1 DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below. 1. QUESTIONS & ANSWERS QUESTION 1: There are no plumbing drawings or fixture schedules shown. Please verify if these items will be provided. If not what fixtures should be provided. ANSWER 1: The link provided within the RFP for digital drawings has been verified to include plumbing drawings and a fixture schedule. See Plumbing Drawings. QUESTION 2: Please confirm this project is to follow the University of Texas System OFPC Prevailing Wage Determination included with Appendix 6 Special Conditions of the bid documents. ANSWER 2: Confirmed QUESTION 3: Please confirm a full-time superintendent is require for the duration of the project. ANSWER 3: Yes, a dedicated full-time Superintendent is required for the duration of the project. QUESTION 4: Per UGC Article 9.4 contractor shall develop its schedule, pricing and execution plan to provide a minimum of ten (10) percent total float at acceptance of the base schedule. Please confirm this project will require specified float and be required in all contractors bids. Page 1 of 8

2 ANSWER 4: Yes, a minimum of 10% float is required for all bidders and submitted construction schedules. QUESTION 5: Please advise working hours. Will the contractor be given badge access to the building for any hours they need to maintain schedule? ANSWER 5: Monday through Friday: 6am 6pm Library hours (North half of SL and all of level 1) Monday Thursday 7am 10pm Friday 7am 9pm Saturday 9am 5pm Sunday 1pm 8pm Badge Access: Foreman and Supervisors will receive building access. All others will receive badge only. All contractors are required to obtain a UT Identification Badge. A fee of $15 per badge is required to be paid by the GC. QUESTION 6: Please clarify hours for deliveries to job site. ANSWER 6: All deliveries must be coordinated and received by the GC during working hours. The Owner will not accept deliveries on behalf of the GC. QUESTION 7: Please confirm the responsible party for the following systems is correct: ANSWER 7: a. Test & Balance Owner- Confirmed b. Telecom/Data cabling & devices Owner - Confirmed c. A/V cabling & devices Owner - Confirmed d. Security cabling & devices Owner Confirmed QUESTION 8: Please confirm the phasing plan is to be followed per G-200. Are there any phases that can be performed at one time? Page 2 of 8

3 ANSWER 8: The intent of the phases are for them to be scheduled and completed sequentially. Spot coolers and/or temporary AHUs are required in any area (occupied or not) that is orphaned by an AHU to be demo d. Survey required to confirm phasing limits. Outages are to be coordinated with the owners designated represented/project manager (ODR/PM) to minimize impacts on occupants. QUESTION 9: Please confirm amount of time required in the schedule between phase completion and the start of the next phase for the owner. ANSWER 9: Staff Move Out - 10 working days Hazardous Materials Testing and Abatement if Required - 10 working days QUESTION 10: Please provide the weight capacity of elevator and dimensions of the freight elevator contractors will have access to during this project. ANSWER 10: Only freight elevator is acceptable for contractor use. Elevator is 58 W x 7 H x 7 D. Door is 58 W x 79 H. The weight limit is 3,000 lbs. Reference spec section Part 1.6 QUESTION 11: Please confirm signage is by owner. No signage drawings or specifications were provided. ANSWER 11: Confirmed. Signage is by Owner. QUESTION 12: No Telecom/Data drawings were provided with the bid documents. If conduit and backboxes are to be installed for the low voltage cabling and devices, please provide these drawings. ANSWER 12: Provided by Owner. GC to allow for installation by Owner. Follow Drawings and Specification for conduit and backboxes. Page 3 of 8

4 QUESTION 13: Per the manufacture TerraMai MC White Oak is no longer available in 6. Will 5 or 7 be acceptable? ANSWER 13: 5 is acceptable. QUESTION 14: Where is it acceptable to have a dumpster located? Are there any cost with the acceptable location? ANSWER 14: Aerial photo is provided as attachment B at the end of of possible locations if available. QUESTION 15: Please confirm hazardous material removal by UTHealth will occur in each phase prior to contractors work. If so, please advise how much time should be included in the schedule for abatement work. ANSWER 15: Staff Move Out - 10 working days Hazardous Materials Testing and Abatement if Required - 10 working days QUESTION 16: General Note #03, MH-100 notes Reasonable Allowance should be planned by the contractor in the bid for adjustments as required. Please advise the nature and value of allowances which should be carried. ANSWER 16: Bidders to use a $50k unforeseen conditions allowance. QUESTION 17: Drawing MH-100 indicates new ductwork to be ran from the new air handler units through the swing space on the street level. However, the reflected ceiling plan does not indicate this area is to receive new ceiling tile. Please provide an updated RCP drawing showing potential new ceiling. Page 4 of 8

5 ANSWER 17: Ceilings are too low. No grid and tile required. QUESTION 18: Is a temporary air system required for the occupied spaces during construction of the MEP scope? Please provide CFM, relative humidity conditions etc., to be met. ANSWER 18: Office air must be maintained during construction when the respective AHU is taken off line. QUESTION 19: If a temporary air system is required during construction of the MEP scope, what allowance value do you want us to carry in our bid for this scope of work? ANSWER 19: Office air must be maintained during construction when the respective AHU is taken off line. QUESTION 20: Are there any specific temporary air requirements for the rare book room during the MEP scope of work? Please provide CFM, relative humidity conditions etc. to be met. ANSWER 20: N/A. Existing Rare Book system to remain. NIC, reference MH-101 Rare books room shall be provided with a temporary air system while associated ASU is being replaced. Relative humidity shall be maintained at 50% RH and 72 F. QUESTION 21: Please confirm 2013 Uniform General and Supplementary Conditions for UT System Constructions Projects item Asbestos Abatement Liability Insurance will not be required due to asbestos abatement being provided by owner. ANSWER 21: We currently use the 2013 Version of the UGC. Asbestos Abatement Liability Insurance is not required for this project. Page 5 of 8

6 QUESTION 22: Please confirm only the original proposal requires the Price and Delivery Schedule to be filled and the copies do not require pricing to be filled in per RFP 3.1. ANSWER 22: Correct. QUESTION 23: Please provide the length required for roller shade RS-1 and RS-2. ANSWER 23: RS-1 length = apprx range 8-4 to contractor is responsible for verifying final length in field RS-2 length = apprx contractor is responsible for verifying final length in field QUESTION 24: Please confirm existing furniture will be moved and stored by owner prior to the start of each phase. ANSWER 24: Confirmed. QUESTION 25: Please provide the deck height of each level. ANSWER 25: Reference G-001 for deck heights of each level. 2. ADDITIONAL INFO/COMMENTS FOR BIDDERS 1. Stair 1S06 extend gypbd furring at East, West & North perimeter down 16 below ceiling. 2. Door SJ01 Hardware: HARDWARE GROUP NO. C200G PROVIDE EACH PR DOOR(S) WITH THE FOLLOWING: Page 6 of 8

7 6 EA HINGE 5BB1HW 4.5 X 4.5 ( 5" 652 IVE DOORS OVER 3'0" WIDE) 1 EA POWER TRANSFER EPT10 CON 689 VON 1 SET CONST LATCHING FB IVE BOLT 1 EA MORTISE CYLINDER 1E74 X ABC 626 BES 1 EA EU MORTISE LOCK L9092LEU 06A RX XL CON 626 SCH 1 EA PERMANENT CORE PATENTEND PERMANENT CORE BES MATCH SYSTEM 1 EA COORDINATOR COR X FL X MB (AS REQ'D) 628 IVE 2 EA SURFACE CLOSER 4040XP REG / 4040XP EDA TBSRT 689 LCN (AS REQ'D) 2 EA FLOOR/ WALL STOP FS436/ WS401 (AS REQUIRED) 626 IVE 2 EA DOOR BOTTOM 369AA6-Z49 AA ZER 1 EA MEETING STILE 41AA AA ZER 1 EA THRESHOLD 164A-223 A ZER 1 EA GASKETING 188S-BK (SET) BK ZER 2 EA DOOR POSITION BY SECURITY CONTRACTOR B/O SWITCH 1 EA POWER SUPPLY BY SECURITY CONTRACTOR B/O 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O ACCESS CONTROL BY OTHERS. OPERATIONAL DESCRIPTION: ENTRANCE BY CREDENTIAL READER OR MANUAL KEY OVER-RIDE. ALWAYS FREE EGRESS. FAIL SECURE. 3. ADDITIONAL SCOPE 1. MHC-100. Add Keynote 6 Disconnect and remove ductwork in swing space. Protect ductwork from debris until new ductwork connections are made. Add keynote 6 to all ductwork shown to be removed in swing space. 2. MHD-101. Add Keynote 5 Disconnect and remove supply air ductwork to Rare Books and Reading Room. Protect ductwork from debris until new ductwork connections are made. Add keynote 5 to all ductwork shown entering/leaving Rare Books (110), Reading Room (153) and Vault Room (110B). 3. MH-100. Provide transfer return duct in Break Room (S50A), Elec. (SE05.2), Conference Room (S50C). 4. MH-100. Provide a fire damper in 6 ductwork between Computer Classroom (S50F) and Corridor (SC04). 5. MH-100. Add keynote 4 Duct mounted smoke detector. Add keynote 4 at all combination fire /smoke dampers. 6. MH-100. Relief air riser in Chase (SEL05) to be 36/18. Relief air ductwork through wall shall be 36/18 and be provided with a bell mouth opening. 7. MH-101. Add VVR-1B-3-7 to serve restroom. Provide associated ductwork from 18/12 main ductwork to linear diffusers in restrooms. MH-101. Coordinate ductwork in 8. MH-101. Provide bell mouth opening on all return air duct openings in plenum. Page 7 of 8

8 9. MH-101. Add keynote 4 Duct mounted smoke detector. Add keynote 4 at all combination fire /smoke dampers. 10. MH-101. Relief air riser in Chase (1EL05) to be 36/24. Relief air ductwork through wall shall be 30/20 and be provided with a bell mouth opening. 11. MP-100. Add general note 1 All piping to VVR reheat coils to be ¾ unless notes otherwise. 12. MP-101. Add general note 1 All piping to VVR reheat coils to be ¾ unless notes otherwise. 13. MP-101. Route HWS/R piping to VVR-1A MP-101. Route HWS/R piping to VVR-1B MH-401. Add Keynote 1 Connect existing supply and return air ductwork to new AHU. Route condensate to floor drain. 16. MH-401. Add keynote 2 Coordinate installation of VFD with electrical contractor, maintain code required clearance in front of and above VFD. 17. MH-401. Add keynote 3 Duct mounted smoke detector. Add Keynote 3 at all AHU supply and return air connections. Page 8 of 8

City of St. Charles School District New Addition and Renovation at George M. Null Elementary School 435 Yale Boulevard St. Charles, Missouri 63301

City of St. Charles School District New Addition and Renovation at George M. Null Elementary School 435 Yale Boulevard St. Charles, Missouri 63301 City of St. Charles School District 435 Yale Boulevard St. Charles, Missouri 6330 ADDENDUM #2 Date: April 03, 209 Prepared or: City of St. Charles School District Project Number: 709 Architect: Dickinson

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

SYLVAN WAY LIBRARY FIRE DOORS REQUEST FOR BID

SYLVAN WAY LIBRARY FIRE DOORS REQUEST FOR BID SYLVAN WAY LIBRARY FIRE DOORS REQUEST FOR BID Kitsap Regional Library is currently seeking quotes for replacement and installation of fire rated frames, doors and hardware at the Sylvan Way branch. There

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA

RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA KOCH HAZARD ARCHITECTS ADDENDUM DATE:. SCOPE OF THIS ADDENDUM: The following becomes a part of the original

More information

DIVISION Hardware

DIVISION Hardware FORMAT 1. Technical specifications content and numbering system shall be based on the most current CSI Master Format. BASIS OF DESIGN 1. APSU design standards shall not replace fully developed, project

More information

Lincoln County Tax Appraisal Office Project No. RFB

Lincoln County Tax Appraisal Office Project No. RFB Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference Cone HVAC Modernization Thursday, September 1, 2016 Pre Proposal Conference Meeting Agenda Part I: General Part II: Submittal Part III: Project Overview Part IV: Questions General Welcome Introductions

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

TELEPHONE: (215) Addendum No. 1

TELEPHONE: (215) Addendum No. 1 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.

More information

DR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479

DR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479 AREA MAP DR. FAKHOURI SKIN CARE SPECIALISTS 750 WEST GRAND PARKWAY SOUTH SUITE 20 SUGAR LAND, TX 7779 DRAWING LIST G00 G002 G00 G00 G005 G00 G007 G008 A0 A02 A0 00 0 02 0 0 05 Cover Sheet General Conditions

More information

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder. ADDENDUM TWO Client: The Abla Griffin Partnership Project Name: Sooner Elementary Media Center Saferoom Project Location: Oklahoma City, OK Issue Date: February 22, 2018 Owner: Moore Public Schools Engineer:

More information

ADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017

ADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017 Procurement Services Lucas Administrative Center, 617 1 Nunn Drive Highland Heights, KY 41099 859.572.6605 FAX 859.572.6995 ADDENDUM NO: 1 IFB/RFP No: NKU-22-18 Commodity: Kentucky Hall Renovation Date:

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

POST BID ADDENDUM TWO

POST BID ADDENDUM TWO POST BID ADDENDUM TWO DATE: March 4, 2016 PROJECT: Ingham County Human Services Building Renovation Packet No. 96-15 PROJECT #: 14-614 This Addendum is issued for the purpose of modifying and/or clarifying

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017 Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Alma Salcedo Corporate Buyer

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

(Larry D. Svitak, PE) License No

(Larry D. Svitak, PE) License No ADDENDUM NO. engineering design initiative north 5 th Street minneapolis, mn 55 Phone: () 33-55 AX: () 33-58 or Project: Nobles County Government Center AHU- Replacement EDI Project No.: 7-075 Owner: Nobles

More information

Division 08. Openings

Division 08. Openings Division 08. Openings 08 10 00. Doors and Frames 08 11 00. Metal Doors and Frames 1. All fire rated doors shall be metal. 2. Contractors shall remove all rating labels from doors/frames that are not installed

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

RIT CAD Specifications

RIT CAD Specifications RIT CAD Specifications The design team shall provide RIT with Revit, AutoCAD, and PDF files that capture the construction conditions of the associated project. This document outlines requirements for submitting

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

M1.0 MECHNANICAL FLOOR PLAN

M1.0 MECHNANICAL FLOOR PLAN GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE 231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE

More information

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR RFQ/RFP 15P40 Campus Center East HVAC Unit Replacement CHAFFEY COMMUNITY COLLEGE DISTRICT February 26, 2015 CHAFFEY COMMUNITY

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

REAR FRONT 93' 20' 12' 48' 120' 30' 52' 75' Sample Shopping Center. Unit # 5 +/- 10,920 GLA GROUND FLOOR. Width +/- 105' Depth +/- 120' Site Map

REAR FRONT 93' 20' 12' 48' 120' 30' 52' 75' Sample Shopping Center. Unit # 5 +/- 10,920 GLA GROUND FLOOR. Width +/- 105' Depth +/- 120' Site Map Electrical Information Breaker Panel 1: Service Type: 120/208 Panel Type: LP2 Panel Number: CHH31500 Manufacturer: Cutler Hammer Amps: 150 Location: Back Room Breaker Panel 2: Service Type: 120/208 Panel

More information

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type: Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1 A R C H I T E C T S, I n c. TO: ALL PLAN HOLDERS FROM: NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, 2018 PROJECT: Lea County General Service Building PROJECT NO: 18-142 ADDENDUM NO: 1 PAGES: 10

More information

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation Montclair, NJ 07043 ADDENDUM NO. 2 Issue Date: June 18, 2010 Request for Proposal # 898 Finley Hall Renovation Number of Pages: 14 (plus attachment) Date of Original Bidding Documents: April 28, 2010 INTENT:

More information

City of Thousand Oaks

City of Thousand Oaks TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity

More information

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017 These documents, indicated as Construction Change Directive #1 with a delta - 1, supersede the previous issue and should be inserted into the Construction Documents. The tags in the column indicate which

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

APPENDIX 1H: DOOR HARDWARE 1

APPENDIX 1H: DOOR HARDWARE 1 APPENDIX 1H: DOOR HARDWARE 1 Typical Hardware The typical door descriptions set out in this Appendix provide function and quality expectations and are not intended to describe all scenarios or be a complete

More information

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No. July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

ADDENDUM NO. 3. Ellis County Elections Building

ADDENDUM NO. 3. Ellis County Elections Building AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. December 8, 2014 to the BIDDING DOCUMENTS for Ellis County Elections Building Waxahachie, Texas By ARCHITEXAS

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017 #Question & Answer: #1 The RFP states that there is one week to complete all survey work. Please confirm this duration and that no other time will be allowed for survey work. The week identified in the

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

X X X X X - Finalize drawing list X X B. Project Description

X X X X X - Finalize drawing list X X B. Project Description Design Submittals, Details Submittal Requirements General For all LAWA issued projects, the Construction Document plans and specifications shall include all information in previous submittals plus all

More information

Snohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017

Snohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017 Review the Process Building Assessment Prioritize into Tiered Matrix Develop Cost Estimate per Scope Items Schematic Design Renovation + Addition Schematic Drawings Interior + Exterior Perspectives Recommendations

More information

Element Z General Design Requirements Standards and Other Requirements

Element Z General Design Requirements Standards and Other Requirements P AR T 1 - GENERAL 1.01 OVERVIEW A. The Table identified in Part 2 of this document summarizes A/E deliverables and minimum level of information to be depicted on construction documents at 100 percent

More information

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R. ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

Amendment to Bid #1 Minor Office Renovations B /30/2018 No

Amendment to Bid #1 Minor Office Renovations B /30/2018 No Project Name: Bid #: Extend Bid Opening Date and Time: Public Construction Bond Required: Pre-Bid Meeting (mandatory): Procurement Services Drive, Columbia, SC 0 Phone: 0-0-0 Web: www.riverbanks.org/procurement

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

Ives Pemko Hager 112HD FMSLFHD HD 224HD FMHD HD 210HD FSHD HD 157HD FSCPHD HD

Ives Pemko Hager 112HD FMSLFHD HD 224HD FMHD HD 210HD FSHD HD 157HD FSCPHD HD PART 1 - PRODUCTS 1.1 FASTENERS A. All exposed fasteners shall be Phillips head or as otherwise specified, and shall match the finish of the adjacent hardware. All fasteners ex-posed to the weather shall

More information

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE: ADDENDUM #01 PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : 2018-04600 DATE: 2018.04.27 This Addendum shall be considered part of the specifications for the construction of

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors

More information

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete

More information

ADDENDUM NUMBER 04 Washington & Jefferson College Rec Center Renovation and Expansion

ADDENDUM NUMBER 04 Washington & Jefferson College Rec Center Renovation and Expansion ADDENDUM NUMBER 04 Washington & Jefferson College Rec Center Renovation and Expansion 102051 March 13, 2015 To the Bidders: The following Addendum items are to be included in the scope of work and all

More information

INFORMATION FOR OBTAINING A BUILDING PERMIT

INFORMATION FOR OBTAINING A BUILDING PERMIT INFORMATION FOR OBTAINING A BUILDING PERMIT To apply for a building permit, you must be a licensed contractor or the legal property owner. (Commercial permits can only be obtained by a licensed Contractor).

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information