C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

Size: px
Start display at page:

Download "C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit"

Transcription

1 Horizontal battens between verticals at soffit 2 C Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C C.01 1 C C.02 C mm Maximum nog spacing Stud can be 45 or 35 mm wide Two cavity battens fixed side by side at window open Wall Batten Elevation C.00

2 Note: Leave a 10 mm gap between battens 4 mm gap left between end of weatherboards and corner flashing Ulltraclad UA4530 Female Corner Flashing Ulltraclad UA4529 Male Corner Flashing fixed to wall framing with 30x2.5 mm 600 mm ctrs Ulltraclad locater fixed to each stud with Ulltraclad Note: Leave a 10 mm gap between battens Wall frame Interior lining Ulltraclad Weatherboards Building underlay continuous around corner External Corner On Cavity C.01

3 Ulltraclad weatherboard. Leave 4mm expansion gap at end of board Building underlay continuous around corner Ulltraclad locater fixed to each stud with Ulltraclad Ulltraclad UA4529 Male Corner Flashing Ulltraclad UA4530 Female Corner Flashing fixed to wall framing with 30x2.5 mm 600 mm ctrs Note: Double studs required at internal corners Note: Leave a 10 mm gap between battens Interior lining Internal Corner On Cavity C.02

4 4 mm gap left between end of weatherboards and vertical wall jointer Ulltraclad Weatherboards Building underlay Ulltraclad UA6323 Jointer Top Ulltraclad UA6324 Jointer Bottom fixed to wall frame with 30x2.5 mm 600 mm ctrs Leave a 10mm gap between battens Double studs behind vertical jointer Interior lining Vertical Wall Jointer C.03

5 Sealant over PEF backing rod Ulltraclad UA4535 Locater Clip 10 Building underlay Ulltraclad weatherboards Soffit Detail On Cavity C.04

6 Soffit lining Ulltraclad UA5833 Clip Top Ulltraclad UA5831 Soffit Clip Base fixed to wall framing with 50x2.5 mm clouts Building underlay Ulltraclad UA4535 Locater Clip Ulltraclad weatherboards Soffit Detail On Cavity C.04

7 Ulltraclad weatherboards Ulltraclad UA4535 Locater Clip Interior lining Building underlay Ulltraclad cavity vent strip Ulltraclad UA4862 Starter Strip fixed to bottom plate with 50 x 2.5 mm 600 mm ctrs Bottom plate over DPC 50 overhang Concrete slab or blockwork Finished ground level 175 to unpaved ground to clause of E2/AS1 (100mm to permanent paving) Wall Starter On Cavity C.05

8 Interior lining Bottom plate Ulltraclad UA4535 Locater Clip Timber floor structure in accordance with NZS 3604:2011 Ulltraclad weatherboards Building underlay Ulltraclad cavity vent strip Ulltraclad UA4862 Starter Strip fixed to bottom plate with 50 x 2.5 mm 600 mm ctrs 50 overhang Wall Starter Timber Floor On Cavity C.06

9 Ulltraclad UA4535 Locater Clip Ulltraclad weatherboards Building underlay continuous behind head flashing and into opening Interior lining Ulltraclad cavity vent strip Second layer of building underlay over head flashing upstand Ulltraclad UA4533 Head Flashing. 5mm diameter drainage holes drilled through base of 300 mm ctrs. Sealant between head flashing and window flange in Very High wind zone and above min flashing upstand Airseal to perimeter of trim cavity with expandable foam or sealant over PEF rod as per section of E2/AS1 Window head flashing 15 slope (Note: Not supplied with Ulltraclad system - contractor to supply as additional flashing) 10 mm gap nominal Window liner Window frame (Note: refer to window manufacturer for method of support and fixing) 5 mm gap between head flashings 10 mm cover H3.1 treated packers Flexible flashing tape at corners Window head On Cavity C.07

10 Ulltraclad UA4532 Window Flashing fixed to wall framing with 50 x 2.5 mm 600 mm ctrs. Double, 10mm gap between Building underlay continuous around opening min 10 mm cover Ulltraclad Weatherboards Inseal min 19 mm thick x 10 mm wide Window frame (Note: refer to window manufacturer for method of support and fixing) Window liner H3.1 treated packers Flexible flashing tape 100 mm minimum up jamb Airseal to perimeter of trim cavity with expandable foam or sealant over PEF rod as per section of E2/AS1 Interior lining 10 mm gap nominal Window Jamb On Cavity C.08

11 Flexible flashing tape along entire sill, 100 mm up each jamb and 50 mm onto face of building underlay Window frame (Note: refer to window manufacturer for method of support and fixing) Add window support bar. Required for windows wider than 600mm 10 mm min cover 100 mm long soaker located at each side of the window opening (Note: contractor to provide as secondary flashing) 5 Airseal to perimeter of trim cavity with expandable foam or sealant over PEF rod as per section of E2/AS1 Window liner Interior lining H3.1 treated packers Ulltraclad UA4535 Locater Clip Ulltraclad weatherboards Building underlay Note: A sloped sill trimmer is required when the glazing pocket of window / door frame is positioned back past the line of the wall framing Window Jamb on Sill C.09

12 40x18 mm cavity battens Ulltraclad head flashing Cut channel on both sides to 70 mm. Turn down channel floor 90 and trim back to 20 mm Ulltraclad jamb flashing Window head flashing cut around jamb flashing. Seal junction with cavity battens and Ulltraclad jamb flashing Note: Ulltraclad Head Flashing to extend 80 mm past edge of window or door joinery. Building underlay and lashing tape omitted for clarity Head / Jamb On Cavity - Isometric C.10

13 40x18 mm cavity battens Building underlay folded into opening Ulltraclad jamb flashing Flexible flashing tape continue 50 mm onto face of wall and 100 min, up each jamb Sill support Bar for windows wider than 600mm Back of flashing bent forward approximately 10 mm to divert any water to the back of the Ulltraclad weatherboard Underlay strips to isolate aluminium from treated battens Aluminium soaker each side of opening to divert incidental water to back to cladding (Note: contractor to provide as secondary flashing) Sill / Jamb On Cavity - Isometric C.11

14 Ulltraclad UA4535 Locater Clip Ulltraclad weatherboards Building underlay continuous behind head flashing and into opening Ulltraclad cavity vent strip Second layer of building underlay over head flashing upstand Ulltraclad UA4533 Head Flashing with 5mm diameter drainage holes drilled through base of 300 mm ctrs min flashing upstand Nog as required Airseal over PEF rod around all sides of meter box 20x20 mm metal angle sealed and riveted to meter box 10 mm gap nominal Window head flashing 15 slope (Note: Not supplied with Ulltraclad system - contractor to supply as additional flashing) 5 mm gap between head flashings 10 mm cover Flexible flashing tape at corners Metal meter box Meter Box Head On Cavity C.12

15 Ulltraclad UA4532 Window Flashing fixed to wall framing with 50 x 2.5 mm 600 mm ctrs. Building underlay continuous around opening Ulltraclad Weatherboards Metal meter box Inseal 3259 tape between angle and jamb flashing 20x20 mm metal angle sealed and riveted to meter box Flexible flashing tape 100 mm minimum up jamb Airseal over PEF rod around all sides of meter box 10 mm gap nominal Meter Box Jamb On Cavity C.13

16 Metal meter box Flexible flashing tape to sill and jambs 20x20 mm metal angle sealed and riveted to meter box Inseal 3259 tape between angle and jamb flashing Airseal around all sides of meter box over PEF rod 10 mm gap nominal Ulltraclad UA4532 Window Flashing fixed to wall framing with 50 x 2.5 mm 600 mm ctrs. Ulltraclad UA4535 Locater Clip Ulltraclad weatherboards Building underlay Meter Box Sill On Cavity C.14

17 Underlay strips to isolate aluminium from treated battens 40x18 mm cavity battens Square of flexible flashing tape to a min. of 100 mm outside of pipe. Ensure seal with pipe bandage Pipe to have min. 5 fall to outside Building underlay carefully cut to suit pipe. Ulltraclad weatherboard over flashing tape, carefully cut to suit pipe. Seal with PVC flange and flexible sealant. Flexible flashing tape bandage min. 25 mm wide all round pipe Pipe Penetration On Cavity - Isometric C.15

18 Ulltraclad weatherboards Ulltraclad UA4535 Locater Clip Building underlay lapped over flashing upstand Ulltraclad cavity vent strip Ulltraclad UA4533 Head Flashing with 15mm drip edge and 5mm diameter drainage holes drilled through base of 300 mm ctrs. 35 mm min clear gap 75 mm min flashing leg above bottom of weatherboard Nog as required Apron flashing with 75 mm upstand cover behind cladding Roofing underlay turned up under flashing Selected roofing with stop ends Note: Refer to E2/AS1 Table 7 for apron flashing cover dimensions Roof / Wall Junction On Cavity C.16

19 from treated battens Building underlay 48x18 mm cavity battens Ulltraclad weatherboards Flashing tape or extra layer of building underlay over flashing Selected roofing Fall Flashing upstand behind building underlay Apron flashing with tapered stopend. Weatherboards to be carefully cut over stopend & sealed End of spouting must finish 10 mm min. clear of weatherboards Selected spouting Soffit Fascia board Note: Refer to E2/AS1 Table 7 for apron flashing cover dimensions Gutter Wall Junction On Cavity - Isometric C.17

20 H3.1 treated timber packer to form slope Note: Where top of board is cut down - screw fix through board, ensure fixing is covered by flashing See table 7 E2/AS1for flashing depth 5 slope min Underlay to provide isolation of metal flashing from treated timber Metal capping flashing (Note: not supplied with Ulltraclad system - contractor to supply as additional flashing) Metal capping to be fixed with rivets to sides only Ulltraclad weatherboards Ulltraclad UA4535 Locater Clip fixed to each stud with Ulltraclad Building underlay continuous over framing Underlay strips to isolate aluminium from treated battens (Alternatively use 'CAVIBAT' system) Parapet On Cavity C.18

21 12 mm min Ulltraclad weatherboards Ulltraclad UA4535 Locater Clip 12 mm H3.2 timber packer at fixing locations Building underlay Deck joists Solid blocking 50x50x3 mm thick EPDM washer to suit, hole to fit tightly around bolt Bolt fixing in accordance with NZS3604:2011 H3.2 timber stringer Deck Junction On Cavity C.19

22 Ulltraclad weatherboards Ulltraclad UA4535 Locater Clip Interior lining Building underlay Ulltraclad cavity vent strip Ulltraclad UA4862 Starter Strip fixed to bottom plate with 50 x 2.5 mm 600 mm ctrs Bottom plate over DPC Floor structure Waterproof deck structure 100 mm min finished floor level to finished deck surface 50 overhang Deck waterproof membrane lapped up behind building underlay past over bottom plate Minimum 150mm upstand Corner fillet Waterproof Deck On Cavity C.20

23 Ulltraclad UA4535 Locater Clip Ulltraclad weatherboards Bottom plate Flooring to finish 10 mm back from outside framing Ulltraclad cavity vent strip Building underlay lapped over flashing upstand Aluminium flashing 15 slope (Note: Not supplied with Ulltraclad system - contractor to supply as additional flashing) mm min cover Continuous boundary joists 5 35 mm min cover Note: Where top of board is cut down - screw fix though board, ensure fixing is covered by flashing Top plate Interior lining Note: This detail is required to limit cavities to two storeys or 7m maximum. Refer E2/AS1 clause Inter-Storey Junction On Cavity C.21

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs. Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm

More information

STOPOREN FACADE SYSTEM TIMBER WINDOW JOINERY - HEAD DETAIL

STOPOREN FACADE SYSTEM TIMBER WINDOW JOINERY - HEAD DETAIL INTERNAL LINING TIMBER LINTEL AS PER NZS 3604 FLEXIBLE FLASHING TAPE INSTALLED OVER AT AIRSEAL ON CORNERS PEF ROD GAP 7.5-8mm APPROX 35 RENDER 20mm DRAINED & VENTED CAVITY - BATTENS AT 300-600mm MAX.CTRS.

More information

System for 2+ Level Buildings

System for 2+ Level Buildings Issued Sept 205 Contact Info@symonite.co.nz System for 2+ Level Buildings Typical Details Issued: September 205 TYPICAL DETAILS CONTENTS.0 TYPICAL VERTICAL JOINTS 2.0 EXT. CORNER / TYPICAL HORIZONTAL JOINT

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 1 October 2012 Ver. 1.2 Window Association of New Zealand Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening

More information

TYPICAL BARGE DETAIL - CROSS SECTION

TYPICAL BARGE DETAIL - CROSS SECTION SELECTED OWENS CORNING ASPHALT SHINGLES APPLY A BEAD OF BITUMASTIC ADHESIVE/SEALANT METAL BARGE DRIP EDGE FLASHING No15 RAG FELT ROOF UNDERLAY PLYWOOD ROOF FRAME BARGE BOARD SOFFIT LINING (IF APPLICABLE)

More information

BBS Rusticated & Splaycut Cavity System

BBS Rusticated & Splaycut Cavity System BBS Rusticated & Splaycut Cavity System 2018 www.bbstimbers.co.nz www.cedarcorp.co.nz BBS Rusticated & Splaycut Weatherboard Cavity Wrap System Installation Specifications 1.0 General Information Introduction

More information

The WANZ Guide to Window Installation. as described in E2/AS1 Amendment 7

The WANZ Guide to Window Installation. as described in E2/AS1 Amendment 7 The WANZ Guide to Window Installation as described in E2/AS1 Amendment 7 1 November 2017 Version 1.4 0800 397 263 technical@altus.co.nz The WANZ Guide to Window Installation as described in E2/AS1 Amendment

More information

TARANAKIPINE WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz 1 CONTENTS May 2015 For the latest

More information

Timber Cavity Batten Technical Specifiction

Timber Cavity Batten Technical Specifiction Timber Cavity Batten Technical Specifiction OCTOBER 2016 I NEW ZEALAND Contents 1 APPLICATION AND SCOPE 3 1.1 Application 3 1.2 Scope 3 1.3 Details 3 1.4 Specific Design 3 2 DESIGN 3 2.1 Compliance 3 2.2

More information

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details Vented ridge refer CT02 Substrate Viking SuperStrand or F11 Roofing ply Pipe penetration refer CT15 Valley details refer CT07 and CT08 refer CT17 and CT18 for requirements Drip-edge refer CT01 Barge detail

More information

ALPINE TRAY. To get the best from this product please follow these recommendations.

ALPINE TRAY. To get the best from this product please follow these recommendations. F I X I N G D E TA I L S ALPINE TRAY The standing seam roofing profile is designed to withstand some of New Zealand s harshest weather in our toughest environments. To get the best from this product please

More information

4256HM JAMES HARDIE MONOLITHIC CLADDING

4256HM JAMES HARDIE MONOLITHIC CLADDING 4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James

More information

E2 REDWAY FLASHINGS. Product. Scope. Appraisal No. 977 [2017] Appraisal No. 977 (2017) BRANZ Appraisals

E2 REDWAY FLASHINGS. Product. Scope. Appraisal No. 977 [2017] Appraisal No. 977 (2017) BRANZ Appraisals E2 REDWAY FLASHINGS BRANZ Appraisals Technical Assessments of products for building and construction. Redway Developments Limited 162 Kendal Ave Burnside Christchurch Tel: 03 358 5775 Email: info@e2flashings.co.nz

More information

DW HORIZONTAL INSTALLATION

DW HORIZONTAL INSTALLATION AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S

More information

The Roofing Store TRS 9 35MM 78MM 150MM 78MM PRODUCT TECHNICAL DATA

The Roofing Store TRS 9 35MM 78MM 150MM 78MM PRODUCT TECHNICAL DATA TRS 9 35MM 78MM 150MM 78MM THICKNESS END SPAN INTERNAL SPAN MINIMUM PITCH 0.55MM 2.30M 3.20M 3 DESCRIPTION TRS 9 profile is designed for commercial and industrial roofing. The profile is suitable for low

More information

How-To-build guide Garden shed

How-To-build guide Garden shed How-To-build guide Garden shed What you can build using this guide This guide will show you how to build a re-locatable garden shed. Before you begin building Contact your local territorial authority to

More information

12x12 Shed Plans and Building Guide

12x12 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

10x10 Shed Plans and Building Guide

10x10 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME

More information

8x8 Shed Plans and Building Guide

8x8 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

900 SERIES WALL PANELS

900 SERIES WALL PANELS CI-DS-01-900 CI-PP-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-PJ-03-900 CI-BS-01-900 CI-BS-02-900 CI-BS-03-900 CI-BS-04-900 CI-BS-05-900 CI-OC-01-900 CI-OC-02-900 CI-IC-01-900 CI-FO-01-900 CI-FO-02-900 CI-FO-03-900

More information

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS ADGV_001_FASTPOS Panel Timber Frame 12mm from top edge 600mm MAX CTRS TIMBER STUDS 200 mm MAX CTRS 50mm from corner Fastener Positioning Scale 1:20 No. ADGV_001 ADGV_003_SHTEDGEPOS Centre line of Timber

More information

STOPOREN FACADE SYSTEM DRAWING REGISTER

STOPOREN FACADE SYSTEM DRAWING REGISTER Drawing Description STO DRAWING REGISTER Drawing No. Drawing Register PP 001-006 Introduction Series 000 StoPoren Facade System StoArmat Render System PP 007 StoPoren Facade System StoPoren Render System

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

400 SERIES VERTICAL INSTALLATION

400 SERIES VERTICAL INSTALLATION CI-DS-01-400V CI-PJ-01-400V CI-PJ-02-400V CI-PJ-03-400V CI-BS-01-400V CI-BS-02-400V CI-BS-03-400V CI-BS-04-400V CI-BS-05-400V CI-OC-01-400V CI-OC-02-400V CI-IC-01-400V CI-IC-02-400V CI-FO-01-400V CI-FO-02-400V

More information

6x6 Shed Plans and Building Guide

6x6 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

KS42 MF SERIES - HORIZONTAL INSTALLATION

KS42 MF SERIES - HORIZONTAL INSTALLATION CI-DS-01-KSMF H CI-PJ-01-KSMF H CI-PJ-02-KSMF H CI-PJ-03-KSMF H CI-PJ-04-KSMF H CI-PJ-05-KSMF H CI-PJ-06-KSMF H CI-PJ-07-KSMF H CI-PJ-08-KSMF H CI-PJ-09-KSMF H CI-PJ-10-KSMF H CI-PJ-11-KSMF H CI-PJ-12-KSMF

More information

THIS DRAWING IS INDICATIVE ONLY AND BY NO MEANS COMPREHENSIVE

THIS DRAWING IS INDICATIVE ONLY AND BY NO MEANS COMPREHENSIVE BRANZ Appraised Appraisal No. 547 [2007] NURALITE Nuralite Waterproofing Ltd. 53A Victoria Street, Onehunga, Auckland 1061, Zealand TEL: (64) (9) 579-2046 FAX: (64) (9) 579-5136 email: info@nuralite.co.nz

More information

DW VERTICAL INSTALLATION

DW VERTICAL INSTALLATION AR-PJ-01-DW5V AR-PJ-02-DW5V AR-PJ-03-DW5V AR-PJ-04-DW5V AR-BS-01-DW5V AR-BS-02-DW5V AR-OC-01-DW5V AR-OC-02-DW5V AR-OC-03-DW5V AR-IC-01-DW5V AR-IC-02-DW5V AR-IC-03-DW5V AR-FO-01-DW5V AR-FO-02-DW5V AR-FO-03-DW5V

More information

STEEL FRAMING WEATHERBOARD SYSTEM

STEEL FRAMING WEATHERBOARD SYSTEM T A R A NAK IPINE STEEL FRAMING WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz T A R ANAKIPINE

More information

9.0 PS Pacbld Sidings

9.0 PS Pacbld Sidings The application: 9.0 PS Pacbld Sidings Revision: June 2017 9.0 PS Pacbld Sidings Full Manual Revision: Jun 2017 Contents 1. Product Information 2. Quality Assurance Check Sheet 3. Maintenance 4. Details

More information

DurasheetTM Fibre Cement

DurasheetTM Fibre Cement DurasheetTM Fibre Cement fibre cement sheets Durasheet TM - tough and durable History & Mission BGC Fibre Cement is a proud Australian owned manufacturer of fibre cement products. BGC has state-of-the-art

More information

ThermoSpan EPS. Metalcraft COMMERCIAL ROOFING CREPS. Insulated Panel Systems DETAIL LIST

ThermoSpan EPS. Metalcraft COMMERCIAL ROOFING CREPS. Insulated Panel Systems DETAIL LIST ThermoSpan EPS DETAIL LIST 00 / 15 COVER SHEET 01 / 15 RIDGE DETAIL 02 / 15 HEAD FLASHING DETAIL 03 / 15 EAVES GUTTER DETAIL 04 / 15 INSULATED GUTTER 05 / 15 INSULATED BOX GUTTER 06 / 15 BARGE CAPPING

More information

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25 Installation Manual Pitchglaze Roof Window Contents Contents and introduction 2 Delivery 3 Pre Installation 4 Installation 8 Stage 1. Preparation of the aperture 9 Stage 2. Fitting the Pitchglaze 11 Stage

More information

NULINE PLUS WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 641 [2015]

NULINE PLUS WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 641 [2015] NULINE PLUS WEATHERBOARD This Appraisal replaces BRANZ Appraisal No. 641 (2009). BRANZ Appraisals Technical Assessments of products for building and construction. Appraisal Holder: BGC Fibre Cement Australia

More information

A-lign Technical Manual

A-lign Technical Manual A-lign Technical Manual Bevelback Weatherboard Nail-free Boardface System Solution High Moisture Protection From Renewable Wood Fast Install & Less Waste NZBC Compliant Primed & Undercoated BRANZ Appraised

More information

Shingle Installation Guide

Shingle Installation Guide Installation Guide Roof Framing Information Installation Installation Accessory Installation Estimating Data General Information Roof Framing Information It is the responsibility or roofers, building contractors

More information

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION It is the responsibility or roofers, building

More information

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood

More information

STOLITE CONSTRUCTION SYSTEM EXT.CORNER - MANUF.STONE/STOLITE

STOLITE CONSTRUCTION SYSTEM EXT.CORNER - MANUF.STONE/STOLITE RENDER TIMBER FRAMING WALL UNDERLAY CONTINUOUS AROUND CORNERS, POLYPROPYLENE TAPE APPLIED TO PROTECT WALL UNDERLAY 75mm MIN.WIDE CLIP ON MS SEALANT ON PEF ROD SEALANT TO JUNCTION PROPRIETARY MANUF.STONE

More information

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans 12 X 8 Shed Plans With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans Blueprints And Diagrams Instructions For Building The Shed

More information

MULTI-STORY FIRE STOPPING ASSEMBLY FRAMED OPENING JAMB (LOW CELL) INDEX SHEET

MULTI-STORY FIRE STOPPING ASSEMBLY FRAMED OPENING JAMB (LOW CELL) INDEX SHEET KPH-DS-01-MTLV KPH-PP-01-MTLV KPH-PP-02-MTLV KPH-PJ-01-MTLV KPH-PJ-02-MTLV KPH-PJ-03-MTLV KPH-PJ-04-MTLV KPH-PJ-05-MTLV KPH-FS-01-MTLV KPH-FS-02-MTLV KPH-FS-03-MTLV KPH-BS-01-MTLV KPH-BS-02-MTLV KPH-BS-03-MTLV

More information

Extrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.

Extrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd. Extrusions Updated: N/A Scale: N.T.S REV: - Dwg Dwg Revision Rev No Description Description Date GB-3-IN01 Index Page - - - - - GB-3-001 Extrusions - - - - - GB-3-002 Extrusions - - - - - GB-3-003 Extrusions

More information

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008) SPECIFICATION FOR TEKTON WEATHERIZATION SYSTEM BRANZ Appraisal Certificate # 621 (2008) MW TWS 10/07/2012 Page 1 SYSTEM DESCRIPTION The Tekton Weatherization System consists of TEKTON Wall Underlay, Tekton

More information

THESE DETAILS ARE PROVIDED AS A GUIDELINE FOR PROPER PANEL AND ASSOCIATED COMPONENT INSTALLATION, AND ARE BASED ON INDUSTRY ACCEPTED PRACTICES.

THESE DETAILS ARE PROVIDED AS A GUIDELINE FOR PROPER PANEL AND ASSOCIATED COMPONENT INSTALLATION, AND ARE BASED ON INDUSTRY ACCEPTED PRACTICES. KPV-DS-01-MTLH C & I DISCLAIMER KPV-PJ-01-MTLH EXPANDED PANEL JOINT KPV-PJ-02-MTLH ENGAGED PANEL JOINT KPV-PJ-03-MTLH INTERMEDIATE SUPPORT KPV-FS-01-MTLH MULTI-STORY FIRE STOPPING DETAIL KPV-FS-02-MTLH

More information

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a

More information

THESE DETAILS ARE PROVIDED AS A GUIDELINE FOR PROPER PANEL AND ASSOCIATED COMPONENT INSTALLATION, AND ARE BASED ON INDUSTRY ACCEPTED PRACTICES.

THESE DETAILS ARE PROVIDED AS A GUIDELINE FOR PROPER PANEL AND ASSOCIATED COMPONENT INSTALLATION, AND ARE BASED ON INDUSTRY ACCEPTED PRACTICES. FRKPV-DS-01-MTLH FRKPV-PJ-01-MTLH FRKPV-PJ-02-MTLH FRKPV-PJ-03-MTLH FRKPV-FS-01-MTLH FRKPV-FS-02-MTLH FRKPV-BS-01-MTLH FRKPV-BS-02-MTLH FRKPV-BS-03-MTLH FRKPV-BS-04-MTLH FRKPV-OC-01-MTLH FRKPV-IC-01-MTLH

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM The following guide covers the technique for the Mechanically Fixed System. This system is best employed when an overlay

More information

Installation guide for 20/20

Installation guide for 20/20 Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British

More information

GLOSSARY OF TERMS SECTION 8

GLOSSARY OF TERMS SECTION 8 GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the

More information

L:\Document Control\DR Drafting\Records\Royce\Facades\Plank\US BenchmarkTM By Kingspan 40% RGB Gold 2013.jpg FACADES - BRICK INDEX SHEET

L:\Document Control\DR Drafting\Records\Royce\Facades\Plank\US BenchmarkTM By Kingspan 40% RGB Gold 2013.jpg FACADES - BRICK INDEX SHEET KPV-DS-01-BRH KPV-PJ-01-BRH KPV-PJ-02-BRH KPV-PJ-03-BRH KPV-BS-01-BRH KPV-BS-02-BRH KPV-BS-03-BRH KPV-OC-01-BRH KPV-IC-01-BRH KPV-FO-01-BRH KPV-FO-02-BRH KPV-FO-03-BRH KPV-SJ-01-BRH KPV-PR-01-BRH KPV-LE-01-BRH

More information

HOW TO BUILD A 12X8 SHED

HOW TO BUILD A 12X8 SHED HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D. With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

GV Standard PitchVent

GV Standard PitchVent GV Standard PitchVent Installation Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings. 202-INST v1.0

More information

SpeedDeck. Fixing and Handling Guide

SpeedDeck. Fixing and Handling Guide SpeedDeck Section 1 Delivery/Storing On Site/Handling l SpeedDeck is factory or on-site manufactured. l Straight SpeedDeck bundles are a maximum 1 tonne, sheets nestled and banded with polypropylene or

More information

JAMES HARDIE RIGID AIR BARRIERS

JAMES HARDIE RIGID AIR BARRIERS Product 1.1 James Hardie Rigid Air Barriers are a range of rigid wall underlay materials including RAB Board and HomeRAB Pre-Cladding. They are sealed fibre cement sheets designed for use as rigid wall

More information

TRADE SILL FLASHING TAPE. Product. Scope. Appraisal No. 712 [2012] Appraisal No. 712 (2012) Amended 19 July BRANZ Appraisals

TRADE SILL FLASHING TAPE. Product. Scope. Appraisal No. 712 [2012] Appraisal No. 712 (2012) Amended 19 July BRANZ Appraisals TRADE SILL FLASHING TAPE Amended 19 July 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Marshall Innovations Limited PO Box 9411 Greerton Tauranga Tel: 07 543 0948

More information

PROTECTO SILL WINDOW SEALING SYSTEM. Product. Scope. Appraisal No. 444 [2017]

PROTECTO SILL WINDOW SEALING SYSTEM. Product. Scope. Appraisal No. 444 [2017] PROTECTO SILL WINDOW SEALING SYSTEM This Appraisal replaces BRANZ Appraisal No. 444 (2011) BRANZ Appraisals Technical Assessments of products for building and construction. Marshall Innovations Limited

More information

GV Standard Pitchglaze

GV Standard Pitchglaze GV Standard Pitchglaze Installation Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings. 201-INST-101

More information

NULINE PLUS WEATHERBOARD DIRECT FIXED CLADDING SYSTEM. Product. Scope. Appraisal No. 640 [2015]

NULINE PLUS WEATHERBOARD DIRECT FIXED CLADDING SYSTEM. Product. Scope. Appraisal No. 640 [2015] NULINE PLUS WEATHERBOARD DIRECT FIXED CLADDING This Appraisal replaces BRANZ Appraisal No. 640 (2009). BRANZ Appraisals Technical Assessments of products for building and construction. Appraisal Holder:

More information

TEKTON WEATHERIZATION SYSTEM SPECIFICATION

TEKTON WEATHERIZATION SYSTEM SPECIFICATION MWNZ Tekton Weatherization System AUG 2017 TEKTON WEATHERIZATION SYSTEM SPECIFICATION SYSTEM DESCRIPTION The Tekton Weatherization System consists of TEKTON Wall Underlay, Tekton SEAM TAPE, TRADE-SEAL

More information

Acceptable Standards of Domestic Construction

Acceptable Standards of Domestic Construction Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV

More information

CFDTT-01. Control Joint Study (General)

CFDTT-01. Control Joint Study (General) Trim Method Classic Method Notes: Control joints are required and should be located by the designer at the following locations on the construction documents: 144 sf (13.4 sm) is the maximum overall area

More information

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504 ATTACH TO STRUC- TURE ABOVE 1/8"Ø BOLT W/ LOCKING NUT #12 WIRE TIE IN PLANE EACH TEE ANGLED 45 FROM HORIZ ATTACH 2" FROM INTERSECTION COMPRESSION POST LOCATE WITHIN 2" OF TEE INTERSECTION SIZE STRUTS FOR

More information

DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies

DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies Technical Data Series Revised: 1 January, 2011 Article IX. SECTION 9.01 PERSONAL DOOR CANOPIES...3 SECTION 9.02 ERECTION INSTRUCTIONS...4 SECTION 9.03 ERECTION ILLUSTRATIONS...7 SECTION 9.04 MULL INSTRUCTIONS

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows with nailing fin or primed wood windows with exterior trim. While the

More information

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS General This Installation Instruction document for Owens Corning asphalt roofing shingles is to be read in conjunction with the Installation information printed on each packet of shingles along with the

More information

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction

More information

The better way to build TM. Installation Manual ROOF SIPs

The better way to build TM. Installation Manual ROOF SIPs The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................

More information

900 SERIES PANEL SHEET INDEX STAGGERED ENDLAP STAGGERED MALE LEG AT ENDLAP CONTINUOUS FEMALE ENDLAP INSTALLATION SEQUENCE CI-WR

900 SERIES PANEL SHEET INDEX STAGGERED ENDLAP STAGGERED MALE LEG AT ENDLAP CONTINUOUS FEMALE ENDLAP INSTALLATION SEQUENCE CI-WR 900 SERIES PANEL CI-DS-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-EL-01-900 CI-EL-02-900 CI-EL-03-900 CI-EL-04-900 CI-EL-05-900 CI-EL-06-900 CI-EL-07-900 CI-EL-08-900 CI-RD-01-900 CI-RD-02-900 CI-RD-03-900 CI-EV-01-900

More information

Pebbletex Adhered Mat Design. Typical Details

Pebbletex Adhered Mat Design. Typical Details Pebbletex Adhered Mat Design Typical Details (THIS PAGE INTENTIONALLY LEFT BLANK) Pebbletex Adhered Mat Design TABLE OF CONTENTS 1. Pebbletex Adhered Mat Design Application (Plan VIew) 2. Pebbletex Adhered

More information

IDAHO ASSEMBLY INSTRUCTIONS. BASE SIZE: 1.800m x 1.200m

IDAHO ASSEMBLY INSTRUCTIONS. BASE SIZE: 1.800m x 1.200m IDAHO ASSEMBLY INSTRUCTIONS BASE SIZE: 1.800m x 1.200m IDAHO Tools Required: Battery Drill Riveter Hammer Tape Measure Ladder Skillsaw Level Square Drive Bit No.2 3/8 Hex Drive Bit 8mm Hex Drive Bit Drill

More information

Quick Reference Guide For MoistureFree Certified Inspectors and Contractors

Quick Reference Guide For MoistureFree Certified Inspectors and Contractors Quick Reference Guide For MoistureFree Certified Inspectors and Contractors Topic Page No. Critical Elements Of The Kickout 2 Bad Kickout Examples 3 Raintek Kickout By Demand Products 4 Inspecting and

More information

Dear Contractor, I am glad that you are interested in our window rebate program.

Dear Contractor, I am glad that you are interested in our window rebate program. Dear Contractor, I am glad that you are interested in our window rebate program. I have included three documents with this letter. One is our form to indicate your intention to participate in the program.

More information

YWY M08 The new VELUX solution

YWY M08 The new VELUX solution YWY M08 The new VELUX solution VELUX roof windows and vertical window elements installed as a dormer in roof pitches between 42º and 52º YWY M08 is available as a double or triple unit and can be installed

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

Assembly Book. 10' x 12' the Cambridge II. revised June 13, 2014

Assembly Book. 10' x 12' the Cambridge II. revised June 13, 2014 Assembly Book revised June 13, 2014 the Cambridge II 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the

More information

NEVADA ASSEMBLY INSTRUCTIONS

NEVADA ASSEMBLY INSTRUCTIONS NEVADA ASSEMBLY INSTRUCTIONS BASE SIZE: 2.700m x 1.500m NEVADA Tools Required: Battery Drill Riveter Hammer Tape Measure Ladder Skillsaw Level Screwdriver - Flat 3/8 Hex Drive bit 8mm Hex Drive bit Drill

More information

CROSSBAR RAFTER ISOMETRIC

CROSSBAR RAFTER ISOMETRIC Super Sky Products' typical glazing system consists of glass panels or "lites" which are attached to the main framing members using extruded aluminum "retainers" or "pressure plates". These retainers are

More information

NEW equinox INSTALLATION GUIDE Issue

NEW equinox INSTALLATION GUIDE Issue NEW equinox INSTALLATION GUIDE Issue 1 CONTENTS If in doubt at any stage 1. Preparing the ring beam 2 2. Installing the framework 3 3. Insulation and waterproofing 7 4. Tile application: Steel tiles 9

More information

8 x 10 Timber-frame Garden Shed

8 x 10 Timber-frame Garden Shed 8 x 10 Timber-frame Garden Shed Includes: Step-By-Step Instructions, Complete Details & Materials Lists Timber-framing is a traditional building method that uses a simple framework of heavy timber posts

More information

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11 INSTALLATION MANUAL CONTENTS Important Notes... 2-4 Weather Protective Barriers... 2 Storage and Transportation... 2 Tools and Equipment... 2 Fastener Choices... 3 Wall Preparation... 3,4 Flashing... 4

More information

Integrate the Window and WRB (1/2)

Integrate the Window and WRB (1/2) Window and WRB Installation - Window/WRB. Cut the house wrap flush along all sides of the rough opening.. Slope the sill and flash with flashing tape. Push the tape tight into the corners, being careful

More information

Basic Fitting Details No. 1

Basic Fitting Details No. 1 No. 1 Fixing free edges of flashings A. Clips for flashings over interlocking tiles B. Clip to ridge or hip roll C. Clip to apron flashings Clips should be made from quarter hard copper, 0.6mm thick, terne

More information

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS 2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated

50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated 50948-RHN Putney 06 January 2018 This document includes: Code Section Revision Dated H72 Aluminium strip/ sheet coverings/ flashings 1 Table of Contents Title H72 Aluminium strip/ sheet coverings/ flashings

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary. for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) Thank you for selecting JELD -WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows

More information

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals BASIC REQUIREMENTS Irrespective of the type of pavers or tiles that will be installed over pedestals, the following basic requirement must be met. Decks must be designed not to exceed the load capacity

More information

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip Tolerance Detail (recommended) Verge Closure Verge Channel Verge Clip Verge Flashing VERGE CHANNEL RIVETTED TO EUROSEAM AT APPROX 400MM CENTRES USING 4.8 X 12MM RIVETS. NB: DO NOT RIVET AT HALTER POSITION

More information

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,

More information

TABLE OF CONTENTS A. PBR

TABLE OF CONTENTS A. PBR TABLE OF CONTENTS A. PBR Panel 1. PBR Panel Architect/Engineer Information....................................... 2 2. PBR Panel UL 90 Requirements............................................... 3 3. PBR

More information

METL-VISION WINDOW SYSTEM FOR HORIZONTAL WALL PIONEERING INSULATED METAL PANEL TECHNOLOGY

METL-VISION WINDOW SYSTEM FOR HORIZONTAL WALL PIONEERING INSULATED METAL PANEL TECHNOLOGY METL-VISION WINDOW SYSTEM FOR HORIZONTAL WALL Window assembly GUIDE PIONEERING INSULATED METAL PANEL TECHNOLOGY PIONEERING INSULATED METAL PANEL TECHNOLOGY CONTENTS DETAIL TITLE FILE NO. PAGE NO. INTRODUCTION..................................................................

More information

Recommended Slating Tools

Recommended Slating Tools Recommended Slating Tools Product Size L Sketch of Article No. Description 60-070 Scriber 60-00 Slater s Hammer 60-00 Slater Ripper 60-080 Parallel Shears 60-0 Slate Cutter Kwiksnip Slate Guuillotine Slate

More information

Assembly Book. 10' x 16' the Cambridge II. revised July 15, 2014

Assembly Book. 10' x 16' the Cambridge II. revised July 15, 2014 Assembly Book revised July 15, 2014 the Cambridge II 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the

More information

ASSEMBLY INSTRUCTIONS GG77. BASE SIZE: 2.190m x 2.020m

ASSEMBLY INSTRUCTIONS GG77. BASE SIZE: 2.190m x 2.020m ASSEMBLY INSTRUCTIONS GG77 BASE SIZE: 2.190m x 2.020m CONGRATULATIONS ON PURCHASING A DURATUF GUARDIAN SHED. BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS: BEFORE YOU START: Read all

More information