1 FUNCTIONAL AREA: Occupatinal Safety & Health SME: Dave Lipinski Page 1 f 41 APPROVED BY/DATE: Barry K 11/09/17 (Signature n File) Categrically Excluded frm USQD/USQ Prcess Yes N Cat Ex USQD/Screening N: N/A USQD Screening/USQD Required: Yes N USQD Screening/USQD N: FBP-17-SCN USE CATEGORY: INFORMATION USE EFFECTIVE DATE: 11/27/17 3 YEAR PERIODIC REVIEW DATE: 11/09/20 Level 2 Prgram Requirements Dcument ATTENTION: Please select the apprpriate cmmunicatin methd fr this dcument. N Actin Required Grup Briefing Required Reading Frmal Training Selected cmmunicatin t be cmpleted: Befre First Use Befre Effective Date RECORD OF ISSUE/REVISION Frmer Dc #: N/A Revisin/ Change Descriptin f Changes Affected Pages Date Apprved 0 Initial FBP Release; cnversin f frmer prcedure FBP-OS-PRO int prgram requirements dcument; Integratin f FBP-OS-PRO base with FBP-OS-PRO All 08/07/12 1 Minr Revisin; made crrectin t Appendix B /26/12

2 Page 2 f 41 Revisin/ Change Descriptin f Changes Affected Pages Date Apprved 2 Minr Revisin; remved appendices A-E and referenced NFPA 70E in their place in prcedure text, updated Appendix numbering accrdingly, changed Flame Retardant t Arc Rated in , updated Appendix C. 7, 12-13, & 25 05/02/13 3 Revisin t add training requirements in sectins 3.3, 3.4, and 3.5; made minr changes t Appendix A and B; perfrmed peridic review. 6,7,12,24, 25 09/25/ General Revisin; update t reflect current cdes and standards and peridic review was perfrmed. General Revisin/Peridic Review; updated prcedure frmatting and FBP lg. Revised as part f a crrective actin plan created frm an independent assessment PORT-16-IS General Revisin/Peridic Review; Added new frm, -F02, Electrical Task Risk Assessment Frm. Updated frmatting. Added reference t FBP-SM-PRO-00981, added exceptin nte fr resetting breakers, and added requirements fr Electrical Assessment frm. All 10/02/14 All 03/27/17 All 11/09/17

3 Page 3 f 41 CONTENTS 1.0 PURPOSE SCOPE AND APPLICABLITY TRAINING AND QUALIFICATIONS General Training and Qualificatins All Emplyees Unqualified Wrkers Qualified Instrument Specialists Qualified Electrician Qualified Electrical Supervisr Natinal Electrical Cde Inspectrs Qualificatin Training Wrkers Interacting With Electrical Equipment PROGRAM RESPONSIBILITES Envirnmental, Safety, Health, and Quality (ESH&Q) Nuclear Safety and Engineering Electrical Authrity Having Jurisdictin Natinal Electrical Cde Inspectrs Qualified Electrical Wrkers Electrical Supervisrs Site Prject Directr PROGRAM DESCRIPTION Electrical Installatin Equipment Electrical Equipment Nt Part f the Electrical Installatin Electrical Test Equipment Electrical Safe Wrk Practices Grund Fault Circuit Interrupters (GFCIs) Prtable Tls and Extensin Crd Sets Wrk Invlving Electrical Hazards Overcurrent Prtective Devices Activities Invlving Cranes and Derricks Wrking Within 20 Feet f Energized Overhead Pwer lines Planning Wrk with Ptential t be Within the LAB f Overhead Lines... 23

4 Page 4 f Cre Drilling, Excavatins, and Blind Penetratins Generatrs Batteries r Battery Banks Operating ver 100 Vlts Electrical Persnal Prtective Equipment (PPE) NEC Inspectins Electrical Task Risk Assessment Prgram Assessments DEFINITIONS/ACRONYMS Definitins Acrnyms REFERENCES Attachment A ELECTRICAL INSTALLATION REQUEST Attachment B ELECTRICAL TASK RISK ASSESSMENT FORM... 39

5 Page 5 f PURPOSE 1.1 This dcument establishes the Flur-BWXT Prtsmuth LLC (FBP) Prgram (ESP) implemented at the Prtsmuth Gaseus Diffusin Plant (PORTS). 1.2 The ESP prvides the requirements fr electrical installatins, electrical safe wrk practices including maintenance, and electrical safety training. 1.3 Cmpliance with this prgram when implemented ensures a wrkplace free frm unplanned expsure t electrical hazards fr all emplyees f FBP, sub-cntractrs, sub-tier cntractrs, and vendrs. It als minimizes risk f damage t equipment and facilities frm electrical energy. 1.4 This prgram dcument implements applicable requirements fr perfrming safe electrical wrk frm the fllwing: 10 CFR 851, Wrker Safety and Health Prgram 29 CFR , Scafflds 29 CFR , Pwer Line Safety (up t 350 kv)--equipment Operatins 29 CFR , Pwer Line Safety (up t 350 kv)--equipment Operatins 29 CFR 1910, Occupatinal Safety and Health Standards General Industry 29 CFR 1926, Occupatinal Safety and Health Standards Cnstructin Natinal Fire Prtectin Assciatin (NFPA) 70, Natinal Electric Cde NFPA 70E- Standard fr in the Wrkplace 1.5 Definitins f terms specific t this prgram may be fund in NFPA and Cde f Federal Regulatins (CFR) surce dcuments listed in Sectin 7.0, Use References. EXCEPTION: Wrk perfrmed n the electrical system n the supply side f the service pint is excluded frm the requirements cntained within this dcument, and is cvered in FBP-OS-PRD-00003, Electrical Utility Safety Prgram. 2.0 SCOPE AND APPLICABLITY 2.1 The scpe f this dcument includes wrkplaces supplied by the electrical system n the lad side f the defined service pint (premises wiring system).

6 Page 6 f Althugh the service pint is uniquely established at each facility and structure served, it is generally defined at PORTS as ne f the fllwing: Fr electrical service t a building r ther structure that perates at a nminal vltage less than 13,000 vlts and is prvided frm an verhead drp, the service pint shall be the splice pint near the weather head f the service raceway cntaining the service entrance cnductrs. Fr electrical service t a building r ther structure that perates at a nminal vltage less than 13,000 vlts and is prvided frm an undergrund service lateral supplied frm an elevated transfrmer, the service pint shall be the cnnectin f the lateral cnductrs at the first equipment munted n r near the building r ther structure served. Fr electrical service t a building r ther structure that perates at a nminal vltage less than 13,000 vlts and is prvided frm a pad-munted transfrmer, the service pint shall be the cnnectin f the secndary cnductrs t the secndary terminals f the transfrmer. 3.0 TRAINING AND QUALIFICATIONS 3.1 General Training and Qualificatins Cnsistent training is critical t successful implementatin f the prgram. Training material intending t meet the requirements f this prgram shall be reviewed and accepted by the FBP Training Manager. Individual training equivalencies, waivers, and extensins shall be apprved and dcumented by the Training Manager Electrical safety training shall meet the fllwing when applicable: Be in accrdance with 10 CFR 851 Wrkers wh face a risk f expsure t electrical hazards shall have electrical safety training cmmensurate t their assigned duties. training shall include a hands-n element(s) t reinfrce learning bjectives assciated with hazardus electrical wrk tasks. Persnnel shall be trained n the prper use and maintenance f Persnal Prtective Equipment (PPE). Dcumented evidence f electrical training may be in the frm f required reads, classrm training, annual assessments r pre-jb briefings.

7 Page 7 f All Emplyees All emplyees whether qualified r unqualified shall receive electrical training (initial and refresher) thrugh cmpletin f the mdule f General Emplyee Training (GET). This includes wrkers wh perate electrical hand tls such as drills and grinders. Cntractr/Subcntractr training requirements must meet any and all applicable electrical safety requirements called ut in the FBP prgram in the event the cntractr chses t fllw the FBP Prgram t perfrm wrk. 3.3 Unqualified Wrkers Emplyees wh are nt cnsidered qualified electrical wrkers shall be trained in and familiar with any electrical safety related wrk practices cmmensurate with their wrk task. 3.4 Qualified Instrument Specialists Qualificatin Dcumented evidence f qualificatin shall be prvided and maintained fr each Qualified Instrument Specialist. The emplyer shall make the determinatin as t qualificatin, but ne f the fllwing requirements shuld be cnsidered as guidelines fr a determinatin basis: Be an established instrument specialist wrking n the Prtsmuth Site befre the date f implementatin f this dcument OR Meet at least ne f the fllwing: Verificatin f cmpletin f a recgnized apprenticeship prgram that includes minimum f 8,000 hurs in a recgnized apprentice prgram and minimum f three years f industry experience Equivalent military experience with any cmbinatin f five years training r experience applicable t the task assignment Minimum five years industry experience related t jb respnsibilities Verificatin f cmpletin f a technical schl and equivalent industry experience that includes minimum f tw years at a recgnized technical schl and minimum f three years f industry experience with related respnsibilities Management has cnducted bservatins and evaluatins and determined the emplyee based n experience, training and/r educatin, and is qualified t perfrm jb respnsibilities.

8 Page 8 f 41 Training An instrument specialist wh is underging n-the-jb training under the direct supervisin f a Qualified Instrument Specialist and wh has demnstrated an ability t perfrm duties safely at his r her level f training shall be cnsidered qualified fr the perfrmance f thse duties Qualified Instrument Specialists shall attend the fllwing training: First Aid/ Cardipulmnary Resuscitatin (CPR)/Autmated External Defibrillatr (AED) training (refresher training shall ccur annually) training at intervals nt t exceed three years Qualified Instrument Specialists permitted t wrk within the Limited Apprach Bundary (LAB) f expsed energized electrical cnductrs and circuit parts perating at 50 vlts r mre shall, at a minimum, be trained in all f the fllwing: The skills and techniques necessary t distinguish expsed energized electrical cnductrs and circuit parts frm ther parts f electrical equipment The skills and techniques necessary t determine the nminal vltage f expsed energized electrical cnductrs and circuit parts The apprach distances specified in NFPA 70E, Article 130 tables fr Apprach Bundaries t Energized Electrical Cnductrs r Circuit Parts fr Shck Prtectin, and the crrespnding vltages t which the Qualified Instrument Specialists will be expsed The decisin-making prcess necessary t determine the degree and extent f the hazard, PPE, and jb planning necessary t perfrm the task safely Demnstrated prficiency t select, use, interpret indicatins, and understand limitatins f each specific vltage detectr used fr their task assignments Evidence the training required by this sectin is current shall be verified at least annually by the emplyer reviewing the emplyee s training recrds. The emplyer shall dcument that the training required by this sectin has ccurred.

9 Page 9 f Qualified Electrician Qualificatin Dcumented evidence f qualificatin shall be prvided and maintained fr each Qualified Electrician. The emplyer shall make the determinatin as t qualificatin, but ne f the fllwing shuld be cnsidered as guidelines fr a determinatin basis: Be an established electrician wrking n the PORTS Site befre the date f implementatin f this dcument OR Meet at least ne f the fllwing: Verificatin f cmpletin f a recgnized apprenticeship prgram that includes minimum f 8,000 hurs n-the-jb supervised experience and minimum f 900 hurs classrm training Equivalent military experience with any cmbinatin f five years training r experience applicable t the task assignment Minimum five years industry experience related t jb respnsibilities Verificatin f cmpletin f a technical schl and equivalent industry experience that includes minimum f tw years at a recgnized technical schl and minimum f three years f industry experience with related respnsibilities Training Management has cnducted bservatins and evaluatins and determined the emplyee, based n experience, training, and/r educatin is qualified t perfrm jb respnsibilities. An Electrical Wrker wh is underging n-the-jb training under the direct supervisin f a Qualified Electrical Wrker and wh has demnstrated an ability t perfrm duties safely at his r her level f training shall be cnsidered qualified fr the perfrmance f thse duties Qualified Electricians shall attend the fllwing training: First Aid/CPR/AED training annually NFPA 70, Natinal Electrical Cde, and cde refresher training at intervals nt t exceed three years training at intervals nt t exceed three years

10 Page 10 f 41 [1] Qualified Electricians permitted t wrk within the LAB f expsed energized electrical cnductrs and circuit parts perating at 50 vlts r mre shall, at a minimum, be trained in all f the fllwing: The skills and techniques necessary t distinguish expsed energized electrical cnductrs and circuit parts frm ther parts f electrical equipment The skills and techniques necessary t determine the nminal vltage f expsed energized electrical cnductrs and circuit parts The apprach distances specified in NFPA 70E, Article 130, tables fr Apprach Bundaries t Energized Electrical Cnductrs r Circuit Parts fr Shck Prtectin, and the crrespnding vltages t which the Qualified Electrician will be expsed The decisin-making prcess necessary t determine the degree and extent f the hazard, PPE, and jb planning necessary t perfrm the task safely Demnstrated prficiency t select, use, interpret indicatins, and understand limitatins f each specific test instrument used fr their task assignments [2] Evidence the training required by this sectin is current shall be verified at least annually by the manager r supervisr reviewing the emplyee s training recrds. [3] The manager r supervisr shall dcument the training required by this sectin has ccurred. 3.6 Qualified Electrical Supervisr Qualified Electrical Supervisrs that supervise energized electrical wrk tasks shall have at least the same level f electrical safety training as the wrkers they supervise. 3.7 Natinal Electrical Cde Inspectrs Natinal Electrical Cde (NEC) inspectins shall be perfrmed by designated NEC Inspectrs wh have been authrized by the Authrity Having Jurisdictin (AHJ) t perfrm such inspectins. 3.8 Qualificatin NEC Inspectrs shall have at least ne f the fllwing: N less than fur years experience as a jurneyman electrician installing and maintaining electrical equipment

11 Page 11 f Training Tw years electrical training in a cllege f electrical engineering f recgnized standing and fur years cntinuus practical electrical experience in installatin wrk Fur years f electrical training in a cllege f electrical engineering f recgnized standing and tw years cntinuus practical electrical experience in electrical installatin wrk apprval and designatin frm the AHJ based upn years f experience in the electrical field NOTE The AHJ, FBP Management, r the Cmmittee (ESC) may prescribe additinal training fr NEC inspectrs t ensure cntinued cmpetency NEC Inspectrs shall attend the fllwing training: NFPA 70E, Standard fr in the Wrkplace, training at intervals nt t exceed three years NFPA 70, Natinal Electrical Cde, training at intervals nt t exceed three years 3.10 Wrkers Interacting With Electrical Equipment Individuals wh perfrm tasks n electrical equipment such as perating circuit breakers, pening r clsing discnnect switches, r racking electrical equipment shall be cnsidered cmpetent t perfrm the task if trained in and have demnstrated the skills and knwledge t understand and perfrm the task and apply the necessary related electrical safe wrk practices Evidence f training will be dcumented. 4.0 PROGRAM RESPONSIBILITES 4.1 Envirnmental, Safety, Health, and Quality (ESH&Q) ESH&Q administers the ESP by: Appinting an ESP Administratr. Prviding representatives t the ESC Crdinating electrical safety activities and initiatives with Department f Energy (DOE) and ther Prtsmuth site cntractrs

12 Page 12 f 41 Ensuring industrial safety prfessinals bserve and prvide versite t wrk tasks which invlve electrical hazards are trained in electrical safety requirements Prviding, as necessary, Qualified Electrical Inspectrs Ensuring persnnel are trained t the requirements listed in Sectin 3.0, General Training and Qualificatins. Identifying apprved PPE fr electrical wrk Ensuring safe wrk practices, as described in the prgram and NFPA 70E, are used by wrkers under their directin including nn-electrical wrkers 4.2 Nuclear Safety and Engineering Nuclear Safety and Engineering implements the ESP by: Appinting the Cmmittee Chairpersn and Vice Chairpersn Designating an Electrical AHJ t represent FBP Prviding representatives t the ESC Ensuring engineers are cmpetent Dcumenting decisins/interpretatins and recmmendatins by the ESC and AHJ Ensuring that meeting summaries, interpretatins, lessns learned, and ther infrmatin related t electrical safety is effectively cmmunicated Supprting the electrical hazard analysis prcess Cnducting peridic meetings t serve as pen frums fr discussin f issues presented by ESC representatives and ther stakehlders Facilitating discussins f electrical events r trends acrss the DOE Cmplex Maintaining an ESP website, accessible by all emplyees, fr electrical safety infrmatin

13 Page 13 f Electrical Authrity Having Jurisdictin The AHJ shall: Enfrce and interpret all required dcuments stated in Sectin 1.0, Purpse. Dcument cmpany specific AHJ decisins and interpretatins. Execute respnsibilities as described in mem t DOE (FBP ). The AHJ may delegate respnsibility as necessary t ensure adequate field implementatin f applicable electrical cdes, standards, and prcedure requirements; but ultimate authrity and accuntability reside with the appinted AHJ. Ptential delegates may include: deputies, inspectrs, and industrial safety prfessinals. Cnsult n electrical designs, installatins, inspectins, and ther electrical safety matters. Determine the demarcatin f the service pint. 4.4 Natinal Electrical Cde Inspectrs Natinal Electrical Cde (NEC) Inspectrs shall: Be independent frm the wrk they inspect. They shall nt inspect wrk fr which they have direct line management, engineering, r cnstructin respnsibility. Act as a field representative f the AHJ(s) t administer and enfrce the NEC. Maintain qualificatins established by the AHJ(s). Issue electrical inspectin reprts. Cnsult with designers and installers n NEC cmpliance issues. Perfrm field inspectins fr new installatins, temprary installatins, and mdificatins f existing electrical systems and equipment. Present disputed NEC inspectin reprts and issues t the AHJ fr reslutin. Issue and apprve electrical installatin permits and requests fr electrical inspectins.

14 Page 14 f Qualified Electrical Wrkers Qualified Electrical Wrkers shall: 4.6 Electrical Supervisrs Perfrm wrk within the cntrls f the wrk dcument(s). Understand and fllw the shck and arc flash risk assessments. Perfrm wrk cmmensurate with qualificatins. See Sectin 3.0, Training and Qualificatins. Identify and cmmunicate ptentially unsafe electrical cnditins Electrical Supervisrs shall: 4.7 Site Prject Directr Perfrm a prficiency evaluatin n their emplyees annually t ensure cmpliance with electrical safety related wrk practices. Verify thrugh training recrds that emplyees have the required training cmmensurate with the task the emplyee is perfrming. Appints and recmmends t DOE an Electrical AHJ t represent DOE at the field level. 5.0 PROGRAM DESCRIPTION 5.1 Electrical Installatin Equipment All equipment that is part f an electrical installatin r electrical utilizatin equipment within the scpe f the NEC r Occupatinal Safety and Health Assciatin (OSHA) subpart S shall be apprved by and acceptable t the Electrical AHJ r designee. Apprved equipment shall be suitable fr its intended purpse and used in accrdance with instructins r requirements f the Natinally Recgnized Testing Labratries (NRTL) listing Criteria fr acceptability include in rder f pririty: If it is accepted, certified, listed, labeled, r therwise determined t be safe by a NRTL recgnized pursuant t 29 CFR , thrugh applicatin by the manufacture r thrugh field evaluatin by a representative f an NRTL With respect t an installatin r equipment f a kind that n NRTL accepts, certifies, lists, labels, r determines t be safe

15 Page 15 f 41 If it is inspected r tested by anther Federal agency, State, municipal, r ther lcal authrity respnsible fr enfrcing ccupatinal safety prvisins f the NEC and fund in cmpliance with the prvisins f the NEC With respect t custm-made equipment r related installatins that are designed, fabricated fr, and intended fr use exclusively by FBP, and if it is determined t be safe fr its intended use by its manufacturer n the basis f test data which FBP keeps and makes available fr inspectin t DOE r its representatives 5.2 Electrical Equipment Nt Part f the Electrical Installatin The fllwing equipment des nt require apprval by the electrical AHJ: Equipment cnnected t the lad side f a class 2 r 3 pwer supply NRTL listed equipment perating at less than 50 vlts such as cable assemblies, instruments, security systems, lw vltage lighting, cmmunicatin systems, etc. NOTE These prducts shuld be listed by NRTL and acceptable t the Industrial Safety representative fr the wrk area. Cnsumer prducts such as phne chargers, electric staplers, cffee pts, etc. Legacy nn-nrtl equipment installed prir t implementatin f this Prgram may remain in service and des nt require reevaluatin s lng as it has nt been mdified, fund t be defective r damaged, and des nt present a hazard t the wrkers r facility. 5.3 Electrical Test Equipment All electrical multi-meters including the external test leads used n electrical equipment that perate ver 50 vlts shall be listed and labeled by an NRTL. The multi-meter r ther test instrument used shall be rated at the apprpriate vltage level and categry fr the particular applicatin.

16 Page 16 f 41 NOTE Electrical test instruments used t verify the absence f vltage are nt required t be cntinually calibrated unless required t gather data t meet ther prject requirements. 5.4 Electrical Safe Wrk Practices The FBP plicy regarding electrical hazards is such that n wrker shall be permitted t be intentinally expsed t an electrical hazard with r withut PPE unless it can be demnstrated that it is infeasible t cmplete a task with the equipment, cmpnent, r system de-energized Wrk n r arund electrical equipment that is n lnger cnsidered safe by the applicable installatin cdes and standards shall be perfrmed accrding Integrated Safety Management System (ISMS) principles using safe wrk practices identified in NFPA 70E, FPB prcedures, and the fllwing: A hazard/risk evaluatin including bth an arc flash risk assessment and a shck hazard risk assessment shall be perfrmed and dcumented fr all electrical wrk in accrdance with NFPA 70E and this Prgram. All electrical equipment, circuit cnductrs, and circuit parts shall be cnsidered energized until placed in an electrically safe wrk cnditin in accrdance with NFPA 70E, Article 120. Persnnel shall be permitted t perfrm electrical wrk nly t the level fr which they have been trained and qualified in accrdance with Sectin 3.0, Training and Qualificatins. Apprpriate signs, tags, barricades, r an attendant shall be used t warn and prtect emplyees frm hazards that may cause injury due t electric shck r arc flash accrding t NFPA 70E, 130.7(E). When wrk is perfrmed n de-energized electrical equipment that has been placed int an electrically safe wrk cnditin in an area with energized equipment that is similar in size, shape, and cnstructin an alerting methd shall be used t prevent persnnel frm entering the lk-alike equipment. The alerting methd shall be in the frm f signs, tags, barricades, r attendants. The hierarchy f cnsidered cntrls shall be: Eliminatin Substitutin Engineered cntrls (barriers) Awareness

17 Page 17 f 41 Administrative cntrls PPE Electrical PPE and ther prtective equipment shall meet the requirements f Sectin 5.14, Electrical Persnal Prtective Equipment. Test instruments including prbes, cables, leads, and cnnectrs shall be designed, rated, and apprved fr their applicatin and visually inspected fr external damage befre each use. Instruments with evidence f damage shall be remved frm service until determined safe fr use. A dcumented maintenance prgram shall be implemented that ensures electrical equipment will perate safely, within anticipated parameters, and withut causing risk f hazard expsure t emplyees in the wrk area. 5.5 Grund Fault Circuit Interrupters (GFCIs) CAUTION GFCIs are fr persnnel prtectin t limit the severity f a shck t a nn-injury level (4 t 6 milliamps). They are nt intended fr the prtectin f equipment Where Required, GFCI prtectin shall be prvided and implemented where emplyees interact with prtable electric tls and equipment and are used under the fllwing cnditins: With temprary wiring methds including extensin crd sets In wet r ther cnductive lcatins Outdrs Where required t be installed by the NEC Prtable GFCIs shuld be lcated clsest t the surce althugh equipment cnfiguratin may require lcating the GFCI device clser t the wrker. Deviatins frm this requirement shall be permitted nly when special permissin is btained frm the AHJ GFCI devices shall be cnfirmed t functin prperly using the fllwing criteria: Permanently installed GFCI prtectin devices shall nt be used unless they have been tested within the past mnth. Testing fr permanently installed GFCI prtectin devices shall be perfrmed per the requirements f FBP-SM-PRO

18 Page 18 f 41 GFCI devices lcated in areas that are nt accessible, in unccupied facilities under lng-term surveillance r underging deactivatin/demlitin, r that wuld create a greater hazard when tested, shall be tested prir t use. NOTE Fr the purpses f this prgram a prtable GFCI is a factry assembled, listed, in-line device with a crd, and attachment plug. Prtable GFCIs shall be tested prir t use. GFCI receptacles/in-line GFCI devices that trip during use shall be permitted t be reset by the user ne time. If the GFCI trips a secnd time, the supervisr shall be cntacted t determine the prper respnse. 5.6 Prtable Tls and Extensin Crd Sets Prtable electric tls, extensin crd sets, relcatable pwer taps, and surge prtective devices shall be used and maintained in a manner t minimize risk t wrkers Flexible pwer crds shall nt: Be ruted thrugh walls, ceilings, r flrs Be cncealed behind building walls, ceilings, r flrs Be attached t building surfaces Crd-and-plug-cnnected equipment and extensin crd sets shall be visually inspected prir t each use and remved frm service if evidence f damage is detected. The inspectin shuld cnsider: Breaks r cracks expsing energized cnductrs and circuit parts Missing cver plates Missing, lse, altered, r damaged crd, blades, r pins/prngs, etc. Interruptin in the cntinuity f the equipment grunding cnductr Referenced equipment shall be: Listed and labeled Used in accrdance with prduct listing Be suitable fr the envirnment in which it is used

19 Page 19 f Extensin crds sets shall be permitted t be field-assembled by a Qualified Electrical Wrker prvided that: Each cmpnent is cmpatible with the ther cmpnents and is NRTL listed fr the purpse. A Qualified Electrical Wrker verifies crrect plarity f the extensin crd set and the cntinuity f the grunding cnductr befre it is used. The extensin crd set is durably marked t indicate the rganizatin respnsible fr its assembly. The extensin crd set is durably marked t indicate the maximum allwable lad in amps and watts, and whether r nt it is suitable fr utdr use Extensin crd sets shall: Cntain an equipment grunding cnductr Nt be fastened in place in a manner that may damage the crds r restrict their mvement Nt be used as a substitute fr the fixed wiring f a structure Have a current rating that is greater than the cnnected lad Nt be cnnected in series (daisy-chained) unless specifically designed and apprved fr this use Be unplugged and prperly stred when nt in use Nt create a trip hazard Be prtected frm damage (sharp crners and prjectins shall be avided) Be prvided with substantial prtectin prvided t avid damage where passing thrugh drways r ther pinch pints (fire drs shall nt be blcked pen withut the Fire Marshal s apprval) Be rated and labeled as suitable fr utdr use when used utdrs

20 Page 20 f Wrk Invlving Electrical Hazards Wrking within the LAB r Flash Prtectin Bundary (FPB): [1] Befre a wrker is authrized t wrk inside the LAB r Arc Flash Bundary f expsed energized circuit parts perating at 50 vlts r mre, an FBP OS-PRO F01, Energized Wrk Permit, shall be cmpleted. [2] Fr tasks such as taking vltage measurements, current readings, absence-f-vltage checks fr Lckut/Tagut (LOTO), and visual inspectins, an Energized Wrk Permit shall nt be required prvided if: Results f the electrical hazard risk assessment are dcumented Apprpriate safe electrical wrk practices are incrprated int the wrk task Prper PPE is prvided and used Authrizatin is btained befre wrk prceeds [3] Only qualified persns shall perfrm servicing r maintenance n electrical equipment within the Limited Apprach Bundary f expsed energized parts perating at 50 vlts r mre. [4] Unqualified persns shall be cntinuusly escrted by a qualified persn if their authrized task requires them t crss the Limited Apprach Bundary f expsed energized parts perating at 50 vlts r mre. Under n circumstances shall an unqualified persn crss the Restricted Apprach Bundary. [5] Tls, test instruments, and handling equipment used inside the Limited Apprach Bundary shall be insulated fr the vltage f the expsed energized parts. Other equipment used inside the Limited Apprach Bundary shall be nncnductive Insulated tls shall be inspected befre use t determine if there is evidence f insulatin failure Live-line tls such as ht sticks shall be electrically tested in accrdance with applicable American Sciety fr Testing and Materials (ASTM) standards Parts being tested t verify absence f vltage shall be cnsidered energized fr the purpse f cmpleting an electrical hazard analysis Arc-rated apparel and ther arc flash PPE shall be prvided and used by any wrker inside the arc flash bundary f expsed energized parts perating at 50 vlts r mre. Arc flash PPE shall be used when energized parts are nt expsed, but the arc flash risk assessment identifies a ptential arc flash hazard.

21 Page 21 f Arc flash PPE shall be identified by a task-specific arc flash risk assessment r infrmatin taken frm an arc flash label n the equipment Servicing r maintenance including vltage testing n equipment identified with greater than 40 calrie per square centimeter (cal/cm 2 ) at the assumed wrking distance frm the surce f the prspective arc shall require a task-specific jb hazard analysis befre wrk is authrized t prceed Cnductive articles f jewelry and clthing (e.g., watchbands, bracelets, rings, key chains, necklaces, metalized aprns, clth with cnductive thread, metal headgear, r metal frame glasses) shall nt be wrn within the restricted apprach bundary r where they present an electrical cntact hazard with expsed energized cnductrs r circuit parts. 5.8 Overcurrent Prtective Devices Operating Circuit Breakers [1] An emplyee wh perates a circuit breaker shall have demnstrated the knwledge in the safe peratin f the equipment and the hazards invlved. (See Sectin 3.0, Training and Qualificatins, fr required training and Sectin 5.14, Electrical Persnal Prtective Equipment, fr required PPE). [2] Prtective device peratin shall be simulated fr emergency preparedness drills Reclsing (Re-Energizing) Circuits After Prtective Device Operatin NOTE EXCEPTION: Mlded case circuit breakers with a maximum amperage f 20 amps and 120 vlts may be reset ne time by the Facility Manager r their designee after it has been determined the autmatic peratin f the breaker was caused by an verlad cnditin befre requesting the service f a Qualified Electrical Wrker After a circuit is de-energized by an vercurrent prtective device (e.g., tripped circuit breaker, blwn fuse), the circuit shall nt be manually reenergized until the facility manager has been ntified and it has been determined by a Qualified Electrical Wrker(s) the equipment and circuit may be reenergized safely.

22 Page 22 f Activities Invlving Cranes and Derricks Wrking Within 20 Feet f Energized Overhead Pwer lines NOTE De-energized and grunded is the preferred cnditin under which equipment peratin shuld be perfrmed because the hazard f injury r death due t electrcutin has been remved Mandatry Barrier Cntrl [1] Pwer Operatins shall be infrmed f wrk near verhead lines. [2] Trained Operatrs and Sptters shall be used and shall meet the fllwing requirements. The sptter shall be in place prir t mvement f the equipment and be psitined t effectively gauge the clearance distance. Operatrs f equipment and sptters wh wrk near energized verhead pwer lines shall be trained t: Visually determine when equipment is nearing the LAB fr verhead pwer lines T establish and maintain effective cmmunicatins between the peratr and sptter The sptter shall have n duties ther than being a sptter fr a single specific peratin. Sptters shall have direct cmmunicatin with the equipment peratr. The methd f cmmunicatin must take int accunt ptentially high nise levels cmmn with heavy equipment peratin Secndary Barrier Cntrl As a minimum, ne f the fllwing secndary barrier cntrls shall be used in additin t a trained sptter: Install physical barriers t prevent encrachment int the LAB. Use stakes, cnes, r painted lines t prvide cnstant reminders t peratrs and sptters f the prximity t energized verhead lines. Use materials t enhance visibility f energized verhead lines fr sptters.

23 Page 23 f 41 Have qualified persnnel measure line height. Signs shall be psted t indicate verhead pwer line height t warn f energized verhead pwer lines and enable the sptter t accurately determine the clearance distance. Have qualified persnnel raise r relcate energized verhead pwer lines and enable the sptter t accurately determine the clearance distance. Other cntrl(s) may be permitted fllwing review and apprval by the electrical AHJ. This review shall verify the alternate cntrls are as effective as the cntrls listed abve Planning Wrk with Ptential t be Within the LAB f Overhead Lines This sectin shall apply t activities cnducted in the vicinity f, but NOT n, verhead electrical cnductrs. It shall NOT apply t qualified wrkers wrking n r near verhead line distributin systems. [1] If the area 360 degrees arund the equipment up t the equipment s maximum wrking radius intersect with the LAB, then wrk shall be cnsidered t have the ptential t cme within the LAB. [2] Overhead lines shall be de-energized when wrk is planning t be perfrmed in the LAB r when the wrk activity/equipment has the ptential t enter the LAB unless it is determined after a dcumented evaluatin, cnsidering prbability, cnsequence, and risk fr each phase/activity f the wrk scpe that de-energizing is infeasible r creates a greater hazard. [3] If wrk will be perfrmed within the LAB f energized verhead pwer lines under the exclusive cntrl f Pwer Operatins, then it is the respnsibility f the rganizatin perfrming the wrk t cntact Pwer Operatins t determine if: Overhead lines can be de-energized and grunded De-energizing verhead pwer lines are infeasible Equipment Operatins Near Overhead Lines If energized verhead lines are t be de-energized, then arrangements shall be made with the persn r rganizatin that perates r cntrls the verhead lines t de-energize them and implement apprpriate hazardus energy cntrl measures Wrking Near Cmmunicatin Lines Where any mbile equipment structure will be elevated near cmmunicatin lines, they shall be perated t avid cntact.

24 Page 24 f Overhead Lines De-Energized and Grunded NOTE This sectin addresses perfrming cre drilling, saw cutting, excavatins, and ther blind penetratins int surfaces cntaining cncealed electrical cnduits and cables Cre Drilling, Excavatins, and Blind Penetratins Excavatins shall be perfrmed per the requirements f FBP-OS-PRO-00022, Excavatin/Penetratin If the presence and lcatin f electrical circuits r cnductrs cannt be accurately identified and cmpletely de-energized, apprpriate mitigating cntrls shall be used. At a minimum: 5.12 Generatrs [1] All applicable drawings and dcumentatin shall be reviewed. The jb site shall be inspected t the maximum extent pssible t determine if bstructins are present befre starting the jb. [2] A scan shall be perfrmed if penetrating deeper than 1 ½ inches int cncrete r masnry surfaces. [3] Circuits r cnductrs shall be de-energized t the maximum extent pssible and placed in an electrically safe wrk cnditin. [4] A JHA and a penetratin permit shall be cmpleted fr wrk requiring penetratins deeper than 1 ½ inches int r thrugh walls, flrs, r ther surfaces that may cntain cncealed electrical systems. [5] When required, a drill stp bx shall be used t ensure that the pwer is interrupted if a metal embedment is cntacted during drilling peratins. A drill stp bx shall nt be relied upn fr shck prtectin. If the pssibility f cntacting a hidden energized circuit cannt be ruled ut, apprpriate electrical PPE based upn a dcumented risk assessment shall be used. [6] When using water during drilling peratins, a GFCI shall be used (see Sectin 5.5, Grund Fault Circuit Interrupters [GFCIs]) When prtable r vehicle-munted generatrs are used t supply electrical lads n the generatr r crd and plug-cnnected equipment thrugh a receptacle munted n the generatr, a grunding electrde cnductr cnnectin t an electrde is nt required if the nn-current-carrying metal parts f the equipment and the equipment grunding cnductr terminals f the receptacles are cnnected t the generatr frame. Fr vehicle munted generatrs, the frame f the generatr shall be bnded t the vehicle frame Permanently installed generatrs shall be grunded accrding t NEC

25 Page 25 f Cables/crd sets shall be discnnected frm the generatr surce utput circuit breaker r utput terminals when they are nt terminated at the lad end Batteries r Battery Banks Operating ver 100 Vlts A shck risk assessment shall be cmpleted befre wrking within the limited apprach bundary f expsed energized parts perating at 100 vlts direct current (vdc) When perfrming wrk n batteries where chemical expsures may exist, the fllwing chemical resistant PPE shall be wrn as required by the risk assessment: Gggle and face shields Glves Prtective aprns Prtective ftwear Prtable r statinary water facilities shall be available fr rinsing eyes and skin in case f electrlyte spillage, in accrdance with American Natinal Standards Institute (ANSI) Z D nt use tls r cnductive bjects that may shrt circuit any battery cmpnents Befre making r breaking cnnectins within a grup f cells, pen the battery system discnnecting means t minimize the pssibility f arcing Electrical Persnal Prtective Equipment (PPE) NOTE PPE fr nn-electrical hazards (e.g., battery acid) shall als be cnsidered Electrical PPE includes, but is nt limited t, the equipment and clthing necessary t prtect persnnel perfrming electrical wrk frm hazards invlving electrical shck, arc flash, batteries, and any ther electrical hazards that may be encuntered Electrical PPE and ther prtective equipment that has an expired testing date r fails visual r functinal inspectin shall be remved frm service PPE shall be: Maintained in a safe, reliable cnditin

26 Page 26 f 41 Stred in a manner that prtects against physical damage, misture, dust, r ther deterirating agents Visually inspected befre each use Peridically inspected r tested in accrdance with manufacturer s instructins and/r the applicable ANSI r ASTM standard(s) All persnnel are t be prvided and shall use PPE apprpriate fr ptential shck r arc flash hazards t which they may be expsed. All parts f the bdy inside the arc flash bundary shall be prtected Persnnel shall be instructed t the prper use and maintenance f PPE prir t use Vltage rated rubber-insulating equipment shall be marked with the testing due date.

27 Page 27 f 41 NOTE EXCEPTION: If vltage rated glves are used withut leather prtectrs, the glves shall be remved frm service until electrically tested Electrical PPE shall be subject t peridic electrical tests per the applicable ASTM standard with the maximum test intervals as identified belw. Rubber Insulating Equipment Blankets Cvers Glves Line hse Sleeves Dielectric Ftwear Testing Interval Befre first issue; every 12 mnths thereafter ASTM F 479 If insulating value is suspect ASTM F 478 Befre first issue; every 6 mnths thereafter ASTM F 496 If insulating value is suspect ASTM F 478 Befre first issue; every 12 mnths thereafter ASTM F 496 If insulating value is suspect ASTM F Vltage rated glves with leather prtectrs shall be used when there is a danger f injury frm electric shck due t cntact with expsed energized electrical cnductrs r circuit parts An inspectin shall be perfrmed n vltage rated glves and leather prtectrs prir t using them and immediately fllwing any incident that is suspected f having caused damage The testing due date n the vltage rated glves shall be verified t assure it is within the use perid specified Visually inspect vltage rated glves fr cracks, hles, tears, freign substances, and ther visible defects befre each use Perfrm air leakage test n vltage rated glves Vltage rated glves fund with any defects that may affect the insulating prperties shall nt be used and immediately remved frm service Vltage rated insulating sleeves shall als be used when there is an additinal danger f arm injury frm electric shck due t cntact with energized electrical cnductrs r circuit parts.

28 Page 28 f Vltage rated glves expsed t chemicals, damaged, r requiring peridic testing, cleaning, and sanitizing shall be taken frm service until tested Persnnel wh perate circuit breakers, electrical discnnect switches, and similar switchgear equipment at 240 vlts r less and the incident energy is 1.2 cal/cm 2 r less at the wrking distance with drs clsed and all cvers in place shall wear as a minimum: Safety glasses Leather r insulating glves NOTE EXCEPTION: Where the wrk t be perfrmed inside the arc flash bundary expses the wrker t multiple hazards, PPE withut an arc rating shall be permitted with special permissin by the AHJ Persnnel shall wear apprpriate layers f arc-rated clthing wherever there is ptential expsure t an arc flash abve the threshld incident energy level fr a secnd-degree burn (1.2 cal/cm 2 ) The engineering arc flash hazard evaluatin prvided with the wrk dcuments r as part f the prcedure shall be the principle infrmatin used fr the selectin f PPE. The PPE requirements in table, PPE Identificatin and Selectin, (page 28) are designed t prtect qualified electrical wrkers frm arc flash hazards with incident energy levels up t 40 cal/cm 2. If the calculated incident energy exceeds 40 cal/cm 2, special permissin shall be required t perfrm the wrk Fr the standard PPE applicatins, in table, PPE Identificatin and Selectin, (page 28) uses three prtectin systems identified as Level 0, Level 2, and Level 4. Fr situatins which may be utside the standard applicatins, Management and Safety with advice frm engineering, shall determine the PPE requirements.

29 Page 29 f 41 PPE Identificatin and Selectin Incident Energy Value PPE Level Prtective Clthing and Equipment Less than r Equal t 1.2 cal/cm 2 0 Greater than 1.2 cal/cm 2 up t 8.0 cal/cm 2 2 Greater than 8.0 cal/cm 2 up t 40 cal/cm 2 4 Shirt (Lng Sleeve), Pants (Lng) r Cveralls made frm nn-melting fibers r untreated natural fibers; Prtective Leather Ftwear; Safety Glasses; Ear Canal Inserts; Vltage-Rated Rubber Glves with Leather Prtectrs. Minimum 8 cal/cm2 Arc-rated Lng Sleeve Shirt and Pants r Arc-rated Cveralls, Class E Hard Hat w/arcrated Wraparund Face Shield and Arc-rated Balaclava r Arc-rated Flash Suit Hd; Prtective Leather Ftwear; Safety Glasses; Ear Canal Inserts; Vltage- Rated Glves w/leather Prtectrs. Minimum 40 cal/cm 2 Arc-rated Flash Suit Pants and Jacket; FR Cveralls; Class E Hard Hat w/arc-rated Flash Suit Hd; Prtective Leather Ftwear; Safety Glasses; Ear Canal Inserts; Vltage-Rated Glves w/leather Prtectrs NEC Inspectins NEC Inspectins and Electrical Inspectin Requests (EIR) are required fr new electrical installatins, mdificatin f existing electrical installatins, and temprary electrical installatins t ensure cmpliance with the NEC NEC Inspectins are nt required fr installatin r replacement f electrical utilizatin equipment apprved fr cnnectin t permanently installed receptacles with crd attachments r fr minr maintenance and repair wrk including like-fr-like replacement f switches, fuses, lamp sckets, receptacles, replacing wrn crds, and tightening cnnectins n a wiring device. NOTE Cntact Industrial Safety fr listing and labeling f electrical cmpnents nt part f the electrical installatin Electrical equipment that is nt part f an electrical installatin that prvides heat, light, r pwer t a wrk place is nt required t be inspected t the NEC.

30 Page 30 f Design rganizatins shuld cnsult with an NEC Inspectr during the design f new facilities, mdificatin f existing facilities, temprary installatins t assure cmpliance with NEC cdes, and t prmte early identificatin f prblems NEC Inspectrs shall immediately ntify the requestr f nn-cmpliant cnditins NEC Inspectrs shall verify crrectins f deficiencies per AHJ acceptance An NEC inspectin is required t energize an electrical service, feeder, r branch circuit subject t inspectin The NEC Inspectr shall dcument the inspectin and apprval f the electrical service n the NEC Service Inspectin Label and shall attach the inspectin label t the electrical equipment Cde cmpliance issues that the requestr and the NEC Inspectr cannt reslve satisfactrily shall be referred t the cmpany AHJ Electrical Inspectin Request (EIR) All new electrical installatins, mdificatins f existing electrical installatins, and temprary electrical installatins shall require an EIR unless it is determined by the NEC Inspectr r Electrical AHJ the wrk des nt require an EIR Electrical Task Risk Assessment Electrical task risk assessments are required fr tasks invlving electrical wrk. The risk assessment will identify the hazards, assess the risks, and implement cntrls F02 Electrical Task Risk Assessment shall be used as dcumentatin in electrical wrk packages t prvide incident energy values, vltage ratings, and Persnal Prtective Equipment (PPE) levels The Electrical Task Risk Assessment frm shall be the methd f prviding the risk assessment infrmatin in wrk packages nce the apprpriate training n use f the frm has been cmpleted Methds t determine electrical risks such as shck and arc flash hazards may be used in lieu f the Electrical Task Risk Assessment frm fr written prcedures r prject wrk.

31 Page 31 f Prgram Assessments The FBP ESP shall be assessed t help ensure that the principles and prcedures f the Prgram are being fllwed. Where the assessment determines that the principles and prcedures f the Prgram are nt being fllwed, actins shall be taken t crrect any bservatins r findings. Deficiencies and findings shall be dcumented in accrdance with the FBP crrective actin system. Issues cncerning the FBP ESP that are identified thrugh assessments and surveillance reprts shall be frwarded t the FBP ESC. 6.0 DEFINITIONS/ACRONYMS 6.1 Definitins A. Authrity Having Jurisdictin Appinted by the Site Prject Directr t be the ultimate authrity n electrical issues at PORTS. Individual will have extensive experience in applicatin f the NEC and the NFPA 70E. B. Apprach Bundaries t Live Parts: Arc Flash Bundary When a flash hazard exists, an apprach limit at a distance frm a prspective arc surce within which a persn culd receive a secnd degree burn if an arc flash were t ccur. Limited Apprach Bundary An apprach limit at a distance frm an expsed live part within a shck hazard exists; the minimum apprach distance t expsed live parts within which PPE is nt required fr shck hazards. T enter this bundary, a persn must be qualified r cntinuusly escrted by a qualified persn. Restricted Apprach Bundary An apprach limit at a distance frm an expsed live part within which there is an increased risk f shck due t electrical arc ver cmbined with inadvertent mvement, fr persnnel wrking in clse prximity t the live part; the minimum apprach distance (fr shck hazards) t expsed live parts fr qualified persns with PPE (the equivalent f wrking near fr qualified persns). Unqualified persns cannt enter this bundary. Arc Rated The value attributed t materials that describe their perfrmance t expsure t an electrical arc discharge. The arc rating is expressed in cal/cm 2 and is derived frm the determined value f the Arc Thermal Perfrmance Value (ATPV) r Energy f Breakpen Threshld (EBT). Arc rating is reprted as either ATPV r EBT whichever is the lwer value. Barricade A physical bstructin such as bundary tape, cnes, saw-hrses, fence, r similar warning markers intended t limit access t a hazardus area.

32 Page 32 f 41 Barrier A physical bstructin which is intended t prevent cntact with energized cnductrs, circuit parts, lines, r equipment r t prevent unauthrized access t a wrk area. Balaclava (Sck Hd) Type f arc-rated PPE that is wrn ver the head fr the required task. Prvides head, neck and face prtectin (except fr eye and nse). Cnfined/Enclsed Wrk Space A cnfined r enclsed space (i.e., manhle r vault) that cntains expsed energized electrical cnductrs r circuit parts perating at 50 vlts r mre, r where an electrical hazard exists, where prtective shields, prtective barriers, r insulating materials shall be used as necessary t avid inadvertent cntact with these parts and the effects f the electrical hazards. Dead Frnt Withut live parts expsed t a persn n the perating side f the equipment. De-energized Free frm any electrical cnnectin t a surce f ptential difference and frm electrical charge; nt having a ptential different frm that f the earth. Electrical Hazard A dangerus cnditin such that cntactr equipment failure can result in electric shck, arc flash, thermal burn, r blast. C. Electrically Safe Wrk Cnditin A state in which the cnductr r circuit part t be wrked n r near has been discnnected frm energized parts, lcked/tagged in accrdance with established prcedures, tested t ensure the absence f vltage, and grunded if determined necessary. D. Expsed (as applied t live parts) Parts that are nt suitably guarded, islated, r insulated and that are capable f being inadvertently tuched r apprached nearer than a safe distance by a persn s bdy, tls, r material. E. Flash Suit A cmplete arc-rated clthing and equipment system that cvers the entire bdy except fr the hands and feet. This includes pants r leggings, jacket, and bee-keeper type hd fitted with a face shield and integrated hard hats all with apprpriate arc ratings t prtect against hazards. F. Grund The earth. G. Grund Fault An unintentinal, electrically cnducting cnnectin between an ungrunded cnductr f an electrical circuit and the nrmally nn-current carrying cnductrs, metallic enclsures, metallic raceways, metallic equipment, r earth. H. Grund-Fault Circuit Interrupter A device intended fr the prtectin f persnnel that functins t de-energize a circuit r prtin theref within an established perid f time when a current t grund exceeds the values established fr a Class A device (4 milliamp [ma] t 6mA).

33 Page 33 f 41 I. Guarded Cvered, shielded, fenced, enclsed, r therwise prtected by means f suitable cvers, casings, barriers, rails, screens, mats, r platfrms t remve the likelihd r apprach r cntact by persns r bjects t a pint f danger. J. Incident Energy The amunt f energy impressed n a surface a certain distance frm the surce generated during an electrical arc event. One f the units used t measure incident energy is cal/cm2. K. Minimum Apprach Distance The clsest distance a persn is permitted t apprach an energized bject withut apprved PPE and tls. L. Overcurrent Any current in excess f the rated current f equipment r the ampacity f a cnductr. It may result frm verlad, shrt circuit, r grund fault. M. Overlad Operatin f equipment in excess f full-lad rating that wuld cause damage r dangerus verheating when it persists fr a sufficient length f time. A fault such as a shrt circuit r grund fault is nt an verlad. N. Qualified Persn One wh has demnstrated the skills and knwledge related t the cnstructin and peratin f the electrical equipment and installatins and received safety training n identifying hazards invlved. O. Risk. A cmbinatin f the likelihd f ccurrence f injury r damage t health and the severity f injury r damage t health the results in a hazard. P. Risk Assessment. An verall prcess that identifies hazards, estimates the ptential severity f injury f damage t health, and determines if prtective measures are required. The term includes arc flash and shck risk assessments. Q. Service Pint The pint f cnnectin between the facility f the serving utility and the premises wiring. R. Step Ptential A grund ptential gradient difference that can cause current flw frm ft t ft thrugh the bdy. S. Tuch Ptential A grund ptential gradient difference that can cause current flw frm hand t hand, hand t ft, r anther path ther than ft t ft thrugh the bdy. 6.2 Acrnyms A. AC Alternating Current B. AED Autmated External Defibrillatr C. AHJ - Authrity Having Jurisdictin D. ASTM American Sciety fr Testing and Materials

34 Page 34 f REFERENCES E. ATPV Arc Thermal Perfrmance Value F. Cal/cm 2 Calrie per centimeter squared G. CPR Cardipulmnary Resuscitatin H. EBT - Energy f Breakpen Threshld I. EIR - Electrical Installatin Request J. ESC Cmmittee K. ESP Prgram L. GFCI - Grund Fault Circuit Interrupters M. LAB - Limited Apprach Bundary N. NEC Natinal Electrical Cde O. NFPA - Natinal Fire Prtectin Assciatin P. NRTL Natinally Recgnized Testing Labratry A. 10 CFR 851, Wrker Safety and Health Prgram B. 29 CFR 1910, Subpart I, Persnal Prtective Equipment C. 29 CFR , Electrical Prtective Equipment D. 29 CFR 1910, Subpart S, Electrical E. 29 CFR , Subpart R, Telecmmunicatins F. 29 CFR , Subpart R, Electrical Pwer Generatin, Transmissin, and Distributin G. 29 CFR 1926, Subpart K, Electrical H. 29 CFR 1926, Subpart CC, Cranes & Derricks in Cnstructin I. 29 CFR 1926, Subpart O, Mtr Vehicles, Mtrized Equipment, and Marine Operatins J. 29 CFR 1926, Subpart V, Pwer Transmissin and Distributin K. ASTM D Standard Specificatin fr Rubber Insulating Glves L. ASTM D Standard Specificatin fr Rubber Insulating Sleeves

35 Page 35 f 41 M. ASTM F Standard Specificatin fr In-Service Care f Insulating Line Hse and Cvers N. ASTM F Standard Specificatin fr In-Service Care f Insulating Blankets O. ASTM F Standard Specificatin fr In-Service Care f Insulating Glves and Sleeves P. ASTM F Standard Specificatin fr Leather Prtectrs fr Rubber Insulating Glves and Mittens Q. ASTM F Standard Specificatin fr Fiberglass-Reinfrced Plastic (FRP) Rd and Tube Used in Live Line Tls R. ASTM D Standard Specificatin fr Rubber Insulating Blankets S. ASTM F Standard Specificatin fr Dielectric Ftwear T. ASTM F Standard Guide fr Visual Inspectin f Electrical Prtective Rubber Prducts U. ASTM F Standard Perfrmance Specificatin fr Flame Resistant and Arc Rated Textile Materials fr Wearing Apparel fr Use by Electrical Wrkers Expsed t Mmentary Electric Arc and Related Thermal Hazards V. ASTM F Standard Specificatin fr Arc and Flame Resistant Rainwear W. DOE O 414.1, Quality Assurance, as amended X. DOE-HDBK-1092, DOE Handbk, Y. NFPA , Natinal Electrical Cde (NEC) Z. NFPA 70E-2012, Standard fr in the Wrkplace

36 Page 36 f 41 Attachment A ELECTRICAL INSTALLATION REQUEST Page 1 f 3

37 Page 37 f 41 Attachment A ELECTRICAL INSTALLATION REQUEST Page 2 f 3

38 Page 38 f 41 Attachment A ELECTRICAL INSTALLATION REQUEST Page 3 f 3

39 Page 39 f 41 Attachment B ELECTRICAL TASK RISK ASSESSMENT FORM Page 1 f 3

40 Page 40 f 41 Attachment B ELECTRICAL TASK RISK ASSESSMENT FORM Page 2 f 3

41 Page 41 f 41 Attachment B ELECTRICAL TASK RISK ASSESSMENT FORM Page 3 f 3

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC) PtashCrp Tier 1 Safety Standard Date Revisin Changes 03/09/2016 0 Dcument issued 11/01/2016 1 Apprved by Nutrient Presidents 1.0 Purpse This prcedure utlines the PtashCrp (PCS) Flame Resistant Clthing

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 4 03 / 2007 Page 1 f 5 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N. 10.5 Radiatin 10.5.1 INTRODUCTION 10.5.1.1 Radiactive materials and radiatin generatrs, which include

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PURPOSE AND SCOPE The intent f this primary standard is t utline the requirements fr the effective islatin f static and mbile plant and equipment prir t the wrk

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

DynaRound Hatch Guard System Installation Instructions

DynaRound Hatch Guard System Installation Instructions DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

2017 NEC Significant Code Changes Part 1

2017 NEC Significant Code Changes Part 1 2017 NEC Significant Cde Changes Part 1 Fur (4) Cntinuing Educatin Hurs Curse #EE1001 Apprved Cntinuing Educatin fr Prfessinal Engineers 2017 NEC Significant Cde Changes Part 1 i Table f Cntents 2017 NEC

More information

Pool & Hot Tub Guide

Pool & Hot Tub Guide Pl & Ht Tub Guide PERMIT(S) FOR POOLS/HOT TUBS WITH SIDE WALLS > 24 ***** ALL FEES DUE AT TIME OF APPLICATION ***** Building Permit Applicatin. Be aware f any subdivisin restrictins prir t applicatin.

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY

OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY 100W: BOP 20-5, BOP 50-2, BOP 100-1 200W: BOP 20-10, BOP 36-6, BOP 50-4, BOP 72-3, BOP 100-2, BOP 200-1 400W: BOP 20-20, BOP 36-12, BOP

More information

Pre-Installation Preparation Job Aid

Pre-Installation Preparation Job Aid Summary This Jb Aid cvers: ViaSat Installatin Standards Equipment Necessary fr ViaSat Service installatin Installatin Tls Safety: IDU Safety: ODU Safety: Persnal Safety: Wrking Arund Electricity Safety:

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers Applicatin fr Registratin f Designated Radiatin Equipment Class 3b and 4 Lasers OWNER INFORMATION Is this equipment wned by a Zne? Yes N If yes, which Zne? If n, please cmplete the fllwing: Owner Name:

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE Versin 40 This is a general manual describing a series f single axis mdule Serv Amplifiers having utput capability suitable fr driving Brushless

More information

Evidence analysis VET Quality Framework

Evidence analysis VET Quality Framework Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty

More information

Operating Process for Access to Gas Insulated Switchgear

Operating Process for Access to Gas Insulated Switchgear Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument

More information

Some Supplementary Review Information for ARMs

Some Supplementary Review Information for ARMs General Infrmatin Regarding Radilgical Areas Sme Supplementary Review Infrmatin fr ARMs As a class f areas, Radilgical Areas are designated in 10CFR835. This has a different meaning than ur use f the designatin

More information

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

5500K LED Module. 123,000- hours to a 30% decrease in brightness Aluminum Printed circuit board, Cree LEDs

5500K LED Module. 123,000- hours to a 30% decrease in brightness Aluminum Printed circuit board, Cree LEDs 5500K LED Mdule Descriptin: Size, Quantity f LEDs, Pwer, Brightness Vltage Dimming CRI: (R4) 84 ~6 x 6 x 0.28-in, 36 LEDs, 6-watts, 60 lm ~6 x 6 x 0.28-in, 49 LEDs, 8-watts, 830 lm ~2 x 2 x 0.28-in, 44

More information

SISTEMA ELEVATÓRIO ETV 460A

SISTEMA ELEVATÓRIO ETV 460A Parts included with yur Flat Lift Lift unit ( #1 ) Pwer supply ( #2 ) R.F. Mdule ( #3 ) Rcker switch ( #4 ) Remte Cntrl ( #5 ) Lift unit ( #1 ) Remte Cntrl ( #5 ) Pwer supply ( #2 ) Rcker switch ( #4 )

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

CB-030S Circuit Board

CB-030S Circuit Board CB-030S Circuit Bard Designed fr use with the high trque PM486FH (up t 7A) Adjustable acceleratin and deceleratin time (0 t 2.5s) Stable speed peratin Switch fr manual r autmatic recvery f the thermal

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

SolarEdge Built-in Revenue Grade Meter Troubleshooting

SolarEdge Built-in Revenue Grade Meter Troubleshooting SlarEdge Built-in Revenue Grade Meter Trubleshting Versin 1.0 Cntents Trubleshting Meter Cnnectin 3 Cmmunicatin Status Screen Trubleshting 3 Device Type and Prtcl are cnfigured incrrectly 3 Number f devices

More information

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should:

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should: AQA Resistant Materials - Unit 1 Specificatin 2014-4560 Materials: Metals, timber, plastics, cmpsites, smart and nanmaterials Be aware f the surce f a range f materials. Understand they are prcessed fr

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. Order N. : 5323 02 Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty damage pssible. Please read

More information

Laser Equipment Companion Manual

Laser Equipment Companion Manual Cllege f Physicians & Surgens f Alberta Laser Equipment Cmpanin Manual Owner Respnsibilities Radiatin equipment cannt be used until a CPSA registratin certificate has been issued. Register equipment accrding

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

GENERAL TECHNICAL DATA Specifications, Directives and Standards

GENERAL TECHNICAL DATA Specifications, Directives and Standards GENERAL TECHNICAL DATA Specificatins, Directives and Standards The Camden prducts listed in this catalgue are develped and manufactured accrding t the rules set ut in IEC internatinal publicatins and EN

More information

2017 NEC Significant Code Changes Part 2

2017 NEC Significant Code Changes Part 2 2017 NEC Significant Cde Changes Part 2 Fur (4) Cntinuing Educatin Hurs Curse Apprval #EE1002 Apprved Cntinuing Educatin fr Prfessinal Engineers 2017 NEC Significant Cde Changes Part 2 i Table f Cntents

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

Generating Facility Interconnection Guide. Revision 5.0

Generating Facility Interconnection Guide. Revision 5.0 Generating Facility Intercnnectin Guide Revisin 5.0 AMERICAN TRANSMISSION COMPANY Generating Facility Intercnnectin Guide (An ATC Business Practice) Revisin 5.0 April 2014 American Transmissin Cmpany W234

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

TRANSPORTADORA DE GAS DEL PERU

TRANSPORTADORA DE GAS DEL PERU Page 1 0 ISSUE FOR CONSTRUCTION 03..05.02 GIU BOF GIU B ISSUE FOR APPROVAL 02.01.02 GIU BOF GIU A ISSUE FOR APPROVAL 12.06.01 GIU BOF GIU REV.. DESCRIPTION DATA PROJ. EXEC. CONT. APROV. TRANSPORTADORA

More information

Standard OPS-020 Avionics and Communications

Standard OPS-020 Avionics and Communications Standard OPS-020 Avinics and Cmmunicatins The Natinal Aerial Firefighting Centre r NAFC is a business unit f the Australasian Fire and Emergency Service Authrities Cuncil Limited (ACN 060 049 327). The

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

Biochemistry Laboratory II CHEM Course Syllabus

Biochemistry Laboratory II CHEM Course Syllabus Bichemistry Labratry II CHEM 4582 Curse Syllabus 1 General Infrmatin COURSE OBJECTIVE The primary bjective f this curse is fr students t learn labratry methds fr characterizing bilgical macrmlecules using

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

PRODUCT SAFETY ALERT

PRODUCT SAFETY ALERT Allen-Bradley Mtr Prtectin Circuit Breakers 140M-C2E and 140M-C2T, Series A and B 140M-D8E and 140M-D8T, Series A and B 140M-F8E and 140M-F8T, Series A, B and C Starters that use Allen-Bradley Mtr Prtectin

More information

Participation is open on equal conditions to all national and international experienced individual consultants.

Participation is open on equal conditions to all national and international experienced individual consultants. REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS

More information

PJM Protection Standards

PJM Protection Standards PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010

More information

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM March 29, 2018 Richard B. Oliver Orange Cunty Pst Presenter Richard Oliver, a Ls Angeles-based Pillsbury partner, is a leading authrity n gvernment cntracts and disputes

More information

Application Note: Conducted Immunity: Quick Guide

Application Note: Conducted Immunity: Quick Guide icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas

More information

IEC Functional Safety Assessment

IEC Functional Safety Assessment IEC 61508 Functinal Safety Assessment Prject: 1052 Series Actuatrs Cmpany: Fisher Cntrls Internatinal LLC, Inc. (an Emersn Prcess Management cmpany) Marshalltwn, IA USA Cntract Number: Q13/05-046 Reprt

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. 2-gang Art. N. : HS2 RF 4-gang Art. N. : HS4 RF Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty

More information

CAR ASYST - Quick Start Guide MAIN MENU

CAR ASYST - Quick Start Guide MAIN MENU fficially apprved by CAR ASYST - Quick Start Guide MAIN MENU Main menu The main menu f ur CAR ASYST APP is divided int 7 menu items. Belw yu will find a list f these items including a shrt descriptin.

More information

Beechcraft Bonanza HID Landing Light Assembly Kit

Beechcraft Bonanza HID Landing Light Assembly Kit Beech Bnanza HID Light Assembly Kit Manual N. HID-B-001 Issue Date: 5-8-05 STC N. SA01834CH Revisin Date: 12-22-07 Beechcraft Bnanza HID Landing Light Assembly Kit INSTALLATION MANUAL N. HID-B-001 Beechcraft

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines BASIC SAFETY AND FABRICATION GUIDE Safety Guidelines These manuals are designed t give basic guidelines t help ensure that Century Quartz Stne Surfaces prducts are t be handled, stred, fabricated, and

More information

Radiation Standard Procedures Sealed Source. RSP-4 Page 1 of 12. Environmental Health and Safety Radiation Protection Committee

Radiation Standard Procedures Sealed Source. RSP-4 Page 1 of 12. Environmental Health and Safety Radiation Protection Committee Radiatin Safety Manual Title: Number: Radiatin Standard Prcedures Sealed Surce Page 1 f 12 Issued by: Apprved by: Envirnmental Health and Safety Radiatin Prtectin Cmmittee Date issued: Date apprved: June

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

Tension meter dynaline HF45/LPT

Tension meter dynaline HF45/LPT Tensin meter dynaline HF45/LPT EN Operatin and maintenance manual SUMMARY 1. DEFINITIONS... 3 2. PICTOGRAMS USED IN THIS MANUAL... 3 3. STANDARD CONTENT OF DELIVERY... 3 4. INTRODUCTION... 4 4.1. Descriptin...

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION Date f Request: Prperty Owner Name: (Please Print) Prperty Address: Day Time Phne: ( ) E-Mail: Est. Start Date: Est. Cmpletin Date: The hmewner must ntify the Prperty Management Office, via e-mail, upn

More information

Dry Contact Sensor

Dry Contact Sensor www.akcp.cm Dry Cntact Sensr Intrductin The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable

More information

IA CERTIFICATE (Revision 3 Revised for Annual review)

IA CERTIFICATE (Revision 3 Revised for Annual review) Certificate Number: MASC M/11-376X Issue: 22 September 2014 Expire: 22 September 2015 Page: 1 f 5 IA CERTIFICATE (Revisin 3 Revised fr Annual review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS ACT

More information

ASSEMBLE ALUMINUM TOOLBOX

ASSEMBLE ALUMINUM TOOLBOX ASSEMBLE ALUMINUM TOOLBOX INTRODUCTION In this lessn, yu will assemble an aluminum sheet metal tlbx using rivets. Yu will start with a kit that includes pre cut and pre frmed aluminum tlbx panels. This

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

E-Learning, DC drives DCS800 Hardware Options, part 1 Size D1 D4. ABB Group February 2, 2010 Slide 1 DCS800_HARDWARE_OPTIONS_01R0101

E-Learning, DC drives DCS800 Hardware Options, part 1 Size D1 D4. ABB Group February 2, 2010 Slide 1 DCS800_HARDWARE_OPTIONS_01R0101 E-Learning, DC drives DCS800 Hardware Optins, part 1 Size D1 D4 February 2, 2010 Slide 1 Objectives This training mdule cvers: Lcatin fr plug-in ptins Types f plug-in ptins Fiber ptic cnnectin bard DCS800

More information

AF4000 MOD-1 OEM Production Line Troubleshooting Guide

AF4000 MOD-1 OEM Production Line Troubleshooting Guide Revisin 0: Initial dcument creatin, 9/2006, M. Rgers AF4000 MOD-1 OEM Prductin Line Trubleshting Guide If erratic system behavir is bserved that cannt be reslved by the methds utlined belw, ensure that

More information

PhotoVu Digital Picture Frame Service & Repair Guide

PhotoVu Digital Picture Frame Service & Repair Guide PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu

More information

1300 S. Interocean Ave. Holyoke, CO

1300 S. Interocean Ave. Holyoke, CO 1300 S. Intercean Ave. Hlyke, CO Intercnnectin Standard fr Small Generating Facilities N Larger Than 25kW and 600VAC Intrductin This dcument prvides a standard fr intercnnectin f distributed resurces within

More information

Wireless Bridge Module for DXR2.E

Wireless Bridge Module for DXR2.E Technical Specificatin Sheet Dcument N. A6V11470500 July 31, 2018 Wireless Bridge Mdule fr DXR2.E Descriptin A wireless bridge cnnects tw wired netwrks tgether ver Wi-Fi utilizing a Wireless Access Pint.

More information

WiFi Lab C. Equipment Needs:

WiFi Lab C. Equipment Needs: WiFi Lab C Event Objective: Teams will cnstruct an antenna prir t the turnament that is designed t transmit a signal at 2.4 GHz and cmplete a written test n the principles f electrmagnetic wave prpagatin.

More information

2017 NEC Significant Code Changes Part 5

2017 NEC Significant Code Changes Part 5 2017 NEC Significant Cde Changes Part 5 Fur (4) Cntinuing Educatin Hurs Curse Apprval #EE1005 Apprved Cntinuing Educatin fr Prfessinal Engineers 2017 NEC Significant Cde Changes Part 5 i Table f Cntents

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

Creative Scotland is the national development agency for the arts, screen and creative industries.

Creative Scotland is the national development agency for the arts, screen and creative industries. Creative Sctland is the natinal develpment agency fr the arts, screen and creative industries. Unlcking Ptential, Embracing Ambitin Creative Sctland is the public bdy that supprts the arts, screen and

More information

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256)

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256) ADS ECHO Qstart Quick Reference Guide December 2016 QR 775033 A0 340 The Bridge Street, Suite 204 Huntsville, Alabama 35806 (256) 430-3366 www.adsenv.cm 2 ADS ECHO Qstart Quick Reference Guide 2016 ADS

More information

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID: xtltipelement Service Infrmatin 2015 Chevrlet Crvette Crvette Service Manual 7527625 Bdy Systems Vehicle Access Repair Instructins Dcument ID: 3448513 Remte Cntrl Dr Lck and Theft Deterrent Transmitter

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

HIGH VOLTAGE PROXIMITY DETECTOR

HIGH VOLTAGE PROXIMITY DETECTOR HIH VOLTAE PROXIMITY DETECTOR An ISO 01:2008 Cmpany Mdel 275 HP (Upt 275KV) / 500 HP (Upt 500KV) The / 500HP is a HIH VOLTAE prximity detectr. has eight vltage detectin settings frm t 275KVac. & 500HP

More information

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based

More information

Application Note AN-2097 Evaluation Kit for the S7500 CW Tunable Laser

Application Note AN-2097 Evaluation Kit for the S7500 CW Tunable Laser Applicatin Nte AN-2097 Evaluatin Kit fr the S7500 CW Tunable Laser 1 Intrductin The evaluatin kit is intended t facilitate testing f Finisar s S7500 widely tunable laser, S7610 Integrable Tunable Laser

More information

ACM1281 NFC Reader Module Reference Information

ACM1281 NFC Reader Module Reference Information ACM1281 NFC Reader Mdule Reference Infrmatin ACM1281 NFC Reader Mdule Technical Reference Infrmatin V1.00 Subject t change withut prir ntice inf@acs.cm.hk www.acs.cm.hk Versin Histry Date By Changes Versin

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON BUILDING SERVICES ENGINEERING PLAN REVIEW GUIDELINES (PRG 2): Guidelines Objective: 1. Imprve cmmunicatins between Building Services and the engineering design cmmunity that prepares

More information

Roof Safe Netting CONTENTS

Roof Safe Netting CONTENTS Rf Safe Netting CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 3 Technical Data... 4 Size Range Available...

More information

Remote Control Learn Button Receiver Input Connections

Remote Control Learn Button Receiver Input Connections Remte Cntrl Learn Buttn Receiver Input Cnnectins Remte Cntrl LED Light Wi-fi/Factry Reset Buttn Receiver Output Cnnectin Heartbeat LED Light PRV Cnnectins Pwer Reset Buttn Pl / Treadmill Switch Flat Switch

More information