1 Engineering Surveying -1 CE212 Chain Survey Lecture 2016, September Muhammad Noman

2 Chain Survey Chain survey is the simplest method of surveying. In this survey only measurements are taken in the field, and the rest work, such as plotting calculation etc. are done in the office. This is most suitable adapted to small plane areas with very few details. If carefully done, it gives quite accurate results. The necessary requirements for field work are: chain, tape, ranging rod, arrows and some time cross staff.

3 Purpose of Land Surveying Used for the exact description of the boundaries of a piece of land (Cadastral Survey). Used to determine the area. Used for making plan. To re-establish the boundaries of a piece of land which is already surveyed. To divide a piece of land.

4 General Methods of Land Surveying Triangulation Traversing

5 Triangulation Triangulation is the basis of geodetic survey. A system of surveying in which the sides of various triangles are computed. Base line is measured directly. Three angles of each triangle is measured accurately with a theodolite.

6 Well Conditioned Triangles In chain surveying, a NETWORK of TRIANGLES is preferred The triangle should be well conditioned The triangles in which no angle is smaller than 30 degrees of larger than 120 degrees is called well condition triangle

7 Survey Stations Survey stations are of two kinds: i. Main station ii. Subsidiary or tie station i. Main Station: Main stations are the ends of the survey lines, which commands the boundaries of the survey. The lines joining the main stations are called main survey lines or the chain lines.

8 Subsidiary or Tie Station: These are points selected on the main survey lines, where it is necessary to locate the interior details such as fences, hedges, buildings etc. A tie line joints, fixed points on the main survey lines. It helps in checking the accuracy of surveying and to locate the interior details. The position of each tie line should be close to some features such as paths, building etc.

9

10 Base line and Check line Base Line: It is the main and longest line, which passes approximately through the centre of the field. All other measurements to show the details of the work are taken with respect to this line. Check Line: It is also called as proof line. It is a line joining the apex of a triangle to some fixed points on any two sides of a triangle. It is measured to check the accuracy of the frame work. The length of a check line, as measured on the ground should agree with its length on the plan.

11 Offsets These are the lateral measurements from the base line to fix the positions of different objects. These are generally set at right angle. It can also be drawn with the help of a tape. There are two kinds of offsets: The measurements are taken at right angle to the survey line called perpendicular or right angled offsets. The measurements which are not made at right angles to the survey line are called oblique offsets or tie line offsets.

12 Procedure of Chain Survey Reconnaissance: The preliminary inspection of the area to be surveyed is called reconnaissance. The surveyor inspects the area to be surveyed and prepares a hand sketch called index sketch or key plan. It shows all the principle features of the area such as roads, buildings and nallas etc.

13 Marking station The surveyor fixes up the required number of stations at places from where max. detail can be obtained. Then he selects the way for passing the main line, which should be clear and horizontal as possible and should pass approximately through the centre of the area. Then ranging rods are fixed on the stations. After fixing the ranging rods, chaining should be started. Make ranging wherever necessary. Measure the chainage and offset. Enter the data in the field book.

14 Obstacles Various obstacles are met with while chaining such as woods, hills, ponds, rivers etc. There are three types of obstacles 1. Chaining free, vision obstructed 2. Chaining obstructed, vision free 3. Chaining and vision both obstructed

15 Chaining free, vision obstructed In this type the ends of a line are not inter-visible. e.g. rising ground or a hill intervening There are two cases a. Both ends may be visible from intermediate points on the line. This is done by reciprocal ranging Let A and B are two stations with rising ground or hill between them Now make two other intermediate station C and D in between A and B such that chainman at station C can see both D and B Similarly chainman at station D can see both A and C The two chainman then proceed to line in each other alternately They will change their position until they come in the same line AB exactly

16 Chaining free, vision obstructed b. Both ends may not be visible from any intermediate points Both ends of the line may not be visible from intermediate points on the line, but may be visible from a point slightly away from the line. Intervening trees and bushes are the examples of such obstacles. This obstacle to chaining may be overcome by measuring along a random line as shown in Fig.

17 Chaining obstructed but vision free

18 a. Select two convenient points A and B on the chain line PR on either side of the obstacle. Erect AC and BD by the (3,4,5) method or by optical square. Measure the length CD. AB = CD

19 b. Select A and B on either side of the obstruction. Set out perpendicular AC of such length that CB clears the obstacle and measure AC and CB. AB = (BC 2 - AC 2 ) 1/2

20 c. Set out AC and BC such that it clear the obstacle. <C = 90 0 Measure AC and CB. Then AB = ( AC 2 + CB 2 ) 1/2

21 Thank you

Question bank. Unit 1: Introduction

Question bank. Unit 1: Introduction Question bank Unit 1: Introduction 1. Define surveying. 2. State the objects of surveying 3. State and explain the principle of surveying 4. State and explain the classification of surveying 5. Differentiate

More information

WESTERN POWER DISTRIBUTION

WESTERN POWER DISTRIBUTION WESTERN POWER DISTRIBUTION Framework Document on cable recording techniques to be read in conjunction with other Western Power Distribution Framework Document Appendices relating to Housing and to Industrial

More information

SURVEYING I CENG 383

SURVEYING I CENG 383 SURVEYING I CENG 383 9/21/2011 2 Introduction Definition An art of collecting data for mapping the relative positions of points above, below or on the surface of the earth. Surveying also includes the

More information

SURVEYING LAB MANUAL

SURVEYING LAB MANUAL DEPLOMA IN CIVIL ENGINEERING C-111 SURVEYING LAB MANUAL D.VINAYA ASST.PROFESSOR CIVIL ENGINEERING DEPARTMENT SANKETIKA POLYTECHNIC COLLEGE AFFILIATED TO STATE BOARD OF TECHNICAL EDUCATION & TRAINING, HYDERABAD

More information

Suveying Lectures for CE 498

Suveying Lectures for CE 498 Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations

More information

BASIC PRINCIPLES IN SURVEYING I COURSE CODE: SUG 101

BASIC PRINCIPLES IN SURVEYING I COURSE CODE: SUG 101 UNESCO-NIGERIA TECHNICAL & VOCATIONAL EDUCATION REVITALISATION PROJECT-PHASE II NATIONAL DIPLOMA IN BUILDING TECHNOLOGY BASIC PRINCIPLES IN SURVEYING I COURSE CODE: SUG 101 YEAR I- SE MESTER I THEORY/PRACTICALS

More information

ISOMETRIC PROJECTION. Contents. Isometric Scale. Construction of Isometric Scale. Methods to draw isometric projections/isometric views

ISOMETRIC PROJECTION. Contents. Isometric Scale. Construction of Isometric Scale. Methods to draw isometric projections/isometric views ISOMETRIC PROJECTION Contents Introduction Principle of Isometric Projection Isometric Scale Construction of Isometric Scale Isometric View (Isometric Drawings) Methods to draw isometric projections/isometric

More information

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information

More information

Department of Civil and Environmental Engineering

Department of Civil and Environmental Engineering Department of Civil and Environmental Engineering CEE213L Surveying & Introduction to GIS Lab SURVEYING LABORATORY NORTH SOUTH UNIVERSITY Center of Excellence in Higher Education The First Private University

More information

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM. Course Title: Surveying (Code: )

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM. Course Title: Surveying (Code: ) GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM Course Title: Surveying (Code: 3330605) Diploma Programme in which this course is offered Civil /Mining/ Environmental/Transportation

More information

S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100

S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100 Total No. of Questions 12] [Total No. of Printed Pages 8 Seat No. [4162]-108 S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100 N.B. : (i)

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17419 21314 3 Hours / 100 Seat No. Instructions (1) All Questions are Compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary. (4)

More information

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus Surveying Unit-II Important Questions Define Surveying and Leveling Differentiate between Surveying and Leveling. Explain fundamental Principles of Surveying. Explain Plain and Diagonal Scale. What is

More information

To determine the difference in levels of points/objects. To determine the depth cutting and filling in engineering works.

To determine the difference in levels of points/objects. To determine the depth cutting and filling in engineering works. UET-11-CE-SCET WAH SURVEYING-I Dumpy (Wye) Level LEVELLING: It is a surveying method used to determine the level of points/objects with reference to the selected datum. It is also used to set out engineering

More information

Scheme I Sample Question Paper

Scheme I Sample Question Paper Sample Question Paper Max. Marks : 70 Time : 3 Hrs. Q.1) Attempt any FIVE of the following. a. Define the term surveying b. List different instruments used for linear measurement. c. Define the term bearing

More information

Engineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman

Engineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman Engineering Surveying -1 CE212 Contouring Lectures Lecture 2016, November 29 th Muhammad Noman Contour An Imaginary line on the ground surface joining the points of equal elevation is known as contour.

More information

PART XII: TOPOGRAPHIC SURVEYS

PART XII: TOPOGRAPHIC SURVEYS PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface

More information

Regents Exam Questions by Topic Page 1 TOOLS OF GEOMETRY: Constructions NAME:

Regents Exam Questions by Topic Page 1 TOOLS OF GEOMETRY: Constructions   NAME: Regents Exam Questions by Topic Page 1 1. 060925ge, P.I. G.G.17 Which illustration shows the correct construction of an angle bisector? [A] 3. 060022a, P.I. G.G.17 Using only a ruler and compass, construct

More information

Introduction to Surveying. Chapter -One-

Introduction to Surveying. Chapter -One- Introduction to Surveying Chapter -One- 1 GENERAL INFORMATION FALL 2016 Assistant Lecturer : Asmaa Abdulmajeed Research Assistant: Zanyar Bazyan Course Title : Surveying 1 Course Code : CE 215 Class No

More information

Class 9 Coordinate Geometry

Class 9 Coordinate Geometry ID : in-9-coordinate-geometry [1] Class 9 Coordinate Geometry For more such worksheets visit www.edugain.com Answer the questions (1) Find the coordinates of the point shown in the picture. (2) Find the

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17419 21415 3 Hours / 100 Seat No. Instructions (1) All Questions are Compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary. (4)

More information

CC Geometry H Aim #3: How do we rotate points 90 degrees on the coordinate plane? Do Now:

CC Geometry H Aim #3: How do we rotate points 90 degrees on the coordinate plane? Do Now: CC Geometry H Aim #3: How do we rotate points 90 degrees on the coordinate plane? Do Now: 1. a. Write the equation of the line that has a slope of m = and passes through the point (0, 3). Graph this equation

More information

ENGINEERING GRAPHICS 1E9

ENGINEERING GRAPHICS 1E9 Lecture 3 Monday, 15 December 2014 1 ENGINEERING GRAPHICS 1E9 Lecture 3: Isometric Projections Lecture 3 Monday, 15 December 2014 2 What is ISOMETRIC? It is a method of producing pictorial view of an object

More information

Cleveland State University

Cleveland State University CVE 212 - Surveying Lab #4 LOCATION SURVEY EQUIPMENT Right angle mirror (pentaprism) Surveyor s tape Plumb bobs Range poles INTRODUCTION Many times the surveyor is called upon to catalog details of a project

More information

Surveying & Measurement. Detail Survey Topographic Surveying

Surveying & Measurement. Detail Survey Topographic Surveying Surveying & Measurement Detail Survey Topographic Surveying Introduction Mapping surveys are made to determine the relief of the earth s surface and locate critical points on it. to determine the locations

More information

Principles of Technology DUE one week from your lab day. Lab 2: Measuring Forces

Principles of Technology DUE one week from your lab day. Lab 2: Measuring Forces Lab 2: Measuring Forces Principles of Technology DUE one week from your lab day Lab Objectives When you ve finished this lab, you should be able to do the following: Measure forces by using appropriate

More information

COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles

COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles Introduction 1. Review chapter 4 The Digital Transit and watch and understand chapter 5 Control

More information

COURSE SYLLABUS SURVEYING I

COURSE SYLLABUS SURVEYING I Solution Manual for Surveying Fundamentals and Practices 6th Edition by Nathanson Lanzafama Emeritus Link full download: http://testbankcollection.com/download/solution-manual-forsurveying-fundamentals-and-practices-6th-edition-by-nathanson-lanzafamaemeritus/

More information

Figure 8-1 Layout equipment and tools. Tape measure. String line level. Eyepiece level. Laser plane level Delmar/Cengage Learning.

Figure 8-1 Layout equipment and tools. Tape measure. String line level. Eyepiece level. Laser plane level Delmar/Cengage Learning. 3 2 1 0 Tape measure String line level Clinometer Eyepiece level Transit Dumpy level Carpenter s or builder s level Electronic measurement Tool Laser plane level Figure 8-1 Layout equipment and tools.

More information

IAN HUMBY TEACHING. List of Hand-Outs. Levelling

IAN HUMBY TEACHING. List of Hand-Outs. Levelling IAN HUMBY TEACHING List of Hand-Outs Levelling 6-1 Equipment List (Levelling) 11-1 to 11-3 Introduction to Levelling 11-4 Levelling Terminology 12-1 to 12-2 Measuring Height Change by Basic Methods 13-1

More information

10/9/2018. Introduction to Surveying. Chapter -One-

10/9/2018. Introduction to Surveying. Chapter -One- Introduction to Surveying Chapter -One- 1 GENERAL INFORMATION FALL 2018-2019 Assistant Lecturer : Asmaa Ab. Mustafa Research Assistant: Course Title : Surveying Course Code : ARCH 224 Class No : S. 203

More information

Lesson 8: Surveying the Forest

Lesson 8: Surveying the Forest Lesson 8: Surveying the Forest TEACHER: SCHOOL: GRADE LEVEL: 9-12 TASKS/COMPETENCIES ANR8046.172 Set up and operate a transit level and rod. ANR8046.173 Read a rod and a level to calculate slope. ANR8046.174

More information

Constructions. Learning Intention: By If you use 1 litre of orange, you will use 4 litres of water (1:4).

Constructions. Learning Intention: By If you use 1 litre of orange, you will use 4 litres of water (1:4). Constructions Scales Scales are important in everyday life. We use scales to draw maps, to construct building plans, in housing, street construction... It is impossible to draw building plans with the

More information

Chapter 2: Functions and Graphs Lesson Index & Summary

Chapter 2: Functions and Graphs Lesson Index & Summary Section 1: Relations and Graphs Cartesian coordinates Screen 2 Coordinate plane Screen 2 Domain of relation Screen 3 Graph of a relation Screen 3 Linear equation Screen 6 Ordered pairs Screen 1 Origin

More information

Trade of Sheet Metalwork. Module 2: Geometry and Pattern Development Unit 4: Cones and Pyramids Phase 2

Trade of Sheet Metalwork. Module 2: Geometry and Pattern Development Unit 4: Cones and Pyramids Phase 2 Trade of Sheet Metalwork Module 2: Geometry and Pattern Development Unit 4: Cones and Pyramids Phase 2 Table of Contents List of Figures... 4 List of Tables... 4 Document Release History... 5 Module 2

More information

ME1105 Engineering Drawing & Design

ME1105 Engineering Drawing & Design City University London Term 1 Assessment 2008/2009 School of Engineering and Mathematical Sciences ME1105 Engineering Drawing & Design Student Name:.., Group: Examination duration: Reading time: This paper

More information

ENGINEERING GRAPHICS ESSENTIALS

ENGINEERING GRAPHICS ESSENTIALS ENGINEERING GRAPHICS ESSENTIALS with AutoCAD 2012 Instruction Introduction to AutoCAD Engineering Graphics Principles Hand Sketching Text and Independent Learning CD Independent Learning CD: A Comprehensive

More information

AUXILIARY VIEWS C H A P T E R N I N E

AUXILIARY VIEWS C H A P T E R N I N E AUXILIARY VIEWS C H A P T E R N I N E Giesecke, Hill, Spencer, Dygdon, Novak, Lockhart, Goodman 1 OBJECTIVES 1. Create an auxiliary view from orthographic views. 2. Draw folding lines or reference-plane

More information

Mapping The Study Area

Mapping The Study Area While on the beach you will need to take some measurements to show where the study area is relative to the rest of the world and to show what is inside the study area. Once the measurements have been taken,

More information

Math 3 Geogebra Discovery - Equidistance Decemeber 5, 2014

Math 3 Geogebra Discovery - Equidistance Decemeber 5, 2014 Math 3 Geogebra Discovery - Equidistance Decemeber 5, 2014 Today you and your partner are going to explore two theorems: The Equidistance Theorem and the Perpendicular Bisector Characterization Theorem.

More information

Orthographic Projection

Orthographic Projection Orthographic Projection Why Orthographic Projection is used in technical drawing Orthographic projection is a method of producing a number of separate two-dimensional inter-related views, which are mutually

More information

6.2 Slopes of Parallel and Perpendicular Lines

6.2 Slopes of Parallel and Perpendicular Lines . Slopes of Parallel and Perpendicular Lines FOCUS Use slope to find out if two lines are parallel or perpendicular. These two lines are parallel. Slope of line AB Slope of line CD These two lines have

More information

Orthographic Projection 1

Orthographic Projection 1 Orthographic Projection 1 What Is Orthographic Projection? Basically it is a way a representing a 3D object on a piece of paper. This means we make the object becomes 2D. The difference between Orthographic

More information

8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation

8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Leveling results are used: To design highways, railroads, canals, sewers,

More information

Lesson 10.1 Skills Practice

Lesson 10.1 Skills Practice Lesson 10.1 Skills Practice Location, Location, Location! Line Relationships Vocabulary Write the term or terms from the box that best complete each statement. intersecting lines perpendicular lines parallel

More information

Activity 11 OBJECTIVE. MATERIAL REQUIRED Cardboard, white paper, graph paper with various given points, geometry box, pen/pencil.

Activity 11 OBJECTIVE. MATERIAL REQUIRED Cardboard, white paper, graph paper with various given points, geometry box, pen/pencil. Activity 11 OBJECTIVE To find the values of abscissae and ordinates of various points given in a cartesian plane. MATERIAL REQUIRED Cardboard, white paper, graph paper with various given points, geometry

More information

Measuring areas, volumes and heights accurately

Measuring areas, volumes and heights accurately Measuring areas, volumes and heights accurately So far in this book, we have used measurement relationships to construct and use mathematical models. In order to interpret your mathematical model realistically,

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (MSBTE) I Scheme II Semester Course Curriculum. Course Title: Basic Surveying (Course Code:...

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (MSBTE) I Scheme II Semester Course Curriculum. Course Title: Basic Surveying (Course Code:... MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (MSBTE) I Scheme II Semester Course Curriculum Course Title: Basic Surveying (Course Code:... ) Diploma programme in which this course is offered Semester

More information

SMML MEET 3 ROUND 1

SMML MEET 3 ROUND 1 ROUND 1 1. How many different 3-digit numbers can be formed using the digits 0, 2, 3, 5 and 7 without repetition? 2. There are 120 students in the senior class at Jefferson High. 25 of these seniors participate

More information

Perpendicular and Parallel Line Segments

Perpendicular and Parallel Line Segments 10 Chapter Lesson 10.1 erpendicular and arallel Line Segments Drawing erpendicular Line Segments Use a protractor to draw perpendicular line segments. 1. Draw a line segment perpendicular to Q at point.

More information

In this section, we find equations for straight lines lying in a coordinate plane.

In this section, we find equations for straight lines lying in a coordinate plane. 2.4 Lines Lines In this section, we find equations for straight lines lying in a coordinate plane. The equations will depend on how the line is inclined. So, we begin by discussing the concept of slope.

More information

Characteristics of Linear Relations

Characteristics of Linear Relations HW Mark: 10 9 8 7 6 RE-Submit Characteristics of Linear Relations This booklet belongs to: Period LESSON # DATE QUESTIONS FROM NOTES Questions that I find difficult Pg. Pg. Pg. Pg. Pg. Pg. Pg. Pg. Pg.

More information

Name Period GEOMETRY CHAPTER 3 Perpendicular and Parallel Lines Section 3.1 Lines and Angles GOAL 1: Relationship between lines

Name Period GEOMETRY CHAPTER 3 Perpendicular and Parallel Lines Section 3.1 Lines and Angles GOAL 1: Relationship between lines Name Period GEOMETRY CHAPTER 3 Perpendicular and Parallel Lines Section 3.1 Lines and Angles GOAL 1: Relationship between lines Two lines are if they are coplanar and do not intersect. Skew lines. Two

More information

Up and Down. - Circle Theorems 2: The Converse of the Chord Theorem -

Up and Down. - Circle Theorems 2: The Converse of the Chord Theorem - - Circle Theorems 2: The Converse of the Chord Theorem - Revision Label the circle diagram showing: the circumference the centre a diameter a chord a radius State the Chord Theorem. Checkpoint An Example

More information

Math A Regents Exam 0800 Page a, P.I. A.A.12 The product of 2 3 x and 6 5 x is [A] 10x 8

Math A Regents Exam 0800 Page a, P.I. A.A.12 The product of 2 3 x and 6 5 x is [A] 10x 8 Math A Regents Exam 0800 Page 1 1. 080001a, P.I. A.A.1 The product of x and 6 5 x is [A] x 8 [B] x 15 [C] 1x 8 [D] 1x 15 5. 080005a Which table does not show an example of direct variation? [A] [B]. 08000a,

More information

Mechanical Drawing. Unit 2 Study Guide for Chapters 6-10

Mechanical Drawing. Unit 2 Study Guide for Chapters 6-10 Mechanical Drawing Unit 2 Study Guide for Chapters 6-10 Chapter 6 Multiview Drawing Section 6.1 Understanding Orthographic Projection A. Technical Drawing: How can a technical drawing give more accurate

More information

Engineering Graphics Essentials with AutoCAD 2015 Instruction

Engineering Graphics Essentials with AutoCAD 2015 Instruction Kirstie Plantenberg Engineering Graphics Essentials with AutoCAD 2015 Instruction Text and Video Instruction Multimedia Disc SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com

More information

4.4 Slope and Graphs of Linear Equations. Copyright Cengage Learning. All rights reserved.

4.4 Slope and Graphs of Linear Equations. Copyright Cengage Learning. All rights reserved. 4.4 Slope and Graphs of Linear Equations Copyright Cengage Learning. All rights reserved. 1 What You Will Learn Determine the slope of a line through two points Write linear equations in slope-intercept

More information

AC : THE PEDAGOGY OF THE SURVEYING LABORATORY

AC : THE PEDAGOGY OF THE SURVEYING LABORATORY C 2008-724: THE PEDGOGY OF THE URVEYING LBORTORY Philip Brach, University of the District of Columbia PHILIP L. BRCH, PH.D., P.E., F-NPE Distinguished Professor (Emeritus), former Dean, Past President,

More information

1. The topographic map below shows a depression contour line on Earth's surface.

1. The topographic map below shows a depression contour line on Earth's surface. 1. The topographic map below shows a depression contour line on Earth's surface. Points A, B, C, and D represent surface locations. Contour line elevations are in feet. Which profile best shows the topography

More information

Isometric Projection Drawing CHAPTER 6

Isometric Projection Drawing CHAPTER 6 Isometric Projection Drawing CHAPTER 6 Content Overview Pictorial projection Parallel projection Axonometric projection Isometric projection Axes and selection Isometric lines and planes Isometric scale

More information

Downloaded from

Downloaded from 1 IX Mathematics Chapter 8: Quadrilaterals Chapter Notes Top Definitions 1. A quadrilateral is a closed figure obtained by joining four points (with no three points collinear) in an order. 2. A diagonal

More information

Drawing: technical drawing TECHNOLOGY

Drawing: technical drawing TECHNOLOGY Drawing: technical drawing Introduction Humans have always used images to communicate. Cave paintings, some of which are over 40,000 years old, are the earliest example of this artistic form of communication.

More information

Hand-Drawn Mountain and Tree Map Elements using Photoshop or GIMP

Hand-Drawn Mountain and Tree Map Elements using Photoshop or GIMP Hand-Drawn Mountain and Tree Map Elements using Photoshop or GIMP While simple upside-down 'V' mountains or rendered terrain mountains and forest textures are excellent ways to show physical features on

More information

COSC 301 Construction Surveying & Layout Activity IX Total Station; Final Site Circuit Survey

COSC 301 Construction Surveying & Layout Activity IX Total Station; Final Site Circuit Survey COSC 301 Construction Surveying & Layout Activity IX Total Station; Final Site Circuit Survey Introduction Set Up 1. Review Chapter 8 Total Station & EDM. 2. This activity will test your ability to set

More information

Location of Structure on Site

Location of Structure on Site Chapter 1 Location of Structure on Site A number of factors affect the location of a structure on a site, as well as the type of building that may be erected. Once the site is chosen, different methods

More information

ENGI 3703 Surveying and Geomatics

ENGI 3703 Surveying and Geomatics Distance Measurement Errors (Chapter 6) We have reviewed at vertical distance measurement and identified errors associated with those. Now we turn to horizontal distance measurement. There are a number

More information

Permutations and Combinations Problems

Permutations and Combinations Problems Permutations and Combinations Problems Permutations and combinations are used to solve problems. Factorial Example 1: How many 3 digit numbers can you make using the digits 1, 2 and 3 without method (1)

More information

GCSE Mathematics Practice Tests: Set 6

GCSE Mathematics Practice Tests: Set 6 GCSE Mathematics Practice Tests: Set 6 Paper 1H (Non-calculator) Time: 1 hour 30 minutes You should have: Ruler graduated in centimetres and millimetres, protractor, pair of compasses, pen, HB pencil,

More information

Sketching Fundamentals

Sketching Fundamentals Sketching Fundamentals Learning Outcome When you complete this module you will be able to: Make basic engineering sketches of plant equipment. Learning Objectives Here is what you will be able to do when

More information

Trade of Metal Fabrication. Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2

Trade of Metal Fabrication. Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2 Trade of Metal Fabrication Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 6 Fabrication

More information

FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK. LEVELING (Standard Of Procedure)

FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK. LEVELING (Standard Of Procedure) FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK LEVELING (Standard Of Procedure) Subject Code Date Group Number Student Name & ID Number Group Member Name & ID Number 1 2 Lecturer

More information

2009 Academic Challenge

2009 Academic Challenge 2009 Academic Challenge ENGINEERING GRAPHICS TEST SECTIONAL This Test Consists of 50 Questions Engineering Graphics Test Production Team Ryan Brown, Illinois State University Author/Team Leader Kevin Devine,

More information

Control Position Fix Using Single Frequency Global Positioning System Receiver Technique - A Case Study

Control Position Fix Using Single Frequency Global Positioning System Receiver Technique - A Case Study Research Journal of Environmental and Earth Sciences 3(1): 32-37, 2011 ISSN: 2041-0492 Maxwell Scientific Organization, 2011 Received: September 10, 2010 Accepted: October 09, 2010 Published: January 05,

More information

MODELING AND DESIGN C H A P T E R F O U R

MODELING AND DESIGN C H A P T E R F O U R MODELING AND DESIGN C H A P T E R F O U R OBJECTIVES 1. Identify and specify basic geometric elements and primitive shapes. 2. Select a 2D profile that best describes the shape of an object. 3. Identify

More information

9.1 and 9.2 Introduction to Circles

9.1 and 9.2 Introduction to Circles Date: Secondary Math 2 Vocabulary 9.1 and 9.2 Introduction to Circles Define the following terms and identify them on the circle: Circle: The set of all points in a plane that are equidistant from a given

More information

Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK

Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK Abstract In common with many other countries that have an extended coastline, sea

More information

S u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 30S/30E/30M

S u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 30S/30E/30M 9 1 4 9 S u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 30S/30E/30M 9 1 4 9 S u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 3 0 S / 3 0 E / 3 0 M Course Description

More information

CO-ORDINATE GEOMETRY CHAPTER 3. Points to Remember :

CO-ORDINATE GEOMETRY CHAPTER 3. Points to Remember : CHAPTER Points to Remember : CO-ORDINATE GEOMETRY 1. Coordinate axes : Two mutually perpendicular lines X OX and YOY known as x-axis and y-axis respectively, constitutes to form a co-ordinate axes system.

More information

CRM 230 Module 2 Lecture Notes. Crime Scene Search

CRM 230 Module 2 Lecture Notes. Crime Scene Search CRM 230 Module 2 Lecture Notes Crime Scene Search Hello. This presentation will discuss sequential processing of a crime scene and the importance of identification and individualization of evidence. It

More information

Drafting Requirements for the Preparation of Plans

Drafting Requirements for the Preparation of Plans October 4, 2014 Drafting Requirements for the Preparation of Plans NOTE: This document is a Controller of Surveys Policy manual to be used as a general guideline for the preparation and examination of

More information

J. La Favre Fusion 360 Lesson 5 April 24, 2017

J. La Favre Fusion 360 Lesson 5 April 24, 2017 In this lesson, you will create a funnel like the one in the illustration to the left. The main purpose of this lesson is to introduce you to the use of the Revolve tool. The Revolve tool is similar to

More information

Technical Drawing Paper 1 - Higher Level (Plane and Solid Geometry)

Technical Drawing Paper 1 - Higher Level (Plane and Solid Geometry) Coimisiún na Scrúduithe Stáit State Examinations Commission 2008. M81 Leaving Certificate Examination 2008 Technical Drawing Paper 1 - Higher Level (Plane and Solid Geometry) (200 Marks) Friday 13 June

More information

Use smooth curves to complete the graph between and beyond the vertical asymptotes.

Use smooth curves to complete the graph between and beyond the vertical asymptotes. 5.3 Graphs of Rational Functions Guidelines for Graphing Rational Functions 1. Find and plot the x-intercepts. (Set numerator = 0 and solve for x) 2. Find and plot the y-intercepts. (Let x = 0 and solve

More information

THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE. Contents

THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE. Contents Document Number: EOS 09-0100a Contents 1 Introduction... 2 2 Cable Routes/Joints... 2 3 Cable Details... 2 4 Cable Warning Markers... 4 5 Cable Drum Numbers... 4 6 Ducts - Including those used in a Directional

More information

LEVELING. Definitions

LEVELING. Definitions Definitions An elevation of a point : The vertical distance between the point and the reference level surface ( datum ),the most commonly used datum is the mean sea level (MSL ). Leveling : The process

More information

b. Draw a line and a circle that intersect at exactly one point. When this happens, the line is called a tangent.

b. Draw a line and a circle that intersect at exactly one point. When this happens, the line is called a tangent. 6-1. Circles can be folded to create many different shapes. Today, you will work with a circle and use properties of other shapes to develop a three-dimensional shape. Be sure to have reasons for each

More information

Council Policy Engineering Drawing Submission Requirements

Council Policy Engineering Drawing Submission Requirements POLICY 265 City of Kelowna 1435 Water Street Kelowna, BC V1Y 1J4 250 469-8500 kelowna.ca Council Policy Engineering Drawing Submission Requirements APPROVED June 4, 2001 RESOLUTION: R375/10/04/26 REPLACING:

More information

Finite Math - Fall 2016

Finite Math - Fall 2016 Finite Math - Fall 206 Lecture Notes - /28/206 Section 7.4 - Permutations and Combinations There are often situations in which we have to multiply many consecutive numbers together, for example, in examples

More information

UNIT 1 GEOMETRY. (revision from 1 st ESO) Unit 8 in our books

UNIT 1 GEOMETRY. (revision from 1 st ESO) Unit 8 in our books UNIT 1 GEOMETRY (revision from 1 st ESO) Unit 8 in our books WHAT'S GEOMETRY? Geometry is the study of the size, shape and position of 2 dimensional shapes and 3 dimensional figures. In geometry, one explores

More information

Module 2: Radial-Line Sheet-Metal 3D Modeling and 2D Pattern Development: Right Cone (Regular, Frustum, and Truncated)

Module 2: Radial-Line Sheet-Metal 3D Modeling and 2D Pattern Development: Right Cone (Regular, Frustum, and Truncated) Inventor (5) Module 2: 2-1 Module 2: Radial-Line Sheet-Metal 3D Modeling and 2D Pattern Development: Right Cone (Regular, Frustum, and Truncated) In this tutorial, we will learn how to build a 3D model

More information

The Tennessee Geodetic Reference Network (TGRN): An Update*

The Tennessee Geodetic Reference Network (TGRN): An Update* The Tennessee Geodetic Reference Network (TGRN): An Update* James H. Zeigler Tennessee Department of Transportation INTRODUCTION As the Tennessee Department of Transportation (T.D.O.T.) considered the

More information

UNDERSTAND SIMILARITY IN TERMS OF SIMILARITY TRANSFORMATIONS

UNDERSTAND SIMILARITY IN TERMS OF SIMILARITY TRANSFORMATIONS UNDERSTAND SIMILARITY IN TERMS OF SIMILARITY TRANSFORMATIONS KEY IDEAS 1. A dilation is a transformation that makes a figure larger or smaller than the original figure based on a ratio given by a scale

More information

Master Stair Jig Instruction Leaflet

Master Stair Jig Instruction Leaflet Master Stair Jig Instruction Leaflet Page 1 INTRODUCTION Equipment required to operate this jig: Hand Router 30mm guide bush 2 G-Clamps Standard Staircase: (all cutters required to be 95 ) 14mm diameter

More information

Laboratory 7: Properties of Lenses and Mirrors

Laboratory 7: Properties of Lenses and Mirrors Laboratory 7: Properties of Lenses and Mirrors Converging and Diverging Lens Focal Lengths: A converging lens is thicker at the center than at the periphery and light from an object at infinity passes

More information

Round and Round. - Circle Theorems 1: The Chord Theorem -

Round and Round. - Circle Theorems 1: The Chord Theorem - - Circle Theorems 1: The Chord Theorem - A Historic Note The main ideas about plane geometry were developed by Greek scholars during the period between 600 and 300 B.C.E. Euclid established a school of

More information

6.1 Warm Up The diagram includes a pair of congruent triangles. Use the congruent triangles to find the value of x in the diagram.

6.1 Warm Up The diagram includes a pair of congruent triangles. Use the congruent triangles to find the value of x in the diagram. 6.1 Warm Up The diagram includes a pair of congruent triangles. Use the congruent triangles to find the value of x in the diagram. 1. 2. Write a proof. 3. Given: P is the midpoint of MN and TQ. Prove:

More information

The Sheet Metal Bath Tub. Copyright Bud Goodman 2004

The Sheet Metal Bath Tub. Copyright Bud Goodman 2004 The Sheet Metal Bath Tub. Copyright Bud Goodman 2004 Here is a great way to have some fun, strengthen your layout skills and create a useful product that you can use yourself or pass on as a gift. The

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

Geometry Topic 4 Quadrilaterals and Coordinate Proof

Geometry Topic 4 Quadrilaterals and Coordinate Proof Geometry Topic 4 Quadrilaterals and Coordinate Proof MAFS.912.G-CO.3.11 In the diagram below, parallelogram has diagonals and that intersect at point. Which expression is NOT always true? A. B. C. D. C

More information