SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017

Size: px
Start display at page:

Download "SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017"

Transcription

1 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017 Letting Location: SCDOT Headquarters Building Conference Room Park Street Columbia, SC Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803) with all Letting related questions. The following items will be made available on May 16, 2017 unless otherwise noted: EBS (Electronic Bidding System) files via Bid Express website Hardcopy plans/proposals & letting DVD via Engineering Publications o Located in room 122 SCDOT Headquarters o Phone (803) / Fax (803) o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds) Access the Construction Extranet for the following items: Plans Announcements Bids as Received CPM Schedule Templates Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. See link for details Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803) The SCDOT Standard Drawings are available for download at or for purchase by contacting: Engineering Publications at (803) Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice.

2 Call No.: 010 Page: 1 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Aiken DBE Goal Percent: 2.00% Letting Time: 2:00 P.M. Description: 2017 FEDERAL AID PAVEMENT PRESERVATION PROGRAM Completion Date: 5/31/ MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) SY HOT MIX ASPHALT SURFACE COURSE TYPE D TON PREVENTATIVE MAINTENANCE SURFACE TREATMENT 100, SY MICRO SURFACING SURFACE COURSE 100, SY MICRO SURFACING LEVELING TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 69, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING LF WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING EA 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 1, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 62, LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 139, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 125, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA

3 Call No.: 020 Page: 2 SC File NO(S).: Letting Date: June 13, 2017 PCN: P CO(S).: Aiken Project No.: P DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: 2018 NFA PRESERV. PROGRAM - AIKEN Completion Date: 6/30/2018 MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1, SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 14, SY HOT MIX ASPHALT SURFACE COURSE TYPE D TON PREVENTATIVE MAINTENANCE SURFACE TREATMENT 106, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1, SF 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING LF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 12, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 37, LF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 12, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 75, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA SURFACE APPLIED DETECTABLE WARNING SF

4 Call No.: 030 Page: 3 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Aiken DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: AIKEN COUNTY CTC RESURFACING Completion Date: 5/31/ BORROW EXCAVATION CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1, SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 7, SY HOT MIX ASPHALT SURFACE COURSE TYPE C 2, TON HOT MIX ASPHALT SURFACE COURSE TYPE D 5, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING LF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 50, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING LF WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING EA WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING EA WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING EA 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 50, LF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 50, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT EA 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 79, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT LF FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1, LF SAWCUT FOR LOOP DETECTOR LF PERMANENT GRASSING FOR SMALL PROJECTS ACRE

5 Call No.: 040 Page: 4 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Anderson DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: 2018 NFA PRESERVATION (125#) Completion Date: 11/30/ REMOVAL & DISPOSAL OF EXISTING PAVEMENT SY BORROW EXCAVATION CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF SY HOT MIX ASPHALT SURFACE COURSE TYPE D TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 11, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 11, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 5, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 5, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA ADJUST DROP INLET ADJUST D. I EA DETECTABLE WARNING MATERIAL SF PEDESTRIAN RAMP CONSTRUCTION SY PERMANENT GRASSING FOR SMALL PROJECTS ACRE

6 Call No.: 050 Page: 5 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Berkeley DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: BERKELEY COUNTY CTC RELET Completion Date: 10/31/ CONSTRUCTION STAKES, LINES & GRADES EA CSX RAILROAD INSURANCE AND FLAGGING LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 3, SY REMOVAL & DISPOSAL OF EXISTING CURB 1, LF REMOVAL OF EXIST. GUARDRAIL LF UNCLASSIFIED EXCAVATION 2, CY BORROW EXCAVATION 6, CY EXCAVATION FOR SHOULDER PAVING STA HAULING OF EXCAVATED SHOULDER MATERIAL STA ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION TON CEMENT MODIFIED RECYCLED BASE (10" UNIFORM) CURING METHOD 4 46, SY PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1, TON MAINTENANCE STONE TON HOT MIX ASPHALT BASE COURSE - TYPE B TON HMA SHOULDER WIDENING COURSE 2, TON LIQUID ASPHALT BINDER PG , TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 10, SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 25, SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 95, SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 68, SY MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 12, TON HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C TON HOT MIX ASPHALT SURFACE COURSE TYPE B 25, TON HOT MIX ASPHALT SURFACE COURSE TYPE C 10, TON HOT MIX ASPHALT SURFACE COURSE TYPE D TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3, SF

7 Call No.: 050 Page: 6 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 7, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 155, LF 8" WHITE SOLID LINES PERM.PVMT.MARKINGS 4, LF 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 2, LF WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING EA WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING EA WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING EA RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING EA 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 12, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 153, LF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 15, LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 437, LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 4, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 5, LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 23, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 438, LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1, EA REMOVAL OF PAVEMENT MARKINGS LF FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT LF NO.14 CU.WIRE, 1 CONDUC,IMSA , LF SAWCUT FOR LOOP DETECTOR 2, LF F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD EA ADJUST CATCH BASIN EA ADJUST DROP INLET ADJUST D. I EA CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE LF CONCRETE CURB AND GUTTER (2'-0") OGEE LF CONCRETE SIDEWALK(4" UNIFORM) 1, SY CONCRETE SIDEWALK(6" UNIFORM) SY DETECTABLE WARNING MATERIAL SF CONCRETE DRIVEWAY(6" UNIFORM) SY CONCRETE MEDIAN SY PEDESTRIAN RAMP CONSTRUCTION 1, SY SURFACE APPLIED DETECTABLE WARNING SF STEEL BEAM GUARDRAIL STEEL BEAM GR LF

8 Call No.: 050 Page: 7 GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25 POST SPACING LF STEEL BEAM GUARDRAIL (THRIE) LF END TERMINAL - TYPE T EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE TEMPORARY EROSION CONTROL BLANKET (CLASS B) MSY SILT FENCE LF

9 Call No.: 060 Page: 8 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Chesterfield DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: NFA CHIP SEAL Completion Date: 5/31/ FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2, SY ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 134, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1, SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 121, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 100, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA

10 Call No.: 070 Page: 9 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Georgetown DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: 2017 CTC RESURFACING - GEORGETOWN Completion Date: 4/30/ BORROW EXCAVATION CY EXCAVATION FOR SHOULDER PAVING STA HAULING OF EXCAVATED SHOULDER MATERIAL STA MAINTENANCE STONE TON HMA SHOULDER WIDENING COURSE 1, TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 1, SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 27, SY MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 3, TON HOT MIX ASPHALT SURFACE COURSE TYPE B 3, TON HOT MIX ASPHALT SURFACE COURSE TYPE D TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 59, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 7, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 17, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 19, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 5, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

11 Call No.: 080 Page: 10 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Greenwood DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: NON-FEDERAL AID PRESERVATION Completion Date: 5/15/ BORROW EXCAVATION CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 1, SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) SY HOT MIX ASPHALT SURFACE COURSE TYPE D 1, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 9, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 21, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 9, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 21, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

12 Call No.: 090 Page: 11 SC File NO(S).: Letting Date: June 13, 2017 PCN: P CO(S).: Horry Project No.: P DBE Goal Percent: 14.00% Letting Time: 2:00 P.M. Cost of Road Plans: $43.00 Description: WACCAMAW DRIVE EAST COAST GREENWAY Completion Date: 11/30/ CONSTRUCTION STAKES, LINES & GRADES EA REMOVAL & DISPOSAL ITEM NO LS REMOVAL & DISPOSAL ITEM NO LS REMOVAL & DISPOSAL ITEM NO LS SITE EXCAVATION LS GRADED AGGREGATE BASE COURSE (6" UNIFORM) 2, SY PRIME COAT GAL LIQUID ASPHALT BINDER PG TON HOT MIX ASPHALT SURFACE COURSE TYPE C TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 8" WHITE SOLID LINES THERMOPLASTIC MIL LF 12" WHITE SOLID LINES - THERMO MIL LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL LF FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN SF U-SECTION POST FOR SIGN SUPPORTS - 3P LF 24" PERF.CORR. ALUM. ALLOY PIPE-0.060"WITH FABRIC 1, LF 15" SMOOTH WALL PIPE LF 18" SMOOTH WALL PIPE 1, LF 24" SMOOTH WALL PIPE LF 18"X15" SMOOTH WALL PIPE CUL.TEE EA 24" CORRUGATED WALL PIPE LF 24"X15" CORRUGATED WALL PIPE CUL.TEE EA 24"X18" CORRUGATED WALL PIPE CUL.TEE EA DROP INLET (24" X 24") EA DROP INLET (24" X 36") WITH MODIFIED BOX NO.( ) EA 36" X 36" JUNCTION BOX EA

13 Call No.: 090 Page: 12 CATCH BASIN - TYPE 9 MH (TOP ONLY) EA CONCRETE SIDEWALK(4" UNIFORM) SY CONCRETE DRIVEWAY(6" UNIFORM) SY SURFACE APPLIED DETECTABLE WARNING SF AGGREGATE UNDERDRAIN AGGR. UNDERDRAIN CY GEOTEXTILE FOR DRAINAGE FILTRATION (FABRIC PROTECTED)CLASS 1 2, SY MOVING ITEM NO LS MOVING ITEM NO LS MOVING ITEM NO LS MOVING ITEM NO LS PERMANENT COVER ACRE TEMPORARY COVER ACRE FERTILIZER (NITROGEN) LB FERTILIZER (PHOSPHORIC ACID) LB FERTILIZER (POTASH) LB AGRICULTURAL GRANULAR LIME 1, LB SELECTIVE WATERING 54, GAL MOWING ACRE HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE ACRE SEDIMENT TUBES FOR DITCH CHECKS LF SILT FENCE 3, LF REPLACE/REPAIR SILT FENCE LF REMOVAL OF SILT RETAINED BY SILT FENCE LF CLEANING INLET STRUCTURE FILTERS EA INLET STRUCTURE FILTER - TYPE D EA FILTER MATERIAL FOR INLET STRUCTURE FILTER - TYPE D EA STABILIZED CONSTRUCTION ENTRANCE SY

14 Call No.: 100 Page: 13 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Kershaw DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: KERSHAW NFA CHIPS SEAL Completion Date: 4/30/ REMOVAL & DISPOSAL OF EXISTING PAVEMENT SY BORROW EXCAVATION 2, CY EXCAVATION FOR SHOULDER PAVING 1, STA HAULING OF EXCAVATED SHOULDER MATERIAL 1, STA MAINTENANCE STONE TON HMA SHOULDER WIDENING COURSE 7, TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 6, SY HOT MIX ASPHALT SURFACE COURSE TYPE D TON ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 231, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2, SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 174, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1, LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 126, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 174, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1, LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 10, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 126, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1, EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

15 Call No.: 110 Page: 14 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Marlboro DBE Goal Percent: 13.00% Letting Time: 2:00 P.M. Description: PDCOG RESURFACING - MARLBORO Completion Date: 10/31/ REMOVAL & DISPOSAL OF EXISTING PAVEMENT SY REMOVAL & DISPOSAL OF EXISTING CURB LF BORROW EXCAVATION CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 10"UNIF SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 10, SY HOT MIX ASPHALT SURFACE COURSE TYPE C 1, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1, LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 4, LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 9, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 2, LF 8" WHITE SOLID LINES THERMOPLASTIC MIL LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL EA WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL EA RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 4, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA

16 Call No.: 110 Page: 15 FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1, LF FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1, LF SAWCUT FOR LOOP DETECTOR 1, LF ADJUST DROP INLET ADJUST D. I EA CONCRETE CURB AND GUTTER (2'-6") VERTICAL FACE LF CONCRETE SIDEWALK(4" UNIFORM) SY CONCRETE SIDEWALK(6" UNIFORM) SY DETECTABLE WARNING MATERIAL SF CONCRETE DRIVEWAY(6" UNIFORM) SY PEDESTRIAN RAMP CONSTRUCTION SY SURFACE APPLIED DETECTABLE WARNING SF PERMANENT GRASSING FOR SMALL PROJECTS ACRE

17 Call No.: 120 Page: 16 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Oconee DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: CTC RESURFACING IN OCONEE COUNTY Completion Date: 11/30/ BORROW EXCAVATION CY CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) CURING METHOD 4 40, SY PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1, TON MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) SY HOT MIX ASPHALT SURFACE COURSE TYPE C 4, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 50, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 102, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 25, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 25, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA ADJUST DROP INLET ADJUST D. I EA REMOVE AND REPLACE W BEAM GUARDRAIL LF END TERMINAL - TYPE T EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

18 Call No.: 130 Page: 17 SC File NO(S).: Letting Date: June 13, 2017 PCN: P CO(S).: Orangeburg Project No.: P DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Cost of Road Plans: $16.00 Description: SC 6 & US 301 (BASS DR.) INTERSECTION SINKHOLE REPAIR Completion Date: 9/15/ CONSTRUCTION STAKES, LINES & GRADES EA CLEARING & GRUBBING WITHIN ROADWAY LS REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT SY UNCLASSIFIED EXCAVATION CY BORROW EXCAVATION CY FINE GRADING SY FLOWABLE FILL CY MAINTENANCE STONE TON HOT MIX ASPHALT BASE COURSE - TYPE B TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 1, SY HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C TON HOT MIX ASPHALT SURFACE COURSE TYPE B TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) SF BARRICADE - TYPE LF TYPE B - FLASHING LIGHT EA PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES LF PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1, LF SAWCUT FOR LOOP DETECTOR LF 18" SMOOTH WALL PIPE LF

19 Call No.: 130 Page: 18 18" ELASTOMER/FABRIC BACKFLOW CHECK VALVE EA CLEANING EXISTING PIPE LF CATCH BASIN -TYPE 1 WITH STANDARD 6' X 6' BOX EA CATCH BASIN -TYPE EA CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE LF CONCRETE SIDEWALK(4" UNIFORM) SY RIP-RAP (CLASS B) TON GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B SY TEMPORARY BARRIER FENCE LF PERMANENT GRASSING FOR SMALL PROJECTS ACRE SODDING MSY TEMPORARY EROSION CONTROL BLANKET (ECB) MSY HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE ACRE INLET STRUCTURE FILTER - TYPE F (WEIGHTED) LF SILT FENCE LF STABILIZED CONSTRUCTION ENTRANCE SY

20 Call No.: 140 Page: 19 SC File NO(S).: Letting Date: June 13, 2017 PCN: P CO(S).: Pickens Project No.: P DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: 2018 PRIMARY IMPROVEMENT PROGRAM Completion Date: 5/31/2018 REMOVAL OF EXIST. GUARDRAIL LF BORROW EXCAVATION CY EXCAVATION FOR SHOULDER PAVING STA HAULING OF EXCAVATED SHOULDER MATERIAL STA MAINTENANCE STONE TON HMA SHOULDER WIDENING COURSE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8, SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 36, SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) SY MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 3, TON HOT MIX ASPHALT SURFACE COURSE TYPE B 3, TON HOT MIX ASPHALT SURFACE COURSE TYPE D TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 15, LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 38, LF 12" WHITE SOLID LINES - FAST DRY PAINT 3, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 36, LF 4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT LF 4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 2, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 12, LF 12" WHITE SOLID LINES - THERMO MIL LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF

21 Call No.: 140 Page: 20 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 12, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA RESET GUARDRAIL RESET GR. 3, LF END TERMINAL - TYPE T EA RESET END TERMINAL-TYPE T EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

22 MINIMUM REQUIRED QUARTERLY CPS: 68.0 (Period ending on June 30, 2016) Call No.: 150 Page: 21 SC File NO(S).: Letting Date: June 13, 2017 PCN: P CO(S).: Richland Project No.: ER16052 DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Cost of Road Plans: $44.00 Description: US 21 (WILSON BLVD)/LAKE ELIZABETH BRIDGE Completion Date: 4/31/ MINIMUM REQUIRED QUARTERLY CPS: 73.9 (Period ending on December 31, 2016) CONTRACTORS ARE ADVISED THAT THERE WILL BE A MANDATORY PRE-BID CONFERENCE FOR THIS PROJECT TO BE HELD AT 10:00 AM ON TUESDAY, MAY 23, LOCATION FOR THIS PRE-BID CONFERENCE WILL BE AT (DISTRICT 1 OFFICE) 1400 SHOP ROAD, COLUMBIA, SOUTH CAROLINA. CONTRACTORS WHO DO NOT ATTEND THIS PRE-BID CONFERENCE WILL NOT BE ALLOWED TO SUBMIT A BID PROPOSAL FOR THIS PROJECT. CLEARING & GRUBBING WITHIN RIGHT OF WAY LS REMOVAL & DISPOSAL ITEM NO LS REMOVAL & DISPOSAL ITEMS LS REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT SY REMOVAL OF EXIST. GUARDRAIL LF UNCLASSIFIED EXCAVATION 1, CY SITE EXCAVATION LS BORROW EXCAVATION 1, CY CHANNEL RESTORATION LF DEWATERING SYSTEM NO L S FINE GRADING 2, SY FLOWABLE FILL CY AGGREGATE NO. CR TON MACADAM BASE COURSE TON MAINTENANCE STONE TON HOT MIX ASPHALT BASE COURSE - TYPE A 1, TON HMA SHOULDER WIDENING COURSE TON LIQUID ASPHALT BINDER PG TON MILLING EXISTING ASPHALT PAVEMENT 2.0" 1, SY HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B TON HOT MIX ASPHALT SURFACE COURSE TYPE B TON HOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) SF BARRICADE - TYPE LF TYPE B - FLASHING LIGHT EA PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 1, LF

23 Call No.: 150 Page: 22 PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1, LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA CLEANING EXISTING PIPE LF BEVELING OF PIPE END EA BRIDGE APPROACH CONCRETE CURB AND GUTTER(1'-10") LF RIP-RAP (CLASS A) TON RIP-RAP (CLASS B) TON RIP-RAP (CLASS C) 1, TON RIP-RAP (CLASS D) 1, TON GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 1)TYPE A SY GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C SY STEEL BEAM GUARDRAIL STEEL BEAM GR LF END ANCHOR-TYPE B EA END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA STEEL BEAM GUARDRAIL (THRIE) LF PERMANENT VEGETATION MSY PERMANENT COVER ACRE TEMPORARY COVER ACRE SELECT MATERIAL CY TEMPORARY VEGETATION MSY LANDSCAPING LS TYPE A PLANT 2, EA PLATANUS OCCIDENTALIS (SYCAMORE) 4-6'HT.BARE ROOT EA ACER NEGUNDO L. (BOX ELDER) 4-6'HT.BARE ROOT EA ACER RUBRUM (RED MAPLE) SEEDLING EA BETULA NIGRA(RIVERBIRCH) 4-6'HT.BARE ROOT EA QUERCUS PHELLOS(WILLOW OAK) SEEDLING EA QUERCUS NIGRA(WATER OAK) SEEDLING EA SODDING MSY TEMPORARY EROSION CONTROL BLANKET (ECB) MSY INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 1, LF SILT FENCE 3, LF DITCH CHECK TON AGGREGATE NO.5 FOR EROSION CONTROL (6" UNIFORM) SY

24 Call No.: 160 Page: 23 SC File NO(S).: PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Union DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: NFA CHIP SEAL Completion Date: 5/31/ LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF SY HOT MIX ASPHALT SURFACE COURSE TYPE E TON ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 61, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 52, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 38, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA

25 Call No.: 170 Page: 24 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P Letting Date: Letting Time: June 13, :00 P.M. Completion Date: 4/30/2018 CO(S).: Anderson Laurens McCormick Newberry Description: 2018 NFA PRESERVATION (CRACK SEAL) DBE Goal Percent: 0.00% CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT LaMi 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 71, LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 66, LF

26 Call No.: 180 Page: 25 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P Letting Date: Letting Time: June 13, :00 P.M. Description: 2018 NFA PRESERVATION Completion Date: 7/31/2018 CO(S).: Abbeville Anderson Edgefield Laurens McCormick Newberry Saluda DBE Goal Percent: 0.00% BORROW EXCAVATION 5, CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 16, SY FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1, SY HOT MIX ASPHALT SURFACE COURSE TYPE D 1, TON ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 308, SY ASPHALT SURFACE TREATMENT (TRIPLE TREATMENT) TYPE 2 13, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4, SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 87, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 230, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 39, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 45, LF

27 Call No.: 180 Page: 26 PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1, EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

28 Call No.: 190 Page: 27 SC File NO(S).: Letting Date: Letting Time: June 13, :00 P.M. Completion Date: 4/30/2018 PCN: P PCN: P CO(S).: Greenville Spartanburg Description: 2018 NFA PRESERVATION PROGRAM Project No.: P Project No.: P DBE Goal Percent: 0.00% MAINTENANCE STONE TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF SY CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT LaMi 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 2, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 5, LF

29 Call No.: 200 Page: 28 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P Letting Date: Letting Time: June 13, :00 P.M. Completion Date: 6/30/2018 CO(S).: Greenville Pickens Spartanburg Description: 2018 NFA PRESERVATION PROGRAM DBE Goal Percent: 0.00% MAINTENANCE STONE TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3, SY CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT LaMi MICRO SURFACING SURFACE COURSE 87, SY 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 71, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 290, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 71, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL EA 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 72, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA

30 Call No.: 210 Page: 29 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Oconee Pickens DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: 2017 NFA PRESERVATION PROGRAM Completion Date: 5/31/ MAINTENANCE STONE TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2, SY CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT LaMi PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 3, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 3, LF

31 Call No.: 220 Page: 30 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P Letting Date: Letting Time: June 13, :00 P.M. Description: NFA PMST Completion Date: 6/30/2018 CO(S).: Cherokee Chester York DBE Goal Percent: 0.00% FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1, SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1, SY PREVENTATIVE MAINTENANCE SURFACE TREATMENT 79, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 52, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 51, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 58, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL EA WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC MIL EA RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 57, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA

32 Call No.: 230 Page: 31 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P Letting Date: Letting Time: June 13, :00 P.M. Description: NFA MICROSURFACING Completion Date: 5/31/2018 CO(S).: Fairfield Lancaster York DBE Goal Percent: 0.00% FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1, SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF SY MICRO SURFACING SURFACE COURSE 96, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 84, LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 75, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 84, LF 8" WHITE SOLID LINES THERMOPLASTIC MIL LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 75, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA

33 Call No.: 240 Page: 32 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Dillon Marion DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: 2018 NFA PRESERVATION Completion Date: 5/31/ BORROW EXCAVATION CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 2, SY HOT MIX ASPHALT SURFACE COURSE TYPE D 3, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 44, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 23, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 22, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 12, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

34 Call No.: 250 Page: 33 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Georgetown Horry DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: 2018 NFA PRESERVATION Completion Date: 4/30/ BORROW EXCAVATION CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1, SY HOT MIX ASPHALT SURFACE COURSE TYPE D 4, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1, SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 35, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 35, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 17, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL EA WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC MIL EA RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 17, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

35 Call No.: 260 Page: 34 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P Letting Date: June 13, 2017 CO(S).: Darlington Marlboro DBE Goal Percent: 0.00% Letting Time: 2:00 P.M. Description: 2018 NFA PRESERVATION Completion Date: 5/31/ BORROW EXCAVATION 1, CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF SY MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT SURFACE COURSE TYPE D 5, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 84, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 29, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 48, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 18, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

36 Call No.: 270 Page: 35 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P Letting Date: Letting Time: June 13, :00 P.M. Description: 2018 NFA PRESERVATION Completion Date: 5/31/2018 CO(S).: Florence Williamsburg DBE Goal Percent: 0.00% CSX RAILROAD INSURANCE AND FLAGGING LS BORROW EXCAVATION 1, CY MAINTENANCE STONE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1, SY MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT SURFACE COURSE TYPE D 8, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1, SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 276, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 20, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 155, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 94, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL EA WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL EA RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 7, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 56, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

37 Call No.: 280 Page: 36 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P Letting Date: Letting Time: June 13, :00 P.M. Description: 2018 PRIMARY IN BCD COUNTY Completion Date: 6/30/2018 CO(S).: Berkeley Charleston Dorchester DBE Goal Percent: 0.00% BORROW EXCAVATION 1, CY EXCAVATION FOR SHOULDER PAVING STA HAULING OF EXCAVATED SHOULDER MATERIAL STA MAINTENANCE STONE TON HOT MIX ASPHALT BASE COURSE - TYPE A TON HOT MIX ASPHALT BASE COURSE - TYPE B 1, TON HMA SHOULDER WIDENING COURSE 2, TON LIQUID ASPHALT BINDER PG , TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 4, SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 74, SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 31, SY MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 4, TON HOT MIX ASPHALT SURFACE COURSE TYPE B 12, TON HOT MIX ASPHALT SURFACE COURSE TYPE D TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 6, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 44, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING LF WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING EA WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING EA 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 2, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 39, LF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 12, LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 119, LF

38 Call No.: 280 Page: 37 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 7, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 93, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA GUARDRAIL THRIE-BEAM WITH BASE PLATE POST SPACING LF STEEL BEAM GUARDRAIL (THRIE) LF END TERMINAL - TYPE T EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE TEMPORARY EROSION CONTROL BLANKET (CLASS B) MSY SILT FENCE 5, LF REPLACE/REPAIR SILT FENCE LF REMOVAL OF SILT RETAINED BY SILT FENCE 1, LF

39 Call No.: 290 Page: 38 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P Letting Date: Letting Time: June 13, :00 P.M. Description: 2018 NFA RESURF. BCD Completion Date: 5/31/2018 CO(S).: Berkeley Charleston Dorchester DBE Goal Percent: 0.00% CSX RAILROAD INSURANCE AND FLAGGING LS MAINTENANCE STONE TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3, SY MICRO SURFACING SURFACE COURSE 214, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING LF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 58, LF 6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING LF 8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1, LF 12" WHITE SOLID LINES - PERM.PVMT.MARKINGS LF 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1, LF WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING EA WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING EA WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING EA RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING EA 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 5, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 110, LF 24" YELLOW SOLID LINES - PERM.PVMT.MARKING LF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1, LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 116, LF 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1, LF 12" WHITE SOLID LINES - FAST DRY PAINT LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2, LF

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board

More information

11/06/2014 Pay Items - 1

11/06/2014 Pay Items - 1 Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...

More information

LETTING : CALL : 029 COUNTIES : GOODHUE

LETTING : CALL : 029 COUNTIES : GOODHUE PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO. 25024. CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

APPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION February 10, 2017 LETTING

APPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION February 10, 2017 LETTING COUNTY: BLEDSOE, GRUNDY, MARION, SEQUATCHIE (CNR914) 001 PROJECT: 98029-4230-04 TYPE: Mowing and/or Litter Removal LENGTH: Project Length: 364.990 miles WRK DAY: On or before December 31, 2017 806-01 MOWING

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

Plan Preparation Guide. Chapter 18 QUALITY CONTROL / QUALITY ASSURANCE

Plan Preparation Guide. Chapter 18 QUALITY CONTROL / QUALITY ASSURANCE Plan Preparation Guide Chapter 18 QUALITY CONTROL / QUALITY ASSURANCE Section Description Page 1 QC/QA for Roadway Plans 18-1 2 Engineering Directive PC-27 18-2 3 QC/QA for Review Process for SCDOT and

More information

Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS

Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS 2016 20.02 M 20.03 M 20.03 SP 20.04 M 20.04 M 20.04 M 20.06 M 20.06 M 20.07 M 20.07 M 20.08 M 20.08

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By: CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018 SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic

More information

BRIDGE S-803-A TEST PILE EA 4, , , , ,

BRIDGE S-803-A TEST PILE EA 4, , , , , OFFICE OF STATE AID ROAD CONSTRUCTION BID LETTING- PROJECT #: LSBP-65(16) AMOUNT RANK CONTRACT. SURETY OF BID 1 Joe Mcgee ConsSafe Co. 337,266.65 2 Jordan Crane In.Co.of West 345,347.00 3 Fordice Const.Fidelity

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum. ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this

More information

Valley Road Main Replacement

Valley Road Main Replacement Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not

More information

Kansas Department of Transportation DISTRICT 4. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 4. Project(s): Min: Max: Page 1 of 11 BETTIS ASPHALT & (2) APAC-KANSAS INC SHEARS DIVISION (3) KILLOUGH SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

Construction Plan Reading Basics & Applications

Construction Plan Reading Basics & Applications Construction Plan Reading Basics & Applications July 12 th, 2016 / 4 p.m. Richland County Transportation Penny Office Instructor Ben W. Lewis, PE Welcome & Introductions Instructor Ben W. Lewis, PE Project

More information

Midland County Road Commission AS AWARDED 2017 Material Bid Tablulations

Midland County Road Commission AS AWARDED 2017 Material Bid Tablulations Ace Saginaw Paving Central Asphalt Pyramid Paving Hodgins Asphalt Paving ITEM 1 HMA PAVING "/ton" Item 1.a. HMA 13A "/ton" $52.75 $43.51 $53.25 $58.00 Item 1.b. Wedging, Partial Lane "/ton" $58.25 $58.43

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

STORM M ANHOLE FOR 42 PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30MAX 3 OR 3.5 PRECAST ECCENTIC CONC 01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

Plate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST.

Plate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST. DISTRIBUTION: 7 MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Design Services Section TRANSMITTAL LETTER NO. (0-0) MANUAL: Standard Plates DATED: January 9, 00 SUBJECT:

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

Riverside County Flood Control & Water Conservation District

Riverside County Flood Control & Water Conservation District 10/11/2018 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI G.J. GENTRY GENERAL ENGINEERING, INC. 1 MOBILIZATION L.S. 1 $100,000.00 $100,000.00 $48,000.00 $48,000.00 $88,580.77 $88,580.77 2 WATER

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

APPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION December 2, 2016 LETTING

APPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION December 2, 2016 LETTING COUNTY: CUMBERLAND (CNQ921) 001 PROJECT: 18038-3240-14 TYPE: Grade & Drain LENGTH: Project Length: 3.025 miles WRK DAY: On or before November 30, 2020 DBE: 7%. 109-10.01 TRAINEE 5,140.0 HOUR 202-06.01

More information

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA INVITATION TO BID TOWN OF CARY Cary, North Carolina Sealed bids must be submitted no later than 1:30 p.m. on October 1, 2018 to the Town of Cary at the office of the Transportation and Facilities Department],

More information

BID SET C1.1 8 LEGEND UTILITY NOTES GENERAL NOTES CONCRETE & PAVEMENT NOTES DEMOLITION NOTES GENERAL NOTES UTILITY OWNERSHIP

BID SET C1.1 8 LEGEND UTILITY NOTES GENERAL NOTES CONCRETE & PAVEMENT NOTES DEMOLITION NOTES GENERAL NOTES UTILITY OWNERSHIP GENERAL NOTES UTILITY NOTES DEMOLITION NOTES UTILITY OWNERSHIP LEGEND CONCRETE & PAVEMENT NOTES 1 1 Exp. 1-31-01 0-1-01 C1.1 GENERAL NOTES F ST. FROM ROCK BLVD TO 1TH ST. 1TH ST. FROM PRATER TO F ST. 110

More information

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM 600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn

More information

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit

More information

MARQUETTE GREENWAY TRAIL

MARQUETTE GREENWAY TRAIL ------ ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A DESIGN DATA DESIGN SPEED DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office.

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (13-03) MANUAL: Standard

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

DIVISION PAVEMENT MARKINGS AND MARKERS

DIVISION PAVEMENT MARKINGS AND MARKERS DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen

More information

2018 PARKING LOT MAINTENANCE & REPAIR

2018 PARKING LOT MAINTENANCE & REPAIR Drawing Name: D:\Projects\CSU Parking Lot\Dwg\Sheets\Cover Monday, Sheet.dwg May 14, 2018 10:28 AMBy: RhondaBunner 2018 PARKING LOT MAINTENANCE & REPAIR BENCHMARKS Coordinate Control VERTICAL DATUM: HORIZONTAL

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

Appendix D Answers To Chapter Review Questions

Appendix D Answers To Chapter Review Questions Appendix D Answers To Chapter Review Questions Chapter 1 Standard Practices 1. The purpose of pavement markings is to communicate information about the traveled roadway so motorists can safely reach their

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

Riverside County Flood Control & Water Conservation District

Riverside County Flood Control & Water Conservation District 9/28/2016 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI H & H GENERAL CONTRACTORS, INC. 1 MOBILIZATION L.S. 1 $50,000.00 $50,000.00 $106,571.00 $106,571.00 $180,000.00 $180,000.00 2 WATER CONTROL

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925)

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925) STANDARD DETAILS 2401 Crow Canyon Road San Ramon, CA 94583 Telephone: (925) 973-2670 Fax: (925) 838-3937 CITY OF SAN RAMON STANDARD DETAILS INDEX CONCRETE WORK NAME DRAWING # Curb, Gutter & Sidewalk C-1

More information

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS DIVISION 400 - APPROVED MATERIAL LIST AND STANDARD DETAILS Section 403 - STANDARD DETAILS TABLE OF CONTENTS DIVISION 400, Section 403 - STANDARD DETAILS SECTION DETAIL NOS. Application Table 403-1 I. Concrete

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

MICRO MILLING. Applications and Advantages for Pavement Preservation

MICRO MILLING. Applications and Advantages for Pavement Preservation MICRO MILLING Applications and Advantages for Pavement Preservation Presentation Overview 1. Difference between standard milling, fine milling and micro milling 2. Factors that dictate surface texture

More information

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2 Section 4-02 Typical Sections TABLE OF CONTENTS INTRODUCTION...2 General...2 DRAFTING GUIDELINES...3 General...3 Drawing Typical Sections...3 Attaching a Sheet...3 Text Size and Spacing...4 Labeling of

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3

TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3 TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL January 2018 May 2, 2018 Addendum #1 Introduction As part of the Turnpike s continuing

More information

.1 Applicability: These criteria shall be applied as follows:

.1 Applicability: These criteria shall be applied as follows: DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS

PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS EVANS DREXEL DREXEL ELLIS ELLIS PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS SHEETS INDEX TO SHEETS DESCRIPTION 90 294 94 LANGLEY EVANS 48TH COTTAGE

More information

Any of the above may be used as source documents. Let's discuss each of these types of documentation.

Any of the above may be used as source documents. Let's discuss each of these types of documentation. INTRODUCTION TO DOCUMENTATION Much of the work of preparing final estimates involves careful and orderly documentation of measurements and computations. You will become familiar with the various types

More information

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT Case ID: MI Date of Investigation Respondent Employer Information 1. Is the employer the primary contractor or a subcontractor working at the site? Victim Information

More information

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A Permits/Approvals 1. Copy of water management district permit

More information

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised

More information

Information for File # RMM

Information for File # RMM Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

2018 District 1 Highway Construction Program

2018 District 1 Highway Construction Program District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last

More information

Chapter 23. Signing and Pavement Marking Plans

Chapter 23. Signing and Pavement Marking Plans Chapter 23 Signing and Pavement Marking Plans 23.1 General... 23-3 23.2 Key Sheet... 23-4 23.3 Signature Sheet... 23-4 23.4 Tabulation of Quantities and Pay Item Notes... 23-4 23.4.1 Standard Notes...

More information

Project Name: County File No.: Checked by: For: Date:

Project Name: County File No.: Checked by: For: Date: Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

Traffic Line Painting and Other Pavement Markings

Traffic Line Painting and Other Pavement Markings Gateway to the 1000 Islands QUOTATION FOR: Traffic Line Painting and Other Pavement Markings QUOTATION CLOSING: May 23, 2013 QUOTATION NUMBER: RDS-2013-02 Submit completed quotations to: Quotation for

More information

Survey Control Point Observations

Survey Control Point Observations Level Name SURVEY_CTRL SURVEY_CTRL_CHK_NODE SURVEY_CTRL_NODE SURVEY_CTRL_OBS SURVEY_CTRL_REF_SYM SURVEY_CTRL_SETUPS SURVEY_CTRL_SYM SURVEY_CTRL_TXT SURVEY_DTM_BREAKLINE SURVEY_DTM_BREAKLINE_NODE SURVEY_DTM_CHECK_NODE

More information

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project

More information

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing 10-1. JOINTED PLAIN CONCRETE PAVEMENT GENERAL Summary This work includes constructing jointed plain concrete pavement. Comply with Section 40, "Concrete Pavement," of the Standard Specifications. Submittals

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56 OF INDEX OF 1 7 FOUNDATION TREATMENT, COMPACTION & SUBGRADING DETAIL 8 SALVAGED TOPSOIL 15 SIDEROAD PLAN-PROFILE 16 RIGHT OF WAY MONUMENT INSTALLATION DETAIL SHEET -23 PAVING DETAILS 24-29 PAVEMENT DETAILS

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

SECTION 6A ROADWAY PLAN PREPARATION

SECTION 6A ROADWAY PLAN PREPARATION SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4

More information

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information