City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation
|
|
- Melvin Osborne
- 6 years ago
- Views:
Transcription
1 City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation June 3, 2010 Pella asks what is needed for submittals. See Attachment #1. June 7, 2010 Pella (Matt Tison) confirms the receipt of Preconstruction meeting date and time. See Attachment #2. June 16, 2010 Matt Tison asks for a copy of the scope of work. This would be included in his contract at the Preconstruction meeting. See the Attachment #3. June 16, 2010 Brian returns the scope of work to Matt Tison. See Attachment 3.1 and 3.2. The scope of work clearly states, Furnish all windows, doors and swinging French doors per plans and specifications. June 22, 2010 Matt Tison answers Brian Van Gorp s question about the C/L (Centerline) of the height of the latch at 1-4 above the sill or 4-0 above finished floor. His incorrect response indicates that, at this point, he does not understand the proper latch positions (1-4 from sill, or 4-0 from F.F.). Undated Attachment #5 (Pages 1-5) are documents sent by Pella asking if they can make changes to Kier s P.O. See attachment for requested changes. June 29, Brian Van Gorp sends the rejected submittal back to Matt Tison to revise his submittal. See Attachment 5.1. June 30, 2010 Matt Tison is stating that he is meeting with Dan Dazotel (Architect) to go over the submittal that was rejected. See Attachment #6. July 1, 2010 Matt Tison sends an indicating that he left a message with the architect (Dan Dazotel) to discuss the resubmittal and the RFI. He is asking what time would be best to meet. He is suggesting today or tomorrow. See Attachment #7
2 July 2, 2010 Matt Tison sends and to Dan Dazotel. He states that the one lock at the desired height will not allow them to meet the specified performance and testing requirements. See Attachment #8. July 19, 2010 Matt Tison sends and to All Western Windows (Window Installer). Matt invite the window installer to the weekly construction meeting to discuss mock-up s and best installation methods. See Attachment #9. July 21, 2010 Attachment #10 is the meeting minutes from the Construction meeting held at 1pm on July 21, The meeting minutes describe the events of the meeting. It is explained that the windows that Pella has submitted will not meet the specs. July 21, 2010 The following are documents that were give to Jeff during the construction meeting on July 21, 2010: Attachment 11.1 Mock-Up Delivery Tickets Attachment 11.2 Resubmittal Transmittal Attachment 11.3 Original PO Attachment 11.4 PO Change Request Attachment 11.5 Response from Pella Attachment 11.6 PO with Rider Attachment 11.7 Resubmittal July 23, 2010 Attachment #12 is a bid from Pella to use the Pella doors only. July 23, 2010 Present Matt Tison has been showing up at meetings uninvited and bothering members of the design team, construction team, and owners. September 14, 2010 Attachment #13 is a letter from Pella s attorney. September 22, 2010 Attachment #14 is a response letter from the Housing Authority of Salt Lake County. *** Also included is Attachment #15. This is the specification for these sections. It is dated April 23, 2010.
3
4
5
6
7
8
9
10
11
12
13
14
15
16 3710 QUINCY AVENUE OGDEN, UT Ph : (801) Letter of Transmittal To: S. 'IKE' EISENHOUR ALL WESTERN WINDOWS 1178 WEST 17TH STREET MARRIOTT-SLATERVILLE, UT Ph: (801) Fax: (801) Subject: Submittal - Windows and Doors Transmittal #: 16 Date: 8/11/2010 Job: SENIOR HIGH RISE/CITY PLAZA WE ARE SENDING YOU Shop drawings Copy of letter Attached Prints Change order Under separate cover via the following items: Plans Samples Specifications Submittal Document Type Submittal Copies Date No. 1 8/11/ Rev Description WINDOWS AND DOORS Status: Revise and resubmit THESE ARE TRANSMITTED as checked below: For approval For your use As requested For review and comment FOR BIDS DUE Approved as submitted Resubmit 3 copies for approval Approved as noted Submit copies for distribution Returned for corrections Return corrected prints Other PRINTS RETURNED AFTER LOAN TO US Remarks: FOR YOUR USE. REVISE AND RESUBMIT. PROVIDE 3 COMPLETE HARD COPIES. Copy To: THANK YOU. From: BRIAN VAN GORP (KIER CONSTRUCTION CO Signature: If enclosures are not as noted, kindly notify us at once. Page 1 of 1
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN
SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary
More informationSUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.
SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade
More informationSUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN
SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,
More informationLetter of Transmittal
3710 QUINCY AVENUE OGDEN, UT 84403-1934 Ph : (801)627-1414 Letter of Transmittal To: GEN ARCHITECTS, INC. 11001 SW RIVERSIDE DRIVE PORTLAND, OR 97219 Ph: (503)243-7183 Fax: (503)243-7193 Subject: Submittal
More informationSUBMITTAL REVIEW COVERSHEET
SUBMITTAL REVIEW COVERSHEET Project Name: Alley 111 1725 Westlake Avenue N. Date: 2015-02-12 Suite 300 Submittal No & Description Rev 0: Submittal #220500-0205-0 Plumbing Shop Drawings L7-L8 Seattle, WA
More informationSUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.
SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSubmittal Transmittal
Submittal Transmittal DLR Group PROJECT: SUBJECT: Windsor High School 37-17223-00 Flush Wood Doors - Flush Wood Door, Veneer-Faced Doors Product Data and Shop Drawings DATE SENT: 6/21/2017 SUBMITTAL ID:
More informationLETTER OF TRANSMITTAL
LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A
More informationSpec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN
SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary
More informationDIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES
DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including
More informationSECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,
More informationSubmittal Packages Detailed with Items and Reviewers
Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting
More informationState of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY
State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY 08625-0350 CHRIS CHRISTIE GOVERNOR KIM GUADAGNO Lt. Governor March 24, 2011 LEE A. SOLOMON
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationCITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES
SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationA. Action Submittals: Written and graphic information that requires Engineer's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationLETTER OF TRANSMITTAL
NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 LETTER OF TRANSMITTAL To: DeKalb Mechanical 339 Wurlitzer Drive DeKalb, Illinois 60115 Date:
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General
More informationWorking Drawing Manual
Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...
More informationsubmittals 1s e c t i o n
Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationARCHITECT S SUPPLEMENTAL INSTRUCTIONSS
ARCHITECT S SUPPLEMENTAL INSTRUCTIONSS To: Kier Construction 3710 Quincy Avenue Ogden, UT 84403 Attn: Devin Healy Date: 09/10/2014 Project Name: Birkhill Apartments Phase 3A & 3B Project No: 130640 Re:
More informationSECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.
SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.
More informationSUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:
OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: FLOOR BOXES BUILDING REFERENCE: DATE RECIEVED: Oct 09, 2014 DISCIPLINE: Electrical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 26 05 38 REVIEWER DUE
More informationADDENDUM TO RFP DOCUMENTS
Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,
More informationMuseum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1
700 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006 Office: 202.842.200 Museum of the Bible Submittal Pkg. No.: 08443.0 Submittal Review Form Submittal Items thru SG Project No: 26865.000 Response Date: 3/2/206
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationWTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE
WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationSUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.
SUBMITTAL REVIEW Submittal: No. 016.00 Spec Section: 3 113 Underground Natural Gas Piping Reviewed By: Laura Landon, Comma-Q Architecture Date: June 1, 01 Project: BPS Belgrade Elementary School Location:
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationJacksonville District Master
-01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationTaylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES
SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working
More informationSECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000
More informationSubmittal Review Form
Submittal Review Form Project Name: SMD1 Pump Station Project Contract No: 184030298 Submittal No: 8.1 Resubmittal Received Submittal Title: Standby Generator, Resubmittal 01 Spec. No: 16620 Routing Sequence
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment
More informationAnswer: Qualification statement should be provided with the bid.
Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationSUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project
SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project 02-3113 To: Quimby McCoy Preservation To: (Write-in Consultant) From: Vaughn Construction, LLC Architecture.
More informationWhat Are Submittals?
Introduction Overview of the Submittal Process Comparison of AIA with ConsensusDOCS Architect and Contractor Obligations FAR Requirements State Licensing Requirements 1 What Are Submittals? Submittals
More informationSECTION PROJECT MANAGEMENT AND COORDINATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationLETTER OF TRANSMITTAL
LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 08/29/2016 Job #: 289-11150 Submittal #: D-11235-001-A
More informationMuseum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1
1700 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006 Office: 202.842.2100 Museum of the Bible Submittal Pkg. No.: 074213.13.0 Submittal Review Form Submittal Items 1 thru 1 SG Project No: 26865.000 Response
More informationSeptember 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.
Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The
More informationPROCEDURE FOR PROCESSING WORKING DRAWINGS
PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,
More informationSECTION NON-ILLUMINATED INTERIOR DISPLAY SYSTEM
SECTION 10445 NON-ILLUMINATED INTERIOR DISPLAY SYSTEM FullView Display System includes concealed pin lock device to secure a clear cover and/or sign insert material into the frame. Vandal resistant. PART
More informationSECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationWorking Drawing Procedure
Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring
More information2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS
PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called
More informationDrawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820
Date: 2/1/18 P1-101 Submittal Transmittal Project Name: P1-101 Sludge Dewatering and Odor Control at Plant 1 To: Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, CA 92708 Attn: Plant
More informationSUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE
(Project) (Date) (Location) Turner Job # (TBD) Item No. 15 SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE (Location) TURNER CONTRACT
More informationJanuary, 2014 Page 1 of 5
Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.
More informationProcedure to Petition for Plat Review and Site Plan Review
Economic Development Department (734) 676-7104 or (734) 676-7109 Procedure to Petition for Plat Review and Site Plan Review All site plans shall be submitted to the Economic Development Department to be
More informationSUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS
SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SEAC/ RMSCA Steel Liaison Committee May 17, 2006 Disclaimer SEAC, RMSCA, nor its committees, writers, editors and individuals who have
More informationRecommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7)
Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Final Revision 2 AACE International Recommended Practice PS-24 Tracking
More informationIngham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18
Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the
More informationDesigner CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer
Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal
More informationAddendum No. 4 page 1
Addendum No. 4 page 1 Project: Proj. No: 1541.01 Athletic Support Building and Site Improvements Woehrle Athletic Complex Jeffersonville, Indiana Date: December 11, 2015 This addendum is a part of the
More informationD Prints D As Requested 0 For Reference Only. D Samples Sent Via: 0 No Exception Taken. D Change Order!ZI RFI Response 0 Resubmit D Plans
Silicon Valley Rapid Transit Program VTA's BART Silicon Valley Berryessa Extension 1436 California Circle, 2 d Floor Milpitas, CA 95035 Transmittal No. C730-00931 P0728 Contract No.: C730 Contract: Contractor:
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationSECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.
SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in
More informationCloud Based Plan Review Process (Applicant)
1 Cloud Based Plan Review Process (Applicant) Organize Documentation Process Overview Upload Documents To Mercer Island FTP Site No Initial Submittal? Yes Intake Screening Approved? CST will inform you
More informationADDENDUM NO. 3, March 14, 2017 A.B.C. No
ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS
SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationEXECUTIVE SUMMARY of DESIGN REVIEW
EXECUTIVE SUMMARY of DESIGN REVIEW 1 - REVISIONING PROMONTORY From its inception, Promontory has focused on creating a premier community which blends the natural beauty of its mountain setting with excellence
More informationREMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.
SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett
More information.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal
City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings
More informationCity Development Department 9500 Civic Center Drive Thornton, Colorado FAX
City Hall City Development Department 9500 Civic Center Drive 303-538-7295 Thornton, Colorado 80229-4326 FAX 303-538-7373 www.cityofthornton.net Zach Lauterbach Evergreen Devco, Incorporated 2390 East
More informationSECTION IDENTIFYING DEVICES
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 10441 IDENTIFYING DEVICES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section,
More information[Corporate Communications Department] Notice Inviting Tender
[Corporate Communications Department] Notice Inviting Tender Tender Ref: CorpComm/GreetingCardPrinting/2018 Tender Date: 22.11.2017 Last Date for Tender Submission: 28.11.2017 Balmer Lawrie & Co. Ltd.
More informationLincoln County Tax Appraisal Office Project No. RFB
Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior
More informationField Tickets Frequently Asked Questions
When should I contact the Husky procurement technician (purchase order owner)? If the field ticket has not been actioned for a long time and you are waiting to invoice. If the purchase order (PO) from
More informationA. Section includes administrative and procedural requirements for project record documents, including the following:
SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01
More informationSECTION 2 GENERAL REQUIREMENTS
SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall
More informationDIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION
USACE / NAVFAC / AFCEC / NASA UFGS-01 33 00.05 20 (May 2014) Change 1-09/15 Change 2-12/15 Change 3-09/16 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 33 00.05 20
More informationSHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018
SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationSubmittal Exchange Design Team User Guide
Submittal Exchange Design Team User Guide Version 17 November 2017 Contents About This Guide... 9 Access/Permissions... 11 What is Submittal Exchange for Design?... 11 How Can I Get Submittal Exchange
More informationWhite Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)
White Lake Township Building Dept. 7525 Highland Rd. (248) 698-3300 SUBMITTAL REQUIREMENTS FOR SINGLE FAMILY HOMES, ADDITIONS, GARAGES AND RENOVATIONS --NEW-- Package for new residences must include $
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.
More informationCONVEYANCE PIPELINE AND PUMP STATION
SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station
More informationSubmittal Packages Detailed with Items and Reviewers
Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 1 San Diego State University 00 Campanile Drive San Diego, CA 918 Tel: 619-94-740 Fax: 0079-1116-0 Circulating Pump Author
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 34 59 (August 2008) Change 1-11/12 --------------------------- Preparing Activity: USACE Superseding UFGS-08 34 59 (April 2006) UFGS-08 34 53.00 40 (June 2006) UNIFIED
More informationSPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS
Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized
More informationSUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:
OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 23 25 00 REVIEWER DUE DATE: 6/11/2015
More information