REQUEST FOR PROPOSAL

Size: px
Start display at page:

Download "REQUEST FOR PROPOSAL"

Transcription

1 REQUEST FOR PROPOSAL Engineering Design Services for the Preliminary Engineering of Lake Nepessing/Davison/Genesee Intersection Improvements Sections 1, 2, 11 and 12 of Elba Township Lapeer County, Michigan

2 TABLE OF CONTENTS SECTION 1 General Information... 3 SECTION 2 Scope of Work... 5 SECTION 3 Scope of Services SECTION 4 Project Administration SECTION 5 Proposal Rating Method APPENDIX A Survey and Right-of-Way Requirements

3 REQUEST FOR PROPOSAL I. Objective SECTION 1: GENERAL INFORMATION The purpose of this Request for Proposal ( RFP ) is to provide interested and qualified consultants with specific information to prepare and submit a proposal for preliminary engineering and utility coordination services for the Lake Nepessing/Davison/Genesee Intersection Improvements ( Intersection Improvements ) project. The selected firm shall provide a complete design and bid package as further described in Sections 2 and 3 of this RFP. The LCRC shall use a qualifications-based selection ( QBS ) process as outlined in Section 5 of this RFP. II. Issuing Office The RFP is issued by the Lapeer County Road Commission ( LCRC ) Engineering Department. All correspondence, questions and additional information regarding this RFP shall be addressed to: Ryan Doyle, P.E. Lapeer County Road Commission 820 Davis Lake Road Lapeer, MI Phone: rdoyle@lcrconline.com III. Proposals Two (2) copies of the proposal shall be submitted. The information included therein should be as concise as possible. The total submittal shall not be more than twenty (20) single pages of content (A size). To be considered, each Proposer must submit a complete response to this RFP using the format provided in Section 5. No other distribution of proposals is to be made by the Proposer. The proposal must be signed in ink by an official authorized to bind the Proposer to its provisions. Each proposal must remain valid at least ninety (90) days from the due date of this RFP. 3

4 IV. Changes in RFP Should any prospective Proposer be in doubt as to the true meaning of any portion of this RFP, or should the Proposer find any patent ambiguity, inconsistency or omission therein, the Proposer shall make a written request for an official interpretation or correction. Such requests shall be submitted to the issuing office not less than five (5) business days prior to the final date of submittal of the proposal. The person making the request shall be held responsible for its prompt delivery. Such interpretation or correction, as well as any additional RFP provisions that the LCRC may decide to include, will be made only as addenda, which will be ed to each firm recorded as having received a copy of the RFP. Any addenda issued by the LCRC shall become a part of the RFP and shall be taken into account by each Proposer in preparing his or her proposal. V. Proposal Receipt Proposals must arrive at the LCRC on or before 1:30 p.m., October 15, Each Proposer is responsible for the timely delivery of his or her proposal. Late proposals will not be considered. VI. Disclosures All information in a Proposer s proposal is subject to disclosure under the provisions of Public Act No. 442 of 1976 known as the Freedom of Information Act. This Act also provides for the complete disclosure of contracts and attachments thereto. All unsuccessful proposals will be retained for thirty (30) days after acceptance of the successful proposal. VII. Type of Contract A standard Engineering Services Agreement will be executed between the LCRC and the Consultant. The LCRC reserves the right to award the total proposal, to reject any and all proposals in whole or in part, and to waive any informality or technical defects if, in the LCRC s sole judgment, the best interests of the LCRC will be so served. VIII. Questions and Additional Information There will not be a pre-proposal meeting. Please contact Ryan Doyle at , or rdoyle@lcrconline.com with questions regarding this RFP. 4

5 IX. Cost Liability The LCRC assumes no responsibility or liability for costs incurred by the Consultant prior to the execution of an Engineering Services Agreement. The liability of the LCRC is described in the standard Engineering Services Agreement, a copy of which is available upon request. I. Location & Project History SECTION 2: SCOPE OF WORK Davison Road is an east-west two lane primary road (former state highway) that runs across Lapeer County. It is 3 lanes wide at the intersection. Lake Nepessing Road is a two lane primary that approaches Davison Road from the south and ends at the intersection. It currently has a left turn lane at the intersection for 3 total lanes. Genesee Road is a local dead end road that ends at Lake Nepessing Road, just south of the Davison Road intersection. The existing intersection has a stop condition for Genesee and Lake Nepessing Road traffic. Davison Road is unrestricted. Davison and Lake Nepessing Roads are on the county all-season network and shall be re-built to that standard. There are several commercial businesses in the area and they are located on all three roads. There is a large wetland area located in the southeast quadrant of the intersection. There are several utilities located within the existing right-of-way of all roadways. These utilities are present and must be mapped and impacts defined and/or mitigated. The Consultant is responsible for all aspects of utility coordination for the Intersection Improvements. II. Design Details & Tasks A. Provide a design for a single lane modern roundabout at the intersection. The Consultant shall be responsible for reviewing the TIS and associated RODEL analysis. The consultant shall also consider the impact of providing by-pass lanes for northbound right turn and westbound thru traffic. B. General Design Standards: The current version of AASHTO Policy on Geometric Design of Highways and Streets, AASHTO Roadside Design Guide, Roundabouts An Informational Guide (FHWA-RD ), Roadway Lighting Design Guide (AASHTO), The American National Standard Practice for 5

6 Roadway Lighting, Michigan Department of Transportation ( MDOT ) Standard Plans, MDOT Road Design Manual, the current Michigan Manual of Uniform Traffic Control Devices ( MMUTCD ), MDOT Access Management Guidebook, LCRC design standards and Highway Capacity Manual will be required. C. Specifications: The current version of the MDOT Standard Specifications for Construction (including the latest MDOT Supplemental Specifications and Special Provisions) will apply along with project specific Special Provisions. D. Road Classification: Road is a county all-season route, primary road classified as a minor arterial under the National Functional Classification system. Lake Nepessing Road is a county all-season route, primary road classified as a minor arterial under the National Functional Classification system. Genesee Road is a county normal route, local road classified as a local under the National Functional Classification system. E. Design Vehicle: The design vehicle shall be a minimum of WB-50, with a WB-62 if possible within right-of-way limitations. F. Survey: A complete design survey shall be provided meeting the requirements outlined in Appendix A. G. Drainage: Both enclosed drainage and open channel drainage shall be utilized for the Intersection Improvements. Enclosed drainage shall be provided utilizing curb and gutter section. All drainage systems shall be sized to handle a ten-year design storm, and meet the requirements of the MDEQ and the LCRC. H. Soil Conditions: A geotechnical evaluation shall be conducted by the Consultant and recommendations shall be provided for all aspects of the Intersection Improvements. All future and existing lanes shall be included in the soil investigation through both soil borings and pavement cores. The borings shall be at least five feet below the depth of any proposed pavement structure and 15 feet below the depth of the existing ground otherwise. All traffic control required to perform the soil investigation shall be in accordance with the MMUTCD and LCRC standards. Miss Dig must be notified at least three (3) working days prior to any exploration. I. Horizontal & Vertical Alignment: The Consultant shall prepare base plan level geometrics (approximately 30% design) and an Engineer s Estimate of Probable Cost. Preparation of the plans shall include 3-D surface modeling for the existing intersection, design of preliminary profiles and determination of a preliminary footprint of the proposed roundabout concept including initial right-of-way impacts. LCRC shall review and approve the geometric layout prior to proceeding. 6

7 Upon approval of the geometric layout, the Consultant shall submit Grade Inspection ( GI ) Plans (approximately 75% design) in accordance with MDOT and LCRC plan requirements. LCRC and MDOT shall review and the Consultant shall incorporate review comments for the Final Plan submittal. J. Right-of-Way/Grading Easements: A complete right-of-way plan will be required to be prepared by the Consultant and incorporated into the project s plan set. The right-of-way plan shall identify all the required right-of-way acquisitions and/or grading easements. The LCRC will prepare all required right-of-way acquisition documents and/or grading easements. LCRC will be responsible for the acquisition of all the required right-of-way and grading easements. K. Utility Coordination: All utility agencies must be notified of the project and plans and their existing and proposed facilities within the project limits must be obtained and incorporated into the design of the project. Utility meetings must be conducted to determine utility conflicts, identify where exploration holes will be taken, coordinate resolution of conflicts, and timing of relocations. L. Permits: The Consultant must obtain approvals or waiver letters for permit applications from the following regulatory agencies: 1. MDEQ NPDES and Wetland 2. SHPO (State Historic Preservation Office) for the Intersection Improvements This list of permits may not be all inclusive. The Consultant is responsible for securing approvals or waiver letters from all applicable agencies required by law for design and construction of project. M. Pavement Structural Design: Based upon the geotechnical evaluation, the Consultant shall provide a recommendation for the pavement cross section. N. Maintenance of Traffic: A complete construction staging plan will be required for the project. Construction signing plans and detour routes shall also be required. O. Permanent Signage and Pavement Marking: All permanent sign locations and pavement markings will be included in the construction plans. The current MDOT Standard Pavement Marking Plans and the current MMUTCD shall be used. P. Landscaping: A landscaping plan shall be provided for the roundabout including a proposed plan for the area within the central island and standard roadway restoration along the outside of the roundabout. The Consultant shall coordinate with the LCRC the types material (stone) recommended for landscaping of the central island and colored/textured concrete for the truck apron and splitter islands. 7

8 Q. Lighting: A Lighting plan shall be provided for the roundabout. The Consultant shall provide lighting design calculations based on the assumption that the proposed lighting will cover the entire roundabout including approximately 275 feet of the roundabout approach legs. III. Information that will be provided by the LCRC to the Consultant A. Copies of executed right-of-way/grading easements for incorporation into final plans. IV. Project Meetings & Public Participation A. Kick-Off Meeting: A kick-off meeting will be held with LCRC staff, county and township representatives. B. Project Review Meeting(s): It is anticipated that bi-weekly design review checkups (phone call/ /or meeting) may be necessary with LCRC staff to verify that the project is progressing in the manner and timeframe anticipated. C. Formal Plan Review Meetings: It is anticipated plan review meetings will be held for the base plan and GI plan. D. Public Information Meeting(s): It is anticipated that two (2) public information meetings will be held to inform the public of the proposed project and potential impacts to the surrounding area. These public information meetings will be held using a standard open house format. V. Deliverables A. Design Survey: The design survey shall include a scaled drawing of existing planimetric and topographic features tied to the existing survey centerline, existing right of way lines, property lines, a minimum of two site benchmarks (NAVD88 Datum - list source), three physical control monuments with MCS83 state plane coordinates (using LCRC approved methodology), field notes for all level loops, and adjustment notes for horizontal and vertical control. An AutoCAD digital copy of the drawing file will be provided to the LCRC using AIA civil/survey layering standards. B. Design Report: The design report should include all computations, design exceptions, notes, minutes, utility coordination correspondence, permit applications, permits and related correspondence and other documentation relating to the design of the project. C. Final Bid Documents: The final bid documents submittal shall include; 2 sets of the final full size plans (D size with a scale of 1:40 horizontal, 1:4 vertical), a PDF document of the final full size plans,4 sets of the half size plans on 11 x 17, a 8

9 PDF document of the half size plans, the engineer s opinion of probable costs, the proposal that contains all relevant special provisions, supplemental specifications, standard details and other related bid information, and any other documents required by LCRC to complete a full bid package for the project. D. Final Cross-Sections: Final cross-sections should be provided at intervals not to exceed 50 feet, at all driveways and non-parallel ditches or drains (D size with a scale of 1:20 horizontal, 1:10 vertical). Cross-sections shall be taken out to 75 feet each side of the centerlines of each road. E. Electronic Data Files: All electronic data should be provided to the LCRC including, but not limited to; estimate (MERL), grade book, storm calculations, proposal, final plans and cross-sections both in AutoCAD and PDF formats. VI. Design Team All key personnel shall be listed with their experience as well as a breakdown of the proposed hours and tasks to be completed by each staff person. The principle design engineer and project manager must be specified in the Proposal. If Sub-Consultants will be utilized, qualifications for the firm and their key personnel must be submitted. The selected firm must submit a written request to substitute key personnel or Sub-Consultants. The design survey must be conducted under the direct supervision of a Michigan Licensed Professional Surveyor and the existing condition map will be signed and sealed by said Surveyor. SECTION 3: SCOPE OF SERVICES The services to be provided by the Consultant shall include, but are not necessarily limited to, the following: I. Attend a pre-design meeting with the LCRC to establish the concept of the project based on the Scope of Work and to coordinate design schedules. II. III. IV. Provide a detailed listing of the layering scheme and symbology to be used for this project to the LCRC for review prior to plan development. A complete field survey shall be provided by the Consultant for the completion of the design. Conduct a soils condition investigation and geotechnical analysis. V. Conduct a condition survey of any existing drainage and utility structures within the project limits. 9

10 VI. VII. VIII. IX. Notify all utility agencies (as a representative of the LCRC) of the proposed construction project and obtain plans of their existing and proposed facilities within the project limits. If the drawings show areas where utility locations are expected to conflict with proposed improvements then exploration holes WILL be required by the utility companies and the Consultant will be responsible for coordinating with the utility company and using a survey crew to locate the utility and tie it to the design datum. Miss Dig must be notified at least three (3) working days prior to any exploration. Investigate all existing and proposed utility interference, public or private, within the project limits, identify utility conflicts and coordinate utility relocations with the appropriate agency. Prepare programming application, road and drainage plans, proposal and engineer s opinion of probable cost for a MDOT bid letting. Prepare and submit all necessary permit documents to the appropriate agencies. X. Attend up to two (2) public information meetings and provide exhibits. XI. Attend and document all project progress and plan review meetings. Two (2) sets of plans, completed cross-sections, specifications and engineer s opinion of probable costs shall be submitted to the LCRC prior to each plan review. SECTION 4: PROJECT ADMINISTRATION I. Project Schedule LCRC staff anticipates the following tentative schedule to meet a March 2015 bid date. If the reviews and approvals by LCRC are delayed, the schedule will be adjusted accordingly. January 2014 Kick-Off Meeting March 2014 Base Plans/Right-of-Way Plans April 2014 Utility Coordination Meeting June 2014 Grade Inspection Submittal July 2014 Grade Inspection Review Meeting August 2014 Public Meeting October 2014 Final Plans, Proposal, and Estimate March 2015 Bid Date April 2015 Public Meeting II. Fee 10

11 Once the Consultant is selected based on qualifications, the LCRC will attempt to negotiate a fee for engineering services that considers all work and staff required, including appropriate overhead and fixed fee (profit). Unless the scope of the project changes, this fee will be considered a Not to Exceed Amount. The fee shall be divided into partial amounts by major elements as provided on the project schedule. III. Progress Payments Monthly progress payments will be processed upon providing justification of the actual hours and expenses. Progress payments will be processed utilizing the following guidelines: ITEM % of Total Base Plans... 30% of Design Grade Inspection Plans... 75% of Design Final Plans, Proposal and Estimate % of Design SECTION 5: PROPOSAL RATING METHOD I. Professional Qualifications - 25 points A. State the full name and address of the organization and, if applicable, the branch office or other subordinates that will perform, or assist in performing, the work hereunder. Indicate whether it operates as an individual, partnership or corporation. If as a corporation, include the state in which it is incorporated. If appropriate, indicate whether it is licensed to operate in the State of Michigan. B. Include the number of executive and professional staff who will be employed in the work by skill and qualification. Show where these personnel will be physically located during the time they are engaged in the work. Indicate which of these individuals are considered key to the successful completion of the project. Identify individuals who will do the work on this project by name and title. Resumes or qualifications are required for key project personnel. 11

12 C. State the history of the firm in terms of length of experience, types of services provided and other relevant information. Identify the technical details that make the firm uniquely qualified for this work. II. Past Performance with Similar Projects - 35 points The written proposal shall include a list of specific experience in this area and indicate the firm s ability to have projects completed within the budgeted amounts as well as references. A summary of related projects with the original deadline and cost estimate versus the actual design completion date and final cost of the design is appropriate in this section. III. Proposed Work Plan - 40 points A detailed work plan is to be presented which lists all tasks determined to be necessary to accomplish the work of this project. The work plan shall define resources needed for each task (title and person hours) and the staff person completing the project element tasks. In addition, the work plan shall include a time line schedule depicting the sequence and duration of tasks and showing how the work will be organized and executed. The work plan shall be sufficiently detailed and clear to identify the progress milestones (i.e. when project elements, measures and deliverables are to be completed). Additional project elements suggested by the Proposer are to be included in the work plan and identified as Proposer suggested elements. The Proposer shall also submit, as part of the work plan, a sheet entitled Consultant s Understanding of the Project. The Proposer shall include specific items that were omitted from the RFP and, in particular, any Gray Areas of the RFP that will need to be addressed during the project. The Consultant s Understanding of the Project shall become part of the contract and a basis for negotiating extra work. Any item sufficiently addressed in the RFP shall supersede the Consultant s Understanding of the Project. Include any other information believed to be pertinent but not specifically requested elsewhere. IV. Authorized Negotiator Include the name and contact information of the person(s) in the organization authorized to negotiate the Engineering Services Agreement with the LCRC. 12

13 V. Interview The LCRC will evaluate each proposal by the above-described criteria and point system (I through III) to select the Consultant for this project. The LCRC reserves the right to not consider any proposal that it determines to be unresponsive and deficient in any of the information requested for evaluation. The LCRC then will schedule interviews, if necessary, with the selected firms. The selected firms will be given the opportunity to discuss in greater detail their qualifications, experience, proposed work plan and fee proposal. The interview shall consist of a presentation of no longer than thirty (30) minutes by no more than five (5) representatives of the firm (including the person who will be project manager on this project). The presentation will be followed by no more than one (1) hour of questions and answers. Audiovisual aids may be used during the oral interviews. The firms interviewed will be re-evaluated using the above criteria (I through V), after the interview and a final decision made. I. Topographic Survey APPENDIX A SURVEY AND RIGHT-OF-WAY REQUIREMENTS The limits of this survey shall be defined by the Consultant in order to accomplish the intended intersection improvements. The Consultant shall be responsible for collection of all survey data required for the design and construction of this project meeting the specifications and accuracy requirements as outlined in the Michigan Department of Transportation s Design Survey Manual. The Consultant shall provide a hard copy scaled map (not to exceed 1 =50 ) with 1 ft. contour intervals of the existing conditions survey. The survey will be signed and sealed by the Michigan Licensed Professional Surveyor who directly supervises the survey. The survey shall also be delivered to the LCRC in digital format using AutoCAD and AIA civil/survey layer scheme. In general, the survey shall include: Three physical monuments on site with MCS83 state plane coordinates with a relative positional accuracy meeting 0.07 feet +50ppm. 13

14 Two site benchmarks NAVD88 datum (state source) or as approved by LCRC in advance of design. Cross sections at intervals of 50 feet. Topographic features at a density sufficient to develop computer terrain models and determine drainage impacts. Planimetric features including but not limited to trees, other vegetation, utilities, mailboxes, and guardrails. Recover/Establish the Legal Alignment from which all right of way, titles, and easements are described. Establish Structure Alignment and clearly show relationship to Legal Alignment if differences exist. Structures: Position and elevation shown to 0.01 feet of critical objects and structures within limits of the survey including: bridge footings, piers, abutments, walls, decks, sidewalks, catch basins, bridge under-clearance measurements. Clear and detailed sketches of the structure should be drafted in relation to any established reference lines. Existing Right of Way Lines and Easements. Existing Property Lines based on Tax Equalization Records. II. Utilities LCRC has not contacted any utility agency or collected any as-built utility information. The Consultant is to coordinate with the utility agencies and LCRC the need to field locate any existing utilities or test hole locations. III. Alignment and Right of Way The Consultant shall develop a hard copy and digital AutoCAD drawing file of the existing legal alignment, relationship of bridge alignment to legal alignment, right of way, property, and survey control (horizontal and vertical) for the project area for inclusion in the plans. The plan shall show coordinates and elevations of all horizontal and vertical control with a description of the monument and its location. Witnesses and current Land Corner Recordation Certificate Liber and Page will be posted on the plan where appropriate. IV. Additional Right-of-Way Requirements 14

15 During the course of the design phase, areas identified as needing additional right of way, easements, grading and/or driveway permits will be presented to LCRC. Upon determination of the necessity for the additional right-of-way or other easements, the Consultant will provide a digital AutoCAD drawing file showing the area needed. LCRC will develop the necessary drawings and documents for right of way acquisition. Final negotiated right-of-way lines will be delivered to the Consultant in digital format for inclusion in the final plans. 15

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

PART XII: TOPOGRAPHIC SURVEYS

PART XII: TOPOGRAPHIC SURVEYS PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder 9 LAND SURVEYING 9.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with land surveying, including Project and supplemental horizontal and vertical control

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

Subdivision Application Checklist

Subdivision Application Checklist City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application

More information

Checklist for Tentative Subdivision Map

Checklist for Tentative Subdivision Map Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

MnDOT Contract Exhibit A - Scope of Services

MnDOT Contract Exhibit A - Scope of Services Introduction Information Introduction This Scope of Services represents work on two individual highway improvement projects as described below. The State intends to let two of the projects as separate

More information

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be

More information

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist

More information

Section 101. Street Design

Section 101. Street Design Section 101 Street Design This section establishes the uniform policies and procedures for the preparation of street design plans and construction requirements in the City of Irvine. It is not intended

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

Chapter 23. Signing and Pavement Marking Plans

Chapter 23. Signing and Pavement Marking Plans Chapter 23 Signing and Pavement Marking Plans 23.1 General... 23-3 23.2 Key Sheet... 23-4 23.3 Signature Sheet... 23-4 23.4 Tabulation of Quantities and Pay Item Notes... 23-4 23.4.1 Standard Notes...

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

SITE PLAN REVIEW GUIDELINES Rev. 2016

SITE PLAN REVIEW GUIDELINES Rev. 2016 SITE PLAN REVIEW GUIDELINES Rev. 2016 The Site Plan Review process mandates that all information required in the Zoning Resolution and on the checklist be submitted and/or indicated on the site plan before

More information

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 Based on a preliminary study by Euthenics, Inc. www.euthenics_inc.com 1 SECTION I GENERAL INFORMATION AND EXISTING CONDITIONS

More information

ADMINISTRATIVE DESIGN REVIEW Information

ADMINISTRATIVE DESIGN REVIEW Information Information The following information summarizes the City s Administrative Design Review (ADR) provisions. If you have any questions, please contact the Planning and Development Services Department at

More information

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations MDOT SUGGESTED TRAFFIC SIGNAL DESIGN PROCEDURE INDEFINITE DELIVERY INSTALLATION

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:

More information

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project

More information

MAJOR GRADING PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading

More information

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1

More information

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted. SITE PLAN BUILDING ELEVATION LANDSCAPE PLAN SIGNAGE PLAN APPLICATION FOR THE VILLAGE OF MATTESON I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

More information

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Signing

More information

Minor Site Plan Application and Checklist Land Disturbing Activities

Minor Site Plan Application and Checklist Land Disturbing Activities Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based

More information

This Call for Qualifications does not require the preparation of a design proposal.

This Call for Qualifications does not require the preparation of a design proposal. EDMS# 211137 I. Introduction This Call for Qualifications invites professional artists, or artist team, to participate in a two-stage selection process to develop an original, public art work for Port

More information

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS REQUIREMENTS for ENGINEERING SERVICES on PUBLIC CONSTRUCTION PROJECTS April, 2007 David W. Johnson Senior Engineer Design & Construction Requirements for Engineering Services on Public Construction Projects

More information

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT The Cherokee Nation is requesting proposals from qualified professionals to provide aerial photography and digital mapping of

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia PROJECT OVERVIEW S.P. 6935-89 is on T.H. 169 from 0.07 miles west of CR 109 in Mt. Iron to Hoover Road in Virginia

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc. HIGHWAY PROJECT EXPERIENCE Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc. Alpha provided survey services to prepare a base plan of an approximately 2900

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

MnDOT Contract Exhibit A- Scope of Services. Project Information -

MnDOT Contract Exhibit A- Scope of Services. Project Information - Detail Design For Pedestrian Improvements on Trunk Highways 23, 59, and 68 In the Marshall Area Introduction and Project Information Introduction The purpose of this contract is to provide the State with

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: SECTION 13-400 ADMINISTRATIVE SITE PLAN 13-401 INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: A. All development on vacant land

More information

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248) Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248)-858-1447 Fax (248)-858-7466 Requirements Needed for Final Condominium Approval General Requirements. 1

More information

SCOPE OF WORK AND DELIVERABLES T.H.

SCOPE OF WORK AND DELIVERABLES T.H. Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. s 27, 73 and 289 in Moose Lake S.P. 8821-200 PROJECT OVERVIEW The project is located in Moose Lake, Carlton County s on TH 27, 73, and 289. TH 27 RP 245.044

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions

More information

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade). Snyderville Basin G. Site Plan Requirements: Three (3) copies of a site plan, a minimum size of 11" x 17" (must be legible) and a maximum size of 36" x 48" shall be submitted with all building permit applications

More information

Town of Skowhegan Application For Development Review

Town of Skowhegan Application For Development Review Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:

More information

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone: CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

A. Dewatering observation wells are part of dewatering allowance.

A. Dewatering observation wells are part of dewatering allowance. SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY PROJECT NO CONSULTANT PROJECT NO.

CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY PROJECT NO CONSULTANT PROJECT NO. EXHIBIT A CONSULTING SERVICE AUTHORIZATION DATE: CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY P.O. NO. CITY EXPENSE CODE CITY PROJECT NO. 14-073 CONSULTANT

More information

Checklist for Minor Plan Modification

Checklist for Minor Plan Modification Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

Chapter 13 Plan Submittals

Chapter 13 Plan Submittals Chapter 13 Plan Submittals U30013.DOC 02/01/07 Chapter 13 Plan Submittals Section Topic Page 13.1 General 13.1 13.2 Subdivision Plans 13.1 13.3 Capital Improvement Project Plans 13.12 U30013.DOC 02/01/07

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information