1 SETTLEMENT AGREEMENT ARTICLE 513 BALD EAGLE MANAGEMENT 2014 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2014 BAKER RIVER HYDROELECTRIC PROJECT FERC No September 2015 PUGET SOUND ENERGY Baker River Hydroelectric Project
2 CONTENTS CONTENTS 1.0 Executive Summary Introduction Activity Report Bald Eagle Nest Survey Bald Eagle Communal Night Roost Surveys Minimizing Effects of Construction Incidental Observations Maps of Aerial Survey and Incidental Observations Acquisition Activities Design and Planning Activities Documents Submitted Accounting Funding and Expenditures Prescribed by SA Adjustments... 6 APPENDIX A: BALD EAGLE NEST SITE MANAGEMENT PLAN... 7 List of Tables Table 1. Bald eagle aerial nest survey results for Table 2. Incidental bald eagle observations in List of Figures Figure 1. Map of Baker Lake bald eagle nest sites and 2014 observations Figure 2. Map of Lake Shannon bald eagle nest sites and 2014 observations PUGET SOUND ENERGY Baker River Hydroelectric Project Page ii
3 1.0 Executive Summary This Bald Eagle Management Annual Report reviews Puget Sound Energy s actions in 2014 to implement settlement agreement article 513 (SA 513), Bald Eagle Management Plan, for the Baker River Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No This report was prepared by Puget Sound Energy in accordance with the Bald Eagle Management Plan and was reviewed by the Terrestrial Resource Implementation Group (TRIG). This report summarizes the activities conducted in 2014 in accordance with SA 513, which included: Development and TRIG review of the SA 513 annual report for Completion of the aerial nest survey. Documentation of incidental bald eagle observations during the nesting season. Coordination with construction project managers, Project operations staff, and the Recreation Resources Group (RRG) to minimize any potential disturbance to nesting or roosting bald eagles or their habitat from Project-related construction or recreation activities. Section 4 of this report outlines funding expenditures in 2014 for SA Introduction This report has been prepared for the Baker River Hydroelectric Project (the Project), and documents the activities conducted in 2014 to implement settlement agreement article 513 (SA 513, Bald Eagle Management Plan, in a manner consistent with the FERC-approved Bald Eagle Management Plan. This report was reviewed by the Terrestrial Resource Implementation Group. The list of TRIG members who received this report, along with a table of reviewer comments and PSE responses, is provided in the SA 501 Terrestrial Resource Management Plan (TRMP) annual report for The goals of SA 513 are to protect known bald eagle nests and communal winter night roosts within the Project boundary from disturbance due to Project-related activities, and to assist the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), and U.S. Forest Service (USDA-FS) in identifying eagle nests and communal night roosts in need of protection in the Project area. 3.0 Activity Report Bald eagle management and monitoring activities at the Project during 2014 were directed by license article 410, (LA 410), Threatened, Endangered, and Sensitive Species, as well as SA 513. This section provides an overview of activities conducted in 2014 related to bald eagles under both of these articles. Details related to incidental observations are provided in section of this report. PUGET SOUND ENERGY Baker River Hydroelectric Project Page 1
4 Activity Report 3.1 8Bald Eagle Nest Survey Puget Sound Energy conducted an aerial survey of the Project area on July 3, In 2014, nesting activity was confirmed during the aerial survey at three of the five known bald eagle nest territories Maple Grove and Panorama Point on Baker Lake, and the Thunder Creek nest on Lake Shannon. One adult eagle and one chick were observed at each of the three nests. In addition, two adult bald eagles and one chick were observed in a new bald eagle nest discovered between Sulphur Creek and Depression Lake. A nest site management plan has been developed for this nest, based on information from the 2014 annual survey. The exact location of the nest was not recorded during the survey, but a GPS point will be taken during the 2015 nest season. After the nest location is recorded, a nest observation form will be completed and submitted to the WDFW for inclusion in the WDFW priority habitat and species database. The WDFW is no longer requiring or managing bald eagle nest site management plans, but PSE has completed one for its own purposes and for consistence with the SA 513 Bald Eagle Management Plan. Table 1. Bald eagle aerial nest survey results for Nest territory name Nest territory ID Number of adults Number of chicks Maple Grove Panorama Point Baker River Thunder Creek North Shannon Bald Eagle Communal Night Roost Surveys Bald eagle night roost surveys were not conducted during the reporting period in accordance with SA 512, Bald Eagle Night Roost Surveys. Two seasons of surveys were conducted from November 2009 through February 2010, and again from November 2010 through February Two additional seasons of surveys will be conducted in years of the license, as directed by SA BMinimizing Effects of Construction During the reporting period, PSE biologists met with construction project managers, land use planners, and Project operations staff to minimize any potential effects to nesting or roosting bald eagles in the Project area. No projects were planned or conducted in close proximity to eagle nest or roost sites. No large overstory trees that could be used for bald eagle nesting or roosting were removed from the Project area during the reporting period. The Upper Baker Kulshan boat launch improvement project plan was reviewed for potential effects to bald eagles, and none were identified. This activity will not occur near any of the known eagle nests, and will have no effect on eagle nesting or roosting habitat. USFWS consultation related to this project is documented in the LA 410 annual report for PUGET SOUND ENERGY Baker River Hydroelectric Project Page 2
5 Activity Report 3.4 1BIncidental Observations Bald eagles were observed incidentally during loon and osprey surveys throughout the nesting season. Table 2 and the maps in section 3.5 summarize these observations. Survey Date Number of Eagles 4/3/ Adult 4/3/ Adult 4/3/ Adult 4/3/ Adult 4/16/ Adult 4/16/ Adult 4/16/ Adult Table 2. Incidental bald eagle observations in Age Class Location Nest Comments N end of Lake Shannon, near osprey nest tree T-13 Maple Grove, Baker Lake Just north of Maple Grove Near Noisy Creek, Baker Lake South of Noisy Creek, Baker Lake East of Swift Creek, Baker Lake Panorama Point, Baker Lake 5/5/ Adult Maple Grove 5/5/ Adult 5/5/ Adult North end of Baker Lake North end of Baker Lake N Shannon Maple Grove Panorama Point Maple Grove Baker River Baker River near nest near nest tree 5/5/ Adult Panorama Point Feeding on shore 5/5/ Adult 6/11/ Subadult 6/11/ Adult 7/9/ Adult 7/25/ Adult Little Sandy Creek, Baker Lake West of Ermine Creek, Baker Lake North end of Baker Lake Thunder Creek, Lake Shannon Near the Lower Baker dam Baker River Thunder Creek Flew over tree line on east side of the lake, then perched near the nest. Flew up Lake Shannon from near the dam, perched in a tree on SW side of the lake. A few minutes later the eagle flew off to the west. PUGET SOUND ENERGY Baker River Hydroelectric Project Page 3
6 Activity Report BMaps of Aerial Survey and Incidental Observations Figure 1. Map of Baker Lake bald eagle nest sites and 2014 observations. PUGET SOUND ENERGY Baker River Hydroelectric Project Page 4
7 Activity Report Figure 2. Map of Lake Shannon bald eagle nest sites and 2014 observations. PUGET SOUND ENERGY Baker River Hydroelectric Project Page 5
8 Accounting BAcquisition Activities PSE acquired the Burpee Hill south property in December The Burpee Hill Management Program document will be updated to include the Burpee Hill south property, which will be managed primarily for elk forage habitat under SA 503. There are no known eagle nests on or near the Burpee Hill south property BDesign and Planning Activities Design and planning activities in 2014 included coordination with the planning for the Upper Baker Kulshan boat launch improvement project. The area in which this activity will occur is not near any active eagle nests or roost sites, and the project will not include removal of any large overstory trees that could be used by bald eagles BDocuments Submitted During the reporting period, Puget Sound Energy developed the SA 513 Annual Report for 2013 and submitted the report to the TRIG for the 30-day review period as directed by SA 501, Terrestrial Resource Management Plan. The final 2012 report for SA 513 was filed with the FERC during the reporting period. 4.0 Accounting Puget Sound Energy, pursuant to settlement agreement articles 102, 201, 301, 501, and 602, is required to provide an annual summary of expenditures made during the preceding year, as well as an accounting of funding expenditures, any interest earned, disbursements made as required by any article, and adjustments for inflation. This section provides an accounting of expenditures made between January 1, 2014 and December 31, All disbursement adjustments and relevant calculations were determined using the guidelines provided in settlement article 602, Required Funding BFunding and Expenditures Prescribed by SA 513 SA 513 did not prescribe any funding during the reporting period BAdjustments There were no adjustments made to the funding for SA 513 during the reporting period. PUGET SOUND ENERGY Baker River Hydroelectric Project Page 6
9 APPENDIX A: BALD EAGLE NEST SITE MANAGEMENT PLAN APPENDIX A: BALD EAGLE NEST SITE MANAGEMENT PLAN PUGET SOUND ENERGY Baker River Hydroelectric Project Page 7
10 APPENDIX A: BALD EAGLE NEST SITE MANAGEMENT PLAN PUGET SOUND ENERGY Baker River Hydroelectric Project Page 8
11 APPENDIX A: BALD EAGLE NEST SITE MANAGEMENT PLAN PUGET SOUND ENERGY Baker River Hydroelectric Project Page 9
BALD EAGLE MANAGEMENT 2012 ANNUAL REPORT
SETTLEMENT AGREEMENT ARTICLE 513 BALD EAGLE MANAGEMENT 2012 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2012 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 April 2014 BAK SA 513 Annual Report
More informationLOON FLOATING NEST PLATFORMS 2014 ANNUAL REPORT
SETTLEMENT AGREEMENT ARTICLE 507 LOON FLOATING NEST PLATFORMS 2014 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2014 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 September 2015 PUGET SOUND
More informationTHREATENED, ENDANGERED, AND SENSITIVE SPECIES 2011 ANNUAL REPORT
LICENSE ARTICLE 410 THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2011 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2011 BAKER RIVER HYDROELECTRIC PROJECT FERC. 2150 April 2012 BAK LA 410 Annual
More informationBALD EAGLE NIGHT ROOST SURVEYS
SETTLEMENT AGREEMENT ARTICLE 512 BALD EAGLE NIGHT ROOST SURVEYS SEASON ONE RESULTS: NOVEMBER 2009 FEBRUARY 2010 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 Puget Sound Energy Bellevue, Washington May
More informationFOREST HABITAT 2015 ANNUAL REPORT
SETTLEMENT AGREEMENT ARTICLE 0 FOREST HABITAT 01 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 01 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 10 September 01 PUGET SOUND ENERGY Baker River Hydroelectric
More informationRocky Reach Wildlife Forum 2017 Wildlife Monitoring Proposal FINAL
Rocky Reach Wildlife Forum 2017 Wildlife Monitoring Proposal FINAL Background January 13, 2017 During the Rocky Reach Hydroelectric Project (Project 2145) relicensing process, the Public Utility District
More informationOSPREY NEST STRUCTURES 2013 ANNUAL REPORT
SETTLEMENT AGREEMENT ARTICLE 506 OSPREY NEST STRUCTURES 2013 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2013 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 January 2015 BAK SA 506 Annual Report
More informationBald Eagle and Osprey Nest Survey Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington
Revised Bald Eagle and Osprey Nest Survey Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968
More informationStep-by-Step Instructions for Documenting Compliance on the Bald Eagle Form For WSDOT s On-Call Consultants
Introduction Step-by-Step Instructions for Documenting Compliance on the Bald Eagle Form For WSDOT s On-Call Consultants WSDOT Environmental Services Office Updated June 2011 This form is intended to document
More informationMystic Lake Hydroelectric Project FERC Project Number Year Bald Eagle Monitoring Summary Report Public
Mystic Hydroelectric Project FERC Project Number 2301 3-Year Bald Eagle Monitoring Summary Report 2010-2013 Public 2013 by PPL Montana, LLC. ALL RIGHTS RESERVED Submitted to: Federal Energy Regulatory
More informationLOON FLOATING NEST PLATFORMS 2010 ANNUAL REPORT
SETTLEMENT AGREEMENT ARTICLE 507 LOON FLOATING NEST PLATFORMS 2010 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2010 BAKER RIVER HYDROELECTRIC PROJECT FERC. 2150 April 2012 BAK SA 507 Annual Report
More informationBald Eagle Annual Report February 1, 2016
Bald Eagle Annual Report 2015 February 1, 2016 This page intentionally blank. PROJECT SUMMARY Project Title: Bald Eagle HCP Monitoring Subject Area: Habitat Conservation Plan (HCP) monitoring Date initiated:
More informationPSE Avian Protection Program -Hydro -Wind -Distribution/Transmission -Substations. Mel Walters, Program Manager Consulting Natural Resource Scientist
PSE Avian Protection Program -Hydro -Wind -Distribution/Transmission -Substations Mel Walters, Program Manager Consulting Natural Resource Scientist Regulations 1918 Migratory Bird Treaty Act Strict Liability
More informationPriest Rapids Hydroelectric Project No Annual Report for the Bald Eagle Perch/Roost Protection Plan Pursuant FERC Article 414
Priest Rapids Hydroelectric Project No. 2114 2016 Annual Report for the Bald Eagle Perch/Roost Protection Plan Pursuant FERC Article 414 Grant County Public Utility District No. 2 P.O. Box 878 Ephrata,
More informationLOON FLOATING NEST PLATFORM PLAN
LOON FLOATING NEST PLATFORM PLAN SETTLEMENT AGREEMENT ARTICLE 507 Appendix E to the SA 501 Terrestrial Resource Management Plan BAKER RIVER PROJECT FERC No. 2150-033 Puget Sound Energy Bellevue, Washington
More informationWildlife Habitat Monitoring and Information and Education Program Progress Report
Priest Rapids Hydroelectric Project (FERC No. 2114) Wildlife Habitat Monitoring and Information and Education Program 2013 Progress Report License Article 410 December 2013 Executive Summary On October
More informationBucks Creek Hydroelectric Project, FERC Project No. 619 Revised Study Plan
Revised Study Plan RTE-S2 STUDY GOAL AND OBJECTIVE STUDY DESCRIPTION RTE-S2 BALD EAGLE & OSPREY September 2014 (Revised February 2015) The Bucks Creek Project (Project) Pre-Application Document (PAD) (November
More informationBALD EAGLE MANAGEMENT PLAN
BALD EAGLE MANAGEMENT PLAN BIG CREEK HYDROELECTRIC SYSTEM MAMMOTH POOL (FERC Project No. 2085) BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) BIG CREEK Nos. 2A, 8, AND EASTWOOD (FERC Project No. 67) BIG
More informationBald Eagle Wintering Activity Rocky Reach Reservoir
Bald Eagle Wintering Activity Rocky Reach Reservoir 2011-2012 Public Utility District No. 1 of Chelan County Fish & Wildlife Department Wenatchee, WA 98807-1231 INTRODUCTION The Public Utility District
More informationYoungs Creek Hydroelectric Project FERC No
Youngs Creek Hydroelectric Project FERC No. 10359 WILDLIFE HABITAT MITIGATION PLAN License Article 403 2015 ANNUAL REPORT Prepared By: Everett, WA January 2016 Final This document has been prepared for
More informationA.11 BALD EAGLE (HALIAEETUS. Species Distribution and Status
A.11 BALD EAGLE (HALIAEETUS LEUCOCEPHALUS) A.11.1 Legal Status The bald eagle was listed as endangered under the federal Endangered Species Act (ESA) in 1978 (43 FR 6230). In 1995, the bald eagle was reclassified
More informationFINAL Bald Eagle and Osprey Nest Survey Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington
FINAL Bald Eagle and Osprey Nest Survey Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968
More informationW-S3: EAGLE AND RAPTOR NEST STUDY - DRAFT
W-S3: EAGLE AND RAPTOR NEST STUDY - DRAFT INTRODUCTION The (AEA) is preparing a License Application that will be submitted to the Federal Energy Regulatory Commission (FERC) for the Susitna-Watana Hydroelectric
More informationGolden Eagle (Aquila chrysaetos) Management Indicator Species Assessment Ochoco National Forest
Golden Eagle (Aquila chrysaetos) Management Indicator Species Assessment Ochoco National Forest I. Introduction The golden eagle was chosen as a terrestrial management indicator species (MIS) on the Ochoco
More informationSOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA
SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA LAKE MURRAY WOOD STORK SURVEYS 2005 SUMMARY REPORT DECEMBER 2005 Prepared by: Kleinschmidt Associates Energy & Water Resource Consultants
More informationHenry M. Jackson Hydroelectric Project (FERC No. 2157) TERRESTRIAL RESOURCES 2016 ANNUAL REPORT. Everett, WA
Henry M. Jackson Hydroelectric Project (FERC No. 2157) TERRESTRIAL RESOURCES 2016 ANNUAL REPORT Everett, WA Final - This document has been prepared by the District. It has been peer-reviewed by the District
More informationBald Eagle Wintering Activity Rocky Reach Reservoir
Bald Eagle Wintering Activity Rocky Reach Reservoir 2014-2015 Kelly Cordell Stine and Von R. Pope Public Utility District No. 1 of Chelan County Fish & Wildlife Department Wenatchee, WA 98807-1231 INTRODUCTION
More informationWood Stork Aerial Survey Trip Report. Lake Murray and Saluda River August 27, Aircraft: Fixed-Wing Cessna 210 Survey Duration: hrs
Survey Attendees Shane Boring Tom Murphy Bucky Harris Kleinschmidt SCDNR Endangered Species Biologist SCDNR Pilot Aircraft: Fixed-Wing Cessna 210 Survey Duration: 1300 1415 hrs Survey Observations The
More informationBird Watch. Inform ation You Need to K now for Nesting Se a son
Bird Watch Inform ation You Need to K now for Nesting Se a son Contents Overview of American Tower s Bird Site Practices 3 Bird Site Treatment Protocol 4 American Tower s Eagle Nest Policy 4 American Tower
More informationGrey County Natural Heritage System Study
Grey County Natural Heritage System Study Green in Grey Technical Advisory Committee Meeting #1 February 25, 2015 225 Labrador Drive, Unit 1, Waterloo, Ontario, N2K 4M8 Tel: (519) 725-2227 Web: www.nrsi.on.ca
More informationAPPENDIX A Vernal Field Office Best Management Practices for Raptors and Associated Habitats
APPENDIX A Vernal Field Office Best Management Practices for Raptors and Associated Habitats A-1 A-2 APPENDIX A VERNAL FIELD OFFICE BEST MANAGEMENT PRACTICES FOR RAPTORS AND ASSOCIATED HABITATS September
More informationBald Eagles Productivity Summary Lake Clark National Park and Preserve Cook Inlet Coastline
Bald Eagles Productivity Summary 1994-1996 Lake Clark National Park and Preserve Cook Inlet Coastline Introduction: Although the bald eagle (Haliaeetus leucocephalus)is not listed as endangered or threatened
More informationSusitna-Watana Hydroelectric Project (FERC No ) Waterbird Migration, Breeding, and Habitat Use Study Plan Section 10.15
(FERC No. 14241) Waterbird Migration, Breeding, and Habitat Use Study Plan Section 10.15 Initial Study Report Part C: Executive Summary and Section 7 Prepared for Prepared by ABR, Inc. Environmental Research
More informationStudy Surveys of Eagles and Other Raptors
Initial Study Report Meeting Study 10.14 Surveys of Eagles and Other Raptors March 29, 2016 Prepared by ABR, Inc. Environmental Research & Services 3/29/2016 1 Study 10.14 Status ISR Documents (ISR Part
More informationWork Plan for Pre-Construction Avian and Bat Surveys
Work Plan for Pre-Construction Avian and Bat Surveys, Steuben County, New York Prepared For: EverPower Wind Holdings, Inc. 1251 Waterfront Place, 3rd Floor Pittsburgh, PA 15222 Prepared By: Stantec Consulting
More informationRECENT CHANGES TO THE ILLINOIS SMCRA THREATENED AND ENDANGERED SPECIES (T&E) REQUIREMENTS
RECENT CHANGES TO THE ILLINOIS SMCRA THREATENED AND ENDANGERED SPECIES (T&E) REQUIREMENTS William O Leary, M.S. and Amanda Pankau, M.S. HDR Engineering Murphysboro, IL ILLINOIS SMCRA T&E HISTORY 1983 2009
More informationTiered Species Habitats (Terrestrial and Aquatic)
Tiered Species Habitats (Terrestrial and Aquatic) Dataset Description Free-Bridge Area Map The Department of Game and Inland Fisheries (DGIF s) Tiered Species Habitat data shows the number of Tier 1, 2
More informationUpdate on Northern Long-eared Bat in Minnesota
Update on Northern Long-eared Bat in Minnesota For Minnesota Forest Resources Partnership April 7, 2016 By Rich Baker Endangered Species Coordinator MNDNR Ecological and Water Resources Outline: Update
More informationUpdate on American Oystercatcher Reseach and Conservation in New Jersey
Update on American Oystercatcher Reseach and Conservation in New Jersey - 2007 Todd Pover, New Jersey Division of Fish and Wildlife - Endangered and Nongame Species Program Tom Virzi, PhD Candidate Department
More informationUS Army Corps of Engineers Rock Island District
US Army Corps of Engineers Rock Island District Compiled by Marsha Dolan March 2014 The American Bald Eagle: Natural History & Current Conditions The bald eagle has proudly served as the emblem for the
More informationMarine Corps Support Facility-Blount Island: Integrated Natural Resources Program Successes. E2S2 Conference May 12, 2011
Marine Corps Support Facility-Blount Island: Integrated Natural Resources Program Successes E2S2 Conference May 12, 2011 Shari Kennedy, MCSF-BI Robert Price, CH2M HILL Location Mission The mission of Marine
More informationREVISED DRAFT - 8/21/00 BIOLOGICAL OPINION ON THE OPERATION OF THE MISSOURI RIVER MAIN STEM RESERVOIR SYSTEM,
REVISED DRAFT - 8/21/00 BIOLOGICAL OPINION ON THE OPERATION OF THE MISSOURI RIVER MAIN STEM RESERVOIR SYSTEM, OPERATION AND MAINTENANCE OF THE MISSOURI RIVER BANK STABILIZATION AND NAVIGATION PROJECT,
More informationAttachment C. Implementation Schedule for Technical Study Plans as of December 31, Aquatic Resources
Attachment C. Implementation Schedule for s as December 31, 2008. Resources 2007 2008 2009 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
More informationSOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA
SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA LAKE MURRAY WOOD STORK SURVEYS 2006 SUMMARY REPORT MARCH 2007 Prepared by: Kleinschmidt Associates Energy & Water Resource Consultants 101
More informationListed Birds along the Stony Brook Corridor Impacted by BMS Zoning Change
Listed Birds along the Stony Brook Corridor Impacted by BMS Zoning Change Washington Crossing Audubon Society (WCAS) opposes the zoning change to allow high density housing on the Bristol-Meyers Squibb
More informationWisconsin Bald Eagle and Osprey Nest Surveys 2016
Wisconsin Bald Eagle and Osprey Nest Surveys Project Staff: Jim Woodford Rhinelander Steve Easterly Oshkosh Dean Edlin Alma Dan Goltz Boscobel Michael Stelpflug La Crosse Nicholas Schroeder Alma Sharon
More informationWisconsin Bald Eagle and Osprey Nest Surveys 2015
Wisconsin Bald Eagle and Osprey Nest Surveys 2015 Project Staff: Photo credit: Brian M. Collins Jim Woodford Rhinelander Steve Easterly Oshkosh Dean Edlin Alma Ryan Magana Spooner Carly Lapin - Rhinelander
More informationMcKay Creek National Wildlife Refuge BCS number: 48-19
Oregon Coordinated Aquatic Bird Monitoring: Description of Important Aquatic Bird Site McKay Creek National Wildlife Refuge BCS number: 48-19 Site description author(s) Howard Browers, Supervisory Wildlife
More informationSurveys were planned for Nov Dec of 2015 as outlined in the RRWHMP and for January of 2016, as outlined in the RRWHMP.
From: To: Subject: Date: Attachments: Cordell-Stine, Kelly Andrew Fielding; Bitterman, Deborah; Brigitte Ranne; Erik Ellis; Jack Oelfke; James Blanchard; Jesse Mccarty; K Vradenburg; Ken Finicle; Matthew
More informationUS Army Corps of Engineers Rock Island District
US Army Corps of Engineers Rock Island District Compiled by Davi Michl March 218 The American Bald Eagle: 2 Natural History & Current Conditions The bald eagle has proudly served as the emblem for the
More informationThe following protocols should begin as soon as feasible after identification of a diurnal roost (ideally that night):
PERSONNEL Qualified biologists 48, biological technicians, and any other individuals deemed qualified by a local USFWS FO may conduct emergence surveys for Indiana bats by following the protocols below.
More informationCoastal Wildlife Conservation Initiative
Coastal Wildlife Conservation Initiative What is the Coastal Wildlife Conservation Initiative? A partnership strategy to address coastal issues that impact wildlife and their habitats USFWS CWCI Vision
More informationSACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC NO. 2101) BALD EAGLE AND OSPREY TECHNICAL REPORT
SACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC NO. 2101) BALD EAGLE AND OSPREY TECHNICAL REPORT Devine Tarbell & Associates, Inc. Sacramento, California Prepared by: Santa Cruz
More informationOregon Dunes National Recreation Area BCS Number: 47-5
Oregon Dunes National Recreation Area BCS Number: 47-5 ***NOTE: We were unable to determine all necessary information for this site description. If you would like to contribute the needed information to
More informationBV-24A DMMA Florida Scrub-Jay Survey Brevard County
REPORT BV-24A DMMA Florida Scrub-Jay Survey Brevard County Submitted to: David L. Stites, Ph.D. Director of Environmental Services Taylor Engineering, Inc. 10199 Southside Blvd Suite 310 Jacksonville,
More informationSPECIES PROTECTION CONSTRUCTION Protective Radius
SPECIES PROTECTION Attention is directed to the existence of environmental work restrictions that require special precautions to be taken by the Contractor to protect the species of concern in conforming
More informationSTATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah
I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires
More informationHardrock Project GRT Terrestrial Working Group Environmental Baseline
Hardrock Project GRT Terrestrial Working Group Environmental Baseline February 24, 2015 : Presentation Overview Introductions Project Overview Terrestrial Objectives / methods Results / key takeaways Discussion
More informationRRWF Members, Please let Von or I know if you have any questions. Kelly A. Cordell-Stine Wildlife Biologist Chelan County PUD (509)
From: To: cc: Subject: Date: Attachments: Cordell-Stine, Kelly "Andrea Lyons"; Andrew Fielding; Bitterman, Deborah; Bob Huber; "Brigitte M Ranne"; Dave Volsen ; Erik Ellis (edellis@blm.gov); Jack Oelfke
More informationPost Point Heron Colony
Post Point Heron Colony Monitoring Annual Report 2006 prepared for: The Department of Public Works 2221 Pacific Street Bellingham, WA 98226 prepared by: Ann Eissinger Wildlife Services PO Box 176 Bow,
More informationProtecting the Endangered Mount Graham Red Squirrel
MICUSP Version 1.0 - NRE.G1.21.1 - Natural Resources - First year Graduate - Female - Native Speaker - Research Paper 1 Abstract Protecting the Endangered Mount Graham Red Squirrel The Mount Graham red
More informationOsprey Nest Abundance, Distribution, and Productivity in Casco Bay
University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2012 Osprey Nest Abundance, Distribution, and Productivity in Casco Bay Chris DeSorbo Follow this and
More informationSpecies Conclusions Table
Species Conclusions Table Project Manager: Theresita Crockett-Augustine Date: May 9, 2016 Project Name: Huntington Run Levee Project Number: NAO-2014-00272 Consultation Code: 05E2VA00-2016-SLI-1964 Event
More informationThe USFWS is here to help you! An overview of the ESA process
The USFWS is here to help you! An overview of the ESA process and T&E species Sandie Doran, Robyn Niver*, Noelle Rayman, Tim Sullivan U.S. Fish and Wildlife Service New York Field Office March 5, 2015
More informationDivision: Habitat and Species Conservation Authors: Claire Sunquist Blunden and Brad Gruver
Division: Habitat and Species Conservation Authors: Claire Sunquist Blunden and Brad Gruver Report date: December 13, 2018 All photos by FWC unless otherwise acknowledged Presenting 6 new guidelines 1
More informationFlorida Keys National Wildlife Refuge Complex. Key West NWR Great White Heron NWR National Key Deer NWR Crocodile Lake NWR
Florida Keys National Wildlife Refuge Complex Key West NWR Great White Heron NWR National Key Deer NWR Crocodile Lake NWR Key West NWR Marquesas Keys and 13 other keys Mission as a preserve and protect
More informationRaptor Nest Field Survey Technical Memorandum for the North Meadows Extension to US 85 and Interstate 25
for the North Meadows Extension to US 85 and Interstate 25 December 2007 Prepared for: Town of Castle Rock Douglas County Colorado Department of Transportation Federal Highway Administration Prepared by:
More informationOVERVIEW INTRODUCTION TO SHOREBIRDS MANAGEMENT FOR SHOREBIRDS TVA REGIONAL SHOREBIRD PROJECT ESTIMATING SHOREBIRD NUMBERS
SHOREBIRD CONSERVATION AND MONITORING RESOURCES US SHOREBIRD CONSERVATOIN PLAN http://www.fws.gov/shorebirdplan WATERFOWL MANAGEMENT HANDBOOK - http://www.nwrc.usgs.gov/wdb/pub/wmh/contents.html MANOMET
More informationAPPENDIX M BIRD NESTING DATA ( )
APPENDIX M BIRD NESTING DATA (1984-2011) Final Environmental Impact Statement Village of Bald Head Island Shoreline Protection Project Brunswick County, North Carolina Date Species Number of Birds Number
More informationJackson Bottom Wetlands Preserve BCS Number: 47-14
Jackson Bottom Wetlands Preserve BCS Number: 47-14 Site description author(s) Greg Gillson, Jackson Bottom Wetlands Preserve Primary contact for this site Ed Becker, Natural Resources Manager, Jackson
More informationPROJECT: Bald Eagle Monitoring, REPORTING DATE: January 2011
PROJECT: Eagle Monitoring, 2010-2011 REPORTING DATE: January 2011 AUTHORS: Dawn M. Fletcher and Jef R. Jaeger Public Lands Institute, University of Nevada, Las Vegas Under task agreement with the National
More information1313 Sherman Street, Room 618 Denver, Colorado Phone (303) FAX (303) wildlife.state.co.us parks.state.co.
COLORADO S & WILDLIFE 1313 Sherman Street, Room 618 Denver, Colorado 80203 Phone (303) 866-3437 FAX (303) 866-3206 wildlife.state.co.us parks.state.co.us MEMORANDUM Date: To: From: Re: August 29, 2013
More informationPLAN B Natural Heritage
City of Brantford Waterfront Master Plan Bald Eagle Habitat Management Recommendations - DRAFT Introduction In 2009, a pair of bald eagles (Haliaetus leucocephalus) attempted to nest in a large Cottonwood
More informationWatching for Whoopers in Wisconsin Wetlands
Summary Students make maps of their communities to explore whooping crane habitat close to their neighborhoods. Objectives: Students will be able to: Use a variety of geographic representations, such as
More informationAppendix B Lease Rights, Status and Stipulations
Appendix B Lease Rights, Status and Stipulations Appendix B Lease Rights, Status and Stipulations B.1 Lease Rights An oil and gas lease grants the lessee the right and privilege to drill for, mine, extract,
More informationNo, the action area is located partially or wholly inside the white-nose syndrome zone. Continue to #2
Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions that May Affect Northern Long-Eared Bats A separate key is available for non-federal activities Federal agency actions that involve incidental
More informationSecond Term Extra Credit: Bald Eagle Field Study America s most prestigious bird of prey
Second Term Extra Credit: Bald Eagle Field Study America s most prestigious bird of prey Name: Hour: Field Dates: Pre-field study done: Arrival time: Saturday, January 8 8:00 10:00 AM (in conjunction w/
More informationCalifornia Condor Activity in the Tejon Ranch Region
California Condor Activity in the Tejon Ranch Region A summary of California condor habitat use patterns in conjunction with designated critical habitat and proposed developments on Tejon Ranch, CA Christopher
More informationSOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA
SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT (FERC NO. 516) RARE, THREATENED AND ENDANGERED SPECIES MANAGEMENT PROGRAM APRIL 2009 Prepared by: SOUTH CAROLINA
More informationSubject: Technical Memorandum Number 3 Summary of Field Surveys for Bata (Chiroptera)
Planning and Resource Management for Our Communities and the Environment 2 April 2002 Scott E. Shewbridge Senior Engineer - Hydroelectric El Dorado Irrigation District 2890 Mosquito Road Placerville, California
More informationAppendix A Little Brown Myotis Species Account
Appendix 5.4.14A Little Brown Myotis Species Account Section 5 Project Name: Scientific Name: Species Code: Status: Blackwater Myotis lucifugus M_MYLU Yellow-listed species by the British Columbia Conservation
More informationCDOW Recommended Stipulations for Oil and Gas Within the State of Colorado
CDOW Recommended Stipulations for Oil and Gas Within the State of Colorado No Surface Occupancy Timing Limitation Controlled Surface Use Stipulation Stipulation Stipulation Wildlife Habitat Species Types
More informationTable of Contents. Chapter 1.0 Purpose and Need
Table of Contents Chapter 1.0 Purpose and Need CHAPTER 1.0 PURPOSE AND NEED... 1 1.1 INTRODUCTION... 1 1.1.1 EA ORGANIZATION... 1 1.2 PROJECT AREA... 1 1.3 PROPOSED ACTION... 2 1.3.1 SCOPE OF THE PROPOSED
More informationSauvie Island Wildlife Area BCS number: 47-28
Sauvie Island Wildlife Area BCS number: 47-28 Site description author(s) Mark Nebeker, Oregon Department of Fish and Wildlife, Sauvie Island Wildlife Area Manager Primary contact for this site Mark Nebeker,
More informationFINAL TECHNICAL REPORT
Hancock and Calligan Creek Hydroelectric Projects FERC No. 13994 and 13948 HANCOCK CREEK AND CALLIGAN CREEK BALD EAGLE, OSPREY AND PEREGRINE FALCON SURVEY RESULTS FINAL TECHNICAL REPORT Prepared for: Everett,
More informationUSFWS Migratory Bird Program
USFWS Migratory Bird Program Updates for the Bird Conservation Committee North American Wildlife & Natural Resources Conference Norfolk, Va. ~ March 28, 2018 Presented by Sarah Mott & Ken Richkus U.S.
More informationWISCONSIN BIRD CONSERVATION INITIATIVE IMPORTANT BIRD AREAS PROGRAM
WISCONSIN BIRD CONSERVATION INITIATIVE IMPORTANT BIRD AREAS PROGRAM NOMINATION FORM The Wisconsin Bird Conservation Initiative (WBCI) is conducting an inventory of areas that may qualify as Important Bird
More informationHarlequin Ducks in Idaho Ecology, Distribution, Monitoring & Conservation
Paul Higgins Harlequin Ducks in Idaho Ecology, Distribution, Monitoring & Conservation Sonya Knetter & Frances Cassirer, IDFG Jacob Briggs, BYU-Idaho Idaho Bird Conservation Partnership, March 12, 2015
More informationThreatened & Endangered Species and T&E Habitats Encountered during Road and Bridge Projects
Threatened & Endangered Species and T&E Habitats Encountered during Road and Bridge Projects Keto Gyekis Wetland Identification Program (WIP) Coordinator T&E Species Technical Review Coordinator Project
More informationFinal Environmental Assessment for the Issuance of an Eagle Incidental Take Permit to Garrett Construction Company LLC
Final Environmental Assessment for the Issuance of an Eagle Incidental Take Permit to Garrett Construction Company LLC Prepared by U.S. Fish and Wildlife Service Region 6, Migratory Bird Management Office
More informationBaker River Project License Implementation. Cultural Resource Advisory Group. FINAL Meeting Notes
Baker River Project License Implementation Meeting FINAL Meeting Notes Team Leader: Elizabeth Dubreuil (PSE), (425) 462-3609, elizabeth.dubreuil@pse.com. PRESENT Elizabeth Dubreuil, Cary Feldmann, Mark
More informationPENNSYLVANIA GAME COMMISSION BUREAU OF WILDLIFE MANAGEMENT RESEARCH DIVISION PROJECT ANNUAL JOB REPORT
PENNSYLVANIA GAME COMMISSION BUREAU OF WILDLIFE MANAGEMENT RESEARCH DIVISION PROJECT ANNUAL JOB REPORT PROJECT CODE NO.: 06750 TITLE: Nongame Wildlife Research/Management JOB CODE NO.: 70004 TITLE: Colonial
More informationNorthampton Washlands: Frequently Asked Questions
Northampton Washlands: Frequently Asked Questions Site Significance 1 Why is the site important for wildlife? 2 Why are over wintering birds of such high conservation importance? 3 What are the issues
More informationFall Trumpeter Swan Survey of the High Plains Flock
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln US Fish & Wildlife Publications US Fish & Wildlife Service 10-2009 Fall Trumpeter Swan Survey of the High Plains Flock Shilo
More informationThe Adirondack Tremolo
The Adirondack Tremolo 2004 Winter Newsletter Volume 3, Issue 1 Loon Migration Linking People and the Environment Every fall, the most common question asked of the Adirondack Cooperative Loon Program is
More informationPeregrine Falcon Falco peregrinus
Plant Composition and Density Mosaic Distance to Water Prey Populations Cliff Properties Minimum Patch Size Recommended Patch Size Home Range Photo by Christy Klinger Habitat Use Profile Habitats Used
More informationPort of Portland s Streaked Horned Lark Habitat Conservation Plan. January 18th, 2017 Dana Green Sr. Manager, Natural Resources
Port of Portland s Streaked Horned Lark Habitat Conservation Plan January 18th, 2017 Dana Green Sr. Manager, Natural Resources Presentation Overview Streaked Horned Larks: Unique Habitat Requirements Airports:
More informationPesi 593 April 17, Variance MVP-ATWS-SM-031 Detailed Habitat Assessment and Portal Searches
Pesi 593 April 17, 2018 Ms. Tiernan Lennon and Mr. John Schmidt U.S. Fish & Wildlife Service West Virginia Field Office 90 Vance Drive Elkins, WV 26241 RE: Variance MVP-ATWS-SM-031 Detailed Habitat Assessment
More informationAPPENDIX A BIOLOGICAL ASSESSMENT. TCEF Research Project for LEWIS AND CLARK NATIONAL FOREST PREPARED BY
APPENDIX A BIOLOGICAL ASSESSMENT TCEF Research Project for LEWIS AND CLARK NATIONAL FOREST PREPARED BY Donald Godtel Forest Wildlife Biologist December 17, 1997 Updated November 1, 1998 to reflect status
More informationMixed Conifer Working Group Meeting February 17, 2011 Wildlife Habitat Management Considerations
Mixed Conifer Working Group Meeting February 17, 2011 Wildlife Habitat Management Considerations Overview 1. Existing mixed conifer habitat 2. Habitat trends 3. Factors influencing wildlife habitat suitability