Request for Statement of Interest (SOI) Advanced Traffic Management System (ATMS) Software Development and Integration

Size: px
Start display at page:

Download "Request for Statement of Interest (SOI) Advanced Traffic Management System (ATMS) Software Development and Integration"

Transcription

1 Request fr Statement f Interest (SOI) Advanced Traffic Management System (ATMS) Sftware Develpment and Integratin The Kane Cunty Divisin f Transprtatin (KDOT) is in need f prfessinal services frm a qualified traffic system engineering firm. These services are required fr the develpment f an Advanced Traffic Management System (ATMS) and integratin t an existing cunty ATMS field cmmunicatin netwrk and future Arterial Operatins Center. The attached Preliminary Scpe f Services prvides in detail the anticipated items that are necessary as part f the requested traffic system engineering services. The duratin f these services will begin in mid May f 2012 and cntinue cncurrently with the cnstructin f the AOC additin, which is anticipated t begin in late 2012 and be cmpleted apprximately within eight mnths. The Statement f Interest shall be submitted VIA n later than 4:00 P.M. n March 9, 2012 and shuld be addressed t Thmas F. Szab, TOPS, TSOS Traffic Sectin Manager Mr. Szab s address is: szabtm@c.kane.il.us. Statements f Interest received will be used by Cunty engineering staff t develp a shrt-list f three (3) firms. The Cunty will then submit a Request fr Prpsal (RFP) and schedule interviews with the shrt-listed firms. Fr mre infrmatin regarding the SOI, such as cntent and frmat f these items, please reference ur QBS dcument fund at Als, the SOI shall be submitted in PDF frmat viewable with the latest versin f Adbe reader. The Cunty will prvide yu with an receipt/respnse verifying that yur submittal was received. If yu d nt receive this verificatin please cntact Mr. Thmas Szab, Traffic Manager at (630) If yu plan t enter int a jint venture with anther firm fr this prject please nte this n yur Statement f Interest, including the name f the firm yu are entering int a jint venture with. Shrt-listed firms will be psted n ur website at Click n the link labeled Request fr Cnsultant Services, then click n the link labeled Summary Table. A Statement f Interest (SOI) received after the abve nted deadline will nt be used as part f ur cnsultant selectin prcess. 1

2 1. PROJECT DESCRIPTION In respnse t cntinued reginal grwth and the need t ptimize the Cunty s transprtatin resurces, the Kane Cunty Divisin f Transprtatin develped an ITS Strategic Plan. This plan defined the fllwing visin statement fr the Cunty s use f ITS technlgies and systems: Deply advanced transprtatin technlgy and peratinal strategies t maximize the safety and efficiency f the cuntywide transprtatin system thrugh enhanced traveler infrmatin, interagency cperatin and reginal crdinatin That plan identified fur fcus areas fr the ITS prjects within the Cunty: Arterial Operatins Traffic Incident Management Maintenance and Cnstructin Management Rural Operatins It was determined that these fur fcus areas culd best be supprted with the develpment f an Arterial Operatins Center (AOC). Since the initial plan, the Cunty cntinues t expand the ITS infrastructure and has develped a Cncept f Operatins. Architectural plans fr the AOC are currently being finalized. The scpe f services fr this prject includes ITS system integratin supprt and a centralized Arterial Traffic Management System (ATMS) t be perated frm the Cunty s future AOC. The selected cnsultant will prvide a cmplete fully functinal ATMS meeting the requirements as described herein. The Cnsultant shall prvide all integratin supprt, hardware and sftware required t deliver a fully functinal ATMS. 2. PROJECT SUMMARY Prject Functinality Frm the AOC it is envisined that the ATMS will be used t supprt the fllwing activities. The blded belw items will be integrated thrugh this prject. The ther (italicized) items listed will becme a part f future enhancements Traffic Cnditin Mnitring Weather Thrugh RWIS and/r Natinal Weather Service Incidents thrugh Dispatch integratin with Kane Cunty Department f Emergency Cmmunicatin (KaneCmm) & thers Cnstructin Planned events Cngestin and Events n neighbring rutes that impact KDOT radways Recurring/Capacity driven Cngestin Traffic Cnditin Respnse Use and sharing f CCTV Traffic Signal timing updates and respnses (manual) Use and sharing f Weather (atmspheric and pavement) Infrmatin Dynamic Message Sign respnses Prtable and permanent Ntificatins within KDOT Ntificatins t Stakehlders 2

3 Public Web Page System Mnitring and Maintenance CCTV perfrmance Dynamic Message Signs (DMS) Cnnectins t external systems Traffic Signal Cntrller Perfrmance ATMS Netwrk Detectr Perfrmance Cunty Staff Crdinatin Divisin f Transprtatin Maintenance Cnstructin Traffic Infrmatin Technlgies (IT) Department f Emergency Cmmunicatin (KaneCmm) Department f Infrmatin Technlgies (IT) 2. Devices and Quantities Thrugh this prject the selected cnsultant will be required t prvide ATMS applicatin sftware, hardware and integratin/cnfiguratin services needed t supprt the highlighted items abve, as described in mre detail belw. The hardware must be sized t meet all the gals listed abve, and the sftware must be readily expandable t meet the un-highlighted gals in future phases. Over the next 5 years the cunty anticipates the fllwing ITS infrastructure and data integratin cmpnents as the basis f the system design. DEVICES EXISTING PLANNED/5 YEAR ANTICIPATED CCTV DMS 4 10 Cngestin/Travel Times cllectin devices 0 50 VDS Types 5 (lps, micrwave, videptical, vide thermal, magnetic pint detectin) 8 RWIS 0 5 Rail Crssings

4 INTERFACES EXISTING PLANNED/5 YEAR ANTICIPATED Gateway 0 1 Natinal Weather Service 0 1 Cmputer Aided Dispatch 0 5 Kane Cunty Traffic Signals System 1 (112 intersectins) 1 (125 intersectins) CMAP 0 1 AVL 40 (Vehicles) Other Traffic Management Devices including (i.e. Flashing Warning Beacns, Driver Feedback Signs, etc.) 100 (Vehicles) 5 40 Municipal Signal Systems 0 5 GIS Data Histrical and static data and maps 3. CONSULTANT QUALIFICATION Interested cnsultants must be able t demnstrate the fllwing: Have designed and deplyed arterial based traffic management systems that integrate with a brad range f ITS devices and systems. Have extensive system integratin and deplyment experience including all f the identified areas listed herein. Demnstrate sufficient lcal staff t supprt this prject and future enhancements The Prject Manager must be lcated within a 2 hur drive frm the Kane Cunty AOC fr the life f the prject. Key integratin technical supprt must be lcal f the AOC thrughut the deplyment, integratin, testing and acceptance phase. During the maintenance perid, the prvider must be able t prvide n-site supprt within 4 hurs during business hurs 7 am t 5 pm, Mnday thrugh Friday excluding hlidays. Shall be able t demnstrate an existing system that already prvides and supprts the majrity f the items listed in bld abve and describe as fllws. Demnstrated capabilities shall be defined as the cmbinatin f: System Demnstratin (at KDOT discretin) Listing f deplyments utilizing the desired and demnstrated functins Client references The fllwing bullets describe the high level functinality that that Cunty wuld like the ATMS t prvide. Prpsals shuld clearly respnd t each item listed belw. Yur respnse shuld describe hw yur system meets the need, where it is currently deplyed, and prvide screen captures f yur system as apprpriate t help describe yur slutin. Yur respnse shuld clearly indicate if yur prpsed slutin has been implemented in a live system, r if sftware develpment is needed t meet the requirement. Respndents must include client references that can verify the functinality f each live system that is referenced. If any screen shts are mcked up t shw hw the system will functin nce 4

5 the system is mdified t meet the requirement, the screen sht must be clearly identified as a Mckup versus a live system screen capture. 4. SYSTEM CAPIBILITIES The Cunty desires t deply an ATMS slutin that is based n an existing (in current peratin) system that meets the majrity f the required functinality withut substantial sftware mdificatins Traffic and Radway Cnditin Mnitring Weather Thrugh RWIS and Natinal Weather Service (NWS) The phase 1 deplyment will include the integratin f RWIS statin data int the ATMS. The ATMS shall use the data t clr cde icns n the system map based n the data cllected frm the RWIS statin. Please prvide examples f hw yu have used RWIS data in yur prpsed ATMS. Phase 1 deplyment will als include the integratin f NWS data int the ATMS. Please describe hw yu have used NWS service within yur prpsed ATMS. RWIS Cnnectivity will be ver IP cellular r KDOT netwrk. NWS will be btained ver internet Incidents thrugh Dispatch integratin with KaneCmm - Mnitring, managing and distributing incidents that affect the arterial traffic is an imprtant part f the prpsed ATMS. The first phase ATMS deplyment will include an interface t the Kane Cunty (KaneCmm) Cmputer Aided Dispatch (CAD) System. Thrugh this interface the ATMS must cllect incident detail and autmatically create crrespnding incidents within the ATMS. The interface will include the tw-way sharing f event ntes between KaneCmm and the AOC. The infrmatin cllected frm the CAD system will include basic incident details such as type and lcatin, and CAD ntes. Please describe hw and where yu have develped CAD interfaces t an arterial based traffic management system. Please describe the functinal characteristics f the planned interface. The Cnnectivity will ccur ver KDOT netwrk. KaneCmm utilizes CAD frm New Wrld, versin 9.0. Cnstructin The Phase 1 deplyment will allw the Cunty t enter, mnitr and manage maintenance and cnstructin events and traffic peratins thrugh the ATMS. Please describe hw yur ATMS supprts the mnitring and management f cnstructin events. Cnnectivity mst likely thrugh manual user entry. Planned events - Phase 1 deplyment must als allw the Cunty t enter, mnitr and manage planned events such as the Kane Cunty Fair, Flea Market, and Kane Cunty Cugars games, varius large churches, etc. Please describe hw yur ATMS supprts the mnitring and management f planned events. Cnnectivity mst likely thrugh manual user entry. Cngestin and Events n rutes that impact KDOT radways The Phase 1 deplyment will include an interface t the Gateway system managed by IDOT. Thrugh this interface the ATMS will receive event data (incident, cnstructin, maintenance and special events). The ATMS must autmatically create crrespnding ATMS events fr Gateway events that are relevant t Kane Cunty. Please indicate if yu have ever deplyed an ATMS that interfaces with the Gateway. Als describe hw this type f interface wrks within yur prpsed system. Cnnectivity thrugh Gateway ver internet. 5

6 Recurring/Capacity driven Cngestin - Phase 2 deplyment f the ATMS will include an interface t the Cunty s traffic signal system Siemens Tactics t cllect system detectr data. The ATMS will use the system detectr data t derive the apprximate level f cngestin. The ATMS will use this data t clr cde segments n the internal ATMS Map and the Cunty s public web page. In additinal ther traffic data surces may be used t supplement the traffic data prvide by the signal system detectrs. Other detectin types may include traditinal lp detectin, vide detectin, radar detectin, Bluetth technlgy, and external third party prbe based data. Respndents shuld demnstrate that they have used signal system detectr data t derive levels f cngestin n an arterial. Please describe hw the data was used. Als demnstrate yur ability t use the ther data surces listed abve t prvide cngestin levels n an arterial Traffic Cnditin Respnse Use and sharing f CCTV- Fr the initial phase 1 deplyment the ATMS must include an integrated CCTV cntrl, viewing and sharing slutin. The ATMS must allw bth users in the AOC and remte users t cntrl and view CCTV images. The system must supprt the sharing f vide with partnering agencies, including IDOT Gateway, Illinis Tllway, and municipal partners. Please prvide an peratinal and technical descriptin f yur ATMS CCTV functinality, features, specificatins and licensing terms. Cnnectivity via KDOT fiber netwrk. Use and sharing f Weather (atmspheric and pavement) Infrmatin The Phase 1 deplyment will include the integratin with RWIS statins. The ATMS must be able t generate ATMS events based n the utput f RWIS sensrs r input frm the NWS. ATMS event must include the ability t autmatically generate a respnse based n the characteristics f the weather event. Fr example, if an RWIS statin reprts parameters utside f user settable threshld, the ATMS shuld autmatically create an event and a respnse t that event that utilizes the apprpriate devices and utputs that are available. Dynamic Message Sign (DMS) respnses - The Phase 1 deplyment must supprt the cntrl f NTCIP based prtable and permanent munted DMS. The ATMS must supprt message queuing, spell checking, banned wrd restrictins, and autmated DMS respnse based n event characteristics. Please describe hw yur system supprts this DMS functinality. Cmmunicatin with Signs will be accmplished via IP Cellular mdem ver internet and/r fiber ptic cmmunicatin thrugh the existing ATMS netwrk. Ntificatins within KDOT The Phase 1 ATMS must prvide autmated ntificatins t selected KDOT staff. The system must autmatically generate and SMS messages based n device failures, device parameters and event details r severity. Please describe hw yur system meets this functinality. Ntificatins t Stakehlders - The Phase 1 ATMS must als prvide autmated ntificatins t external stake hlders thrugh , SMS, a standards based C2C interface, and a direct feed t the Gateway. The Gateway and C2C interface must prvide event details t C2C subscribers in near real time. The ATMS must als autmatically generate and/r SMS messages t selected external entities based n user settable event parameters such as type r severity. Ntificatin capabilities shall include event status, device status and device threshlds (ex VDS speed, travel times, 6

7 RWIS pavement temperatures, surface cnditins, and wind speed). Please describe hw yur system meets this requirement. Traffic Signal Timing Updates and Respnses The Phase 2 deplyment will include a tw way interface with the Cunty s centralized traffic signal system. Thrugh this interface, the cunty wuld like the ATMS t be able t suggest and implement signal timing changes based n majr incidents, events r severe traffic cnditins. Respnses shall indicate examples f implementatins ATMS that interfaces t an external traffic signal systems t mnitr perfrmance and implement changes t the signal timing plans. Public Web Pages The Phase 2 deplyment activities can be expected t prvide data and ptentially a web site service Systems Mnitring and Maintenance Device Mnitring - Phase 1 deplyment will include the integratin f DMS, VDS and CCTV. The ATMS must mnitr the status f these devices and indicate the status f the device n the system map based n the clr f the icn. Please describe hw yur system meets this need. Interface Mnitring - The Phase 1 ATMS deplyment must als mnitr cnnectins t external systems and prvide alarms when the cnnectins are dwn. Please describe where and hw yu have implemented this feature n previus ATMS deplyments. ATMS Netwrk Mnitring Phase 2 deplyment may include mnitring f cmmunicatins system devices such as switches and cmmunicatins band with mnitring. Please describe where and hw yu have implemented this feature n previus ATMS deplyments. Traffic Signal Cntrller Perfrmance The Phase 2 ATMS deplyment will include an interface t the Cunty s central traffic signal system. Thrugh this interface the ATMS will cllect and then display the status if each cnnected intersectin. Please indicate if yu have deplyed an ATMS that includes an interface t an external signal system and cllects signal status infrmatin. If s please describe the functinality and prvide screen shts that shw the signal status in the ATMS. Detectr Perfrmance Phase 2 ATMS deplyment will include the integratin f external traffic detectin. The ATMS shuld include failure management strategies that help assess data quality. Please indicate hw yur prpsed ATMS slutin has implemented any failure management strategies KDOT Crdinatin Fr Phase 1, the ATMS must be designed t supprt the crdinatin with KDOT maintenance, cnstructin, traffic and (KDOT and Kane Cunty) IT staff. It is imprtant that the ATMS architecture makes it easy t supprt and manage many remte users. As a result, KDOT wuld prefer a brwser-based thin client ATMS slutin. Java, r ther thick client based platfrms may als be acceptable if the respndent can demnstrate hw the end user wrkstatins can be autmatically updated and easily managed remtely. Please describe hw yur system meets the need fr easy supprt fr need user clients. Als prvide any ther details r features f yur system that supprt the desire fr crdinatin with Maintenance, Cnstructin, Traffic and IT staff. 7

8 Other General Requirements Respndents must respnd (in their prpsal) t each item, acknwledge cnfrmance and prvide apprpriate detail related t yur prpsed system. Please prvide a detailed technical descriptin f yur prpsed slutin, including architecture, sftware language(s) used, database platfrm and required hardware. The cnsultant shall prvide a cmplete, integrated, fully functinal ATMS that meets all the functinal and technical requirements listed in this RFP. The Cunty is lking fr a cmplete integrated slutin. The use f multiple separate sftware packages t meet the requirements is nt acceptable, unless the Cnsultant can demnstrate cmplete integratin between the packages. The ATMS must include a map interface that supprts the display f Cunty ITS assets with status, traffic cnditin data, and events as well as incrprating map pan, zm and preset viewing features, fcused n Kane Cunty, but including at least Nrthern Illinis with I-80 as the suthern brder and state line t the West, Nrth, and East as the cnstraints. With limitatins in AOC staffing and given ther staffing cnsideratins, it is imprtant that the ATMS prvides a level f autmatin that ensures cnsistent and timely respnses. As such, the ATMS must be capable f generating autmated DMS, and ATIS respnses based n event details. Respnses must be based n templates that can be cnfigured and mdified by KDOT. The prvided slutin must include all apprpriate licensing fr the ATMS and any included COTS packages. Licensing must include supprt fr an pen number f users and devices within the Cunty f each device type as well as shared device cntrl with partner agencies. Fr example, if the license includes DMS cntrl, there shall nt be specific cnstraint t the number f DMS that the Cunty can add t the system within the terms f the license, and the Cunty shall be able t add access t ther users such as IDOT, lcal municipalities and neighbring cunties, and ther stakehlders. Representative licensing agreement language and csting mdels shall be prvided with the respnse. The Cnsultants prpsal shall include the full deplyment f the ATMS and 1 year f pst-deplyment supprt and maintenance. During the 1 year pst deplyment supprt and maintenance perid, the cnsultant shall be required t maintain the system functinality as deplyed at the time f acceptance. The Cnsultant shall prvide all required integratin with existing ITS systems and devices, system sftware, hardware, dcumentatin and training. Dcumentatin shall include an Administratrs Manual, Users Manual, and a System Cnfiguratin dcument prvided at acceptance and update thrughut the first year f supprt. The cnsultant shall prvide tw fur-hur training sessins prir t acceptance f the system. The ATMS shall utilize a cmmn ff the shelf database fr data archiving. The ATMS hardware, sftware and database shall be sized t supprt the cllectin and n-line 8

9 archiving supprting 2 years f event data, and up t ne mnth f snapsht CCTV image strage fr up t 400 camera images cllected at 5-minute intervals. The ATMS client shall perate n a PC running Windws 7 and prvide fr secure access by administratr apprved users. 5. PROJECT SCHEDULE AND DURATION Upn cmpletin f the review f all prpsals, KDOT may request select cnsultants t demnstrate their prpsed system. If demnstratins are requested, the cnsultants will be expected t demnstrate a fully functins system that meets mst f the high level requirements identified herein. Cntract duratin shall begin upn the receipt f the ntice t prceed frm the Cunty t the Cnsultant, which is anticipated t be within the next tw mnths. KDOT s gal is t have the Phase 1 ATMS fully peratinal prir t the cmpletin f the AOC. The AOC is expected t be cmplete in late 2012/early Respndents shuld prvide a prject schedule shwing hw they will implement the system in a manner that best supprts day 1 peratins frm the AOC. The initial cntract duratin is expected t be 36 mnths and include the deplyment f phase 1 and 2 within the first 24 mnths and ne year f supprt and maintenance. It is anticipated that the agreement will likley include tw ne-year ptins, fr the Cunty t retain the Cnsultant fr nging system supprt, maintenance r further enhancements as needed. 9

10 Acrnyms AOC Arterial Operatins Center ATMS Advanced Traffic Management System AVL Autmated Vehicle Lcatin CCTV Clsed Circuit Televisin CMAP Chicag Metrplitan Agency fr Planning IDOT Illinis Department f Transprtatin ITS Intelligent Transprtatin Systems DMS Dynamic Message Sign RWIS Radway Weather Infrmatin System VDS Vehicle Detectin Statin KDOT Kane Cunty Divisin f Transprtatin PC Persnal Cmputer SMS Shrt Message Service 10

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

Automatic Number Plate Recognition

Automatic Number Plate Recognition Release Ntes Autmatic Number Plate Recgnitin Versin 14.2.0 Release Ntes Revisin 0 This dcument describes new features and reslved issues fr Autmatic Number Plate Recgnitin 14.2.0. Yu can retrieve the latest

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

CAR ASYST - Quick Start Guide MAIN MENU

CAR ASYST - Quick Start Guide MAIN MENU fficially apprved by CAR ASYST - Quick Start Guide MAIN MENU Main menu The main menu f ur CAR ASYST APP is divided int 7 menu items. Belw yu will find a list f these items including a shrt descriptin.

More information

Dry Contact Sensor

Dry Contact Sensor www.akcp.cm Dry Cntact Sensr Intrductin The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017 Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing

More information

Damocles 2404i Manual

Damocles 2404i Manual Damcles 2404i Inputs 1 8 Each blue terminal is shared by tw inputs. POWER 12V supply (+U / GND) ETHERNET Link & Activity Inputs 17 24 Each blue terminal is shared by tw inputs. Cnfiguratin Default: DIP1=

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...

More information

JJ / CP RFP Response to Inquiries

JJ / CP RFP Response to Inquiries GENERAL QUESTIONS Is it pssible t have pages 19 thrugh 40? The MS Wrd versin f the RFP can be fund n the Clerk f the Curt s website at www.ckcuntyclerkfcurt.rg. Please clarify the due date f the prpsals.

More information

SunGuide TM GUI Design Review Release 3.1 Express Lanes Meeting Minutes Date: March 10, 2008 Location: Video Conference

SunGuide TM GUI Design Review Release 3.1 Express Lanes Meeting Minutes Date: March 10, 2008 Location: Video Conference SunGuide TM GUI Design Review Release 3.1 Express Lanes Meeting Minutes Date: Lcatin: Vide Cnference Attendees: Trey Tillander, FDOT CO Steve Crbin, FDOT D4 Rry Santana, FDOT D6 Manny Fntan, FDOT D6 David

More information

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting Revisin Date: 12/31/2012 Table f Cntents 1. Institutin, Cre Facility and Lab Administratin Reprting Overview...2 2. Hw d I access ilab Reprts?...3 3. What is the General Functinality fr ilab Reprting?...6

More information

E-Jobsheet Tablet Application Functionality

E-Jobsheet Tablet Application Functionality E-Jbsheet Tablet Applicatin Functinality The e-jbsheet applicatin has been created fr Truck Service Prviders (TSP) in rder fr their admin staff and fitters t handle all types f wrk via a mbile platfrm

More information

D a i s y M o d e m s

D a i s y M o d e m s D a i s y M d e m s D a i s y - C h a i n i n g Y u r N e t w r k W i t h R a v e n s W i r e l e s s T e c h n l g y Using Raven s secure Daisy radi mdems t access yur data frm arund the wrld, build yur

More information

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord High Level Design Circuit CitEE Irere Kwihangana Lauren Mahle Jaclyn Nrd 12/16/2013 Table f Cntents 1 Intrductin. 3 2 Prblem Statement and Prpsed Slutin. 3 3 Requirements. 3 4 System Blck Diagram 4.1 Overall

More information

Small Business Innovation Challenge Program. Ministry of Economic Development and Growth Ministry of Research, Innovation and Science

Small Business Innovation Challenge Program. Ministry of Economic Development and Growth Ministry of Research, Innovation and Science Small Business Innvatin Challenge Prgram Ministry f Ecnmic Develpment and Grwth Ministry f Research, Innvatin and Science Small Business Innvatin Challenge (SBIC) Overview On March 1, MEDG launched the

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

Multistate Mobility Performance Monitoring

Multistate Mobility Performance Monitoring Great Lakes Reginal Operatins Calitin (GLRTOC) Multistate Mbility Perfrmance Mnitring September 2015 GLRTOC Members The Great Lakes Reginal Transprtatin Operatins Calitin was funded in May 2010, and was

More information

Dispatcher Control for MotoTRBO Capacity Plus Systems

Dispatcher Control for MotoTRBO Capacity Plus Systems Dispatcher Cntrl fr MtTRBO Capacity Plus Systems This tutrial prvides brief instructins t set up the dispatch cntrl ver MtTRBO Capacity Plus systems, using SmartPTT dispatch sftware. Bth cases are cnsidered:

More information

DEVELOPMENT APPLICATION

DEVELOPMENT APPLICATION DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications CATA Cmpser R2016 Fact Sheet Add a New Dimensin t Yur Prduct Cmmunicatins Versin 1.0-8/11/2015 Table f Cntents 1. CATIA Cmpser: VALUE AT A GLANCE... 3 2. CATIA Cmpser: Overview... 4 2.1. Immediate Prductivity

More information

NanoDrop One/One C Printing

NanoDrop One/One C Printing MARK S100 INSTRUCTIONS NanDrp One/One C NanDrp One/One C Printing Fr use with versin 1.4 f lcal cntrl sftware All Therm Scientific NanDrp One/One C instruments with versin 1.4 f lcal cntrl sftware can

More information

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD Intrductin The Denver Internatinal Airprt (DEN) Art & Culture Prgram (in cllabratin

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

Damocles 1208 MANUAL. Damocles Damocles 1208 Manual. Input status LED indicators. Inputs Not connected

Damocles 1208 MANUAL. Damocles Damocles 1208 Manual. Input status LED indicators. Inputs Not connected Damcles 1208 Damcles 1208 MANUAL Input status LED indicatrs Inputs 5 12 Nt cnnected DIP settings Default: DIP1:SETUP = Off DIP2:SAFE = Off Inputs 1 4 Output activatin LED indicatrs Outputs 1 8 (pen cllectrs)

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

CUSTOMER PORTAL. Floorplan Management

CUSTOMER PORTAL. Floorplan Management CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm

More information

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System VIP-200 Vide ver IP Extender and Matrix System Pint t Pint Extensin Cnfiguratin Quick Start Guide PureLink TM 535 East Crescent Avenue Ramsey, NJ 07446 USA Cntents What is in the bx... 3 Transmitter kit

More information

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256)

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256) ADS ECHO Qstart Quick Reference Guide December 2016 QR 775033 A0 340 The Bridge Street, Suite 204 Huntsville, Alabama 35806 (256) 430-3366 www.adsenv.cm 2 ADS ECHO Qstart Quick Reference Guide 2016 ADS

More information

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 Lab 2- VGA display and Light Sensr interface Reprt due at start f class Friday September 15 th Use the prvided Ambient Light Sensr mdule

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note RS232 Cmmunicatin Between a Sunny By 2500U and a PC Technical Nte Revisin 1.5 July 8, 2003 Kent Sheldn Revisin Histry 1.5 July 8, 2003 Kent Sheldn Cntact update 20830 Red Dg Rad Grass Valley, CA 95945

More information

GRFX 1801: Game Development for Platforms

GRFX 1801: Game Development for Platforms GRFX 1801: Game Develpment fr Platfrms Instructr Camern Buckley Email cbuckley@astate.edu Office Lcatin Fine Arts Center 123 Office Hurs Friday 10a 1p Curse Overview Intermediate and advanced techniques

More information

A c r o s s t h e S k y l i n e

A c r o s s t h e S k y l i n e A c r s s t h e S k y l i n e D a i s y - C h a i n i n g Y u r N e t w r k W i t h R a v e n s W i r e l e s s T e c h n l g y Using Raven s secure Daisy radi mdems and Skyline System t wirelessly access

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

Operating Instructions

Operating Instructions TC 40 THERMOCOMPUTER TC 40 start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing the Prgramme

More information

A c r o s s t h e S k y l i n e

A c r o s s t h e S k y l i n e A c r s s t h e S k y l i n e D a i s y - C h a i n i n g Y u r N e t w r k W i t h R a v e n s W i r e l e s s T e c h n l g y Using Raven s secure Daisy radi mdems and Skyline System t access yur data

More information

User Guide. ACC Mobile 3 Preview App for ios

User Guide. ACC Mobile 3 Preview App for ios User Guide ACC Mbile 3 Preview App fr ios 2017, Avigiln Crpratin. All rights reserved. AVIGILON, the AVIGILON lg, AVIGILON CONTROL CENTER, ACC, and TRUSTED SECURITY SOLUTIONS are trademarks f Avigiln Crpratin.

More information

The WHO e-atlas of disaster risk for the European Region Instructions for use

The WHO e-atlas of disaster risk for the European Region Instructions for use The WHO e-atlas f disaster risk fr the Eurpean Regin Instructins fr use 1 Last Update: June 2011 Cntents 1. Basic system requirements... 3 2. Structure f the WHO e-atlas... 4 2.1. Main menu... 4 2.1.1.

More information

Fig 1 System architecture. As shown in Figure 1, AUV system could be separated in 3 main blocks:

Fig 1 System architecture. As shown in Figure 1, AUV system could be separated in 3 main blocks: AUV System Descriptin Railway usage authrizatin system (called AUV, by its abbreviatin in Spanish) is a Safe Train Cntrl (STC) system prvided by Alta Rail Technlgy (ART). AUV system s structure is based

More information

Foundations of Technology

Foundations of Technology EXAM INFORMATION Items 70 Pints 70 Prerequisites NONE Grade Level 9-10 Curse Length ONE SEMESTER DESCRIPTION is an actin-based engineering and technlgy educatinal curse emphasizing design and prblem-slving

More information

Transportation Pooled Fund Study TPF-5 (231)

Transportation Pooled Fund Study TPF-5 (231) ENTERPRISE Drafmu Transprtatin Pled Fund Study TPF-5 (231) Real-Time Integratin f Arrw Bard Messages int Traveler Infrmatin Systems MODEL CONCEPT OF OPERATIONS February 2017 Prepared by Acknwledgements

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

Creating Gift Card Batches

Creating Gift Card Batches Every active custmer gift card issued is a part f a batch f gift cards. Prir t activating any individual gift card, yu must define a batch f gift cards and any accmpanying rules that apply t each batch.

More information

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions TC 60 prg start stp THERMOCOMPUTER TC 60 h C/h C Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing

More information

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016 Minneaplis Dwntwn Experience Cmmittee & The Minneaplis Dwntwn Cuncil HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016 Request fr Creativity Issue Date: June 2016 Submissin Deadline: June 24, 2016 at 5:00 p.m.

More information

GE Multilin 339 Motor Protection Specifications

GE Multilin 339 Motor Protection Specifications GE Multilin 339 Mtr Prtectin Specificatins The mtr prtectin relay shall prvide primary prtectin fr medium vltage mtrs. The relay shall be equipped with the fllwing prtectin functins. Mtr Thermal Overlad

More information

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start: Claim Amalgamatin Amalgamate means t jin 2 r mre cell claims int ne cell claim. Befre yu start: Yu will need t knw the title numbers f the cell titles fr amalgamatin. If yu are acting as an agent, yu must

More information

Service Update 7. PaperStream IP (TWAIN x64) for SP Series. change history. Version Version Version

Service Update 7. PaperStream IP (TWAIN x64) for SP Series. change history. Version Version Version PaperStream IP (TWAIN x64) fr SP Series change histry Service Update 7 Versin 1.46.0.5900 Crrected issue: 1. Minr errrs have been mdified. Versin 1.46.0.5775 New feature: 1. SP-1425 is newly supprted.

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Maxon Motor & Motor Controller Manual

Maxon Motor & Motor Controller Manual Maxn Mtr & Mtr Cntrller Manual Nte: This manual is nly fr use fr the Maxn mtr and cntrller utlined belw. This infrmatin is based upn the tutrial vides fund nline and thrugh testing. NOTE: Maximum Permitted

More information

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM March 29, 2018 Richard B. Oliver Orange Cunty Pst Presenter Richard Oliver, a Ls Angeles-based Pillsbury partner, is a leading authrity n gvernment cntracts and disputes

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel

More information

Consultancy Proposal. Abstract This document lays out the consultancy service proposal details Reference:

Consultancy Proposal. Abstract This document lays out the consultancy service proposal details Reference: Cnsultancy Prpsal Abstract This dcument lays ut the cnsultancy service prpsal details Reference: www.gamalearn.cm e-mail: inf@gamalearn.cm Page 1 f 8 Table f Cntents: Overview... 3 Cnsultatin Services:

More information

SVT Tab and Service Visibility Tool Job Aid

SVT Tab and Service Visibility Tool Job Aid Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining

More information

Develop preliminary specification and plans from a design brief

Develop preliminary specification and plans from a design brief Unit Title: OCR unit number 1 Level: 2 Credit value: 3 Guided learning hurs: 24 Unit reference number A/503/5851 Develp preliminary specificatin and plans frm a design brief Unit purpse and aim The fcus

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

San Diego I-15 Integrated Corridor Management (ICM) System: Phase I

San Diego I-15 Integrated Corridor Management (ICM) System: Phase I CALIFORNIA PATH PROGRAM INSTITUTE OF TRANSPORTATION STUDIES UNIVERSITY OF CALIFORNIA, BERKELEY San Dieg I-15 Integrated Crridr Management (ICM) System: Phase I Mark Miller, Linda Nvick, Yuwei Li, Alex

More information

Data Sheet - cctvxanpr PC based 1-4 channel ANPR (Automatic Licence Number Plate Recognition)

Data Sheet - cctvxanpr PC based 1-4 channel ANPR (Automatic Licence Number Plate Recognition) Data Sheet - cctvxanpr PC based 1-4 channel ANPR (Autmatic Licence Number Plate Recgnitin) the hme f Kdicm in Main features Real time PC based recrding Neural Net ANPR system Multi user peratin Event lg

More information

Hospital Task Scheduling using Constraint Programming

Hospital Task Scheduling using Constraint Programming Hspital Task Scheduling using Cnstraint Prgramming Authr: Chaman Chahal Supervisr: Dr. P. Bse, Schl f Cmputer Science Organizatin: Carletn University Curse: COMP4905 Date: Dec. 11, 2012 1 Abstract Hspitals

More information

SEARCHING PROVINCIAL NETLAW

SEARCHING PROVINCIAL NETLAW SEARCHING PROVINCIAL NETLAW Prvincial NetLaw ffers access t all Acts, Ordinances and Regulatins currently in frce and applicable t all 9 prvinces frm 1910 t date. Each amendment t an Act, Ordinance r Regulatin

More information

T-Mobile. Interim Text to Services and Wireless Emergency Alerts. Harold Salters, Director, Federal Regulatory Affairs, T-Mobile, USA

T-Mobile. Interim Text to Services and Wireless Emergency Alerts. Harold Salters, Director, Federal Regulatory Affairs, T-Mobile, USA T-Mbile Interim Text t 9-1-1 Services and Wireless Emergency Alerts Harld Salters, Directr, Federal Regulatry Affairs, T-Mbile, USA Interim Text t 9-1-1 ~ Vluntary Cmmitment Vluntary cmmitment t ffer Interim

More information

IntesisBox IS-IR-KNX-1i v1.0. User's Manual Issue Date: 06/2017 r1.0 eng

IntesisBox IS-IR-KNX-1i v1.0. User's Manual Issue Date: 06/2017 r1.0 eng IntesisBx IS-IR-KNX-1i v1.0 User's Manual Issue Date: 06/2017 r1.0 eng IntesisBx KNX IR Universal AC Intesis Sftware S.L.U. 2017 All Rights Reserved. Infrmatin in this dcument is subject t change withut

More information

FIRMWARE RELEASE NOTES. Versions V2.0.0 to V Model HDL-32E. High Definition LiDAR Sensor

FIRMWARE RELEASE NOTES. Versions V2.0.0 to V Model HDL-32E. High Definition LiDAR Sensor FIRMWARE RELEASE NOTES Versins V2.0.0 t V2.2.21.0 Mdel HDL-32E High Definitin LiDAR Sensr HDL-32E Firmware Release Ntes Page 2 Fr all new features and changes, refer t the dcumentatin that accmpanies the

More information

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research DRIVING TOMORROW Our plan t lead and innvate Twin Cities Campus Strategic Plan Grand Challenges Research Transfrming the University f Minnesta thrugh the Enhancement f Interdisciplinary Research Prvst

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

RSB Service Bulletin No.. RSB--E4--003/12

RSB Service Bulletin No.. RSB--E4--003/12 RECOMMENDED SERVICE BULLETIN N.. RSB--E4--003/12 SSUUPPEERRSSEEDEESS SSBB N.. RRSSBB--EE44--000033//1111 1. BASIC INFORMATION 1.1. SUBJECT Sftware and Hardware Versins f the E4 Engine. 1.2. ENGINES AFFECTED

More information

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server. Autmatic impsitin Page 1/8 Autmatic impsitin Descriptin Autmatic impsitin will d the mst cmmn impsitins fr yur digital printer. It will autmatically d flders fr A5, A4 r US Letter page sizes in either

More information

C9 Trader Service User Guide

C9 Trader Service User Guide C9 Trader Service User Guide JUNE 2017 Cntents 1. Launching the C9 Trader... 2 2. Lgging in t Clud9... 2 3. Clud9 Hme Screen... 3 3.1 Cntrl Panel... 3 3.1.1 Hme Buttn... 3 3.1.2 Cmmunity Buttn... 3 3.1.3

More information

User Guide. ACC Mobile 3 Preview App for Android

User Guide. ACC Mobile 3 Preview App for Android User Guide ACC Mbile 3 Preview App fr Andrid 2017-2018, Avigiln Crpratin. All rights reserved. AVIGILON, the AVIGILON lg, AVIGILON CONTROL CENTER, ACC, and TRUSTED SECURITY SOLUTIONS are trademarks f Avigiln

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Flash Image Rotator Web Part

Flash Image Rotator Web Part Flash Image Rtatr Web Part User Guide Cpyright 2007 Data Springs Inc. All rights reserved. Table f cntents: 1 INTRODUCTION...3 2 INSTALLATION PROCEDURE...4 2.1 After installatin ntes:...5 2.2 Trubleshting...6

More information

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12 (DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Cmmunicatins Plan ECERT Cmmunicatins Plan Rev. 0.2 Page 1 f 12 Table f Cntents OBJECTIVES:... 3 GENERAL:... 3 FAMILY COMMUNICATION:... 3 Designated

More information

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared

More information

Freading for Kindle Fire Using the SlideME app.

Freading for Kindle Fire Using the SlideME app. Harvard Public Library www.harvardpubliclibrary.rg Freading fr Kindle Fire Using the SlideME app. Freading is an e-bk cllectin, available t Harvard Public Library cardhlders, that ffers tens f thusands

More information

Grade 7. National Core Visual Arts Standards. Lesson Assignment (Criteria for Success) Artist/Big Idea

Grade 7. National Core Visual Arts Standards. Lesson Assignment (Criteria for Success) Artist/Big Idea Grade 7 Natinal Cre Visual Arts Standards Lessn Assignment (Criteria fr Success) Artist/Big Idea Dcument Evidence f Mastery (Skills/Techniques) Line/Angle Drawings Creating: VA:Cr1.2.7 - Develp criteria

More information

PCCW Solutions Engineering Graduate Trainee Program - Audio Visual / Aviation / Broadcasting / Systems Integration

PCCW Solutions Engineering Graduate Trainee Program - Audio Visual / Aviation / Broadcasting / Systems Integration PCCW Slutins Engineering Graduate Trainee Prgram - Audi Visual / Aviatin / Bradcasting / Systems Integratin Becme a PCCW Slutins prfessinal with a technical specialty 101010101010101010101010101 0101010101010101010101010101010101010101010

More information

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit

More information

Describing Digital Materials in Finding Aids

Describing Digital Materials in Finding Aids Describing Digital Materials in Finding Aids Versin 2.0 March 14, 2013 Intrductin Staff frm the Michigan Histrical Cllectins, University Archives and Recrds Prgram, and Digital Curatin adpted the fllwing

More information

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments PID Cntrl with ADwin Prcessrs with Sub-Micrsecnd Respnse Times Cntrl a Variety f I/O CHESTERLAND OH March 9, 2015 *Adapted frm PID Cntrl with ADwin, by Dug Rathburn, Keithley Instruments By Terry Nagy,

More information

Internship opportunities

Internship opportunities Internship pprtunities 2018-2019 1 General Infrmatin Why is an internship valuable fr yu? In the first instance, an internship needs t be wrthwhile fr yu, the student! Everyne deserves the pprtunity t

More information

What is a Customer Service Model?

What is a Customer Service Model? What is a Custmer Service Mdel? Qin Wu IETF 97 Seul Krean L2SM WG meeting 1 Mtivatin Mtivatin: Nt everybdy understand the difference between the device mdel and service mdel Clarify what a service mdel

More information

Creative Scotland is the national development agency for the arts, screen and creative industries.

Creative Scotland is the national development agency for the arts, screen and creative industries. Creative Sctland is the natinal develpment agency fr the arts, screen and creative industries. Unlcking Ptential, Embracing Ambitin Creative Sctland is the public bdy that supprts the arts, screen and

More information

EPOCH 50 V4.70 GNSS Firmware

EPOCH 50 V4.70 GNSS Firmware 25 April 2013 EPOCH 50 V4.70 GNSS Firmware A new versin f EPOCH 50 GNSS firmware v4.70 has been released. This updated versin prvides the fllwing imprvements and fixes: New Antenna library versin 7.49

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

Open Call for Artists and Arts Professionals 2018

Open Call for Artists and Arts Professionals 2018 Open Call fr Artists and Arts Prfessinals 2018 Open Call fr Artists and Arts Prfessinals 2018 All materials must be received by 5:00 pm EST n Friday, March 16, 2018 Art n the Atlanta BeltLine is seeking

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Automated Meters Frequently Asked Questions

Automated Meters Frequently Asked Questions Autmated Metering Prject Utilities Divisin Phne: 403.529.8111 Autmated Meters Frequently Asked Questins Intrductin The City f Medicine Hat has cmpleted its prject t install autmated meters fr all electric,

More information