City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

Size: px
Start display at page:

Download "City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation"

Transcription

1 City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation June 3, 2010 Pella asks what is needed for submittals. See Attachment #1. June 7, 2010 Pella (Matt Tison) confirms the receipt of Preconstruction meeting date and time. See Attachment #2. June 16, 2010 Matt Tison asks for a copy of the scope of work. This would be included in his contract at the Preconstruction meeting. See the Attachment #3. June 16, 2010 Brian returns the scope of work to Matt Tison. See Attachment 3.1 and 3.2. The scope of work clearly states, Furnish all windows, doors and swinging French doors per plans and specifications. June 22, 2010 Matt Tison answers Brian Van Gorp s question about the C/L (Centerline) of the height of the latch at 1-4 above the sill or 4-0 above finished floor. His incorrect response indicates that, at this point, he does not understand the proper latch positions (1-4 from sill, or 4-0 from F.F.). Undated Attachment #5 (Pages 1-5) are documents sent by Pella asking if they can make changes to Kier s P.O. See attachment for requested changes. June 29, Brian Van Gorp sends the rejected submittal back to Matt Tison to revise his submittal. See Attachment 5.1. June 30, 2010 Matt Tison is stating that he is meeting with Dan Dazotel (Architect) to go over the submittal that was rejected. See Attachment #6. July 1, 2010 Matt Tison sends an indicating that he left a message with the architect (Dan Dazotel) to discuss the resubmittal and the RFI. He is asking what time would be best to meet. He is suggesting today or tomorrow. See Attachment #7

2 July 2, 2010 Matt Tison sends and to Dan Dazotel. He states that the one lock at the desired height will not allow them to meet the specified performance and testing requirements. See Attachment #8. July 19, 2010 Matt Tison sends and to All Western Windows (Window Installer). Matt invite the window installer to the weekly construction meeting to discuss mock-up s and best installation methods. See Attachment #9. July 21, 2010 Attachment #10 is the meeting minutes from the Construction meeting held at 1pm on July 21, The meeting minutes describe the events of the meeting. It is explained that the windows that Pella has submitted will not meet the specs. July 21, 2010 The following are documents that were give to Jeff during the construction meeting on July 21, 2010: Attachment 11.1 Mock-Up Delivery Tickets Attachment 11.2 Resubmittal Transmittal Attachment 11.3 Original PO Attachment 11.4 PO Change Request Attachment 11.5 Response from Pella Attachment 11.6 PO with Rider Attachment 11.7 Resubmittal July 23, 2010 Attachment #12 is a bid from Pella to use the Pella doors only. July 23, 2010 Present Matt Tison has been showing up at meetings uninvited and bothering members of the design team, construction team, and owners. September 14, 2010 Attachment #13 is a letter from Pella s attorney. September 22, 2010 Attachment #14 is a response letter from the Housing Authority of Salt Lake County. *** Also included is Attachment #15. This is the specification for these sections. It is dated April 23, 2010.

3

4

5

6

7

8

9

10

11

12

13

14

15

16 3710 QUINCY AVENUE OGDEN, UT Ph : (801) Letter of Transmittal To: S. 'IKE' EISENHOUR ALL WESTERN WINDOWS 1178 WEST 17TH STREET MARRIOTT-SLATERVILLE, UT Ph: (801) Fax: (801) Subject: Submittal - Windows and Doors Transmittal #: 16 Date: 8/11/2010 Job: SENIOR HIGH RISE/CITY PLAZA WE ARE SENDING YOU Shop drawings Copy of letter Attached Prints Change order Under separate cover via the following items: Plans Samples Specifications Submittal Document Type Submittal Copies Date No. 1 8/11/ Rev Description WINDOWS AND DOORS Status: Revise and resubmit THESE ARE TRANSMITTED as checked below: For approval For your use As requested For review and comment FOR BIDS DUE Approved as submitted Resubmit 3 copies for approval Approved as noted Submit copies for distribution Returned for corrections Return corrected prints Other PRINTS RETURNED AFTER LOAN TO US Remarks: FOR YOUR USE. REVISE AND RESUBMIT. PROVIDE 3 COMPLETE HARD COPIES. Copy To: THANK YOU. From: BRIAN VAN GORP (KIER CONSTRUCTION CO Signature: If enclosures are not as noted, kindly notify us at once. Page 1 of 1

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary

More information

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal. SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade

More information

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,

More information

Letter of Transmittal

Letter of Transmittal 3710 QUINCY AVENUE OGDEN, UT 84403-1934 Ph : (801)627-1414 Letter of Transmittal To: GEN ARCHITECTS, INC. 11001 SW RIVERSIDE DRIVE PORTLAND, OR 97219 Ph: (503)243-7183 Fax: (503)243-7193 Subject: Submittal

More information

SUBMITTAL REVIEW COVERSHEET

SUBMITTAL REVIEW COVERSHEET SUBMITTAL REVIEW COVERSHEET Project Name: Alley 111 1725 Westlake Avenue N. Date: 2015-02-12 Suite 300 Submittal No & Description Rev 0: Submittal #220500-0205-0 Plumbing Shop Drawings L7-L8 Seattle, WA

More information

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035. SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal DLR Group PROJECT: SUBJECT: Windsor High School 37-17223-00 Flush Wood Doors - Flush Wood Door, Veneer-Faced Doors Product Data and Shop Drawings DATE SENT: 6/21/2017 SUBMITTAL ID:

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting

More information

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY 08625-0350 CHRIS CHRISTIE GOVERNOR KIM GUADAGNO Lt. Governor March 24, 2011 LEE A. SOLOMON

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 LETTER OF TRANSMITTAL To: DeKalb Mechanical 339 Wurlitzer Drive DeKalb, Illinois 60115 Date:

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

ARCHITECT S SUPPLEMENTAL INSTRUCTIONSS

ARCHITECT S SUPPLEMENTAL INSTRUCTIONSS ARCHITECT S SUPPLEMENTAL INSTRUCTIONSS To: Kier Construction 3710 Quincy Avenue Ogden, UT 84403 Attn: Devin Healy Date: 09/10/2014 Project Name: Birkhill Apartments Phase 3A & 3B Project No: 130640 Re:

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: FLOOR BOXES BUILDING REFERENCE: DATE RECIEVED: Oct 09, 2014 DISCIPLINE: Electrical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 26 05 38 REVIEWER DUE

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1 700 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006 Office: 202.842.200 Museum of the Bible Submittal Pkg. No.: 08443.0 Submittal Review Form Submittal Items thru SG Project No: 26865.000 Response Date: 3/2/206

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016. SUBMITTAL REVIEW Submittal: No. 016.00 Spec Section: 3 113 Underground Natural Gas Piping Reviewed By: Laura Landon, Comma-Q Architecture Date: June 1, 01 Project: BPS Belgrade Elementary School Location:

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

Submittal Review Form

Submittal Review Form Submittal Review Form Project Name: SMD1 Pump Station Project Contract No: 184030298 Submittal No: 8.1 Resubmittal Received Submittal Title: Standby Generator, Resubmittal 01 Spec. No: 16620 Routing Sequence

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project 02-3113 To: Quimby McCoy Preservation To: (Write-in Consultant) From: Vaughn Construction, LLC Architecture.

More information

What Are Submittals?

What Are Submittals? Introduction Overview of the Submittal Process Comparison of AIA with ConsensusDOCS Architect and Contractor Obligations FAR Requirements State Licensing Requirements 1 What Are Submittals? Submittals

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 08/29/2016 Job #: 289-11150 Submittal #: D-11235-001-A

More information

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1 1700 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006 Office: 202.842.2100 Museum of the Bible Submittal Pkg. No.: 074213.13.0 Submittal Review Form Submittal Items 1 thru 1 SG Project No: 26865.000 Response

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

SECTION NON-ILLUMINATED INTERIOR DISPLAY SYSTEM

SECTION NON-ILLUMINATED INTERIOR DISPLAY SYSTEM SECTION 10445 NON-ILLUMINATED INTERIOR DISPLAY SYSTEM FullView Display System includes concealed pin lock device to secure a clear cover and/or sign insert material into the frame. Vandal resistant. PART

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820 Date: 2/1/18 P1-101 Submittal Transmittal Project Name: P1-101 Sludge Dewatering and Odor Control at Plant 1 To: Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, CA 92708 Attn: Plant

More information

SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE

SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE (Project) (Date) (Location) Turner Job # (TBD) Item No. 15 SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE (Location) TURNER CONTRACT

More information

January, 2014 Page 1 of 5

January, 2014 Page 1 of 5 Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

Procedure to Petition for Plat Review and Site Plan Review

Procedure to Petition for Plat Review and Site Plan Review Economic Development Department (734) 676-7104 or (734) 676-7109 Procedure to Petition for Plat Review and Site Plan Review All site plans shall be submitted to the Economic Development Department to be

More information

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SEAC/ RMSCA Steel Liaison Committee May 17, 2006 Disclaimer SEAC, RMSCA, nor its committees, writers, editors and individuals who have

More information

Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7)

Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7) Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Final Revision 2 AACE International Recommended Practice PS-24 Tracking

More information

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the

More information

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal

More information

Addendum No. 4 page 1

Addendum No. 4 page 1 Addendum No. 4 page 1 Project: Proj. No: 1541.01 Athletic Support Building and Site Improvements Woehrle Athletic Complex Jeffersonville, Indiana Date: December 11, 2015 This addendum is a part of the

More information

D Prints D As Requested 0 For Reference Only. D Samples Sent Via: 0 No Exception Taken. D Change Order!ZI RFI Response 0 Resubmit D Plans

D Prints D As Requested 0 For Reference Only. D Samples Sent Via: 0 No Exception Taken. D Change Order!ZI RFI Response 0 Resubmit D Plans Silicon Valley Rapid Transit Program VTA's BART Silicon Valley Berryessa Extension 1436 California Circle, 2 d Floor Milpitas, CA 95035 Transmittal No. C730-00931 P0728 Contract No.: C730 Contract: Contractor:

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

Cloud Based Plan Review Process (Applicant)

Cloud Based Plan Review Process (Applicant) 1 Cloud Based Plan Review Process (Applicant) Organize Documentation Process Overview Upload Documents To Mercer Island FTP Site No Initial Submittal? Yes Intake Screening Approved? CST will inform you

More information

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

ADDENDUM NO. 3, March 14, 2017 A.B.C. No ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

EXECUTIVE SUMMARY of DESIGN REVIEW

EXECUTIVE SUMMARY of DESIGN REVIEW EXECUTIVE SUMMARY of DESIGN REVIEW 1 - REVISIONING PROMONTORY From its inception, Promontory has focused on creating a premier community which blends the natural beauty of its mountain setting with excellence

More information

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0. SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX City Hall City Development Department 9500 Civic Center Drive 303-538-7295 Thornton, Colorado 80229-4326 FAX 303-538-7373 www.cityofthornton.net Zach Lauterbach Evergreen Devco, Incorporated 2390 East

More information

SECTION IDENTIFYING DEVICES

SECTION IDENTIFYING DEVICES PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 10441 IDENTIFYING DEVICES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section,

More information

[Corporate Communications Department] Notice Inviting Tender

[Corporate Communications Department] Notice Inviting Tender [Corporate Communications Department] Notice Inviting Tender Tender Ref: CorpComm/GreetingCardPrinting/2018 Tender Date: 22.11.2017 Last Date for Tender Submission: 28.11.2017 Balmer Lawrie & Co. Ltd.

More information

Lincoln County Tax Appraisal Office Project No. RFB

Lincoln County Tax Appraisal Office Project No. RFB Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior

More information

Field Tickets Frequently Asked Questions

Field Tickets Frequently Asked Questions When should I contact the Husky procurement technician (purchase order owner)? If the field ticket has not been actioned for a long time and you are waiting to invoice. If the purchase order (PO) from

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION USACE / NAVFAC / AFCEC / NASA UFGS-01 33 00.05 20 (May 2014) Change 1-09/15 Change 2-12/15 Change 3-09/16 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 33 00.05 20

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

Submittal Exchange Design Team User Guide

Submittal Exchange Design Team User Guide Submittal Exchange Design Team User Guide Version 17 November 2017 Contents About This Guide... 9 Access/Permissions... 11 What is Submittal Exchange for Design?... 11 How Can I Get Submittal Exchange

More information

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248) White Lake Township Building Dept. 7525 Highland Rd. (248) 698-3300 SUBMITTAL REQUIREMENTS FOR SINGLE FAMILY HOMES, ADDITIONS, GARAGES AND RENOVATIONS --NEW-- Package for new residences must include $

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 1 San Diego State University 00 Campanile Drive San Diego, CA 918 Tel: 619-94-740 Fax: 0079-1116-0 Circulating Pump Author

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 34 59 (August 2008) Change 1-11/12 --------------------------- Preparing Activity: USACE Superseding UFGS-08 34 59 (April 2006) UFGS-08 34 53.00 40 (June 2006) UNIFIED

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 23 25 00 REVIEWER DUE DATE: 6/11/2015