1 Request for Information 0026 Detailed, RFIs Grouped by RFI Number SLAC Photon Science Lab (PSLB) Project # Sand Hill Road Tel: Fax: Menlo Park, CA RFI #: 0026 Date Created: 4/4/2017 Answer Company Answered By Author Company Authored By HDR ENGINEERING INC Robert Seelenbacher Rudolph & Sletten Van Do 560 Mission Street, Suite 900 San Francisco, CA Seaport Blvd., Suite 350 Suite 350 Redwood City, CA Co-Respondent Author RFI Number Subject DP4-B1 Architectural RFIs Discipline Architectural Category Drawing Interpretation / Clarification Cc: Company Name Contact Name Copies Notes Carolyn Galayda 1 James Hutcheson 1 John Azevedo 1 Lee Anne De Wan 1 Question Date Required: 4/12/2017 Please see attached spreadsheet with list of associated DP4-B1 questions/clarifications for various Architectural Drawings. Suggestion Answer Date Answered: Prolog Manager Printed on: 4/4/2017 RS_Prolog2008_ActiveProjects Page 1

2 1 of 5 Page Num Dialog All 185 At page turn drawing review at DP4/Bulletin 1, HDR noted that room numbering were updated within the current drawing set. However, there are a number of rooms that have not been renumbered in various sheets. Is there more room number changes to follow? - The current changes are not clouded. Please define which disciplines have been updated and which have not been. All 186 Various drawings have some additions/edits from DP3 but there are no clouding to indicate new/changed item G "Under Occupancy" and "Special Uses" items have change and have not been clouded. Please clarify G Conference Room now changed to Conference Room 2064 (see detail C1). These items were not clouded. Please clarify G Further clarifications needed as room numbers were added and not clouded. For example, Staircase 1-Stair-E was added (Gridlines 3&4, K&L) and not clouded. A Gridlines Btwn K&L, 8--Changes not clouded on bottom right LN2 Yard area. Vaporizer not shown. This is needed to be shown as clearance is marked. Or, will this be completely eliminated? Door needs dimensions. A Gridelines 2-3, E&F-- Future raised floor hitting door (Door 1014). HDR response: This is not a raised floor. The floating floor is level with the adjacent flooring. R&S response: Please confirm all floating floors are the same elevation to finished concrete slab floor as this is not stated in drawings. Please confirm that the 6" high note is to be ignored (on S-303 detail A5) A Col. Lines 2-I--Is step required for Room 1040? HDR response: This is not a raised floor. The floating floor is level with the adjacent flooring. R&S response: Please confirm all floating floors are the same elevation to finished concrete slab floor as this is not stated in drawings. Please confirm that the 6" high note is to be ignored (on S-303 detail A5) A Between Col. Lines M-N, near 2--At Door 1054 (vs Door 1059) note to remove door frame. No door present. Please clarify. A Col. lines B&C, 7&8--Meeting Room Wall dimension change/move and not clouded. Please clarify A Dashed lines around building-- 1 hour fire barrier has changed from solid centerline between diamonds to dashed lines between diamonds. However, wall rating legend on G-101 does not have dashed lines can you please clarify.

3 2 of 5 A Floor Plan Symbol Legend changed, but no cloud. Please clarify. A Room number changes at details D2 and D3 that are not clouded. Please clarify. A Between Col. Lines K-L, at 1.5 line There is casework. Provide an elevation for this scope. Associated section B4 on A- 411 does not provide enough information. (Reference Coffee Room 2052) A Column L between 2050 and 2056 Detail A3 on A-513 is called out. However, detail is "New Wall at Existing Curtain Wall" is this the correct reference? Is there a new pony wall? Please provide details. A Grideline 3-4(right side) This is an elevation for new page A-201. It is not clouded A Gridline F The lockers along gridline F do not have a detail reference/call out. Please provide. The lockers to the east of gridline F appear to be a built-in assembly per details A3 on A-514 and E2 on A-514. However, keynote 5 says there is part of the furniture package. Does either of these keynote 5 need to be deleted from drawing set. Please clarify. A between Col. Lines B-C Reference elevation A3 on A-211 references A2 on A-514. Detail A2 on A-514 shows an assembly which appears to be encased in plywood. This is not detailed. Please clarify scope. A-102 & A Col. Lines A-C, Breakroom 2006 refrences detail C1 on A-403. This shows, "below sofit and referenced and detail C4, it shows 4 containers, Model H." however, on sheet A- 102 between gridlines D-E, along 1.5 line, elevation references a section detail A3, on A-104 and that detail calls out "locker section" for same scope. Please clarify. A Floor Plan Symbol Legend changed, but no cloud. Please update drawings A Details D1 & D2 are not referenced to the roof plan's west and east mechanical enclosure. Please provide the applicable note reference on the roof plan A Col. Lines 3&4, K&L Plywood is called out in electrical room #4002. Please provide a spec section for this material. A Col. Lines B&C, 5&6 Room 1084 remove toilet partition on reflected ceiling.

4 3 of 5 A Metrology is shown as "Bid Option F2." However, on sheet A-101 and Q-101 it appears as base scope for Phase B's work. Please clarify if this is a bid option or base work on Phase B and coordinate drawings accordingly. HDR response: The Metrology Bid Option is to add FFUs in the ceiling. The drawings are correct. Please review spec section Alternates for a description of bid options. R&S response: On pages A-101 there are details D1 and D2 that outline bid options. However, there are no details that call out for Metrology on A-101. While on Q-101 there are bolded dashed lines and call outs for bid options for Cryo-Tem and NanoX areas BUT there are no indications for the Metrology. A Left of gridline 1 There is a section cut between 3rd and 2nd floors referencing Detail B2 on A-522 between gridlines 1-2 on exterior elevation. B2 is a detail at full height wall. Is this a correct reference? How would somoeone (or a subcontractor) get to this detail from the exterior wall? A RH Lab/Room (RH 1024)--Check Controlled Environmental Rooms. No elevation or details given for this room. Please provide this information. A Key Notes have changed and are not clouded. A Left of gridline G Reference Detail C1, on east side, at exterior wall--it should detail C5 on A-201. A Gridline F Detail A1 at gridline F appears to show a locker suspended above finished floor. Please review and clarify. A Between gridlines F-C Detail C1 The room between grid lines F and C on the first floor needs to be labeled. A Near Roof level and Penthouse Level gridlines Detail C1 reference details D4 and D3 on sheet A-524. Architectural details D3 and D4 on page A-524 do not correspond with the sheathing shown on the structural drawings. Is plywood required at walls? Is subfloor required at roof? Please coordinate between structural and architectural drawings. A Please show HVAC diffusers in Men's and Women's restroom (Detail) A Detail A1 identifies Rooms 1078 & There is no toilet Room Room 2110 is "Biology" in other referenced drawings (not restroom). Please correct drawing detail A1 on A-401 identified room. A Detail C1 identifies "Typ. Women's Toilet" (Rms 1082 and 2112). Room 1082 is an electrical room. Room 2112 is "Fume Hood #1". Please correct Drawings

5 4 of 5 A Detail D3, D4, C3, B3, B4, and A3 all reference details on A-522. Architectural dwg shows gypboard on metal framing. The related structural drawings on S-404 reference an associated details from there. On S-501 show different assemblies. Please coordinate drawings. A Detail C1 references detail A3 on A-513 for the condition at office Rm 2014 & 2028's front curtain wall. On detail C1 on A-402, it notes a "(N) Pony Wall Below." Please define this work scope. A Detail A1 conference room 1050 shows lines for unidentified work on opposing east and west walls. Please define and detail scope. A Detail A5 shows wall panels A west stair elevation. However, Sheet A-516 which was a former reference to this stair's work shows a related detail "delete." Please confirm that the panels at the stairs have been deleted. A Reference detail A5 on Sheet A-410. The corresponding RCP on sheets A-112 and A-111 do not show the new ceiling framing at the 1st and 2nd floors in the RCPs. Please clarify if new framing is required by addressing these items on sheets. A Detail B4 on A-411, the upper most walls on detail are halftone. What is this trying to indicate? A Reference sheet A-102 and the west elevator. The East Elevator has details A4 on A-411 on the first floor; B4 on A-411 on the second floor; and D4 on A-411 on the third floor. While the west elevator has A3 on A-411 on the first floor and C3 on A-411 on the thrid floor. Please provide the applicable detail on the second floor for the west elevator. A Reference detail A5 on sheet A-514. This detail includes a reference to E4 on sheet A-514. The specific reference looks applicable to A4 on A-514. Please review. A ( Gridlines 4&5, K&L; B&C, 4&5) Detail D3 and D4 show cement plaster at the roof duct penthouses at gridline 4 & 5,K&L as well as gridlines B&C,4&5, on sheet A-104. The section between 4&5 references the detail C1 on A-301 associated with these details A. Please provide a specification for the: 1) Cement Plaster 2) Vapor Barrier 3) 1x6 Facia 4) 5/8"" Exterior Gyp related to detail D4 and a3. B. In Addition to the above items, please provide a specification for the: 1) Drip mould 2) Continuous Stainless Steel Cap Flashing"

6 5 of 5 AI-602 AI-112 AG Reference "Room Finish Schedule- Level 3" on sheet AI-602. There is gypboard at this level not identified in this schedule. What if any paint is required, specifically at the 3rd floor's shell space? /17 (Taylor/Galayda) Need manufacturer/model nos., etc., for furniture notes on drawing.2. 03/18 (Hadsell/Galayda) Information is in SLAC provided furniture specification. Please see furniture specification appendix. final manufacturers will be provided with furniture bid.3. 04/03 (Nadler/Galayda) Migrate to DP [Source: ] 235 Between gridlines 1&2, L&O. This area is encircled with a dot/dashed line similar to requested alternate pricing that is also reflected on sheet A-112. Is the dot/dashed lines around 1&2, L&O applicable? If so, Please confirm what is being requested or note it as this specific location.

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11 HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum

More information

All drawings submitted to the University should adhere to these guidelines.

All drawings submitted to the University should adhere to these guidelines. CAD Drawing Guidelines 1. Overview This document presents CAD drawing guidelines for using and maintaining the Columbia University facilities base architectural and space CAD floor plans. All drawings

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

LET S BUILD R U D O L P H A N D S L E T T E N

LET S BUILD R U D O L P H A N D S L E T T E N LET S BUILD PHOTON SCIENCE LABORATORY BUILDING SLAC National Accelerator Laboratory Menlo Park, CA http://projects.rsconstruction.com/slac-pslb/ Corporate and Regional Offices Building Where we Work &

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

Solicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers

Solicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers Solicitation No. VA244-13-B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers 1. Question: Is this project Tax Exempt in regards to materials and equipment as per PA State

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

214 Wilshire Blvd., Suite 102 Santa Monica California 90401

214 Wilshire Blvd., Suite 102 Santa Monica California 90401 Wilshire Blvd., Suite 0 Santa Monica California 900 7 W a l l a c e P l. C a l i f o r n i a 9 8 t e l : 0 7 7 N ND COURT PROPERTY LINE 0.00' THE RENOVATION AND CHANGE OF USE OF AN EXISTING BOOK STORE

More information

DR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479

DR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479 AREA MAP DR. FAKHOURI SKIN CARE SPECIALISTS 750 WEST GRAND PARKWAY SOUTH SUITE 20 SUGAR LAND, TX 7779 DRAWING LIST G00 G002 G00 G00 G005 G00 G007 G008 A0 A02 A0 00 0 02 0 0 05 Cover Sheet General Conditions

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS

MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS TABLE OF CONTENTS INTRODUCTION 1 PART ONE LAYERS AND CLASSES FOR RENOVATION PROJECT 2 OVERVIEW 2 SETTING UP LAYERS AND CLASSES 2 CREATING

More information

MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS

MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS WHAT S INSIDE INTRODUCTION 1 PART ONE LAYERS AND CLASSES FOR RENOVATION PROJECT 1 OVERVIEW 1 SETTING UP LAYERS AND CLASSES 1 CREATING OBJECT

More information

TG Glazing Design-Build

TG Glazing Design-Build TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593 April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6

More information

A101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN

A101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN A00 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" A00 A0 A0 A B C D E F G ' - 0" 8' - 0" 9' - 0" 9' - 0" 9' - 0" 8' - 0" OVERHANG OF ROOF ABOVE RECESSED PEDI-MAT AT ENTRANCE MECH ENCL 0 0 WOMENS

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

Deck Tutorial. Decks and Porches. Drawing Decks

Deck Tutorial. Decks and Porches. Drawing Decks Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

CONTENTS CHAPTER 1 WHAT THIS IS ALL ABOUT...

CONTENTS CHAPTER 1 WHAT THIS IS ALL ABOUT... CONTENTS CHAPTER 1 WHAT THIS IS ALL ABOUT... 17 INTRODUCTION... 17 Terminology... 18 MACINTOSH AND WINDOWS... 20 CONVENTIONS USED IN THIS TUTORIAL... 21 Command Menu Title And Pull-Down Menu... 22 Commands,

More information

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners

More information

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. SPEC-0800 1/5 1.0 PURPOSE This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. 2.0 VALE DRAWING TYPE DEFINITIONS Engineering Drawings Engineering

More information

Architectural Alliance Incorporated KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN 2 SCALE:1/4" = 1'-0"

Architectural Alliance Incorporated KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN 2 SCALE:1/4 = 1'-0 KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN SCALE:/4" = '-0" SECOND FLOOR DEMOLITION FLOOR PLAN SCALE:/4" = '-0" P P 08 /A30 KEYNOTES. ALTERNATE # RE-LAMINATE CABINET.. NEW BLINDS 3. WRAP HEAD,

More information

BOQ /Bill of Quantities for Interior Furnishing of Bank of India; BO: BAGH MUGHALIA-BHOPAL with Details of Specification.

BOQ /Bill of Quantities for Interior Furnishing of Bank of India; BO: BAGH MUGHALIA-BHOPAL with Details of Specification. S.NO. ITEM QTY. UNIT RATE AMOUNT 01. FACADE OF ENTRANCE DOOR Providing & fixing in position Aluminum composite panel boxing with PVDF coating & LDPE core laminated Eurobond/ Alukbond exterior grade 4mm

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)

More information

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES: CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No. July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below. DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

TECHNICAL DRAWING GUIDE

TECHNICAL DRAWING GUIDE Budapest University of Technology & Economics (BME) Faculty of Architecture Department of Building Constructions 2017 + TECHNICAL DRAWING GUIDE Edited by Dr Zsuzsanna Fülöp and Aryan Choroomi based on

More information

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative. ADDENDUM_04 1 page(s) I 1 project number CIN001 project name Cinemark XD12 Altoona, IA issue date December 16, 2013 venue > distribution Jeff Duffy EDC jduffy@edcweb.com Justin Couch VCC USA jcouch@vccusa.com

More information

EstimaXpro. S&R Consultants

EstimaXpro. S&R Consultants EstimaXpro S&R Consultants Contents 1. Introduction... 5 2. Masters... 7 2.1 Project Details... 7 2.2 Storey Details... 8 2.3 Joinery Details... 8 2.4 Rate types... 9 2.5 Rates... 9 2.6 Rate Analysis Type...

More information

FACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015

FACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015 FACILITIES MANAGEMENT AutoCAD Guidelines & Standards May 2015 PLEASE NOTE: Changes in the 2015 guidelines appear in these sections; 1.1, 3.2, and 5.2. SECTION 1: General Guideline Table of Contents 1.1

More information

Required Supporting Information and Documentation for Historic Preservation Certification Applications

Required Supporting Information and Documentation for Historic Preservation Certification Applications Required Supporting Information and Documentation for Historic Preservation Certification Applications Part 1 Submittal- Evaluation of Significance Descriptive Information Describe the major features of

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO. 18-04 ADDENDUM NO. ONE DATE: September 07, 27 CLIENT / PROJECT: Chabot-Las Positas CCD Campus Master

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information

TELEPHONE: (215) Addendum No. 1

TELEPHONE: (215) Addendum No. 1 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.

More information

Deck Tutorial. Decks and Porches. Drawing Decks

Deck Tutorial. Decks and Porches. Drawing Decks Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

House Design Tutorial

House Design Tutorial House Design Tutorial This House Design Tutorial shows you how to get started on a design project. The tutorials that follow continue with the same plan. When you are finished, you will have created a

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

Typical Drawings for Schools

Typical Drawings for Schools 0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)

More information

2D Drawings Levels of Detail Specification

2D Drawings Levels of Detail Specification 2D Drawings Levels of Detail Specification March 2018 2D Measured Building Survey Level of detail Level of detail should be chosen based on the intention that the final drawings will be used for. It should

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

Getting Started with Revit

Getting Started with Revit AUTODESK Autodesk REVIT Revit TRAINING Training TUTORIAL Tutorial Getting Started with Revit FOCUS Focus KUWAIT Kuwait CAD Cad Team 2012-13 Step 01 02 Grid & levels Grid create 5 vertical grid lines grid

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

Description of Item Unit Quantity

Description of Item Unit Quantity Page 1 of 6 a) Façade of Entrance Door (Refer Drawing 11) Providing and fixing in place Aluminum Composite Panel Cladding of approved quality / shade / colour / make (Euroband / Altobond / Alucobond) per

More information

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated DMI Database CCF5IF9HGLPD-QB (4,88) $14,775.00 CSI Section 05400 DMI Light Gage Structural Steel Framing Systems Angle Framing Bridging Channel Flat Strapping Furring Clip Angle Soffit/Fascia/Deck Framing

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017 #Question & Answer: #1 The RFP states that there is one week to complete all survey work. Please confirm this duration and that no other time will be allowed for survey work. The week identified in the

More information

SMALL OFFICE TUTORIAL

SMALL OFFICE TUTORIAL SMALL OFFICE TUTORIAL in this lesson you will get a down and dirty overview of the functionality of Revit Architecture. The very basics of creating walls, doors, windows, roofs, annotations and dimensioning.

More information

INTERIOR SIGNAGE MANUAL

INTERIOR SIGNAGE MANUAL INTERIOR SIGNAGE MANUAL ➊ Purpose ➋ Procedures ➌ ADA Requirements INTERIOR SIGNAGE MANUAL ➍ Text, Braille, Pictograms and Color ➎ Families of Interior Signage ➏ Mounting Guidelines ➐ Signage Diagrams ➑

More information

Chief Architect New Feature List

Chief Architect New Feature List SYSTEM / PERFORMANCE Chief Architect Premier X4 is available in 64 bit and 32 bit versions. The 64 bit version is more efficient in managing memory and you will see better performance on larger plan files

More information

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

UDS OVERVIEW Uniform Drawing System

UDS OVERVIEW Uniform Drawing System UDS OVERVIEW Uniform Drawing System The Construction Specifications Institute 601 Madison Street Alexandria, VA 1994 CSI began development of UDS Organization and presentation of drawing sets Organization

More information

Basic tools. In this tutorial you will study how to: House for Living-2008 Arh. AART Architects

Basic tools. In this tutorial you will study how to: House for Living-2008 Arh. AART Architects Basic Tools Basic tools House for Living-2008 Arh. AART Architects Home for Life is designed as the world s first Active House and sets new standards for combining energy-efficient solutions with a healthy

More information

Project Booklet. Structural Drafting with AutoCAD

Project Booklet. Structural Drafting with AutoCAD Project Booklet Structural Drafting with AutoCAD Introduction 1 General Setup 2 Border and Title Block 3 Drafting the Foundation Plan (Plate 1) 8 Drafting the South Elevation (Plate 2) 11 Drafting Section

More information

REND TH STREET PERSPECTIVE 363 6TH STREET SAN FRANCISCO, CALIFORNIA th St - Shadow on Gene Friend: Attachment B

REND TH STREET PERSPECTIVE 363 6TH STREET SAN FRANCISCO, CALIFORNIA th St - Shadow on Gene Friend: Attachment B 6TH STREET PERSPECTIVE 363 6TH STREET SAN FRANCISCO, CALIFORNIA 94109 REND-1 This drawing and written material constitute the original work of this Architect and may not be used, duplicated, or disculosed

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

GROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only)

GROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) 3 5' ' 5' ' -0" High Wall -6" W W bedroom x ' carpet fl. fin. W bedroom ' x ' carpet fl. fin. W ' D3 5' 6' 5' D W3-8" x 8'-8" D4 ceramic tile fin. kitchen '- 8' x 8'-8" ceramic tile fin. D3 4 bath 5' -8"

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

12'-0" SIDE YARD 12'-0" SIDE YARD NEW 3,826 SF 2 STORY + BASEMENT S.F.D. PLOT PLAN SCALE 1 8" = 1'-0" 2

12'-0 SIDE YARD 12'-0 SIDE YARD NEW 3,826 SF 2 STORY + BASEMENT S.F.D. PLOT PLAN SCALE 1 8 = 1'-0 2 LEGAL DESCRIPTION ADDRESS: 3599 LANKERSHIM BOULEVARD APN LOT LOT SIZE TRACT BLOCK ARB 2380-005-009 10 22,282.0 SQ.F.T TR 12578 NONE 3 LIC ENSED A RC HIT ECT V LA DIMIR T O MA LEV SK I No. C 22417 ST A

More information

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN -2,000 MORNING PATIO ±0 D O R S E T A V E N U E -2,800 SITE PLAN SCALE 1:200 CHECK ALL DIMENSIONS AND LEVELS ON SITE PRIOR TO CONSTRUCTION, REPORT ANY DISCREPANCIES TO THE ER SK 21.03.2014 SITE PLAN 21.03.14

More information

TELEPHONE: (215) Addendum No. 01

TELEPHONE: (215) Addendum No. 01 THE SCHOOL DISTRICT OF PHILADELPHIA BOARD OF EDUCATION Office of Capital Programs 0 North Broad Street, Third Floor - Suite Philadelphia, PA 0-0 TELEPHONE: () 00-0 Addendum No. 0 Subject: Location: Potter

More information

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,

More information

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building

More information

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS

More information

Carpentry/Carpenter CIP Task Grid

Carpentry/Carpenter CIP Task Grid 1 Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

Appendix to Chapter 1 Release 3

Appendix to Chapter 1 Release 3 Appendix to Chapter 1 Release 3 Introduction to AutoCAD Architectural Desktop Release 3 Enhancements to AutoCAD Architectural Desktop Release 3 include changes in the content of the menu bar, toolbars,

More information

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS INTRODUCTION In this lesson, you ll learn about the different types of drawings used in the construction industry, and how to read floor plans, section drawings,

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information