SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

Size: px
Start display at page:

Download "SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035."

Transcription

1 SUBMITTAL REVIEW Submittal: No Spec Section: Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location: Belgrade, MT Job Number: Copy to: File, Owner This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following: NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted Food Service Equipment Data Sheets GCAN Notes: 1. See D-C Design comments. END OF REVIEW

2 SUBMITTAL REVIEW CONTACT: DATE: Laura Landon 7/22/2012 COMPANY: Comma Q Architecture ADDRESS: 109 North Rouse Avenue, Ste #1 Bozeman, Montana PHONE: JOB NUMBER: PROJECT: Belgrade Elementary School Belgrade, Montana FROM: Michael Miles, FCSI REVIEWED SEE REMARKS REVISE AND RESUBMIT SEE COMMENTS DOCUMENT: PRODUCT DATA PRODUCT SCHEDULE OTHER: SHOP DRAWINGS SLAB MAINTENANCE DATA WALL BACKING SCHEDULE COORDINATION DRAWINGS Checking is for general conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site; for information that pertains solely to the fabrication processes or to techniques of construction; and for coordination of the work of all trades. Acceptance does not authorize changes to the contract requirements unless stated in a separate letter. Failure to provide a complete submittal package will result in the return of submittal, without review. It is the sole responsibility of the Kitchen Equipment Contractor to coordinate with General Contractor, verify and adjust equipment gas type and elevation requirements (regulator and orifices) for optimal performance to site specifications regardless of original gas type/elevation provision. Extra charges resulting from KEC not confirming gas type and elevation prior to foodservice equipment ordering will be paid by the Kitchen Equipment Contractor. COMMENTS: KEC to verify and coordinate flooring conditions (Walk in pit required) and surfaces prior to ordering walk in, this box is designed to have 4 modular flooring panels. Shop Drawings: Item 14 Trench Drain ok Item 32 Floor Trough ok H C DESIGN & COUNSULTING P.O. BOX 10545, BOZEMAN MONTANA CDESIGN.COM

3 TRANSMITTAL July 22, 2012 To: H-C Design Attention: Michael Miles From: Laura Landon Project: BPS Belgrade Elementary School Location: Bozeman, MT Job Number: Copy to: File we are sending you : Attached Under separate cover the following: Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other: these are transmitted as checked below: Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment: date qty description 7/20/ (elec) Submittal Food Service Equipment Remarks: Michael, please review the attached submittal, please return an electronic version to our office with your comments. Thanks

4 MARTEL CONSTRUCTION, INC South Church Avenue Bozeman, MT LETTER OF TRANSMITTAL Telephone: (406) Facsimile: (406) DATE 07/20/12 JOB NO TRANSMITTAL/SUBMITTAL NO TO: Comma Q Architects RE: Food Service Equipment 109 North Rouse Ave #1 Bozeman, MT ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL We are hand delivering We are sending via X ATTACHED UNDER SEPARATE COVER TheThe following items: Shop drawings Prints Plans Samples Specifications Copy of letter Change order X Product Data COPIES DATE DWG NO. DESCRIPTION 1 7/15/ Food Service Equipment - Item #14- Trench Drain 1 7/15/ Food Service Equipment - Item #32- Floor Trough Drain THESE ARE TRANSMITTED as checked below: X For approval Approved as Submitted Resubmit Copies for Approval For your use Approved as Noted Submit Copies for Distribution As requested Returned for Corrections Return Corrected Prints For review and comment REMARKS: FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US COPY TO File Michael - HC Design SIGNED: Mike Wilkinson - Project Engineer If enclosures are not as noted, kindly notify us at once.

5 Food Service Equipment

6

7

8 Eagle Group ASFT-2430-SG Item#:32 Specification Sheet Short Form Specifications Eagle Anti-Splash Floor Trough with stainless steel grating, model. Unit constructed of 14/304 stainless steel all-welded construction. Patented anti-splash design (patent #D519,618 S) assures complete drainage while preventing splash back onto the floor. Drain accommodates up to a 4 -diameter pipe and comes standard with a stainless steel removable perforated basket. Type 304 stainless steel subway style grating shall be 3 16 x 1 vertically positioned bars spaced 1 apart for ease of drainage. Two 5 8 stainless steel rods, set in from each edge, are welded to the bars to eliminate swaying. Eagle Anti-Splash Floor Trough with fiberglass grating, model. Unit constructed of 14/304 stainless steel all-welded construction. Patented anti-splash design (patent #D519,618 S) assures complete drainage while preventing splash back onto the floor. Drain accommodates up to a 4 -diameter pipe and comes standard with a stainless steel removable perforated basket. Fiberglass grating to be 1 high yellow polyester material with a non-slip grit surface. Tapered I beam construction for ease of cleaning and drainage. Gray color grating available. anti-splash floor trough Options / Accessories Gray color fiberglass grating ADA-approved wide T Bar fiberglass grating, gray color Item No.: Project No.: S.I.S. No.: Anti-splash Floor Troughs MODELS: ASFT-1218-* ASFT-1224-* ASFT-1230-* ASFT-1236-* ASFT-1248-* ASFT-1260-* ASFT-1272-* ASFT-1284-* ASFT-1296-* ASFT * ASFT-1524-* ASFT-1530-* ASFT-1536-* ASFT-1548-* ASFT-1560-* ASFT-1572-* ASFT-1584-* ASFT-1596-* ASFT * ASFT-1824-* ASFT-1830-* ASFT-1836-* ASFT-1848-* ASFT-1860-* ASFT-1872-* * See chart on back for complete model numbers. ASFT-1884-* ASFT-1896-* ASFT * ASFT-2424-* ASFT-2430-* ASFT-2436-* ASFT-2448-* ASFT-2460-* ASFT-2472-* ASFT-2484-* ASFT-2496-* ASFT * Design and Construction Features Patented anti-splash design (patent #D519,618 S) assures complete drainage, while preventing splash back onto floor. 14 gauge type 304 stainless steel all-welded construction. Built-in pitch towards drain insures complete drainage. Stainless steel drain accommodates up to a 4 (102mm) diameter pipe, and features a removable perforated stainless steel basket. Comes with subway-style stainless steel grating or yellow fiberglass grating. Floor troughs with gray fiberglass grating available (in place of yellow). To order, add suffix G to model number of trough with yellow fiberglass grating. Example: ASFT-1224-FGG Floor troughs with ADA-approved T-Bar fiberglass grating* available. Gray color. To order, add suffix -ADA to end of model number. Example: ASFT-1224-FG-ADA Custom sizes available. Consult factory for details. * Available for Floor Troughs with Fiberglass Grating only. Catalog Specification Sheet No. EG25.01 Anti-splash Floor Troughs EAGLE GROUP 100 Industrial Boulevard, Clayton, DE USA Phone: Fax: Foodservice Division: Phone MHC/Retail Display Divisions: Phone For custom configuration or fabrication needs, contact our SpecFAB Division. Phone: Fax: specfab@eaglegrp.com EG25.01 Rev. 10/09 Spec sheets available for viewing, printing or downloading from our online literature library at Eagle Foodservice Equipment, Eagle MHC, SpecFAB, and Retail Display are divisions of Eagle Group by the Eagle Group New Belgrade Elementary School J & V Restaurant Supply

9 Eagle Group ASFT-2430-SG Item#:32 Catalog Specification Sheet No. EG25.01 Anti-splash Floor Troughs Anti-splash Floor Troughs END VIEW TOP VIEW See chart below for dimensions A through F Item No.: Project No.: S.I.S. No.: Grating Used in Various Floor Troughs Floor Trough Floor Trough Grating Used (dimension E) (dimension F) - Quantity and Length 18 (457mm) 15 (381mm) one 15 (381mm) 24 (610mm) 21 (533mm) one 12 (305mm) 30 (762mm) 27 (686mm) three 9 (229mm) 36 (914mm) 33 (838mm) two 12 (305mm) three 12 (305mm) 48 (1219mm) 45 (1143mm) 60 (1524mm) 57 (1448mm) four 12 (305mm) 72 (1829mm) 69 (1753mm) five 12 (305mm) 84 (2134mm) 81 (2057mm) six 12 (305mm) 96 (2438mm) 93 (2362mm) seven 12 (305mm) 120 (3048mm) 117 (2972mm) nine 12 (305mm) 12 (305mm)-WIDE TROUGHS dimension A: 7 (178mm) dimension B: 9 (229mm) dimension C: 12 (305mm) 15 (381mm)-WIDE TROUGHS dimension A: 10 (254mm) dimension B: 12 (305mm) dimension C: 15 (381mm) 18 (457mm)-WIDE TROUGHS dimension A: 13 (330mm) dimension B: 15 (381mm) dimension C: 18 (457mm) 24 (610mm)-WIDE TROUGHS dimension A: 19 (483mm) dimension B: 21 (533mm) dimension C: 24 (610mm) dimension D: (286mm) dimension D: (362mm) dimension D: (438mm) dimension D: (591mm) WITH YELLOW * WITH WITH YELLOW * WITH WITH YELLOW * WITH WITH YELLOW * WITH FIBERGLASS STAINLESS FIBERGLASS STAINLESS FIBERGLASS STAINLESS FIBERGLASS STAINLESS dimension dimension GRATING GRATING GRATING GRATING GRATING GRATING GRATING GRATING E F model # model # model # model # model # model # model # model # in. mm in. mm ASFT-1218-FG ASFT-1218-SG n/a n/a n/a n/a n/a n/a ASFT-1224-FG ASFT-1224-SG ASFT-1524-FG ASFT-1524-SG ASFT-1824-FG ASFT-1824-SG ASFT-2424-FG ASFT-2424-SG ASFT-1230-FG ASFT-1230-SG ASFT-1530-FG ASFT-1530-SG ASFT-1830-FG ASFT-1830-SG ASFT-2430-FG ASFT-2430-SG ASFT-1236-FG ASFT-1236-SG ASFT-1536-FG ASFT-1536-SG ASFT-1836-FG ASFT-1836-SG ASFT-2436-FG ASFT-2436-SG ASFT-1248-FG ASFT-1248-SG ASFT-1548-FG ASFT-1548-SG ASFT-1848-FG ASFT-1848-SG ASFT-2448-FG ASFT-2448-SG ASFT-1260-FG ASFT-1260-SG ASFT-1560-FG ASFT-1560-SG ASFT-1860-FG ASFT-1860-SG ASFT-2460-FG ASFT-2460-SG ASFT-1272-FG ASFT-1272-SG ASFT-1572-FG ASFT-1572-SG ASFT-1872-FG ASFT-1872-SG ASFT-2472-FG ASFT-2472-SG ASFT-1284-FG ASFT-1284-SG ASFT-1584-FG ASFT-1584-SG ASFT-1884-FG ASFT-1884-SG ASFT-2484-FG ASFT-2484-SG ASFT-1296-FG ASFT-1296-SG ASFT-1596-FG ASFT-1596-SG ASFT-1896-FG ASFT-1896-SG ASFT-2496-FG ASFT-2496-SG ASFT FG ASFT SG ASFT FG ASFT SG ASFT FG ASFT SG ASFT FG ASFT SG * To order Floor Trough with Gray Fiberglass Grating, add suffix G. Example: ASFT1224-FGG To order Floor Trough with Gray ADA-approved wide T Bar Fiberglass Grating, add suffix -ADA. Example: ASFT1224-FG-ADA. Available for Floor Troughs with Fiberglass Grating only. EAGLE GROUP 100 Industrial Boulevard, Clayton, DE USA Phone: Fax: Printed in U.S.A. Foodservice Division: Phone by Eagle Group MHC/Retail Display Divisions: Phone Rev. 10/09 Spec sheets available for viewing, printing or downloading from our online literature library at Although every attempt has been made to ensure the accuracy of the information provided, we cannot be held responsible for typographical or printing errors. Information and specifications are subject to change without notice. Please confirm at time of order. New Belgrade Elementary School J & V Restaurant Supply

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary

More information

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal. SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade

More information

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016. SUBMITTAL REVIEW Submittal: No. 016.00 Spec Section: 3 113 Underground Natural Gas Piping Reviewed By: Laura Landon, Comma-Q Architecture Date: June 1, 01 Project: BPS Belgrade Elementary School Location:

More information

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation June 3, 2010 Pella asks what is needed for submittals. See Attachment #1. June 7, 2010 Pella (Matt Tison) confirms the receipt of

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SUBMITTAL REVIEW COVERSHEET

SUBMITTAL REVIEW COVERSHEET SUBMITTAL REVIEW COVERSHEET Project Name: Alley 111 1725 Westlake Avenue N. Date: 2015-02-12 Suite 300 Submittal No & Description Rev 0: Submittal #220500-0205-0 Plumbing Shop Drawings L7-L8 Seattle, WA

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School Submittal Review TO: Pavilion Construction DATE: 07.20.2015 JOB NO.: 1484P 4700 SW Macadam Ave Suite 200 ATTENTION: Riley Tobin Portland, OR 97239 RE: BSD Sunset High School Concession Stand/Interior Renovations

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A

More information

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY 08625-0350 CHRIS CHRISTIE GOVERNOR KIM GUADAGNO Lt. Governor March 24, 2011 LEE A. SOLOMON

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 08/29/2016 Job #: 289-11150 Submittal #: D-11235-001-A

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Promontory Architectural Review Committee

Promontory Architectural Review Committee Promontory Architectural Review Committee Design Review Application Purpose The Design Review Process and Application have been established to insure that a proposed project is compatible with historical,

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-11 42 00 (January 2008) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS-11 40 00.00 20 (April 2006) UFGS 11 46 01.00 10 (April 2006) UNIFIED

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (February 2009) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (January 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

What Are Submittals?

What Are Submittals? Introduction Overview of the Submittal Process Comparison of AIA with ConsensusDOCS Architect and Contractor Obligations FAR Requirements State Licensing Requirements 1 What Are Submittals? Submittals

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 LETTER OF TRANSMITTAL To: DeKalb Mechanical 339 Wurlitzer Drive DeKalb, Illinois 60115 Date:

More information

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0. SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett

More information

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: BUILDING REFERENCE: SUBJECT: ATHLETIC EQUIPMENT - CALCS - RESUBMITTED 2 TIME(S) DATE RECIEVED: Feb 02, 2015 DISCIPLINE: Structural PRIORITY STATUS: 2-STANDARD SPECIFICATION

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project 02-3113 To: Quimby McCoy Preservation To: (Write-in Consultant) From: Vaughn Construction, LLC Architecture.

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248) White Lake Township Building Dept. 7525 Highland Rd. (248) 698-3300 SUBMITTAL REQUIREMENTS FOR SINGLE FAMILY HOMES, ADDITIONS, GARAGES AND RENOVATIONS --NEW-- Package for new residences must include $

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone: DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 1 San Diego State University 00 Campanile Drive San Diego, CA 918 Tel: 619-94-740 Fax: 0079-1116-0 Circulating Pump Author

More information

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS SECTION 10520: FIRE EXTINGUISHERS AND CABINETS PART 1 GENERAL 1.01 GENERAL REQUIREMENTS: A. This section specifies fire extinguishers, cabinets for fire extinguishers, fire and other accessories. Their

More information

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM SECTION 011000 SUMMARY PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Work covered by the Contract Documents. 2. Work under other contracts. 3. Use of premises. 4. Specification

More information

Letter of Transmittal

Letter of Transmittal 3710 QUINCY AVENUE OGDEN, UT 84403-1934 Ph : (801)627-1414 Letter of Transmittal To: GEN ARCHITECTS, INC. 11001 SW RIVERSIDE DRIVE PORTLAND, OR 97219 Ph: (503)243-7183 Fax: (503)243-7193 Subject: Submittal

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

CITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR

CITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR CITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR Permit # Complete this application and submit it to the Development Services Team, 400 S. Eagle Street, Naperville.

More information

Chapter 1 General Design Information

Chapter 1 General Design Information Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130 PART 1 GENERAL 1.01 SUMMARY Section 15130 PRESSURE GAUGES, This Section includes the furnishing and subsequent installation of pressure gauges and pressure level transmitters as shown on Plans and specified

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

Windmill Village Homeowners Association

Windmill Village Homeowners Association Windmill Village Homeowners Association Rules & Design Guidelines Windmill Village Homeowners Association P.O. Box 5720 Mesa, AZ 85211 APPLICATION PROCEDURE Submittal Application and plans (which will

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 46 00 (January 2008) ---------------------------- Preparing Activity: USACE Superseding UFGS-11 40 00.00 20 (April 2006) UFGS 11 46 01.00 10 (April 2006) UNIFIED FACILITIES

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

January, 2014 Page 1 of 5

January, 2014 Page 1 of 5 Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

835 Gil Harbin Industrial Blvd Valdosta, GA 31601 QUALITY CONTROL PLAN NAVFAC SE PUBLIC WORKS MAYPORT FEAD MAYPORT 1966 BONHOMME RICHARD STREET MAYPORT NAVAL STATION FL 32228-0073 N69450-08-D-1781/0004 835 Gil Harbin Industrial Blvd Valdosta, GA 31601

More information

A. Deviation from this standard must be approved by the Project Architect.

A. Deviation from this standard must be approved by the Project Architect. September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of

More information

May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee

May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee Shop Drawings: Contractual and Legal Issues May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee Shop Drawings Defined CSI definition: Drawings that illustrate a

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 10/7/2011 Reference

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Submittal Transmittal

Submittal Transmittal Commonwealth Engineers, Inc. 7256 Company Drive Indianapolis IN 46237 United States Submittal Transmittal PROJECT: Waynetown - Water-Strmwtr Imprv-Div A J13046-A DATE SENT: 9/28/2016 SUBJECT: DS-22-15_Lavatory

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1 700 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006 Office: 202.842.200 Museum of the Bible Submittal Pkg. No.: 08443.0 Submittal Review Form Submittal Items thru SG Project No: 26865.000 Response Date: 3/2/206

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal DLR Group PROJECT: SUBJECT: Windsor High School 37-17223-00 Flush Wood Doors - Flush Wood Door, Veneer-Faced Doors Product Data and Shop Drawings DATE SENT: 6/21/2017 SUBMITTAL ID:

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip: Central Lyon County Fire Protection District 246 Dayton Valley Rd Suite 106 Dayton, NV 89403 Rich Harvey, Chief Office (775) 246-6209, Fax (775)246-6204 TTY 7-1-1 APPLICATION FOR COMMERCIAL CONSTRUCTION

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information