1 Construction Services 2016 Architect / Engineers Guidelines TL

2 Architect/Engineer Fee Proposal Format Fee proposals should be formatted in the following content order: Client Information: Project Name: Project Location: Project Description: Project Program: Architect/Engineers (A/E) Program Verification Basic Services of the Architect/Engineers shall include the following: The Architect shall establish and/or confirm the Owner s Project Program. Schematic Design The Architect shall develop/present a maximum of (3) proposed design solutions. Schematic Designs shall include architectural site plan, floor plans, and building elevations. Design Development/ Contract Documents (Drawings/Specifications) The A/E shall develop the approved Schematic Design for new construction for all basic Civil, Architectural, Structural, Mechanical, Plumbing, Fire Protection, Electrical Power Distribution, Lighting, Communications, and Fire Alarm Design. Construction Documents shall be prepared to a Green Design Standard. Bidding & Negotiations Architect shall assist and coordinate information during the Bidding process to respond to questions and submit Addenda as required to obtain GMP (Guaranteed Maximum Price). Construction Administration Architect shall attend scheduled Owner/Architect/Construction Manager Meetings to review and discuss the progress of the construction, review and approve Pay Applications, prepare and submit ASI s (Architectural Supplemental Instructions), PR s (Proposal Requests), OCCAA s (Owner Construction Contingency/Allowance Use Authorizations), provide Field Observation Reports (minimum of 2 per month) and a separate Bi-Weekly Project Status Report to the Director of Construction Services, provide review and respond to all submitted meeting minutes, shop drawing submittals, and RFI s (Request for Information). Project Closeout Architect shall prepare a Punch list at Substantial and Final Completion. Other Basic Services Architect shall organize, schedule, and attend meetings that are necessary through all phases of design. Architect shall record and distribute Meeting Minutes for all meetings. Architect shall provide required DOE forms, Life Cycle Cost Analysis, and Energy Efficiency Analysis during each phase of review, permit documents, and project closeout. Architect shall prepare interior/exterior material color board for Owner Approval/Construction Manager Use within 60 days of GMP. Architect shall attend DSBPC Board Meeting(s) at the request of the Owner to provide design information or report on issues related to the project. PCS Guidelines See Architect /Engineer Deliverable Guidelines for specific project deliverables.

3 Architect/Engineer Fee Proposal Format, Page 2 Civil Engineering Basic Services of the Civil Engineer shall include the following: Review Project Geotechnical and Survey Information. Coordinate as required. Prepare Contract Documents (Drawings and Specifications) and Permit Submittals in accordance with local municipal, County, State, and Federal governing agency requirements. Attend Pre-Application Meetings and Coordinate with Regulatory Agencies (SWFWMD, ACOE, DEP, NPDES, DRC, BOCC, Municipality Permitting, Right of Way, Utilities, etc.) as required to process and obtain permits in a timely manner Provide Construction/Contract Administration (RFI s, Submittal/Shop Drawing/Test Report Review, Regular Construction Observation and Inspections, Change Order Review, Normal and Customary attendance at Project Meetings). Provide coordination with Utility Service Providers. Provide coordination of Map Control. Provide Cut and Fill Calculations. Provide Engineer s Estimate of Cost. Add Service Allowances: (See Add Service Allowances under Fee Breakdown Format attached) Reimbursables: Exclusions (Work Not Included): Owner Provided Items: Deliverables: (See Architect/Engineer Deliverables Guideline attached) Project Schedule: Architect Point of Contact Information: Consulting Engineers Point of Contact Information:

4 Architect/Engineer Fee Breakdown Format Basic Services Fee Breakdown (Architectural, Civil, Structural, MEP, and Fire Protection): Program/Project Verification Schematic Design Design Development Construction Documents Bidding & Negotiations Construction Administration Close Out 05% of total fee 15% of total fee 20% of total fee 25% of total fee 05% of total fee 25% of total fee 05% of total fee Add Service Allowances Fee Breakdown (include from list below as applicable). Project Viewpoint - Office to Office Allowance (shall be carried for all projects). Additional Service Allowance (shall be carried for all projects at 5.00% of Basic Services Fee). Feasibility Studies, Programming, and/or Master planning LEED/Green Globes Certification Phase I Environmental site Assessment Site Studies and Special Design Services (watershed drainage modeling, wetland delineation and survey, wetland impact assessment, wetland mitigation, sanitary lift station design) Gopher Tortoise Survey, Permitting, and Removal Geotechnical Investigations and Reports Site Surveying Services (Topo and Boundary) Utility Identification, Location, and Coordination (Electricity, Water, Sanitary, Gas, Telecommunications, Fire, etc.) Traffic Analysis, Studies, and Counts Aerial/GIS Research Off-site Design Not Identified at Time of A/E Agreement US Army Corp of Engineers Landscape Design Estimating Services Food Service Design Owner Initiated Scope Increase Requiring Additional Design Scope Sanitary and Storm lines (existing buildings) Preliminary T&B Analysis (existing buildings) Health Department Review and Permitting (required at concession stands only) Note: Add Service Allowances will require backup fee breakdown for review and approval and are permitted a 10% markup by the A/E. Exception: Items known to have a predetermined fixed fee (i.e. permit application fees, LEED certification fees, etc.) are not permitted to have markup.

5 Architect/Engineer Fee Breakdown Format, Page 2 Reimbursable Expenses The following shall be permitted with backup invoices: Express and messenger charges, postage, reproduction costs applicable to the project, such as blueprinting, photocopying, photographs, printing, binding, etc. Mileage and meals are NOT permitted reimbursable expenses. Architect/Engineer Invoice Format:

6 Architect/Engineer Deliverables Guidelines The purpose of these Guidelines are to outline the requirements of the project deliverables. The Guidelines do NOT modify the scope of work or contractual obligations of the Agreement between the Owner and Architect/Engineer (A/E) or the Agreement between the Owner and Construction Manager (CM). PROJECT MANAGEMENT Communications The A/E shall schedule all necessary design review, coordination, and scope related meetings to obtain necessary project information to maintain project progress and completion. The A/E shall record the minutes of all scheduled meetings, conference calls, and presentations. Minutes shall be distributed within 7 days of meeting date. Project Schedule The A/E shall supply a project schedule and be responsible for updating the schedule at the commencement of each deliverable phase demonstrating compliance with the established project completion dates. Project Schedule shall denote Submittal Deliverable Dates to the Owner for each phase and include one week minimum Owner Review period for Schematic Design and two weeks minimum for Design Development, Construction Documents, and Permit Review. Correspondence The Architect/Engineer shall format all Subject Lines with the school initials followed by subject (i.e. Anclote Elementary School (AES), Bayonet Point Middle School (BPMS), River Ridge High School (RRHS). If you are not sure of the school initials verify with your Project Coordinator. PROJECT VIEWPOINT PCS requires the use of a web based project collaboration/archiving system in all phases of the project commencing at Design Development. The system to be employed is Project Viewpoint by Office 2 Office, LLC. The Architect shall contract with Office 2 Office, LLC. for the use of Project Viewpoint. The A/E responsibilities are defined in the Appendix Documents noted as Project Viewpoint Digital Project Procedures and Project Viewpoint Protocol Table. The A/E and CM Team shall employ Project Viewpoint for all activities required in the Owner Architect Agreement and the Owner Construction Manager/Contractor Agreement including General Conditions, Supplementary General Conditions, Technical Specifications and all other elements of the Contract Documents for construction. All documents employed in the project shall be processed and delivered electronically through the Project Viewpoint web-based software. Project Viewpoint is intended at project completion to be a complete Digital Archive of ALL Contract and Construction Documents. Training will be provided to all members of the A/E and CM Team one month prior to the Design Development Submission (first required submittal for upload). The Architect shall be responsible for coordinating the training. The Architect shall carry and Add Service Allowance for the OTO monthly maintenance fee which shall be calculated as follows: Startup OTO the last month of Design Development + Duration of Construction Document Phase + Duration of Construction + 12 month warranty period + 3 months.

7 Architect/Engineer Deliverables Guidelines, Page 2 CONTRACT DOCUMENTS Provide contract documents as outlined within the Architect/Engineer Deliverables Guidelines for Schematic Design, Design Development, Construction Documents, and Final Construction Documents; also complying with SREF State Requirements for Educational Facilities, approved September 29, 2014; effective November 4, 2014: The Architect/Engineer shall be required to complete all required SREF document forms including, but not limited to, the following: OEF LCCA OEF 208a OEF 208 OEF 110a OEF 110b OEF 209 Life Cycle Cost Analysis Form (Required at Schematic Design phase) Facility Space Chart/Net and Gross Square Footage Form (Required at DD and CD phases) Letter of Transmittal (Required at Construction phase) Project Implementation Information Form (Required at CD phase) Certificate of Occupancy Form (Required at Construction phase) Certificate of Final Inspection Form (Required at Construction phase) SCHEMATIC DESIGN Provide architectural documents that establish the conceptual design, demonstrating scale and relationship of the project components. The Schematic Design Deliverable shall include, but not be limited to the following: Architectural Program Verification Confirm and/or establish building program can be accommodated. Site Plan Depict the entire site showing relationships of all site components. Graphically differentiate between new and existing construction and areas to be remodeled/renovated. Show existing and proposed parking areas with labeled space counts for each. Show existing and proposed walks and covered walkways. Show portable classroom locations (differentiate between existing portables, future portables, and those required by construction). Indicate proposed method of storm water management. Indicate proposed method of environmental management. Floor Plans 1/8-inch scale floor plan(s) labeled with Room Name and Room Square Footage. Elevations To scale elevations. Design Narratives Provide design narratives for Civil, Architectural, Structural, and MEP&FP, & Telecom Systems outlining the proposed major building components and systems.

8 Architect/Engineer Deliverables Guidelines, Page 3 SCHEMATIC DESIGN CONT D Project Schedule (See Project Management Requirements) This package shall be submitted in hard copy and electronic format per the following: (1) Project Program Verified (3) printed sets of drawings (11x17 format minimum) (1) Adobe PDF file (documents shall be combined into a single bookmarked file) (1) OEF LCCA - Life Cycle Cost Analysis Form (if required) DESIGN DEVELOPMENT Provide contract documents that further define and develop the approved schematic design and major building components and systems. Drawings MUST be setup using the PCS Drawing Index and Sheet Numbering/Naming Standard (See Appendix Documents). Drawing sheets shall be 24x36 unless approved by the Owner. The Design Development Deliverable shall include, but not be limited to the following: Site Survey Incorporate property boundary survey and topographical information (if required). Geotechnical Incorporate geotechnical recommendations (if required). Civil Depict the entire site showing relationships of all site components. Graphically differentiate between new and existing construction and areas to be remodeled/renovated. Show existing and proposed parking areas with labeled space counts for each. Show existing and proposed walks and covered walkways. Show portable classroom locations (differentiate between existing portables and those required by construction). Show preliminary environmental controls. Show preliminary locations and depths of storm water retention area(s). Show preliminary utilities inclusive of points of connection (identify potential conflicts). Show grading and all permanent features to be constructed on site. Lateral and transverse sections through the site. Landscape Show hardscape and plant material (if part of A/E contract). Architectural Site Plan Elaboration of Site Plan requirement denoted under Schematic Design. Graphically depict the project phases and dependencies (if applicable). Show building overhangs. Show fencing existing and proposed. Show all building entries and associated permanent walkways and hardscape. Show all service related site components (receiving, loading, fire lane, dumpsters, recycling, etc.)

9 Architect/Engineer Deliverables Guidelines, Page 4 DESIGN DEVELOPMENT CONT D Floor Plans Provide overall floor plans. Provide Life Safety floor plans. 1/8-inch scale floor plan(s) labeled with Room Name, Room Number, Room Square Footage, and FISH code reference, and dimensions. Submit to Project Coordinator for Planning Department Review (See Appendix Document denoted FISH Plans and Space Chart Submittal Requirements). Graphically differentiate between new and existing construction and areas to be remodeled/renovated. Provide detailed Phasing Plans as required. Label wall partitions, door and window tags, interior and exterior elevation tags, enlarged plan tags, etc. Show plumbing fixtures with confirmed fixture counts and toilet partition layouts. Show major furniture, equipment, and casework layouts. Show preliminary kitchen plan (if applicable). Setup Coordination Meeting with PCS Kitchen Consultant. Show preliminary roof plan(s). Elevations To scale elevations indicating primary building materials. Interior Elevations To scale interior elevations indicating primary materials and/or special features. Building Sections Show building sections. Wall Sections Show typical wall section. Schedules Preliminary Room Finish, Door, and Window Schedules. Structural Preliminary foundation plans with footing schedule. Preliminary floor and/or roof framing plans with member sizes and columns. Mechanical 1/8-inch scale floor plan(s) labeled with Room Name, Room Number, Room Square Footage, and FISH code reference. Graphically differentiate between new and existing construction and areas to be remodeled/renovated. Provide detailed Phasing Plans as required. Proposed Site Plan. Proposed HVAC ductwork layouts. Proposed major equipment layouts. Proposed HVAC equipment schedules. Proposed controls system.

10 Architect/Engineer Deliverables Guidelines, Page 5 DESIGN DEVELOPMENT CONT D Plumbing/Fire Protection 1/8-inch scale floor plan(s) labeled with Room Name, Room Number, Room Square Footage, and FISH code reference. Graphically differentiate between new and existing construction and areas to be remodeled/renovated. Provide detailed Phasing Plans as required. Proposed Site Plan. Proposed water and sewer line routing (inclusive of elevations). Proposed horizontal and vertical services with locations and sizes. Proposed fixture layout and schedules. Electrical/Technology 1/8-inch scale floor plan(s) labeled with Room Name, Room Number, Room Square Footage, and FISH code reference. Graphically differentiate between new and existing construction and areas to be remodeled/renovated. Provide detailed Phasing Plans as required. Proposed Site Plan. Proposed electrical service entrance and transformer requirements. Proposed location of main switchboard, power panels, and/or equipment panels. Proposed location of all lights, power/data outlets, and switching. Proposed emergency electrical system. Proposed lightning protection. Proposed fire alarm system. Proposed wireless access points. Show preliminary MDF and IDF room layouts. Specifications Specifications with complete project Table of Contents and completed sections for major products, items, and systems for pricing purposes. Project Schedule Provide updated project schedule with established design completion date (See Project Management Requirements). Initiate Project Viewpoint - Office 2 Office Setup & Training one month prior to DD Submittal. This package shall be submitted in hard copy and electronic format per the following: (1) Project Program Verified (1) PCS Building Permit/Plan Review Application (See Appendix Documents). (3) printed full size sets of (24x36) drawings and (1) printed (18x24) set of drawings (2) printed specification books Adobe PDF Individual Sheet files labeled per the PCS Drawing Index and Sheet Numbering/Naming Standard (See Appendix Documents). (1) OEF 208a - Facility Space Chart/Net And Gross Square Footage Form Note: All electronic files shall be uploaded to the Project Viewpoint Office 2 Office website.

11 Architect/Engineer Deliverables Guidelines, Page 6 CONSTRUCTION DOCUMENTS CONT D Provide contract documents of sufficient scope for bidding and construction. Drawings MUST be setup using the PCS Drawing Index and Sheet Numbering/Naming Standard (See Appendix Documents). Drawing sheets shall be 24x36 unless approved by the Owner. The Construction Document Phase shall consist of a 50 and 90% submittal. The 90% Construction Document Deliverable shall be fully complete and coordinated by all Disciplines for review by PCS prior to submitting the Signed/ Sealed Permit Drawings. The documents shall include, but not be limited to the following: Civil Completed permit drawings as submitted to SWFWMD. Landscape Completed hardscape and plant material drawings (if part of A/E contract). Irrigation plan(s) (if applicable and part of A/E contract). Architectural Site Plan Completed Site Plan and all related Site Details showing full scope of Site work (location and height of fencing, details for sidewalks, ramps, dumpster enclosure, gates, bollards, etc.). Coordinated area where temporary buildings and/or structures shall be located with associated utilities. Identify phasing (if applicable). Floor Plans Completed Life Safety. Completed 1/8-inch scale floor plan(s) labeled with Room Name, Room Number, Room Square Footage, and FISH code reference, and dimensions. Completed labeled wall partitions, door and window tags, interior and exterior elevation tags, enlarged plan tags, building section cuts, wall section cuts, detail cuts, etc. Completed major furniture, equipment, and casework layouts. Completed kitchen plan and equipment schedule(s) (if applicable). Completed roof plan(s) and details. Completed finish and floor pattern plans. Elevations Completed elevations indicating primary building materials and showing all coordinated MEP items. Interior Elevations Completed interior elevations indicating primary materials and special construction. Building Sections Completed building sections. Wall Sections Completed wall sections.

12 Architect/Engineer Deliverables Guidelines, Page 7 CONSTRUCTION DOCUMENTS CONT D Schedules Completed Room Finish Schedule and Finishes Legend, Door and Window Schedules. Structural Completed foundation plans. Completed floor and/or roof framing plans. Completed structural details. Mechanical Completed Site Plan. Completed HVAC ductwork and equipment layouts and schedules. Completed HVAC piping layouts and schedules. Completed controls systems description. Plumbing/Fire Protection Completed Site Plan with coordinated civil connections, future portable stub outs, etc. Completed water and sewer line routing. Completed piping layouts and schedules. Completed fixture layout and schedules. Electrical/Technology Systems Completed electrical Site plan with service entrance, transformer, site lighting, future portable stub outs, etc. Completed equipment panel schedules. Completed lighting, power and data, and switching plans. Completed emergency electrical, lightning protection, and fire alarm systems. Specifications Completed project Specifications (all disciplines). Project Schedule Provide updated project schedule with established design completion date See Project Management Requirements). This package shall be submitted in hard copy and electronic format per the following: (1) PCS Building Permit/Plan Review Application (See Appendix Documents). (3) printed full size sets of (24x36) drawings AND (1) printed (18x24) set of drawings (2) printed specification books Adobe PDF Individual Sheet files labeled per the PCS Drawing Index and Sheet Numbering/Naming Standard (See Appendix Documents). (1) Letter from EOR denoting approval from local utility company for transformer location. (1) Copy of permit application letters for storm water and/or environmental permits or letter from EOR certifying no storm water and/or environmental permits are required. Note: All electronic files shall be uploaded to the Project Viewpoint Office 2 Office website.

13 Architect/Engineer Deliverables Guidelines, Page 8 PERMIT DOCUMENTS Provide Signed & Sealed Contract Documents for permit review. This package shall be submitted in hard copy and electronic format per the following: (1) PCS Building Permit/Plan Review Application (See Appendix Documents). (3) printed (24x36) sets of drawings (Signed/Sealed) (1) printed (18x24) set of drawings (3) printed specification books (Signed/Sealed) Adobe PDF Individual Sheet files labeled per the PCS Drawing Index and Sheet Numbering/Naming Standard (See Appendix Documents). (3) OEF 208a - Facility Space Chart/Net And Gross Square Footage Form (Signed/Sealed) (2) OEF 110a - Project Implementation Information Form (Signed/Sealed) (2) FL Energy Efficiency Code calculations (Signed/Sealed) (2) OEF LCCA - Life Cycle Cost Analysis Form (if required) (2) Architect certification of code compliance (Signed/Sealed) (2) Architect/Engineer response to Phase III mandatory issues (2) Architect Affidavit for Code Compliance. (3) Threshold Inspection Plan (if required) (Signed/Sealed) (1) CD-ROM with ACAD formatted files for contract documents. The disc should be labeled FINAL CONSTRUCTION DOCUMENT CAD FILES and should identify the project, date, and design firm. All Sheet files shall be bound to include all sheet specific data. CAD files shall be Individual Sheet files labeled per the PCS Drawing Index and Sheet Numbering/Naming Standard (See Appendix Documents). Note: All electronic files shall be uploaded to the Project Viewpoint Office 2 Office website.

14 Construction Services 2016 APPENDIX

15 Insert Architects Letterhead PROJECT STATUS REPORT NO: 01 INSERT SCHOOL NAME INSERT SCHOOL ADDRESS DATE: xx/xx/16 WORK IN PROGRESS: Briefly provide general overview of Work in Progress. OBSERVATIONS: Briefly provide general observations. OPEN ISSUES: Briefly describe major open issues at current stage of the project. CM / ACTION: Briefly describe outstanding and/or major CM Action items at current stage of the project. OWNER / ACTION: Briefly describe outstanding and/or major Owner Action items at current stage of the project. DESIGN TEAM / ACTION: Briefly describe outstanding and/or major Design Team Action items at current stage of the project. Prepared by: Copy: Architects Name PCS Director of Construction, PCS Project Coordinator, PCS EFI, other primary team members

16 PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES Office 2 Office Project Viewpoint is a web based project collaboration system, designed specifically for Architects, Consultants, Contractors and Owners. Office 2 Office, LLC Tampa, Florida (813)

17 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES The following is a description of each phase of the project and what the Architect, Construction Manager and other project team members shall complete at each phase. The description outline matches the menu structure of Project Viewpoint. See "PROJECT VIEWPOINT PROTOCAL TABLE" at the end of this document for assignment of applicable phases. 1. Project Information A. General Project Information 1. The Architect shall post the appropriate information in this list. B. Project Team Members 1. The Project Team Members include all individuals associated with the project and includes registered users as well as non-registered users. 2. The Architect shall post his own information and shall coordinate and verify that all project team members post their own information. 3. Information for non-registered users shall be added by the Architect and shall include consultants and sub-contractors. C. Tasks 1. General Tasks to be accomplished that are not phase specific shall be placed in this list. 2. notifications are only sent to individuals that are assigned a task and the person assigning the task. D. Discussion 1. Discussion Boards shall be used to document decisions as well as informational items that must be distributed to the project team by phase. 2. Each Discussion Board topic should be encapsulated into a single entry. Any new information associated with a specific topic can be appended as a Reply to that Discussion Board item. E. Project Team Calendar 1. Significant project dates shall be added that affect all project team members. 2. The Project Team Calendar is generally available to all registered users of the project site. F. Communications 1. The Communications library shall be used to store both scanned hard copy and digital communications. G. Meetings 1. The Meetings library shall be used to store and distribute meeting agendas and minutes. 2. A Meeting Agendas folder has been created for agendas to upcoming meetings. The agendas shall be placed in the library no later than forty eight hours prior to the upcoming meeting. 3. A Meeting Minutes folder has been created for completed meetings. The minutes for a completed meeting shall be placed in the library no later than forty eight hours after a completed meeting. OVERVIEW OF PROJECT VIEWPOINT Page 1

18 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES H. Budget 1. The original documentation confirming the budget shall be placed in the Budget library. I. Site Information 1. General project data such as the survey, information about utilities and other general information shall be posted in the Site Information library. 2. Project Administration A. Tasks 1. Tasks to be accomplished by the Owner, Architect or Contractor shall be added to this list. 2. These tasks are not generally associated with a specific phase of the project. 3. notifications are only sent to individuals that are assigned a task and the person assigning the task. B. Discussions 1. Discussion Boards shall be used to document decisions as well as informational items that must be distributed to the project team by phase. 2. Each Discussion Board topic should be encapsulated into a single entry. Any new information associated with a specific topic can be appended as a Reply to that Discussion Board item. C. Calendar 1. Significant project dates shall be added that affect specific project team members. 2. This Calendar is generally only for the Owner, Architect and Contractor. D. Communications 1. The Communications library shall be used to store both scanned hard copy and digital communications. E. Meetings 1. The Meetings library shall be used to store and distribute meeting agendas and minutes. 2. A Meeting Agendas folder has been created for agendas to upcoming meetings. The agendas shall be placed in the library no later than forty eight hours prior to the upcoming meeting. 3. A Meeting Minutes folder has been created for completed meetings. The minutes for a completed meeting shall be placed in the library no later than forty eight hours after a completed meeting. F. Budget Update 1. Revisions that add to the project date as well as project finances shall be placed in the Budget Update library. G. Accounting Records 1. Documents that have a bearing on the finances of the project and that are not for all project team members shall be placed in the library. OVERVIEW OF PROJECT VIEWPOINT Page 2

19 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES H. Legal Records 1. Documents that have a bearing on any legal aspect of the project and that are not for all project team members shall be placed in the library. I. RFP 1. The owner shall post any responses to a Request for Proposal for this specific project. 2. The owner is the only party that will have access to this library. J. Permitting Documents 1. Documents necessary for the permitting process shall be placed in this library. 3. Programming A. Tasks 1. Tasks to be accomplished by the Owner, Architect or Contractor shall be added to this list. 2. These tasks are not generally associated with a specific phase of the project. 3. notifications are only sent to individuals that are assigned a task and the person assigning the task. B. Discussions 1. Discussion Boards shall be used to document decisions as well as informational items that must be distributed to the project team by phase. 2. Each Discussion Board topic should be encapsulated into a single entry. Any new information associated with a specific topic can be appended as a Reply to that Discussion Board item. C. Communications 1. The Communications library shall be used to store both scanned hard copy and digital communications. D. Meetings 1. The Meetings library shall be used to store and distribute meeting agendas and minutes. 2. A Meeting Agendas folder has been created for agendas for upcoming meetings. The agendas shall be placed in the library no later than forty eight hours prior to the upcoming meeting. 3. A Meeting Minutes folder has been created for completed meetings. The minutes for a completed meeting shall be placed in the library no later than forty eight hours after a completed meeting. E. Budget Update 1. Revisions that add to the project date as well as project finances shall be placed in the Budget Update library. F. Documents in Progress 1. The Architect shall, at his discretion, post any documents that are to be used by his consultants. OVERVIEW OF PROJECT VIEWPOINT Page 3

20 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES 2. This library is solely for the purpose of collaborating on specific documents and is not intended to act as a repository for the owner or contractor to access. G. Documents in Review 1. The Architect shall post documents in this library for the purposes of facilitating the document review process. 2. This shall be accomplished by posting files as PDF documents and creating them in such a manner as to allow the owner to markup the documents using digital tools provided in the PDF document format. H. Final Approved Documents 1. The Architect shall post the Final Approved Programming Documents into this library. 2. This will serve as an archive copy of the documents as a record of the state of the documents used to proceed to the Schematic Design phase of the project. 4. Schematic Design A. Tasks 1. Tasks to be accomplished that are specific to the Schematic Design phase shall be placed in this list. 2. notifications are only sent to individuals that are assigned a task and the person assigning the task. B. Discussions 1. Discussion Boards shall be used to document decisions as well as informational items that must be distributed to the project team by phase. 2. Each Discussion Board topic should be encapsulated into a single entry. Any new information associated with a specific topic can be appended as a Reply to that Discussion Board item. C. Communications 1. The Communications library shall be used to store both scanned hard copy and digital communications. D. Meetings 1. The Meetings library shall be used to store and distribute meeting agendas and minutes. 2. A Meeting Agendas folder has been created for agendas for upcoming meetings. The agendas shall be placed in the library no later than forty eight hours prior to the upcoming meeting. 3. A Meeting Minutes folder has been created for completed meetings. The minutes for a completed meeting shall be placed in the library no later than forty eight hours after a completed meeting. E. Budget Update 1. Revisions that add to the project date as well as project finances shall be placed in the Budget Update library. F. Documents in Progress OVERVIEW OF PROJECT VIEWPOINT Page 4

21 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES 1. The Architect shall, at his discretion, post any documents that are to be used by his consultants. 2. This library is solely for the purpose of collaborating on specific documents and is not intended to act as a repository for the owner or contractor to access. G. Documents in Review 1. The Architect shall post documents in this library for the purposes of facilitating the document review process. 2. This shall be accomplished by posting files as PDF documents and creating them in such a manner as to allow the owner to markup the documents using digital tools provided in the PDF document format. H. Final Approved Documents 1. The Architect shall post the Final Approved Schematic Design Documents into this library. 2. This will serve as an archive copy of the documents as a record of the state of the documents used to proceed to the Design Development phase of the project. 5. Design Development A. Tasks 1. Tasks to be accomplished that are specific to the Design Development phase shall be placed in this list. 2. notifications are only sent to individuals that are assigned a task and the person assigning the task. B. Discussions 1. Discussion Boards shall be used to document decisions as well as informational items that must be distributed to the project team by phase. 2. Each Discussion Board topic should be encapsulated into a single entry. Any new information associated with a specific topic can be appended as a Reply to that Discussion Board item. C. Communications 1. The Communications library shall be used to store scanned both hard copy and digital communications. D. Meetings 1. The Meetings library shall be used to store and distribute meeting agendas and minutes. 2. A Meeting Agendas folder has been created for agendas for upcoming meetings. The agendas shall be placed in the library no later than forty eight hours prior to the upcoming meeting. 3. A Meeting Minutes folder has been created for completed meetings. The minutes for a completed meeting shall be placed in the library no later than forty eight hours after a completed meeting. E. Budget Update 1. Revisions that add to the project date as well as project finances shall be placed in the Budget Update library. OVERVIEW OF PROJECT VIEWPOINT Page 5

22 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES F. Documents in Progress 1. The Architect shall, at his discretion, post any documents that are to be used by his consultants. 2. This library is solely for the purpose of collaborating on specific documents and is not intended to act as a repository for the owner or contractor to access. G. Documents in Review 1. The Architect shall post documents in this library for the purposes of facilitating the document review process. 2. This shall be accomplished by posting files as PDF documents and creating them in such a manner as to allow the owner to markup the documents using digital tools provided in the PDF document format. H. Final Approved Documents 1. The Architect shall post the Final Approved Design Development Documents into this library. 2. This will serve as an archive copy of the documents as a record of the state of the documents used to proceed to the Construction Documents phase of the project. 6. Construction Documents A. Tasks 1. Tasks to be accomplished that are specific to the Construction Documents phase shall be placed in this list. 2. notifications are only sent to individuals that are assigned a task and the person assigning the task. B. Discussions 1. Discussion Boards shall be used to document decisions as well as informational items that must be distributed to the project team by phase. 2. Each Discussion Board topic should be encapsulated into a single entry. Any new information associated with a specific topic can be appended as a Reply to that Discussion Board item. C. Communications 1. The Communications library shall be used to store both scanned hard copy and digital communications. D. Meetings 1. The Meetings library shall be used to store and distribute meeting agendas and minutes. 2. A Meeting Agendas folder has been created for agendas for upcoming meetings. The agendas shall be placed in the library no later than forty eight hours prior to the upcoming meeting. 3. A Meeting Minutes folder has been created for completed meetings. The minutes for a completed meeting shall be placed in the library no later than forty eight hours after a completed meeting. OVERVIEW OF PROJECT VIEWPOINT Page 6

23 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES E. Specifications in Progress 1. The Architect shall post the specifications in this library as they are being prepared. 2. This library is solely for the purpose of collaborating on specific documents and is not intended to act as a repository for the owner or contractor to access. F. Drawings in Progress 1. The Architect shall, at his discretion, post any documents that are to be used by his consultants. 2. This library is solely for the purpose of collaborating on specific documents and is not intended to act as a repository for the owner or contractor to access. 3. The Architects may post DWG files in this location for transmittal to consultants. G. Documents in Review 1. The Architect shall post documents in this library for the purposes of facilitating the document review process. 2. This shall be accomplished by posting files as PDF documents and creating them in such a manner as to allow the owner to markup the documents using digital tools provided in the PDF document format. H. Final Approved Documents 1. The Architect shall post the Final Approved Contract Documents into this library. 2. Upon final approval of Contract Documents by Owner, the Architect shall post a PDF of each drawing and specification division. 3. This will serve as an archive copy of the documents used for permitting and / or securing the final GMP. I. Revised During Construction 1. This library is used to store drawings / PDF s and specifications which contain modifications made during construction. 2. Upon the completion of the Bidding phase, the Architect will copy the documents in the Final Approved Documents library into this library. 3. Upon issuance of an ASI, the Architect shall post, within two business days, revised drawings and specifications reflecting such changes and complete the properties for each document as it is posted. 4. Upon approval of revisions by the Owner, (CCD, CO) the Architect shall post, within two business days, revised drawings and specifications reflecting such changes and complete the properties for each document as it is posted. 5. It is the responsibility of the Architect to maintain the latest drawings and specifications in this library as well as all approved revisions to these documents. J. Contractor s Field Changes 1. This library is used to store drawings / PDF s and specifications which contain modifications made during construction. 2. The Contractor shall modify the on-site construction documents to reflect changes made in the field that have not been incorporated into the Architect s set of Construction Documents that are stored in the Revised During Construction library OVERVIEW OF PROJECT VIEWPOINT Page 7

24 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES 3. The modified Documents are then to be uploaded to this library. K. As-Built Documents 1. Upon completion of the project a set of Construction documents shall be produced which reflects changes made to the Construction Documents during construction. 2. This set shall reflect, but shall not be limited to, changes made by the Architect in such items as ASI s, RFI s, etc. as well as changes made by the Contractor due to field conditions. 3. This set shall be produced by an agent agreed upon by the Owner. 7. Bidding and Negotiations A. Tasks 1. Tasks to be accomplished that are specific to the Bidding phase shall be placed in this list. 2. notifications are only sent to individuals that are assigned a task and the person assigning the task. B. Discussions 1. Discussion Boards shall be used to document decisions as well as informational items that must be distributed to the project team by phase. 2. Each Discussion Board topic should be encapsulated into a single entry. Any new information associated with a specific topic can be appended as a Reply to that Discussion Board item. C. Communications 1. The Communications library shall be used to store both scanned hard copy and digital communications. D. Meetings 1. The Meetings library shall be used to store and distribute meeting agendas and minutes. 2. A Meeting Agendas folder has been created for agendas for upcoming meetings. The agendas shall be placed in the library no later than forty eight hours prior to the upcoming meeting. 3. A Meeting Minutes folder has been created for completed meetings. The minutes for a completed meeting shall be placed in the library no later than forty eight hours after a completed meeting. E. Documents 1. The Construction Manager shall place documents in this library for the purposes of expediting the bidding process. 2. The documents in this library may be split out into PDF files that correspond to the requested bids from subcontractors. F. Invitation to Bid 1. The Invitation to Bid shall be placed in this library by the Construction Manager. G. Supplementary Bid Information OVERVIEW OF PROJECT VIEWPOINT Page 8

25 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES 1. Any supplementary information that is required for the bidding process shall be placed into this library by the Construction Manager. 2. The files in this library may be of any file type necessary to transmit the appropriate information to the bidding parties. H. Bid Questions 1. The Construction Manager shall document in writing using agreed upon forms any questions which arise during bidding. 2. These questions shall be posted in the Bid Questions library. 3. The bid questions shall be consecutively numbered. 4. All documents contained in the Bid Question, including attachments, shall be packaged in one PDF file to be posted. 5. The Construction Manager shall complete the properties list for each bid question as it is posted. I. Addenda 1. The Architect shall respond to Bid Questions in writing using agreed upon Addendum forms. 2. The Architect shall post the Addenda in the Addenda library and shall consecutively number each Addendum. 3. All documents contained in the Addenda including attachments shall be packaged in one PDF file to be posted. 4. The Architect shall complete the properties for each addendum as it is posted. J. Preconstruction Negotiations 1. Any documents created as part of Preconstruction Negotiations shall be posted in this library. K. Cost Negotiations 1. Any documents created as part of Cost Negotiations shall be posted in this library. L. Value Engineering 1. Any documents created as part of the Value Engineering process shall be posted in this library. M. Bid Tabulation 1. The Construction Manager shall post the Bid Tabulation documents for each Bid Package. N. CM Bid Tracking 1. For the purposes of tabulating all bids received along with the minority contract information, the Construction Manager shall complete the data entry form of the CM Bid Tracking list. O. Notice of Award 1. The Owner or Architect shall post the Notice of Award into this library. P. Roster of Bidders OVERVIEW OF PROJECT VIEWPOINT Page 9

26 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES 1. For the purposes of documenting the contact information for all bidders, the Construction Manager shall complete the data entry form of the Roster of Bidders list. 8. Construction Administration A. Tasks 1. Tasks to be accomplished that are specific to the Construction Administration phase shall be placed in this list. 2. notifications are only sent to individuals that are assigned a task and the person assigning the task. B. Discussions 1. Discussion Boards shall be used to document decisions as well as informational items that must be distributed to the project team by phase. 2. Each Discussion Board topic should be encapsulated into a single entry. Any new information associated with a specific topic can be appended as a Reply to that Discussion Board item. C. Communications 1. The Communications library shall be used to store both scanned hard copy and digital communications. D. Meetings 1. The Meetings library shall be used to store and distribute meeting agendas and minutes. 2. A Meeting Agendas folder has been created for agendas for upcoming meetings. The agendas shall be placed in the library no later than forty eight hours prior to the upcoming meeting. 3. A Meeting Minutes folder has been created for completed meetings. The minutes for a completed meeting shall be placed in the library no later than forty eight hours after a completed meeting. E. Notice to Proceed 1. The Owner or Architect shall post the Notice of Award into this library. F. Approvals 1. The Architect shall post any approvals that have been issued through the bidding process. G. Bonds and Insurance 1. The Construction Manager shall post all Bonds and Insurance certificates as required by the contract documents. H. Schedule of Values 1. The Construction Manager shall post the Schedule of Values into this library as required by the contract documents. 2. The Schedule of Values shall be posted in a timeframe consist with the requirements of the contract documents. I. Material and Color Schedule OVERVIEW OF PROJECT VIEWPOINT Page 10

27 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES 1. The Architect shall post the documentation of all Material and Color selections into this library. J. Site Photos 1. Periodic photographs of the construction process shall be posted, at the owner s discretion. 2. A folder may be created by each team member for uploading their respective photographs. K. Field Reports 1. All field reports by any team member shall be posted into this library. 2. This shall conform to the requirements of the contract documents. 3. The Architect shall be responsible for ensuring that appropriate field reports, required by the contract documents, are posted into this area. L. Request for Information 1. The Construction Manager shall prepare an RFI for any items that require additional clarification. 2. The Construction Manager will issue the RFI by posting it into the RFI library. 3. All documents contained in the RFI including attachments shall be packaged into one PDF file and posted. 4. All parties shall complete the properties for each document as it is posted. 5. Each RFI shall have attached all appropriate documents such as drawings, specifications, supplementary drawings, etc. 6. The Architect shall review the RFI and provide written response. 7. The Architect shall post the RFI Response as an amendment or attachment to the original RFI and post in the RFI library and update the properties for that RFI. 8. The final document shall contain the original request with attachments and the response with attachments all packaged in one PDF. M. Pay Requests 1. The Construction Manager shall post each Pay Request into this library. 2. The timeframe and process for each upload shall be agreed upon prior to the first Pay Request. N. Change Orders 1. The Architect or Construction Manager shall prepare and post a Change Order for any additional work which is not included in the Contract Documents and will increase the Contract Sum or extend the Contract Time. 2. The Change Order will be consecutively numbered (001, 002) and recorded by posting in this area. 3. The properties for each Change Order shall be updated as it is posted. O. Proposal Request 1. The Architect shall prepare a Proposal Request for any required additional work which is not included in the Contract Documents and will increase the Contract Sum or extend the Contract Time. 2. The Architect will issue the Proposal Request by posting in the Proposal Request library. OVERVIEW OF PROJECT VIEWPOINT Page 11

28 OFFICE 2 OFFICE PROJECT VIEWPOINT DIGITAL PROJECT PROCEDURES 3. All documents contained in the Proposal Request including attachments shall be packaged in one PDF file and posted. 4. All team members shall complete the properties for each document as it is posted. 5. Each Proposal Request shall have attached all appropriate documents such as drawings, specifications, supplementary drawings, etc. 6. The Construction Manager shall analyze the Proposal request and provide written response. 7. The Construction Manager shall post the Proposal Request Response in the Proposal Request area as an amendment to the original Proposal Request. 8. The final document shall contain the original request with attachments and the response with attachments all packaged in one PDF. P. Contingency Adjustment 1. The Construction Manager shall maintain a Contingency Adjustment Accounting. The CAA will be consecutively numbered (001, 002) and recorded by posting in this area. 2. All team members shall complete the properties for each CCA as it is posted. Q. Construction Change Directive 1. The Architect will prepare and post a Construction Change Directive for any additional work which is not included in the Contract Documents and will increase the Contract Sum or extend the Contract Time but is to be funded by a contingency or allowance. 2. The CCD shall indicate the source of funds. 3. The CCD will be consecutively numbered (001, 002) and recorded by posting in this library. 4. All team members shall complete the properties for each CCD as it is posted. R. Architect s Supplemental Instructions 1. The Architect will prepare and post an Architect's Supplemental Instruction for any additional work which is not included in the Contract Documents and will not increase the Contract Sum or extend the Contract Time. 2. The Architect's Supplemental Instruction will be consecutively numbered (001, 002) and recorded by posting into this library. 3. The Architect shall complete the properties for each ASI as it is posted. S. Construction Change Request 1. The Construction Manager shall document in writing, using agreed upon forms, any request for a change in contract cost or an extension of time as a result of any RFI and / or ASI issued by the Architect. 2. The CCR shall be consecutively numbered (001, 002) and posted into this library. 3. The Construction Manager shall complete the properties for each CCR as it is posted. T. Submittals 1. The Construction Manager shall post submittals consisting of Shop Drawings, Data Sheets, Manuals, etc. into this library. 2. To facilitate easy retrieval, posted submittals shall only contain information concerning one spec section and one submittal type. OVERVIEW OF PROJECT VIEWPOINT Page 12

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

TAB B-9 RECORD DRAWINGS

TAB B-9 RECORD DRAWINGS TAB B-9 RECORD DRAWINGS Project record drawings and shall be prepared for all University of Arizona projects. The concept Record Drawings shall replace what has previously been called As-Builts. During

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

BIM/VDC on TAA Projects:

BIM/VDC on TAA Projects: 2018 Logan International Airport BIM/VDC on TAA Projects: Direct Tenant TAA Projects Third Party Development Properties Massachusetts Port Authority Capital Programs & Environmental Affairs Preface Massport

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting. Number: BD-020 Title: Electronic Plan Submittal and Review Effective Keywords: Permits, Plan Review, Plan Submittal Date: April 3, 2013 Revision Date: vember 4, 2015 Approved By: Thomas Hogarth Contact

More information

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review Step 1: Request for Conditional Approval, page 1 of 5 Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review I,, the Property Owner, or Owner

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION DOCUMENT SUBMISSION For Building Permit Submittal: Applicants bring Permit Application, Digital Drawings, and Supporting Documents

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

1. Land survey Work. 2. Civil and Structural engineering services.

1. Land survey Work. 2. Civil and Structural engineering services. SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

APPLICATION FOR SITE PLAN REVIEW

APPLICATION FOR SITE PLAN REVIEW APPLICATION FOR SITE PLAN REVIEW ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fees (Nonrefundable) $ Arch.: $ (772) 871-5212 FAX: (772) 871-5124

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION / / Date Received by NSCA Office / / Submittal Expiration Date Owner s Name: Tract:

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

January, 2014 Page 1 of 5

January, 2014 Page 1 of 5 Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

Checklist for Minor Plan Modification

Checklist for Minor Plan Modification Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

Vanderbilt University Standard Specification Revised 2/6/08

Vanderbilt University Standard Specification Revised 2/6/08 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

Town of Skowhegan Application For Development Review

Town of Skowhegan Application For Development Review Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:

More information

MnDOT Contract Exhibit A - Scope of Services

MnDOT Contract Exhibit A - Scope of Services Introduction Information Introduction This Scope of Services represents work on two individual highway improvement projects as described below. The State intends to let two of the projects as separate

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

FIT-OUT PERMIT REQUEST (GENERAL WORKS) Dubai Maritime City P.O. Box 8988 Dubai, UAE T +97143450626 F +97143450116 www.dubaimaritimecity.com FIT-OUT PERMIT REQUEST (GENERAL WORKS) PROJECT DETAILS Project Name: Plot Number: TENANT DETAILS Contact

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION For Office Use Only Date Received: Approved: ARC Non-Refundable Fees: ARC Refundable Deposit Pd: For Office Use Only Plat Name: Lot # Street Address: New Construction Alteration Preliminary Final ARCHITECTURAL

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

SITE PLAN REVIEW GUIDELINES Rev. 2016

SITE PLAN REVIEW GUIDELINES Rev. 2016 SITE PLAN REVIEW GUIDELINES Rev. 2016 The Site Plan Review process mandates that all information required in the Zoning Resolution and on the checklist be submitted and/or indicated on the site plan before

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum SECTION 013201 - SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum Pay Unit price breakdown) shall be developed and ultimately

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

UDS OVERVIEW Uniform Drawing System

UDS OVERVIEW Uniform Drawing System UDS OVERVIEW Uniform Drawing System The Construction Specifications Institute 601 Madison Street Alexandria, VA 1994 CSI began development of UDS Organization and presentation of drawing sets Organization

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information