APPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION February 10, 2017 LETTING

Size: px
Start display at page:

Download "APPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION February 10, 2017 LETTING"

Transcription

1 COUNTY: BLEDSOE, GRUNDY, MARION, SEQUATCHIE (CNR914) 001 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before December 31, MOWING 5,462.0 ACRE COUNTY: BRADLEY, MCMINN, POLK (CNR915) 002 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before December 31, REMOVAL AND DISPOSAL OF LITTER L.M MOWING 3,752.0 ACRE COUNTY: CLAY, DEKALB, JACKSON, OVERTON (CNR916) 003 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before December 31, MOWING 4,616.0 ACRE COUNTY: COCKE, HAMBLEN, JEFFERSON, SEVIER (CNR917) 004 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before December 31, INVOLUNTARY WORK SUSPENSION 6.0 DAY MOWING 2,331.0 ACRE COUNTY: DAVIDSON, WILLIAMSON (CNR908) 005 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before March 31, INVOLUNTARY WORK SUSPENSION 5.0 DAY REMOVAL AND DISPOSAL OF LITTER 3,895.0 L.M MOWING 11,654.0 ACRE COUNTY: DICKSON, HICKMAN, HUMPHREYS (CNR909) 006 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before December 31, REMOVAL AND DISPOSAL OF LITTER L.M MOWING 2,972.0 ACRE COUNTY: DYER, GIBSON, LAKE, OBION (CNR910) 007 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before December 31, REMOVAL AND DISPOSAL OF LITTER 1,795.0 L.M MOWING 15,426.0 ACRE COUNTY: FAYETTE, LAUDERDALE, SHELBY, TIPTON (CNR911) 008 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before March 31, INVOLUNTARY WORK SUSPENSION 5.0 DAY REMOVAL AND DISPOSAL OF LITTER 2,327.0 L.M MOWING 18,021.0 ACRE COUNTY: MCMINN, MEIGS, POLK (CNR900) 009 PROJECT: TYPE: Miscellaneous safety improvements LENGTH: Project Length: miles WRK DAY: On or before August 31, 2017 DBE: 3.0% REMOVAL OF ASPHALT PAVEMENT S.Y ROAD & DRAINAGE EXCAVATION (UNCLIFIED) C.Y MINERAL AGGREGATE, TY A BASE, GRADING D TON ASP. CONC. MIX(PG64-22) (BPMB-HM) GR. A TON ASPHALT CONC MX(PG64-22)(BPMB-HM)GR B-M TON BITUMINOUS MATERIAL FOR PRIME COAT (PC) 1.0 TON AGGREGATE FOR COVER MATERIAL (PC) 4.0 TON BITUMINOUS MATERIAL FOR TACK COAT (TC) 1.0 TON SAW CUTTING ASPHALT PAVEMENT L.F ACS MIX(PG64-22) GRADING D 42.0 TON SCORING RUMBLE STRIPE (NON-CONT. 4IN) 20.9 L.M GUARDRAIL DELINEATION ENHANCEMENT 4,730.0 L.F. Tenneessee Road Builders Association Page 1

2 SIGN POST DELINEATION ENHANCEMENT L.F "U" SECTION STEEL POSTS 1,532.0 LB PERFORATED/KNOCKOUT SQUARE TUBE POST 5,473.0 LB FLAT SHEET ALUMINUM SIGNS (0.080" THICK) S.F FLAT SHEET ALUMINUM SIGNS (0.100" THICK) S.F REMOVE SIGN, SUPPORT & FOOTING EACH REMOVE AND REPLACE SIGN 5.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le 1,210.0 EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color 10.0 EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) 20.0 S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 7.0 EACH PLASTIC WORD PVMT MARKING (STOP AHEAD) 2.0 EACH PLASTIC WORD PVMT MARKING (STOP) 2.0 EACH ENHANCED FLAT THERMO P.M. (4IN) 6.2 L.M SPRAY THERMO P.M. (60 mil 4IN) 43.2 L.M SPRAY THERMO P.M. (60 mil 4IN DOTTED) 1,320.0 L.F TEMPORARY SEDIMENT TUBE 18IN L.F SODDING (NEW SOD) S.Y RMVL OF SNOWPLOWABLE REFLECTIVE MARKER EACH PLASTIC PAVEMENT MARKING (STOP LINE) 32.0 L.F PLASTIC PAVEMENT MKG (24" BARRIER LINE) 1,860.0 L.F PAINTED PAVEMENT MARKING (4" LINE) 26.0 L.M PAINTED PAVEMENT MKG (8" BARRIER LINE) 6,614.0 L.F ENHANCED FLAT THERMO P.M. (6IN) 26.0 L.M ENHANCED FLAT THERMO P.M. (8IN BARR) 6,614.0 L.F ENHANCED FLAT THERMO P.M. (6IN DOTTED) L.F. COUNTY: RUTHERFORD, SUMNER, WILSON (CNR912) 011 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before March 31, INVOLUNTARY WORK SUSPENSION 5.0 DAY REMOVAL AND DISPOSAL OF LITTER L.M MOWING 6,332.0 ACRE COUNTY: MONROE (CNR907) 010 PROJECT: TYPE: Asphalt Paving LENGTH: Project Length: miles WRK DAY: On or before July 31, 2017 DBE: 3% CLEARING AND GRUBBING 1.0 LS REMOVAL OF ASPHALT PAVEMENT 14,209.0 S.Y SHOULDERS AND DITCHES 26.0 L.M TEMPORARY SILT FENCE (WITHOUT BACKING) L.F MINERAL AGGREGATE, TY A BASE, GRADING D 1,356.0 TON ASPHALT CONC MIX (PG76-22)(BPMB-HM) GR C 17,407.0 TON BITUMINOUS MATERIAL FOR TACK COAT (TC) TON BITUMINOUS MATERIAL (FOG SEAL) SHOULDER 20.0 TON ACS MIX (PG76-22) OGFC 14,753.0 TON SCORING SHOULDERS (CONT. 16IN) 26.0 L.M COLD PLANING BITUMINOUS PAVEMENT 15,265.0 TON RESEALING JOINTS (HOT POURED ELASTIC) 19,674.0 L.F TAN ENERGY ABSG TERM (NCHRP 350,TL3) 5.0 EACH EARTH PAD FOR TYPE 38 GR END TREATMENT 5.0 EACH FLEXIBLE DRUMS (CHANNELIZING) EACH WARNING LIGHTS (TYPE A) EACH SIGNS (CONSTRUCTION) 4,782.0 S.F SIGNS (CNSTR)(REDUCED SPEED WARNING) 10.0 EACH ARROW BOARD (TYPE C) 4.0 EACH MOBILE MESSAGE SIGN UNIT W/ATTENUATOR HOUR CHANGEABLE MESSAGE SIGN UNIT 2.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L EACH COUNTY: SULLIVAN (CNR906) 012 PROJECT: TYPE: Asphalt Paving LENGTH: Project Length: miles WRK DAY: On or before August 31, 2017 DBE: 3.0% CONSTRUCTION STAKES, LINES AND GRADES 1.0 LS CLEARING AND GRUBBING 1.0 LS REMOVAL OF STRUCTURES & OBSTRUCTIONS 1.0 LS REMOVAL OF ASPHALT PAVEMENT 5,970.0 S.Y ROAD & DRAINAGE EXCAVATION (UNCLIFIED) 3,418.0 C.Y BORROW EXCAVATION (GRADED SOLID ROCK) 35.0 TON PLACING AND SPREADING TOPSOIL C.Y FURNISHING & SPREADING TOPSOIL 96.0 C.Y COMPACTED CLAY 25.0 C.Y BACKFILL MATERIAL (FLOWABLE FILL) 4.0 C.Y SHOULDERS AND DITCHES 5.8 L.M SEDIMENT REMOVAL 27.0 C.Y TEMPORARY SILT FENCE (WITHOUT BACKING) L.F ROCK CHECK DAM PER 11.0 EACH ENHANCED ROCK CHECK DAM 4.0 EACH CURB INLET PROTECTION (TYPE 4) 2.0 EACH CATCH BASIN PROTECTION (TYPE D) 3.0 EACH CATCH BASIN FILTER ASSEMBLY(TYPE 1) 3.0 EACH MINERAL AGGREGATE, TY A BASE, GRADING D 2,855.0 TON GRANULAR BACKFILL (ROADWAY) TON MINERAL AGGREGATE (SIZE 57) 23.0 TON ASPHALT CONC MX(PG64-22)(BPMB-HM)GR B-M TON ASP. CONC. MIX(PG76-22) (BPMB-HM) GR A-S TON Tenneessee Road Builders Association Page 2

3 ASPHALT CONC MIX (PG76-22)(BPMB-HM) GR A TON ASPHALT CONC MX(PG76-22)(BPMB-HM)GR B-M TON ASPHALT CONC MIX (PG76-22)(BPMB-HM) GR C 8,407.0 TON BITUMINOUS MATERIAL FOR PRIME COAT (PC) 4.5 TON BITUMINOUS MATERIAL FOR TACK COAT (TC) 65.0 TON BIT MATERIAL(TC/FOG SEAL)(UNDILUTED) 8.3 TON SAW CUTTING ASPHALT PAVEMENT 1,152.0 L.F ACS MIX (PG64-22) GRADING E SHOULDER 90.0 TON ACS MIX (PG76-22) OGFC 5,404.0 TON SCORING SHOULDERS (CONT. 16IN) 5.9 L.M COLD PLANING BITUMINOUS PAVEMENT 6,236.0 TON RESEALING JOINTS (HOT POURED ELASTIC) 9,074.0 L.F " CONCRETE PIPE CULVERT (CLASS III) L.F " CONCRETE PIPE CULVERT (CLASS III) 56.0 L.F CLASS A CONCRETE (PIPE ENDWALLS) 2.0 C.Y STEEL BAR REINFORCEMENT (PIPE ENDWALLS) 68.0 LB CATCH BASINS, TYPE 41, > 4' - 8' DEPTH 2.0 EACH CATCH BASINS, TYPE 42, > 4' - 8' DEPTH 1.0 EACH CEMENT CONCRETE DITCH PAVING 22.0 C.Y GUARDRAIL AT BRIDGE ENDS 27.0 L.F TAN ENERGY ABSG TERM (NCHRP 350,TL3) 1.0 EACH PORTABLE BARRIER RAIL DELINEATOR 70.0 EACH PORTABLE IMPACT ATTENUATOR NCHRP350 TL EACH MACHINED RIP-RAP (CLASS A-3) 50.0 TON MACHINED RIP-RAP (CLASS A-1) TON AGGREGATE UNDERDRAINS (WITH PIPE) 1,152.0 L.F LATERAL UNDERDRAIN 54.0 L.F LATERAL UNDERDRAIN ENDWALL (4:1) 1.0 EACH LATERAL UNDERDRAIN ENDWALL (6:1) 2.0 EACH FLARED S/S CONCRETE MEDIAN BARRIER WALL 60.0 L.F GRADE SEPARATED SINGE SLOPE MEDIAN WALL L.F INTERCONNECTED PORTABLE BARRIER RAIL 1,340.0 L.F FLEXIBLE DRUMS (CHANNELIZING) EACH WARNING LIGHTS (TYPE A) EACH SIGNS (CONSTRUCTION) 2,486.0 S.F SIGNS (CNSTR)(REDUCED SPEED WARNING) 10.0 EACH ARROW BOARD (TYPE C) 6.0 EACH MOBILE MESSAGE SIGN UNIT W/ATTENUATOR HOUR REMOVABLE PAVEMENT MARKING LINE 2,696.0 L.F REMOVABLE BLACK-OUT TAPE (8IN) L.F CL A CNC (FOUNDATION FOR SIGN SUPPORTS) 5.0 C.Y STEEL B. REINFORCEM(F FOR SIGN SUPPORTS) 1,425.0 LB DELINEATOR (MILE MARKER) & STEEL POST 2.0 EACH FLEXIBLE DELINEATOR (WHITE) EACH FLEXIBLE DELINEATOR (YELLOW) 70.0 EACH STEEL I-BMs & WF-BMs(BKWY) SIGN SUPPORT 4,988.0 LB PERFORATED/KNOCKOUT SQUARE TUBE POST LB P POST SLIP BASE 10.0 EACH FLAT SHEET ALUMINUM SIGNS (0.100" THICK) 81.0 S.F EXTRUDED ALUMINUM PANEL SIGNS S.F REMOVAL OF SIGNS, POSTS AND FOOTINGS 1.0 LS CHANGEABLE MESSAGE SIGN UNIT 3.0 EACH STRUCTURAL LIGHTING 1.0 LS DIRECT BRL CONDUIT (2"PVC, SCHEDULE 40) 1,000.0 L.F PULL BOXES (TYPE C) 1.0 EACH PULL BOXES 2.0 EACH CABLE 3,900.0 L.F LIGHT STANDARDS (45' M.H., 15' ARM) 4.0 EACH LIGHT STANDARDS 2.0 EACH REMOVAL OF LIGHT STANDARD & FOUNDATION 2.0 EACH LUMINAIRES (250 WATT) 6.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L EACH RMVL OF SNOWPLOWABLE REFLECTIVE MARKER EACH PLASTIC PAVEMENT MKG (24" BARRIER LINE) L.F PLASTIC PAVEMENT MKG (EXIT ONLY ARROW) 2.0 EACH PLASTIC PAVEMENT MARKING(LANE RED ARROW) 4.0 EACH PAINTED PAVEMENT MKG (8" BARRIER LINE) 5,272.0 L.F PAINTED PAVEMENT MARKINGS(8" LINE) 13.5 L.M ENHANCED FLAT THERMO P.M. (6IN) 13.4 L.M ENHANCED FLAT THERMO P.M. (8IN BARR) 5,272.0 L.F ENHANCED FLAT THERMO P.M. (6IN DOTTED) 1,604.0 L.F GEOMEMBRANE 1,353.0 S.Y GEOTEXTILE (TYPE III)(EROSION CONTROL) S.Y GEOTEXTILE (TYPE IV) (STABILIZATION) S.Y TEMPORARY SEDIMENT TUBE 8IN 2,328.0 L.F TEMPORARY SEEDING (WITH MULCH) 11.0 UNIT SEEDING (WITHOUT MULCH) 22.0 UNIT WATER (SEEDING & SODDING) 2.0 M.G FERTILIZER (SUPPLEMENTAL APPLICATION) 1.0 TON EROSION CONTROL BLANKET (TYPE III) 2,484.0 S.Y. COUNTY: WILLIAMSON (CNR913) 013 PROJECT: TYPE: Mowing and/or Litter Removal LENGTH: Project Length: miles WRK DAY: On or before December 31, INVOLUNTARY WORK SUSPENSION 5.0 DAY MOWING 1,431.0 ACRE COUNTY: ANDERSON, BLOUNT, CAMPBELL, CARTER (CNR054) 014 PROJECT: TYPE: Pavement Marking WRK DAY: On or before June 30, SCORING SHOULDERS (CONT. 16IN) 10.0 L.M SCORING SHOULDERS (NON-CONT. 16IN) 10.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 8IN) 10.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 4IN) 10.0 L.M. Tenneessee Road Builders Association Page 3

4 MAINTENANCE OF TRAFFIC 25.0 EACH DELINEATORS (ALL) 2,000.0 EACH RAISED PVMT MARKERS (BI-DIR. 1 COLOR) 1,000.0 EACH RAISED PVMT MRKRS (MONO-DIR. 1 COLOR) 1,250.0 EACH RAISED PVMT MARKERS (BI-DIR. 2 COLOR) EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le 1,000.0 EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR EACH PLASTIC PAVEMENT MARKING (CROSS-WALK) L.F PLASTIC PAVEMENT MARKING (CHNZ STRIPING) S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) EACH PLASTIC PAVEMENT MKG (24" BARRIER LINE) L.F PLASTIC PAVEMENT MKG (8" DOTTED LINE) L.F PLASTIC PVMT MKG (LONGITUDINAL X-WALK) L.F PLASTIC WORD PVMT MARKING (ONLY) 50.0 EACH PLASTIC WORD PVMT MARKING (RXR) 20.0 EACH PLASTIC WORD PVMT MARKING (STOP AHEAD) 5.0 EACH PLASTIC WORD PVMT MARKING (SCHOOL) 5.0 EACH PLASTIC WORD PVMT MARKING (BIKE LANE) 20.0 EACH PLASTIC WORD PVMT MARKING (SIGNAL AHEAD) 8.0 EACH PLASTIC WORD PVMT MARKING (STOP) 15.0 EACH PLASTIC WORD PVMT MARKING (PED-XING) 4.0 EACH PLASTIC PVMT MKG (STRAIGHT-TURN ARROW) 5.0 EACH PLASTIC PVMT MKG(DOUBLE TURNING ARROW) 5.0 EACH PLASTIC PVMT MKG (TRANSVERSE SHOULDER) L.F PLASTIC PAVEMENT MKG (STRAIGHT ARROW) 20.0 EACH PLASTIC PAVEMENT MKG (WRONG WAY ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (EXIT ONLY ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (OPTION LANE ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (H.O.V. DIAMOND) 20.0 EACH PLASTIC PAVEMENT MKG (HANDICAP SYMBOL) 5.0 EACH PLASTIC PAVEMENT MARKING (YIELD LINE) S.F PLASTIC PAVEMENT MARKING(LANE RED ARROW) 20.0 EACH PLASTIC PAVEMT MARKING-BIKE SYMBOL/AR SH 50.0 EACH PAINTED PAVEMENT MARKING (4" LINE) 30.0 L.M PRFRMNCE BASED RETRCNG SPRA THRMO 4IN 1,676.0 L.M PRFRMNCE BASED RETRCNG SPRA THRMO 6IN L.M PRFRMNCE BASED RETRCNG SPRA THRMO 8IN 156,880.0 L.F REMOVAL OF PAVEMENT MARKING (LINE) 20,000.0 L.F REMOVAL OF PVMT MKG (8" BARRIER LINE) 1,000.0 L.F REMOVAL OF PAVEMENT MARKING (CROSS-WALK) L.F REMOVAL PAVEMENT MKG (CHNZ STRIPING) S.Y REMOVAL OF PAVEMENT MARKING (STOP LINE) L.F REMOVAL OF PVMT MKG (TURN LANE ARROW) 20.0 EACH REMOVAL PVMT MKG (STRAIGHT-TURN ARROW) 4.0 EACH REMOVAL PVMT MKG (DOUBLE TURNING ARROW) 2.0 EACH REMOVAL OF PAVEMENT MKG (DOTTED LINE) L.F REMOVAL PVMT MKG (TRANSVERSE SHOULDER) L.F REMOVAL OF WORD PVMT MKG 5.0 EACH REMOVAL OF WORD PVMT MKG 3.0 EACH REMOVAL OF WORD PVMT MKG 2.0 EACH PPPM 4IN LINE W/1.5IN BLACK SILHOUETTE 1.0 L.M PRFRMED PLSTC PVMNT MRKNG (ISTATE SHLD) 50.0 EACH ENHANCED FLAT THERMO P.M. (4IN) 5.0 L.M ENHANCED FLAT THERMO P.M. (6IN) 5.0 L.M ENHANCED FLAT THERMO P.M. (8IN BARR) L.F ENHANCED FLAT THERMO P.M. (4IN DOTTED) L.F ENHANCED FLAT THERMO P.M. (6IN DOTTED) L.F ENHANCED FLAT LINE THERMO (8IN LINE) L.F ENHANCED FLAT LINE THERMO (8IN BROKEN LN L.F ENHANCED FLAT LINE THERMO (12IN BARRIER L.F ENHANCED FLAT LINE THERMO (12IN LINE L.F SPRAY THERMO P.M. (40 mil 4IN) 60.0 L.M SPRAY THERMO P.M. (40 mil 6IN) 20.0 L.M SPRAY THERMO P.M. (40 mil 8IN BARRIER) 5,000.0 L.F SPRAY THERMO P.M. (40 mil 4IN DOTTED) L.F SPRAY THERMO P.M. (40 mil 6IN DOTTED) L.F ROADWAY CLEANING FOR PAVEMENT MARKING 17.0 L.M MOBILIZATION (PER CALL-OUT) 10.0 EACH MOBILIZATION 3.0 EACH COUNTY: ANDERSON, BLOUNT, CAMPBELL, CARTER (CNR050) 015 PROJECT: TYPE: Pavement Marking PERFORMANCE BASED RETRACING PAINTED 4IN 3,917.0 L.M PERFORMANCE BASED RETRACING PAINTED 8IN L.F ROADWAY CLEANING FOR PAVEMENT MARKING 5.0 L.M. COUNTY: BEDFORD, CHEATHAM, DAVIDSON, DICKSON (CNR036) 016 PROJECT: TYPE: Pavement Marking WRK DAY: On or before June 30, SCORING SHOULDERS (CONT. 16IN) 10.0 L.M SCORING SHOULDERS (NON-CONT. 16IN) 10.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 8IN) 10.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 4IN) 10.0 L.M MAINTENANCE OF TRAFFIC 30.0 EACH DELINEATORS (ALL) 2,000.0 EACH RAISED PVMT MARKERS (BI-DIR. 1 COLOR) 1,000.0 EACH RAISED PVMT MRKRS (MONO-DIR. 1 COLOR) 1,250.0 EACH RAISED PVMT MARKERS (BI-DIR. 2 COLOR) EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le 1,000.0 EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color EACH Tenneessee Road Builders Association Page 4

5 Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR 1,000.0 EACH PLASTIC PAVEMENT MARKING (CROSS-WALK) L.F PLASTIC PAVEMENT MARKING (CHNZ STRIPING) S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) EACH PLASTIC PAVEMENT MKG (24" BARRIER LINE) L.F PLASTIC PAVEMENT MKG (8" DOTTED LINE) L.F PLASTIC PVMT MKG (LONGITUDINAL X-WALK) L.F PLASTIC WORD PVMT MARKING (ONLY) 50.0 EACH PLASTIC WORD PVMT MARKING (RXR) 50.0 EACH PLASTIC WORD PVMT MARKING (STOP AHEAD) 10.0 EACH PLASTIC WORD PVMT MARKING (SCHOOL) 5.0 EACH PLASTIC WORD PVMT MARKING (BIKE LANE) 10.0 EACH PLASTIC WORD PVMT MARKING (SIGNAL AHEAD) 10.0 EACH PLASTIC WORD PVMT MARKING (STOP) 12.0 EACH PLASTIC WORD PVMT MARKING (PED-XING) 5.0 EACH PLASTIC PVMT MKG (STRAIGHT-TURN ARROW) 5.0 EACH PLASTIC PVMT MKG(DOUBLE TURNING ARROW) 10.0 EACH PLASTIC PVMT MKG (TRANSVERSE SHOULDER) L.F PLASTIC PAVEMENT MKG (STRAIGHT ARROW) 5.0 EACH PLASTIC PAVEMENT MKG (WRONG WAY ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (EXIT ONLY ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (OPTION LANE ARROW) 15.0 EACH PLASTIC PAVEMENT MKG (H.O.V. DIAMOND) 15.0 EACH PLASTIC PAVEMENT MKG (HANDICAP SYMBOL) 5.0 EACH PLASTIC PAVEMENT MARKING (YIELD LINE) S.F PLASTIC PAVEMENT MARKING(LANE RED ARROW) 15.0 EACH PLASTIC PAVEMT MARKING-BIKE SYMBOL/AR SH 30.0 EACH PAINTED PAVEMENT MARKING (4" LINE) 30.0 L.M PRFRMNCE BASED RETRCNG SPRA THRMO 4IN 1,666.0 L.M PRFRMNCE BASED RETRCNG SPRA THRMO 6IN 1,125.0 L.M PRFRMNCE BASED RETRCNG SPRA THRMO 8IN 316,800.0 L.F REMOVAL OF PAVEMENT MARKING (LINE) 20,000.0 L.F REMOVAL OF PVMT MKG (8" BARRIER LINE) 1,000.0 L.F REMOVAL OF PAVEMENT MARKING (CROSS-WALK) L.F REMOVAL PAVEMENT MKG (CHNZ STRIPING) S.Y REMOVAL OF PAVEMENT MARKING (STOP LINE) L.F REMOVAL OF PVMT MKG (TURN LANE ARROW) 20.0 EACH REMOVAL PVMT MKG (STRAIGHT-TURN ARROW) 4.0 EACH REMOVAL PVMT MKG (DOUBLE TURNING ARROW) 2.0 EACH REMOVAL OF PAVEMENT MKG (DOTTED LINE) L.F REMOVAL PVMT MKG (TRANSVERSE SHOULDER) L.F REMOVAL OF WORD PVMT MKG 5.0 EACH REMOVAL OF WORD PVMT MKG 3.0 EACH REMOVAL OF WORD PVMT MKG 2.0 EACH PPPM 4IN LINE W/1.5IN BLACK SILHOUETTE 1.0 L.M PRFRMED PLSTC PVMNT MRKNG (ISTATE SHLD) 40.0 EACH ENHANCED FLAT THERMO P.M. (4IN) 5.0 L.M ENHANCED FLAT THERMO P.M. (6IN) 5.0 L.M ENHANCED FLAT THERMO P.M. (8IN BARR) L.F ENHANCED FLAT THERMO P.M. (4IN DOTTED) L.F ENHANCED FLAT THERMO P.M. (6IN DOTTED) L.F ENHANCED FLAT LINE THERMO (8IN LINE) L.F ENHANCED FLAT LINE THERMO (8IN BROKEN LN L.F ENHANCED FLAT LINE THERMO (12IN BARRIER L.F ENHANCED FLAT LINE THERMO (12IN LINE L.F SPRAY THERMO P.M. (40 mil 4IN) 30.0 L.M SPRAY THERMO P.M. (40 mil 6IN) 20.0 L.M SPRAY THERMO P.M. (40 mil 8IN BARRIER) 20,000.0 L.F SPRAY THERMO P.M. (40 mil 4IN DOTTED) L.F SPRAY THERMO P.M. (40 mil 6IN DOTTED) 1,000.0 L.F ROADWAY CLEANING FOR PAVEMENT MARKING 30.0 L.M MOBILIZATION (PER CALL-OUT) 30.0 EACH MOBILIZATION 6.0 EACH COUNTY: BEDFORD, CHEATHAM, DAVIDSON, DICKSON (CNR033) 017 PROJECT: TYPE: Pavement Marking PERFORMANCE BASED RETRACING PAINTED 4IN 4,136.0 L.M ROADWAY CLEANING FOR PAVEMENT MARKING 8.0 L.M. COUNTY: BENTON (CNR021) 018 PROJECT: TYPE: Asphalt Paving LENGTH: Project Length: miles WRK DAY: On or before July 31, 2017 DBE: 2.0% REMOVAL OF ASPHALT PAVEMENT S.Y WATER 26.0 M.G MINERAL AGGR,TY B BASE, GR 3,432.0 TON ASP. CONC. MIX(PG64-22) (BPMB-HM) GR. A TON BITUMINOUS MATERIAL FOR TACK COAT (TC) TON ACS MIX (PG64-22) GRADING E SHOULDER 9,898.0 TON ACS MIX(PG70-22) GRADING D 16,569.0 TON SCORING SHOULDERS (NON-CONT. 16IN) 21.8 L.M COLD PLANING BITUMINOUS PAVEMENT 384,471.0 S.Y " PIPE CULVERT (SIDE DRAIN) L.F " PIPE CULVERT (SIDE DRAIN) 40.0 L.F " PIPE CULVERT (SIDE DRAIN) 60.0 L.F GUARDRAIL ENERGY ABSORBING TERMINAL 16.0 EACH SIGNS (CONSTRUCTION) 1,856.0 S.F SNOWPLOWABLE REFLECTIVE MARKER 2,574.0 EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) 4,800.0 S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 24.0 EACH Tenneessee Road Builders Association Page 5

6 PAINTED PAVEMENT MARKING (4" LINE) 40.4 L.M ENHANCED FLAT THERMO P.M. (4IN) 2.6 L.M ENHANCED FLAT THERMO P.M. (6IN) 35.8 L.M ENHANCED FLAT THERMO P.M. (8IN BARR) L.F. COUNTY: BENTON, CARROLL, CHESTER, CROCKETT (CNR018) 019 PROJECT: TYPE: Pavement Marking WRK DAY: On or before June 30, SCORING SHOULDERS (CONT. 16IN) 10.0 L.M SCORING SHOULDERS (NON-CONT. 16IN) 10.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 8IN) 10.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 4IN) 10.0 L.M MAINTENANCE OF TRAFFIC 30.0 EACH DELINEATORS (ALL) 2,000.0 EACH RAISED PVMT MARKERS (BI-DIR. 1 COLOR) 1,000.0 EACH RAISED PVMT MRKRS (MONO-DIR. 1 COLOR) 1,250.0 EACH RAISED PVMT MARKERS (BI-DIR. 2 COLOR) EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le 1,000.0 EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR EACH PLASTIC PAVEMENT MARKING (CROSS-WALK) L.F PLASTIC PAVEMENT MARKING (CHNZ STRIPING) S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) EACH PLASTIC PAVEMENT MKG (24" BARRIER LINE) L.F PLASTIC PAVEMENT MKG (8" DOTTED LINE) L.F PLASTIC PVMT MKG (LONGITUDINAL X-WALK) L.F PLASTIC WORD PVMT MARKING (ONLY) 60.0 EACH PLASTIC WORD PVMT MARKING (RXR) 30.0 EACH PLASTIC WORD PVMT MARKING (STOP AHEAD) 12.0 EACH PLASTIC WORD PVMT MARKING (SCHOOL) 5.0 EACH PLASTIC WORD PVMT MARKING (BIKE LANE) 10.0 EACH PLASTIC WORD PVMT MARKING (SIGNAL AHEAD) 15.0 EACH PLASTIC WORD PVMT MARKING (STOP) 20.0 EACH PLASTIC WORD PVMT MARKING (PED-XING) 3.0 EACH PLASTIC PVMT MKG (STRAIGHT-TURN ARROW) 7.0 EACH PLASTIC PVMT MKG(DOUBLE TURNING ARROW) 12.0 EACH PLASTIC PVMT MKG (TRANSVERSE SHOULDER) L.F PLASTIC PAVEMENT MKG (STRAIGHT ARROW) 5.0 EACH PLASTIC PAVEMENT MKG (WRONG WAY ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (EXIT ONLY ARROW) 6.0 EACH PLASTIC PAVEMENT MKG (OPTION LANE ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (H.O.V. DIAMOND) 20.0 EACH PLASTIC PAVEMENT MKG (HANDICAP SYMBOL) 5.0 EACH PLASTIC PAVEMENT MARKING (YIELD LINE) S.F PLASTIC PAVEMENT MARKING(LANE RED ARROW) 15.0 EACH PLASTIC PAVEMT MARKING-BIKE SYMBOL/AR SH 20.0 EACH PAINTED PAVEMENT MARKING (4" LINE) 30.0 L.M PRFRMNCE BASED RETRCNG SPRA THRMO 4IN 1,117.0 L.M PRFRMNCE BASED RETRCNG SPRA THRMO 6IN L.M PRFRMNCE BASED RETRCNG SPRA THRMO 8IN 20,000.0 L.F REMOVAL OF PAVEMENT MARKING (LINE) 20,000.0 L.F REMOVAL OF PVMT MKG (8" BARRIER LINE) 1,000.0 L.F REMOVAL OF PAVEMENT MARKING (CROSS-WALK) L.F REMOVAL PAVEMENT MKG (CHNZ STRIPING) S.Y REMOVAL OF PAVEMENT MARKING (STOP LINE) L.F REMOVAL OF PVMT MKG (TURN LANE ARROW) 20.0 EACH REMOVAL PVMT MKG (STRAIGHT-TURN ARROW) 4.0 EACH REMOVAL PVMT MKG (DOUBLE TURNING ARROW) 2.0 EACH REMOVAL OF PAVEMENT MKG (DOTTED LINE) L.F REMOVAL PVMT MKG (TRANSVERSE SHOULDER) L.F REMOVAL OF WORD PVMT MKG 5.0 EACH REMOVAL OF WORD PVMT MKG 3.0 EACH REMOVAL OF WORD PVMT MKG 2.0 EACH PPPM 4IN LINE W/1.5IN BLACK SILHOUETTE 1.0 L.M PRFRMED PLSTC PVMNT MRKNG (ISTATE SHLD) 30.0 EACH ENHANCED FLAT THERMO P.M. (4IN) 5.0 L.M ENHANCED FLAT THERMO P.M. (6IN) 5.0 L.M ENHANCED FLAT THERMO P.M. (8IN BARR) L.F ENHANCED FLAT THERMO P.M. (4IN DOTTED) L.F ENHANCED FLAT THERMO P.M. (6IN DOTTED) L.F ENHANCED FLAT LINE THERMO (8IN LINE) L.F ENHANCED FLAT LINE THERMO (8IN BROKEN LN L.F ENHANCED FLAT LINE THERMO (12IN BARRIER L.F ENHANCED FLAT LINE THERMO (12IN LINE L.F SPRAY THERMO P.M. (40 mil 4IN) L.M SPRAY THERMO P.M. (40 mil 6IN) 20.0 L.M SPRAY THERMO P.M. (40 mil 8IN BARRIER) 20,000.0 L.F SPRAY THERMO P.M. (40 mil 4IN DOTTED) L.F SPRAY THERMO P.M. (40 mil 6IN DOTTED) L.F ROADWAY CLEANING FOR PAVEMENT MARKING 18.0 L.M MOBILIZATION (PER CALL-OUT) 20.0 EACH MOBILIZATION 3.0 EACH COUNTY: BENTON, CARROLL, CROCKETT, DECATUR (CNR020) 020 PROJECT: TYPE: Pavement Marking WRK DAY: On or before November 30, TRUCK MOUNTED ENERGY ATTENUATOR 1.0 EACH SIGNS (CONSTRUCTION) S.F ARROW BOARD (TYPE C) 2.0 EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR 42,281.0 EACH Tenneessee Road Builders Association Page 6

7 COUNTY: BENTON, CARROLL, DYER, GIBSON (CNR019) 021 PROJECT: TYPE: Pavement Marking PERFORMANCE BASED RETRACING PAINTED 4IN 3,494.0 L.M PERFORMANCE BASED RETRACING PAINTED 8IN 15,000.0 L.F ROADWAY CLEANING FOR PAVEMENT MARKING 8.0 L.M. COUNTY: BLEDSOE, BRADLEY, CANNON, CLAY (CNR052) 022 PROJECT: TYPE: Pavement Marking WRK DAY: On or before June 30, SCORING SHOULDERS (CONT. 16IN) 10.0 L.M SCORING SHOULDERS (NON-CONT. 16IN) 10.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 8IN) 10.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 4IN) 10.0 L.M MAINTENANCE OF TRAFFIC 20.0 EACH SIGNS (CONSTRUCTION) 32.0 S.F DELINEATORS (ALL) 2,000.0 EACH RAISED PVMT MARKERS (BI-DIR. 1 COLOR) 1,000.0 EACH RAISED PVMT MRKRS (MONO-DIR. 1 COLOR) 1,250.0 EACH RAISED PVMT MARKERS (BI-DIR. 2 COLOR) EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le 1,000.0 EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR EACH PLASTIC PAVEMENT MARKING (CROSS-WALK) L.F PLASTIC PAVEMENT MARKING (CHNZ STRIPING) S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) EACH PLASTIC PAVEMENT MKG (24" BARRIER LINE) L.F PLASTIC PAVEMENT MKG (8" DOTTED LINE) L.F PLASTIC PVMT MKG (LONGITUDINAL X-WALK) L.F PLASTIC WORD PVMT MARKING (ONLY) 60.0 EACH PLASTIC WORD PVMT MARKING (RXR) 40.0 EACH PLASTIC WORD PVMT MARKING (STOP AHEAD) 5.0 EACH PLASTIC WORD PVMT MARKING (SCHOOL) 5.0 EACH PLASTIC WORD PVMT MARKING (BIKE LANE) 10.0 EACH PLASTIC WORD PVMT MARKING (SIGNAL AHEAD) 15.0 EACH PLASTIC WORD PVMT MARKING (STOP) 15.0 EACH PLASTIC WORD PVMT MARKING (PED-XING) 3.0 EACH PLASTIC PVMT MKG (STRAIGHT-TURN ARROW) 5.0 EACH PLASTIC PVMT MKG(DOUBLE TURNING ARROW) 5.0 EACH PLASTIC PVMT MKG (TRANSVERSE SHOULDER) L.F PLASTIC PAVEMENT MKG (STRAIGHT ARROW) 12.0 EACH PLASTIC PAVEMENT MKG (WRONG WAY ARROW) 15.0 EACH PLASTIC PAVEMENT MKG (EXIT ONLY ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (OPTION LANE ARROW) 10.0 EACH PLASTIC PAVEMENT MKG (H.O.V. DIAMOND) 5.0 EACH PLASTIC PAVEMENT MKG (HANDICAP SYMBOL) 5.0 EACH PLASTIC PAVEMENT MARKING (YIELD LINE) S.F PLASTIC PAVEMENT MARKING(LANE RED ARROW) 20.0 EACH PLASTIC PAVEMT MARKING-BIKE SYMBOL/AR SH 20.0 EACH PAINTED PAVEMENT MARKING (4" LINE) 30.0 L.M PRFRMNCE BASED RETRCNG SPRA THRMO 4IN L.M PRFRMNCE BASED RETRCNG SPRA THRMO 6IN L.M PRFRMNCE BASED RETRCNG SPRA THRMO 8IN 31,850.0 L.F PRFRMNCE BSED RETRCNG SPRA THRMO 6IN DOT 5,770.0 L.F REMOVAL OF PAVEMENT MARKING (LINE) 20,000.0 L.F REMOVAL OF PVMT MKG (8" BARRIER LINE) 1,000.0 L.F REMOVAL OF PAVEMENT MARKING (CROSS-WALK) L.F REMOVAL PAVEMENT MKG (CHNZ STRIPING) S.Y REMOVAL OF PAVEMENT MARKING (STOP LINE) L.F REMOVAL OF PVMT MKG (TURN LANE ARROW) 20.0 EACH REMOVAL PVMT MKG (STRAIGHT-TURN ARROW) 4.0 EACH REMOVAL PVMT MKG (DOUBLE TURNING ARROW) 2.0 EACH REMOVAL OF PAVEMENT MKG (DOTTED LINE) L.F REMOVAL PVMT MKG (TRANSVERSE SHOULDER) L.F REMOVAL OF WORD PVMT MKG 5.0 EACH REMOVAL OF WORD PVMT MKG 3.0 EACH REMOVAL OF WORD PVMT MKG 2.0 EACH PPPM 4IN LINE W/1.5IN BLACK SILHOUETTE 1.0 L.M PRFRMED PLSTC PVMNT MRKNG (ISTATE SHLD) 4.0 EACH ENHANCED FLAT THERMO P.M. (4IN) 5.0 L.M ENHANCED FLAT THERMO P.M. (6IN) 5.0 L.M ENHANCED FLAT THERMO P.M. (8IN BARR) L.F ENHANCED FLAT THERMO P.M. (4IN DOTTED) L.F ENHANCED FLAT THERMO P.M. (6IN DOTTED) L.F ENHANCED FLAT LINE THERMO (8IN LINE) L.F ENHANCED FLAT LINE THERMO (8IN BROKEN LN L.F ENHANCED FLAT LINE THERMO (12IN BARRIER L.F ENHANCED FLAT LINE THERMO (12IN LINE L.F SPRAY THERMO P.M. (40 mil 4IN) 20.0 L.M SPRAY THERMO P.M. (40 mil 6IN) 20.0 L.M SPRAY THERMO P.M. (40 mil 8IN BARRIER) 20,000.0 L.F SPRAY THERMO P.M. (40 mil 4IN DOTTED) L.F SPRAY THERMO P.M. (40 mil 6IN DOTTED) L.F ROADWAY CLEANING FOR PAVEMENT MARKING 14.0 L.M MOBILIZATION (PER CALL-OUT) 8.0 EACH MOBILIZATION 3.0 EACH Tenneessee Road Builders Association Page 7

8 COUNTY: BLEDSOE, BRADLEY, CANNON, CLAY (CNR058) 023 PROJECT: TYPE: Pavement Marking SIGNS (CONSTRUCTION) 32.0 S.F PERFORMANCE BASED RETRACING PAINTED 4IN 1,774.0 L.M PERFORMANCE BASED RETRACING PAINTED 8IN 5,665.0 L.F PERFORMANCE BASED RETRACING PAINTED 6IN 1,055.0 L.F ROADWAY CLEANING FOR PAVEMENT MARKING 5.0 L.M. COUNTY: BLOUNT, SEVIER (CNR068) 024 PROJECT: TYPE: Asphalt Paving LENGTH: Project Length: miles WRK DAY: On or before June 30, 2017 DBE: 2% BITUMINOUS MATERIAL FOR TACK COAT (TC) 32.0 TON ACS MIX(PG70-22) THIN LIFT D ASPHALT 2,147.0 TON SCORING RUMBLE STRIPE (NON-CONT. 8IN) 1.4 L.M ADJUSTMENT OF EXISTING CATCHBASIN 2.0 EACH TAN ENERGY ABSG TERM (NCHRP 350,TL3) 2.0 EACH EARTH PAD FOR TYPE 38 GR END TREATMENT 2.0 EACH GUARDRAIL REMOVED L.F FLEXIBLE DRUMS (CHANNELIZING) EACH WARNING LIGHTS (TYPE A) 78.0 EACH SIGNS (CONSTRUCTION) S.F ARROW BOARD (TYPE C) 2.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) 50.0 S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 13.0 EACH PLASTIC PAVEMENT MARKING(4" DOTTED LINE) L.F PAINTED PAVEMENT MARKING (4" LINE) 7.0 L.M ENHANCED FLAT THERMO P.M. (6IN) 7.0 L.M. COUNTY: BRADLEY (CNR025) 025 PROJECT: TYPE: Surface Treatment (Bituminous) LENGTH: Project Length: miles DBE: 3% MINERAL AGGREGATE, TY A BASE, GRADING D 80.0 TON BITUMINOUS MATERIAL FOR TACK COAT (MICRO 10.0 TON BITUMINOUS MATERIAL (FOG SEAL) SHOULDER 1.0 TON SCORING RUMBLE STRIPE (NON-CONT. 8IN) 5.6 L.M EMULSIFIED ASPHALT FOR MICRO-SURFACING 81.0 TON AGGREGATE FOR MICRO SURFACING TON CONCRETE CURB RAMP (RETROFIT) S.F CONCRETE COMBINED CURB & GUTTER 8.3 C.Y TAN ENERGY ABSG TERM (NCHRP 350,TL3) 4.0 EACH GUARDRAIL REMOVED L.F FLEXIBLE DRUMS (CHANNELIZATION) EACH WARNING LIGHTS (TYPE A) 28.0 EACH SIGNS (CONSTRUCTION) S.F CHANGEABLE MESSAGE SIGN UNIT 2.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color 21.0 EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 9.0 EACH PLASTIC PAVEMENT MKG (8" DOTTED LINE) L.F PLASTIC PVMT MKG (LONGITUDINAL X-WALK) L.F PLASTIC WORD PVMT MARKING (ONLY) 2.0 EACH PAINTED PAVEMENT MARKING (4" LINE) 12.0 L.M SPRAY THERMO P.M. (60 mil 4IN) 12.0 L.M SPRAY THERMO P.M. (60 mil 8IN BARRIER) L.F. COUNTY: CAMPBELL, CARTER, GREENE, HAMBLEN (CNR051) 026 PROJECT: TYPE: Pavement Marking WRK DAY: On or before November 30, TRUCK MOUNTED ENERGY ATTENUATOR 1.0 EACH SIGNS (CONSTRUCTION) S.F ARROW BOARD (TYPE C) 2.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L 1,200.0 EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR 36,348.0 EACH COUNTY: CARROLL (CNR022) 027 PROJECT: TYPE: Asphalt Paving LENGTH: Project Length: miles WRK DAY: On or before July 31, 2017 DBE: 2.5% REMOVAL OF ASPHALT PAVEMENT S.Y WATER 11.0 M.G. Tenneessee Road Builders Association Page 8

9 MINERAL AGGR,TY B BASE, GR 1,596.0 TON ASP. CONC. MIX(PG64-22) (BPMB-HM) GR. A TON ASPHALT CONC MIX(PG64-22)(BPMB-HM)GR C-W 6,813.0 TON BITUMINOUS MATERIAL FOR TACK COAT (TC) 32.0 TON PM REJUVENATING SCRUB SEAL 70,805.0 S.Y SCORING RUMBLE STRIPE (NON-CONT. 4IN) 10.3 L.M COLD PLANING BITUMINOUS PAVEMENT 7,329.0 S.Y " PIPE CULVERT (SIDE DRAIN) L.F " PIPE CULVERT (SIDE DRAIN) L.F " PIPE CULVERT (SIDE DRAIN) 48.0 L.F SIGNS (CONSTRUCTION) 1,840.0 S.F Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le EACH PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 1.0 EACH PAINTED PAVEMENT MARKING (4" LINE) 24.7 L.M ENHANCED FLAT THERMO P.M. (6IN) 9.3 L.M SPRAY THERMO P.M. (60 mil 4IN) 10.3 L.M CONDUIT 1" DIAMETER (PVC) 50.0 L.F SHIELDED DETECTOR CABLE 50.0 L.F SAW SLOT L.F LOOP WIRE L.F. COUNTY: CARROLL (CNR001) 028 PROJECT: TYPE: Bridge Repair (including Br Repainting) WRK DAY: On or before October 31, REMOVAL OF STRUCTURES 1.0 LS ACS MIX(PG76-22) GRADING D 45.0 TON COLD PLANING BITUMINOUS PAVEMENT S.Y STRUCTURAL STEEL REPAIR 32.0 EACH BR JOINT SEISMIC MOD 32.0 EACH APPLIED TEXTURE FINISH (EX STRUCTURES) S.Y REMOVE EXISTING WEARING SURFACE 1.0 LS CONCRETE REPAIRS S.F BRIDGE REPAIRS 1.0 LS COMPOSITE FIBER ENCASEMENT S.F MODIFY BRIDGE DECK DRAIN SYSTEM 1.0 LS CONCRETE PARAPET L.F GUARDRAIL AT BRIDGE ENDS L.F TAN ENERGY ABSG TERM (NCHRP 350,TL3) 4.0 EACH PORTABLE IMPACT ATTENUATOR NCHRP350 TL EACH INTERCONNECTED PORTABLE BARRIER RAIL L.F FLEXIBLE DRUMS (CHANNELIZING) 22.0 EACH PORTABLE BARRIER RAIL DELINEATOR 9.0 EACH SIGNS (CONSTRUCTION) S.F REMOVABLE PAVEMENT MARKING LINE 3,671.0 L.F REMOVABLE PAVEMENT MARKING (STOP LINE) 48.0 L.F SPRAY THERMO P.M. (60 mil 4IN) 1.0 L.M TEMPORARY TRAFFIC SIGNAL SYSTEM 1.0 EACH COUNTY: CHEATHAM, DAVIDSON, LAWRENCE, LEWIS (CNR034) 029 PROJECT: TYPE: Pavement Marking WRK DAY: On or before November 30, TRUCK MOUNTED ENERGY ATTENUATOR 1.0 EACH SIGNS (CONSTRUCTION) S.F ARROW BOARD (TYPE C) 2.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L 1,876.0 EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR 48,863.0 EACH COUNTY: CLAY, CUMBERLAND, DEKALB, FENTRESS (CNR053) 030 PROJECT: TYPE: Pavement Marking WRK DAY: On or before November 30, TRUCK MOUNTED ENERGY ATTENUATOR 1.0 EACH SIGNS (CONSTRUCTION) S.F ARROW BOARD (TYPE C) 2.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L 1,221.0 EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR 59,304.0 EACH COUNTY: CLAY, FENTRESS, OVERTON, PICKETT (CNR063) 031 PROJECT: TYPE: Miscellaneous safety improvements WRK DAY: On or before July 31, 2017 DBE: 4.0% SCORING SHOULDERS (CONT. 16IN) 16.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 8IN) 8.0 L.M SCORING RUMBLE STRIPE (NON-CONT. 4IN) 4.0 L.M TAN ENERGY ABSG TERM (NCHRP 350,TL3) 4.0 EACH EARTH PAD FOR TYPE 38 GR END TREATMENT 4.0 EACH GUARDRAIL DELINEATION ENHANCEMENT 47,038.0 L.F GUARDRAIL REMOVED L.F CONCRETE BARRIER DELINEATION ENHANCEMENT 4,550.0 L.F. Tenneessee Road Builders Association Page 9

10 ROADSIDE OBSTACLE DELINEATION 1.0 S.F SIGN POST DELINEATION ENHANCEMENT 2,718.0 L.F "U" SECTION STEEL POSTS 3,941.0 LB PERFORATED/KNOCKOUT SQUARE TUBE POST 16,105.0 LB FLAT SHEET ALUMINUM SIGNS (0.080" THICK) 2,920.0 S.F FLAT SHEET ALUMINUM SIGNS (0.100" THICK) 3,017.0 S.F REMOVE SIGN, SUPPORT & FOOTING EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le 4,721.0 EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) S.Y PLASTIC PAVEMENT MARKING (STOP LINE) 57.0 L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 11.0 EACH PLASTIC WORD PVMT MARKING (STOP AHEAD) 1.0 EACH PLASTIC PAVEMENT MARKING(LANE RED ARROW) 9.0 EACH ENHANCED FLAT THERMO P.M. (4IN) 41.0 L.M ENHANCED FLAT THERMO P.M. (4IN DOTTED) 1,565.0 L.F SPRAY THERMO P.M. (60 mil 4IN) L.M SPRAY THERMO P.M. (60 mil 4IN DOTTED) 4,644.0 L.F SCHOOL SPEED LIMIT FLASHG SIGNAL INSTED 4.0 EACH CHANGEABLE MESSAGE SIGN UNIT 4.0 EACH SIGNS 9.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L 1,081.0 EACH RMVL OF SNOWPLOWABLE REFLECTIVE MARKER EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 34.0 EACH PLASTIC WORD PVMT MARKING (RXR) 8.0 EACH PLASTIC WORD PVMT MARKING (STOP AHEAD) 2.0 EACH PLASTIC PAVEMENT MARKING (YIELD LINE) 25.0 S.F PLASTIC PAVEMENT MARKING (NOISE STRIP) L.F PAINTED PAVEMENT MARKING (4" LINE) 85.0 L.M PPPM 4IN LINE W/1.5IN BLACK SILHOUETTE 0.8 L.M SPRAY THERMO P.M. (60 mil 6IN) 82.5 L.M SPRAY THERMO P.M. (60 mil 6IN DOTTED) 1,121.0 L.F EXPANSION JOINT REPAIRS 94.0 L.F BRIDGE DECK REPAIRS (PARTIAL DEPTH SLAB) 80.0 S.Y TYPE 2 THIN EPOXY OVERLAY (LOW-MOD EPOXY 1,593.0 S.Y. COUNTY: CUMBERLAND, RHEA (CNR042) 032 PROJECT: TYPE: Surface Treatment (Bituminous) LENGTH: Project Length: miles DBE: 3% MINERAL AGGREGATE, TY A BASE, GRADING D TON BITUMINOUS MATERIAL FOR TACK COAT (MICRO 80.0 TON BITUMINOUS MATERIAL (FOG SEAL) SHOULDER 59.0 TON PM REJUVENATING SCRUB SEAL 284,234.0 S.Y SCORING SHOULDERS (CONT. 16IN) 16.4 L.M SCORING SHOULDERS (NON-CONT. 16IN) 7.5 L.M SCORING RUMBLE STRIPE (NON-CONT. 8IN) 6.1 L.M EMULSIFIED ASPHALT FOR MICRO-SURFACING TON AGGREGATE FOR MICRO SURFACING 5,289.0 TON SINGLE GUARDRAIL (TYPE 2) 50.0 L.F GUARDRAIL TERMINAL (TYPE 12) 1.0 EACH TAN ENERGY ABSG TERM (NCHRP 350,TL3) 6.0 EACH GUARDRAIL DELINEATION ENHANCEMENT 11,563.0 L.F TRUCK MOUNTED ENERGY ATTENUATOR 2.0 EACH GUARDRAIL REMOVED L.F CONCRETE BARRIER DELINEATION ENHANCEMENT L.F FLEXIBLE DRUMS (CHANNELIZING) 14.0 EACH FLEXIBLE DRUMS (CHANNELIZATION) 90.0 EACH WARNING LIGHTS (TYPE A) 14.0 EACH SIGNS (CONSTRUCTION) S.F ARROW BOARD (TYPE C) 4.0 EACH FLEXIBLE DELINEATOR (WHITE) EACH COUNTY: DAVIDSON (CNR003) 033 PROJECT: TYPE: Miscellaneous safety improvements WRK DAY: On or before July 31, SIGN POST DELINEATION ENHANCEMENT 90.0 L.F "U" SECTION STEEL POSTS 3,136.0 LB PERFORATED/KNOCKOUT SQUARE TUBE POST 6,233.0 LB FLAT SHEET ALUMINUM SIGNS (0.080" THICK) S.F FLAT SHEET ALUMINUM SIGNS (0.100" THICK) 1,422.0 S.F REMOVE SIGN, SUPPORT & FOOTING EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) 40.0 S.Y PLASTIC PAVEMENT MARKING (STOP LINE) 2,736.0 L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 56.0 EACH PLASTIC PAVEMENT MKG (8" DOTTED LINE) L.F PLASTIC PVMT MKG (LONGITUDINAL X-WALK) L.F PLASTIC PAVEMENT MARKING (8IN LINE) 0.4 L.M PLASTIC WORD PVMT MARKING (ONLY) 1.0 EACH PLASTIC WORD PVMT MARKING (STOP) 3.0 EACH PLASTIC PVMT MKG (STRAIGHT-TURN ARROW) 10.0 EACH PLASTIC PAVEMENT MARKING (YIELD LINE) 11.0 S.F PLASTIC PAVEMENT MARKING(BLANE SY ARROW) 1.0 EACH SPRAY THERMO P.M. (60 mil 4IN) 43.8 L.M SPRAY THERMO P.M. (60 mil 6IN) 0.0 L.M. Tenneessee Road Builders Association Page 10

11 COUNTY: DAVIDSON (CNR070) 034 PROJECT: TYPE: Maintenance (not mowing & litter) WRK DAY: On or before June 30, HOT APPLIED FIBER-POLYMER PATCHING MATER 60,000.0 LB QUEUE PROTECTION TRUCK 30.0 DAY CHANGEABLE MESSAGE SIGN UNIT 6.0 EACH COUNTY: DAVIDSON, LAWRENCE, MAURY, SUMNER (CNR027) 035 PROJECT: TYPE: Miscellaneous safety improvements LENGTH: Project Length: miles HIGH FRICTION SURF. TRTMNT (SINGLE LIFT) 59,620.0 S.Y HIGH FRICTION SURF. TRTMNT (DOUBLE LIFT) 21,425.0 S.Y SCORING SHOULDERS (CONT. 16IN) 0.3 L.M APPLIED TEXTURE FINISH (EX STRUCTURES) 1,090.0 S.Y GUARDRAIL AT BRIDGE ENDS 27.0 L.F SINGLE GUARDRAIL (TYPE 2) L.F MEDIAN DV GUARDRAIL,WITH RUB-RAIL (TY 2) L.F GUARDRAIL TERMINAL (TYPE 12) 1.0 EACH GUARDRAIL TERMINAL (TYPE 13) 2.0 EACH FLAR ENE ABS TRM(NCHRP 350,TL 3 MED DIV) 1.0 EACH GUARDRAIL DELINEATION ENHANCEMENT 2,825.0 L.F GUARDRAIL REMOVED L.F CL A CNC (FOUNDATION FOR SIGN SUPPORTS) 1.0 C.Y STEEL B. REINFORCEM(F FOR SIGN SUPPORTS) LB FLEXIBLE DELINEATOR (WHITE) 9.0 EACH SIGN POST DELINEATION ENHANCEMENT L.F BARRIER WALL DELINEATION ENHANCEMENT L.F STEEL I-BMs & WF-BMs(BKWY) SIGN SUPPORT LB "U" SECTION STEEL POSTS 1,346.0 LB PERFORATED/KNOCKOUT SQUARE TUBE POST LB P POST SLIP BASE 2.0 EACH FLAT SHEET ALUMINUM SIGNS (0.080" THICK) S.F FLAT SHEET ALUMINUM SIGNS (0.100" THICK) S.F EXTRUDED ALUMINUM PANEL SIGNS 33.0 S.F REMOVE SIGN, SUPPORT & FOOTING 61.0 EACH CHANGEABLE MESSAGE SIGN UNIT 2.0 EACH BARRIER MOUNTED SIGN SUPPORT (DESCR) 27.0 EACH RMV AND RPLC LENS ON SNOWPLW RFLCTV MKR 33.0 EACH PLASTIC PAVEMENT MARKING (STOP LINE) 14.0 L.F PLASTIC PAVEMENT MKG (24" BARRIER LINE) L.F PLASTIC PAVEMENT MKG (8" DOTTED LINE) L.F PLASTIC PAVEMENT MKG (EXIT ONLY ARROW) 4.0 EACH ENHANCED FLAT THERMO P.M. (6IN) 8.4 L.M ENHANCED FLAT THERMO P.M. (8IN BARR) 3,350.0 L.F ENHANCED FLAT THERMO P.M. (6IN DOTTED) L.F SPRAY THERMO P.M. (60 mil 4IN) 2.8 L.M SPRAY THERMO P.M. (60 mil 6IN) 0.8 L.M SPRAY THERMO P.M. (60 mil 4IN DOTTED) L.F FLASHING WARNING BEACON (DESCRIPTION) 2.0 EACH HIGH FRICTION SURF. TRTMNT (SINGLE LIFT) 2,700.0 S.Y. COUNTY: DEKALB (CNR041) 036 PROJECT: TYPE: Surface Treatment (Bituminous) LENGTH: Project Length: miles MINERAL AGGREGATE, TY A BASE, GRADING D 80.0 TON BITUMINOUS MATERIAL FOR TACK COAT (MICRO 58.0 TON BITUMINOUS MATERIAL (FOG SEAL) SHOULDER 36.0 TON SCORING SHOULDERS (NON-CONT. 16IN) 7.6 L.M SCORING RUMBLE STRIPE (NON-CONT. 8IN) 20.2 L.M EMULSIFIED ASPHALT FOR MICRO-SURFACING TON AGGREGATE FOR MICRO SURFACING 3,928.0 TON SINGLE GUARDRAIL (TYPE 2) L.F TAN ENERGY ABSG TERM (NCHRP 350,TL3) 4.0 EACH GUARDRAIL DELINEATION ENHANCEMENT 4,840.0 L.F GUARDRAIL REMOVED L.F FLEXIBLE DRUMS (CHANNELIZATION) EACH WARNING LIGHTS (TYPE A) 40.0 EACH SIGNS (CONSTRUCTION) 1,058.0 S.F ARROW BOARD (TYPE C) 4.0 EACH CHANGEABLE MESSAGE SIGN UNIT 4.0 EACH Snwplwble Pvmt Mrkrs (Bi-Dir)(1 Color Le 2,457.0 EACH Snwplwble Pvmt Mrkrs (Mono-Dir) (1 Color EACH Snwplwble Pvmt Mrkrs (Bi-Dir) (2 Color L 45.0 EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (TURN LANE ARROW) 72.0 EACH PLASTIC WORD PVMT MARKING (STOP AHEAD) 1.0 EACH PLASTIC PVMT MKG (TRANSVERSE SHOULDER) L.F PLASTIC PAVEMENT MARKING (YIELD LINE) 60.0 S.F PLASTIC PAVEMENT MARKING(LANE RED ARROW) 2.0 EACH PLASTIC PAVEMENT MARKING (NOISE STRIP) L.F PAINTED PAVEMENT MARKING (4" LINE) 67.1 L.M PAINTED PAVEMENT MARKING(4"DOTTED LINE) L.F TRUNCATED DOME DETECTABLE WARNING MAT S.F ENHANCED FLAT THERMO P.M. (6IN) 28.2 L.M ENHANCED FLAT THERMO P.M. (6IN DOTTED) L.F SPRAY THERMO P.M. (60 mil 4IN) 49.5 L.M. Tenneessee Road Builders Association Page 11

12 SPRAY THERMO P.M. (60 mil 4IN DOTTED) L.F EXPANSION JOINT REPAIRS L.F BRIDGE DECK REPAIRS (PARTIAL DEPTH SLAB) 15.0 S.Y CONCRETE REPAIRS 60.0 S.Y TYPE 2 THIN EPOXY OVERLAY (LOW-MOD EPOXY 8,809.0 S.Y. COUNTY: DEKALB (CNR046) 037 PROJECT: TYPE: Bridge Repair (including Br Repainting) BITUMINOUS MATERIAL FOR TACK COAT (TC) 1.0 TON ACS MIX(PG64-22) GRADING D 19.0 TON PORTABLE IMPACT ATTENUATOR NCHRP350 TL EACH INTERCONNECTED PORTABLE BARRIER RAIL L.F FLEXIBLE DRUMS (CHANNELIZING) EACH WARNING LIGHTS (TYPE A) 25.0 EACH SIGNS (CONSTRUCTION) S.F TEMPORARY BARRICADES (TYPE III) 22.0 L.F ARROW BOARD (TYPE C) 2.0 EACH PAINTED PAVEMENT MARKING (4" LINE) 0.4 L.M SPRAY THERMO P.M. (60 mil 4IN) 0.1 L.M STEEL BEAM 81.0 L.F REMOVE EXISTING WEARING SURFACE 1.0 LS CONCRETE REPAIRS 20.0 C.F CONCRETE REPAIRS 12.0 S.F EPOXY INJECTION (INJECTION) 4.0 GAL EPOXY INJCTN REPAIR (CMPLT AND IN PLACE) L.F CONCRETE REPAIRS 29.0 L.F BRIDGE DECK SEALANT S.Y BRIDGE DECK REPAIR (PMC) 34.0 S.Y TEMPORARY SHORING 1.0 LS COUNTY: DEKALB, WILSON (CNR026) 038 PROJECT: TYPE: Miscellaneous safety improvements LENGTH: Project Length: miles WRK DAY: On or before June 30, 2017 DBE: 3% SCORING RUMBLE STRIPE (NON-CONT. 4IN) 1.2 L.M GUARDRAIL AT BRIDGE ENDS L.F SINGLE GUARDRAIL (TYPE 2) L.F GUARDRAIL TERMINAL (TYPE 21) 3.0 EACH TAN ENERGY ABSG TERM (NCHRP 350,TL3) 5.0 EACH EARTH PAD FOR TYPE 38 GR END TREATMENT 5.0 EACH EARTH PAD FOR GUARD RAIL END TREATMENT 3.0 EACH GUARDRAIL DELINEATION ENHANCEMENT 1,975.0 L.F GUARDRAIL REMOVED L.F ROADSIDE OBSTACLE DELINEATION 8.0 S.F SIGN POST DELINEATION ENHANCEMENT L.F BARRIER WALL DELINEATION ENHANCEMENT L.F "U" SECTION STEEL POSTS 1,697.0 LB PERFORATED/KNOCKOUT SQUARE TUBE POST 1,215.0 LB FLAT SHEET ALUMINUM SIGNS (0.080" THICK) S.F FLAT SHEET ALUMINUM SIGNS (0.100" THICK) S.F REMOVE SIGN, SUPPORT & FOOTING 62.0 EACH PLASTIC PAVEMENT MARKING (CHNZ STRIPING) 60.0 S.Y PLASTIC PAVEMENT MARKING (STOP LINE) L.F PLASTIC PAVEMENT MKG (8" DOTTED LINE) L.F PLASTIC PVMT MKG (TRANSVERSE SHOULDER) L.F PLASTIC PAVEMENT MARKING (YIELD LINE) 35.0 S.F PLASTIC PAVEMENT MARKING(LANE RED ARROW) 2.0 EACH SPRAY THERMO P.M. (60 mil 4IN) 1.2 L.M. COUNTY: FRANKLIN (CNR044) 039 PROJECT: TYPE: Bridge Constr (new, widening, reconstr) LENGTH: Project Length: miles WRK DAY: On or before October 31, 2018 DBE: 5.0% CONSTRUCTION STAKES, LINES AND GRADES 1.0 LS TRAINEE 1,040.0 HOUR CLEARING AND GRUBBING 1.0 LS REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1.0 LS ROAD & DRAINAGE EXCAVATION (UNCLIFIED) 9,573.0 C.Y BORROW EXCAVATION (GRADED SOLID ROCK) 6,147.0 TON WATER 67.0 M.G WASTE MATERIAL C.Y CONSTRUCTION OF HAUL ROAD 1.0 LS " TEMPORARY SLOPE DRAIN 88.0 L.F SEDIMENT REMOVAL C.Y TEMPORARY SILT FENCE (WITH BACKING) 2,348.0 L.F TEMPORARY SILT FENCE (WITHOUT BACKING) 2,316.0 L.F ROCK CHECK DAM PER 12.0 EACH ENHANCED ROCK CHECK DAM 11.0 EACH SEDIMENT FILTER BAG (15' X 15') 3.0 EACH TURBIDITY CURTAIN 2,537.0 L.F POLYETHYLENE SHEETING (6 MIL. MINIMUM) S.Y MINERAL AGGREGATE, TY A BASE, GRADING D 7,728.0 TON MINERAL AGGREGATE (SIZE 57) 56.0 TON ASP. CONC. MIX(PG64-22) (BPMB-HM) GR. A 1,235.0 TON ASPHALT CONC MX(PG64-22)(BPMB-HM)GR B-M TON BITUMINOUS MATERIAL FOR PRIME COAT (PC) 16.0 TON AGGREGATE FOR COVER MATERIAL (PC) 49.0 TON Tenneessee Road Builders Association Page 12

APPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION December 2, 2016 LETTING

APPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION December 2, 2016 LETTING COUNTY: CUMBERLAND (CNQ921) 001 PROJECT: 18038-3240-14 TYPE: Grade & Drain LENGTH: Project Length: 3.025 miles WRK DAY: On or before November 30, 2020 DBE: 7%. 109-10.01 TRAINEE 5,140.0 HOUR 202-06.01

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

LETTING : CALL : 029 COUNTIES : GOODHUE

LETTING : CALL : 029 COUNTIES : GOODHUE PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO. 25024. CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

11/06/2014 Pay Items - 1

11/06/2014 Pay Items - 1 Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

COUNTY-LEVEL DATA ON TENNESSEE S 2018 OBAMACARE ENROLLMENT

COUNTY-LEVEL DATA ON TENNESSEE S 2018 OBAMACARE ENROLLMENT APRIL 19, COUNTY-LEVEL DATA ON TENNESSEE S OBAMACARE ENROLLMENT Last week, we dug into statewide data on open enrollment in private health insurance through the healthcare.gov Marketplace created by the

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017 Letting Location: SCDOT Headquarters Building Conference Room 332 955 Park Street Columbia, SC

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

Tennessee Housing Development Agency Andrew Jackson Building 502 Deaderick Street, Third Floor Nashville, Tennessee /

Tennessee Housing Development Agency Andrew Jackson Building 502 Deaderick Street, Third Floor Nashville, Tennessee / Ralph M. Perrey Tennessee Housing Development Agency Andrew Jackson Building 502 Deaderick Street, Third Floor Nashville, Tennessee 37243 615/815-2200 Writer s Phone Number: Executive Director 615-815-2210

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

Plate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST.

Plate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST. DISTRIBUTION: 7 MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Design Services Section TRANSMITTAL LETTER NO. (0-0) MANUAL: Standard Plates DATED: January 9, 00 SUBJECT:

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM 600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office.

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (13-03) MANUAL: Standard

More information

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018 SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic

More information

Riverside County Flood Control & Water Conservation District

Riverside County Flood Control & Water Conservation District 10/11/2018 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI G.J. GENTRY GENERAL ENGINEERING, INC. 1 MOBILIZATION L.S. 1 $100,000.00 $100,000.00 $48,000.00 $48,000.00 $88,580.77 $88,580.77 2 WATER

More information

MCMINN COUNTY RACES AMATEUR RADIO STATION STANDARD OPERATING PROCEDURES KM4RAX / NCS638 SHARES

MCMINN COUNTY RACES AMATEUR RADIO STATION STANDARD OPERATING PROCEDURES KM4RAX / NCS638 SHARES MCMINN COUNTY RACES AMATEUR RADIO STATION STANDARD OPERATING PROCEDURES KM4RAX / NCS638 SHARES OPENING THE STATION Connect antennas to radios (HF antenna connects to HF radio antenna port # 1 and is marked

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted

More information

Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS

Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS 2016 20.02 M 20.03 M 20.03 SP 20.04 M 20.04 M 20.04 M 20.06 M 20.06 M 20.07 M 20.07 M 20.08 M 20.08

More information

TYPE 4-C TYPE 6 TYPE 7 TYPE 8

TYPE 4-C TYPE 6 TYPE 7 TYPE 8 ````` Face of ase rad. 42 TYPE rad. " T T T 22.5 2'- unless otherwise shown on plans 5" 5" 5" Slope 2: TYPE 2 rad. Concrete TYPE 2-A rad. Wearing Course Concrete ase Course TYPE 2-0" rad. TYPE 3 As Shown

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

Midland County Road Commission AS AWARDED 2017 Material Bid Tablulations

Midland County Road Commission AS AWARDED 2017 Material Bid Tablulations Ace Saginaw Paving Central Asphalt Pyramid Paving Hodgins Asphalt Paving ITEM 1 HMA PAVING "/ton" Item 1.a. HMA 13A "/ton" $52.75 $43.51 $53.25 $58.00 Item 1.b. Wedging, Partial Lane "/ton" $58.25 $58.43

More information

MICRO MILLING. Applications and Advantages for Pavement Preservation

MICRO MILLING. Applications and Advantages for Pavement Preservation MICRO MILLING Applications and Advantages for Pavement Preservation Presentation Overview 1. Difference between standard milling, fine milling and micro milling 2. Factors that dictate surface texture

More information

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925)

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925) STANDARD DETAILS 2401 Crow Canyon Road San Ramon, CA 94583 Telephone: (925) 973-2670 Fax: (925) 838-3937 CITY OF SAN RAMON STANDARD DETAILS INDEX CONCRETE WORK NAME DRAWING # Curb, Gutter & Sidewalk C-1

More information

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing 10-1. JOINTED PLAIN CONCRETE PAVEMENT GENERAL Summary This work includes constructing jointed plain concrete pavement. Comply with Section 40, "Concrete Pavement," of the Standard Specifications. Submittals

More information

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board

More information

Precast Concrete Box Culverts

Precast Concrete Box Culverts We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with precast concrete box

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS

MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS 75m 70m 65m 60m DEFLECTION ANGLE C/L RADII OF CURVATURE 55m 50m 45m 40m 35m 30m 25m 20m 15m 90 80 70 60 50 40 30 20 10 0 DEFLECTION ANGLE - MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS

PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS EVANS DREXEL DREXEL ELLIS ELLIS PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS SHEETS INDEX TO SHEETS DESCRIPTION 90 294 94 LANGLEY EVANS 48TH COTTAGE

More information

EXTERIOR BUILDING, ROOFING, AND SITE IMPROVEMENTS

EXTERIOR BUILDING, ROOFING, AND SITE IMPROVEMENTS CONTRACT NUMBER: IFB-8-B006 ARCHITECT / ENGINEER : HURST-ROSCHE, INC. NO. LINOIS 62203 (68) 398-0890 -7 E. RANDLE ST./ N. FRITZ ST. 402 CHERRY ST., 404-406 ST. LOUIS ST. 502-506 DEE ST. 50-505 PLUM ST.

More information

SYMBOL DESCRIPTION TRAFFIC CONTROL SIGN TYPE III BARRICADE = IMPACT ATTENUATOR STRIPING KEY TRIANGLE - PAINT PLASTIC MARKING 1ST DIGIT WIDTH 4" OR 8"

SYMBOL DESCRIPTION TRAFFIC CONTROL SIGN TYPE III BARRICADE = IMPACT ATTENUATOR STRIPING KEY TRIANGLE - PAINT PLASTIC MARKING 1ST DIGIT WIDTH 4 OR 8 TES & GUIDELINES TRAIC CONTROL DEVICES & SYMBOLS LEGEND INDEX 2. GENERAL IRMATION: THE CONTRACTOR SHALL URNISH, INSTALL AND MAINTAIN THE DEVICES IN THIS TRAIC CONTROL PLAN UNLESS OTHERWISE TED. IELD CONDITIONS

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS

PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS Project Design Services Unit June 2018 http://ihub/projectdelivery/design/index.html PROJECT RATING FORM This is filled out for ALL Process B projects.

More information

Table 5G-2.01: Transverse Joint Requirements. Transverse Joint Type 6 C 12 7 C 15 8 CD CD CD 1 20

Table 5G-2.01: Transverse Joint Requirements. Transverse Joint Type 6 C 12 7 C 15 8 CD CD CD 1 20 Design Manual Chapter 5 - Roadway Design 5G - PCC Pavement Joints 5G-2 Types of Joints A. Jointing PCC pavement joints are necessary primarily to control the location of cracks that occur from natural

More information

DIVISION PAVEMENT MARKINGS AND MARKERS

DIVISION PAVEMENT MARKINGS AND MARKERS DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition

More information

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By: CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS

More information

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by AMENDMENTS to 2012 Manual of STANDARD SPECIFICATIONS Adopted by Standard Specifications Committee Amendment No. 6 Published by Utah LTAP Center Utah State University 8305 Old Main Hill Logan UT 84322-8205

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

Session 8: Load Transfer Restoration. (Dowel Bar Retrofit, Cross-Stitching, and Slot Stitching)

Session 8: Load Transfer Restoration. (Dowel Bar Retrofit, Cross-Stitching, and Slot Stitching) Session 8: Load Transfer Restoration (Dowel Bar Retrofit, Cross-Stitching, and Slot Stitching) Learning Outcomes 1. List benefits and applications of dowel bar retrofit (DBR), cross stitching, and slot

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

SHLDR + + Ê HOMINY TRAIL #4 REBAR 24"O.C. 4" TYPE 5 AGG. BASE TRAIL WALL 9 5' SHLDR 2' SHLDR Ê TRAIL #4 24" O.C.

SHLDR + + Ê HOMINY TRAIL #4 REBAR 24O.C. 4 TYPE 5 AGG. BASE TRAIL WALL 9 5' SHLDR 2' SHLDR Ê TRAIL #4 24 O.C. WO20-1 WO20-1 2' 10' 2' 2' 8' 2' RT. EDGE OF TRAIL 2' RT. SHLD. BREAK MAX SLOPE AT FILL MAX SLOPE AT FILL SHLDR TRAIL SHLDR + + 1% +/- 0.5% SEE NOTE 1 Ê HOMINY TRAIL MAX SLOPE AT CUT MAX SLOPE AT FILL

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

Manholes Table of Contents

Manholes Table of Contents Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type

More information

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

Design and Construction of Highway Pavement Joint Systems

Design and Construction of Highway Pavement Joint Systems Design and Construction of Highway Pavement Joint Systems Troubleshooting Joint Design and Construction Issues Mark B. Snyder, Ph.D., P.E. Engineering Consultant to the American Concrete Pavement Association

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) Page 500-20, subsection 502.2.

More information

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

STORM M ANHOLE FOR 42 PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30MAX 3 OR 3.5 PRECAST ECCENTIC CONC 01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP

More information

Jointed Precast Concrete Pavement

Jointed Precast Concrete Pavement NATIONAL PRECAST CONCRETE ASSOCIATION Manual for Jointed Precast Concrete Pavement 3rd Edition Authors Peter Smith, P.E. Mark B. Snyder, Ph.D., P.E. Graphic Designer Deborah Templeton NPCA Precast Concrete

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

PORTLAND COMMUNITY COLLEGE ROCK CREEK CAMPUS ELECTRICAL POWER GENERATION FEASIBILITY STUDY APPENDIX A, DETAILED (CONCEPT LEVEL) PROBABLE COST ESTIMATE

PORTLAND COMMUNITY COLLEGE ROCK CREEK CAMPUS ELECTRICAL POWER GENERATION FEASIBILITY STUDY APPENDIX A, DETAILED (CONCEPT LEVEL) PROBABLE COST ESTIMATE PORTLAND COMMUNITY COLLEGE ROCK CREEK CAMPUS ELECTRICAL POWER GENERATION FEASIBILITY STUDY APPENDIX A, DETAILED (CONCEPT LEVEL) PROBABLE COST ESTIMATE September 14th, 2018 Prepared by: DAO Architecture

More information

MARQUETTE GREENWAY TRAIL

MARQUETTE GREENWAY TRAIL ------ ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A DESIGN DATA DESIGN SPEED DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN

More information

Introduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5.

Introduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5. June 2015 Table of Contents Introduction 3 System Overview 3 Before Installation 3 Limitations and Warnings 4 Safety Statements 4 Parts Identification 5 Preparation 7 Soil Conditions 7 Tools Required 7

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

Project Name: County File No.: Checked by: For: Date:

Project Name: County File No.: Checked by: For: Date: Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction

More information

PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements

PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements Larry Scofield, P.E. International Grooving and Grinding Association 1 Big Preservation Everybody Wins

More information

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

DATE: April 22, 2016 (CPR Details Revised & Dated April 22, 2016)

DATE: April 22, 2016 (CPR Details Revised & Dated April 22, 2016) Minnesota Department of Transportation Office of Materials & Road Research 1400 Gervais Avenue, MS 645 Maplewood, MN 55109 Memo TO: FROM: Design Engineers Maintenance Engineers Materials Engineers Resident

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2 TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL January 2018 May 2, 2018 Addendum #1 Introduction As part of the Turnpike s continuing

More information

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum. ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

Any of the above may be used as source documents. Let's discuss each of these types of documentation.

Any of the above may be used as source documents. Let's discuss each of these types of documentation. INTRODUCTION TO DOCUMENTATION Much of the work of preparing final estimates involves careful and orderly documentation of measurements and computations. You will become familiar with the various types

More information

ET2000 Plus. Guardrail Extruder Terminal. Product Manual

ET2000 Plus.  Guardrail Extruder Terminal. Product Manual ET2000 Plus Guardrail Extruder Terminal Product Manual ET2000 PLUS is licensed to Ingal Civil Products by Trinity Industries Inc. of the U.S.A. www.ingalcivil.com.au ET2000 Plus Guardrail Extruder Terminal

More information

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit

More information

CITY OF STOCKTON 2016 STANDARD PLANS AND SPECIFICATIONS PROPOSED REVISIONS

CITY OF STOCKTON 2016 STANDARD PLANS AND SPECIFICATIONS PROPOSED REVISIONS STANDARD PLANS EXISTING ALL Proposed to Modify the outdated Standard Plans numbering system (See Attachment B) GENERAL 1 Typical Layout for Improvement Plans Added Note 7: North Arrow Location and Orientation

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

2018 PARKING LOT MAINTENANCE & REPAIR

2018 PARKING LOT MAINTENANCE & REPAIR Drawing Name: D:\Projects\CSU Parking Lot\Dwg\Sheets\Cover Monday, Sheet.dwg May 14, 2018 10:28 AMBy: RhondaBunner 2018 PARKING LOT MAINTENANCE & REPAIR BENCHMARKS Coordinate Control VERTICAL DATUM: HORIZONTAL

More information

ADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE. SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP

ADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE. SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP ADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP SafetyWall TM ADA-COMPLIANT PEDESTRIAN BARRICADE Ideal for creating accessible work zones.

More information

ABC and Innovative Bridge Construction for Minnesota Local Roads

ABC and Innovative Bridge Construction for Minnesota Local Roads ABC and Innovative Bridge Construction for Minnesota Local Roads May 23, 2013 To box the cha of t unl qua gra ma all g You ma add Tex Chris Werner, PE Senior Bridge Engineer HDR Engineering, Inc. 763-278-5918

More information

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following. SAMPLING AND TESTING. The Sampling and Testing requirements contained in -03 shall apply. MARKING. The Marking requirements contained in -03 shall apply. FINAL PRODUCTION INSPECTION. The Final Production

More information

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved: To: New York State Department of Transportation ENGINEERING INSTRUCTION Title: PRECAST CONCRETE PAVEMENT SLAB SYSTEMS STANDARD SPECIFICATION Distribution: Manufacturers (18) Local Govt. (31) Agencies (32)

More information

Team Sports Report. District Code County Registration Number Name Age

Team Sports Report. District Code County Registration Number Name Age Team Sports Report District Code County Registration Number Name Age 50-54 Female BEDFORD BOOMERS SC Bedford 1171 BERTHA.E.STEWART 60 SC Franklin 1172 ANN.M.SOLOMON 51 SC Marshall 1173 TISH.-.ZIEGLER 57

More information