SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

Size: px
Start display at page:

Download "SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work"

Transcription

1 2004 Specifications CSJ SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing, installing, testing, and interconnecting a Computerized Transportation Management System. This project covers IH 45 North from Tamina Road to FM The Components of the system are as follows: Dynamic Message Signs CCTV Surveillance Communications System Control of the systems will be via computers located in the satellite control center and at Houston Transtar. Communications to the various hubs from the satellite control center will be via fiber optic cable. Video transmissions will also be via fiber optic cable. A. Dynamic Message Sign System. The Dynamic Message Signs (DMS) will be located along the freeway main lanes and will be used to provide motorists with traffic condition information and other pertinent messages from Houston Transtar. Dynamic message signs utilizing fiber optic technology will be used on this project. Each sign will display 3 lines of message text each with 15 characters and will be equipped with two flashing beacons utilizing Light Emitting Diode (LED) technology. The existing DMS control system at Houston Transtar will be used to control all DMS. All DMS communication between the DMS control system and each sign must utilize the National Transportation Communications for ITS Protocol (NTCIP). B. CCTV Surveillance System. The CCTV surveillance system consists of CCTV cameras to be located at strategic locations along the freeway. These cameras will furnish visual surveillance of the roadway and also provide visual confirmation of freeflow conditions, incidents, or congestion along the freeway and frontage roads. The CCTV cameras will be mounted on structures dedicated to the CCTV cameras. Personnel operating the CCTV system from the Satellite Control Center and from Houston Transtar will have the following remote control functions for each CCTV locations: pan, tilt, zoom, focus, iris control, and camera power. The video signals and control data for each CCTV installation will be transmitted to the Satellite Control Center and to Houston Transtar utilizing the fiber optic cable and communication network

2 C. Communications System. This project will utilize an Asynchronous Transfer Mode (ATM) communications system. The communications system will be used to interconnect all equipment in the field and to provide control and monitoring of field devices from Houston Transtar. Command data from the control equipment at Houston Transtar will be transmitted to the communication hub locations via the ATM network for distribution to the various field equipment. Data from the field equipment will also be collected in the communications hub for transmission to the Satellite Control Center and Houston Transtar. Fiber optic cable will be used for interconnection of all field equipment to the communications hub locations and for interconnection of the communications hubs to the satellite control center. 2. Scope of Contract. A. General. 1. Dynamic Message Sign System. Furnish dynamic message signs (DMS) and associated components and accessories which are fully compliant with all requirements of the plans and specifications. Completely install the DMS, flashing beacons, sign support structures, foundations, fiber optic cable, transceivers, and field controllers as shown on the plans, and make them fully operational. Fully test all DMS installed on this project in accordance with plans and specifications. Provide all incidental work, material, and services not expressly called for in the specifications, or not shown on the plans, which may be necessary for a complete and properly functioning system. 2. CCTV Surveillance System. Furnish and install, as shown on the plans, CCTV equipment and associated components and accessories which are fully compliant with all requirements of the plans and specifications. Completely install all CCTV equipment as shown on the plans and make it fully operational. Fully test all CCTV equipment installed on this project in accordance with the plans and specifications. Provide all incidental work, material and services not expressly called for in the specifications, or not shown on the plans, which may be necessary for a complete and properly functioning system. 3. Communications System. Furnish, install, splice and test all fiber optic cable as shown on the plans. Provide all incidental work, material, and services not expressly called for in the specifications, or not shown on the plans, which may be necessary for a complete and properly functioning system. Fully test all fiber optic cables installed on this project in full compliance with the requirements of the plans and specifications. Provide all test results to the Engineer. Perform all necessary splicing, and provide all necessary fiber optic jumper cables and all other incidentals necessary for complete and operating systems

3 This project will utilize portions of the existing fiber optic cable between the Tamina Road communications hub building and the Satellite Control Center. Perform all necessary splicing on the existing cable to provide the necessary connectivity for equipment installed on this project. ATM communications equipment for this project will be supplied by TxDOT, through the Engineer, for installation by the Contractor. This equipment consists of signal encoders and terminal servers. Install the encoders and terminal servers in the communications hub buildings as shown on the plans. The terminal servers will be utilized for transmission of serial data for the DMS and CCTV control equipment. The encoders will be utilized to encode the video signals from the CCTV cameras and also the serial data for the terminal servers for communication with the ATM switches located at the satellite control center. Configuration and programming of the ATM equipment will be done by TxDOT. B. Trade Name Reference. Reference to any manufacturer s trade name, or catalog number for any item of equipment or material necessary to meet the requirements of this specification and the plans is intended to be descriptive but not restrictive, and is intended to indicate the type of equipment or materials that will be acceptable. C. Approval of Equipment, Materials, and Details. Within 30 days after time charges begin, submit for approval, 10 copies of descriptive manuals and brochures for each type of electronic equipment and apparatus proposed for this project. Also submit for approval, ten copies of detailed equipment submittals and shop drawings for each fabricated item proposed for use on this project. Provide shop drawing on 11 in. by 17 in. sheets using computer aided drafting software. Ensure these documents completely identify the equipment manufacturer s name and model number for each submitted item and contain sufficient technical data for complete evaluation. Provide drawings which contain all information required for complete fabrication in accordance with the plans and specifications and which fully describe the quality, function and capability of each deliverable item in complete detail. Provide original manuals and brochures. Reproduced documents and facsimile transmission (fax) documents will not be accepted. Stamp each submittal with the Contractor s approval and identified as to the TxDOT contract numbers, title and bid item number. Provide ten copies of a separate submittal letter for each unit of equipment (1 copy of letter attached to each copy of submittal). The specifications for this project contain component lists defining the minimum requirements for submittal contents on various bid items. Review and prepare submittals in accordance with these requirements. Provide submittals which, as a minimum, completely address all stated requirements. Include in the submittal package, all information not specifically contained in the lists but required for clarification of submittal information. Provide submittals on all items necessary for completion of the project but not specifically identified elsewhere in the project documents to the Engineer no less than 60 days prior to the time needed for use on the project. Submittal packages, which do not completely address all required information or are incomplete in any manner, will be subject to rejection

4 Review all submittals for completeness prior to submission to TxDOT. At time of submission, certify in writing that the submittal has been reviewed for completeness and that the submittal completely addresses all requirements of the specification and that the equipment is appropriate for intended use. In addition to the submittals and shop drawings, the Engineer may also require the Contractor to provide equipment samples for evaluation and may also require complete demonstration of equipment as part of the submittal review process. Additional requirements for equipment demonstrations and testing are located elsewhere in the project documents. The Engineer, upon receipt of the complete submittal packages, has no less than 60 days to indicate and authorize any correction to the details in the submittals. The Engineer, upon approval of the submittals, will indicate and authorize any correction to the details in the submittals. Correct any errors in the submittals, as directed by the Engineer, and if required, resubmit to the Engineer a minimum of 10 copies of the same. No change will be permitted in the list of equipment or shop drawings once approved, unless authorized by the Engineer in writing. Equipment will not be accepted for delivery or any payment made until the equipment, materials lists and shop drawing have been approved by the Engineer. Approval by the Engineer does not relieve the Contractor of his responsibility to meet the requirements of the specifications and plans. D. Inspection and Tests. TxDOT, through its authorized representative, retains the right to rigidly inspect all structures, equipment and materials used in the project before, during and after installation, also the right to inspect the work during the process of fabrication or manufacture for the purpose of determining if the plans and specification upon which the award was made are being complied with and being satisfied as to quality of the material and workmanship. Such inspection will not release the manufacturer from strict compliance with specifications when the work is completed and offered for acceptance. E. Utilities. Cooperate with the public utility companies in placing and connecting meters and other required service equipment. The Contractor will not be required to furnish meters for same. The Contractor will not be responsible for payment for utilities during the testing of the systems. Be aware that while working near power lines a minimum clearance of 10 ft. from power lines must be maintained between personnel and equipment. Do not install any structure within 10 ft. of a power line. When the required clearance of 10 ft. cannot be maintained during construction, contact the Power Company to arrange for deenergization of the line. Notify the Power Company at least one week prior to the time deenergization of the lines will be needed

5 F. Right-of-Way. Cooperate in the use of the right-of-way with other contractors, utility companies and other entities when such parties are engaged in work through the same general area. The Engineer will permit temporary closures subject to the provisions of Item 7 of the Standard Specifications. No extra compensations will be made for any delays occasioned by work of other contractors; however, time suspension may be granted if justified and authorized by the Engineer in writing. G. Traveling Public. Regard the safety and convenience of the traveling public passing through and adjacent to this project as an important feature of this project. Keep any section of roadway now open to traffic or that may be open to traffic during the duration of this project open to traffic at all times except for temporary closure when erecting overhead structures and appurtenances thereto, or when moving heavy equipment. The traffic lane contiguous to the freeway median may be blocked during the temporary closure period when such space as is provided by these lanes is needed to pursue construction work in the freeway median. Furnish one or more, as needed, mobile advance warning signs of a design and size approved by the Engineer. Locate the warning signs in advance of any construction work within the crown width of any roadway when such roadway is under traffic. The use of the warning signs will in no way relieve the Contractor of the responsibility of furnishing other warning devices or flagging as is necessary to accommodate the traveling public. The Engineer has the authority to suspend all work on this project if the Contractor conducts operations in such a manner as to cause unwarranted hazards that affect the traveling public. Provide all signs, detours, and other traffic control devices in accordance with the Traffic Control Plan shown on the plans and with the Texas Manual on Uniform Traffic Control Devices. H. Documentation. Provide documentation as specified in the Special Specifications. Submit three draft copies of all documentation to the Engineer for approval at least 30 days before delivery of final documentation. Provide each field cabinet with 3 copies of the final cabinet wiring diagrams. Also deliver to the Engineer, a mylar reproducible of the cabinet wiring diagrams showing all field changes incorporated. I. Support. 1. General. Provide support during the entire project including any required design reviews, maintenance during construction, operational support during system integration, manufacturers normal warranties and guarantees. 2. Design Reviews. Conduct all design reviews as required, at no additional cost

6 3. Maintenance during Construction. Assume responsibility for all new materials and equipment furnished and installed, as well as existing equipment modified as part of this contract, until final acceptance of the systems. Replace equipment that fails due to all causes including vandalism and knockdowns. 4. Operational Support. Provide a project manager who is responsible for the project and who will be on-site from the beginning of construction until final system acceptance to serve as the Contractor s official contact for communications with the Engineer. Supplement the project manager s support with the services of qualified engineers and the services of vendor technical representatives for the duration of the project. Include the cost of this operational support in the price bid for the individual equipment. 5. Warranties and Guarantees. Prior to acceptance of the project, obtain all manufacturer s normal warranties or guarantees on electronic, electrical and mechanical equipment, materials, technical data, and products purchased for use on the project which are consistent with those provided as customary trade practice. Assign, to the Department, all manufacturers normal warranties or guarantees on all such electronic, electrical and mechanical equipment, materials, technical data, and products furnished for and installed on the project. Technical data, as used in this section, means recorded information, regardless of form or characteristics, of a scientific or technical nature. Assume full responsibility for all technical data delivered under this contract. If any revisions are required in the technical data due to errors, deficiencies, or omissions, deliver the revisions to the Engineer. 6. Training. Provide training materials and services on all equipment which was furnished and installed on this project. Training includes basic theory of the equipment operation, trouble-shooting procedures including the use of test equipment and scheduled maintenance requirements. Provide hands-on training for each type of equipment. Provide a minimum of 40 hours of training for up to 15 persons over a period not less than 10 working days. Submit an outline of the proposed training material to the Engineer for approval at least 60 days before the training is to begin. TxDOT will review this material and approve it or request changes to the outline. Conduct training in Houston after the completion of all subsystem acceptance tests. Establish the schedule of the training sessions with the approval of the Engineer. Include the cost of training in the price bid for the individual equipment. Video all training sessions, in VHS and DVD format, and deliver the media to the Engineer upon completion of training

7 J. Testing. Conduct Design Approval Tests, Factory Demonstration Tests, Stand-Alone Tests, and Subsystem Tests as described in the Special Specification for each type of equipment. Follow approved test procedures in conducting all tests and provide completed approved data forms for each test. Submit these completed data forms to the Engineer. 1. Final System Acceptance Test. 2. Testing Procedures. Prepare the test procedure and data forms for each of the types of tests required which include a step-by-step sequence for conducting the tests. Provide data form which are designed to record the results of each step of the tests. Submit 5 copies of the proposed test procedures and data forms to the Engineer at least 60 days prior to the initiation of each type of test. Obtain the Engineer s approval for the test procedures and data forms prior to submission of equipment for tests. Fully complete all inspection and testing requirements prior to submission for the Engineer s inspection and witness of the tests. Provide a minimum of 25 working days notice for all the tests to permit the Engineer s representative to observe each test. Failure to satisfy the requirements of any tests is counted as a defect and the equipment is subject to rejection by the Engineer. The rejected equipment may be offered again for retest provided all noncompliance have been corrected. Provide all test fixtures and test instruments for the tests. Furnish completed data forms containing all of the data taken including quantitative results for all tests. Ensure the data forms for the Design Approval Tests are signed by an authorized representative (company official) of the equipment manufacturer or by an authorized representative of an independent testing facility. Ensure the data forms for the Factory Demonstration Tests are signed by an authorized representative (company official) of the equipment manufacturer. The data forms for all the other tests must be signed by an authorized representative (company official) of the Contractor. Submit three copies of the completed forms to the Engineer. K. Installation Summary. Compile and furnish an installation summary for each field installation. Include in this summary the equipment complement and cable lists for each location. L. As Built Plans. Upon final system acceptance, furnish a set of As Built plans which show the actual equipment and construction of the various systems. Prepare these plans using the current version of MicroStation and deliver the plans to the Engineer in a file format specified by the Engineer. Also deliver to the Engineer one printed paper copy of the as-built plans, 11 in. by 17 in. in size

8 M. Perform the collection of data pertaining to as built documentation for use by TxDOT for entry into software databases. Collect this data on forms supplied by the Engineer and in a format specified by the Engineer. 3. Standard Specifications. In addition to the requirements of these specifications, all equipment, materials, and work conforms to the requirements of the following standard specifications: Federal Communications Regulations Part 68 & 76 as applicable to this project. The Standards of the National Electrical Manufacturer s Association (NEMA). The National Electrical Code (NEC). The American National Standards Institute (ANSI). The Specifications of the International Municipal Signal Association, Inc. (IMSA). American Association of State Highway and Transportation Officials (AASHTO). The American Institute of Steel Construction (AISC). Texas Manual of Uniform Traffic Control Devices (Texas MUTCD) National Manual of Uniform Traffic Control Devices (National MUTCD) The National Fire Protection Association (NFPA). The Electronic Industries Association (EIA). International Telephone and Telegraph Consultative Committee (CCITT). The Joint Electronic Device Engineering Council (JEDEC). The Institute of Electrical and Electronic Engineers (IEEE). The American Society of Testing and Materials (ASTM). The American Concrete Institute (ACI). The applicable ordinances of the County, City, State. Where reference is made in these specifications to the code or standards mentioned above, construct the reference to mean the code of standard that is in effect on the date of advertising of these specifications. If there is a conflict between the Special Specifications and the general specification list above, the Special Specifications take precedence. 4. Sequence of Work and Project Schedule. Within 30 days after the Authorization to Begin Work, and prior to beginning any construction on the project, provide 10 copies of a proposed sequence of construction of the entire project and project schedule (CPM, PERT, or equivalent) covering all items of work. Clearly indicate the interrelation of individual tasks in the schedule. Divide the schedule into logical stages with scheduling of equipment design, Design Approval Tests, Factory Demonstration Tests, delivery of equipment, installation dates and completion dates of work items clearly indicated. Also include in this schedule, the procurement of the materials and equipment for the installation and testing of the fiber optic cable system. Show sufficient detail to permit monitoring of progress in monthly intervals

9 The schedule and sequence of work constitute the construction procedure for this project subject to the approval of the Engineer. No change will be permitted in the approved sequence except as approved by the Engineer in writing. 5. Payment. All requirements necessary to satisfy the Scope of Contract and Sequence of Work described herein will not be paid for directly; but included in the unit price for the various items in the proposal

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SPECIAL SPECIFICATION 1789 Fiber Optic RS-232 Data Modem

SPECIAL SPECIFICATION 1789 Fiber Optic RS-232 Data Modem 1993 Specifications CSJ 2266-02-095 SPECIAL SPECIFICATION 1789 Fiber Optic RS-232 Data Modem 1. Description. This Item shall govern for the furnishing and installation of Fiber Optic RS- 232 Data Modem

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

SPECIAL SPECIFICATION 6734 RS-232 Optical Modem

SPECIAL SPECIFICATION 6734 RS-232 Optical Modem 2004 Specifications CSJ 0924-06-244 SPECIAL SPECIFICATION 6734 RS-232 Optical Modem 1. Description. This Item shall govern for the furnishing and installation of Fiber Optic RS- 232 Data Modem (OTR) in

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SPECIAL SPECIFICATION 6419 Fiber Optic Video Transceiver with Data

SPECIAL SPECIFICATION 6419 Fiber Optic Video Transceiver with Data 2004 Specifications CSJ 0617-01-169 SPECIAL SPECIFICATION 6419 Fiber Optic Video Transceiver with Data 1. Description. This Item shall govern for the furnishing and installation of Video optical transceiver

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Drop/Insert Multiplexor/Demultiplexor

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Drop/Insert Multiplexor/Demultiplexor 1993 Specifications CSJ 0008-12-071 SPECIAL SPECIFICATION ITEM 6550 Drop/Insert Multiplexor/Demultiplexor 1.0 Description. This Item shall govern for the furnishing and installation of intelligent drop/insert

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Multimode Video Fiber Optic Transmission Equipment

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Multimode Video Fiber Optic Transmission Equipment 1995 Metric CSJ 3483-01-010 SPECIAL SPECIFICATION ITEM 6329 Multimode Video Fiber Optic Transmission Equipment 1.0 Description. This Item shall govern for the furnishing and installation of Video Fiber

More information

SPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM

SPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM 2004 Specifications CSJ 3622-01-001, ETC. SPECIAL SPECIFICATION 8398 LIGHTNING PROTECTION SYSTEM 1. Description. This Special Specification governs the design and installation of Lightning Protection System

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

SPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment

SPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment 1995 Metric CSJ's 1047-03-056 & 0008-08-066 SPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment 1. Description. This Item shall govern for the furnishing and installation

More information

SPECIAL SPECIFICATION 1533 Drop/Insert Multiplexor/Demultiplexor

SPECIAL SPECIFICATION 1533 Drop/Insert Multiplexor/Demultiplexor 1993 Specifications CSJ 0177-11-131 SPECIAL SPECIFICATION 1533 Drop/Insert Multiplexor/Demultiplexor 1. Description. This Item shall govern for for the furnishing and installation of intelligent drop/insert

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION USACE / NAVFAC / AFCEC / NASA UFGS-01 33 00.05 20 (May 2014) Change 1-09/15 Change 2-12/15 Change 3-09/16 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 33 00.05 20

More information

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

B. Division-16 Basic Materials and Methods section apply to work specified in this section. Section 16745 PREMISE CABLING SYSTEMS PART ONE GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification

More information

SPECIAL SPECIFICATION 6574 Low Power Wireless Modem

SPECIAL SPECIFICATION 6574 Low Power Wireless Modem 2004 Specifications CSJ 1068-04-126, etc. SPECIAL SPECIFICATION 6574 Low Power Wireless Modem 1. Description. This work shall consist of furnishing and supplying a Low Power Wireless Modem at the locations

More information

01100 SUMMARY OF WORK

01100 SUMMARY OF WORK Lambert..STL Airport Uve Animal Facility- World Trade Center- St. Louis, Missouri 01100 SUMMARY OF WORK PART 1.. DESCRIPTION a. General: The work to be completed consists of fabrication, deliver, and installation

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

SPECIAL SPECIFICATION 1118 Data Fiber Optic Transceiver

SPECIAL SPECIFICATION 1118 Data Fiber Optic Transceiver 2004 Specifications CSJ 0050-09-071, 0027-13-205, 0271-14-228, 0500-03-042, 0050-09-070, 0050-09-069 etc, 0050-08-086, 0050-08-087 & 0500-03-577 SPECIAL SPECIFICATION 1118 Data Fiber Optic Transceiver

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

ELECTRIAL AND SIGNING MATERIALS STANDARDS VOLUME 3

ELECTRIAL AND SIGNING MATERIALS STANDARDS VOLUME 3 ELECTRIAL AND SIGNING MATERIALS STANDARDS VOLUME 3 Electrical and ITS Engineering September 2018 2300 ELECTRONIC MESSAGE SIGNS 2301 PERMANENT ELECTRONIC MESSAGE SIGNS 2302 PORTABLE ELECTRONIC MESSAGE SIGNS

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Signing

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum SECTION 013201 - SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum Pay Unit price breakdown) shall be developed and ultimately

More information

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Drop/Insert Multiplexor/Demultiplexor

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Drop/Insert Multiplexor/Demultiplexor 1995 Metric CSJ 3256-02-049 1.0 Description SPECIAL SPECIFICATION ITEM 6093 Drop/Insert Multiplexor/Demultiplexor This Item shall govern for the furnishing and installation of intelligent drop/insert multiplexor/demultiplexors

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM SECTION 011000 SUMMARY PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Work covered by the Contract Documents. 2. Work under other contracts. 3. Use of premises. 4. Specification

More information

SEI Certification Program Manual

SEI Certification Program Manual Safety Equipment Institute SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Program 0 of 6 SEI Certification Program Manual Section 29: Industrial Protective Clothing

More information

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

PUBLICATION 213. Think Safety First

PUBLICATION 213. Think Safety First PUBLICATION 213 (67 PA CODE, CHAPTER 212) Think Safety First Pub 213 (02-08) Appendix Appendix A - Temporary/Portable

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

S 0342 S T A T E O F R H O D E I S L A N D

S 0342 S T A T E O F R H O D E I S L A N D LC000 01 -- S 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - SMALL CELL SITING ACT Introduced By: Senators DiPalma,

More information

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES)

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES) Reference: Denver Fire Code Sections 510 Approved: Manuel Almagure Division Chief, Fire Prevention Division Number: 510-1 Effective Date: February 1, 2018 Page 1 of 8 This Policy 510-1 provides additional

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

What Are Submittals?

What Are Submittals? Introduction Overview of the Submittal Process Comparison of AIA with ConsensusDOCS Architect and Contractor Obligations FAR Requirements State Licensing Requirements 1 What Are Submittals? Submittals

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

SECTION - II BID DATA SHEET

SECTION - II BID DATA SHEET SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or

More information

A Bill Regular Session, 2017 HOUSE BILL 1926

A Bill Regular Session, 2017 HOUSE BILL 1926 Stricken language would be deleted from and underlined language would be added to present law. 0 0 0 State of Arkansas st General Assembly As Engrossed: H// A Bill Regular Session, 0 HOUSE BILL By: Representative

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

SECTION SUBMITTALS

SECTION SUBMITTALS SECTION 01300 SUBMITTALS PART 1- GENERAL 1.01 SCOPE OF WORK A. This Section specifies the general methods and requirements of submissions applicable to Shop Drawings, Product Data, Samples and Operations

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Add/Drop Multiplexor/Demultiplexor

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Add/Drop Multiplexor/Demultiplexor 1995 Metric CSJ 0113-13-109 SPECIAL SPECIFICATION ITEM 6225 Add/Drop Multiplexor/Demultiplexor 1.0 Description. This Item shall govern for the furnishing and installation of intelligent Add/Drop Multiplexor/Demultiplexor

More information

SPECIAL SPECIFICATION Inch LED Traffic Signal Lamp Unit

SPECIAL SPECIFICATION Inch LED Traffic Signal Lamp Unit 1993 Specifications SPECIAL SPECIFICATION 1201 12 Inch LED Traffic Signal Lamp Unit 1. Description. This specification describes the minimum acceptable design and performance requirements for a twelve

More information

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip: Central Lyon County Fire Protection District 246 Dayton Valley Rd Suite 106 Dayton, NV 89403 Rich Harvey, Chief Office (775) 246-6209, Fax (775)246-6204 TTY 7-1-1 APPLICATION FOR COMMERCIAL CONSTRUCTION

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO MEDICAL EQUIPMENT SUPPORTS SECTION 05600 1. GENERAL

More information

TRAFFIC ENGINEERING DIVISION

TRAFFIC ENGINEERING DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM GENERAL SUBJECT: Radio Systems/Highway Signs SPECIFIC SUBJECT: Use of Radio Systems by VDOT & Localities: HAR and TIS Informational

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS PROJECT: Painting of the Signal Poles, Mast Arms and Decorative Bases OWNER: City of Goose Creek, Department of Public Works RECEIPT OF PROPOSALS: Separate sealed proposals for the

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

St. Monica Food Pantry

St. Monica Food Pantry St. Monica Food Pantry 26 5113-1 ELECTRICAL WORK DIVISION 26 SECTION 265113 INTERIOR LIGHTING FIXTURES PART 1. GENERAL 1.1 WORK INCLUDES A. Extent, location, and details of interior lighting fixture work

More information

Engineering Drawing System

Engineering Drawing System LPR 7320.1 Effective Date: February 2, 2010 Expiration Date: February 2, 2015 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems

More information