SCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study

Size: px
Start display at page:

Download "SCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study"

Transcription

1 SCARSDALE PUBLIC SCHOOLS Greenacres Feasibility Study

2 Committee List Lee Maude Scott Silberfein Stuart Mattey John Trenholm Liz Marrinan Sharon Hill Paul Berger Karen Guardino Carole Phillips Joan Iorio Shoshana Cooper Joan Farella Bob Steves Lynne Clark Paul Hong Xue Su Christa Mruz Jon Singer Amy Nadasdi

3 Process Committee convened to review prior work and to make recommendations to the Board of Education Review Work already completed including: The Building Conditions Analysis Code Analysis Model Program Enrollment projections and Design Options Toured existing facility. A new option, B1, was developed in response to some comments on the original Option B and it was compelling enough to supplant the original Option B. A prioritization process was conducted so that each individual could express their preferences for the options as well as rank the evaluation criteria. Recommendations were drafted and circulated for comment.

4

5 Infrastructure

6 Enrollment Enrollment History and Projections Target Enrollment

7 Design Options Summary REPAIR "AS-IS" OPTION A OPTION B OPTION B1 OPTION C Description Renovate and Update Existing Building. Additions & Alterations to Existing Building Additions & Alterations to Existing Building New Building on Adjacent Site Total Gross Square Footage (GSF) 58,689 58,689 99,675 72,689 84,307 Projected Budget in Millions $ 26.5 $ 39.0 $ 55.9 $ 49.4 $ 56.4 Projected Budget in Millions $25.2 $37.1 $53.1 $46.9 $53.6 Reduced Scope of Infrastructure work includes all HVAC $35.1

8 Option B1 - Site

9 Option B1 Main Floor Plan

10 Option B1 Second Floor Plan

11 Option C - Site

12 Option C Main Floor Plan

13 Option C Second Floor Plan

14 Evaluation Criteria Educational Adequacy Compliance with the model program including appropriate adjacencies and flexibility for a 21 st century educational setting. Building Condition Evaluation - The overall condition of the building or quality of the completed construction including ventilation, air conditioning overall interior environment and durability of building systems. Safety and Security The capability of the project to provide a safe and secure experience for students and staff including arrival, departure and transit to outdoor recreation spaces. Accessibility The ability of the project to fully provide for those with disabilities. Historical and Community Significance Value of the historic qualities of the project including the configuration of fields and open space. Operational Issues including ongoing or Life Cycle costs The total cost of the project over its entire life including ongoing maintenance, utility expenses and financing cost. Disruption during Construction The extent to which the ongoing operation of the school is inconvenienced by the project including use of temporary facilities. Aesthetic Considerations The quality of the overall interior and exterior appearance of the building, site and landscape design including how it relates to the scale and character of the neighborhood. Initial Construction Cost Funds initially approved and expended to construct the entire project. Sustainability The project s environmental footprint taking into account both the embodied energy of existing buildings and the sustainable features of a new or renovated building. Future Expansion Capabilities The ability to add additional capacity.

15 SCARSDALE GREEN ACRES ELEMENTARY - BUILDING COVERAGE AREAS (SF) OPTION A RENOVATE EXISTING OPTION B PROPOSED ADDITION OPTION C PROPOSED NEW SCHOOL SITE COVERAGE 88,081 sf 100,133 sf 108,944 sf BUILDING COVERAGE 46,645 sf 56,175 sf 54,607 sf PLAYGROUNDS 33,250 sf 33,250 sf 30,731 sf SITE COVERAGE AS % OF BUILDING LOT [409,053 sf] 21.5 % 24.5 % 26.6 % PLAYING FIELDS SOCCER FIELD SIZES 21,806 sf 21,806 sf 50,400 sf 22,000 sf 22,000 sf 50,400 sf 33,750 sf 33,750 sf N/A SOCCER SUBTOTAL 77,556 sf 77,556 sf 100,800 sf SOFTBALL FIELD SIZES 87,100 sf 87,100 sf 31,400 sf 31,400 sf 31,400 sf 31,400 sf SOFTBALL SUBTOTAL 118,500 sf 118,500 sf 62,800 sf PLAYING FIELD TOTALS 121,500 sf 121,500 sf 103,073 sf PARKING AREAS PARKING AREA TOTAL 27,092 sf 22,000 sf 44,410 sf # OF SPACES

16 Prioritization Graphs

17 Prioritization Graphs

18 Prioritization Graphs

19 Prioritization Graphs

20 Prioritization Graphs

21 Prioritization Graphs

22 Recommendations Options B1 and C both offer good responses to the many criteria used for evaluation. They should remain in consideration by the Board. The committee agreed that Educational Adequacy and Building Condition were the two most important evaluation criteria. The committee recognized that there was a need for and that there would be opportunities for additional community input. If Option B1 was selected and was only partially implemented due to cost restrictions there was a strong feeling that the initial phase should include all work related to updating the heating and ventilation systems in all parts of the existing building. The committee recommended that the partial closing of Huntington Avenue be explored further independent of the building project planning process. Additional parking should also be explored further independent of the building project planning process. The committee understands that whichever direction is selected there will be further refinement of the design to best meet the District s concerns.

23 Next Steps January Board of Education receives report from Greenacres Re-convened Committee. January/February/March Public Information Forums for Facilities Dec Bond Project Update. May 2017 Project Planning Process and Update. Greenacres Elementary School Planning Process & Update. May Board of Education charges the District Facilities Steering Committee with expectations regarding their study of alternatives for the Greenacres Elementary School building and development of the District Wide Facilities Master Plan. June-November Review of Greenacres issues by a District-Wide Committee in the context of all of the District s building and facilities issues. January 2017 Board of Education finalizes a proposal to put before the voters. May 2017 Public Vote

24

SCARSDALE PUBLIC SCHOOLS

SCARSDALE PUBLIC SCHOOLS SCARSDALE PUBLIC SCHOOLS GREENACRES FEASIBILITY STUDY PROGRESS REPORT BOARD OF EDUCATION Mary Beth Gose Leila Shames Maude Lewis Leone, Jr. Christopher Morin William Natbony Suzanne Seiden Scott E. Silberfein

More information

Allan Hancock College

Allan Hancock College Allan Hancock College Project Planning Board Workshop February 17, 2009 Agenda Objective Funding Allocation Space Demand Analysis Project Overview Bond Measure I Program Schedule Charge: To review funding

More information

The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011

The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011 The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee Clinton Town Hall January 20, 2011 Tonight s Agenda History of Morgan School and of the Building

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

John A Johnson Elementary School

John A Johnson Elementary School 740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The

More information

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR)

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

Horace Mann Elementary

Horace Mann Elementary 2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are

More information

Summerland Planning Advisory Committee

Summerland Planning Advisory Committee Summerland Planning Advisory Committee SunPAC Meeting #32 May 10, 2011 1 SunPAC Meeting Agenda Call to Order Agenda Item: 1 Item 1: Pledge of allegiance and roll call Item 2: Public comment period Item

More information

Residential Plot Plans

Residential Plot Plans Residential Plot Plans Planning & Development Services/Building Safety Division 1 Riverfront Plaza Ste. 110 Lawrence, KS 66044 (785)832-7700 Fax (785)832-3110 Email: buildinginspections@lawrenceks.org

More information

Public Art Mural Packet

Public Art Mural Packet Public Art Mural Packet October 2016 Thank you for your interest in the process for executing exterior murals on public or private property in within the City of Ashland. The attached documents are intended

More information

Cherokee Heights Elementary School

Cherokee Heights Elementary School 694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

ouglas Intermediate School

ouglas Intermediate School ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion

More information

Hostos Community College Master Plan Amendment

Hostos Community College Master Plan Amendment Hostos Community College Master Plan Amendment Prepared for: The City University of New York 1 Introduction College Overview Located in the South Bronx at the nexus of Mott Haven & Melrose neighborhoods

More information

WEST HOLLYWOOD PARK MASTER PLAN 2004

WEST HOLLYWOOD PARK MASTER PLAN 2004 WEST HOLLYWOOD PARK MASTER PLAN 2004 Total of 5.23 acres of uninterrupted grass and trees including playground areas and tree-lined promenades compared with only 1.86 acres of park open space in the existing

More information

POLICE FACILITY NEEDS ASSESSMENT LAWRENCE, KANSAS

POLICE FACILITY NEEDS ASSESSMENT LAWRENCE, KANSAS POLICE FACILITY NEEDS ASSESSMENT LAWRENCE, KANSAS THE STUDY PROCESS EXPERIENCE & APPROACH EXISTING FACILITIES STUDY FINDINGS NEXT STEPS EXPERIENCE EXCLUSIVE DEDICATION with LOCAL COMMITMENT METHOD AND

More information

Harding Senior High School

Harding Senior High School 1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to

More information

Minor Site Plan Review Process

Minor Site Plan Review Process Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice

More information

CITY UNIVERSITY CONSTRUCTION FUND 555 W. 57 t h Street, 16 t h Floor, New York, NY 10019

CITY UNIVERSITY CONSTRUCTION FUND 555 W. 57 t h Street, 16 t h Floor, New York, NY 10019 CITY UNIVERSITY CONSTRUCTION FUND 555 W. 57 t h Street, 16 t h Floor, New York, NY 10019 Trustees Present: Hon. Philip Berry, Acting Chairman Hon. Marcella Maxwell Hon. Brian Obergfell Hon. Michael Walsh

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS

More information

CAC MEETING, FEB. 28 TH, 2017 NADAAA

CAC MEETING, FEB. 28 TH, 2017 NADAAA ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL

More information

City Operations / Fiscal Responsibility. Press Briefing August 14, 2008

City Operations / Fiscal Responsibility. Press Briefing August 14, 2008 City Operations / Fiscal Responsibility San Diego Explore Civic the Possibilities Center Complex Press Briefing August 14, 2008 City Operations / Fiscal Responsibility Objective Save Taxpayer Dollars City

More information

Portola Valley Elementary School District: 2017 Revenue Measure Feasibility Survey. October 25, 2017

Portola Valley Elementary School District: 2017 Revenue Measure Feasibility Survey. October 25, 2017 Portola Valley Elementary School District: 2017 Revenue Measure Feasibility Survey October 25, 2017 Page 1 Overview and Research Objectives Portola Valley Elementary School District commissioned Godbe

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

Toronto Reference Library Premium Rental Space Renovation Award of Tender

Toronto Reference Library Premium Rental Space Renovation Award of Tender STAFF REPORT ACTION REQUIRED 13. Toronto Reference Library Premium Rental Space Renovation Award of Tender Date: February 22, 2016 To: From: Toronto Public Library Board City Librarian SUMMARY The purpose

More information

MIT Capital Renewal. Kevin Connolly Brian Healy Ken Packard Greg Raposa MIT DEPARTMENT OF FACILITIES

MIT Capital Renewal. Kevin Connolly Brian Healy Ken Packard Greg Raposa MIT DEPARTMENT OF FACILITIES MIT Capital Renewal To ensure that MIT s buildings are able to support its mission-critical education, research, and student life activities, the Capital Renewal team creates and implements programs of

More information

March 1, Buildings for Our Future: 2016 Update

March 1, Buildings for Our Future: 2016 Update March 1, 2016 Buildings for Our Future: 2016 Update Buildings For Our Future: Project Objectives Transform five elementary schools in poor and worsening condition into 21st century centers of learning

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Idaho State Historical Museum Renovation and Addition

Idaho State Historical Museum Renovation and Addition Idaho State Historical Museum Renovation and Addition History is essential to understanding America. Lessons from the past enhance historical literacy, create an informed citizenry, deepen our connections

More information

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Single Family Design Guidelines Update/ Neighborhood Preservation Ordinance Update ISSUE PAPER A. Definition: Mass, Bulk & Scale

Single Family Design Guidelines Update/ Neighborhood Preservation Ordinance Update ISSUE PAPER A. Definition: Mass, Bulk & Scale The purpose of this issue paper is to: Single Family Design Guidelines Update/ Neighborhood Preservation Ordinance Update ISSUE PAPER A Definition: Mass, Bulk & Scale clarify current definitions of mass,

More information

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011 Summerland Planning Advisory Committee SunPAC Meeting #31 April 28, 2011 1 SunPAC Meeting Agenda Call to Order Item 1: Pledge of allegiance and roll call Agenda Item: 1 Item 2: Public comment period Item

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-00196 March 20, 2018 Consent Item 14 Title: Contract: Fort Natomas Shade Structure Location: District

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

PUBLIC ART PROGRAM Guidelines for Site Plan Projects

PUBLIC ART PROGRAM Guidelines for Site Plan Projects PUBLIC ART PROGRAM Guidelines for Site Plan Projects I. Purpose II. Public Art Policy Goals III. Developer s Options for Public Art IV. Administrative Regulation 4.1 V. Contributing to the Public Art Fund

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C. 20240 October 23, 2003 EMS TRANSMISSION 10/23/2003 Instruction Memorandum No. 2003-275 Change 1 Expires: 09/30/2004 In

More information

Wireless Telecommunications Facilities Meeting. Neighborhood Leaders Meeting May 8, 2014

Wireless Telecommunications Facilities Meeting. Neighborhood Leaders Meeting May 8, 2014 Wireless Telecommunications Facilities Meeting Neighborhood Leaders Meeting May 8, 2014 Agenda Welcome and Introductions Project Overview Process and Schedule Wireless Concepts and Terminology Overview

More information

2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment

2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment 2.8 NOISE 2.8.1 CONSTRUCTION NOISE The noise impacts are not adequately addressed or studied in the DEIR, as there appears to be no analysis at all of potential noise level increases as measured from locations

More information

The Tri-State Transit Authority

The Tri-State Transit Authority The Tri-State Transit Authority Finding Creative Pockets for Funding By: Paul Davis, General Manager and CEO 8/11/2016 Tri-State Transit Authority 1 Goals 1. Give SUN attendees history of TTA & overview

More information

Required Supporting Information and Documentation for Historic Preservation Certification Applications

Required Supporting Information and Documentation for Historic Preservation Certification Applications Required Supporting Information and Documentation for Historic Preservation Certification Applications Part 1 Submittal- Evaluation of Significance Descriptive Information Describe the major features of

More information

CITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY

CITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY CITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY The following acquisition policy provides a framework for decisions relating to the duties and responsibilities of the Visual Arts Commission

More information

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $ CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Port Orchard, WA 98366 (360) 874-5533 permitcenter@cityofportorchard.us COMMERCIAL or MULTI-FAMILY

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

Where To Start: Collegiate Space Needs & Planning Standards

Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Space Needs & Planning Standards Stephen E. DeHekker, AIA, LEED AP BD+C Senior Vice President James Gabel, AIA, LEED AP Senior

More information

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Target Value Design Case Study

More information

PUBLIC ART SOSIP DRAFT OF JUNE 24.

PUBLIC ART SOSIP DRAFT OF JUNE 24. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 PUBLIC ART SOSIP DRAFT OF JUNE 24. PRINCIPLE CONSIDERATIONS Public art can delight and engage

More information

Planning and Zoning Application & Checklist

Planning and Zoning Application & Checklist City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW

More information

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC Prepared for: CSX Transportation Prepared by: Gannett Fleming Inc. May 2017

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

Environmental Permit Performance: Report for Fiscal Year 2015

Environmental Permit Performance: Report for Fiscal Year 2015 MINNESOTA DEPARTMENT OF NATURAL RESOURCES Environmental Permit Performance: Report for Fiscal Year 2015 150-Day and 90-Day Permit Decision Goals August 1, 2015 This report was prepared as required by Minnesota

More information

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019 Town of Belmont, NH Town Space Needs and Feasibility Study January 10, 2019 Police Department EXISTING POLICE DEPARTMENT FULLER STREET MEETING HOUSE SARGENT STREET TOWN OF BELMONT POLICE DEPARTMENT EXISTING

More information

The PLAN The ReALITY The ReMeDY

The PLAN The ReALITY The ReMeDY The PLAN The REALITY The REMEDY PRZ s (Prescription Root Zone) Sports Field Assessment utilizes the following tools to produce an objective study of your sports fields: Initial site evaluation Our comprehensive

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION STAFF REPORT MEETING DATE: August 20, 2013 TO: City Council 75 Rowland Way #200 Novato, CA 94945-3232 (415) 899-8900 FAX (415) 899-8213 www.novato.org FROM: James Berg, Chief of Police SUBJECT: MARIN EMERGENCY

More information

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION

More information

NDUS/UND IT Facility Office Building/Data Center

NDUS/UND IT Facility Office Building/Data Center NDUS/UND IT Facility Building/Data Center Building Option 3 $9,133,128 Data Center $4,937,500 Tier 2 to Tier 3 (add on) $1,356,250 Total $15,426,878 Legislative Appropriation $12,500,000 Difference $2,926,878

More information

SUBJECT: JOHN D. MACARTHUR CAMPUS MASTER PLAN AMENDMENT

SUBJECT: JOHN D. MACARTHUR CAMPUS MASTER PLAN AMENDMENT Item: IV. SP: A-2 Wednesday, June 27, 2007 SUBJECT: JOHN D. MACARTHUR CAMPUS MASTER PLAN AMENDMENT PROPOSED BOARD ACTION To approve the University Architect s Office Division of Facilities to initiate

More information

PROPOSAL FOR REVIEW AND COMMENT

PROPOSAL FOR REVIEW AND COMMENT PROPOSAL FOR REVIEW AND COMMENT September 18, 2017 SUBMITTED TO: MINNESOTA DEPARTMENT OF EDUCATION SUBMITTED BY: INDEPENDENT SCHOOL DISTRICT #518 WORTHINGTON SCHOOL DISTRICT 1117 MARINE AVENUE WORTHINGTON,

More information

PAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING

PAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING PAR AG presentation May 8 2018 agenda 1 project scope 2 site design 3 building design 4 budget and schedule 5 questions & answers A beautiful site project key data o o o o Capacity: 700 students Class

More information

Old School Square Historic Arts District (OSSHAD)

Old School Square Historic Arts District (OSSHAD) SECTION 4.4.24 Section 4.4.24 Old School Square Historic Arts District (OSSHAD) (A) Purpose and Intent: The Old School Square Historic Arts District (OSSHAD) is a mixed use district which is intended to:

More information

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP) E CDIP/10/13 ORIGINAL: ENGLISH DATE: OCTOBER 5, 2012 Committee on Development and Intellectual Property (CDIP) Tenth Session Geneva, November 12 to 16, 2012 DEVELOPING TOOLS FOR ACCESS TO PATENT INFORMATION

More information

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON

More information

INTERIOR SIGNAGE MANUAL

INTERIOR SIGNAGE MANUAL INTERIOR SIGNAGE MANUAL ➊ Purpose ➋ Procedures ➌ ADA Requirements INTERIOR SIGNAGE MANUAL ➍ Text, Braille, Pictograms and Color ➎ Families of Interior Signage ➏ Mounting Guidelines ➐ Signage Diagrams ➑

More information

PUBLIC SCHOOL FACILITIES ELEMENT

PUBLIC SCHOOL FACILITIES ELEMENT PUBLIC SCHOOL FACILITIES ELEMENT of the PINELLAS COUNTY COMPREHENSIVE PLAN Prepared By: The Pinellas County Planning Department as staff to the LOCAL PLANNING AGENCY for THE BOARD OF COUNTY COMMISSIONERS

More information

Pismo Beach Public Art Program Outline

Pismo Beach Public Art Program Outline Pismo Beach Public Art Program Outline What is the Pismo Beach Public Art Program? The Pismo Beach Public Art Program is a means to incorporate art within new and existing developments or publically owned

More information

DRAFT For Discussion Purposes. Las Vegas Stadium Alternative Funding Concept

DRAFT For Discussion Purposes. Las Vegas Stadium Alternative Funding Concept DRAFT For Discussion Purposes Las Vegas Stadium Alternative Funding Concept State of Nevada Creates Stadium Authority via State Legislation Proposed Stadium Corporate Structure Clark County (TBD) $750M

More information

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT Cheney Building & Bennet Academy own of Manchester Phase 1 Study Presentation - April 10, 2013 Schools Modernization & Reinvestment eam Revisited Board of Directors Board of Education DRAF ai Soo Kim Partners

More information

M E M O R A N D U M. NFPA Technical Committee on Assembly Occupancies and Membrane Structures. NFPA 101 ROP Letter Ballot Circulation

M E M O R A N D U M. NFPA Technical Committee on Assembly Occupancies and Membrane Structures. NFPA 101 ROP Letter Ballot Circulation M E M O R A N D U M TO: FROM: NFPA Technical Committee on Assembly Occupancies and Membrane Structures Linda MacKay DATE: January 12, 2010 SUBJECT: NFPA 101 ROP Letter Ballot Circulation The January 11

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2825

More information

CITY OF HANOVER ECONOMIC DEVELOPMENT AUTHORITY MINUTES June 14, 2012

CITY OF HANOVER ECONOMIC DEVELOPMENT AUTHORITY MINUTES June 14, 2012 President Todd Bartels called the Economic Development Authority meeting of to order at 8:00am at Hanover City Hall. Commissioners present were: Bartels, Randy Whitcomb, Chris Kauffman (arrived at 8:03am),

More information

Item 2. September 28, 2017

Item 2. September 28, 2017 September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project

More information

CHAPTER A-15 INTERIOR DESIGN INDEX

CHAPTER A-15 INTERIOR DESIGN INDEX CHAPTER A-15 INTERIOR DESIGN Revised December 2011 INDEX 15.1 GENERAL 15.1.1 Scope 15.1.2 Quality 15.1.3 Sustainable Design 15.1.4 Multiple Buildings 15.1.5 Site Adapting 15.1.6 Renovations 15.2 APPLICABLE

More information

Transportation. Growth Management Policy Board April 4, 2019

Transportation. Growth Management Policy Board April 4, 2019 Transportation Growth Management Policy Board April 4, 2019 Overview Transportation in VISION 2040 Changes since the adoption of VISION 2040 Feedback to date Potential updates to the Transportation chapter

More information

Joint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building

Joint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building Joint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building City of Tacoma Steve Victor, Deputy City Attorney 253-591-5638 svictor@ci.tacoma.wa.us Pierce

More information

COUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT

COUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT ITEM # 28 _ DATE: 03/06/18 COUNCIL ACTION FORM SUBJECT: WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT BACKGROUND: The operation of wireless communication facilities are licensed and regulated by the

More information

1222 First Avenue, San Diego, CA Cycle Distributed: 11/07/2014

1222 First Avenue, San Diego, CA Cycle Distributed: 11/07/2014 Cycle s Project Information Project Nbr: 379530 Title: Living Green Coop MMCC Project Mgr: Gutierrez, Edith (619) 446-5147 egutierrez@sandiego.gov Page 1 of 6 *379530* Reviewing Discipline: LDR-Planning

More information

Riverside, California A Local Government CEQA Perspective

Riverside, California A Local Government CEQA Perspective Historic Resources and CEQA Workshop 6/21/2012 Riverside, California A Local Government CEQA Perspective Erin Gettis, Associate AIA City Historic Preservation Officer and Principal Planner CEQA and Cultural

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 16, 2016 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Robert Garcia, Senior

More information

Plan Peoria AZ 2040 General Plan Update. Public Workshop #2: Presentation June 5, 2017

Plan Peoria AZ 2040 General Plan Update. Public Workshop #2: Presentation June 5, 2017 Plan Peoria AZ 2040 General Plan Update Public Workshop #2: Presentation June 5, 2017 Introductions City of Peoria Planning Staff Chris Jacques, AICP Planning Director Lorie Dever Senior Planner (Project

More information

LEED Council Available Properties in the Addison and North Branch Industrial Corridors (Source: Property Listings from Listing Broker)

LEED Council Available Properties in the Addison and North Branch Industrial Corridors (Source: Property Listings from Listing Broker) LEED Council Available Properties in the Addison and North Branch Industrial Corridors (Source: Property Listings from Listing Broker) Addison Industrial Corridor Area Location: Lease/Sale 4141 N. Rockwell

More information

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) 415 W 6 th ST ~ Vancouver, WA 98660 PO Box 1995 ~ Vancouver, WA 98668 Phone (360) 487-7800 www.cityofvancouver.us Type Of Work Type I

More information

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units.

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units. 3. HOUSING ELEMENT The purpose of this element is to provide plans and policies that will assist the City in meeting identified or projected deficits in the supply of housing, correcting substandard or

More information

St. John Paul II Catholic Parish

St. John Paul II Catholic Parish St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not

More information

ZONING R-LI Low Intensity Residential District. [Amended by Ord. No. 1684] PERMITTED USES BY RIGHT.

ZONING R-LI Low Intensity Residential District. [Amended by Ord. No. 1684] PERMITTED USES BY RIGHT. 130.19. R-LI Low Intensity Residential District. [Amended 10-2-95 by Ord. No. 1684] 130.19.1. Purpose. To preserve steep slopes, floodplains, and other sensitive natural areas and to provide opportunities

More information

ZONING TEXT. Planned Development District General Development Plan Madison Yards at Hill Farms Redevelopment 4802 Sheboygan Ave

ZONING TEXT. Planned Development District General Development Plan Madison Yards at Hill Farms Redevelopment 4802 Sheboygan Ave ZONING TEXT Planned Development District General Development Plan Redevelopment 4802 Sheboygan Ave Legal Description: The lands subject to this Planned Development (PD) District shall include those described

More information

Agenda Forsyth County Historic Resources Commission

Agenda Forsyth County Historic Resources Commission Agenda Forsyth County Historic Resources Commission September 3, 2008 4:00 P.M. Bryce A. Stuart Municipal Building Public Meeting Room, Room 530 100 East First Street, Winston-Salem I. APPROVAL OF AUGUST

More information

District of Columbia Power Line Undergrounding (DC PLUG) Initiative

District of Columbia Power Line Undergrounding (DC PLUG) Initiative District of Columbia Power Line Undergrounding (DC PLUG) Initiative Community Hearing 125 Michigan Avenue, NE Washington, DC 20017 Presented by: Aaron Smith (Pepco), Ronald Williams (DDOT) and Morgan O

More information

Committee Members: CALL TO ORDER (5:31:24) Chairperson Lehmann called the meeting to order at 5:31 p.m.

Committee Members: CALL TO ORDER (5:31:24) Chairperson Lehmann called the meeting to order at 5:31 p.m. MINUTES Regular Meeting Carson City Parks and Recreation Commission Tuesday, August 5, 2014 5:30 PM Community Center Sierra Room 851 East William Street, Carson City, Nevada Committee Members: Chair Sean

More information

Space Utilization Not just for classrooms anymore

Space Utilization Not just for classrooms anymore Space Utilization Not just for classrooms anymore Annie Newman Bob Boes 1 Who s heard this? Campus research space is significantly overcrowded. I m sure that is hoarding space. We just

More information

Snohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017

Snohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017 Review the Process Building Assessment Prioritize into Tiered Matrix Develop Cost Estimate per Scope Items Schematic Design Renovation + Addition Schematic Drawings Interior + Exterior Perspectives Recommendations

More information

TOWN OF NORTH BRANFORD

TOWN OF NORTH BRANFORD TOWN OF NORTH BRANFORD Town Hall 909 Foxon Road P.O. Box 287 North Branford, Connecticut 06471 Planning & Zoning (203) 484-6010 Building Department (203) 484-6008 Department Fax (203) 484-6018 INSTRUCTIONS

More information

Using the PI System to Create a Smart Campus that Optimizes Energy and Water Operations

Using the PI System to Create a Smart Campus that Optimizes Energy and Water Operations 1 Using the PI System to Create a Smart Campus that Optimizes Energy and Water Operations Presented by Elena Thomsen Dan Colvin Sweta Agarwal Presentation Contents About UC Davis: a Utility and Customer

More information

Presentation for. Raymond E. Shaw Elementary School Building Committee

Presentation for. Raymond E. Shaw Elementary School Building Committee Presentation for Raymond E. Shaw Elementary School Building Committee 11.01.2018 AGENDA 1. School Tour Penn Brook School 2. Design Options with Cost 3. Schedule School Tour Penn Brook School, Georgetown,

More information

QUINCY/ADAMS COUNTY 9-1-1

QUINCY/ADAMS COUNTY 9-1-1 QUINCY/ADAMS COUNTY 9-1-1 Steve Rowlands 222 N. 52 nd Street (217) 228-4572 Director Quincy, Illinois 62305 Fax: 222-9361 QUINCY/ADAMS COUNTY 9-1-1 GOVERNING BOARD MEETING Minutes January 16, 2008 9-1-1

More information

a. Experience in providing services to school districts and other governmental

a. Experience in providing services to school districts and other governmental Response of Kawahara Law, a Professional Corporation to the West Contra Costa Unified School District s Request for Qualifications for Special Counsel to the Board of Education A. Background Information

More information