1 Submittal Review Form Project Name: SMD1 Pump Station Project Contract No: Submittal No: 8.1 Resubmittal Received Submittal Title: Standby Generator, Resubmittal 01 Spec. No: Routing Sequence Date Received Contractor/Subcontractor Disney Checked By Date Sent Number of Copies Contractor - Disney Tim Bennett 05/30/2014 Orig. Prints Mfg.Lit. West Yost - CM Stantec - Design Engineer West Yost - CM Contractor - Disney Submittal Compliance We have verified that the material or equipment contained in this submittal meets all the requirements specified or shown (no exceptions). We have verified that the material or equipment contained in this submittal meets all the requirements specified or shown, except for the following deviations (list deviations, attach separate sheet if necessary) Submittal Status A - NO EXCEPTIONS TAKEN B - MAKE CORRECTIONS NOTED C - AMEND AND RESUBMIT D - REJECTED Contractor Remarks Engineer Remarks Please refer to the cover letter from Energy Systems for most submittal comment responses. Below responses by comment number are additional and outside their scope: 2. Based on the RFI #12, and using 5 minimum clearance between units, drawing C031 has been revised and is attached. Note the coordinates for structural and drainage features will be adjusted in the field and as-built. 4. In process. Pending signature from owner. 5. Per RFI #12, the generators will be oriented with the front facing west. Attached is are the sound data sheet from the manufacturer and distance calculations. Stantec Consulting Services Inc. Stantec Consulting Services Inc.
2 Date: May 28, 2014 To: Attn: Re: Disney Construction Tim Bennett SMD1 Sewer Resubmittal Comments 1500kW Generator System (3 x 500 KW) Package No: Item No The proposed generator manufacturer and configuration of (3) paralleled 500kW generators are acceptable. Acknowledged 2. At no additional cost to the Owner (as contractor is submitting alternative generator design), provide 4-feet concrete slab for walking around all sides of the generator, in accordance with drawing S160. Modify grading plan (on drawing C031) to provide for adequate drainage for new slab dimensions. See section B for contractor redesign. Current layout drawing (attachment 4) shows only 16-inches clearance on east/west sides. 4-foot clearance will make the slab 25 4 x 35. The pad as designed by the engineer is 50 by 20 in the contract drawings for 1000 square feet. The proposed design is 25 4 by 30 9 for 779 square feet. While this does not take into account the pad thickness it appears that this will be possible without major cost difference. 3. Contractor to provide seismic calculations, in accordance with drawing S160 and and As we noted in the submittal that the seismic calculations will be provided upon equipment approval. 4. Contractor to submit AtC and PtO air permits in accordance with section and D. Energy System will assist the contractor in obtaining these permits. 5. Provide outdoor sound enclosures rated 70dBA at 23 feet per specification. We understand through the response on RFI #12 that the sound issue has been resolved Longe Street #300, Stockton, CA ; (800) ; (209) ; Fax (209) ; Depot Road, Hayward, CA ; (510) ; Fax (510) ; Bennie Lane, Reno, NV ; (775) ; Fax (775) ; Lauwiliwili Street #202, Kapolei, HI ; (808) ; Fax (808) ;
3 6. Show E-stop switch on wiring diagram, it s unclear if the E-stop is mounted at the generator(s) or at the PMSC panel. The EPO switch is located on each generator at the control panel. Please see the attached wiring diagram 0K0984 page 6 of 10. In addition we have provided a remote mounted EPO switch that can be programmed to shut down all generators in case of emergency. This could be located on the outside of the electrical building. 7. There is a modified one-line exhibit that shows the power connection for the three generators with a Trystar camloc cabinet, what is the purpose of this cabinet? Where should it be mounted and provide recommended conduit size and connections. The use of the Trystart camloc cabinet was in error. It has been removed from the submittal. 8. Provide full-load ampere, voltage and recommended circuit breaker size required for auxiliary power (battery charger, block heaters, etc.) to each generator and the PMSC control panel. PMSC 2A load, recommended breaker 15A MD500 generator loads Battery Charger 2 A Block Heater 12.5 Convenience Outlet 1.5 TOTAL LOAD 16.0A, recommended breaker 25A, single pole for each generator Total of four (4) breaker positions. 9. Modify and submit drawing E170 showing the proposed field conduit and wire connections from the paralleled generator system to the electrical switchboard for review. Show recommended location of PMSC control panel, Trystar camloc cabinet, and any other ancillary devices and their associated conduit and wire requirements. The Trystar cabinet has been removed from the proposed project. The file SMD1 shows the proposed wiring to and between each generator for both the communications and power conduits and wire. I have taken the liberty of using the engineers drawing E170 to show where the 24 wide PMSC cabinet could be located. I have blanked out over the engineers stamp to as to not be interpreted as an approved drawing. 10. Provide drawing showing field conduit and # of wires connections required between each generator Longe Street #300, Stockton, CA ; (800) ; (209) ; Fax (209) ; Depot Road, Hayward, CA ; (510) ; Fax (510) ; Bennie Lane, Reno, NV ; (775) ; Fax (775) ; Lauwiliwili Street #202, Kapolei, HI ; (808) ; Fax (808) ;
4 The file SMD1 shows all connections between the generators. Since the engineer has used 1 C. for his communications which is more than adequate for our communications. 11. Provide I/O data information from PMSC panel to PLC for paralleled generator system. Coordinate with system integrator to provide updated interconnection wiring diagrams showing the three generators. On the face of the PMSC panel a remote annunciator will be located that will provide for the four alarm contacts required by the P & ID drawings as noted on I023. Standby Generator Running Standby Generator Fail Standby Generator battery Low Standby Generator Fuel Tank Low Thank You Gregory Manov Project Engineer Energy Systems (209) Office (209) Fax gregorym@energysystem.net Enclosures: SMD1R1 E Longe Street #300, Stockton, CA ; (800) ; (209) ; Fax (209) ; Depot Road, Hayward, CA ; (510) ; Fax (510) ; Bennie Lane, Reno, NV ; (775) ; Fax (775) ; Lauwiliwili Street #202, Kapolei, HI ; (808) ; Fax (808) ;
5 SOUND EMISSIONS DATA 15.2L PERKINS SD/MD500 DIESEL SB/MB500 BI-FUEL LEVEL 2 ACOUSTIC ENCLOSURE SUBMITTAL DATA AVERAGE SOUND PRESSURE LEVEL AT FULL LOAD, 7 METERS: 75.1 db(a) 60Hz NO-LOAD DATA, db(a) DISTANCE: 7 METERS MICROPHONE LOCATION REAR LEFT OCTAVE BAND CENTER FREQUENCY (Hz) db(a) FRONT RIGHT AVERAGE Hz FULL-LOAD DATA, db(a) DISTANCE: 7 METERS MICROPHONE OCTAVE BAND CENTER FREQUENCY (Hz) LOCATION db(a) FRONT RIGHT REAR LEFT AVERAGE FRONT RIGHT LEFT REAR db(a) No Load Full Load Front Right Rear Left 1. All positions at 23 feet (7 meters) from side faces of generator set. 2. Test conducted on a 100 foot diameter asphault surface. 3. Sound pressure levels are subject to instrumentation, installation and testing conditions. Generac Power Systems, Inc. S45 W29290 HWY. 59, Waukesha, WI generac.com 2014 Generac Power Systems, Inc. All rights reserved. All specifications are subject to change without notice. Bulletin SSD Rev B 2/07/14
6 SOUND LEVEL CALCULATED AT DISTANCES OF 50 AND 150 FEET Calculation of the sound level L 2, which is found at the distance r 2 Reference distance r 1 from sound source 23 m or ft Another distance r 2 from sound source 50 m or ft Sound level L 1 at reference distance r 1 75 dbspl Sound level L 2 at another distance r dbspl Search for L 2 Sound level difference Δ L = L 1 L 2 db Formulas to calculate the sound level L in db (sound pressure level or sound intensity level) in dependence of the distance r. reset Calculation of the sound level L 2, which is found at the distance r 2 Reference distance r 1 from sound source 23 m or ft Another distance r 2 from sound source 150 m or ft Sound level L 1 at reference distance r 1 75 dbspl Sound level L 2 at another distance r dbspl Search for L 2 Sound level difference Δ L = L 1 L 2 db
7
8
9
10
11
12
13
14
15
16
17
Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN
SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary
More informationSpec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN
SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary
More informationSUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project
SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project 02-3113 To: Quimby McCoy Preservation To: (Write-in Consultant) From: Vaughn Construction, LLC Architecture.
More informationSUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.
SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for
More informationPOWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS
POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS 1.0 SCOPE The following specification describes the features, design, and application of the Series 7200A
More informationCity Plaza Energy Upgrades Timeline of Events Pella Window Cancellation
City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation June 3, 2010 Pella asks what is needed for submittals. See Attachment #1. June 7, 2010 Pella (Matt Tison) confirms the receipt of
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationSUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN
SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,
More informationLETTER OF TRANSMITTAL
LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationDESIGN CHECKLIST INTRODUCTION
INTRODUCTION 1 The checklist is intended to serve as a convenient guide in design development as well as the final checking of plans and specifications for construction projects. Its main usefulness for
More informationsubmittals 1s e c t i o n
Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The
More informationCity of Aspen Water Review for Pitkin County Permits Submission Packet
Projects that propose adding, removing, or changing any plumbing fixtures (e.g. faucets, toilets, dishwashers, hose bibs, etc.) are subject to the ECU/Fixture Count component of the review, and the following
More informationCITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES
SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationSECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS
510.1 Emergency responder radio coverage in new buildings. Approved radio coverage for emergency responders shall be provided within all buildings meeting any one of the following conditions: 1. There
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationTaylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES
SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationUtility Systems Technologies, Inc. Sag Fighter. Deep Voltage Sag Protection:
Utility Systems Technologies, Inc. Sag Fighter TM Deep Voltage Sag Protection: D e e p Vo l t a g e S a g P r o t e c t i o n For three phase application: Q u a l i t y P o w e r. B e t t e r B u s i n
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationUniversity of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.
University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.
More informationREMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.
SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett
More informationUBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5
Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS
More informationSECTION GPS WIRELESS CLOCK SYSTEMS
PART 1 GENERAL 1.1 SECTION INCLUDES A. G.P.S. Receiver B. Primary Transmitter C. Satellite Transmitter D. Analog Clocks E. Digital Clocks 1.2 REGULATORY REQUIREMENTS SECTION 27 53 13 GPS WIRELESS CLOCK
More informationAPPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 1. BATTERIES, MODULAR FLOODED LEAD-ACID 2. BATTERIES, MODULAR VALVE REGULATED LEAD ACID
APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 BIDDER INSTRUCTIONS: All Bidder pricing must be based on the Sample Product provided in Appendix H Mandatory Requirements. Any category in Appendix H that
More informationSECTION PROJECT MANAGEMENT AND COORDINATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationSECTION 2 GENERAL REQUIREMENTS
SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall
More informationSECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.
SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in
More informationA. Dewatering observation wells are part of dewatering allowance.
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationP. O. BOX 269 HIGHLAND, ILLINOIS, U.S.A PHONE FAX
SSE-N NEGATIVE FIELD FORCING SHUNT STATIC EXCITER/REGULATOR SYSTEM Control Chassis 6 SCR Power Chassis APPLICATION The SSE-N Negative Field Forcing Exciter/Regulator is used for both new and old installations
More informationQuality Control Checklist - Design Drawings
Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationSubmittal Packages Detailed with Items and Reviewers
Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 1 San Diego State University 00 Campanile Drive San Diego, CA 918 Tel: 619-94-740 Fax: 0079-1116-0 Circulating Pump Author
More informationUNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems
UNITY/I TM UT3K, UT4K, UT5K and UT8K Single-Phase Uninterruptible Power Systems Installation Manual MLS-0351C-OL Copyright 1994-1997 Best Power. All rights reserved. å IMPORTANT SAFETY INSTRUCTIONS! SAVE
More informationSUGGESTED SPECIFICATION for Series 300 Automatic Transfer Switches
SUGGESTED SPECIFICATION for Series 300 Automatic Transfer Switches PART 1 GENERAL 1.01 Scope Furnish and install automatic transfer switches (ATS) with number of poles, amperage, voltage, and withstand
More informationLETTER OF TRANSMITTAL
LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 08/29/2016 Job #: 289-11150 Submittal #: D-11235-001-A
More informationSUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.
SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationAddress: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:
Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL
More informationSC1000 DGPS USCG Dual Transmitter
Southern Avionics Company's DGPS Reference Station Transmitter System. Model: SC1000 DUAL USCG SC1000 DGPS USCG Dual Transmitter QUALIFICATIONS: Meets applicable requirements of the United States Coast
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationVI 3 - i TABLE OF CONTENTS
VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3
More informationPower Verification in Racks B and B950-02
Table of Contents 1.0 Introduction... 1 2.0 Accountability... 1 3.0 Hazards Internal to this Rack... 2 4.0 External Hazards Due to Sources in this Rack... 2 5.0 Battery Charger 120 VAC Verification...
More informationSUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS
SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped
More informationSECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationEDACS WALL MOUNT STATION. Maintenance Manual. Mobile Communications LBI-31838A TABLE OF CONTENTS
A Mobile Communications EDACS WALL MOUNT STATION TABLE OF CONTENTS SYSTEM BOARD & REGULATOR BOARD.......... LBI-31892 KEY/DISPLAY BOARD MAINTENANCE MANUAL.... LBI-31940 Maintenance Manual Printed in U.S.A.
More informationSubmittal Packages Detailed with Items and Reviewers
Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,
More informationSECTION DISTRIBUTION SWITCHBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 11 SPEC WRITER NOTES: Use this section only for NCA projects. Delete between // -- // if not applicable to project. Also delete any other item or paragraph
More informationLetter of Transmittal
3710 QUINCY AVENUE OGDEN, UT 84403-1934 Ph : (801)627-1414 Letter of Transmittal To: GEN ARCHITECTS, INC. 11001 SW RIVERSIDE DRIVE PORTLAND, OR 97219 Ph: (503)243-7183 Fax: (503)243-7193 Subject: Submittal
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationCHAPTER 29 PROJECT COMPLETION DOCUMENTS
CHAPTER 29 PROJECT COMPLETION DOCUMENTS PROJECT COMPLETION Upon completion of traffic control signal system and lighting projects, there are forms and checklists to ensure that the project is closed out
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified 8/23/17 Updated sections on System Design and Performance Requirements; Submittals; Equipment; Accessories or Special Features; Quality
More informationTELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationSPECIAL SPECIFICATION 6574 Low Power Wireless Modem
2004 Specifications CSJ 1068-04-126, etc. SPECIAL SPECIFICATION 6574 Low Power Wireless Modem 1. Description. This work shall consist of furnishing and supplying a Low Power Wireless Modem at the locations
More information9. Pay for the power consumed until the project has been accepted as substantially complete.
9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:
More informationKC Water Rules and Regulations For Water Main Extensions and Relocations
KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationENGINEERING DATA SUBMITTAL For the Interconnection of Generation System
WHO SHOULD FILE THIS SUBMITTAL: Anyone in the final stages of interconnecting a Generation System with Nodak Electric Cooperative, Inc. This submittal shall be completed and provided to Nodak Electric
More informationSubmittal Transmittal
Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 10/7/2011 Reference
More informationBERKELEY COUNTY ENGINEERING AND
BERKELEY COUNTY ENGINEERING AND BUILDING INSPECTIONS 400 West Stephen Street - Suite 202, Martinsburg, WV 25401-3838 Telephone: 304-264-1966, Fax: 304-262-3128 Web Page: www.berkeleywv.org I. WHAT ARE
More informationState of North Dakota Engineering data submittal Page 1 For interconnection of distributed generation to Otter Tail Power Company
Engineering data submittal Page 1 WHO SHOULD FILE THIS SUBMITTAL : Anyone in the final stages of in terconnecting a Generation System with Otter Tail Power. This submittal shall be completed and provided
More informationSERVICE BULLETIN TRANSMITTAL SHEET HC-SB Propeller - Blade Seal Replacement
TRANSMITTAL SHEET January 08, 2019 This page transmits a revision to Service Bulletin. Original Issue, dated Revision 1, dated Jan 08/19 Propeller assemblies that have previously complied with the terminating
More informationBasic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only*
1444 West Garvey Avenue West Covina, CA 91793 Phone: 626-939-8425 Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* ADMINISTRATIVE 1. The following clearances
More informationSHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog
More informationSECTION DISTRIBUTION SWITCHBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 13 DISTRIBUTION SWITCHBOARDS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable
More information1. Land survey Work. 2. Civil and Structural engineering services.
SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification
More informationFoundation Specifications for 5.6-Meter Modular Earth Station Antennas
Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationFUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER O
FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER OF PARKING STALLS PER ROW PROPOSED EXISTING STANDARD
More informationSIGN PERMIT APPLICATION
SIGN PERMIT APPLICATION City of Hawaiian Gardens Community Development Department 21815 Pioneer Boulevard, Hawaiian Gardens, CA 90716 Ph: (562) 420-2641 Fax: (562) 420-8521 www.hgcity.org Please complete
More informationACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).
ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan
More informationAPPENDIX B: Generation Interconnection Application Form
2 APPENDIX B: Generation Interconnection Application Form WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect with Xcel Energy (Local electric utility)
More informationA. Action Submittals: Written and graphic information that requires Engineer's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More information1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.
PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02
More informationFoundation Specifications for 7.6-Meter Modular Earth Station Antennas
Installation Instructions Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Bulletin 237186A Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationCity of Thousand Oaks
TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity
More informationCHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.
14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic
More informationSubmittal Transmittal
Commonwealth Engineers, Inc. 7256 Company Drive Indianapolis IN 46237 United States Submittal Transmittal PROJECT: SUBJECT: Waynetown - Water-Strmwtr Imprv-Div A J13046-A DS-23-01 A_Engine Generators &
More informationCloud Based Plan Review Process (Applicant)
1 Cloud Based Plan Review Process (Applicant) Organize Documentation Process Overview Upload Documents To Mercer Island FTP Site No Initial Submittal? Yes Intake Screening Approved? CST will inform you
More information