LETTER OF TRANSMITTAL

Size: px
Start display at page:

Download "LETTER OF TRANSMITTAL"

Transcription

1 LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA Telephone: (985) Fax: (985) Date: 08/29/2016 Job #: Submittal #: D A Spec Section: Attention: Ryan Asbury RE: Grit Removal System TO: SMITH AND LOVELESS,INC Santa Fe Trail Dr. Lenexa, KS Lake Charles WWTP B-C Lake Charles Capital Project: CP 3128 LDEQ Project Number CS (913) WE ARE SENDING YOU: Shop Drawings/Submittal Attached VIA: the following items: COPIES DATE Submittal No. Description 1 08/29/2016 D A Grit Removal System THESE ARE TRANSMITTED as noted below: Remarks: x See Remarks Code4: Approved as noted/resubmit. Please release for fabrication per the engineer s comments. Please return one electronic copy addressing the engineer s comments. This does not need to be a complete submittal but only the revisions required for approval. Once these comments are addressed we will need seven (7) hard copies and two (2) electronic disk of the final approved submittals for distribution. cc: File Job Site Affinity - Jared Brown Max Foote Construction Company, LLC Signed: If enclosures are not as noted, kindly notify us at once.

2 Submittal Review Transmittal TO: Max Foote Construction Co., LLC ATTN: Bill Hussey 225 Antibes St. West Mandeville, LA Submittal Number: D A Date of Response: Date Received: 8/9/16 Project # Project Name Client WWTP B/C Expansion & Rehabilitation - CP 3128 City of Lake Charles SPECIFICATION Section # Grit Removal System Section Name Grit Removal System PRODUCTS These submittals are transmitted as marked below; comments to follow on additional pages. SUBMITTAL REVIEW Review is for general compliance with contract documents. No responsibility is assumed by ng Group for correctness of quantities, dimensions, and details. No deviation or variation is approved unless specifically accepted in these review comments. The Contractor shall assume full responsibility for coordination with all other trades and deviations from contract requirements. Code 1 APPROVED No notations or comments on the submittal. Contractor may release the equipment and/or material for manufacture. Code 2 APPROVED AS NOTED Confirmation of the notations and comments IS NOT required by the Contractor. Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. Code 3 APPROVED AS NOTED/CONFIRM Confirmation of the notations and comments IS required by the Contractor. Code 4 APPROVED AS NOTED/RESUBMIT Resubmittal to address all comments, omissions and non-conforming items that were noted. Code 5 NOT APPROVED Contractor must resubmit the entire package revised to bring the submittal into conformance. Code 6 COMMENTS ATTACHED Code 7 RECEIPT ACKNOWLEDGED Not subject to the Engineer s review and approval; and, is being filed for informational purposes only. Signed: Chris LaCroix Date: S. GLENSTONE PLACE BATON ROUGE, LOUISIANA TEL (225) FAX (225) PAGE 1 OF 2

3 Submittal Number: D A Project # Project Name Client WWTP B/C Expansion & Rehabilitation - CP 3128 City of Lake Charles SPECIFICATION Section # Grit Removal System Section Name PRODUCTS Grit Removal System Comments: Enclosures need to be NEMA 4X Stainless Steel. They are located outdoors near the corrosive atmosphere of the Headworks. See Project Electrical Drawings E23, E26, and E S. GLENSTONE PLACE BATON ROUGE, LOUISIANA TEL (225) FAX (225) PAGE 2 OF 2

4

5

6

7 LAKE CHARLES WWTP B-C LAKE CHARLES PROJECT CP 3128 LDEQ PROJECT CS SUBMITTAL FOR Grit Removal System D A 8/9/16 Bill Hussey Submittal Number Date Max Foote Construction Certification Statement: By this submittal, I hereby represent that I have determined and verified all field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have reviewed and approved this submittal and checked and coordinated each item with other applicable approved shop drawings and all contract requirements.

8

9

10

11

12 PISTA 360 with V-FORCE BAFFLE 95% Grit Removal Efficiency Down to 140 Mesh (105 Microns) Particle Size The PISTA 360 Grit Chamber is equipped with the patented V-Force Baffle, which is an integral flow control baffle for both the inlet and outlet of the main chamber. The V-Force Baffle directs the inlet flow into the chamber in a manner that ensures the proper vortex flow and prevents short-circuiting. The V-Force Baffle allows for a full 360 rotation from the inlet to the outlet, providing maximum flow travel for effective grit removal. The V-Force Baffle directs the flow out of the PISTA Grit Chamber and acts as a slice weir, controlling the water level in the main chamber and the inlet channel. No additional downstream flow control device is required to keep the velocity between 3.5 fps (1.06 m/s) at peak flow and 1.6 fps (0.48 m/s) at minimum flow with a 10:1 turn down. This most recent innovation further enhances the world s best grit removal scheme by providing engineering and cost saving considerations. By increasing chamber velocity during low flow periods, less grit is permitted to settle in upstream channels. The V-Force Baffle also extends the grit extraction path within the vortex grit chamber. This is a key feature because a longer grit path within the flow pattern dramatically increases the effectiveness of grit being captured on the chamber s flat-floor. Beyond this, the PISTA 360 with V-Force Baffle also permits design flexibility so that water elevations can be controlled. Water level control is important because it maintains the correct velocities approaching the grit chamber. Previously, the most common way to accomplish water level control in the chamber was to back up the flow with a downstream submerged weir. The PISTA 360 with V-Force Baffle has preset inlet and outlet openings that supplant the need for the submerged weir. With all of these improvements, the PISTA 360 with V-Force Baffle achieves 95% grit removal efficiency down to 140 mesh (105 microns). By integrating water elevation settings with the V-Force Baffle, the overall outlet footprint requirements decrease by as much as half the typical distance. The resulting smaller footprint provides significant construction cost savings. The PISTA 360 with V-Force Baffle represents the latest innovation that makes cents from Smith & Loveless. The PISTA 360 with V-Force Baffle is just one of many Smith & Loveless design innovations that make PISTA the world s leading grit removal system. Bulletin 960 Smith & Loveless Inc., 2012 O n l i n e : smithandloveless.com Phone: Fax:

13 PISTA 360 with V-FORCE BAFFLE - Page 2 PISTA Grit Chamber Features and Benefits Coanda Ramp Engineered entry facilitates laminar flow so that it takes a steady tangential direction as it enters the grit chamber and properly conditions the grit for entrapment. Bull Gear Drive Provides minimum service 5.0 factor and trouble-free operation. PISTA TURBO Grit Pump [Top-Mounted & Remote-Mounted Options] Removes grit from storage hopper to washing and dewatering. Available in vacuum-primed and flooded suction arrangements. Now available with SONIC START prime sensing. Outlet Channel S&L can assist with design information for optimal performance. Inlet Channel Controls velocity of influent and draws grit to the grit chamber floor. Exclusive Flat-Bottom Basin Floor Facilitates the forced vortex flow pattern inside the chamber. Minimizes organic capture while hydraulically directing grit into lower hopper. Patented, 360-degree in-line design. PISTA V-FORCE BAFFLE New, patented innovation enhances removal efficiency for low-flow periods and offers design engineering benefits. PISTA Grit Fluidizer Patented blade exclusive to S&L design. Loosens collected grit, preventing compacting. Storage Hopper Stores removed grit prior to dewatering. Hopper Cover Plate Stationary and recessed, it removes for quick access to storage hopper. Axial-Flow Propeller Aids in directing organic-free grit into lower hopper by enhancing flow patterns. Rounded edges prevent solids build-up, thus ensuring high efficiency. V-Force Baffle Benefits PISTA Model Number Max. Flow (U.S. / Metric / LPS) 95% grit removal efficiency down to 140 mesh (105 microns) particle size. Construction cost savings due to decreased overall grit system footprint requirements. Increases grit chamber velocity during low-flow periods. Full 360 rotation in the chamber, lengthening grit extraction path. Eliminates the need for downstream level control devices. Designed to handle wide range of flows. 0.5 I 0.5A I 0.5B 1.0 I 1.0A I 1.0B 2.5 I 2.5A I 2.5B 4.0 I 4.0A I 4.0B 7.0 I 7.0A I 7.0B 12.0 I 12.0A I 12.0B 20.0 I 20.0A I 20.0B 30.0 I 30.0A I 30.0B 50.0 I 50.0A I 50.0B 70.0 I 70.0A I 70.0B I 100.0A I 100.0B 0.5 MGD / 1,892 CMD / 22 LPS 1.0 MGD / 3,785 CMD / 44 LPS 2.5 MGD / 9,465 CMD / 110 LPS 4.0 MGD / 15,140 CMD / 175 LPS 7.0 MGD / 26,495 CMD / 307 LPS 12.0 MGD / 45,420 CMD / 526 LPS 20.0 MGD / 75,700 CMD / 876 LPS 30.0 MGD / 113,550 CMD / 1,314 LPS 50.0 MGD / 189,250 CMD / 2,190 LPS 70.0 MGD / 265,000 CMD / 3,067 LPS MGD / 378,500 CMD / 4,381 LPS O n l i n e : smithandloveless.com Phone: Fax:

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A

More information

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035. SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary

More information

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY 08625-0350 CHRIS CHRISTIE GOVERNOR KIM GUADAGNO Lt. Governor March 24, 2011 LEE A. SOLOMON

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal. SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

SUBMITTAL REVIEW COVERSHEET

SUBMITTAL REVIEW COVERSHEET SUBMITTAL REVIEW COVERSHEET Project Name: Alley 111 1725 Westlake Avenue N. Date: 2015-02-12 Suite 300 Submittal No & Description Rev 0: Submittal #220500-0205-0 Plumbing Shop Drawings L7-L8 Seattle, WA

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation June 3, 2010 Pella asks what is needed for submittals. See Attachment #1. June 7, 2010 Pella (Matt Tison) confirms the receipt of

More information

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School Submittal Review TO: Pavilion Construction DATE: 07.20.2015 JOB NO.: 1484P 4700 SW Macadam Ave Suite 200 ATTENTION: Riley Tobin Portland, OR 97239 RE: BSD Sunset High School Concession Stand/Interior Renovations

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project 02-3113 To: Quimby McCoy Preservation To: (Write-in Consultant) From: Vaughn Construction, LLC Architecture.

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 10/7/2011 Reference

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820 Date: 2/1/18 P1-101 Submittal Transmittal Project Name: P1-101 Sludge Dewatering and Odor Control at Plant 1 To: Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, CA 92708 Attn: Plant

More information

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

Submittal Review Form

Submittal Review Form Submittal Review Form Project Name: SMD1 Pump Station Project Contract No: 184030298 Submittal No: 8.1 Resubmittal Received Submittal Title: Standby Generator, Resubmittal 01 Spec. No: 16620 Routing Sequence

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

Waynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet

Waynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet Waynetown Water System Improvements Division A -New Water Treatment Plant Town of Waynetown, IN Submittal Review Sheet Attached is the submittal for the Backflow Preventer 3 for the Waynetown Water Systems

More information

What Are Submittals?

What Are Submittals? Introduction Overview of the Submittal Process Comparison of AIA with ConsensusDOCS Architect and Contractor Obligations FAR Requirements State Licensing Requirements 1 What Are Submittals? Submittals

More information

SECTION SUBMITTALS

SECTION SUBMITTALS SECTION 01300 SUBMITTALS PART 1- GENERAL 1.01 SCOPE OF WORK A. This Section specifies the general methods and requirements of submissions applicable to Shop Drawings, Product Data, Samples and Operations

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

January, 2014 Page 1 of 5

January, 2014 Page 1 of 5 Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal

More information

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0. SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

Chapter 1 General Design Information

Chapter 1 General Design Information Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,

More information

SEPARATOR INTERNALS. jci-group.com. Filtration & Separation Solutions. JCI Filtration & Separation Inc. JCI Cyclonics Ltd. JCI Sand Separators Ltd.

SEPARATOR INTERNALS. jci-group.com. Filtration & Separation Solutions. JCI Filtration & Separation Inc. JCI Cyclonics Ltd. JCI Sand Separators Ltd. TM Filtration & Separation Solutions SEPARATOR INTERNALS JCI Filtration & Separation Inc. JCI Cyclonics Ltd. JCI Sand Separators Ltd. jci-group.com JCI group of companies engineer and fabricate filtration

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints

More information

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

835 Gil Harbin Industrial Blvd Valdosta, GA 31601 QUALITY CONTROL PLAN NAVFAC SE PUBLIC WORKS MAYPORT FEAD MAYPORT 1966 BONHOMME RICHARD STREET MAYPORT NAVAL STATION FL 32228-0073 N69450-08-D-1781/0004 835 Gil Harbin Industrial Blvd Valdosta, GA 31601

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

Booster Pumping Station 115 Booster Pump Procurement

Booster Pumping Station 115 Booster Pump Procurement Madison Water Utility Tom Heikkinen General Manager 119 E. Olin Avenue Alan L. Larson PE, BCEE Principal Engineer Madison, Wisconsin 53713 Telephone: 608 266-4653 FAX: 608 266-4426 email: allarson@cityofmadison.com

More information

Submittal Transmittal

Submittal Transmittal Commonwealth Engineers, Inc. 7256 Company Drive Indianapolis IN 46237 United States Submittal Transmittal PROJECT: SUBJECT: Waynetown - Water-Strmwtr Imprv-Div A J13046-A DS-23-01 A_Engine Generators &

More information

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD SECTION 01 10 12 DESIGN AFTER AWARD 1. DESIGN RESPONSIBILITY The Contractor shall furnish and be responsible for a complete set of design documents as called for in specification section 01 10 10 DESIGN

More information

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL 1730 VARSITY DRIVE, SUITE 500, RALEIGH, NC 27606 TEL (919) 233-8091 FAX (919) 233-8031 LETTER OF TRANSMITTAL ADDRESS: ATTENTION: 80-A East Street Pittsboro, NC 27312-0130 Lynn Richardson Chatham County

More information

Liquid ring vacuum pumps in compact design

Liquid ring vacuum pumps in compact design Liquid ring vacuum pumps in compact design SIHI extruvac LEME 13, LEME 155 Pressure range: Suction volume flow: 1 to 113 mbar 3 to 17 m³/h CONSTRUCTION TYPE SIHI liquid ring vacuum pumps are displacement

More information

SPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment

SPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment 1995 Metric CSJ's 1047-03-056 & 0008-08-066 SPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment 1. Description. This Item shall govern for the furnishing and installation

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

DS-CD-01 Rev 3

DS-CD-01 Rev 3 Coalescers OVERVIEW There are numerous industrial applications requiring effective physical separation of two process liquids. HAT has developed a number of AlphaSEP Coalescers to handle a wide range of

More information

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 1 San Diego State University 00 Campanile Drive San Diego, CA 918 Tel: 619-94-740 Fax: 0079-1116-0 Circulating Pump Author

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016. SUBMITTAL REVIEW Submittal: No. 016.00 Spec Section: 3 113 Underground Natural Gas Piping Reviewed By: Laura Landon, Comma-Q Architecture Date: June 1, 01 Project: BPS Belgrade Elementary School Location:

More information

Regal Series Recessed Flatwalls

Regal Series Recessed Flatwalls Regal Series Recessed Flatwalls General Specifications The Amico Regal Series Recessed Flatwall shall be manufactured by Amico Corporation, in accordance with job specific shop drawings and documents.

More information

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification

More information

Minor Site Plan Review Process

Minor Site Plan Review Process Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice

More information

TAB B-9 RECORD DRAWINGS

TAB B-9 RECORD DRAWINGS TAB B-9 RECORD DRAWINGS Project record drawings and shall be prepared for all University of Arizona projects. The concept Record Drawings shall replace what has previously been called As-Builts. During

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 LETTER OF TRANSMITTAL To: DeKalb Mechanical 339 Wurlitzer Drive DeKalb, Illinois 60115 Date:

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

EXISTING TREE TO REMAIN (REFER TO LANDSCAPE PLAN) 500 TANCA STREET, SUITE #209 SAN JUAN, PUERTO RICO 00901 TEL 7877244144 FAX 7877244144 19'7" MAX SIDE POOL SETBACK 1000' MAX POOL SETBACK 1000'/ PROPOSED

More information