1 Silicon Valley Rapid Transit Program VTA's BART Silicon Valley Berryessa Extension 1436 California Circle, 2 d Floor Milpitas, CA Transmittal No. C P0728 Contract No.: C730 Contract: Contractor: C730 (DB14062F) McCatihy Building Companies, Inc. Response to: RFI-0094 PDCC#: P0728-C730-RFI-0094 Date: 4/13/2016 To: Mr. Greg Ciuba Project Manager, LEED AP BD + C McCarthy Building Companies, Inc N011h First Street, Suite 102 From: Mat1in Nnam C730 Project Manager Santa Clara Valley Transpo11ation Authority 1436 California Circle Milpitas, CA Phone: (949) Phone: ( 408) >" -'i! L cc: (Const.SVBX.CRP.C730.RFis) Hassan Basma; Dave Fong; Scott Hensler; Daniel Hinojosa; Edward Lao; Roy Lou; Nam Nguyen; Martin Nnam; Mayank Patel; Raj Sehdev; Matt Shipman; Margaret Simmons-Cross; Craig Temple; Kiet Vu; John Vukasin; Agustino Bong; Robert Dona; John Donahue; Catherine Doyle Additional Distribution: We Are Sending: Submitted For: Action Taken: 0 Shop Drawings D Execution 0 Approved As Submitted 0 Letter D Your Use 0 Approved As Noted D Prints D As Requested 0 For Reference Only D Change Order!ZI RFI Response 0 Resubmit D Plans 0 Not Approved D Samples Sent Via: 0 No Exception Taken D Specifications 0 Attached 0 Returned for Corrections D Other: 0 Separate Cover Via: 0 Due Date: Item Copies Date Description Status l l 4/13/2016 Response to RFI No Installation of Additional Berryessa Irrigation Closed Sleeves Remarks: See attached mark-ups for additional clarifications: 1. Add location C. Make location D longer to the decorative concrete band. 2. There are three entrances at location A. Add Location B " and 1-4" PVC inigation sleeves per new installation. Install per detail I/ C OK 5. OK Attachments: RFI No. 94 Mark-ups Signed: Martin Nnam, P.E. C730 Project Manager Page 1of1
2 RECEIVED PDCC April 08, 2016 Request for Information with Comments Project RFI #: Date Created: 04/06/2016 Priority: Normal SVBX Parking Structures at Milpitas and Berryessa Stations Project# C730 (DB 14062F) Tel: (408) Fax: (408) North First Street, Answer Required By: 04/08/2016 Suite 102 Submitted To Santa Clara Valley Transportation Authority Margaret Simmons-Cross 1436 California Circle 2nd Floor Milpitas, CA Submitted By McCarthy Building Companies, Inc. Eric Rudolph 2665 North First Street, Suite 102 Subject: Installation of Additional Berryessa Irrigation Sleeves Discipline: Initiated By: McCarthy - Eric Rudolph Category: BERRYESSA STATION Ref RFI: Reason: Attachments Type Name Description Content File Question RFl_Sleeve_Location_ VTA Berryessa C730.pdf REF: Attached sheet U600 Please see attached sheet U600 and provide clarification on necessary sleeve locations. Please confirm the following, 1. Irrigation sleeves highlighted in green & blue are to be installed per plans. RFl_Sleeve_Location_-_VTA_Berryessa_C730.pdf 2. Irrigation sleeves highlighted in red have recently been requested by VTA and are to be installed by McCarthy. 3. All shown sleeve locations are to have (2) 4" PVC irrigation sleeves. 4. No irrigation sleeves other than those highlighted in green, blue, or red are to be installed by McCarthy. 5. Sleeves highlighted in pink will not be installed by McCarthy as they are outside of the C730 site I scope. Suggestion Answer Date Answered: Comments See cover sheet for response. 4/13/2016 ArchitecVEngineer Signature ~ By: -1.~A Consultant: Printed On: 4/7/16 Date: Page 1of1
3
4
5 50 West San Fernando Street, Suite 950 San Jose, CA Tel (408) Fax (408)
City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation
City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation June 3, 2010 Pella asks what is needed for submittals. See Attachment #1. June 7, 2010 Pella (Matt Tison) confirms the receipt of
More informationSpec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN
SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary
More informationSUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN
SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,
More informationSUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:
OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: FLOOR BOXES BUILDING REFERENCE: DATE RECIEVED: Oct 09, 2014 DISCIPLINE: Electrical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 26 05 38 REVIEWER DUE
More informationAMES INDUSTRIAL PARK AND OFFICE PLAZA
SILICON VALLEY LEASED INVESTMENT OR OWNER/USER OPPORTUNITY FOR SALE ±177,820 SF MULTI-TENANT INDUSTRIAL PARK & OFFICE PLAZA MILPITAS, CALIFORNIA $18,200,000.00 OR $102.35 PSF BACK ON THE MARKET! BUILDING
More informationSILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING MINUTES
SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING Thursday, October 18, 2007 MINUTES 1. The Regular Meeting of the Silicon Valley
More informationSUBMITTAL REVIEW COVERSHEET
SUBMITTAL REVIEW COVERSHEET Project Name: Alley 111 1725 Westlake Avenue N. Date: 2015-02-12 Suite 300 Submittal No & Description Rev 0: Submittal #220500-0205-0 Plumbing Shop Drawings L7-L8 Seattle, WA
More informationSUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.
SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade
More informationTASMAN TECH MILPITAS, CA. ±10,721 to ±225,000 SF available MARRIOTT/ ELEMENT HOTEL STOP TO BART MCCARTHY BLVD COYOTE CREEK SYCAMORE DRIVE
MILPITAS, CA MARRIOTT/ ELEMENT HOTEL LIGHT RAIL SOON STOP TO BART DRIVE DRIVE COYOTE CREEK MCCARTHY BLVD SYCAMORE DRIVE ±10,721 to ±225,000 SF available 10,000 SF 252,000 SF Available Free Standing High
More informationTASMAN TECH MILPITAS, CA. ±10,721 to ±225,000 SF available TASMAN MCCARTHY ALDER MARRIOTT/ ELEMENT HOTEL STOP TO BART
MILPITAS, CA -890 1371- MCCARTHY 500- DRIVE MARRIOTT/ ELEMENT HOTEL LIGHT RAIL SOON STOP TO BART DRIVE COYOTE CREEK MCCARTHY BLVD SYCAMORE DRIVE ±10,721 to ±225,000 SF available 10,000 SF 252,000 SF Available
More informationSeptember 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.
Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The
More informationSUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS
SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SEAC/ RMSCA Steel Liaison Committee May 17, 2006 Disclaimer SEAC, RMSCA, nor its committees, writers, editors and individuals who have
More informationState of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY
State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY 08625-0350 CHRIS CHRISTIE GOVERNOR KIM GUADAGNO Lt. Governor March 24, 2011 LEE A. SOLOMON
More informationSubmittal Packages Detailed with Items and Reviewers
Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting
More informationTASMAN TECH NOW AVAILABLE. 10,000 SF 220,000 SF (appx.) MILPITAS, CA
TECH MILPITAS, CA NOW AVAILABLE 10,000 SF 220,000 SF (appx.) WWW.TECH.NET FEATURES 10,000 SF 220,000 SF Available Free Standing High Image Buildings 2 VTA stops to BART-Milpitas Station 1 VTA stop to Great
More informationSUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:
OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: BUILDING REFERENCE: SUBJECT: ATHLETIC EQUIPMENT - CALCS - RESUBMITTED 2 TIME(S) DATE RECIEVED: Feb 02, 2015 DISCIPLINE: Structural PRIORITY STATUS: 2-STANDARD SPECIFICATION
More informationSubmittal Transmittal
Submittal Transmittal DLR Group PROJECT: SUBJECT: Windsor High School 37-17223-00 Flush Wood Doors - Flush Wood Door, Veneer-Faced Doors Product Data and Shop Drawings DATE SENT: 6/21/2017 SUBMITTAL ID:
More informationVTA Board of Directors: This is for your information only.
From: Board.Secretary Sent: Tuesday, March 24, 2015 11:26 AM To: VTA Board of Directors Cc: Alaniz, Bernice Subject: VTA/Santa Clara County Human Trafficking press conference - March 24, 2015 2 p.m. Importance:
More informationSUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:
OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 23 25 00 REVIEWER DUE DATE: 6/11/2015
More informationREMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.
SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett
More informationWhy BIM? VASQUEZ MARSHALL ARCHITECTS
Why BIM? VASQUEZ MARSHALL ARCHITECTS Agenda Introductions Using BIM Software For Drawing Production Using BIM Software For Constructability Review Benefits Of BIM Getting Started BIM Experts Michael Smith
More informationFremont Business Center FREMONT, CALIFORNIA
CRAIG FORDYCE, sior, ccim +1 408 282 3911 craig.fordyce@colliers.com CA License No. 00872812 MIKE ROSENDIN, sior, ccim +1 408 282 3900 michael.rosendin@colliers.com CA License No. 00826095 SHANE MINNIS,
More informationSUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.
SUBMITTAL REVIEW Submittal: No. 016.00 Spec Section: 3 113 Underground Natural Gas Piping Reviewed By: Laura Landon, Comma-Q Architecture Date: June 1, 01 Project: BPS Belgrade Elementary School Location:
More informationJanuary 10, Public Utilities Commission of the State of California 505 Van Ness Avenue San Francisco, CA Advice Letter No.
January 10, 2017 San Jose Water Company 110 West Taylor Street San Jose, CA 95110 Phone 408 279-7900 Fax 408 279-7934 Public Utilities Commission of the State of California 505 Van Ness Avenue San Francisco,
More informationREQUEST FOR INFORMATION (RFI)
Planning, Development & Facilities 349 Magnolia Avenue Glendale, California 91204 Tel: 818.507.0201 Fax: 818.507.4911 Project Name: Jefferson ES-12 Classroom Bldg. DSA No: A#:03-114361, File#:19-41 District
More informationSubmittal Review Form
Submittal Review Form Project Name: SMD1 Pump Station Project Contract No: 184030298 Submittal No: 8.1 Resubmittal Received Submittal Title: Standby Generator, Resubmittal 01 Spec. No: 16620 Routing Sequence
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationFremont Business Center
CRAIG FORDYCE, sior, ccim +1 408 282 3911 craig.fordyce@colliers.com MIKE ROSENDIN, sior, ccim +1 408 282 3900 michael.rosendin@colliers.com SHANE MINNIS, leed ap +1 408 282 3901 shane.minnis@colliers.com
More informationRequest or Schedule an Appointment Health Link
Request or Schedule an Appointment Health Link Process to schedule or request an appointment with a Heritage Valley Provider via Health Link Patient Portal Please read before proceeding: Request an Appointment
More informationDrawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820
Date: 2/1/18 P1-101 Submittal Transmittal Project Name: P1-101 Sludge Dewatering and Odor Control at Plant 1 To: Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, CA 92708 Attn: Plant
More informationMuseum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1
700 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006 Office: 202.842.200 Museum of the Bible Submittal Pkg. No.: 08443.0 Submittal Review Form Submittal Items thru SG Project No: 26865.000 Response Date: 3/2/206
More informationWorking Drawing Manual
Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More informationSpec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN
SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary
More informationGSFC CONFIGURATION MANAGEMENT MANUAL
GSFC-CM-001 Effective Date: 05/03/2007 Expiration Date: 05/03/2008 National Aeronautics and Space Administration Goddard Space Flight Center Greenbelt, MD 20771 GSFC CONFIGURATION MANAGEMENT MANUAL Responsible
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSUBJECT^REPLACEMENT MEMORANDUM REGARDING CITY COUNCIL COMMITTfeES^BdARDS AND COMMISSIONS APPOINTMENTS
COUNCIL AGENDA 1/10/17 ITEM 2 14 CITY OF SANjOSE CAPITAL OF SILICON VALLEY Memorandum TO: CITY COUNCIL FROM: Mayor Sam SUBJECT: SEE BELOYY DATE: January 10, 2017 / - >o -> 9 SUBJECT^REPLACEMENT MEMORANDUM
More informationLETTER OF TRANSMITTAL
1730 VARSITY DRIVE, SUITE 500, RALEIGH, NC 27606 TEL (919) 233-8091 FAX (919) 233-8031 LETTER OF TRANSMITTAL ADDRESS: ATTENTION: 80-A East Street Pittsboro, NC 27312-0130 Lynn Richardson Chatham County
More informationCHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel
CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints
More information610 Junction Rd., Ste. 101, Madison, Wisconsin District S. 27 th St. P.O. Box 357, 202 W. Main St. Franklin, WI Hortonville, WI 54944
November 12, 2008 November 19, 2008 x 610 Junction Rd., Ste. 101, Madison, Wisconsin District 9 City Center Junction, llc. Blue Design Group, llc. 6495 S. 27 th St. P.O. Box 357, 202 W. Main St. Franklin,
More informationSUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.
SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:
More informationWorking Drawing Procedure
Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring
More informationLETTER OF TRANSMITTAL
NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 LETTER OF TRANSMITTAL To: DeKalb Mechanical 339 Wurlitzer Drive DeKalb, Illinois 60115 Date:
More informationTRANSMITTAL LETTER. As Builts Change Order Contract Copy of Letter Insurance. For approval Approved as submitted Resubmit copies for approval
Redwood City Electric, Inc. TRANSMITTAL LETTER To: Transworld Construction, Inc. 1178 Folsom Street San Francisco, CA 94103 Date: 05/31/12 Job #: 9340 Regarding: SFO DATA CENTER Attn: Rob Acero We are
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationADDENDUM TO RFP DOCUMENTS
Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,
More informationRequest for Information 0026
Request for Information 0026 Detailed, RFIs Grouped by RFI Number SLAC Photon Science Lab (PSLB) Project # 02001.105960 2575 Sand Hill Road Tel: Fax: Menlo Park, CA 94025 RFI #: 0026 Date Created: 4/4/2017
More informationConstruction Phase Project Management and Documentation
Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications
More informationDate of Comment Commenter Page
Master Responses MR1 N/A Master Response 1 Summary of U.S. 101 Alignment Alternatives 2-7 MR2 N/A Master Response 2 Diridon Station Short-Term Parking 2-8 MR3 N/A Master Response 3 Diridon Long-Term Parking
More informationPROCEDURE FOR PROCESSING WORKING DRAWINGS
PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,
More informationLETTER OF TRANSMITTAL
LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A
More informationLetter of Transmittal
3710 QUINCY AVENUE OGDEN, UT 84403-1934 Ph : (801)627-1414 Letter of Transmittal To: GEN ARCHITECTS, INC. 11001 SW RIVERSIDE DRIVE PORTLAND, OR 97219 Ph: (503)243-7183 Fax: (503)243-7193 Subject: Submittal
More informationBOARD MEMBER REQUESTS & INFORMATIONAL ITEMS
NON-AGENDA September 1, 2017 Board Policy: EL-7 Communication and Support to the Board The BAOs shall inform and support the Board in its work. Page # CEO BULLETIN / NEWSLETTERS 4 CEO Bulletin: 08/25/17
More informationLETTER OF TRANSMITTAL
LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 08/29/2016 Job #: 289-11150 Submittal #: D-11235-001-A
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationSubmittal Transmittal
Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 10/7/2011 Reference
More informationSubmittal Transmittal
Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 11/29/2011 Reference
More informationManaging the Line Between Cx Provider and MEP Coordinator
Managing the Line Between Cx Provider and MEP Coordinator Kevin Fish, P.E., LEED TM AP Northwest Engineering Service, Inc. 2008 National Conference on Building Commissioning An important and difficult
More informationBOARD OF DIRECTORS MEETING. Thursday, January 4, 2018 MINUTES
MEETING Thursday, January 4, 2018 1. CALL TO ORDER AND ROLL CALL The Regular Meeting of the Santa Clara Valley Transportation Authority s (VTA) Board of Directors (Board) was called to order by Chairperson
More informationENGLISH TRANSLATION MILLIMETER-WAVE RADAR EQUIPMENT FOR SPECIFIED LOW POWER RADIO STATION
ENGLISH TRANSLATION MILLIMETER-WAVE RADAR EQUIPMENT FOR SPECIFIED LOW POWER RADIO STATION ARIB STANDARD ARIB STD-T48 Version 2. 1 Version 1.0 December 26th 1995 Version 2.0 February 2nd 1999 Version 2.1
More informationSECTION PROJECT MANAGEMENT AND COORDINATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationAddendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time)
United Nations Development Programme Programme of Assistance to the Palestinian People برنامج الا مم المتحدة الا نماي ي/ برنامج مساعدة الشعب الفلسطيني ITB-2016-205 Addendum No. 2 dated 8 September 2016
More informationCITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package
CITY OF RICHMOND CITY OF RICHMOND Notice of Public Opening Contract T.3263 Contract: Richmond Speed Skating Interior/ Exterior Signage Package Tenders have been issued for the Richmond Speed Skating Interior/
More informationBOARD OF DIRECTORS MEETING Thursday, April 4, 2013 MINUTES
BOARD OF DIRECTORS MEETING MINUTES Chairperson Pirzynski welcomed Chuck Page, Alternate Board Member, who replaced Evan Low as Alternate Board Member representing the West Valley Cities, Group 3. 1. CALL
More information333 W. Santa Clara Street
Interior Renovations Complete! Class A, 12-Story Highrise Office Building Market Ready Spaces Superior Identity Location in Downtown - Steps Away from Restaurants, Hotels, Arena, Diridon Station-Caltrain
More informationSECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative
More information10930 W. Sam Houston Parkway N., Suite 900
ADDENDUM NO. 1 10930 W Sam Houston Pkwy. North Suite 900 Houston, Texas 77064 281.664.1900 281.664.1912 (f) www.salasobrien.com March 21, 2018 Project: Prepared by: Taylor Career Center Welding Labs Beaumont
More informationWTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE
WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION
More informationREQUEST FOR INFORMATION
Ardmore, PA Atlantic City, NJ REQUEST FOR INFORMATION PROJECT: 1845 - Renaissance Hotel Renovations RFI NUMBER: 51.0 JONATHAN NEHMER & ASSOC ATTN: Lauren Maccherone Dacey 7361 Calhoun Place Suite 310 Rockville,
More informationInventory of the Lewis Family Papers D-329
http://oac.cdlib.org/findaid/ark:/13030/kt0g5018bk Online items available Sara Gunasekara University of California, Davis General Library, Dept. of Special Collections 2005 1st Floor, Shields Library,
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project
More informationCOMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT
Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION
More informationCase3:12-cv VC Document96 Filed09/14/15 Page1 of 10
Case:-cv-0-VC Document Filed0// Page of (Counsel listed on signature page) UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF CALIFORNIA SAN JOSE DIVISION LLC, et al., v. Plaintiffs, HUAWEI TECHNOLOGIES
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationChapter 1 General Design Information
Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,
More informationCONVEYANCE PIPELINE AND PUMP STATION
SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationSUBMITTAL LOG EXCEL PDF
SUBMITTAL LOG EXCEL PDF ==> Download: SUBMITTAL LOG EXCEL PDF SUBMITTAL LOG EXCEL PDF - Are you searching for Submittal Log Excel Books? Now, you will be happy that at this time Submittal Log Excel PDF
More informationFreedom of Information Act 2000 (FOIA) Decision notice
Freedom of Information Act 2000 (FOIA) Decision notice Date: 21 June 2017 Public Authority: Address: NHS Guildford and Waverley Clinical Commissioning Group 3 rd Floor Dominion House Woodbridge Road Guildford
More informationFEDERAL RESERVE BANK OF SAN FRANCISCO 12TH DISTRICT STATE MEMBER BANKS
ARIZONA PHOENIX 3138146 WESTERN ALLIANCE BANK MR. KEN VECCHIONE, CHIEF EXECUTIVE OFFICER CALIFORNIA SANTA ROSA 3453737 ALTAPACIFIC BANK MR. CHARLES O. HALL, CHIEF EXECUTIVE OFFICER AND DIRECTOR SAN FRANCISCO
More informationEMC Evaluation of Comtrend Ethernet Powerline Adaptors
Page 1 of 81 ERA Business Unit: ERA Technology Ltd Report Title: Author(s): EMC Evaluation of Comtrend Ethernet Powerline Adaptors Roger Smith Client: Ofcom (Contract Ref No 410000327) Client Reference:
More informationFEDERAL RESERVE BANK OF SAN FRANCISCO 12TH DISTRICT STATE MEMBER BANKS
ARIZONA PHOENIX 3138146 WESTERN ALLIANCE BANK MR. KEN VECCHIONE, CHIEF EXECUTIVE OFFICER CALIFORNIA SANTA ROSA 3453737 ALTAPACIFIC BANK MR. CHARLES O. HALL, CHIEF EXECUTIVE OFFICER AND DIRECTOR SAN FRANCISCO
More informationSubmittal Packages Detailed with Items and Reviewers
Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 1 San Diego State University 00 Campanile Drive San Diego, CA 918 Tel: 619-94-740 Fax: 0079-1116-0 Circulating Pump Author
More informationDUAL OPAMP AND VOLTAGE REFERENCE General Description. Features. Applications
General Description The is a monolithic IC specifically designed to control the output current and voltage levels of switch mode battery chargers and power supplies. The device contains two operational
More informationNETWORK CIRCLE SANTA CLARA CA
4160-4200 & 4050 PALM DRIVE ±302,066 SF Office Space Available For Lease in Silicon Valley ROMY ZEID +1 650 492 5206 romy.zeid@colliers.com CA License No. 01433654 JAKE SMART +1 650 492 5216 jake.smart@colliers.com
More informationRegional Interoperable Communications System
SAN FRANCISCO BAY AREA Regional Interoperable Communications System BayRICS By connecting our fi rst responders, we are ensuring that we will be better prepared for future disasters natural or man-made.
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationLUCAS 2009 (Land Use / Cover Area Frame Survey)
EUROPEAN COMMISSION EUROSTAT Directorate E: Agriculture and environment statistics; Statistical Cooperation Unit E-1: Farms, Agro-Environment and Rural development LUCAS 2009 (Land Use / Cover Area Frame
More informationNOTICE OF REQUEST FOR PROPOSALS (RFP) RFP ADDENDUM 1 NORTH SAN JOSE STREET LIGHT CONVERSION TO LED
NOTICE OF REQUEST FOR PROPOSALS (RFP) ADDENDUM 1 NORTH SAN JOSE STREET LIGHT CONVERSION TO LED JULY 28, 2009 INSTRUCTIONS: The purpose of this Addendum is to update information concerning the Mandatory
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationMarch 31, The Honorable Elaine L. Chao Secretary U.S. Department of Transportation 1200 New Jersey Avenue, S.E. Washington, D.C.
The Honorable Elaine L. Chao Secretary U.S. Department of Transportation 1200 New Jersey Avenue, S.E. Washington, D.C. 20590 Dear Secretary Chao: We are writing you, as the top transit CEOs in the United
More informationA. SAFETY B. SCHEDULE
O.A.C. WEEKLY CONSTRUCTION MEETING November 9, 2015 Meeting - #16 UCC Bonnie J. Ford Health, Nursing & Science Center - ACCO Job #14-0965 cc: file Weekly O.A.C. Meeting Held @ 1:00 PM in ACCO Job Trailer
More informationSECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.
SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.
More informationA. Section includes administrative and procedural requirements for project record documents, including the following:
SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01