1 OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: REVIEWER DUE DATE: 6/11/2015 DWG REF. DWG TITLE: RETURNED ITEMS: HVAC WATER TREATMENT CHILLED WATER PIPING TR NONE NO OF ITEMS: ITEM DESCRIPTI CONTRACTOR/CM: SUBMITTAL TRANSMITTAL SUBMITTAL NUMBER: : WILLIAMS COMPANY : BRAD KUBIN 2301 SILVER STAR RD. (407) FAX:(407) DATE RETURNED TO CM: 1 Product Literature(s) REVIEW STATUS: REVIEWED REVIEWERS: PRIMARY: SECONDARY: COMMENTS: KEVIN KING PHN: (407) FAX: (407) kking@matern.net NO SECOND REVIEWER ASSIGNED cc: OWNER : CALVIN WOOLFOLK 6501 MAGIC WAY, BLDG. 200 (407) FAX:(407) R+B FILE: : X6 RHODES + BRITO ARCHITECTS INC. : 605 E. ROBINSON STREET, SUITE 750 : ORLANDO, FL. : : : FAX PAGE 1 OF 1

2 OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: DATE RFI RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: REVIEWER DUE DATE: 6/11/2015 DWG REF. DWG TITLE: SUBMITTAL CONTENTS: HVAC WATER TREATMENT CHILLED WATER PIPING TR NONE NO OF ITEMS: ITEM DESCRIPTION 1 SERVICE REPORT REVIEWERS: PRIMARY: SECONDARY: SUBMITTAL ASSIGNMENT MEMO KEVIN KING PHN: (407) FAX: (407) kking@matern.net SCOTT BURCHFIELD SUBMITTAL NUMBER: PHN: FAX: sburchfield@matern.net REVIEW STATUS: REVIEWED FURNISHED AS MARKED REVISE AND RESUBMIT RE-SUBMIT WITH ITEMS NOT REVIEWED REJECTED THIS SUBMITTAL IS ISSUED TO YOU FOR YOUR REVIEW. PLEASE RESPOND AND RETURN...WITH THIS COMPLETED SAM TRANSMITTAL...TO MICHELE BUDAY-URDANETA NO LATER THAN: 6/11/2015. PLEASE COMPLETE REVIEW STATUS AT RIGHT COMMENTS: THIS SUBMITTAL WAS REVIEWED BY : (please print) cc: OWNER : CALVIN WOOLFOLK 6501 MAGIC WAY, BLDG. 200 CONTR/CM: : WILLIAMS COMPANY : BRAD KUBIN 2301 SILVER STAR RD. R+B FILE: : X6

3 Submittal Approval Form PROJECT: CLAY SPRINGS ELEMENTARY SCHOOL DATE: 6/1/15 SUBCONTRACTOR NAME: DHR Mechanical Services SUBCONTRATOR ADDRESS: NUMBER AND TITLE OF SPECIFICATION SECTION: HVAC Water Treatment Chilled Water Piping TR Contractor s Submittal Stamp Architect/ Engineer s Submittal Stamp 6/1/15

4 SUBMITTAL DATA REVIEW COMMENTS Date: June 12, 2015 MPE Project No: Project: By: Submittal: OCPS-Clay Springs ES J. Walden for Kevin King Water Treatment Data No.: Submittal No.: 002 Contractor s I.D.: DHR Class: Basis of Design (1) Equal (2) Substitution (3) X A No exceptions taken. B Make corrections noted. C Revise and Resubmit. D Submit Specified Item. E Rejected. N Review not required. ACTION CODE THE FOLLOWING COMMENTS SHALL BE CONSIDERED AN INTEGRAL PART OF THE SUBMITTAL DATA REVIEW. REVIEW OF THIS DATA IS ONLY FOR CONFORMANCE WITH THE DESIGN CONCEPT AS GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR: QUANTITIES, FUNCTIONS, DIMENSIONS AND COORDINATION OF THE WORK WITH OTHER TRADES. 1.Preliminary water test report. END OF SUBMITTAL DATA REVIEW COMMENTS Corporate Office: 130 Candace Drive, Maitland, Florida Phone: Orlando Fort Myers Jacksonville Tampa Registered: FLORIDA * GEORGIA* LOUISIANA * NORTH CAROLINA * SOUTH CAROLINA * TEXAS * TENNESSEE * VIRGINIA

5 WATER TREATMENT SERVICE REPORT Company: DHR Mechanical Date: 06/01/15 Address: Plant Clay Springs Elementary City: Apopka State: FL Zip: Country: Attention: Billy Walton Copy to: NALCO Copy to: WP106 FILES PURPOSE: To perform an inspection visit, and issue a preliminary report. Check the chemical parameters of your chilled water loop and provide recommendations to assure the specified performance goals are being met. OBSERVATIONS: Cleaning agent was introduced in the system on and flushed for over 48 hours. System water was tested on We tested the conductivity, iron and ph levels of the closed loop. All parameters were within recommended settings, the results were 301 us/cm, 0.34 ppm and 8.01 respectively and are tabulated below. We recommended the inhibitor to be added once the system is free of leaks so product is not wasted. We returned to test for inhibitor on and it tested At 1000 ppm. Conductivity ph Iron Nitrite us/cm ppm 1000 ppm Conductivity ph Iron Recommen ded Iron Record Record < 1 ppm < 600 ppm Your input on today s visit matters to us, and will help improve our service. Feel free to contact us with any questions or concerns. Jesus Morfa, B.S.M.E., M.S.E.M District Representative. Nalco an Ecolab Company Alex Pichardo, Technical Service Representative. Nalco an Ecolab Company Signed: Jesus Morfa Title: District Representative. District: WP106 NALCO COMPANY 2622 Cypress Ridge Blvd., Suite 102 Wesley Chapel, FL 33544

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: FLOOR BOXES BUILDING REFERENCE: DATE RECIEVED: Oct 09, 2014 DISCIPLINE: Electrical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 26 05 38 REVIEWER DUE

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: BUILDING REFERENCE: SUBJECT: ATHLETIC EQUIPMENT - CALCS - RESUBMITTED 2 TIME(S) DATE RECIEVED: Feb 02, 2015 DISCIPLINE: Structural PRIORITY STATUS: 2-STANDARD SPECIFICATION

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: BUILDING REFERENCE: SUBJECT: DOMESTIC WATER PIPING - RESUBMITTED 2 TIME(S) DATE RECIEVED: Mar 03, 2015 DISCIPLINE: Plumbing PRIORITY STATUS: 2-STANDARD SPECIFICATION

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED REFRIGERANT PIPING AND SPECIALTIES MAT. LIST & CERT. SUBMITTAL NUMBER:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED REFRIGERANT PIPING AND SPECIALTIES MAT. LIST & CERT. SUBMITTAL NUMBER: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Nov 13, 2014 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 23 23 00 REVIEWER DUE DATE: 11/25/2014

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED PLANTS PHOTOGRAPHS/ANCHORING SYSTEMS -RESUBMITTED 1 TIME(S) SUBMITTAL NUMBER:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED PLANTS PHOTOGRAPHS/ANCHORING SYSTEMS -RESUBMITTED 1 TIME(S) SUBMITTAL NUMBER: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Apr 21, 2015 DISCIPLINE: Landscape PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: REVIEWER DUE DATE: 5/1/2015 DWG REF.

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: POWER STUDY BUILDING REFERENCE: DATE RECIEVED: Nov 07, 2014 DISCIPLINE: Electrical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 26 05 73 REVIEWER DUE

More information

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0. SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary

More information

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal. SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade

More information

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

835 Gil Harbin Industrial Blvd Valdosta, GA 31601 QUALITY CONTROL PLAN NAVFAC SE PUBLIC WORKS MAYPORT FEAD MAYPORT 1966 BONHOMME RICHARD STREET MAYPORT NAVAL STATION FL 32228-0073 N69450-08-D-1781/0004 835 Gil Harbin Industrial Blvd Valdosta, GA 31601

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting

More information

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project 02-3113 To: Quimby McCoy Preservation To: (Write-in Consultant) From: Vaughn Construction, LLC Architecture.

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 LETTER OF TRANSMITTAL To: DeKalb Mechanical 339 Wurlitzer Drive DeKalb, Illinois 60115 Date:

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting. Number: BD-020 Title: Electronic Plan Submittal and Review Effective Keywords: Permits, Plan Review, Plan Submittal Date: April 3, 2013 Revision Date: vember 4, 2015 Approved By: Thomas Hogarth Contact

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SUBMITTAL REVIEW COVERSHEET

SUBMITTAL REVIEW COVERSHEET SUBMITTAL REVIEW COVERSHEET Project Name: Alley 111 1725 Westlake Avenue N. Date: 2015-02-12 Suite 300 Submittal No & Description Rev 0: Submittal #220500-0205-0 Plumbing Shop Drawings L7-L8 Seattle, WA

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School Submittal Review TO: Pavilion Construction DATE: 07.20.2015 JOB NO.: 1484P 4700 SW Macadam Ave Suite 200 ATTENTION: Riley Tobin Portland, OR 97239 RE: BSD Sunset High School Concession Stand/Interior Renovations

More information

Ductwork Construction Checklist

Ductwork Construction Checklist Ductwork Construction Checklist Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

Vanderbilt University Standard Specification Revised 2/6/08

Vanderbilt University Standard Specification Revised 2/6/08 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation June 3, 2010 Pella asks what is needed for submittals. See Attachment #1. June 7, 2010 Pella (Matt Tison) confirms the receipt of

More information

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035. SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016. SUBMITTAL REVIEW Submittal: No. 016.00 Spec Section: 3 113 Underground Natural Gas Piping Reviewed By: Laura Landon, Comma-Q Architecture Date: June 1, 01 Project: BPS Belgrade Elementary School Location:

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip: Central Lyon County Fire Protection District 246 Dayton Valley Rd Suite 106 Dayton, NV 89403 Rich Harvey, Chief Office (775) 246-6209, Fax (775)246-6204 TTY 7-1-1 APPLICATION FOR COMMERCIAL CONSTRUCTION

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 1 San Diego State University 00 Campanile Drive San Diego, CA 918 Tel: 619-94-740 Fax: 0079-1116-0 Circulating Pump Author

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal DLR Group PROJECT: SUBJECT: Windsor High School 37-17223-00 Flush Wood Doors - Flush Wood Door, Veneer-Faced Doors Product Data and Shop Drawings DATE SENT: 6/21/2017 SUBMITTAL ID:

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION For Office Use Only Date Received: Approved: ARC Non-Refundable Fees ARC Refundable Deposit Pd: For Office Use Only Plat Name: Lot # Street Address: New Construction Alteration Preliminary Final ARCHITECTURAL

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM SECTION 011000 SUMMARY PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Work covered by the Contract Documents. 2. Work under other contracts. 3. Use of premises. 4. Specification

More information

C I T Y O F M c K I N N E Y PLANNING

C I T Y O F M c K I N N E Y PLANNING C I T Y O F M c K I N N E Y PLANNING 221 N. TENNESSEE STR EE T, McKI NNEY, TEXA S 75069 CONTENTS Approval Process Flowchart FAQs Letter of Intent Requirements Façade Plan Submittal Checklist Non-Residential

More information

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

Brad Luke. Director Peddle Thorp Auckland

Brad Luke. Director Peddle Thorp Auckland Brad Luke Director Peddle Thorp Auckland Site Observation and Practical Completion Preparation PEDDLE THORP Introduction Architects Agreement for Services. Observation Work Plans. Auckland Council Quality

More information

What Are Submittals?

What Are Submittals? Introduction Overview of the Submittal Process Comparison of AIA with ConsensusDOCS Architect and Contractor Obligations FAR Requirements State Licensing Requirements 1 What Are Submittals? Submittals

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

REQUEST FOR INFORMATION (RFI)

REQUEST FOR INFORMATION (RFI) Planning, Development & Facilities 349 Magnolia Avenue Glendale, California 91204 Tel: 818.507.0201 Fax: 818.507.4911 Project Name: Jefferson ES-12 Classroom Bldg. DSA No: A#:03-114361, File#:19-41 District

More information

Submittal Transmittal

Submittal Transmittal Commonwealth Engineers, Inc. 7256 Company Drive Indianapolis IN 46237 United States Submittal Transmittal PROJECT: SUBJECT: Waynetown - Water-Strmwtr Imprv-Div A J13046-A DS-23-01 A_Engine Generators &

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 10/7/2011 Reference

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION Ardmore, PA Atlantic City, NJ REQUEST FOR INFORMATION PROJECT: 1845 - Renaissance Hotel Renovations RFI NUMBER: 51.0 JONATHAN NEHMER & ASSOC ATTN: Lauren Maccherone Dacey 7361 Calhoun Place Suite 310 Rockville,

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

Merrick Pet Care New Distribution Center Hereford, Texas

Merrick Pet Care New Distribution Center Hereford, Texas Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Letter of Transmittal

Letter of Transmittal 3710 QUINCY AVENUE OGDEN, UT 84403-1934 Ph : (801)627-1414 Letter of Transmittal To: GEN ARCHITECTS, INC. 11001 SW RIVERSIDE DRIVE PORTLAND, OR 97219 Ph: (503)243-7183 Fax: (503)243-7193 Subject: Submittal

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

GSFC CONFIGURATION MANAGEMENT MANUAL

GSFC CONFIGURATION MANAGEMENT MANUAL GSFC-CM-001 Effective Date: 05/03/2007 Expiration Date: 05/03/2008 National Aeronautics and Space Administration Goddard Space Flight Center Greenbelt, MD 20771 GSFC CONFIGURATION MANAGEMENT MANUAL Responsible

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please

More information

10930 W. Sam Houston Parkway N., Suite 900

10930 W. Sam Houston Parkway N., Suite 900 ADDENDUM NO. 1 10930 W Sam Houston Pkwy. North Suite 900 Houston, Texas 77064 281.664.1900 281.664.1912 (f) www.salasobrien.com March 21, 2018 Project: Prepared by: Taylor Career Center Welding Labs Beaumont

More information

Section XV - PER, Design, and Construction Submittal Requirements

Section XV - PER, Design, and Construction Submittal Requirements Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information