1 PORTLAND COMMUNITY COLLEGE ROCK CREEK CAMPUS ELECTRICAL POWER GENERATION FEASIBILITY STUDY APPENDIX A, DETAILED (CONCEPT LEVEL) PROBABLE COST ESTIMATE September 14th, 2018 Prepared by: DAO Architecture LLC

2 DIRECT CONSTRUCTION COST SUMMARY Component Area $ / SF Total Option A 7,842 sf $ /sf $2,457,000 Option B 12,467 sf $ /sf $3,392,000 Option C 10,381 sf $ /sf $2,863,000 Remodel Existing BCT 10,800 sf $ /sf $1,347,000 Total Option C $4,210,000 The above estimates are for direct construction cost only. They do not include furnishings & equipment, architect and engineer design fees, consultant fees, inspection and testing fees, plan check fees, state sales tax, hazardous material testing and removal, financing costs, owners contingency, nor any other normally associated development costs. The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major subtrades as well as the general contractors. The above estimates assume a construction start date of: Summer If the start of construction is delayed beyond the date above, the estimates must be indexed at a rate of 5% to 7% per year compounded. This is a probable cost estimate based on in-progress documentation provided by the Architect. The actual bid documents will vary from this estimate due to document completion, detailing, specification, addendum, etc. The estimator has no control over the cost or availability of labor, equipment, materials, over market conditions or contractor's method of pricing, and contractor's construction logistics and scheduling. This estimate is formulated on the estimator's professional judgment and experience. The estimate makes no warranty, expressed or implied, that the quantities, bids or the negotiated cost of the work will not vary from the estimator's opinion of probable construction cost. Executive Summary - Page 1

3 Option A

4 Option A Base Building DIRECT CONSTRUCTION COSTS $ / sf Cost Comments Area 7,842 sf 02 EXISTING CONDITIONS $0.66 $5, CONCRETE , MASONRY METALS , WOOD, PLASTICS & COMPOSITES , THERMAL & MOISTURE PROTECTION , OPENINGS , FINISHES , SPECIALTIES , EQUIPMENT FURNISHINGS , SPECIAL CONSTRUCTION , CONVEYING EQUIPMENT , FIRE SUPPRESSION , PLUMBING , HVAC , ELECTRICAL , COMMUNICATIONS , ELECTRONIC SAFETY & SECURITY , EARTHWORK , EXTERIOR IMPROVEMENTS , UTILITIES ,529 SUB-TOTAL $ $1,791,889 Estimating/Design Contingency 10.00% ,189 Index To Construction Start 7.00% ,975 General Conditions / Insurance / Bond 11.50% ,541 General Contractor OH & Profit 4.50% ,822 TOTAL DIRECT CONSTRUCTION COST $ $2,457,416 Building $ $1,738,695 Site Work / Utilities $91.65 $718,721 Division Summary - Page 3

5 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 02 EXISTING CONDITIONS Site Demolition site demolition allowance 44,700 sf $0.10 $4,470 item sum haul & disposal 1 sum Sub-total 7,842 sf 0.66 /sf $5,140 SUB-TOTAL 02 EXISTING CONDITIONS 0.66 /sf $5, CONCRETE Poured-In-Place Concrete Forming continuous wall footing 930 sf ,510 spread footings 288 sf ,160 slab on grade 5,942 sf ,862 topping slab on metal deck 1,900 sf ,045 misc. forming accessories 1 sum 1, ,018 Sub-total 7,842 sf 1.86 /sf 14,595 Reinforcing Steel continuous wall footing 1,356 lbs ,560 spread footings 2,100 lbs ,415 slab on grade 13,072 lbs ,033 mesh topping slab on metal deck 1,900 sf ,280 Sub-total 7,842 sf 2.71 /sf 21,288 Redi-Mix Concrete 4,000 psi cy ,682 Sub-total 7,842 sf 3.02 /sf 23,682 Placing continuous wall footing 18.1 cy spread footings 16.8 cy slab on grade cy ,466 topping slab on metal deck 25.0 cy pump / transport concrete cy ,140 Sub-total 7,842 sf 1.46 /sf 11,437 Finishing set screeds 5,942 sf ,080 topping slab on metal deck 1,900 sf cure slabs 5,942 sf ,377 topping slab on metal deck 1,900 sf trowel slabs 5,942 sf ,348 topping slab on metal deck 1,900 sf ,710 sealer 7,842 sf ,489 float footing tops 598 sf sawcut control joint at sog 5,942 sf ,080 Sub-total 7,842 sf 2.67 /sf 20,958 Miscellaneous stair fill 1 flight 1, ,500 housekeeping pads 50 sf ,000 set column anchor bolts 8 set grout baseplates 8 ea ,000 Sub-total 7,842 sf 0.55 /sf 4,300 SUB-TOTAL 03 CONCRETE /sf $96,260 Option A Estimate - Page 4

6 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 04 MASONRY Concrete Masonry Units (CMU) 8" cmu sf NIC Sub-total 7,842 sf 0.00 /sf 0 SUB-TOTAL 04 MASONRY 0.00 /sf $0 05 METALS Structural Steel - Beams, Columns, Etc. mezzanine stair 1 flight 8, ,500 Sub-total 7,842 sf 1.08 /sf 8,500 Miscellaneous Metals railings mezzanine / stair guardrail 96 lf ,040 stair handrail, wall mounted 16 lf miscellaneous 7,842 sf ,882 Sub-total 7,842 sf 2.23 /sf 17,482 SUB-TOTAL 05 METALS 3.31 /sf $25, WOOD, PLASTICS & COMPOSITES Rough Carpentry miscellaneous blocking & framing 7,842 sf ,176 item sf fasteners & hardware 1 sum Sub-total 7,842 sf 0.16 /sf 1,236 Architectural Wood Casework NIC - to be determined list each room individually plam base / sink cabinet lf Sub-total 7,842 sf 0.00 /sf 0 SUB-TOTAL 06 WOOD, PLASTICS & COMPOSITES 0.16 /sf $1, THERMAL & MOISTURE PROTECTION Waterproofing & Damproofing NIC damproofing sf waterproofing sf Sub-total 7,842 sf 0.00 /sf 0 Insulation rigid insulation roof, r-30 10,219 sf ,877 premium over PEMB package tapered insulation premium sf NIC slab edge insulation sf to be determined batt insulation above ceiling / roof sf NIC walls 0 sf with PEMB package vapor & weather barriers 0 sf with PEMB package Sub-total 7,842 sf 5.21 /sf 40,877 Fireproofing spray-on sf NIC Sub-total 7,842 sf 0.00 /sf 0 Option A Estimate - Page 5

7 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 07 THERMAL & MOISTURE PROTECTION - Continued Metal Roofing prefinished metal roofing sf with PEMB package slip sheet 0 sf Sub-total 7,842 sf 0.00 /sf 0 Metal Panel building sf with PEMB package entry soffit 58 sf ,160 Sub-total 7,842 sf 0.15 /sf 1,160 Flashing & Sheet Metal gutters lf with PEMB package downspouts lf with PEMB package miscellaneous 7,842 sf ,313 Sub-total 7,842 sf 0.55 /sf 4,313 Roof Accessories roof hatch ea NIC Sub-total 7,842 sf 0.00 /sf 0 Caulking & Sealants caulking / firestopping 7,842 sf ,137 Sub-total 7,842 sf 0.40 /sf 3,137 SUB-TOTAL 07 THERMAL & MOISTURE PROTECTION 6.31 /sf $49, OPENINGS Doors, Frames & Hardware (includes installation) exterior entry doors 1 pair 5, ,000 egress doors 2 ea 1, ,800 auto opener 1 sum 5, ,000 interior doors single passage, vision lite 4 ea 1, ,400 single passage, flush 3 ea 1, ,550 pairs - vestibule 1 pair 4, ,200 pairs 1 pair 2, ,850 access doors 1 sum Sub-total 7,842 sf 4.37 /sf 34,300 Relites & Sidelites vestibule storefront 50 sf ,000 Sub-total 7,842 sf 0.38 /sf 3,000 Overhead & Coiling Doors insulated oh doors, manual, 10' x 11' 2 ea 4, ,350 dwgs out of scale, verify size operator 2 ea NIC Sub-total 7,842 sf 1.19 /sf 9,350 Windows storefront 425 sf ,625 insulated polycarbonate glazing 1,366 sf ,130 Sub-total 7,842 sf /sf 102,755 Skylights skylights sf NIC Sub-total 7,842 sf 0.00 /sf 0 Option A Estimate - Page 6

8 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 08 OPENINGS - Continued Louvers wall louvers sf NIC Sub-total 7,842 sf 0.00 /sf 0 SUB-TOTAL 08 OPENINGS /sf $149, FINISHES Gypsumboard Systems ext. wall stud framing 0 sf with PEMB package ext. gyp sheathing 0 sf with PEMB package gypbd interior 4,010 sf ,043 impact resistant partitions 1,862 sf ,230 acoustic at above 1,862 sf ,862 gypboard to structure 1,199 sf ,592 accessories, miscellaneous, bracing, etc. 1 sum 4, ,030 Sub-total 7,842 sf 7.37 /sf 57,757 Ceramic Tile floor tile 0 sf NIC base 87 lf ,044 wall tile, wet wall 149 sf ,782 Sub-total 7,842 sf 0.36 /sf 2,826 Resilient linoleum 802 sf ,416 base rubber 634 lf ,902 rubber stair treads & risers lf NIC, sealed concrete Sub-total 7,842 sf 1.06 /sf 8,318 Paint & Wallcoverings exterior painting sf NIC paint / finish door & frame 9 lvs ,125 paint gypboard ceilings / fascias 1,199 sf ,319 epoxy paint 222 sf paint interior walls 7,586 sf ,586 epoxy paint 635 sf paint exposed structure 6,643 sf ,643 misc. specialty painting, touchup 7,842 sf Sub-total 7,842 sf 2.37 /sf 18,583 SUB-TOTAL 09 FINISHES /sf $87, SPECIALTIES Visual Display Systems markerboard 12' x 4' 1 ea tackboards 4' x 4' 2 ea tackable wall surface sf NIC - to be determined Sub-total 7,842 sf 0.13 /sf 1,016 Signage Systems directories, bulletin boards, etc. 1 sum NIC signs, ada & code required 7,842 sf ,353 allowance Sub-total 7,842 sf 0.30 /sf 2,353 Option A Estimate - Page 7

9 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 10 SPECIALTIES - Continued Toilet Partitions (painted metal) ada 1 ea standard 0 ea urinal screen 1 ea Sub-total 7,842 sf 0.10 /sf 820 Wall Protection & Corner Guards bumper rails lf NIC corner guards 2 ea Sub-total 7,842 sf 0.04 /sf 300 Toilet Accessories (includes installation) grab bars 2 sets mirrors 2 ea paper towel dispenser / receptacle 2 ea ,050 janitor tool holder 1 ea sanitary napkin dispenser 0 ea sanitary napkin disposal 1 ea hooks 2 ea folding shower seat 0 ea shower curtain rod 0 ea shower curtain & hooks 0 ea toilet paper dispenser 2 ea seat cover dispenser 2 ea soap dispenser 2 ea paper towel dispenser ea elect. hand dryer ea 1, Sub-total 7,842 sf 0.29 /sf 2,285 Fire Extinguisher & Cabinets fec 2 ea Sub-total 7,842 sf 0.06 /sf 500 Exterior Specialties canopies 176 sf entries Sub-total 7,842 sf 1.35 /sf 10,560 SUB-TOTAL 10 SPECIALTIES 2.27 /sf $17, EQUIPMENT Projection Screens / Projector Brackets manual 1 ea projector bracket 1 ea Sub-total 7,842 sf 0.10 /sf 800 SUB-TOTAL 11 EQUIPMENT 0.10 /sf $ FURNISHINGS Window Treatment roller shades, manual 144 sf ,440 roller shades, motorized sf NIC roller shades, blackout sf NIC Sub-total 7,842 sf 0.18 /sf 1,440 Option A Estimate - Page 8

10 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 12 FURNISHINGS - Continued Floor Mats & Frames walk-off mat, glue-down 58 sf vestibule walk-off mat, recessed sf NIC Sub-total 7,842 sf 0.06 /sf 464 Site Furnishings bike racks 10 ea ,500 Sub-total 7,842 sf 0.45 /sf 3,500 SUB-TOTAL 12 FURNISHINGS 0.69 /sf $5, SPECIAL CONSTRUCTION Pre-Engineered Structure base package 5,942 sf ,956 incl stl frame, siding, roofing, insul mezzanine 1,900 sf ,900 erect / install 7,842 sf ,472 hoisting / rigging 1 sum 25, ,000 Sub-total 7,842 sf /sf 278,328 SUB-TOTAL 13 SPECIAL CONSTRUCTION /sf $278, CONVEYING EQUIPMENT Crane Assembly gantry / bridge type assembly, 2,000 lb 1 sum 20, ,000 allowance, verify Sub-total 7,842 sf 2.55 /sf 20,000 SUB-TOTAL 14 CONVEYING EQUIPMENT 2.55 /sf $20, FIRE SUPPRESSION Fire Sprinklers sprinklers, wet 7,842 sf ,289 sprinklers, dry, covered area / soffits 3,958 sf ,664 verify Sub-total 7,842 sf 8.54 /sf 66,953 SUB-TOTAL 21 FIRE SUPPRESSION 8.54 /sf $66, PLUMBING Plumbing compressed air system sf NIC, verify water closets 2 ea 2, ,000 urinals 1 ea 2, ,500 lav. sinks 2 ea 2, ,400 floor drains 2 ea ,000 water heater 1 ea 2, ,000 hose bibs 4 ea ,700 insulation & piping 7,842 sf ,605 Sub-total 7,842 sf 4.62 /sf 36,205 SUB-TOTAL 22 PLUMBING 4.62 /sf $36, HVAC HVAC hvac 7,842 sf ,260 Sub-total 7,842 sf /sf 235,260 SUB-TOTAL 23 HVAC /sf $235,260 Option A Estimate - Page 9

11 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 26 ELECTRICAL Electrical service & distribution 7,842 sf ,447 lighting 7,842 sf ,262 devices 7,842 sf ,803 equipment connections 7,842 sf ,882 basic materials 7,842 sf ,487 security, conduit 7,842 sf ,353 emergency generator 1 sum Sub-total 7,842 sf /sf 157,234 SUB-TOTAL 26 ELECTRICAL /sf $157, COMMUNICATIONS Communications communications 7,842 sf ,605 allowance Sub-total 7,842 sf 2.50 /sf 19,605 SUB-TOTAL 27 COMMUNICATIONS 2.50 /sf $19, ELECTRONIC SAFETY & SECURITY Fire Detection & Alarm fire detection & alarm 7,842 sf ,803 Sub-total 7,842 sf 1.25 /sf 9,803 Security security sum NIC Sub-total 7,842 sf 0.00 /sf 0 SUB-TOTAL 28 ELECTRONIC SAFETY & SECURITY 1.25 /sf $9, EARTHWORK 44,700 sf site footprint Clearing & Grubbing clear & grub 44,700 sf ,470 haul & disposal 1 sum Sub-total 7,842 sf 0.66 /sf 5,140 Stripping & Stockpiling stripping & stockpiling 828 cy ,311 haul off excess 232 cy ,478 Sub-total 7,842 sf 0.87 /sf 6,789 Grading / Site Excavation & Fill mobilization / demobilization 1 sum 15, ,000 construction staking 44,700 sf ,129 cut 828 cy ,933 fill cy NIC haul & disposal off-site 828 cy ,417 rough grading 44,700 sf ,470 proof rolling 44,700 sf ,235 Sub-total 7,842 sf 6.02 /sf 47,184 Option A Estimate - Page 10

12 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 31 EARTHWORK - Continued Excavation & Fill - Building Related footing excavation 87 cy ,616 footing backfill 52 cy ,831 level & grade 5,942 sf ,080 6" gravel under slab 116 cy ,220 vapor barrier 6,536 sf ,288 Sub-total 7,842 sf 1.79 /sf 14,035 Erosion & Sedimentation Controls silt fence 846 lf ,327 truck wheel track-out pad 1 sum 2, ,500 catchbasin protection 4 ea monitor / maintenance 1 sum 1, ,200 Sub-total 7,842 sf 0.82 /sf 6,427 SUB-TOTAL 31 EARTHWORK /sf $79, EXTERIOR IMPROVEMENTS Base Courses 6" base course at 3" ac pavement 655 ton ,198 2" leveling course at 3" ac pavement 218 ton ,235 4" base course at 4" conc. pavement 49 ton ,944 8" base course at 6" conc. pavement 117 ton ,684 4" base course at concrete curbs 30 ton ,188 geotextile fabric at ac pavement 2,025 sy ,746 Sub-total 7,842 sf 5.99 /sf 46,995 Asphalt Paving 3" ac pavement ton ,172 18,225 sf street 30 lf Sub-total 7,842 sf 4.41 /sf 34,622 Concrete Pavement 4" concrete pavement, broom finish 2,028 sf ,168 6" concrete pavement, broom finish 2,444 sf ,552 Sub-total 7,842 sf 4.04 /sf 31,720 Curbs & Gutters concrete curb, vertical 620 lf ,400 Sub-total 7,842 sf 1.58 /sf 12,400 Paving Specialties bollard, standard 4 ea oh doors bollard, removable 0 ea NIC precast concrete wheel stop 0 ea NIC detectable warning surface 10 sf pavement markings ada logo 1 ea diagonal striping 160 sf parking stall striping / other 25 ea ada sign, post & footing 1 ea Sub-total 7,842 sf 0.38 /sf 2,985 Fences & Gates perimeter fence, 6' ht chain-link 456 lf ,680 pedestrian gate 2 ea ,600 vehicular gate 1 sum 12, ,000 Sub-total 7,842 sf 3.48 /sf 27,280 Option A Estimate - Page 11

13 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 32 EXTERIOR IMPROVEMENTS - Continued Retaining & Site Walls retaining walls lf NIC planter walls lf NIC Sub-total 7,842 sf 0.00 /sf 0 Landscape Irrigation 16,090 sf controller 1 sum 5, ,000 irrigation 16,090 sf ,135 Sub-total 7,842 sf 3.72 /sf 29,135 Planting place topsoil from on-site stockpile 596 cy ,874 fine grading 16,090 sf ,609 soil amendments 16,090 sf ,241 seeding rough seed, swales & buffer areas 12,068 sf ,448 planting planting / ground cover / mulch 4,023 sf ,056 allow 25% of area swale / storm water planting sf w/ storm drainage allowance below trees canopy trees, 3" cal. 10 ea ,000 establishment maintenance 1 sum 2, ,000 Sub-total 7,842 sf 3.85 /sf 30,228 SUB-TOTAL 32 EXTERIOR IMPROVEMENTS /sf $215, UTILITIES Water Utilities 6" di pipe 400 lf ,000 6" fittings / bends 4 ea ,460 gate valve 1 ea 1, ,850 ddc / bf / vault. cv 1 sum 15, ,000 fire dept. connection 1 sum 1, ,800 meter & vault 1 sum 5, ,000 hydrant assemblies 0 ea NIC, verify thrust blocks 6 ea tie-in 1 sum 2, ,000 Sub-total 7,842 sf 7.00 /sf 54,860 Sanitary Sewerage Utilities 6" pvc pipe 400 lf ,000 precast manholes 2 ea 3, ,000 connection to existing 1 sum 2, ,000 cleanouts 2 ea ,200 Sub-total 7,842 sf 3.60 /sf 28,200 Storm Drainage Utilities foundation drainage perimeter foundation drain pipe 310 lf ,720 site drainage systems 32,916 sf ,749 allowance Sub-total 7,842 sf /sf 102,469 Natural Gas Distribution natural gas 400 lf ,000 e & b only, pipe by utility, verify Sub-total 7,842 sf 1.53 /sf 12,000 Option A Estimate - Page 12

14 Option A Quantity Unit Cost / Unit Cost Sub-totals Comments 33 UTILITIES - Continued Electrical Utilities service 400 lf ,000 site lighting 1 sum 15, ,000 allowance Sub-total 7,842 sf 4.72 /sf 37,000 SUB-TOTAL 33 UTILITIES /sf $234,529 SUB-TOTAL ,791,889 $1,791,889 Estimating/Design Contingency 10.00% 179,189 Index To Construction Start Summer % ± 7% per year General Conditions / Insurance / Bond 11.50% 242,541 General Contractor OH & Profit 4.50% 105, , % TOTAL DIRECT CONSTRUCTION COST Option A 7,842 sf $ /sf $2,457,416 Main Level 5,942 sf Mezzanine 1,900 sf Option A Estimate - Page 13

15 Option B

16 Option B Base Building DIRECT CONSTRUCTION COSTS $ / sf Cost Comments Area 12,467 sf 02 EXISTING CONDITIONS $0.43 $5, CONCRETE , MASONRY METALS , WOOD, PLASTICS & COMPOSITES , THERMAL & MOISTURE PROTECTION , OPENINGS , FINISHES , SPECIALTIES , EQUIPMENT , FURNISHINGS , SPECIAL CONSTRUCTION , CONVEYING EQUIPMENT , FIRE SUPPRESSION , PLUMBING , HVAC , ELECTRICAL , COMMUNICATIONS , ELECTRONIC SAFETY & SECURITY , EARTHWORK , EXTERIOR IMPROVEMENTS , UTILITIES ,654 SUB-TOTAL $ $2,473,401 Estimating/Design Contingency 10.00% ,340 Index To Construction Start 7.00% ,452 General Conditions / Insurance / Bond 11.50% ,787 General Contractor OH & Profit 4.50% ,069 TOTAL DIRECT CONSTRUCTION COST $ $3,392,049 Building $ $2,637,921 Site Work / Utilities $60.49 $754,128 Division Summary - Page 15

17 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 02 EXISTING CONDITIONS Site Demolition site demolition allowance 46,505 sf $0.10 $4,651 item sum haul & disposal 1 sum Sub-total 12,467 sf 0.43 /sf $5,351 SUB-TOTAL 02 EXISTING CONDITIONS 0.43 /sf $5, CONCRETE Poured-In-Place Concrete Forming continuous wall footing 1,212 sf ,484 spread footings 432 sf ,240 slab on grade 9,467 sf ,154 topping slab on metal deck 3,000 sf ,650 misc. forming accessories 1 sum 1, ,465 Sub-total 12,467 sf 1.68 /sf 20,993 Reinforcing Steel continuous wall footing 1,768 lbs ,033 spread footings 3,150 lbs ,623 slab on grade 20,827 lbs ,952 mesh topping slab on metal deck 3,000 sf ,600 Sub-total 12,467 sf 2.66 /sf 33,208 Redi-Mix Concrete 4,000 psi cy ,699 Sub-total 12,467 sf 2.94 /sf 36,699 Placing continuous wall footing 23.6 cy spread footings 25.2 cy slab on grade cy ,522 topping slab on metal deck 39.0 cy ,170 pump / transport concrete cy ,515 Sub-total 12,467 sf 1.42 /sf 17,720 Finishing set screeds 9,467 sf ,313 topping slab on metal deck 3,000 sf ,050 cure slabs 9,467 sf ,787 topping slab on metal deck 3,000 sf ,200 trowel slabs 9,467 sf ,520 topping slab on metal deck 3,000 sf ,700 sealer 12,467 sf ,727 float footing tops 836 sf sawcut control joint at sog 9,467 sf ,313 Sub-total 12,467 sf 2.67 /sf 33,237 Miscellaneous stair fill 1 flight 1, ,500 housekeeping pads 50 sf ,000 set column anchor bolts 12 set ,200 grout baseplates 12 ea ,500 Sub-total 12,467 sf 0.42 /sf 5,200 SUB-TOTAL 03 CONCRETE /sf $147,057 Option B Estimate - Page 16

18 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 04 MASONRY Concrete Masonry Units (CMU) 8" cmu sf NIC Sub-total 12,467 sf 0.00 /sf 0 SUB-TOTAL 04 MASONRY 0.00 /sf $0 05 METALS Structural Steel - Beams, Columns, Etc. mezzanine stair 1 flight 8, ,500 Sub-total 12,467 sf 0.68 /sf 8,500 Miscellaneous Metals railings mezzanine / stair guardrail 137 lf ,755 stair handrail, wall mounted 16 lf miscellaneous 12,467 sf ,350 Sub-total 12,467 sf 2.06 /sf 25,665 SUB-TOTAL 05 METALS 2.74 /sf $34, WOOD, PLASTICS & COMPOSITES Rough Carpentry miscellaneous blocking & framing 12,467 sf ,870 item sf fasteners & hardware 1 sum Sub-total 12,467 sf 0.16 /sf 1,960 Architectural Wood Casework NIC - to be determined list each room individually plam base / sink cabinet lf Sub-total 12,467 sf 0.00 /sf 0 SUB-TOTAL 06 WOOD, PLASTICS & COMPOSITES 0.16 /sf $1, THERMAL & MOISTURE PROTECTION Waterproofing & Damproofing NIC damproofing sf waterproofing sf Sub-total 12,467 sf 0.00 /sf 0 Insulation rigid insulation roof, r-30 15,585 sf ,339 premium over PEMB package tapered insulation premium sf NIC slab edge insulation sf to be determined batt insulation above ceiling / roof sf NIC walls 0 sf with PEMB package vapor & weather barriers 0 sf with PEMB package Sub-total 12,467 sf 5.00 /sf 62,339 Fireproofing spray-on sf NIC Sub-total 12,467 sf 0.00 /sf 0 Option B Estimate - Page 17

19 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 07 THERMAL & MOISTURE PROTECTION - Continued Metal Roofing prefinished metal roofing sf with PEMB package slip sheet 0 sf Sub-total 12,467 sf 0.00 /sf 0 Metal Panel building sf with PEMB package entry soffit 58 sf ,160 Sub-total 12,467 sf 0.09 /sf 1,160 Flashing & Sheet Metal gutters lf with PEMB package downspouts lf with PEMB package miscellaneous 12,467 sf ,857 Sub-total 12,467 sf 0.55 /sf 6,857 Roof Accessories roof hatch ea NIC Sub-total 12,467 sf 0.00 /sf 0 Caulking & Sealants caulking / firestopping 12,467 sf ,987 Sub-total 12,467 sf 0.40 /sf 4,987 SUB-TOTAL 07 THERMAL & MOISTURE PROTECTION 6.04 /sf $75, OPENINGS Doors, Frames & Hardware (includes installation) exterior entry doors 1 pair 5, ,000 egress doors 2 ea 1, ,800 auto opener 1 sum 5, ,000 interior doors single passage, vision lite 5 ea 1, ,250 single passage, flush 2 ea 1, ,700 pairs - vestibule 1 pair 4, ,200 pairs 1 pair 2, ,850 access doors 1 sum Sub-total 12,467 sf 2.75 /sf 34,300 Relites & Sidelites vestibule storefront 50 sf ,000 Sub-total 12,467 sf 0.24 /sf 3,000 Overhead & Coiling Doors insulated oh doors, manual, 10' x 11' 3 ea 4, ,025 dwgs out of scale, verify size operator 3 ea NIC Sub-total 12,467 sf 1.12 /sf 14,025 Windows storefront 732 sf ,580 insulated polycarbonate glazing 1,644 sf ,420 Sub-total 12,467 sf /sf 138,000 Skylights skylights sf NIC Sub-total 12,467 sf 0.00 /sf 0 Option B Estimate - Page 18

20 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 08 OPENINGS - Continued Louvers wall louvers sf NIC Sub-total 12,467 sf 0.00 /sf 0 SUB-TOTAL 08 OPENINGS /sf $189, FINISHES Gypsumboard Systems ext. wall stud framing 0 sf with PEMB package ext. gyp sheathing 0 sf with PEMB package gypbd interior 5,450 sf ,163 impact resistant partitions 2,622 sf ,528 acoustic at above 2,622 sf ,622 gypboard to structure 2,199 sf ,592 accessories, miscellaneous, bracing, etc. 1 sum 5, ,918 Sub-total 12,467 sf 6.80 /sf 84,823 Ceramic Tile floor tile 0 sf NIC base 152 lf ,824 wall tile, wet wall 216 sf ,592 Sub-total 12,467 sf 0.35 /sf 4,416 Resilient linoleum 1,758 sf ,064 base rubber 833 lf ,499 rubber stair treads & risers lf NIC, sealed concrete Sub-total 12,467 sf 1.33 /sf 16,563 Paint & Wallcoverings exterior painting sf NIC paint / finish door & frame 9 lvs ,125 paint gypboard ceilings / fascias 2,199 sf ,419 epoxy paint 650 sf paint interior walls 10,478 sf ,478 epoxy paint 1,152 sf ,440 paint exposed structure 10,268 sf ,268 misc. specialty painting, touchup 12,467 sf ,247 Sub-total 12,467 sf 2.24 /sf 27,952 SUB-TOTAL 09 FINISHES /sf $133, SPECIALTIES Visual Display Systems markerboard 12' x 4' 2 ea ,536 tackboards 4' x 4' 4 ea tackable wall surface sf NIC - to be determined Sub-total 12,467 sf 0.16 /sf 2,032 Signage Systems directories, bulletin boards, etc. 1 sum NIC signs, ada & code required 12,467 sf ,740 allowance Sub-total 12,467 sf 0.30 /sf 3,740 Option B Estimate - Page 19

21 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 10 SPECIALTIES - Continued Toilet Partitions (painted metal) ada 2 ea ,170 standard 4 ea ,860 urinal screen 1 ea Sub-total 12,467 sf 0.26 /sf 3,265 Wall Protection & Corner Guards bumper rails lf NIC corner guards 2 ea Sub-total 12,467 sf 0.02 /sf 300 Toilet Accessories (includes installation) grab bars 2 sets mirrors 6 ea ,050 paper towel dispenser / receptacle 2 ea ,050 janitor tool holder 1 ea sanitary napkin dispenser 0 ea sanitary napkin disposal 3 ea hooks 5 ea folding shower seat 0 ea shower curtain rod 0 ea shower curtain & hooks 0 ea toilet paper dispenser 6 ea seat cover dispenser 6 ea soap dispenser 6 ea paper towel dispenser ea elect. hand dryer ea 1, Sub-total 12,467 sf 0.32 /sf 4,040 Fire Extinguisher & Cabinets fec 2 ea Sub-total 12,467 sf 0.04 /sf 500 Exterior Specialties canopies 176 sf entries Sub-total 12,467 sf 0.85 /sf 10,560 SUB-TOTAL 10 SPECIALTIES 1.96 /sf $24, EQUIPMENT Projection Screens / Projector Brackets manual 2 ea ,000 projector bracket 2 ea Sub-total 12,467 sf 0.13 /sf 1,600 SUB-TOTAL 11 EQUIPMENT 0.13 /sf $1, FURNISHINGS Window Treatment roller shades, manual 435 sf ,350 roller shades, motorized sf NIC roller shades, blackout sf NIC Sub-total 12,467 sf 0.35 /sf 4,350 Option B Estimate - Page 20

22 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 12 FURNISHINGS - Continued Floor Mats & Frames walk-off mat, glue-down 58 sf vestibule walk-off mat, recessed sf NIC Sub-total 12,467 sf 0.04 /sf 464 Site Furnishings bike racks 10 ea ,500 Sub-total 12,467 sf 0.28 /sf 3,500 SUB-TOTAL 12 FURNISHINGS 0.67 /sf $8, SPECIAL CONSTRUCTION Pre-Engineered Structure base package 9,467 sf ,406 incl stl frame, siding, roofing, insul mezzanine 3,000 sf ,000 erect / install 12,467 sf ,472 hoisting / rigging 1 sum 25, ,000 Sub-total 12,467 sf /sf 427,878 SUB-TOTAL 13 SPECIAL CONSTRUCTION /sf $427, CONVEYING EQUIPMENT Crane Assembly gantry / bridge type assembly, 2,000 lb 1 sum 20, ,000 allowance, verify cab finishes sum 5, Sub-total 12,467 sf 1.60 /sf 20,000 SUB-TOTAL 14 CONVEYING EQUIPMENT 1.60 /sf $20, FIRE SUPPRESSION Fire Sprinklers sprinklers, wet 12,467 sf ,102 sprinklers, dry, covered area / soffits 5,603 sf ,824 verify Sub-total 12,467 sf 8.10 /sf 100,926 SUB-TOTAL 21 FIRE SUPPRESSION 8.10 /sf $100, PLUMBING Plumbing compressed air system sf NIC, verify water closets 6 ea 2, ,000 urinals 2 ea 2, ,000 lav. sinks 6 ea 2, ,200 floor drains 2 ea ,000 water heater 1 ea 3, ,000 hose bibs 4 ea ,700 insulation & piping 12,467 sf ,168 Sub-total 12,467 sf 5.62 /sf 70,068 SUB-TOTAL 22 PLUMBING 5.62 /sf $70,068 Option B Estimate - Page 21

23 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 23 HVAC HVAC hvac 12,467 sf ,010 Sub-total 12,467 sf /sf 374,010 SUB-TOTAL 23 HVAC /sf $374, ELECTRICAL Electrical service & distribution 12,467 sf ,635 lighting 12,467 sf ,137 devices 12,467 sf ,584 equipment connections 12,467 sf ,350 basic materials 12,467 sf ,518 security, conduit 12,467 sf ,740 emergency generator 1 sum Sub-total 12,467 sf /sf 249,964 SUB-TOTAL 26 ELECTRICAL /sf $249, COMMUNICATIONS Communications communications 12,467 sf ,168 allowance Sub-total 12,467 sf 2.50 /sf 31,168 SUB-TOTAL 27 COMMUNICATIONS 2.50 /sf $31, ELECTRONIC SAFETY & SECURITY Fire Detection & Alarm fire detection & alarm 12,467 sf ,584 Sub-total 12,467 sf 1.25 /sf 15,584 Security security sum NIC Sub-total 12,467 sf 0.00 /sf 0 SUB-TOTAL 28 ELECTRONIC SAFETY & SECURITY 1.25 /sf $15, EARTHWORK 46,505 sf site footprint Clearing & Grubbing clear & grub 46,505 sf ,651 haul & disposal 1 sum Sub-total 12,467 sf 0.43 /sf 5,351 Stripping & Stockpiling stripping & stockpiling 861 cy ,445 haul off excess 370 cy ,557 Sub-total 12,467 sf 0.72 /sf 9,002 Grading / Site Excavation & Fill mobilization / demobilization 1 sum 15, ,000 construction staking 46,505 sf ,255 cut 861 cy ,334 fill cy NIC Option B Estimate - Page 22

24 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 31 EARTHWORK - Continued Grading / Site Excavation & Fill - continued haul & disposal off-site 861 cy ,918 rough grading 46,505 sf ,651 proof rolling 46,505 sf ,325 Sub-total 12,467 sf 3.89 /sf 48,483 Excavation & Fill - Building Related footing excavation 122 cy ,658 footing backfill 73 cy ,560 level & grade 9,467 sf ,313 6" gravel under slab 184 cy ,280 vapor barrier 10,414 sf ,645 Sub-total 12,467 sf 1.72 /sf 21,456 Erosion & Sedimentation Controls silt fence 875 lf ,406 truck wheel track-out pad 1 sum 2, ,500 catchbasin protection 4 ea monitor / maintenance 1 sum 1, ,200 Sub-total 12,467 sf 0.52 /sf 6,506 SUB-TOTAL 31 EARTHWORK 7.28 /sf $90, EXTERIOR IMPROVEMENTS Base Courses 6" base course at 3" ac pavement 637 ton ,475 2" leveling course at 3" ac pavement 212 ton ,980 4" base course at 4" conc. pavement 52 ton ,060 8" base course at 6" conc. pavement 182 ton ,268 4" base course at concrete curbs 27 ton ,062 geotextile fabric at ac pavement 1,969 sy ,643 Sub-total 12,467 sf 3.89 /sf 48,488 Asphalt Paving 3" ac pavement ton ,229 17,722 sf street 30 lf Sub-total 12,467 sf 2.70 /sf 33,679 Concrete Pavement 4" concrete pavement, broom finish 2,150 sf ,900 6" concrete pavement, broom finish 3,792 sf ,336 Sub-total 12,467 sf 3.47 /sf 43,236 Curbs & Gutters concrete curb, vertical 554 lf ,080 Sub-total 12,467 sf 0.89 /sf 11,080 Paving Specialties bollard, standard 6 ea oh doors bollard, removable 0 ea NIC precast concrete wheel stop 0 ea NIC detectable warning surface 10 sf Option B Estimate - Page 23

25 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 32 EXTERIOR IMPROVEMENTS - Continued Paving Specialties - continued pavement markings ada logo 1 ea diagonal striping 160 sf parking stall striping / other 25 ea ada sign, post & footing 1 ea Sub-total 12,467 sf 0.28 /sf 3,535 Fences & Gates perimeter fence, 6' ht chain-link 420 lf ,600 pedestrian gate 2 ea ,600 vehicular gate 1 sum 12, ,000 Sub-total 12,467 sf 2.10 /sf 26,200 Retaining & Site Walls retaining walls lf NIC planter walls lf NIC Sub-total 12,467 sf 0.00 /sf 0 Landscape Irrigation 13,250 sf controller 1 sum 5, ,000 irrigation 13,250 sf ,875 Sub-total 12,467 sf 2.00 /sf 24,875 Planting place topsoil from on-site stockpile 491 cy ,190 fine grading 13,250 sf ,325 soil amendments 13,250 sf ,963 seeding rough seed, swales & buffer areas 9,938 sf ,193 planting planting / ground cover / mulch 3,313 sf ,281 allow 25% of area swale / storm water planting sf w/ storm drainage allowance below trees canopy trees, 3" cal. 10 ea ,000 establishment maintenance 1 sum 2, ,000 Sub-total 12,467 sf 2.08 /sf 25,952 SUB-TOTAL 32 EXTERIOR IMPROVEMENTS /sf $217, UTILITIES Water Utilities 6" di pipe 400 lf ,000 6" fittings / bends 4 ea ,460 gate valve 1 ea 1, ,850 ddc / bf / vault. cv 1 sum 15, ,000 fire dept. connection 1 sum 1, ,800 meter & vault 1 sum 5, ,000 hydrant assemblies 0 ea NIC, verify thrust blocks 6 ea tie-in 1 sum 2, ,000 Sub-total 12,467 sf 4.40 /sf 54,860 Option B Estimate - Page 24

26 Option B Quantity Unit Cost / Unit Cost Sub-totals Comments 33 UTILITIES - Continued Sanitary Sewerage Utilities 6" pvc pipe 400 lf ,000 precast manholes 2 ea 3, ,000 connection to existing 1 sum 2, ,000 cleanouts 2 ea ,200 Sub-total 12,467 sf 2.26 /sf 28,200 Storm Drainage Utilities foundation drainage perimeter foundation drain pipe 404 lf ,848 site drainage systems 39,249 sf ,746 allowance Sub-total 12,467 sf 9.83 /sf 122,594 Natural Gas Distribution natural gas 400 lf ,000 e & b only, pipe by utility, verify Sub-total 12,467 sf 0.96 /sf 12,000 Electrical Utilities service 400 lf ,000 site lighting 1 sum 15, ,000 allowance Sub-total 12,467 sf 2.97 /sf 37,000 SUB-TOTAL 33 UTILITIES /sf $254,654 SUB-TOTAL ,473,401 $2,473,401 Estimating/Design Contingency 10.00% 247,340 Index To Construction Start Summer % ± 7% per year General Conditions / Insurance / Bond 11.50% 334,787 General Contractor OH & Profit 4.50% 146, , % TOTAL DIRECT CONSTRUCTION COST Option B 12,467 sf $ /sf $3,392,049 Main Level 9,467 sf Mezzanine 3,000 sf Option B Estimate - Page 25

27 Option C

28 Option C Base Building DIRECT CONSTRUCTION COSTS $ / sf Cost Comments Area 10,381 sf 02 EXISTING CONDITIONS $2.97 $30, CONCRETE , MASONRY METALS , WOOD, PLASTICS & COMPOSITES , THERMAL & MOISTURE PROTECTION , OPENINGS , FINISHES , SPECIALTIES , EQUIPMENT , FURNISHINGS , SPECIAL CONSTRUCTION , CONVEYING EQUIPMENT FIRE SUPPRESSION , PLUMBING , HVAC , ELECTRICAL , COMMUNICATIONS , ELECTRONIC SAFETY & SECURITY , EARTHWORK , EXTERIOR IMPROVEMENTS , UTILITIES ,581 SUB-TOTAL $ $2,087,974 Estimating/Design Contingency 10.00% ,797 Index To Construction Start 7.00% ,774 General Conditions / Insurance / Bond 11.50% ,618 General Contractor OH & Profit 4.50% ,307 TOTAL DIRECT CONSTRUCTION COST $ $2,863,470 Building $ $2,345,557 Site Work / Utilities $49.89 $517,913 Division Summary - Page 27

29 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 02 EXISTING CONDITIONS Site Demolition site demolition allowance 17,900 sf $1.50 $26,850 item sum haul & disposal 1 sum 4, ,030 Sub-total 10,381 sf 2.97 /sf $30,880 SUB-TOTAL 02 EXISTING CONDITIONS 2.97 /sf $30, CONCRETE Poured-In-Place Concrete Forming continuous wall footing 1,248 sf ,736 spread footings 432 sf ,240 slab on grade 10,381 sf ,748 misc. forming accessories 1 sum 1, ,404 Sub-total 10,381 sf 1.94 /sf 20,128 Reinforcing Steel continuous wall footing 1,820 lbs ,093 spread footings 3,150 lbs ,623 slab on grade 22,838 lbs ,264 Sub-total 10,381 sf 3.08 /sf 31,980 Redi-Mix Concrete 4,000 psi cy ,928 Sub-total 10,381 sf 3.27 /sf 33,928 Placing continuous wall footing 24.3 cy spread footings 25.2 cy slab on grade cy ,056 pump / transport concrete cy ,796 Sub-total 10,381 sf 1.58 /sf 16,386 Finishing set screeds 10,381 sf ,633 cure slabs 10,381 sf ,152 trowel slabs 10,381 sf ,343 sealer 10,381 sf ,267 float footing tops 848 sf sawcut control joint at sog 10,381 sf ,633 Sub-total 10,381 sf 2.76 /sf 28,664 Miscellaneous housekeeping pads 50 sf ,000 set column anchor bolts 12 set ,200 grout baseplates 12 ea ,500 Sub-total 10,381 sf 0.36 /sf 3,700 SUB-TOTAL 03 CONCRETE /sf $134, MASONRY Concrete Masonry Units (CMU) 8" cmu sf NIC Sub-total 10,381 sf 0.00 /sf 0 SUB-TOTAL 04 MASONRY 0.00 /sf $0 Option C Estimate - Page 28

30 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 05 METALS Miscellaneous Metals railings miscellaneous 10,381 sf ,786 Sub-total 10,381 sf 0.75 /sf 7,786 SUB-TOTAL 05 METALS 0.75 /sf $7, WOOD, PLASTICS & COMPOSITES Rough Carpentry miscellaneous blocking & framing 10,381 sf ,557 item sf fasteners & hardware 1 sum Sub-total 10,381 sf 0.16 /sf 1,637 Architectural Wood Casework NIC - to be determined list each room individually plam base / sink cabinet lf Sub-total 10,381 sf 0.00 /sf 0 SUB-TOTAL 06 WOOD, PLASTICS & COMPOSITES 0.16 /sf $1, THERMAL & MOISTURE PROTECTION Waterproofing & Damproofing NIC damproofing sf waterproofing sf Sub-total 10,381 sf 0.00 /sf 0 Insulation rigid insulation roof, r-30 15,509 sf ,037 premium over PEMB package tapered insulation premium sf NIC slab edge insulation sf to be determined batt insulation above ceiling / roof sf NIC walls 0 sf with PEMB package vapor & weather barriers 0 sf with PEMB package Sub-total 10,381 sf 5.98 /sf 62,037 Fireproofing spray-on sf NIC Sub-total 10,381 sf 0.00 /sf 0 Metal Roofing prefinished metal roofing sf with PEMB package slip sheet 0 sf Sub-total 10,381 sf 0.00 /sf 0 Metal Panel building sf with PEMB package Sub-total 10,381 sf 0.00 /sf 0 Flashing & Sheet Metal gutters lf with PEMB package downspouts lf with PEMB package miscellaneous 10,381 sf ,710 Sub-total 10,381 sf 0.55 /sf 5,710 Option C Estimate - Page 29

31 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 07 THERMAL & MOISTURE PROTECTION - Continued Roof Accessories roof hatch ea NIC Sub-total 10,381 sf 0.00 /sf 0 Caulking & Sealants caulking / firestopping 10,381 sf ,152 Sub-total 10,381 sf 0.40 /sf 4,152 SUB-TOTAL 07 THERMAL & MOISTURE PROTECTION 6.93 /sf $71, OPENINGS Doors, Frames & Hardware (includes installation) exterior entry doors 1 pair 5, ,000 egress doors 0 ea 1, auto opener 1 sum 5, ,000 interior doors single passage, vision lite 3 ea 1, ,550 single passage, flush 3 ea 1, ,550 pairs - vestibule 0 pair 4, pairs 3 pair 2, ,550 access doors 1 sum Sub-total 10,381 sf 2.90 /sf 30,150 Relites & Sidelites vestibule storefront 0 sf Sub-total 10,381 sf 0.00 /sf 0 Overhead & Coiling Doors insulated oh doors, manual, 24' x 10' 4 ea 11, ,600 dwgs out of scale, verify size operator 4 ea NIC Sub-total 10,381 sf 4.39 /sf 45,600 Windows storefront 658 sf ,770 insulated polycarbonate glazing 1,815 sf ,825 Sub-total 10,381 sf /sf 142,595 Skylights skylights sf NIC Sub-total 10,381 sf 0.00 /sf 0 Louvers wall louvers sf NIC Sub-total 10,381 sf 0.00 /sf 0 SUB-TOTAL 08 OPENINGS /sf $218,345 Option C Estimate - Page 30

32 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 09 FINISHES Gypsumboard Systems ext. wall stud framing 0 sf with PEMB package ext. gyp sheathing 0 sf with PEMB package gypbd interior 2,375 sf ,094 impact resistant plywood - allow 50% 2,375 sf ,500 partitions 2,945 sf ,905 acoustic at above 2,945 sf ,945 suspended restrooms 2,721 sf ,768 accessories, miscellaneous, bracing, etc. 1 sum 6, ,316 Sub-total 10,381 sf 8.72 /sf 90,528 Ceramic Tile floor tile 0 sf NIC base 162 lf ,944 wall tile, wet wall 324 sf ,888 Sub-total 10,381 sf 0.56 /sf 5,832 Resilient linoleum 2,280 sf ,240 base rubber 824 lf ,472 rubber stair treads & risers lf NIC, sealed concrete Sub-total 10,381 sf 2.00 /sf 20,712 Paint & Wallcoverings exterior painting sf NIC paint / finish door & frame 12 lvs ,500 paint gypboard ceilings / fascias 2,721 sf ,993 epoxy paint 676 sf ,014 paint interior walls 10,316 sf ,316 epoxy paint 1,134 sf ,418 paint exposed structure 7,660 sf ,660 misc. specialty painting, touchup 10,381 sf ,038 Sub-total 10,381 sf 2.50 /sf 25,939 SUB-TOTAL 09 FINISHES /sf $143, SPECIALTIES Visual Display Systems markerboard 12' x 4' 2 ea ,536 tackboards 4' x 4' 4 ea tackable wall surface sf NIC - to be determined Sub-total 10,381 sf 0.20 /sf 2,032 Signage Systems directories, bulletin boards, etc. 1 sum NIC signs, ada & code required 10,381 sf ,114 allowance Sub-total 10,381 sf 0.30 /sf 3,114 Toilet Partitions (painted metal) ada 2 ea ,170 standard 4 ea ,860 urinal screen 1 ea Sub-total 10,381 sf 0.31 /sf 3,265 Option C Estimate - Page 31

33 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 10 SPECIALTIES - Continued Wall Protection & Corner Guards bumper rails lf NIC corner guards 2 ea Sub-total 10,381 sf 0.03 /sf 300 Toilet Accessories (includes installation) grab bars 2 sets mirrors 6 ea ,050 paper towel dispenser / receptacle 2 ea ,050 janitor tool holder 1 ea sanitary napkin dispenser 0 ea sanitary napkin disposal 3 ea hooks 5 ea folding shower seat 0 ea shower curtain rod 0 ea shower curtain & hooks 0 ea toilet paper dispenser 6 ea seat cover dispenser 6 ea soap dispenser 6 ea paper towel dispenser ea elect. hand dryer ea 1, Sub-total 10,381 sf 0.39 /sf 4,040 Fire Extinguisher & Cabinets fec 2 ea Sub-total 10,381 sf 0.05 /sf 500 Exterior Specialties canopies 55 sf entries Sub-total 10,381 sf 0.32 /sf 3,300 SUB-TOTAL 10 SPECIALTIES 1.59 /sf $16, EQUIPMENT Projection Screens / Projector Brackets manual 2 ea ,000 projector bracket 2 ea Sub-total 10,381 sf 0.15 /sf 1,600 SUB-TOTAL 11 EQUIPMENT 0.15 /sf $1, FURNISHINGS Window Treatment roller shades, manual 435 sf ,350 roller shades, motorized sf NIC roller shades, blackout sf NIC Sub-total 10,381 sf 0.42 /sf 4,350 Floor Mats & Frames walk-off mat, glue-down 0 sf vestibule walk-off mat, recessed sf NIC Sub-total 10,381 sf 0.00 /sf 0 Option C Estimate - Page 32

34 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 12 FURNISHINGS - Continued Site Furnishings bike racks 10 ea ,500 Sub-total 10,381 sf 0.34 /sf 3,500 SUB-TOTAL 12 FURNISHINGS 0.76 /sf $7, SPECIAL CONSTRUCTION Pre-Engineered Structure base package 10,381 sf ,858 incl stl frame, siding, roofing, insul mezzanine 0 sf erect / install 10,381 sf ,096 hoisting / rigging 1 sum 25, ,000 Sub-total 10,381 sf /sf 377,954 SUB-TOTAL 13 SPECIAL CONSTRUCTION /sf $377, CONVEYING EQUIPMENT Item item 0 sum NIC Sub-total 10,381 sf 0.00 /sf 0 SUB-TOTAL 14 CONVEYING EQUIPMENT 0.00 /sf $0 21 FIRE SUPPRESSION Fire Sprinklers sprinklers, wet 10,381 sf ,715 sprinklers, dry, covered area / soffits 4,914 sf ,312 verify Sub-total 10,381 sf 8.29 /sf 86,027 SUB-TOTAL 21 FIRE SUPPRESSION 8.29 /sf $86, PLUMBING Plumbing compressed air system sf NIC, verify water closets 6 ea 2, ,000 urinals 2 ea 2, ,000 lav. sinks 6 ea 2, ,200 floor drains 2 ea ,000 water heater 1 ea 3, ,000 hose bibs 4 ea ,700 insulation & piping 10,381 sf ,953 Sub-total 10,381 sf 6.25 /sf 64,853 SUB-TOTAL 22 PLUMBING 6.25 /sf $64, HVAC HVAC hvac 10,381 sf ,430 Sub-total 10,381 sf /sf 311,430 SUB-TOTAL 23 HVAC /sf $311,430 Option C Estimate - Page 33

35 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 26 ELECTRICAL Electrical service & distribution 10,381 sf ,334 lighting 10,381 sf ,191 devices 10,381 sf ,976 equipment connections 10,381 sf ,786 basic materials 10,381 sf ,738 security, conduit 10,381 sf ,114 emergency generator 1 sum Sub-total 10,381 sf /sf 208,139 SUB-TOTAL 26 ELECTRICAL /sf $208, COMMUNICATIONS Communications communications 10,381 sf ,953 allowance Sub-total 10,381 sf 2.50 /sf 25,953 SUB-TOTAL 27 COMMUNICATIONS 2.50 /sf $25, ELECTRONIC SAFETY & SECURITY Fire Detection & Alarm fire detection & alarm 10,381 sf ,976 Sub-total 10,381 sf 1.25 /sf 12,976 Security security sum NIC Sub-total 10,381 sf 0.00 /sf 0 SUB-TOTAL 28 ELECTRONIC SAFETY & SECURITY 1.25 /sf $12, EARTHWORK 17,900 sf site footprint Grading / Site Excavation & Fill mobilization / demobilization 1 sum 15, ,000 construction staking 17,900 sf ,685 cut 331 cy ,978 fill cy NIC haul & disposal off-site 331 cy ,972 rough grading 17,900 sf ,790 proof rolling 17,900 sf Sub-total 10,381 sf 2.82 /sf 29,320 Excavation & Fill - Building Related footing excavation 124 cy ,710 footing backfill 74 cy ,597 level & grade 10,381 sf ,633 6" gravel under slab 202 cy ,090 vapor barrier 11,419 sf ,997 Sub-total 10,381 sf 2.22 /sf 23,027 Option C Estimate - Page 34

36 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 31 EARTHWORK - Continued Erosion & Sedimentation Controls silt fence 536 lf ,474 truck wheel track-out pad 1 sum 2, ,500 catchbasin protection 4 ea monitor / maintenance 1 sum 1, ,200 Sub-total 10,381 sf 0.54 /sf 5,574 SUB-TOTAL 31 EARTHWORK 5.58 /sf $57, EXTERIOR IMPROVEMENTS Base Courses 6" base course at 3" ac pavement 39 ton ,578 2" leveling course at 3" ac pavement 13 ton " base course at 4" conc. pavement 18 ton " base course at 6" conc. pavement 262 ton ,477 4" base course at concrete curbs 14 ton geotextile fabric at ac pavement 122 sy Sub-total 10,381 sf 1.36 /sf 14,142 Asphalt Paving 3" ac pavement ton ,059 1,098 sf street 30 lf Sub-total 10,381 sf 0.24 /sf 2,509 Concrete Pavement 4" concrete pavement, broom finish 770 sf ,620 6" concrete pavement, broom finish 5,466 sf ,728 Sub-total 10,381 sf 4.66 /sf 48,348 Curbs & Gutters concrete curb, vertical 296 lf ,920 Sub-total 10,381 sf 0.57 /sf 5,920 Paving Specialties bollard, standard 8 ea oh doors bollard, removable 0 ea NIC precast concrete wheel stop 0 ea NIC detectable warning surface 0 sf pavement markings ada logo 0 ea diagonal striping 0 sf parking stall striping / other 0 ea ada sign, post & footing 0 ea Sub-total 10,381 sf 0.21 /sf 2,200 Fences & Gates perimeter fence, 6' ht chain-link 327 lf ,810 pedestrian gate 1 ea vehicular gate 0 sum 12, Sub-total 10,381 sf 1.02 /sf 10,610 Retaining & Site Walls retaining walls lf NIC planter walls lf NIC Sub-total 10,381 sf 0.00 /sf 0 Option C Estimate - Page 35

37 Option C Quantity Unit Cost / Unit Cost Sub-totals Comments 32 EXTERIOR IMPROVEMENTS - Continued Landscape Irrigation 2,700 sf controller 1 sum 5, ,000 irrigation 2,700 sf ,050 Sub-total 10,381 sf 0.87 /sf 9,050 Planting import topsoil 100 cy ,000 fine grading 2,700 sf soil amendments 2,700 sf ,215 seeding rough seed, swales & buffer areas 2,025 sf planting planting / ground cover / mulch 675 sf ,688 allow 25% of area swale / storm water planting sf w/ storm drainage allowance below trees canopy trees, 3" cal. 4 ea ,600 establishment maintenance 1 sum 2, ,000 Sub-total 10,381 sf 0.96 /sf 10,016 SUB-TOTAL 32 EXTERIOR IMPROVEMENTS 9.90 /sf $102, UTILITIES Water Utilities 6" di pipe 400 lf ,000 6" fittings / bends 4 ea ,460 gate valve 1 ea 1, ,850 ddc / bf / vault. cv 1 sum 15, ,000 fire dept. connection 1 sum 1, ,800 meter & vault 1 sum 5, ,000 hydrant assemblies 0 ea NIC, verify thrust blocks 6 ea tie-in 1 sum 2, ,000 Sub-total 10,381 sf 5.28 /sf 54,860 Sanitary Sewerage Utilities 6" pvc pipe 400 lf ,000 precast manholes 2 ea 3, ,000 connection to existing 1 sum 2, ,000 cleanouts 2 ea ,200 Sub-total 10,381 sf 2.72 /sf 28,200 Storm Drainage Utilities foundation drainage perimeter foundation drain pipe 416 lf ,992 site drainage systems 22,843 sf ,529 allowance Sub-total 10,381 sf 7.08 /sf 73,521 Natural Gas Distribution natural gas 400 lf ,000 e & b only, pipe by utility, verify Sub-total 10,381 sf 1.16 /sf 12,000 Electrical Utilities service 400 lf ,000 site lighting 1 sum 15, ,000 allowance Sub-total 10,381 sf 3.56 /sf 37,000 SUB-TOTAL 33 UTILITIES /sf $205,581 Option C Estimate - Page 36

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643 11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated DMI Database CCF5IF9HGLPD-QB (4,88) $14,775.00 CSI Section 05400 DMI Light Gage Structural Steel Framing Systems Angle Framing Bridging Channel Flat Strapping Furring Clip Angle Soffit/Fascia/Deck Framing

More information

Everett McKinley Dirksen Elementary School

Everett McKinley Dirksen Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620 W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608 W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

George Washington Elementary School 3611 E 114th St Chicago, IL 60617 3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up

More information

North Lawndale College Prep Charter - Collins

North Lawndale College Prep Charter - Collins Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

Jackie Robinson Elementary School

Jackie Robinson Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

Langston Hughes Elementary School

Langston Hughes Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504 ATTACH TO STRUC- TURE ABOVE 1/8"Ø BOLT W/ LOCKING NUT #12 WIRE TIE IN PLANE EACH TEE ANGLED 45 FROM HORIZ ATTACH 2" FROM INTERSECTION COMPRESSION POST LOCATE WITHIN 2" OF TEE INTERSECTION SIZE STRUTS FOR

More information

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647 3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620 82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

James Shields Middle School 2611 W 48th St Chicago, IL 60632

James Shields Middle School 2611 W 48th St Chicago, IL 60632 2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Architecture, Construction, and Engineering Technical Charter

Architecture, Construction, and Engineering Technical Charter Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft Material Report for plan: Willowdale A Page 1 of 7 SQUARE FOOTAGE TOTAL Area 1692 sqft EXCAVATION & FOUNDATION EXCAVATION & BACKFILL Conc. Footing (volume) 5 m³ 122.50 612.50 Conc. Footing (length) 6"x20"

More information

Walt Disney Magnet Elementary School

Walt Disney Magnet Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623 3 W 3st St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX INDEX OF SHEETS SHT. DWG. SHEET TITLE GENERAL 1 G1 COVER SHEET, VICINITY MAP, PROJECT DESCRIPTION 43 A402 INTERIOR ELEVATIONS WOMENS 44 A403 INTERIOR ELEVATIONS MENS 45 A404 INTERIOR ELEVATIONS BUILDING-PLUMBING

More information

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the

More information

Wendell Smith Elementary School

Wendell Smith Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612 33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617 S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

A. It is preferred that all submittals to be submitted electronically in PDF format.

A. It is preferred that all submittals to be submitted electronically in PDF format. June 20 2013, Rev 00 10 2800 Toilet, Bath, and Laundry Accessories PART 1. GENERAL 1.01 This Section includes: A. Toilet room accessories: 1.02 Submittals 1. Grab bars 2. Metal framed mirrors 3. Sanitary

More information

Grade Level Benchmarks and Components

Grade Level Benchmarks and Components Grade Level Benchmarks (GLB) describe the concepts and skills we want students to know and be able to demonstrate in each grade level and each course. Teachers will assess student academic performance

More information

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Amos Alonzo Stagg Elementary School

Amos Alonzo Stagg Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

DIVISION 6 WOOD AND PLASTICS

DIVISION 6 WOOD AND PLASTICS DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.

More information

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS SECTION 10520: FIRE EXTINGUISHERS AND CABINETS PART 1 GENERAL 1.01 GENERAL REQUIREMENTS: A. This section specifies fire extinguishers, cabinets for fire extinguishers, fire and other accessories. Their

More information

Robert Fulton Elementary School

Robert Fulton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Garneau Elementary School B3123A Edmonton Report run on: April 7, 211 4:59 PM Building Name: Address: Location: Building Id: Gross Area

More information

Core Curriculum Carpentry 1 Carpentry 2 Carpentry 3

Core Curriculum Carpentry 1 Carpentry 2 Carpentry 3 A Correlation of Core Curriculum Carpentry 1 Carpentry 3 To the Carpentry II Course Standards and Objectives to the Content Standards Resource Title: Core Curriculum: Introductory Craft Skills, Fifth Edition

More information

University of Chicago Charter - Carter G Woodson

University of Chicago Charter - Carter G Woodson Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition. SECTION 10800 TOILET ROOM ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic Tile. 4. 10170 - Solid Plastic Toilet Partition.

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

James Otis Elementary School 525 N Armour St Chicago, IL 60642

James Otis Elementary School 525 N Armour St Chicago, IL 60642 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

Philip Rogers Elementary School

Philip Rogers Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Sections & Details VOCABULARY

Sections & Details VOCABULARY 1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING

More information

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board

More information

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"

More information

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1 = 10' - 0 SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD \\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE

More information

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622 2 W Rice St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609 S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622 A.. Pritzker School 2009 W Schiller St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document

More information

WALKS AND SIDEWALKS REQUIREMENTS:

WALKS AND SIDEWALKS REQUIREMENTS: DOUBLE PARKING STALLS DIAGONAL PARKING STALLS EXTERIOR ROUTES OF TRAVEL: From accessible parking spaces, provide most practical direct accessible route of travel to all building entrances and exteriorground

More information

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No. July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project

More information

WALL TO FABRICATED FLOOR

WALL TO FABRICATED FLOOR WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN

More information

Rufus M Hitch Elementary School

Rufus M Hitch Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

George Washington Elementary School

George Washington Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Daniel S Wentworth Elementary School

Daniel S Wentworth Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

REAR FRONT 93' 20' 12' 48' 120' 30' 52' 75' Sample Shopping Center. Unit # 5 +/- 10,920 GLA GROUND FLOOR. Width +/- 105' Depth +/- 120' Site Map

REAR FRONT 93' 20' 12' 48' 120' 30' 52' 75' Sample Shopping Center. Unit # 5 +/- 10,920 GLA GROUND FLOOR. Width +/- 105' Depth +/- 120' Site Map Electrical Information Breaker Panel 1: Service Type: 120/208 Panel Type: LP2 Panel Number: CHH31500 Manufacturer: Cutler Hammer Amps: 150 Location: Back Room Breaker Panel 2: Service Type: 120/208 Panel

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

Property Line. House Type 4. 1,280 sf 6' - 0" 6' - 6" 10' - 0" 6' - 6" 10' - 0" 6' - 0" 6' - 6" 10' - 0" 6' - 6" House Type 5 1,088 sf 5' - 0"

Property Line. House Type 4. 1,280 sf 6' - 0 6' - 6 10' - 0 6' - 6 10' - 0 6' - 0 6' - 6 10' - 0 6' - 6 House Type 5 1,088 sf 5' - 0 COMMON WORK ARCHITECT, PLLC 0 0 90 / COMMONWORK.ARCHI Property Line House Type,80 sf House Type,80 sf 6' - 6" 6' - 6" 8' - 0" 6' - 6" OHE OHE Building not in project scope 7' - 0" ' - 0" 8' - 0" House

More information

Andrew Carnegie Elementary School

Andrew Carnegie Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623 3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

John F Kennedy High School

John F Kennedy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners

More information

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653 33 S Wabash Ave Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629 3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

Disney II Magnet School

Disney II Magnet School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

***************************************************************************************************************

*************************************************************************************************************** 10800 TOILET ROOM ACCESSORIES SPECIFIER: CSI MasterFormat 2004 number 10 28 13 PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic

More information

Jonathan Burr Elementary School

Jonathan Burr Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

George Washington High School

George Washington High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Morton School of Excellence

Morton School of Excellence Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641 Kilbourn Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Charles N Holden Elementary School

Charles N Holden Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information