1

2 Review the Process Building Assessment Prioritize into Tiered Matrix Develop Cost Estimate per Scope Items Schematic Design Renovation + Addition Schematic Drawings Interior + Exterior Perspectives Recommendations Scope of Work Additional Scope

3 Snohomish County Courthouse Project Building Assessment

4 Snohomish County Courthouse Project Building Assessment Tiered Matrix

5 Snohomish County Courthouse Project Campus Site Plan

6 Courthouse Renovation Plan Level B Floor Plan Level B Work Plan

7 Courthouse Renovation Plan Level 1 Floor Plan Level 1 Work Plan

8 Courthouse Renovation Plan Level 2 Floor Plan Level 2 Work Plan

9 Courthouse Renovation Plan Level 3 Floor Plan Level 3 Work Plan

10 Courthouse Renovation Plan Level 4 Floor Plan Level 4 Work Plan

11 Courthouse Renovation Plan Level 5 Floor Plan Level 5 Work Plan

12 Snohomish County Courthouse Project Schematic Massing Model

13 Schematic Courthouse Exterior Renderings

14 Schematic Courthouse Exterior Renderings

15 Schematic Public Lobby Renderings

16 Schematic Jury Assembly Renderings

17 Schematic Criminal Hearings Renderings

18 Scope of Base Renovation Work Public Entrance Lobby with Security Screening Public ADA Accessible Restrooms Improved Security Direct Inmate Delivery for 4 Courtrooms Dedicated Inmate Elevator Criminal Hearing on Level 1 Elevator and Stair Tower Courtroom Additions with full ADA Accessibility Jury Assembly with seating for 200 people Judicial Administration Offices Future Expansion capabilities Improved Sheriff Administration Offices Seismic Upgrade Extends the Life of the Building 50 years Cost = $ 62,899,826

19 Scope of Additional Renovation Work Mechanical & Plumbing Systems At End of Operational Life Cooling tower replacement (dual) Chiller replacement (1 of 2) Piping replacement (chilled and condenser) Pump replacement Replace existing heating and cooling coils on Main Building air handler Galvanized domestic water piping replacement allowance Boiler replacement (1 of 2) Heating water pumping replacement Per code, provide outside air to existing emergency generator diesel fuel system Extends the Life of the Building Systems 25 years Cost = $2,631,443

20 Scope of Additional Work Special Systems (Security Systems) Duress System Replacement Current system is obsolete Add help buttons as needed Interface between the help button and access control systems Upgrade access control system Replace and upgrade existing card readers and terminal controllers Add new card readers as required for Addition and Renovation Video surveillance system Upgrade video system Video recorder server Cost = $2,234,174

21 Scope of Additional Work Audio Visual Allowance for Selected Courtrooms AV Budget Allowance Assistive Listening Systems Addition of large-screen monitors New digital microphone system Software and hardware upgrades for HD monitors Video-conferencing capability for selected courtrooms Cost = $2,019,963

22 Scope of Additional Work Improvements to Selected Courtrooms District Court 1 & 2 1 courtroom ADA compliance enhancements for public accommodation Both courtrooms mechanical and lighting improvements Superior 1-4, 7, 8 & 10 Dept. 10 ADA compliance enhancements for public accommodation All interior finish updates, and mechanical and lighting renovations Superior Court 201 (ADA compliance enhancements for public accommodation) 1 Commissioner Courtroom (ADA compliance enhancements for public accommodation) Cost = $2,400,079

23 Design / Construction Schedule

24

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project Ad Hoc Committee: High School Renovation Project Wednesday, October 11, 2017 High School LGI Room, 6:00pm Instructional Focus for 2017-2018 Equitable Access to Rigorous Learning Results Focused Accountability

More information

State College of Florida, Manatee-Sarasota

State College of Florida, Manatee-Sarasota State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

Rufus M Hitch Elementary School

Rufus M Hitch Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan Index 1 Introduction 2 Executive Summary Existing Facility Inventory and Assessment Preliminary Space Needs Projections Master Plan Conclusions Project Recommendations 3 Long-Range Facility Master Plan

More information

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620 82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Appendix A Existing Facilities Condition Audit. values culture relationships since 1909.

Appendix A Existing Facilities Condition Audit. values culture relationships since 1909. Appendix A Existing Facilities Condition Audit values culture relationships since 1909. Existing Facilities Condition Report Outagamie County Downtown Campus City of Appleton Outagamie County, Wisconsin

More information

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

University of Chicago Charter - NKO

University of Chicago Charter - NKO Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623 3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

John F Kennedy High School

John F Kennedy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Arthur A Libby Elementary School

Arthur A Libby Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

James Shields Middle School 2611 W 48th St Chicago, IL 60632

James Shields Middle School 2611 W 48th St Chicago, IL 60632 2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

John Hancock College Preparatory High School

John Hancock College Preparatory High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

INTERIOR SIGNAGE MANUAL

INTERIOR SIGNAGE MANUAL INTERIOR SIGNAGE MANUAL ➊ Purpose ➋ Procedures ➌ ADA Requirements INTERIOR SIGNAGE MANUAL ➍ Text, Braille, Pictograms and Color ➎ Families of Interior Signage ➏ Mounting Guidelines ➐ Signage Diagrams ➑

More information

John Milton Gregory Elementary School

John Milton Gregory Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Arthur E Canty Elementary School

Arthur E Canty Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Academy for Global Citizenship Elementary School

Academy for Global Citizenship Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

William Penn Elementary School

William Penn Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

Cyrus H McCormick Elementary School

Cyrus H McCormick Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECORD GROUP NUMBER 156

RECORD GROUP NUMBER 156 DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services

More information

John L Marsh Elementary School

John L Marsh Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Requ est fo r sea led bids for an addition to Be ave r Lake Bathhouse

Requ est fo r sea led bids for an addition to Be ave r Lake Bathhouse Requ est fo r sea led bids for an addition to Be ave r Lake house The lpena County Parks and Recreation commission will be accepting sealed bids for the following t rades: Concrete/Masonry, Electrical

More information

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622 A.. Pritzker School 2009 W Schiller St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document

More information

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610 22 W Evergreen Ave Chicago, IL 1 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Robert Fulton Elementary School

Robert Fulton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Multicultural Academy of Scholarship

Multicultural Academy of Scholarship Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Daniel S Wentworth Elementary School

Daniel S Wentworth Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608 W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657 39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Architecture, Construction, and Engineering Technical Charter

Architecture, Construction, and Engineering Technical Charter Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

George Washington Elementary School

George Washington Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

University of Chicago Charter - Carter G Woodson

University of Chicago Charter - Carter G Woodson Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617 S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

NDUS/UND IT Facility Office Building/Data Center

NDUS/UND IT Facility Office Building/Data Center NDUS/UND IT Facility Building/Data Center Building Option 3 $9,133,128 Data Center $4,937,500 Tier 2 to Tier 3 (add on) $1,356,250 Total $15,426,878 Legislative Appropriation $12,500,000 Difference $2,926,878

More information

EPIC Academy High School

EPIC Academy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Disney II Magnet School

Disney II Magnet School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

George Washington Elementary School 3611 E 114th St Chicago, IL 60617 3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

George W Tilton Elementary School

George W Tilton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629 3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

11/29/12. Des Moines Social Club Urban Design Review Project Narrative 11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment

More information

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643 11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Amos Alonzo Stagg Elementary School

Amos Alonzo Stagg Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

CLARION COUNTY OFFICE DIRECTORY

CLARION COUNTY OFFICE DIRECTORY CLARION COUNTY OFFICE DIRECTORY www.co.clarion.pa.us All phone numbers are area code 814 unless otherwise noted Adult Probation 500 Main Street, Clarion, PA 16214 Phone: 226-6020 Fax: 226-6027 Assessor

More information

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:

More information

John Harvard Elementary School of Excellence

John Harvard Elementary School of Excellence Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620 W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Richard T Crane Medical Preparatory HS

Richard T Crane Medical Preparatory HS Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

North Lawndale College Prep Charter - Collins

North Lawndale College Prep Charter - Collins Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Disney II Magnet High School

Disney II Magnet High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Idaho State Historical Museum Renovation and Addition

Idaho State Historical Museum Renovation and Addition Idaho State Historical Museum Renovation and Addition History is essential to understanding America. Lessons from the past enhance historical literacy, create an informed citizenry, deepen our connections

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

William Howard Taft High School

William Howard Taft High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Langston Hughes Elementary School

Langston Hughes Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

George Washington High School

George Washington High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Philip Rogers Elementary School

Philip Rogers Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Brian Piccolo Elementary Specialty School

Brian Piccolo Elementary Specialty School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Charles N Holden Elementary School

Charles N Holden Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Morton School of Excellence

Morton School of Excellence Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Richard J Oglesby Elementary School

Richard J Oglesby Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Norman A Bridge Elementary School

Norman A Bridge Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

Jonathan Burr Elementary School

Jonathan Burr Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

UTSA Facilities Condition Assessment. Out Brief August XX, 2009

UTSA Facilities Condition Assessment. Out Brief August XX, 2009 UTSA Facilities Condition Assessment Out Brief August XX, 2009 Agenda Opening Remarks FCA Results Summary by Category Example Deficiencies FCA Results Summary by Building Proposed Project List Potential

More information

Alexander Graham Bell Elementary School

Alexander Graham Bell Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Theodore Roosevelt High School

Theodore Roosevelt High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Spry Elementary Community School

John Spry Elementary Community School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Andrew Carnegie Elementary School

Andrew Carnegie Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2010 ADA Standards Courtroom Requirements

2010 ADA Standards Courtroom Requirements 2010 ADA Standards Courtroom Requirements LIFT-U Division of Hogan Mfg., Inc. P.O. Box 398 Escalon, CA 95320 http://liftu.hogan.com Slide 1 of 50 2010 ADA Standards Courtroom Requirements LIFT-U Division

More information

Required Documents for Commercial Permits Permit Types 1. New Structure 2. Addition 3. Remodel 4. Tenant Finish 5. Change of Tenant/Use 6.

Required Documents for Commercial Permits Permit Types 1. New Structure 2. Addition 3. Remodel 4. Tenant Finish 5. Change of Tenant/Use 6. Required Documents for Commercial Permits Permit Types 1. New Structure 2. Addition 3. Remodel 4. Tenant Finish 5. Change of Tenant/Use 6. Temporary Use 7. Decks over 30 inches 8. Re-Roof 9. Plumbing 10.

More information

Jackie Robinson Elementary School

Jackie Robinson Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CTS-D Job Task Analysis

CTS-D Job Task Analysis A Conducting a Needs Assessment 1 Identify decision-makers and stakeholders Contractual relationships Ability to ask probing questions RACi Chart Client organizational structure Ability to differentiate

More information

Henry H Nash Elementary School

Henry H Nash Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Legacy Charter Elementary School

Legacy Charter Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647 W Schubert Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Betty Shabazz Intl Charter - DuSable Leadership

Betty Shabazz Intl Charter - DuSable Leadership Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

Addendum No. 1 page 1

Addendum No. 1 page 1 Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid

More information

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631 W Bryn Mawr Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647 3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609 S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622 2 W Rice St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Phoenix Military Academy High School

Phoenix Military Academy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

March 1, Buildings for Our Future: 2016 Update

March 1, Buildings for Our Future: 2016 Update March 1, 2016 Buildings for Our Future: 2016 Update Buildings For Our Future: Project Objectives Transform five elementary schools in poor and worsening condition into 21st century centers of learning

More information