ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR
|
|
- Eugenia Hood
- 6 years ago
- Views:
Transcription
1 ADDENDUM NO. 1 November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR North District Pre-Development Studies Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study PROJECT NO UC Rev. 0, August 1, 2007 UCR Rev
2 North District Pre-Development Studies Soils Geotech Hydrology, Phase 2 Environmental Study Project Number: Addendum No. 1, November 6, 2016 The following changes, additions, or deletions shall be made to the following documents as indicated for this Project; and all other terms and conditions shall remain the same. Each firm is responsible for transmitting this information to all affected subconsultants and suppliers before the Deadline. 1. Request for Qualifications: Revise RFQ submittal deadline from Thursday, December 8, 12:00 PM to Monday, December 12, 2016, 12:00 PM. Questions: 1-1 Question: We have reviewed all three RFPs for project There seems to be overlap amongst the three. The Site Aerial Survey RFP contains quite a bit of geotechnical scope as well as field survey, but there is a separate RFP for Geotechnical and Hydrology Services, and there is also surveying in the RFP for ALTA/NSPS. Was the intent to put all of the geotechnical services into one RFP and the survey in another? Answer: YES- It is the intent to put all of the geotechnical services into one RFP and the survey in another. (Please see below) Items g, h, i and m in subsection 2, Section C-Scope of Services for the RFQ for Soils and geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study should be removed. Items b, c, d, e, f, in subsection 1, Section C-Scope of Services for the RFQ for Base Mapping Services-Site Aerial Survey and Filed Survey Site Design should be removed. Items d, of subsection 2, Section C-Scope of Services for the RFQ for ALTA/NSPS Land Title Survey should be removed. 1-2 Question: What information should be included in SOQs beyond the forms specified in the RFQ (i.e., Attachment A Qualification Submittal Form, sample insurance certificate, UC Consultant Experience Form, and Declaration)? Do you require an organization chart, resumes, and descriptions of relevant projects? Do you require a scope and/or understanding narrative, or a project schedule? Answer: Yes. 1-3 Question: For the Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study pursuit, and the Base Mapping Services Site Aerial Survey and Field Survey Site Design pursuit, must a geotechnical firm be proposed as the lead consultant, or can a civil engineering and/or survey firm be the prime? Answer: A civil engineer and/or survey firm can conduct all of the referenced studies and reports. C. Title authorities apply to two specialized areas of civil engineering: structural engineering and geotechnical engineering. Only the use of the title is restricted. Civil engineers may choose to obtain the additional licenses giving them the authority to use the titles Structural Engineer, Geotechnical Engineer, Soil Engineer, and Soils Engineer. Any civil engineer may practice structural engineering or geotechnical engineering except in specifically restricted areas. Specifically, only a structural engineer may design a hospital or public school (primary, secondary, and junior college). (These restrictions are contained in the Health & Safety Code and the Education Code.) Civil engineers may perform all geotechnical work. The titles Geotechnical Engineer, Soil Engineer and Soils Engineer are synonymous. Since structural engineering and geotechnical engineering are part of the practice of civil engineering, and since all structural engineers and geotechnical engineers are also civil engineers, any reference to civil engineering or civil engineer inherently includes structural and geotechnical engineering and structural and geotechnical engineers. (B&P Code 6736, ) UC Rev 0, August 1, UCR Rev
3 North District Pre-Development Studies Soils Geotech Hydrology, Phase 2 Environmental Study Project Number: Addendum No. 1, November 6, Question: Geotechnical services are requested in two of the RFQs with an identical Scope of Work, covering the same site. Is it the intent of UCR to procure two separate geotechnical reports for the same site? If so, what is the differentiation between the two? Answer: No Is not the intent of UCR to procure two separate geotechnical reports for the same site. (please see below) Items g, h, i and m in subsection 2, Section C-Scope of Services for the RFQ for Soils and geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study should be removed. Items b, c, d, e, f, in subsection 1, Section C-Scope of Services for the RFQ for Base Mapping Services-Site Aerial Survey and Filed Survey Site Design should be removed. Items d, of subsection 2, Section C-Scope of Services for the RFQ for ALTA/NSPS Land Title Survey should be removed. 1-5 Question: If subconsultants are required to complete portions of the work on a given contract, should we identify those subconsultants in our SOQ? Answer: Yes. 1-6 Question: Is there a page limit for the SOQs? Answer: 40, excluding tabs and required documents in attachment A. 1-7 Question: Are billing rates required to be submitted as part of the SOQs? Answer: No. Please do not submit billing rates in response to this RFQ. 1-8 Question: Section C. Scope of Services, Item 2, elements g, h, I, and j, seem to overlap with the concurrent Site Areal Survey RFQ for the same project. Would UCR consider removing those items from the Soils, Geotech, Site Hydrology RFQ? Answer: YES- UCR would consider removing those items from the Soils, Geotech, Site Hydrology RFQ.(Please see below) Items g, h, i and m in subsection 2, Section C-Scope of Services for the RFQ for Soils and geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study should be removed. Items b, c, d, e, f, in subsection 1, Section C-Scope of Services for the RFQ for Base Mapping Services-Site Aerial Survey and Filed Survey Site Design should be removed. Items d, of subsection 2, Section C-Scope of Services for the RFQ for ALTA/NSPS Land Title Survey should be removed. 1-9 Question: Is Section C, Scope of Services, Item 2, element k requesting that the site exploration data be submitted on an AutoCAD file? UC Rev 0, August 1, UCR Rev
4 North District Pre-Development Studies Soils Geotech Hydrology, Phase 2 Environmental Study Project Number: Addendum No. 1, November 6, 2016 Answer: YES- Section C, Scope of Services, Item 2, element k is requesting that the site exploration data be submitted on an AutoCAD file, or another equal method to ensure that UCR can incorporate this information into UCR s GIS system Question: The RFQ requests qualifications for Phase 2 Environmental Study services. Have a Phase I Environmental Studies been completed? If so, are they available? Answer: Yes, see attachment Question: Since the RFQ was advertised just prior to the Thanksgiving holiday, would UCR consider extending the timeline by one week? Answer: No Question: Page 5 Item 2a (hydrology) and items g-m are tasks done by a civil engineering consultant. Is it your intent to include these tasks in a geotechnical/environmental RFQ? Answer: Please see below- Items g, h, i and m in subsection 2, Section C-Scope of Services for the RFQ for Soils and geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental Study should be removed. Items b, c, d, e, f, in subsection 1, Section C-Scope of Services for the RFQ for Base Mapping Services-Site Aerial Survey and Filed Survey Site Design should be removed. Items d, of subsection 2, Section C-Scope of Services for the RFQ for ALTA/NSPS Land Title Survey should be removed. END OF ADDENDUM UC Rev 0, August 1, UCR Rev
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement
ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR RFQ/RFP 15P40 Campus Center East HVAC Unit Replacement CHAFFEY COMMUNITY COLLEGE DISTRICT February 26, 2015 CHAFFEY COMMUNITY
More informationNEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017
NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon
More informationADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.
ADDENDUM No. 1 RFP No. 933 Gallup Park Custom Playground Equipment Design Due: Tuesday, August 4, 2015 by 10:00 a.m. The following changes, additions, and/or deletions shall be made to the Request for
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationWATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:
WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced
More informationCITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT
CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:
More informationBid Advertisement in The Wylie News and NTMWD.com Website INVITATION TO BID NORTH TEXAS MUNICIPAL WATER DISTRICT DIGITAL IMAGING SERVICES
Bid Advertisement in The Wylie News and NTMWD.com Website INVITATION TO BID NORTH TEXAS MUNICIPAL WATER DISTRICT DIGITAL IMAGING SERVICES Sealed bids addressed to Kelly O Brian, Records Manager, will be
More informationRFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions
RFP #1587 - CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions 1. Question: Spec requires connects to bitrans, are you going to modify the specs? Answer: City of Culver City s ATCS
More informationAnswer: Qualification statement should be provided with the bid.
Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationFAST TRACK WORKSHOP OBJECTIVES
1 FAST TRACKING FAST TRACK WORKSHOP OBJECTIVES TO UNDERSTAND: 1. WHY ARE CRITICAL PATH ( FAST TRACK ) DESIGN SUBMITTAL PACKAGES ALLOWED 2. WHEN IS FAST TRACK ALLOWED 3. WHEN IS THE CONTRACTOR ALLOWED TO
More informationBid No. B14-02 Building 100 HVAC Improvements
Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationResidential Room Additions
Residential Room Additions The purpose of this information sheet is to provide information regarding building code and permit processing requirements for RESIDENTIAL ROOM ADDITION(S) in the City of Poway.
More informationRFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04
Chair, Christina Fugazi, City of Stockton Vice Chair, Leo Zuber, City of Ripon Commissioner, Bob Johnson, City of Lodi Commissioner, Debby Moorhead, City of Manteca Commissioner, Bob Elliott, San Joaquin
More informationA. Action Submittals: Written and graphic information that requires Engineer's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationPledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project
Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements
More informationJames W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.
ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings
More informationSeptember 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.
Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The
More informationDIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have
More informationWork Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition
Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Signing
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationCONVEYANCE PIPELINE AND PUMP STATION
SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.
More informationBROOKINGS municipal utilities
BROOKINGS municipal utilities 525 Western Ave., P.O. Box 588 Brookings, SD 57006-0588 (605) 692-6325 voice (605) 697-8485 fax March 28, 2016 Re: Request for Submittals Map Conversion Project Brookings,
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationREQUEST FOR PROPOSALS Rochester Downtown Alliance Rochester, Minnesota 2013 Transformer Cabinet Mural Project Budget of $500 per large transformer
REQUEST FOR PROPOSALS Rochester Downtown Alliance Rochester, Minnesota 2013 Transformer Cabinet Mural Project Budget of $500 per large transformer The Rochester Downtown Alliance is seeking to commission
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General
More informationFAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014
FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders
More informationRFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017
#Question & Answer: #1 The RFP states that there is one week to complete all survey work. Please confirm this duration and that no other time will be allowed for survey work. The week identified in the
More informationTAB B-9 RECORD DRAWINGS
TAB B-9 RECORD DRAWINGS Project record drawings and shall be prepared for all University of Arizona projects. The concept Record Drawings shall replace what has previously been called As-Builts. During
More informationHarris County Capital Projects Electronic Submittal Guidelines for Consultants
Harris County Capital Projects Electronic Submittal Guidelines for Consultants This document sets forth the guidelines for electronic submittal for consultants as termed by Harris County Capital Projects.
More informationIngham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18
Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the
More informationAesthetic Steering Committee Meeting No. 8
I-395 Reconstruction Project Aesthetic Steering Committee Meeting No. 8 July 17, 2015 1 Sunshine Law Concepts All meetings of any board or commission of any state agency at which official acts are to be
More informationConstruction Contracts Administration Oregon State University, 644 SW 13th Street, Corvallis, OR T F
Construction Contracts Administration Oregon State University, 644 SW 13th Street, Corvallis, OR 97333 T 541-737-0922 F 541-737-5546 June 29, 2017 Oregon State University Construction Contracts Administration
More informationsubmittals 1s e c t i o n
Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The
More informationMontclair, NJ ADDENDUM NO. 2. Request for Proposal # 1144 Digital Printing Services and Photocopying June 17, 2014
Montclair, NJ 07043 ADDENDUM NO. 2 Request for Proposal # 1144 Digital Printing Services and Photocopying June 17, 2014 Date of Original Bidding Documents: May 16, 2014 Addendum No. 1: June 10, 2014 INTENT:
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationApplications should be ed to:
REQUEST FOR PROPOSALS (RFP) City of Fort Collins, Colorado Art in Public Places Program (APP) Celebrating 20 Years 2015 Community Transformer Cabinet Mural Project Honorarium $450. The Art in Public Places
More informationADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01
ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014
More informationAttached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.
Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.
More informationCall for Entries 2019/2020 El Paseo Sculpture Exhibition (DEADLINE FOR ENTRIES February 28, 2018)
Call for Entries 2019/2020 El Paseo Sculpture Exhibition (DEADLINE FOR ENTRIES February 28, 2018) ABOUT THE EL PASEO SCULPTURE EXHIBITION: El Paseo is the premier shopping street in Palm Desert and the
More informationRequest For Information (RFI) For
Request For Information (RFI) For Metro - Replace 800 MHZ EDACS Radio System Project No. 31AW1201 Metropolitan Transportation Center 181 Ellicott Street Buffalo, New York 14203 Date: December 12, 2012
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationHumboldt Bay Piling Removal
REQUEST FOR PROPOSALS Humboldt Bay Piling Removal Invitation for Proposals The Humboldt Bay Harbor, Recreation & Conservation District (District) is requesting proposals from qualified individuals/firms
More informationADDENDUM 1. Forsyth County. Request for Qualifications and Proposals. Consulting Services for Public Safety Radio Communications
March 27, 2018 Forsyth County Request for Qualifications and Proposals Consulting Services for Public Safety Radio Communications Qualifications and Proposals Will Be Received Until **Date Change** 12:00
More informationBid #3990DB - Two Way Motorola Radio System District Wide Upgrade
LAKE COUNTY SCHOOLS Leading our Children to Success Procurement Services 29529 CR 561 Tavares FL 32778 (352) 253-6760 Fax: (352) 253-6761 http://lake.k12.fl.us Superintendent: School Board Members: Susan
More informationCHAPTER A-10 DRAWINGS
CHAPTER A-10 DRAWINGS INDEX Revised May 2018 10.1 GENERAL 10.1.1 Purpose and Scope 10.2 APPLICABLE PUBLICATIONS 10.3 COMPUTER AIDED DESIGN (CAD) 10.3.1 CAD Requirements 10.3.2 CAD Deliverables 10.3.3 CAD
More informationINFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance
City and County of San Francisco Department of Building Inspection London N. Breed, Mayor Tom C. Hui, S.E., C.B.O., Director INFORMATION SHEET. S-19 DATE : October 2, 2018 CATEGORY SUBJECT : Structural
More informationApplications should be ed to:
REQUEST FOR QUALIFICATIONS (RFQ) City of Fort Collins, Colorado Art in Public Places Program (APP) 2014 Transformer Cabinet Mural Project (7592) Budget: Minimum of $1,000 per artist The Art in Public Places
More informationSECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum
SECTION 013201 - SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum Pay Unit price breakdown) shall be developed and ultimately
More informationCan you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site
CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More informationA. Section includes administrative and procedural requirements for project record documents, including the following:
SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01
More informationAddendum #2: Revised Price Sheets, Added Questionnaire and Questions and Answers (Q&A)
Purchasing Department 6301 S. Stadium Lane, Katy, Texas 77494 281-396-6260 October 23, 2018 RFP 1808 Printing Services and Print Shop Supplies Addendum #2: Revised Price Sheets, Added Questionnaire and
More informationApplications should be ed to:
REQUEST FOR QUALIFICATIONS (RFQ) City of Fort Collins, Colorado Art in Public Places Program (APP) 2013 Transformer Cabinet Mural Project (7461) Budget: Minimum of $1,000 per artist The Art in Public Places
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationThe following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.
ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More informationInformation Manual for Architects
Dufferin-Peel Catholic District School Board Information Manual for Architects for ELEMENTARY AND SECONDARY SCHOOLS Prepared by the Design Department THE INFORMATION CONTAINED IN THIS DOCUMENT IS PROPRIETARY
More informationConsiderations in FERC Licensing of New Projects
Considerations in FERC Licensing of New Projects USSD Workshop The Challenges of Dams in Cold Climates; Design, Construction, Environmental and Sustainability Issues Tract B, Part 2 Environmental Sustainability
More informationThe enclosed information is provided for consideration in the preparation of your response to the abovereferenced
To: Prospective Vendor(s) Date: October 25, 2016 Subject: Solicitation Number: DHSMV-RFI-007-16 Cameras and Related Accessories Addendum No. 1 The enclosed information is provided for consideration in
More informationPROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS 2019 LEGISLATIVE SESSION
State of Nevada Legislative Counsel Bureau 401 S. Carson Street Carson City, NV 89701 775.684.6800 (Phone) 775.684.6600 (Fax) REQUEST FOR PROPOSAL for: PROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS
More informationSection XV - PER, Design, and Construction Submittal Requirements
Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department
More informationJacksonville District Master
-01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS
More informationSoutheastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA
BUILDING THE FUTURE Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA 19107-3780 May 25, 2017 Dear Sir/Madam: Subject: Sealed Bid No. 17-00093-AMZK Enclosed please
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationSolicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project.
Date: June 30, 2017 Project: Ketchikan Shipyard Transfer Carts Solicitation No.: 18002 Addendum No. One TO ALL PLANHOLDERS: The enclosed addendum amends the proposal documents for the above referenced
More informationREQUEST FOR QUOTATION INVITATION
REQUEST FOR QUOTATION INVITATION DATE: July 15, 2010 DPS: REQUIREMENT: SUBJECT: Patricia Farina DPS Contract Administrator Email: Patricia.Farina@cityofchicago.org Telephone: 312-744-7660 Silver Halide
More informationCOMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT
Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION
More informationTELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:
More informationDesigner CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer
Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal
More informationRequest for Proposal (RFP) Nepal EGRP-RFP-FY19-P001. Raising Public Awareness of Early Grade Reading through Regional and National Radio
Request for Proposal (RFP) Nepal EGRP-RFP-FY19-P001 Service Required: Raising Public Awareness of Early Grade Reading through Regional and National Radio Type of Procurement: One Time Purchase Order Type
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationCITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES
CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)
More informationBAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement
1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Engineering Design Services for the Preliminary Engineering of Lake Nepessing/Davison/Genesee Intersection Improvements Sections 1, 2, 11 and 12 of Elba Township Lapeer County, Michigan
More informationLouisville-Southern Indiana Ohio River Bridges Project
Louisville-Southern Indiana Ohio River Bridges Project East End Crossing Jim Stark, INDOT Deputy Commissioner, Innovative Project Delivery July 17, 2013 INDOT Philosophy INDOT utilizes innovative management
More informationDIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines
DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...
More informationMassport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0
Massport Capital Programs Enterprise Schedule Management Primavera Schedule Toolkit Design January 2018 Version 1.0 Contents 1.0 INTRODUCTION 2 1.1 DISCLAIMER 3 2.0 TOOLKIT SCHEDULE COMPONENTS 4 2.1 SCHEDULE
More informationSARASOTA COUNTY GOVERNMENT
SARASOTA COUNTY GOVERNMENT Emergency Services TO: Sarasota County Commission THROUGH: Thomas A. Harmer, County Administrator FROM: Richard Collins, Director of Emergency Services Jerry Wheeler, Manager,
More informationApplications should be ed to:
REQUEST FOR PROPOSALS (RFP) City of Fort Collins, Colorado Art in Public Places Program (APP) 2013 Community Transformer Cabinet Mural Project (7462) Honorarium - $450. The Art in Public Places Program
More informationSECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.
More informationFTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD
SECTION 01 10 12 DESIGN AFTER AWARD 1. DESIGN RESPONSIBILITY The Contractor shall furnish and be responsible for a complete set of design documents as called for in specification section 01 10 10 DESIGN
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationTown of Apex, North Carolina
POND DRAINAGE PLAN APPLICATION Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION: Applications are due by 12:00 pm on the first business day of each month. Please see the Minor Site Plan Schedule
More informationPITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION
PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION DOCUMENT SUBMISSION For Building Permit Submittal: Applicants bring Permit Application, Digital Drawings, and Supporting Documents
More informationSUBDIVISION PLAT APPLICATION
SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................
More informationThe attached information contains mandatory requirements and a submission form.
The Municipality of Greenstone Greenstone Fire Department REQUEST FOR PROPOSAL (RFP) Fire Department VHF Digital Radio Communication System The Municipality of Greenstone seeks Requests for Proposals (RFP
More informationWhite Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)
White Lake Township Building Dept. 7525 Highland Rd. (248) 698-3300 SUBMITTAL REQUIREMENTS FOR SINGLE FAMILY HOMES, ADDITIONS, GARAGES AND RENOVATIONS --NEW-- Package for new residences must include $
More informationSECTION OPERATION AND MAINTENANCE DATA
SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.
More informationThe Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)
The Office of the Finance and Purchasing Manager Telephone : (250) 352-8204 Fax : (250) 352-6594 REQUEST FOR PREQUALIFICATIONS RADIO COMMUNICATIONS INFRASTRUCTURE UPGRADE CONTRACTOR SERVICES 2018-PRQ-01
More informationAttachment J-8 Contractor / Supplier Submittal Register
Contractor / Supplier Register Contract / PO : XXXXXXX Contract / PO Title: OSWDF Construction Quality Control (CQC ) Base Title Proposal s Technical Bid Package Section L G 14 PROC ACC Subcontractor Request
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.
More information