1 STAFFORD CONSULTANTS INCORPORATED Engineering, Design, and Consulting Planning and Environmental Services To: Armstrong Utilities Chojnacki Construction CI Thornburg Cooks Excavating Contractor s Association of WV Cowgirl Up Eastern Tank Utility Services Famco, Inc. Ferguson Water Works Fields Excavating F.W. Dodge Gold Diggers, Inc. Green River Group, LLC. HSC J.F. Allen Co. HD Supply Upton Construction Co. W.C. Weil From: Edward L. Shutt, P Date: March 27, 2014 File: RE: City of Summersville, Glade Creek Phase llb Contract Nos 4 and 5 MEMORANDUM i Little Mountain Pipeline Main Street Builders Marbo Construction Co. MEC Construction, Inc. Mike Enyart &Sons, Inc. Mendon Pipeline, Inc. Orders Construction Co., Inc. Precisions Pump & Valve Service Pipe Plus, Inc. Pro Contracting, Inc. Reed Construction Data Rover Construction, Inc. Swope Construction Co., Inc. Tri-State Pipeline, Inc. Trombold Equipment Underground Contractors, Inc. Welding, Inc. West Virginia Pipeline, Inc. Your attention is directed to an opportunity to bid on the City of Summersville Glade Creek Phase IIB. Enclosed is the Advertisement for Bids. The Mandatory pre-bid conference is May 1, 2014 at 1O:OO AM at the City Hall with the bid opening being May 14, 2014 at 1:30 at the City Hall. If you would like to purchase a set of Plans and Specifications please remit a check in the amount of $ to Stafford Consultants, Inc. The Plans and Specifications will be sent via UPS so be sure to include a physical address. Only one set of documents will be issued. Plans/specifications will be available on April 8, If you have any questions, please let me know. E LS/e r b 1105 Mercer Street Post Omce Box 5849 Princeton, West Virginia Telephone (304) Fax (304)

2 STAFFORD # Enclosure cc: w/encl: Robert Shafer James Corbitt John Tuggle, P.E. David Jenkins Greg Tucker Alice King Jim Ellars, P.E. Public Service Commission John Stafford, P.E. Kelly Workman Katy Mallory, P.E. John Stump

3 ADVERTISEMENT FOR BIDS OWNER: City of Summersville 400 North Broad Street P.O. Box 525 Summersville, West Virginia ENGINEER: Stafford Consultants, Inc Mercer Street P.O. Box 5849 Princeton, West Virginia Separate sealed BIDS for the construction of CONTRACT NO. 4-AML Non-Eligible: will consist of approximately 609 L.F. of 8- inch potable waterline, 20,170 L.F. of 6-inch potable waterline, 2,615 L.F. of 2-inch potable waterline, valves, hydrants, air release and vacuum valves, service lines, meter settings, and all appurtenances; CONTRACT NO. SB-Non-AML Eligible: will consist of approximately 10,928 L.F. of 10-inch potable waterline, 15,697 L.F. of 8-inch potable waterline, 2,598 L.F. of 6-inch potable waterline, 1,460 L.F. of 2-inch potable waterline, valves, hydrants, air release and vacuum valves, service lines, meter settings and all appurtenances; will be received by City of Summersville at the office of the City of Summersville, Summersville, West Virginia until 1:30 p.m., (local prevailing time) May 14,, 2014 and then at said office publicly opened and read aloud. The BIDDING DOCUMENTS may be examined at the following locations: Stafford Consultants, Inc. Contractors Association of WV F.W. Dodge Co. Plan Room /2 Mercer Street 2114 Kanawha Boulevard, East 3315 Central Avenue P.O. Box 5849 Charleston, WV Hot Springs, AR Princeton, WV City of Summersvllle 400 North Broad Street Summersville, WV Copies of t,e BIDDING DOCUMENTS may be obtainec, at the office o Stafforl 1 Consultants, Inc., located at /2 Mercer Street, P.O. Box 5849, Princeton, West Virginia upon payment of $ for a complete set. Any BIDDER or NON-BIDDER, upon returning the BIDDING DOCUMENTS within ten (10) days of BID opening and in good condition, will be refunded $ Notice is hereby given that the City of Summersville has adopted goals for minority and female participation in the project work force. These goals are as follows: I Addendum No. 1 I

4 Female Participation: Minority Participation: 6.9 percent 2.5 percent A mandatory pre-bid conference will be held on May 1,2014 at l0:oo a.m. (LPT) at the office of the City of Summersville, Summersville, West Virginia. Following the conference, a field review of the project will be held for all interested contractors. A Bid Bond executed by the Bidder and Bidders surety company approved by the Grantee, Nicholas County, West Virginia in the amount equal to five percent (5%) of the Bid, shall be submitted with each Bid, to guarantee the Bidder s entrance into a Contract, if given the award, No Bid Bond shall be waived or returned because the Bidder failed to or cannot comply with any requirements as set forth in Plan, Specifications, or any applicable statues of the United States, the State of West Virginia and/or local ordinances. No BIDDER may withdraw their bid for a period of ninety (90) days after the time of the opening of the Bids. All BIDDERS must hold a current West Virginia Contractor s License on the date of bid opening. BIDDERS on this work will be required to comply with the President s Executive Order No entitled Equal Employment Opportunity as amended by Executive Order and HUD Section 109 which prohibits discrimination in employment regarding race, creed, color, sex or national origin. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C u (Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing. The parties of this contract agree to comply with HUD s regulations in 24 CFR Part 135, which implement Section 3. Bidders attention is directed to the Section 3 Clause set forth in the contract documents. BIDDERS must comply with the requirements for Affirmative Action and Minority Business Enterprises participation as described in the Federal Specifications insert to the Contract Documents. Special provision will be made by the BIDDER to show what portions of the BID within each Division are supported by Minority Business Enterprise work. In addition, BIDDERS may obtain, upon request, information concerning local MBE fms. BIDDERS must comply with Title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, the Contract Work Hours and Safety Standards Act, and the West Virginia Division of Labor Wages for Construction of Public Improvements pursuant to West Virginia Code $21-5A-3 and the West Virginia Jobs Act (West Virginia 521-1C-1)

5 Any Contractor submitting a Bid on this project hereby certifies, indicates and acknowledges that he/she has a license and meets all the qualifications required by the statutes of the State and subdivision in which the work is to be performed. The OWNER reserves the right to reject any or all BIDS and to waive any informalities therein. For the purpose of clarification, it is understood that the work to be done is being financed in whole or in part by funding through the West Virginia Development Office, Small Cities Block Grant program and funding through the West Virginia Infrastructure and Jobs Development Council. Date City of Summersville

ENTER INTO CONTRACT WITH JOHN R JURGENSEN FOR FY2012 SOUTH LEBANON MASON-MORROW-MILLGROVE ROAD CDBG PHASE II PROJECT

ENTER INTO CONTRACT WITH JOHN R JURGENSEN FOR FY2012 SOUTH LEBANON MASON-MORROW-MILLGROVE ROAD CDBG PHASE II PROJECT ENTER INTO CONTRACT WITH JOHN R JURGENSEN FOR FY2012 SOUTH LEBANON MASON-MORROW-MILLGROVE ROAD CDBG PHASE II PROJECT WHEREAS, pursuant to Resolution #14-0704, adopted May 13, 2014, this Board approved

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project

More information

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA INVITATION TO BID TOWN OF CARY Cary, North Carolina Sealed bids must be submitted no later than 1:30 p.m. on October 1, 2018 to the Town of Cary at the office of the Transportation and Facilities Department],

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

SECTION - II BID DATA SHEET

SECTION - II BID DATA SHEET SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or

More information

BOARD OF COUNTY COMMISSIONERS WARREN COUNTY, OHIO 406 Justice Drive, Lebanon, Ohio warren.oh.

BOARD OF COUNTY COMMISSIONERS WARREN COUNTY, OHIO 406 Justice Drive, Lebanon, Ohio warren.oh. BOARD OF COUNTY COMMISSIONERS WARREN COUNTY, OHIO 406 Justice Drive, Lebanon, Ohio 45036 www.co.warren.oh.us commissioners@co. warren.oh.us Telephone (513) 695-1250 (513) 261-1250 (513) 925-1250 (513)

More information

ADDENDUM # 01. Date: March 16, District- Wide Grease Trap Pumping Services. RFQ Number:

ADDENDUM # 01. Date: March 16, District- Wide Grease Trap Pumping Services. RFQ Number: ADDENDUM # 01 Date: March 16, 2017 Reference: District- Wide Grease Trap Pumping Services RFQ Number: 117-22-3-29 The following questions were submitted for clarification and/or to request additional information.

More information

10930 W. Sam Houston Parkway N., Suite 900

10930 W. Sam Houston Parkway N., Suite 900 ADDENDUM NO. 1 10930 W Sam Houston Pkwy. North Suite 900 Houston, Texas 77064 281.664.1900 281.664.1912 (f) www.salasobrien.com March 21, 2018 Project: Prepared by: Taylor Career Center Welding Labs Beaumont

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A

More information

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM PATTERSON AVENUE 101 Mobilization, Bonds, Insurance LS 1 $40,000.00 $40,000.00 $22,072.00 $22,072.00 102 18-Inch SDR-26 PVC Sanitary Sewer Line Installation LF 1048 $275.00 $288,200.00 $334.00 $350,032.00

More information

A Bill Regular Session, 2017 HOUSE BILL 1926

A Bill Regular Session, 2017 HOUSE BILL 1926 Stricken language would be deleted from and underlined language would be added to present law. 0 0 0 State of Arkansas st General Assembly As Engrossed: H// A Bill Regular Session, 0 HOUSE BILL By: Representative

More information

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16

More information

PINELLAS COUNTY CONSTRUCTION LICENSING BOARD

PINELLAS COUNTY CONSTRUCTION LICENSING BOARD PINELLAS COUNTY CONSTRUCTION LICENSING BOARD ALL FEES ARE NONREFUNDABLE TO: APPLICANTS FOR JOURNEYMAN EXAMINATION REF: CHAPTER 75-489, LAWS OF FLORIDA Each applicant must complete the attached application

More information

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced To: Prospective Vendor(s) Date: October 25, 2016 Subject: Solicitation Number: DHSMV-RFI-007-16 Cameras and Related Accessories Addendum No. 1 The enclosed information is provided for consideration in

More information

P.S.C. NO. 3 ELECTRICITY LEAF: 190 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 2 INITIAL EFFECTIVE DATE: August 1, 2017 SUPERSEDING REVISION: 1

P.S.C. NO. 3 ELECTRICITY LEAF: 190 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 2 INITIAL EFFECTIVE DATE: August 1, 2017 SUPERSEDING REVISION: 1 P.S.C. NO. 3 ELECTRICITY LEAF: 190 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 2 INITIAL EFFECTIVE DATE: August 1, 2017 SUPERSEDING REVISION: 1 14.1 APPLICATION FOR NEW RESIDENTIAL CONSTRUCTION P.S.C.

More information

New York University University Policies

New York University University Policies New York University University Policies Title: Policy on Patents Effective Date: December 12, 1983 Supersedes: Policy on Patents, November 26, 1956 Issuing Authority: Office of the General Counsel Responsible

More information

CITY OF RICE LAKE COUNTY OF ST. LOUIS ORDINANCE NO. 52 AN ORDINANCE REGULATING SMALL CELL WIRELESS FACILITIES IN THE PUBLIC RIGHT-OF-WAY.

CITY OF RICE LAKE COUNTY OF ST. LOUIS ORDINANCE NO. 52 AN ORDINANCE REGULATING SMALL CELL WIRELESS FACILITIES IN THE PUBLIC RIGHT-OF-WAY. CITY OF RICE LAKE COUNTY OF ST. LOUIS ORDINANCE NO. 52 AN ORDINANCE REGULATING SMALL CELL WIRELESS FACILITIES IN THE PUBLIC RIGHT-OF-WAY. The City Council of the City of Rice Lake hereby ordains: Section

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) ) ) ) ) ) PETITION FOR ETC DESIGNATION OF HUGHES NETWORK SYSTEMS, LLC

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) ) ) ) ) ) PETITION FOR ETC DESIGNATION OF HUGHES NETWORK SYSTEMS, LLC Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of Telecommunications Carriers Eligible to Receive Universal Service Support Petition of Hughes Network Systems, LLC for

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box East Shore Road Jamestown, Rhode Island Invitation to Bid Request for Proposals

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box East Shore Road Jamestown, Rhode Island Invitation to Bid Request for Proposals RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box 437 1 East Shore Road Jamestown, Rhode Island 02835-0437 Invitation to Bid Request for Proposals Mototrbo Digital VHF Radio System Solicitation Number:

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

Reading Area Water Authority Board Meeting Thursday September 29, 2016

Reading Area Water Authority Board Meeting Thursday September 29, 2016 1801 Kutztown Road Reading, Pennsylvania 19604 Phone: 610-406-6300 Fax: 610-406-6307 TDD: 610-655-6442 Reading Area Water Authority Board Meeting Thursday September 29, 2016 The Stated Board Meeting of

More information

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site. INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing

More information

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE San Francisco Water Power Sewer CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE Seivices of the San Francisco Public Utilities Commission Signatures: OCEANSIDE WATER

More information

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 May 31, 2017 TO: RE: Prospective Bidders Request for Quotation (RFQ) Copying Services The Greater Dayton Regional Transit Authority

More information

SPECIFICATIONS PROPOSAL & BID DOCUMENT

SPECIFICATIONS PROPOSAL & BID DOCUMENT Cerro Gordo County Department of Public Health LEAD-BASED PAINT HAZARD CONTROL PROGRAM IALHB0628-16 SPECIFICATIONS PROPOSAL & BID DOCUMENT Property: 13 N Monroe Tenant s Relocating: Yes No Lead Based Paint

More information

LIMITED LICENSE QUALIFICATION APPLICATION

LIMITED LICENSE QUALIFICATION APPLICATION Minnesota Department of Health Well Management Section P.O. Box 64502 St. Paul, Minnesota 55164-0502 651-201-4597 or 800-383-9808 www.health.state.mn.us/divs/eh/wells Protecting, maintaining and improving

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

[Investment Company Act Release No ; ] New Mountain Finance Corporation, et al.; Notice of Application

[Investment Company Act Release No ; ] New Mountain Finance Corporation, et al.; Notice of Application This document is scheduled to be published in the Federal Register on 10/17/2014 and available online at http://federalregister.gov/a/2014-24685, and on FDsys.gov SECURITIES AND EXCHANGE COMMISSION [Investment

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

VINTAGE ORIGINAL ART MURAL REGISTRATION PROCESS

VINTAGE ORIGINAL ART MURAL REGISTRATION PROCESS VINTAGE ORIGINAL ART MURAL REGISTRATION PROCESS VAM Applicant wants to register a mural created before October 12, 2013 as a Vintage Original Art Mural Contact DCA Mural exists in database Mural is NOT

More information

CLARK COUNTY FIRE CODE AMENDMENTS

CLARK COUNTY FIRE CODE AMENDMENTS CLARK COUNTY FIRE CODE AMENDMENTS SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM is amended to read as follows: SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM 510.1 Emergency responder radio

More information

LEBANON BOARD OF EDUCATION, LEBANON, CONNECTICUT REQUEST FOR PROPOSALS FOR LYMAN MEMORIAL HIGH SCHOOL BOYS LOCKER ROOM 2/24/2017

LEBANON BOARD OF EDUCATION, LEBANON, CONNECTICUT REQUEST FOR PROPOSALS FOR LYMAN MEMORIAL HIGH SCHOOL BOYS LOCKER ROOM 2/24/2017 LEBANON BOARD OF EDUCATION, LEBANON, CONNECTICUT REQUEST FOR PROPOSALS FOR LYMAN MEMORIAL HIGH SCHOOL BOYS LOCKER ROOM 2/24/2017 The Lebanon Board of Education invites sealed proposals for replacement

More information

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017 Project No. 6040.0, Contract No. E7-09 SECTION 0090 ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. JULY 2, 207 This Addendum No. ( Addendum ) as dated above modifies certain

More information

REQUEST FOR QUOTATION INVITATION

REQUEST FOR QUOTATION INVITATION REQUEST FOR QUOTATION INVITATION DATE: July 15, 2010 DPS: REQUIREMENT: SUBJECT: Patricia Farina DPS Contract Administrator Email: Patricia.Farina@cityofchicago.org Telephone: 312-744-7660 Silver Halide

More information

P.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint)

P.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint) P.L., CHAPTER, approved October, Assembly, No. 0 (First Reprint) 0 0 0 AN ACT concerning the approval and filing of maps and amending P.L.0, c.. BE IT ENACTED by the Senate and General Assembly of the

More information

Request for Quotation (RFQ)

Request for Quotation (RFQ) Request for Quotation (RFQ) Independent Joint Anti-Corruption Monitoring and Evaluation Committee (MEC) invite Security Companies / Logistic Companies to provide their quotation for the following security

More information

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and J Tomorrow. CITY COUNCIL AGENDA REPORT ITEM NO. 6.C.3 Meeting Date: January 13, 2015 Department:

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

VIA HAND DELIVERY. Re: Joshua S. Foster v. Appalachian Power Company P.S.C. Case No E-C. Dear Ms. Ferrell: July 17,2015

VIA HAND DELIVERY. Re: Joshua S. Foster v. Appalachian Power Company P.S.C. Case No E-C. Dear Ms. Ferrell: July 17,2015 A unit OfAmerican Electric Power Appalachian Power 20 Box 198G Charlesrw Vfll 25327 Appalachiani'oww cam July 17,2015 VIA HAND DELIVERY Ingrid Ferrell Executive Secretary Public Service Commission of West

More information

Geothermal Conversion - North Distribution Utilities Pkg. 2 Ball State University, Muncie IN

Geothermal Conversion - North Distribution Utilities Pkg. 2 Ball State University, Muncie IN A D D E N D U M # 1 Geothermal Conversion - North Distribution Utilities Pkg. 2 Ball State University, Muncie IN BSU Project Number: 2011-06.01 XU MEP Associates Project Number: B20.09.01-02 Addendum #1

More information

CHAPTER ONE: ORGANIZATION, FUNCTIONS, AND GENERAL PROVISIONS. Subchapter 1.01: General

CHAPTER ONE: ORGANIZATION, FUNCTIONS, AND GENERAL PROVISIONS. Subchapter 1.01: General CHAPTER ONE: ORGANIZATION, FUNCTIONS, AND GENERAL PROVISIONS 1.01.010 Title Subchapter 1.01: This code of ordinances of the Town of Colma shall be known as the Town of Colma Municipal Code. [History: formerly

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

SAMPLE. This document is presented for guidance only and does not completely state either Oklahoma law or OCC regulations.

SAMPLE. This document is presented for guidance only and does not completely state either Oklahoma law or OCC regulations. BEFORE THE STATE OF OKLAHOMA CORPORATION COMMISSION In the Matter of the Application of [Company ) Name] for a Certificate of Convenience ) and Necessity To Provide Local Exchange ) Services Within the

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June

More information

Costa Mesa California

Costa Mesa California Costa Mesa California Section 1. Title 5 of the Costa Mesa Municipal Code entitled Building and Structures, is hereby amended to add Chapter IX, entitled INBUILDING PUBLIC SAFETY RADIO SYSTEM COVERAGE

More information

Intellectual Property

Intellectual Property Tennessee Technological University Policy No. 732 Intellectual Property Effective Date: July 1January 1, 20198 Formatted: Highlight Formatted: Highlight Formatted: Highlight Policy No.: 732 Policy Name:

More information

Position Paper.

Position Paper. Position Paper Brussels, 30 September 2010 ORGALIME OPINION ON THE POSITION OF THE COUNCIL AT FIRST READING WITH A VIEW TO THE ADOPTION OF A REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL LAYING

More information

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue TERRY R. CLARK Chairman BARBARA JELKS District 1 Commissioner CHRIS HUNNICUTT District 2 Commissioner MARC DEMOTT District 3 Commissioner

More information

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846 PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y Proposal P.O. Box 846 Baker, MT 59313 P R E C A S T R E I N F O R C E D C O N C R E T E B O X C U L V E R T F O R W E S T M O

More information

STATE OF NORTH CAROLINA

STATE OF NORTH CAROLINA STATE OF NORTH CAROLINA INVESTIGATIVE REPORT ELIZABETH CITY STATE UNIVERSITY ELIZABETH CITY, NORTH CAROLINA MARCH 2010 OFFICE OF THE STATE AUDITOR BETH A. WOOD, CPA STATE AUDITOR INVESTIGATIVE REPORT ELIZABETH

More information

RANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile

RANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile 1 RANDY SCHMELING INSPECTIONS 10884 HARDER ROAD THREE RIVERS, MI 49093 Home 269-244-5184 Mobile 269-625-3260 Before a permit may be issued, ALL of the following documentation must be submitted or justified

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

2045 FAMPO Constrained Long Range Transportation Equity Analysis

2045 FAMPO Constrained Long Range Transportation Equity Analysis 2045 FAMPO Constrained Long Range Transportation Equity Analysis Table of Contents Title VI Nondiscrimination Statement... 2 I. A Brief History of Environmental Justice... 3 II. Methodology... 4 III. Results...

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1051 - REVISED: 2009 Individual and Branch Type Air Admittance Valves MANUFACTURER: CONTACT PERSON: E-MAIL: ADDRESS:

More information

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ) ) ) ) ) ) ) ) ) ) ) ) ) ) AMENDED APPLICATION

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ) ) ) ) ) ) ) ) ) ) ) ) ) ) AMENDED APPLICATION BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF NOBLE ENERGY, INC. FOR AN ORDER ESTABLISHING AN APPROXIMATE 640 ACRE EXPLORATORY DRILLING UNIT

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

Re: Ruby Pipeline Project; Docket No. CP ; Response to Comments from Mr. Randy Largent, Landman for Newmont Mining Corporation

Re: Ruby Pipeline Project; Docket No. CP ; Response to Comments from Mr. Randy Largent, Landman for Newmont Mining Corporation March 1, 2010 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Ruby Pipeline Project; Docket No. CP09-54-000;

More information

Solicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project.

Solicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project. Date: June 30, 2017 Project: Ketchikan Shipyard Transfer Carts Solicitation No.: 18002 Addendum No. One TO ALL PLANHOLDERS: The enclosed addendum amends the proposal documents for the above referenced

More information

Temporary Sign Permit

Temporary Sign Permit 36725 Division Road, P.O. Box 457, Richmond, MI 48062 Building and Planning Department 586-727-7571 ext. 228 586-727-2489 Fax Temporary Sign Permit Application and Regulations Page 1 Updated: 15OCT15 Temporary

More information

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time) ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation

More information

WGA LOW BUDGET AGREEMENT

WGA LOW BUDGET AGREEMENT WGA LOW BUDGET AGREEMENT ( Company ) has read the Writers Guild of America ( WGA ) Low Budget Agreement (the Low Budget Agreement ). Company desires to produce (the Picture ) under the Low Budget Agreement.

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

42296 Federal Register / Vol. 68, No. 137 / Thursday, July 17, 2003 / Rules and Regulations

42296 Federal Register / Vol. 68, No. 137 / Thursday, July 17, 2003 / Rules and Regulations 42296 Federal Register / Vol. 68, No. 137 / Thursday, July 17, 2003 / Rules and Regulations FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 90 [WT Docket No. 99 87; RM 9332; FCC 03 34] Implementation of

More information

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:

More information

Appendix P Contact Information

Appendix P Contact Information Appendix P Contact Information Conservation Districts Capitol Conservation District 418 Goff Mountain Road, Suite 102 Cross Lanes, WV 25313 Phone: (304) 759-0736 Fax: (304) 776-5326 Eastern Panhandle Conservation

More information

ITEM No.7- E MOTION. August 28, 2013ak

ITEM No.7- E MOTION. August 28, 2013ak ITEM No.7- E MOTION I MOVE that the matter of the Continued Consideration of Categorical Exemption, Planning and Land Use Management Committee Report and Ordinance First Consideration relative to the creation

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

City of Keizer Floodplain/Greenway Development Application

City of Keizer Floodplain/Greenway Development Application City of Keizer Floodplain/Greenway Development Application If there are any questions about this application, who should be contacted (Agent)? Name: Address: Daytime Phone Number(s): Fax: Email: 1. Applicant

More information

Provided by: Radio Systems, Inc. 601 Heron Drive Bridgeport, NJ

Provided by: Radio Systems, Inc. 601 Heron Drive Bridgeport, NJ Provided by: Radio Systems, Inc. 601 Heron Drive Bridgeport, NJ 08014 856-467-8000 www.radiosystems.com Before the Federal Communications Commission Washington, DC 20554 GEN Docket No. 87-839 In the Matter

More information

WHEREAS, the City of (the City ) is an Illinois municipality in. accordance with the Constitution of the State of Illinois of 1970; and,

WHEREAS, the City of (the City ) is an Illinois municipality in. accordance with the Constitution of the State of Illinois of 1970; and, SMALL CELL ANTENNA/TOWER RIGHT-OF-WAY SITING ORDINANCE WHEREAS, the City of (the City ) is an Illinois municipality in accordance with the Constitution of the State of Illinois of 1970; and, WHEREAS, the

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

(Full legal name of business submitting the offer)

(Full legal name of business submitting the offer) Procurement Services Addendum # 1 Proposal Request Date Printed Date Issued Procurement Officer Phone E-Mail Address 18-CMG-B-012 April 16, 2018 April 16, 2018 Raymond Jenkins 843-566-8826 raymond_jenkins@

More information

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip: Central Lyon County Fire Protection District 246 Dayton Valley Rd Suite 106 Dayton, NV 89403 Rich Harvey, Chief Office (775) 246-6209, Fax (775)246-6204 TTY 7-1-1 APPLICATION FOR COMMERCIAL CONSTRUCTION

More information

(Y Roadway Production Division

(Y Roadway Production Division PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, FL 33416-1229 (561) 684-4000 FAX: (561) 684-4050 www.pbcgov.com Palm Beach

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

Invitation for Bids Amendment #1

Invitation for Bids Amendment #1 Invitation for Bids Amendment #1 DESCRIPTION: Interior Door Hardware Replacement Solicitation: Date Issued: Procurement Officer: Phone: E-Mail Address: Mailing Address: USING GOVERNMENTAL UNIT: SPARTANBURG

More information

conform the Commission s rule to changes adopted by the Multi-State Lottery Association

conform the Commission s rule to changes adopted by the Multi-State Lottery Association The Texas Lottery Commission (Commission) proposes amendments to 16 TAC 401.317 Powerball On-Line Game Rule. The purpose of the proposed amendments is to conform the Commission s rule to changes adopted

More information

BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT

BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT February 04, 2016 BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT The Bid Documents that are included as part of the above bid package include the following: 1). Instructions to bidders

More information

Union Station Tunnel Overall DBE Goal Calculation

Union Station Tunnel Overall DBE Goal Calculation Bi-State Development Agency of the Missouri-Illinois Metropolitan District Union Station Tunnel Overall DBE Goal Calculation Federal Transit Administration Prepared by: Francoise Lyles-Wiggins Bi-State

More information

1 SB By Senator Sanford. 4 RFD: Tourism and Marketing. 5 First Read: 20-FEB-18. Page 0

1 SB By Senator Sanford. 4 RFD: Tourism and Marketing. 5 First Read: 20-FEB-18. Page 0 1 SB325 2 191811-1 3 By Senator Sanford 4 RFD: Tourism and Marketing 5 First Read: 20-FEB-18 Page 0 1 191811-1:n:02/20/2018:AHP/tj LSA2018-837 2 3 4 5 6 7 8 SYNOPSIS: Under existing law, there are no regulations

More information

380 SERIES REPAIR PARTS INDEX. NOTE! Read and understand the pump and motor instructions before attempting to install, disassemble or repair the pump.

380 SERIES REPAIR PARTS INDEX. NOTE! Read and understand the pump and motor instructions before attempting to install, disassemble or repair the pump. 380 SERIES REPAIR PARTS INDEX NOTE! Read and understand the pump and motor instructions before attempting to install, disassemble or repair the pump. Part # A-03-222 2014 Pentair Ltd. 07/31/14 SECTION

More information

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax: 135 N. Main, P.O. Box 118 Capac, MI 48014 Phone: 810-395-4915 Fax: 810-395-7182 www.musseytownship.org Building Administrator: Cindy Zehnder Mussey Township: 810-395-4915 Building Inspector: James Newberry

More information

SUPERVISORS MEETING, WEDNESDAY, JULY 20, 2016 PAGE 1

SUPERVISORS MEETING, WEDNESDAY, JULY 20, 2016 PAGE 1 SUPERVISORS MEETING, WEDNESDAY, JULY 20, 2016 PAGE 1 Phillip Kline, Chairperson of the Board, called the meeting of the Alsace Township Board of Supervisors to order. Present were Phillip Kline, Michael

More information

ADDENDUM D COMERICA WEB INVOICING TERMS AND CONDITIONS

ADDENDUM D COMERICA WEB INVOICING TERMS AND CONDITIONS Effective 08/15/2013 ADDENDUM D COMERICA WEB INVOICING TERMS AND CONDITIONS This Addendum D is incorporated by this reference into the Comerica Web Banking Terms and Conditions ( Terms ). Capitalized terms

More information

PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT. January 8, 2018

PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT. January 8, 2018 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, FL 33416-1229 (561) 684-4000 FAX: (561) 684-4050 www.pbcgov.com DATE: TO: FROM: PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

pill Los Angeles World Airports

pill Los Angeles World Airports C Y, pill Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT.l COMMISSIONERS Meeting Date: '_`. _. _.. Dominic Nessi, Chief Information Officer 8/20/2015 h Steve Martin, Chief Operating Office CAO

More information

I. MINUTES OF THE PRE-BID CONFERENCE

I. MINUTES OF THE PRE-BID CONFERENCE Addendum No. 1 June 8, 018 Allegany College of Maryland Softball Field Murphy & Dittenhafer Project No. 17118 1401 Willowbrook Road, Cumberland, MD 150 Abbreviations: ACM: Allegany College of Maryland,

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information