGNAL DESIGN PROCEDURE INDEFINITE DELIVERY INSTALLATION
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for
More informationAddendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017
Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Alma Salcedo Corporate Buyer
More informationSAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2
SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationCustomer Requirements Commercial Secondary Service
Application Installation requirements for commercial services from Tacoma Power overhead or underground facilities. It applies to new construction or upgrades of older services. Electrical service may
More information9. Pay for the power consumed until the project has been accepted as substantially complete.
9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:
More informationArchitect. Architect.
The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which
More information