1 March 1, 2010 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Ruby Pipeline Project; Docket No. CP ; Response to Comments from Mr. Randy Largent, Landman for Newmont Mining Corporation Ruby Pipeline, L.L.C. ("Ruby") is filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP a response to comments filed by Mr. Randy Largent, Landman for the Newmont Mining Corporation ( Newmont ), concerning the Ruby Pipeline Project ("Project"). Description of Proceeding On January 27, 2009, Ruby filed its application, pursuant to Section 7(c) of the Natural Gas Act, requesting (i) a certificate of public convenience and necessity authorizing the construction, ownership, and operation of new interstate natural gas pipeline facilities; (ii) a blanket certificate of public convenience and necessity authorizing Ruby to provide open-access transportation services with pre-granted abandonment approval; and (iii) a blanket certificate of public convenience and necessity to construct, operate and/or abandon certain eligible facilities, and services related thereto. The Project would be comprised of approximately 675 miles of 42-inch-diameter, high pressure natural gas pipeline linking production areas in the Rocky Mountain region to demand regions in northern California, Nevada, and the Pacific Northwest. The pipeline project being proposed will be referred to as the "Ruby Pipeline Project" or "Project."

2 Federal Energy Regulatory Commission -2- March 1, 2010 Description of Information Being Filed On February 9, 2010, Mr. Randy Largent filed comments in this proceeding expressing concerns about the construction of the Ruby Pipeline Project along the currently proposed route. Mr. Largent was concerned that a modification to a segment of Ruby's originally proposed route had resulted in the proposed pipeline route being in close proximity to an active mine site. Second, Ruby's proposed route was crossing Newmont's unpatented claims that are located adjacent to Newmont s Midas mine. 1 The referenced segment (between approximately Mileposts and 383.4) of proposed route is located within the Willow Creek Route Alternative which Ruby adopted in September 2009, largely at the request of the Bureau of Land Management ("BLM") and Nevada Department of Wildlife. Ruby strives to be proactive in coordinating its stakeholder outreach activities in a manner that keeps all interested parties to potential rights-of-way matters informed and involved. In this regard, Ruby regrets that its communication efforts with Newmont were not better on this matter; Ruby was simply unaware of Newmont's unpatented mining claim interest in that portion of the Willow Creek Route Alternative. Immediately after Newmont s comments were brought to Ruby s attention, Ruby and Newmont representatives met to identify and confirm the areas of concern. Ruby also met with BLM Staff at the Elko, Nevada BLM office to review these concerns. The BLM advised Ruby that Newmont does have an active unpatented mining claim in the area, with an approved Plan of Operation for exploration only. 2 Furthermore, the BLM clarified that if or when Newmont seeks authorization to mine the area, Newmont will need to file a new Plan of Operation. This new plan would need BLM s review and approval. It is Ruby's understanding that the Midas Mine, as currently authorized by the BLM, would not be affected by Ruby's proposed alignment. Ruby coordinated a meeting on February 22, 2010 with BLM and Newmont to discuss resource concerns and to seek input on possible routing options to minimize potential resource impacts. Ruby is collaborating with Newmont, Barrick Goldstrike Mine (an adjacent private landowner) and the BLM to resolve Newmont's concerns. Ruby, Newmont and BLM have agreed to review different options based on the following: 1 2 For ease of reference, Ruby is attaching a copy of Mr. Largent's comments. If Newmont were to develop any new surface mine in this area, these activities would likely affect Elko County s Midas Tuscarora Road. Note that Ruby s Willow Creek Route Alternative primarily parallels the Midas Tuscarora Road and also is collocated within portions of the abandoned AT&T s coaxial cable right-of-way.

3 Federal Energy Regulatory Commission -3- March 1, 2010 BLM will determine the respective rights of the parties. Specifically, BLM will ascertain whether a right-of-way grant to Ruby would be subject to the unpatented mining claims or whether the mining claims would be subordinate to valid right-of-way grants. Newmont will review its on hand geological information to determine gold trends in the area and possible areas for future mining. Ruby will review avoidance variations and review with Barrick, the private landowner most likely to be affected. o BLM will review the route variations currently under discussion to determine potential resource impacts. Ruby will continue to work with the BLM and Newmont to resolve routing issues and anticipates meeting with all of the interested parties in March Should Ruby, the BLM and Newmont agree to a pipeline reroute in this area that adequately addresses and satisfies all of the parties concerns, Ruby will seek the appropriate Commission, BLM, and landowner approvals to modify its proposed route as part of the post-certification normal variance request process. Filing Information Ruby is efiling this document with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM Ruby is also providing an electronic copy of this filing to the Commission's Office of Energy Projects. Respectfully submitted, RUBY PIPELINE, L.L.C. Enclosures cc: David Swearingen, OEP

4 Certificate of Service I hereby certify that I have this day caused a copy of the letter to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section of the Federal Energy Regulatory Commission's Rules of Practice and Procedures. Dated at Colorado Springs, Colorado as of this 1 st day of March P.O. Box 1087 Colorado Springs, Colorado (719)

5 FERC PDF (Unofficial) 2/9/2010 1:34:32 PM Regarding the Ruby Pipeline, Nevada: On February 4, 2010, I received a call from BLM that informed me that Ruby Pipeline alignment was just.8 miles from a Newmont active mine site. I immediately checked Rubyâ s website and printed the version of Rubyâ s alignment dated 1/23/09. Later I talked to a Ruby representative about this change and he informed me of a modification in which crosses the Newmont mining unpatented claims very close to Midas mine. Ruby had agreed prior that Newmont would be notified promptly of such alignment changes. Ruby failed to do so. The 1/23/09 alignment was satisfactory to Newmont, but a later version of was not posted on the internet and could cause problems with Newmontâ s current geologic or engineering plans. Thank you, Randy Largent Landman, Newmont Mining Corporation 1655 Mountain City Hwy Elko, Nevada 89801

6 FERC PDF (Unofficial) 2/9/2010 1:34:32 PM Document Content(s) 5044.TXT...1-1

September 21, Docket No. ER

September 21, Docket No. ER California Independent System Operator Corporation September 21, 2017 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

August 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

August 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 August 6, 2010 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 ANR Pipeline Company 717 Texas Street, Suite 2400 Houston, TX 77002-2761 John

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C PETITION FOR RECONSIDERATION

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C PETITION FOR RECONSIDERATION Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of Special Access for Price Cap Local Exchange Carriers AT&T Corporation Petition for Rulemaking to Reform Regulation of

More information

May 30, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme Docket No. RM15-13-_

May 30, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme Docket No. RM15-13-_ May 30, 2018 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to for the Revised Definition of Remedial Action

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC COMMENTS OF AMBIENT CORPORATION

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC COMMENTS OF AMBIENT CORPORATION Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of ) ) Carrier Current Systems, including ) ET Docket No. 03-104 Broadband Over Power Line Systems ) ) Amendment of Part

More information

THE MATTER : BEFORE THE SCHOOL

THE MATTER : BEFORE THE SCHOOL : IN THE MATTER : BEFORE THE SCHOOL : ETHICS COMMISSION OF : : Docket No.: C04-01 JUDY FERRARO, : KEANSBURG BOARD OF EDUCATION : MONMOUTH COUNTY : DECISION : PROCEDURAL HISTORY This matter arises from

More information

View referenced exhibit back-up material. (See Report to the City Council No ) Adoption of a Resolution certifying findings that:

View referenced exhibit back-up material. (See Report to the City Council No ) Adoption of a Resolution certifying findings that: Page 9 ITEM-S701: Hillel of San Diego Student Center, Project No. 149437. An application for a Public Right-of-Way Vacation (portion of La Jolla Scenic Drive North between Torrey Pines Road and La Jolla

More information

VIA HAND DELIVERY. Re: Joshua S. Foster v. Appalachian Power Company P.S.C. Case No E-C. Dear Ms. Ferrell: July 17,2015

VIA HAND DELIVERY. Re: Joshua S. Foster v. Appalachian Power Company P.S.C. Case No E-C. Dear Ms. Ferrell: July 17,2015 A unit OfAmerican Electric Power Appalachian Power 20 Box 198G Charlesrw Vfll 25327 Appalachiani'oww cam July 17,2015 VIA HAND DELIVERY Ingrid Ferrell Executive Secretary Public Service Commission of West

More information

August 25, 2017 VIA ELECTRONIC FILING

August 25, 2017 VIA ELECTRONIC FILING !! August 25, 2017 VIA ELECTRONIC FILING Kirsten Walli, Board Secretary Ontario Energy Board P.O Box 2319 2300 Yonge Street Toronto, Ontario, Canada M4P 1E4 Re: North American Electric Reliability Corporation

More information

August 25, Please contact the undersigned if you have any questions concerning this filing.

August 25, Please contact the undersigned if you have any questions concerning this filing. !! August 25, 2017 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) Amendment of Sections 90.20(d)(34) and 90.265 ) PS Docket No. 13-229 of the Commission s Rules to Facilitate the

More information

DRECP Proposed LUPA and Final EIS RESPONSES TO COMMENTS

DRECP Proposed LUPA and Final EIS RESPONSES TO COMMENTS E115-1 October 2015 E115-2 October 2015 E115-3 October 2015 E115-4 October 2015 E115-5 October 2015 E115-6 October 2015 E115-7 October 2015 E115-8 October 2015 E115-9 October 2015 E115-10 October 2015

More information

129 FERC 61,131 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 284. [Docket No. RM ]

129 FERC 61,131 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 284. [Docket No. RM ] 129 FERC 61,131 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 284 [Docket No. RM96-1-036] Standards for Business Practices for Interstate Natural Gas Pipelines (Issued November

More information

Before the Federal Communications Commission Washington, DC ) ) ) ) ) ) ) ) REPLY COMMENTS OF THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION

Before the Federal Communications Commission Washington, DC ) ) ) ) ) ) ) ) REPLY COMMENTS OF THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION Before the Federal Communications Commission Washington, DC 20554 In the Matter of the Petition of The State of Maryland Request for Waiver to permit operation of Airto-Ground radio equipment on 700 MHz

More information

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires

More information

[LLNVB01000.L EX0000.LVTFF15F6810 MO# ] Notice of Intent to Prepare an Environmental Impact Statement for the Proposed

[LLNVB01000.L EX0000.LVTFF15F6810 MO# ] Notice of Intent to Prepare an Environmental Impact Statement for the Proposed This document is scheduled to be published in the Federal Register on 09/29/2015 and available online at http://federalregister.gov/a/2015-24432, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. ) ) ) ) )

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. ) ) ) ) ) Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. In the Matter of Amendment of Part 90 of the Commission s Rules ) ) ) ) ) WP Docket No. 07-100 To: The Commission COMMENTS OF THE AMERICAN

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of Amendment of Part 90 of the Commission s Rules to Permit Terrestrial Trunked Radio (TETRA WT Docket No. 11-69 Technology

More information

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) ) ORDER. Adopted: June 29, 2010 Released: June 30, 2010

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) ) ORDER. Adopted: June 29, 2010 Released: June 30, 2010 Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of Implementation of Sections 309(j and 337 of the Communications Act of 1934 as Amended Promotion of Spectrum Efficient

More information

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING July 31, 2018 6:00 PM Commissioners Chamber Call to order and Establishment of a Quorum Invocation and Pledge of Allegiance Approval

More information

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) REPLY COMMENTS OF THE UTILITIES TECHNOLOGY COUNCIL

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) REPLY COMMENTS OF THE UTILITIES TECHNOLOGY COUNCIL Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of Wireless Telecommunications Bureau and Office of Engineering and Technology Seek Comment Pursuant to the Spectrum Pipeline

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) Amendment of Part 90 of the Commission s Rules ) to Permit Terrestrial Trunked Radio (TETRA) ) WT Docket No. 11-69

More information

BETWEEN. Her Majesty the Queen in Right of Canada, as represented by the Minister of Fisheries and Oceans AND

BETWEEN. Her Majesty the Queen in Right of Canada, as represented by the Minister of Fisheries and Oceans AND Memorandum of Understanding to advance measures to benefit the recovery of the Southern Resident Killer Whale through Trans Mountain Expansion Project Conditions BETWEEN Her Majesty the Queen in Right

More information

[LLNVW00000.L GN0000.LVEMF X. Notice of Intent to Prepare an Environmental Impact Statement for the Proposed

[LLNVW00000.L GN0000.LVEMF X. Notice of Intent to Prepare an Environmental Impact Statement for the Proposed This document is scheduled to be published in the Federal Register on 03/04/2016 and available online at http://federalregister.gov/a/2016-04806, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

Before the Federal Communications Commission Washington, D.C

Before the Federal Communications Commission Washington, D.C Before the Federal Communications Commission Washington, D.C. 20554 ) Revision of Part 15 of the Commission s Rules to ) Permit Unlicensed National Information ) Infrastructure (U-NII) Devices in the 5

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document January, 2014 This draft reference document is posted for stakeholder comments prior to being finalized to support implementation of the Phase 2 Bulk

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) COMMENTS OF THE SATELLITE INDUSTRY ASSOCIATION

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) COMMENTS OF THE SATELLITE INDUSTRY ASSOCIATION Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of Petition of The Boeing Company for Allocation and Authorization of Additional Spectrum for the Fixed-Satellite Service

More information

Notice of Intent to Collect Fees on Public Land in Alamosa County, Colorado

Notice of Intent to Collect Fees on Public Land in Alamosa County, Colorado This document is scheduled to be published in the Federal Register on 11/28/2011 and available online at http://federalregister.gov/a/2011-30470, and on FDsys.gov 4310-JB DEPARTMENT OF INTERIOR Bureau

More information

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ) ) ) ) ) ) ) ) ) APPLICATION

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ) ) ) ) ) ) ) ) ) APPLICATION BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF NOBLE ENERGY, INC. FOR AN ORDER ESTABLISHING AN APPROXIMATE 640 ACRE DRILLING AND SPACING UNIT

More information

Notice of Proposed Withdrawal Extension, Red Rock Canyon State Park; California. AGENCY: Bureau of Land Management, Department of the Interior.

Notice of Proposed Withdrawal Extension, Red Rock Canyon State Park; California. AGENCY: Bureau of Land Management, Department of the Interior. This document is scheduled to be published in the Federal Register on 03/16/2016 and available online at http://federalregister.gov/a/2016-05911, and on FDsys.gov 4310-40 DEPARTMENT OF THE INTERIOR Bureau

More information

42296 Federal Register / Vol. 68, No. 137 / Thursday, July 17, 2003 / Rules and Regulations

42296 Federal Register / Vol. 68, No. 137 / Thursday, July 17, 2003 / Rules and Regulations 42296 Federal Register / Vol. 68, No. 137 / Thursday, July 17, 2003 / Rules and Regulations FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 90 [WT Docket No. 99 87; RM 9332; FCC 03 34] Implementation of

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION State of California, ex rel. Bill Lockyer, Attorney General of the State of California v. Docket No. EL02-71-057 British Columbia

More information

LCRA TRANSMISSION SERVICES CORPORATION

LCRA TRANSMISSION SERVICES CORPORATION UCRA ENEtGY WATER COMMUNfnf SEEVICES LCRA TRANSMISSION SERVICES CORPORATION April 28, 2016 «FirstName» «LastName» «Suffix» «SecondName» «Address1» «Address2» «Address3» «City», «State» «Zip» RE: Application

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability Corporation ) ) Docket No. PETITION OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION FOR

More information

Board of Health. Notice of Opportunity to Comment on the Amendment of Provisions of Article 207 of the New York City Health Code

Board of Health. Notice of Opportunity to Comment on the Amendment of Provisions of Article 207 of the New York City Health Code New York City Department of Health and Mental Hygiene Board of Health Notice of Opportunity to Comment on the Amendment of Provisions of Article 207 of the New York City Health Code What are we proposing?

More information

[LLNV L ER A; ; MO# ] Notice of Availability of the Record of Decision and Final Supplemental

[LLNV L ER A; ; MO# ] Notice of Availability of the Record of Decision and Final Supplemental This document is scheduled to be published in the Federal Register on 11/21/2013 and available online at http://federalregister.gov/a/2013-28030, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

II. Statutory and Regulatory Authorities for Underground Coal Mines

II. Statutory and Regulatory Authorities for Underground Coal Mines I. Purposes MEMORANDUM OF UNDERSTANDING BETWEEN THE U.S. DEPARTMENT OF LABOR, MINE SAFETY AND HEALTH ADMINISTRATION AND THE U.S. DEPARTMENT OF THE INTERIOR, BUREAU OF LAND MANAGEMENT The purposes of this

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION San Diego Gas & Electric Company Sellers of Energy and Ancillary Services Investigation of Practices of the California Independent

More information

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types):

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types): ORDINANCE NO. AN ORDINANCE CHANGING THE ZONING CODE FOR MENDOCINO COUNTY The Board of Supervisors of the County of Mendocino, State of California, ordains as follows: Pursuant to Division I of Title 20,

More information

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * *

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * * REVIEWED LEGAL COUNSEL For Recording Stamp Only BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON An Ordinance Amending Deschutes County Code Title 18 to Provide a Definition of Agricultural

More information

1313 Sherman Street, Room 618 Denver, Colorado Phone (303) FAX (303) wildlife.state.co.us parks.state.co.

1313 Sherman Street, Room 618 Denver, Colorado Phone (303) FAX (303) wildlife.state.co.us parks.state.co. COLORADO S & WILDLIFE 1313 Sherman Street, Room 618 Denver, Colorado 80203 Phone (303) 866-3437 FAX (303) 866-3206 wildlife.state.co.us parks.state.co.us MEMORANDUM Date: To: From: Re: August 29, 2013

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Revisions to Electric Reliability ) Docket Nos. RM12-6-000 Organization Definition of Bulk Electric System ) RM12-7-000 And Rules

More information

Frequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles

Frequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 PH: (408) 777-3354 FX: (408) 777-3333 PUBLIC WORKS DEPARTMENT Frequently Asked Questions about Wireless Facilities on 1. What is a small cell facility?

More information

BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI

BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI » & BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI RE: FILED FOR RECORD PETITION OF DENBURY ONSHORE, LLC TO AMEND THE SPECIAL FIELD RULES FOR THE WEST LITTLE CREEK FIELD, PIKE AND JUN 1 5 2005 LINCOLN

More information

Before the Federal Communications Commission Washington DC ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

Before the Federal Communications Commission Washington DC ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) Before the Washington DC 20554 In the Matter of Amendment of Part 101 of the Commission s Rules to Facilitate the Use of Microwave for Wireless Backhaul and Other Uses and to Provide Additional Flexibility

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

[LLUTC L ER0000-LVRWJ10J4080; UTU ] Notice of Intent to Prepare an Environmental Assessment for the Proposed

[LLUTC L ER0000-LVRWJ10J4080; UTU ] Notice of Intent to Prepare an Environmental Assessment for the Proposed This document is scheduled to be published in the Federal Register on 08/24/2012 and available online at http://federalregister.gov/a/2012-20892, and on FDsys.gov 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) COMMENTS OF REDLINE COMMUNICATIONS INC.

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) COMMENTS OF REDLINE COMMUNICATIONS INC. Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of Amendment of the Commission's Rules with Regard to Commercial Operations in the 3550-3650 MHz Band GN Docket No. 12-354

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C COMMENTS OF THE ENTERPRISE WIRELESS ALLIANCE

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C COMMENTS OF THE ENTERPRISE WIRELESS ALLIANCE Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) Somerset County, NJ ) DA 12-1453 Request for T-Band Waiver ) To: Chief, Public Safety and Homeland Security Bureau

More information

Scotian Basin Exploration Drilling Project: Timeline

Scotian Basin Exploration Drilling Project: Timeline Scotian Basin Exploration Drilling Project: Timeline When it comes to exploratory drilling programs that an operator proposes to conduct, the Canada- Nova Scotia Offshore Petroleum Board (CNSOPB) goes

More information

Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1

Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1 Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1 May 2018 Public Information and Disclosure Regulatory document REGDOC-3.2.1 Canadian Nuclear Safety Commission (CNSC) 2018

More information

Fraser Trebilcock Davis & Dunlap, P.C.

Fraser Trebilcock Davis & Dunlap, P.C. 124 West Allegan Street, Suite 1000 Lansing, Michigan 48933 T (517) 482-5800 F (517) 482-0887 www.fraserlawfirm.com Jennifer Utter Heston jheston@fraserlawfirm.com (517) 377-0802 May 19, 2016 Ms. Mary

More information

IEEE Radio Regulatory Technical Advisory Group Homepage at

IEEE Radio Regulatory Technical Advisory Group Homepage at IEEE 802.18 Radio Regulatory Technical Advisory Group Homepage at http://www.ieee802.org/regulatory/ August 13, 2002 To: Ms. Marlene H. Dortch, Esq. Secretary Federal Communications Commission 236 Massachusetts

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) Connect America Fund ) WC Docket No. 10-90 ) Universal Service Reform Mobility Fund ) WT Docket No. 10-208 ) Connect

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

November 25, Via Electronic Filing

November 25, Via Electronic Filing Association of Public-Safety Communications Officials (APCO) CTIA The Wireless Association National Emergency Number Association (NENA) National Public Safety Telecommunications Council (NPSTC) Rural Cellular

More information

responsiveness. Report. Our sole Scope of work period; Activities outside the Statements of future Methodology site level); Newmont; 3.

responsiveness. Report. Our sole Scope of work period; Activities outside the Statements of future Methodology site level); Newmont; 3. INDEPENDENT ASSURANCE STATEMENT Introduction and objectives of work Bureau Veritas North America, Inc. (Bureau Veritas) was engaged by Newmont Mining Corporation (Newmont) to conduct an independent assurance

More information

clarify the roles of the Department and minerals industry in consultation; and

clarify the roles of the Department and minerals industry in consultation; and Procedures for Crown Consultation with Aboriginal Communities on Mineral Exploration Mineral Resources Division, Manitoba Science, Technology, Energy and Mines The Government of Manitoba recognizes it

More information

BALD EAGLE MANAGEMENT 2014 ANNUAL REPORT

BALD EAGLE MANAGEMENT 2014 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 513 BALD EAGLE MANAGEMENT 2014 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2014 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 September 2015 PUGET SOUND ENERGY

More information

BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP

BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP BLM ACTION CENTER www.blmactioncenter.org BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP Planning What you, the public, can do the Public to Submit Pre-Planning During

More information

REPLY OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTESTS AND REQUESTS FOR HEARINGS

REPLY OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTESTS AND REQUESTS FOR HEARINGS Julie A. Miller Senior Attorney Julie.Miller@SCE.com May 25, 2005 Docket Clerk California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 RE: A.05-04-015 Dear Docket Clerk:

More information

Broadcasting Decision CRTC

Broadcasting Decision CRTC Broadcasting Decision CRTC 2018-155 PDF version Reference: 2017-381 Ottawa, 8 May 2018 United Christian Broadcasters Media Canada Regina, Saskatchewan Public record for this application: 2017-0160-8 Public

More information

Before the Federal Communications Commission Washington, D.C

Before the Federal Communications Commission Washington, D.C Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of ) ) Proposed Changes in the Commission s ) ET Docket No. 03-137 Rules Regarding Human Exposure to ) Radiofrequency Electronic

More information

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) REPORT AND ORDER. Adopted: February 22, 2011 Released: March 4, 2011

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) REPORT AND ORDER. Adopted: February 22, 2011 Released: March 4, 2011 Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of Amendment of the Amateur Service Rules to Facilitate Use of Spread Spectrum Communications Technologies WT Docket No.

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Intrepid Energy Corporation

Intrepid Energy Corporation Alberta Energy and Utilities Board Energy Cost Order 2008-007 Intrepid Energy Corporation S.40 Review Request by Intrepid Energy Corporation on Decision 2007-080 Cost Awards ALBERTA ENERGY AND UTILITIES

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

Election Notice. Notice of Election and Ballots for FINRA Small Firm NAC Member Seat. October 16, Ballots Due: November 15, 2018

Election Notice. Notice of Election and Ballots for FINRA Small Firm NAC Member Seat. October 16, Ballots Due: November 15, 2018 Election Notice Notice of Election and Ballots for FINRA Small Firm NAC Member Seat Ballots Due: November 15, 2018 October 16, 2018 Suggested Routing Executive Representatives Senior Management Executive

More information

Guide to the Requirements for Public Information and Disclosure GD-99.3

Guide to the Requirements for Public Information and Disclosure GD-99.3 Guide to the Requirements for Public Information and Disclosure GD-99.3 November 2010 Guide to the Requirements for Public Information and Disclosure Guidance Document GD-99.3 Minister of Public Works

More information

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ) ) ) ) ) ) ) ) ) ) ) ) ) ) AMENDED APPLICATION

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ) ) ) ) ) ) ) ) ) ) ) ) ) ) AMENDED APPLICATION BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF NOBLE ENERGY, INC. FOR AN ORDER ESTABLISHING AN APPROXIMATE 640 ACRE EXPLORATORY DRILLING UNIT

More information

Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource

Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau of Land Management (LLUTY01000.L16100000.DP0000) Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource Management Plans for the Moab

More information

Notice of Intent to Amend the California Desert Conservation Area, Bakersfield,

Notice of Intent to Amend the California Desert Conservation Area, Bakersfield, This document is scheduled to be published in the Federal Register on 02/02/2018 and available online at https://federalregister.gov/d/2018-02098, and on FDsys.gov 4310-40 DEPARTMENT OF THE INTERIOR Bureau

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

North Fork Alternative Plan Executive Summary

North Fork Alternative Plan Executive Summary North Fork Alternative Plan Executive Summary The North Fork Alternative Plan (NFAP) is a resource-based set of recommendations provided to the U.S. Bureau of Land Management (BLM) as guidance regarding

More information

This page intentionally left blank

This page intentionally left blank Treasure for the Taking America Gives Away Billions Worth of Hardrock Minerals NOTE: This report has not been officially adopted by the Committee on Natural Resources and may not necessarily reflect the

More information

Rachel Eubanks, Commissioner Rachael Eubanks was appointed by Governor Rick Snyder to the Michigan Public Service Commission, for a term beginning

Rachel Eubanks, Commissioner Rachael Eubanks was appointed by Governor Rick Snyder to the Michigan Public Service Commission, for a term beginning Rachel Eubanks, Commissioner Rachael Eubanks was appointed by Governor Rick Snyder to the Michigan Public Service Commission, for a term beginning Aug. 1 and expiring July 2, 2017, as she completes the

More information

[LLIDB00100 LF HT0000 LXSS020D ] Notice of Intent to amend the Cascade Resource Management Plan (RMP) and the

[LLIDB00100 LF HT0000 LXSS020D ] Notice of Intent to amend the Cascade Resource Management Plan (RMP) and the This document is scheduled to be published in the Federal Register on 10/18/2012 and available online at http://federalregister.gov/a/2012-25593, and on FDsys.gov 4310-GG DEPARTMENT OF THE INTERIOR Bureau

More information

March 17, Very truly yours, PLUNKETT COONEY A T T O R N E Y S & C O U N S E L O R S A T L A W

March 17, Very truly yours, PLUNKETT COONEY A T T O R N E Y S & C O U N S E L O R S A T L A W March 17, 2017 Ms. Mary Jo Kunkle Executive Secretary Michigan Public Service Commission 7109 W. Saginaw Highway Lansing, MI 48917 Re: Talk America, LLC Case No: U-18347 Dear Ms. Kunkle: Enclosed for filing

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-4 3. Purpose: To ensure generators provide reactive support and voltage control, within generating

More information

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT PROGRAMMATIC AGREEMENT AMONG THE BUREAU OF LAND MANAGEMENT, THE ADVISORY COUNCIL ON HISTORIC PRESERVATION, AND THE NATIONAL CONFERENCE OF STATE

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC Comments of the National Association of Broadcasters

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC Comments of the National Association of Broadcasters Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of ) ) Amendment of Part 74 of the Commission s ) MB Docket No. 18-119 Rules Regarding FM Translator Interference ) ) I.

More information

Provided by: Radio Systems, Inc. 601 Heron Drive Bridgeport, NJ

Provided by: Radio Systems, Inc. 601 Heron Drive Bridgeport, NJ Provided by: Radio Systems, Inc. 601 Heron Drive Bridgeport, NJ 08014 856-467-8000 www.radiosystems.com Before the Federal Communications Commission Washington, DC 20554 GEN Docket No. 87-839 In the Matter

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document JanuaryVersion 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying

More information

CBRS Commercial Weather RADAR Comments. Document WINNF-RC-1001 Version V1.0.0

CBRS Commercial Weather RADAR Comments. Document WINNF-RC-1001 Version V1.0.0 CBRS Commercial Weather RADAR Comments Document WINNF-RC-1001 Version V1.0.0 24 July 2017 Spectrum Sharing Committee Steering Group CBRS Commercial Weather RADAR Comments WINNF-RC-1001-V1.0.0 TERMS, CONDITIONS

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) ) ) ) ) ) PETITION FOR ETC DESIGNATION OF HUGHES NETWORK SYSTEMS, LLC

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) ) ) ) ) ) PETITION FOR ETC DESIGNATION OF HUGHES NETWORK SYSTEMS, LLC Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of Telecommunications Carriers Eligible to Receive Universal Service Support Petition of Hughes Network Systems, LLC for

More information

ESEA Flexibility. Guidance for Renewal Process. November 13, 2014

ESEA Flexibility. Guidance for Renewal Process. November 13, 2014 ESEA Flexibility Guidance for Renewal Process November 13, 2014 INTRODUCTION In September 2011, the U.S. Department of Education (Department) offered each State educational agency (SEA) the opportunity

More information

BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR

BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF PROPOSED RELIABILITY STANDARD

More information

Public Information and Disclosure RD/GD-99.3

Public Information and Disclosure RD/GD-99.3 Public Information and Disclosure RD/GD-99.3 March, 2012 Public Information and Disclosure Regulatory Document RD/GD-99.3 Minister of Public Works and Government Services Canada 2012 Catalogue number CC172-82/2012E-PDF

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

PLANNING BOARD CITY OF BAYONNE MINUTES OF REGULAR MEETING MARCH 10, 2015

PLANNING BOARD CITY OF BAYONNE MINUTES OF REGULAR MEETING MARCH 10, 2015 PLANNING BOARD CITY OF BAYONNE MINUTES OF REGULAR MEETING MARCH 10, 2015 A regular meeting of the City of Bayonne Planning Board was held on Tuesday, in the Dorothy E. Harrington Municipal Council Chambers,

More information

The following draft Agreement supplements, but does not replace, the MOU by and between the Bureau of Land Management (BLM) and the California

The following draft Agreement supplements, but does not replace, the MOU by and between the Bureau of Land Management (BLM) and the California The following draft Agreement supplements, but does not replace, the MOU by and between the Bureau of Land Management (BLM) and the California Department of Fish and Wildlife (CDFW), which was entered

More information

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR PUBLIC UTILITIES COMMISION

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR PUBLIC UTILITIES COMMISION OAH 40-2500-22816-2 PUC Docket Nos. IP-6853/CN-11-471, WS-11-831, WS-10-1240 STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR PUBLIC UTILITIES COMMISION In the Matter of the Application of Black

More information

RE: City of Summersville, Glade Creek Phase llb

RE: City of Summersville, Glade Creek Phase llb STAFFORD CONSULTANTS INCORPORATED Engineering, Design, and Consulting Planning and Environmental Services To: Armstrong Utilities Chojnacki Construction CI Thornburg Cooks Excavating Contractor s Association

More information

[LLNVS L PQ0000. LVRWF09F1840; N ; MO# ; Notice of Intent to Prepare an Environmental Impact Statement and a Possible

[LLNVS L PQ0000. LVRWF09F1840; N ; MO# ; Notice of Intent to Prepare an Environmental Impact Statement and a Possible This document is scheduled to be published in the Federal Register on 03/15/2018 and available online at https://federalregister.gov/d/2018-05273, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

ICAO/IMO JOINT WORKING GROUP ON HARMONIZATION OF AERONAUTICAL AND MARITIME SEARCH AND RESCUE (ICAO/IMO JWG-SAR)

ICAO/IMO JOINT WORKING GROUP ON HARMONIZATION OF AERONAUTICAL AND MARITIME SEARCH AND RESCUE (ICAO/IMO JWG-SAR) International Civil Aviation Organization ICAO/IMO JWG-SAR/13-WP/3 30/6/06 WORKING PAPER ICAO/IMO JOINT WORKING GROUP ON HARMONIZATION OF AERONAUTICAL AND MARITIME SEARCH AND RESCUE (ICAO/IMO JWG-SAR)

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) COMMENTS OF THE NATIONAL ASSOCIATION OF BROADCASTERS

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) COMMENTS OF THE NATIONAL ASSOCIATION OF BROADCASTERS Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the In the Matter of Revision of Part 15 of the Commission s Rules to Permit Unlicensed National Information Infrastructure (U-NII Devices

More information

BEFORE THE SCHOOL IN THE MATTER OF

BEFORE THE SCHOOL IN THE MATTER OF : BEFORE THE SCHOOL IN THE MATTER OF : ETHICS COMMISSION : : JOHN TALTY and SHARON KIGHT : Docket No. C18-05 and C19-05 BRICK TOWNSHIP : BOARD OF EDUCATION : OCEAN COUNTY : DECISION : PROCEDURAL HISTORY

More information

FREQUENCY PROPOSAL REPORT FACT SHEET For Call Signs with Only NPSPAC Frequencies

FREQUENCY PROPOSAL REPORT FACT SHEET For Call Signs with Only NPSPAC Frequencies Page 1 of 6 FREQUENCY PROPOSAL REPORT FACT SHEET For Call Signs with Only NPSPAC Frequencies This document provides information about the Frequency Proposal Report (FPR) that reconfiguring 800 MHz licensees

More information