SCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study
|
|
- Melvyn Watkins
- 6 years ago
- Views:
Transcription
1 SCARSDALE PUBLIC SCHOOLS Greenacres Feasibility Study
2 Committee List Lee Maude Scott Silberfein Stuart Mattey John Trenholm Liz Marrinan Sharon Hill Paul Berger Karen Guardino Carole Phillips Joan Iorio Shoshana Cooper Joan Farella Bob Steves Lynne Clark Paul Hong Xue Su Christa Mruz Jon Singer Amy Nadasdi
3 Process Committee convened to review prior work and to make recommendations to the Board of Education Review Work already completed including: The Building Conditions Analysis Code Analysis Model Program Enrollment projections and Design Options Toured existing facility. A new option, B1, was developed in response to some comments on the original Option B and it was compelling enough to supplant the original Option B. A prioritization process was conducted so that each individual could express their preferences for the options as well as rank the evaluation criteria. Recommendations were drafted and circulated for comment.
4
5 Infrastructure
6 Enrollment Enrollment History and Projections Target Enrollment
7 Design Options Summary REPAIR "AS-IS" OPTION A OPTION B OPTION B1 OPTION C Description Renovate and Update Existing Building. Additions & Alterations to Existing Building Additions & Alterations to Existing Building New Building on Adjacent Site Total Gross Square Footage (GSF) 58,689 58,689 99,675 72,689 84,307 Projected Budget in Millions $ 26.5 $ 39.0 $ 55.9 $ 49.4 $ 56.4 Projected Budget in Millions $25.2 $37.1 $53.1 $46.9 $53.6 Reduced Scope of Infrastructure work includes all HVAC $35.1
8 Option B1 - Site
9 Option B1 Main Floor Plan
10 Option B1 Second Floor Plan
11 Option C - Site
12 Option C Main Floor Plan
13 Option C Second Floor Plan
14 Evaluation Criteria Educational Adequacy Compliance with the model program including appropriate adjacencies and flexibility for a 21 st century educational setting. Building Condition Evaluation - The overall condition of the building or quality of the completed construction including ventilation, air conditioning overall interior environment and durability of building systems. Safety and Security The capability of the project to provide a safe and secure experience for students and staff including arrival, departure and transit to outdoor recreation spaces. Accessibility The ability of the project to fully provide for those with disabilities. Historical and Community Significance Value of the historic qualities of the project including the configuration of fields and open space. Operational Issues including ongoing or Life Cycle costs The total cost of the project over its entire life including ongoing maintenance, utility expenses and financing cost. Disruption during Construction The extent to which the ongoing operation of the school is inconvenienced by the project including use of temporary facilities. Aesthetic Considerations The quality of the overall interior and exterior appearance of the building, site and landscape design including how it relates to the scale and character of the neighborhood. Initial Construction Cost Funds initially approved and expended to construct the entire project. Sustainability The project s environmental footprint taking into account both the embodied energy of existing buildings and the sustainable features of a new or renovated building. Future Expansion Capabilities The ability to add additional capacity.
15 SCARSDALE GREEN ACRES ELEMENTARY - BUILDING COVERAGE AREAS (SF) OPTION A RENOVATE EXISTING OPTION B PROPOSED ADDITION OPTION C PROPOSED NEW SCHOOL SITE COVERAGE 88,081 sf 100,133 sf 108,944 sf BUILDING COVERAGE 46,645 sf 56,175 sf 54,607 sf PLAYGROUNDS 33,250 sf 33,250 sf 30,731 sf SITE COVERAGE AS % OF BUILDING LOT [409,053 sf] 21.5 % 24.5 % 26.6 % PLAYING FIELDS SOCCER FIELD SIZES 21,806 sf 21,806 sf 50,400 sf 22,000 sf 22,000 sf 50,400 sf 33,750 sf 33,750 sf N/A SOCCER SUBTOTAL 77,556 sf 77,556 sf 100,800 sf SOFTBALL FIELD SIZES 87,100 sf 87,100 sf 31,400 sf 31,400 sf 31,400 sf 31,400 sf SOFTBALL SUBTOTAL 118,500 sf 118,500 sf 62,800 sf PLAYING FIELD TOTALS 121,500 sf 121,500 sf 103,073 sf PARKING AREAS PARKING AREA TOTAL 27,092 sf 22,000 sf 44,410 sf # OF SPACES
16 Prioritization Graphs
17 Prioritization Graphs
18 Prioritization Graphs
19 Prioritization Graphs
20 Prioritization Graphs
21 Prioritization Graphs
22 Recommendations Options B1 and C both offer good responses to the many criteria used for evaluation. They should remain in consideration by the Board. The committee agreed that Educational Adequacy and Building Condition were the two most important evaluation criteria. The committee recognized that there was a need for and that there would be opportunities for additional community input. If Option B1 was selected and was only partially implemented due to cost restrictions there was a strong feeling that the initial phase should include all work related to updating the heating and ventilation systems in all parts of the existing building. The committee recommended that the partial closing of Huntington Avenue be explored further independent of the building project planning process. Additional parking should also be explored further independent of the building project planning process. The committee understands that whichever direction is selected there will be further refinement of the design to best meet the District s concerns.
23 Next Steps January Board of Education receives report from Greenacres Re-convened Committee. January/February/March Public Information Forums for Facilities Dec Bond Project Update. May 2017 Project Planning Process and Update. Greenacres Elementary School Planning Process & Update. May Board of Education charges the District Facilities Steering Committee with expectations regarding their study of alternatives for the Greenacres Elementary School building and development of the District Wide Facilities Master Plan. June-November Review of Greenacres issues by a District-Wide Committee in the context of all of the District s building and facilities issues. January 2017 Board of Education finalizes a proposal to put before the voters. May 2017 Public Vote
24
SCARSDALE PUBLIC SCHOOLS
SCARSDALE PUBLIC SCHOOLS GREENACRES FEASIBILITY STUDY PROGRESS REPORT BOARD OF EDUCATION Mary Beth Gose Leila Shames Maude Lewis Leone, Jr. Christopher Morin William Natbony Suzanne Seiden Scott E. Silberfein
More informationAllan Hancock College
Allan Hancock College Project Planning Board Workshop February 17, 2009 Agenda Objective Funding Allocation Space Demand Analysis Project Overview Bond Measure I Program Schedule Charge: To review funding
More informationThe Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011
The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee Clinton Town Hall January 20, 2011 Tonight s Agenda History of Morgan School and of the Building
More informationCentral High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015
275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.
More informationPublic School Facilities Element
Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL
More informationJohn A Johnson Elementary School
740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The
More informationAshby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update
Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR)
More informationHuntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y
Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program
More informationHorace Mann Elementary
2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are
More informationSummerland Planning Advisory Committee
Summerland Planning Advisory Committee SunPAC Meeting #32 May 10, 2011 1 SunPAC Meeting Agenda Call to Order Agenda Item: 1 Item 1: Pledge of allegiance and roll call Item 2: Public comment period Item
More informationResidential Plot Plans
Residential Plot Plans Planning & Development Services/Building Safety Division 1 Riverfront Plaza Ste. 110 Lawrence, KS 66044 (785)832-7700 Fax (785)832-3110 Email: buildinginspections@lawrenceks.org
More informationPublic Art Mural Packet
Public Art Mural Packet October 2016 Thank you for your interest in the process for executing exterior murals on public or private property in within the City of Ashland. The attached documents are intended
More informationCherokee Heights Elementary School
694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationouglas Intermediate School
ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion
More informationHostos Community College Master Plan Amendment
Hostos Community College Master Plan Amendment Prepared for: The City University of New York 1 Introduction College Overview Located in the South Bronx at the nexus of Mott Haven & Melrose neighborhoods
More informationWEST HOLLYWOOD PARK MASTER PLAN 2004
WEST HOLLYWOOD PARK MASTER PLAN 2004 Total of 5.23 acres of uninterrupted grass and trees including playground areas and tree-lined promenades compared with only 1.86 acres of park open space in the existing
More informationPOLICE FACILITY NEEDS ASSESSMENT LAWRENCE, KANSAS
POLICE FACILITY NEEDS ASSESSMENT LAWRENCE, KANSAS THE STUDY PROCESS EXPERIENCE & APPROACH EXISTING FACILITIES STUDY FINDINGS NEXT STEPS EXPERIENCE EXCLUSIVE DEDICATION with LOCAL COMMITMENT METHOD AND
More informationHarding Senior High School
1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to
More informationMinor Site Plan Review Process
Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice
More informationCITY UNIVERSITY CONSTRUCTION FUND 555 W. 57 t h Street, 16 t h Floor, New York, NY 10019
CITY UNIVERSITY CONSTRUCTION FUND 555 W. 57 t h Street, 16 t h Floor, New York, NY 10019 Trustees Present: Hon. Philip Berry, Acting Chairman Hon. Marcella Maxwell Hon. Brian Obergfell Hon. Michael Walsh
More informationOperating Standards Attachment to Development Application
Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS
More informationCAC MEETING, FEB. 28 TH, 2017 NADAAA
ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL
More informationCity Operations / Fiscal Responsibility. Press Briefing August 14, 2008
City Operations / Fiscal Responsibility San Diego Explore Civic the Possibilities Center Complex Press Briefing August 14, 2008 City Operations / Fiscal Responsibility Objective Save Taxpayer Dollars City
More informationPortola Valley Elementary School District: 2017 Revenue Measure Feasibility Survey. October 25, 2017
Portola Valley Elementary School District: 2017 Revenue Measure Feasibility Survey October 25, 2017 Page 1 Overview and Research Objectives Portola Valley Elementary School District commissioned Godbe
More informationPRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.
MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD
More informationToronto Reference Library Premium Rental Space Renovation Award of Tender
STAFF REPORT ACTION REQUIRED 13. Toronto Reference Library Premium Rental Space Renovation Award of Tender Date: February 22, 2016 To: From: Toronto Public Library Board City Librarian SUMMARY The purpose
More informationMIT Capital Renewal. Kevin Connolly Brian Healy Ken Packard Greg Raposa MIT DEPARTMENT OF FACILITIES
MIT Capital Renewal To ensure that MIT s buildings are able to support its mission-critical education, research, and student life activities, the Capital Renewal team creates and implements programs of
More informationMarch 1, Buildings for Our Future: 2016 Update
March 1, 2016 Buildings for Our Future: 2016 Update Buildings For Our Future: Project Objectives Transform five elementary schools in poor and worsening condition into 21st century centers of learning
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationIdaho State Historical Museum Renovation and Addition
Idaho State Historical Museum Renovation and Addition History is essential to understanding America. Lessons from the past enhance historical literacy, create an informed citizenry, deepen our connections
More informationDESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD
ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationSingle Family Design Guidelines Update/ Neighborhood Preservation Ordinance Update ISSUE PAPER A. Definition: Mass, Bulk & Scale
The purpose of this issue paper is to: Single Family Design Guidelines Update/ Neighborhood Preservation Ordinance Update ISSUE PAPER A Definition: Mass, Bulk & Scale clarify current definitions of mass,
More informationSummerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011
Summerland Planning Advisory Committee SunPAC Meeting #31 April 28, 2011 1 SunPAC Meeting Agenda Call to Order Item 1: Pledge of allegiance and roll call Agenda Item: 1 Item 2: Public comment period Item
More informationCity Council Report 915 I Street, 1 st Floor Sacramento, CA
City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-00196 March 20, 2018 Consent Item 14 Title: Contract: Fort Natomas Shade Structure Location: District
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationPUBLIC ART PROGRAM Guidelines for Site Plan Projects
PUBLIC ART PROGRAM Guidelines for Site Plan Projects I. Purpose II. Public Art Policy Goals III. Developer s Options for Public Art IV. Administrative Regulation 4.1 V. Contributing to the Public Art Fund
More informationUNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003
UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C. 20240 October 23, 2003 EMS TRANSMISSION 10/23/2003 Instruction Memorandum No. 2003-275 Change 1 Expires: 09/30/2004 In
More informationWireless Telecommunications Facilities Meeting. Neighborhood Leaders Meeting May 8, 2014
Wireless Telecommunications Facilities Meeting Neighborhood Leaders Meeting May 8, 2014 Agenda Welcome and Introductions Project Overview Process and Schedule Wireless Concepts and Terminology Overview
More information2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment
2.8 NOISE 2.8.1 CONSTRUCTION NOISE The noise impacts are not adequately addressed or studied in the DEIR, as there appears to be no analysis at all of potential noise level increases as measured from locations
More informationThe Tri-State Transit Authority
The Tri-State Transit Authority Finding Creative Pockets for Funding By: Paul Davis, General Manager and CEO 8/11/2016 Tri-State Transit Authority 1 Goals 1. Give SUN attendees history of TTA & overview
More informationRequired Supporting Information and Documentation for Historic Preservation Certification Applications
Required Supporting Information and Documentation for Historic Preservation Certification Applications Part 1 Submittal- Evaluation of Significance Descriptive Information Describe the major features of
More informationCITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY
CITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY The following acquisition policy provides a framework for decisions relating to the duties and responsibilities of the Visual Arts Commission
More informationINCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $
CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Port Orchard, WA 98366 (360) 874-5533 permitcenter@cityofportorchard.us COMMERCIAL or MULTI-FAMILY
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12
More informationWhere To Start: Collegiate Space Needs & Planning Standards
Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Space Needs & Planning Standards Stephen E. DeHekker, AIA, LEED AP BD+C Senior Vice President James Gabel, AIA, LEED AP Senior
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Target Value Design Case Study
More informationPUBLIC ART SOSIP DRAFT OF JUNE 24.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 PUBLIC ART SOSIP DRAFT OF JUNE 24. PRINCIPLE CONSIDERATIONS Public art can delight and engage
More informationPlanning and Zoning Application & Checklist
City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW
More informationCONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017
CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC Prepared for: CSX Transportation Prepared by: Gannett Fleming Inc. May 2017
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationEnvironmental Permit Performance: Report for Fiscal Year 2015
MINNESOTA DEPARTMENT OF NATURAL RESOURCES Environmental Permit Performance: Report for Fiscal Year 2015 150-Day and 90-Day Permit Decision Goals August 1, 2015 This report was prepared as required by Minnesota
More informationTown of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019
Town of Belmont, NH Town Space Needs and Feasibility Study January 10, 2019 Police Department EXISTING POLICE DEPARTMENT FULLER STREET MEETING HOUSE SARGENT STREET TOWN OF BELMONT POLICE DEPARTMENT EXISTING
More informationThe PLAN The ReALITY The ReMeDY
The PLAN The REALITY The REMEDY PRZ s (Prescription Root Zone) Sports Field Assessment utilizes the following tools to produce an objective study of your sports fields: Initial site evaluation Our comprehensive
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationSUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION
STAFF REPORT MEETING DATE: August 20, 2013 TO: City Council 75 Rowland Way #200 Novato, CA 94945-3232 (415) 899-8900 FAX (415) 899-8213 www.novato.org FROM: James Berg, Chief of Police SUBJECT: MARIN EMERGENCY
More informationGREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM
Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION
More informationNDUS/UND IT Facility Office Building/Data Center
NDUS/UND IT Facility Building/Data Center Building Option 3 $9,133,128 Data Center $4,937,500 Tier 2 to Tier 3 (add on) $1,356,250 Total $15,426,878 Legislative Appropriation $12,500,000 Difference $2,926,878
More informationSUBJECT: JOHN D. MACARTHUR CAMPUS MASTER PLAN AMENDMENT
Item: IV. SP: A-2 Wednesday, June 27, 2007 SUBJECT: JOHN D. MACARTHUR CAMPUS MASTER PLAN AMENDMENT PROPOSED BOARD ACTION To approve the University Architect s Office Division of Facilities to initiate
More informationPROPOSAL FOR REVIEW AND COMMENT
PROPOSAL FOR REVIEW AND COMMENT September 18, 2017 SUBMITTED TO: MINNESOTA DEPARTMENT OF EDUCATION SUBMITTED BY: INDEPENDENT SCHOOL DISTRICT #518 WORTHINGTON SCHOOL DISTRICT 1117 MARINE AVENUE WORTHINGTON,
More informationPAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING
PAR AG presentation May 8 2018 agenda 1 project scope 2 site design 3 building design 4 budget and schedule 5 questions & answers A beautiful site project key data o o o o Capacity: 700 students Class
More informationOld School Square Historic Arts District (OSSHAD)
SECTION 4.4.24 Section 4.4.24 Old School Square Historic Arts District (OSSHAD) (A) Purpose and Intent: The Old School Square Historic Arts District (OSSHAD) is a mixed use district which is intended to:
More informationCommittee on Development and Intellectual Property (CDIP)
E CDIP/10/13 ORIGINAL: ENGLISH DATE: OCTOBER 5, 2012 Committee on Development and Intellectual Property (CDIP) Tenth Session Geneva, November 12 to 16, 2012 DEVELOPING TOOLS FOR ACCESS TO PATENT INFORMATION
More informationGREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study
GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON
More informationINTERIOR SIGNAGE MANUAL
INTERIOR SIGNAGE MANUAL ➊ Purpose ➋ Procedures ➌ ADA Requirements INTERIOR SIGNAGE MANUAL ➍ Text, Braille, Pictograms and Color ➎ Families of Interior Signage ➏ Mounting Guidelines ➐ Signage Diagrams ➑
More informationPUBLIC SCHOOL FACILITIES ELEMENT
PUBLIC SCHOOL FACILITIES ELEMENT of the PINELLAS COUNTY COMPREHENSIVE PLAN Prepared By: The Pinellas County Planning Department as staff to the LOCAL PLANNING AGENCY for THE BOARD OF COUNTY COMMISSIONERS
More informationPismo Beach Public Art Program Outline
Pismo Beach Public Art Program Outline What is the Pismo Beach Public Art Program? The Pismo Beach Public Art Program is a means to incorporate art within new and existing developments or publically owned
More informationDRAFT For Discussion Purposes. Las Vegas Stadium Alternative Funding Concept
DRAFT For Discussion Purposes Las Vegas Stadium Alternative Funding Concept State of Nevada Creates Stadium Authority via State Legislation Proposed Stadium Corporate Structure Clark County (TBD) $750M
More informationCheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT
Cheney Building & Bennet Academy own of Manchester Phase 1 Study Presentation - April 10, 2013 Schools Modernization & Reinvestment eam Revisited Board of Directors Board of Education DRAF ai Soo Kim Partners
More informationM E M O R A N D U M. NFPA Technical Committee on Assembly Occupancies and Membrane Structures. NFPA 101 ROP Letter Ballot Circulation
M E M O R A N D U M TO: FROM: NFPA Technical Committee on Assembly Occupancies and Membrane Structures Linda MacKay DATE: January 12, 2010 SUBJECT: NFPA 101 ROP Letter Ballot Circulation The January 11
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2825
More informationCITY OF HANOVER ECONOMIC DEVELOPMENT AUTHORITY MINUTES June 14, 2012
President Todd Bartels called the Economic Development Authority meeting of to order at 8:00am at Hanover City Hall. Commissioners present were: Bartels, Randy Whitcomb, Chris Kauffman (arrived at 8:03am),
More informationItem 2. September 28, 2017
September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project
More informationCHAPTER A-15 INTERIOR DESIGN INDEX
CHAPTER A-15 INTERIOR DESIGN Revised December 2011 INDEX 15.1 GENERAL 15.1.1 Scope 15.1.2 Quality 15.1.3 Sustainable Design 15.1.4 Multiple Buildings 15.1.5 Site Adapting 15.1.6 Renovations 15.2 APPLICABLE
More informationTransportation. Growth Management Policy Board April 4, 2019
Transportation Growth Management Policy Board April 4, 2019 Overview Transportation in VISION 2040 Changes since the adoption of VISION 2040 Feedback to date Potential updates to the Transportation chapter
More informationJoint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building
Joint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building City of Tacoma Steve Victor, Deputy City Attorney 253-591-5638 svictor@ci.tacoma.wa.us Pierce
More informationCOUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT
ITEM # 28 _ DATE: 03/06/18 COUNCIL ACTION FORM SUBJECT: WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT BACKGROUND: The operation of wireless communication facilities are licensed and regulated by the
More information1222 First Avenue, San Diego, CA Cycle Distributed: 11/07/2014
Cycle s Project Information Project Nbr: 379530 Title: Living Green Coop MMCC Project Mgr: Gutierrez, Edith (619) 446-5147 egutierrez@sandiego.gov Page 1 of 6 *379530* Reviewing Discipline: LDR-Planning
More informationRiverside, California A Local Government CEQA Perspective
Historic Resources and CEQA Workshop 6/21/2012 Riverside, California A Local Government CEQA Perspective Erin Gettis, Associate AIA City Historic Preservation Officer and Principal Planner CEQA and Cultural
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 16, 2016 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Robert Garcia, Senior
More informationPlan Peoria AZ 2040 General Plan Update. Public Workshop #2: Presentation June 5, 2017
Plan Peoria AZ 2040 General Plan Update Public Workshop #2: Presentation June 5, 2017 Introductions City of Peoria Planning Staff Chris Jacques, AICP Planning Director Lorie Dever Senior Planner (Project
More informationLEED Council Available Properties in the Addison and North Branch Industrial Corridors (Source: Property Listings from Listing Broker)
LEED Council Available Properties in the Addison and North Branch Industrial Corridors (Source: Property Listings from Listing Broker) Addison Industrial Corridor Area Location: Lease/Sale 4141 N. Rockwell
More informationPlanning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)
Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) 415 W 6 th ST ~ Vancouver, WA 98660 PO Box 1995 ~ Vancouver, WA 98668 Phone (360) 487-7800 www.cityofvancouver.us Type Of Work Type I
More informationObjective 3.1: Provide or stimulate provision by the private sector of affordable housing units.
3. HOUSING ELEMENT The purpose of this element is to provide plans and policies that will assist the City in meeting identified or projected deficits in the supply of housing, correcting substandard or
More informationSt. John Paul II Catholic Parish
St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not
More informationZONING R-LI Low Intensity Residential District. [Amended by Ord. No. 1684] PERMITTED USES BY RIGHT.
130.19. R-LI Low Intensity Residential District. [Amended 10-2-95 by Ord. No. 1684] 130.19.1. Purpose. To preserve steep slopes, floodplains, and other sensitive natural areas and to provide opportunities
More informationZONING TEXT. Planned Development District General Development Plan Madison Yards at Hill Farms Redevelopment 4802 Sheboygan Ave
ZONING TEXT Planned Development District General Development Plan Redevelopment 4802 Sheboygan Ave Legal Description: The lands subject to this Planned Development (PD) District shall include those described
More informationAgenda Forsyth County Historic Resources Commission
Agenda Forsyth County Historic Resources Commission September 3, 2008 4:00 P.M. Bryce A. Stuart Municipal Building Public Meeting Room, Room 530 100 East First Street, Winston-Salem I. APPROVAL OF AUGUST
More informationDistrict of Columbia Power Line Undergrounding (DC PLUG) Initiative
District of Columbia Power Line Undergrounding (DC PLUG) Initiative Community Hearing 125 Michigan Avenue, NE Washington, DC 20017 Presented by: Aaron Smith (Pepco), Ronald Williams (DDOT) and Morgan O
More informationCommittee Members: CALL TO ORDER (5:31:24) Chairperson Lehmann called the meeting to order at 5:31 p.m.
MINUTES Regular Meeting Carson City Parks and Recreation Commission Tuesday, August 5, 2014 5:30 PM Community Center Sierra Room 851 East William Street, Carson City, Nevada Committee Members: Chair Sean
More informationSpace Utilization Not just for classrooms anymore
Space Utilization Not just for classrooms anymore Annie Newman Bob Boes 1 Who s heard this? Campus research space is significantly overcrowded. I m sure that is hoarding space. We just
More informationSnohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017
Review the Process Building Assessment Prioritize into Tiered Matrix Develop Cost Estimate per Scope Items Schematic Design Renovation + Addition Schematic Drawings Interior + Exterior Perspectives Recommendations
More informationTOWN OF NORTH BRANFORD
TOWN OF NORTH BRANFORD Town Hall 909 Foxon Road P.O. Box 287 North Branford, Connecticut 06471 Planning & Zoning (203) 484-6010 Building Department (203) 484-6008 Department Fax (203) 484-6018 INSTRUCTIONS
More informationUsing the PI System to Create a Smart Campus that Optimizes Energy and Water Operations
1 Using the PI System to Create a Smart Campus that Optimizes Energy and Water Operations Presented by Elena Thomsen Dan Colvin Sweta Agarwal Presentation Contents About UC Davis: a Utility and Customer
More informationPresentation for. Raymond E. Shaw Elementary School Building Committee
Presentation for Raymond E. Shaw Elementary School Building Committee 11.01.2018 AGENDA 1. School Tour Penn Brook School 2. Design Options with Cost 3. Schedule School Tour Penn Brook School, Georgetown,
More informationQUINCY/ADAMS COUNTY 9-1-1
QUINCY/ADAMS COUNTY 9-1-1 Steve Rowlands 222 N. 52 nd Street (217) 228-4572 Director Quincy, Illinois 62305 Fax: 222-9361 QUINCY/ADAMS COUNTY 9-1-1 GOVERNING BOARD MEETING Minutes January 16, 2008 9-1-1
More informationa. Experience in providing services to school districts and other governmental
Response of Kawahara Law, a Professional Corporation to the West Contra Costa Unified School District s Request for Qualifications for Special Counsel to the Board of Education A. Background Information
More information