8 th April 2018 ADDENDUM NO. 1

Size: px
Start display at page:

Download "8 th April 2018 ADDENDUM NO. 1"

Transcription

1 PACIFIC AVIATION INVESTMENT PROGRAM TONGA AVIATION INVESTMENT PROJECT PROCUREMENT OF AIR TRAFFIC CONTROL (ATC) EQUIPMENT AND AIR TRAFFIC CONTROL TRAINING SIMULATOR FOR THE NEW ATC TOWER BUILDING OF FUA AMOTU INTERNATIONAL AIRPORT, TONGA CONTRACT REF: TAL/ICBG/A-42/48 8 th April 2018 ADDENDUM NO. 1 The PAIP TFSU now issues this ADDENDUM NO. 1 to the bidding documents released 16 th March 2018 for the above named tender. Reference to bidding document 1 Section II Bid Data Sheet, ITB 22.1 Original Wording For bid submission purposes only, the Purchaser s address is: Attention: Henry Aho PAIP TFSU Office Ground Floor, Airports Ltd Building The deadline for bid submission is: Date: 1 May 2018 Time: 2.00 pm Bidders shall not have the option of submitting their bids electronically. Bidders should be aware that Courier Services to are not daily and that at least 10 days are required for Bids dispatched from outside the Pacific Region. Addendum For bid submission purposes only, the Purchaser s address is: Attention: Henry Aho PAIP TFSU Office Ground Floor, Airports Ltd Building The deadline for bid submission is: Date: 22 May 2018 Time: 2.00 pm Bidders shall not have the option of submitting their bids electronically. Bidders should be aware that Courier Services to are not daily and that at least 10 days are required for Bids dispatched from outside the Pacific Region.

2 2 Section II Bid Data Sheet, ITB 25.1 The bid opening shall take place at: Ground Floor, Airports Ltd Building Date: 1 May 2018 Time: 2.00 p.m local time The bid opening shall take place at: Ground Floor, Airports Ltd Building Date: 22 May 2018 Time: 2.00 p.m local time 3 GCC 28.6 Warranty Add SCC 28.6 to Section IX Special Conditions of the Contract: The period shall be 60 days. 4 Technical Specifications 5 Technical Specifications 6 Technical Specifications The cabling standard shall be CAT6, screened, as a minimum The network shall be interoperable with, and connected to, the cross-site fibre network Add to 2. Drawings 2.2 The project drawings may be downloaded from the following link: voib/aabf1lsolyeedcfldxznqpbfa?dl=0 Add 3.8 Design Changes Where design parameters have changed prior to, or during, the installation because of an unforeseen issue raised by the Supplier or Project Engineer, a record of the design change, and reasons for it, needs to be agreed. Design changes may occur for any number of reasons. The agreed re-design needs to be published and circulated to all relevant parties Design changes shall be included in Supplier and Client records The cabling standard shall be CAT6, screened, as a minimum The network shall be interoperable with, and connected to, the cross-site fibre

3 described in section 4.21 below If any part of the network uses fibre instead of CAT 6 cabling, the Supplier shall ensure that the fibre type is appropriate for the type of run being installed. It shall be noted that manufacturer approved strain relief techniques shall be used where vertical runs are installed. 7 Pg 34, ITB 17.2 (a) Manufacturer s authorization is: required for the following major equipment: LOT 1: Air Traffic Control Equipment a. VHF Communication System b. 16 Channel Contingency Voice Recorder c. Flight Progress Strip Printing Sytem d. Radio Link Systems e. RCMS System f. MTS & NTP Server g. Building Access Control System h. CCTV Display Panels network described in section 4.21 below If any part of the network uses fibre instead of CAT 6 cabling, the Supplier shall ensure that the fibre type is appropriate for the type of run being installed. It shall be noted that manufacturer approved strain relief techniques shall be used where vertical runs are installed. Manufacturer s authorization is: required for the following major equipment: LOT 1: Air Traffic Control Equipment a. VHF Communication System b. 16 Channel Contingency Voice Recorder c. Flight Progress Strip Printing System d. HF Communications System e. RCMS System f. MTS & NTP Server g. Building Access Control System h. CCTV Display Panels

4 CLARIFICATION NO.4 TO THE BIDDING DOCUMENTS The PAIP TFSU would like to issue the following clarification in response to questions asked by a bidder in relation to the above named tender. The questions and answers are provided below: Reference, bid page no 1 Pg 165 GCC (28. Warranty) Question Regarding defective equipment - Clause 28.6 states: If having been notified, the Supplier fails to remedy the defect within the period specified in the SCC, the Purchaser may proceed to take within a reasonable period such remedial action as may be necessary The time period provided to remedy the defect is missing from the Special Conditions of Contract table on page 181. Please provide this detail. Answer Please refer to Addendum No Pg 106, states: A relevant subset of the project drawings will be included in the bid documents Please advise when these drawings will be made available? These should be available now. There may be minor adjustments to As Built drawings as the tower structure is raised and fitted out. On completion of the major tower build, only ten is it likely (for occupational health and safety reasons) that the supplier will be able to gain access to the site Refers to drawing FIA A-510, please provide specified drawing. Please refer to Addendum No. 1

5 IS a roof drawing for the required for aerodrome beacon available? It would be advisable for the successful supplier to discuss the structural aspects with the design architects prior to finalizing a mounting solution. Contact details will be supplied as required. Please refer to Addendum No.1 for drawings Would it be possible to have the outline drawings of the new VCR? Please refer to Addendum No Can we have access to the latest versions of the drawings of the new control tower for positioning of the CCTV etc? Please refer to Addendum No There is no section 3.8 in the Technical Specifications, please confirm. Please refer to Addendum No You have a double up on section in the Technical specifications, please confirm. This is a numbering error. Please refer to Addendum No. 1

6 9 Pg 34, ITB 17.2 Manufacturers Authorisation is: required for the following major equipment: d. Radio Link Systems This is an error. Please refer to Addendum No. 1. We note that this line item is not included in the pricing & delivery schedules, or detailed in the technical specification. Please clarify. 10 ITB 22.1 Bid Following detailed review of the bid documents, Submission Deadline and pending response to the open clarification questions, we formally request an extension to this date of three (3) weeks, to Tuesday 22 nd May The requested extension also considers Easter and ANZAC Day holiday periods which fall in March/April. Please refer to Addendum No. 1. Pg in table: Is this meant to read pilot not plot? This is a typing error. Please refer to Addendum No. 1

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly: MINUTES OF MEETING Meeting Date : July 15, 2014 Place : Greenwood Shop Main Conference Room Contract Title : Supply of Reworked T1 Trip Switch Brackets Proposal No. : T31BG14139 Present : TTC - A. Mckay

More information

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions RFP #1587 - CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions 1. Question: Spec requires connects to bitrans, are you going to modify the specs? Answer: City of Culver City s ATCS

More information

SECTION - II BID DATA SHEET

SECTION - II BID DATA SHEET SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or

More information

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250) The Office of the Finance and Purchasing Manager Telephone : (250) 352-8204 Fax : (250) 352-6594 REQUEST FOR PREQUALIFICATIONS RADIO COMMUNICATIONS INFRASTRUCTURE UPGRADE CONTRACTOR SERVICES 2018-PRQ-01

More information

The attached information contains mandatory requirements and a submission form.

The attached information contains mandatory requirements and a submission form. The Municipality of Greenstone Greenstone Fire Department REQUEST FOR PROPOSAL (RFP) Fire Department VHF Digital Radio Communication System The Municipality of Greenstone seeks Requests for Proposals (RFP

More information

Addendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time)

Addendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time) United Nations Development Programme Programme of Assistance to the Palestinian People برنامج الا مم المتحدة الا نماي ي/ برنامج مساعدة الشعب الفلسطيني ITB-2016-205 Addendum No. 2 dated 8 September 2016

More information

Bidder : M/s Arya Communications Pvt. Ltd., Mumbai.

Bidder : M/s Arya Communications Pvt. Ltd., Mumbai. Bidder : M/s Arya Communications Pvt. Ltd., Mumbai. Tender No. - 1936 Serial No DGP/17/6162/DMR-Navi Mumbai/69/2018 Clarification in Technical Specifications DMR System in UHF 400 Mhz. for Navi Mumbai

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR RFQ/RFP 15P40 Campus Center East HVAC Unit Replacement CHAFFEY COMMUNITY COLLEGE DISTRICT February 26, 2015 CHAFFEY COMMUNITY

More information

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2 FINANCE, RISK AND BUSINESS PLANNING Supply Chain Management May 17, 2016 INVITATION TO TENDER ITT No. PS20160468 FIRE HALL 5 + HOUSING CONSTRUCTION ADDENDUM No. 2 and AMENDMENT No. 2 RE: Various additions

More information

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time) ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation

More information

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:

More information

Lincoln County Tax Appraisal Office Project No. RFB

Lincoln County Tax Appraisal Office Project No. RFB Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior

More information

Tender 078/2017. Clarification Letter No. 6. RFCs relating to Volume 3

Tender 078/2017. Clarification Letter No. 6. RFCs relating to Volume 3 5 November 2017 #1102069 For the Design, Development, Manufacture, Procurement, Supply, Installation, Testing, Commissioning, Warranty and Maintenance of the Systems of the Red Line Project Tender 078/2017

More information

NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS

NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR-440022 TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS At NPTI (WR), NAGPUR, MAHARASHTRA 1 NATIONAL POWER TRAINING

More information

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements

More information

Invitation for Bids Amendment #1

Invitation for Bids Amendment #1 Invitation for Bids Amendment #1 DESCRIPTION: Interior Door Hardware Replacement Solicitation: Date Issued: Procurement Officer: Phone: E-Mail Address: Mailing Address: USING GOVERNMENTAL UNIT: SPARTANBURG

More information

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade LAKE COUNTY SCHOOLS Leading our Children to Success Procurement Services 29529 CR 561 Tavares FL 32778 (352) 253-6760 Fax: (352) 253-6761 http://lake.k12.fl.us Superintendent: School Board Members: Susan

More information

Company. Signed: Date:

Company. Signed: Date: ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET

More information

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

CITY OF WATERTOWN INVITATION TO BID PRINTING OF GENERAL OFFICE PAPER SUPPLIES WATERTOWN, WI. ADVERTISE: July 31 & August 7, 2015

CITY OF WATERTOWN INVITATION TO BID PRINTING OF GENERAL OFFICE PAPER SUPPLIES WATERTOWN, WI. ADVERTISE: July 31 & August 7, 2015 CITY OF WATERTOWN INVITATION TO BID PRINTING OF GENERAL OFFICE PAPER SUPPLIES WATERTOWN, WI ADVERTISE: July 31 & August 7, 2015 BID DEADLINE: August 14, 2015, 9:30 a.m. Local Time Bid Invitation Your firm

More information

Listed below are the competencies required and examples from the aforementioned job:

Listed below are the competencies required and examples from the aforementioned job: 1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.

More information

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m. ADDENDUM No. 1 RFP No. 933 Gallup Park Custom Playground Equipment Design Due: Tuesday, August 4, 2015 by 10:00 a.m. The following changes, additions, and/or deletions shall be made to the Request for

More information

Solicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project.

Solicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project. Date: June 30, 2017 Project: Ketchikan Shipyard Transfer Carts Solicitation No.: 18002 Addendum No. One TO ALL PLANHOLDERS: The enclosed addendum amends the proposal documents for the above referenced

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

NOTICE TO BIDDERS PURCHASE OF PORTABLE FORENSIC LASER SCANNING TECHONOLGY

NOTICE TO BIDDERS PURCHASE OF PORTABLE FORENSIC LASER SCANNING TECHONOLGY NOTICE TO BIDDERS Sealed bids will be received by the City of Midwest City at its City Clerk' s office located in the Municipal Building, 100 N. Midwest Blvd., Midwest City, Oklahoma until 2: 00 p. m.,

More information

INVITATION FOR QUOTATION. TEQIP-II/2017/btec/Shopping/2

INVITATION FOR QUOTATION. TEQIP-II/2017/btec/Shopping/2 INVITATION FOR QUOTATION TEQIP-II/2017/btec/Shopping/2 12-Oct-2017 To, Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for the

More information

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building

More information

EMITS: Improving Communication between ESA and Industry

EMITS: Improving Communication between ESA and Industry EMITS: Improving Communication between ESA and Industry F. Doblas & E. Cornacchia Directorate of Industrial Matters and Technology Programmes, ESA, Paris Introduction Originally conceived as a system limited

More information

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package CITY OF RICHMOND CITY OF RICHMOND Notice of Public Opening Contract T.3263 Contract: Richmond Speed Skating Interior/ Exterior Signage Package Tenders have been issued for the Richmond Speed Skating Interior/

More information

DEPARTMENT OF ARCHITECTURE

DEPARTMENT OF ARCHITECTURE DEPARTMENT OF ARCHITECTURE Web : www.nitt.edu Phone : 0431-2503001 Short Tender Notification No.: NITT/ARCH/04/2012/ DRAWING TABLE Dated : 19-04 -2012 (Retender Those previously quoted for this tender

More information

TENDER DOCUMENT FOR SUPPLY OF COMPUTER (CONSUMABLES & ACCESSORIES )

TENDER DOCUMENT FOR SUPPLY OF COMPUTER (CONSUMABLES & ACCESSORIES ) Document No.0280/IT/2016 TENDER DOCUMENT FOR SUPPLY OF COMPUTER (CONSUMABLES & ACCESSORIES ) 2016-2017 TAMILNADU TOURISM DEVELOPMENT CORPORATION LIMITED TOURISM COMPLEX, No.2, Wallajah Road, Chennai 600

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017 Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Alma Salcedo Corporate Buyer

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box East Shore Road Jamestown, Rhode Island Invitation to Bid Request for Proposals

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box East Shore Road Jamestown, Rhode Island Invitation to Bid Request for Proposals RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box 437 1 East Shore Road Jamestown, Rhode Island 02835-0437 Invitation to Bid Request for Proposals Mototrbo Digital VHF Radio System Solicitation Number:

More information

Architecture of Workplaces 2 1 st semester 2018/2019 COURSE DESCRIPTION. In case of all design phases the name of the task should be marked uniformly:

Architecture of Workplaces 2 1 st semester 2018/2019 COURSE DESCRIPTION. In case of all design phases the name of the task should be marked uniformly: Architecture of Workplaces 2 1 st semester 2018/2019 COURSE DESCRIPTION The aim of the course is to summarize the acquired architectural-technical knowledge, to prepare for the complex architectural thinking

More information

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017 #Question & Answer: #1 The RFP states that there is one week to complete all survey work. Please confirm this duration and that no other time will be allowed for survey work. The week identified in the

More information

TG Glazing Design-Build

TG Glazing Design-Build TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

Addendum No. 1 page 1

Addendum No. 1 page 1 Addendum No. 1 page 1 Project: 2018 Interior Renovations Jeffersonville Township Public Library Jeffersonville Facility Jeffersonville, Indiana Project No.: 1723.01 Date: April 12, 2018 This addendum is

More information

Columbia Communications District Request for Information New Radio Communications System

Columbia Communications District Request for Information New Radio Communications System Columbia 9-1-1 Communications District Request for Information New Radio Communications System Submission Deadline January 2, 2018 1 1 Overview 1.1 Introduction The Columbia 911Communications District

More information

United Nations Development Programme

United Nations Development Programme Tax on Price Quotation Payment Terms (max. advanced payment is 20% of total price) must be inclusive of VAT and other applicable indirect taxes must be exclusive of VAT and other applicable indirect taxes

More information

THE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT

THE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT THE KENYA POWER AND LIGHTING CO. LTD SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT NAME DESIGNATION SIGNATURE DATE Compiled by Ephantus Nyagah Ag. Senior Engineer Checked by Eng. Thagichu Kiiru Deputy

More information

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK Sealed quotations are invited under Two-Bid system from reputed agencies, either by themselves or as a joint venture/consortium/partnership

More information

[Corporate Communications Department] Notice Inviting Tender

[Corporate Communications Department] Notice Inviting Tender [Corporate Communications Department] Notice Inviting Tender Tender Ref: CorpComm/GreetingCardPrinting/2018 Tender Date: 22.11.2017 Last Date for Tender Submission: 28.11.2017 Balmer Lawrie & Co. Ltd.

More information

Personal Medical Services (PMS) Contract Review Update

Personal Medical Services (PMS) Contract Review Update Personal Medical Services (PMS) Contract Review Update 1. Introduction NHS England commenced the Personal Medical Services (PMS) Review process across the North West London (NWL) Collaboration of CCGs

More information

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA INVITATION TO BID TOWN OF CARY Cary, North Carolina Sealed bids must be submitted no later than 1:30 p.m. on October 1, 2018 to the Town of Cary at the office of the Transportation and Facilities Department],

More information

1. Attached is a copy of addendum #4 issued by Diamond Schmitt Architects, dated

1. Attached is a copy of addendum #4 issued by Diamond Schmitt Architects, dated 2014-10-30 REQUEST FOR TENDER WILDLIFE HEALTH CENTRE RFT # 47 (2014-09) ADDENDUM # 4 This addendum shall be incorporated into, and form part of RFT # 47 (2014-09) and take precedence over all requirements

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

INVITATION FOR QUOTATION. TEQIP-II/2013/UP1G01/Shopping/28

INVITATION FOR QUOTATION. TEQIP-II/2013/UP1G01/Shopping/28 INVITATION FOR QUOTATION TEQIP-II/2013/UP1G01/Shopping/28 09-Nov-2013 Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for the following

More information

H.O-Civil- T&E E-3 /04/2011 / Date QUOTATION CALL NOTICE

H.O-Civil- T&E E-3 /04/2011 / Date QUOTATION CALL NOTICE Orissa Industrial Infrastructure Development Corporation (A Government of Orissa Undertaking) IDCO Towers, Jan path, Bhubaneswar - 751022, Orissa, India Phones: (0674) 2542784, 2540820,Fax: 542 956 Email:

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR , INDIA

INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR , INDIA INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR- 721302, INDIA No. IIT/ISE/RO WATER PURIFIER/2018-19/1 Date: 18.04.2018 Last date for submission: Friday, May 11,2018 at 3:00 PM Time &Date for Opening: Friday,

More information

Supply of Paint for FEA s Administration Building, Training Center & Guard House in Navutu, Lautoka

Supply of Paint for FEA s Administration Building, Training Center & Guard House in Navutu, Lautoka Supply of Paint for FEA s Administration Building, Training Center & Guard House in Navutu, Lautoka Tender Number: MR 137/2018 1 1. BACKGROUND Fiji Electricity Authority (FEA) is a statutory body vested

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR ADDENDUM NO. 1 November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR North District Pre-Development Studies Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental

More information

January, 2014 Page 1 of 5

January, 2014 Page 1 of 5 Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development

More information

e-submission Quick Reference Guide for Economic Operators

e-submission Quick Reference Guide for Economic Operators e-submission Quick Reference Guide for Economic Operators e-submission Quick Guide for Economic Operators Page 1 Welcome to e-submission. This quick reference guide contains: Introduction to e-submission

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting

More information

McKenzie County Healthcare Systems

McKenzie County Healthcare Systems McKenzie County Healthcare Systems Hospital Replacement and Long-Term Care Replacement Watford City, North Dakota Request for Proposal (RFP) for Distributed Antenna System Table of Contents Introducti

More information

Procurement UNDP Sudan

Procurement UNDP Sudan United Nations Development Programme REQUEST FOR QUOTATION Procurement UNDP Sudan Number: RFQ/DDR/KRT/2010/026 IMPORTANT: ALL CORRESPONDENCE MUST SHOW THE REQUEST FOR QUOTATION NUMBER NAME & ADDRESS OF

More information

School City of Hobart

School City of Hobart School City of Hobart Request for Proposal Inter-Building Connectivity Base Bid 1: only Layer-2 services I. Request Overview and Definition of Terms We are requesting proposals for LAN connectivity between

More information

THE DESIGN PROCESS. for an interior design project

THE DESIGN PROCESS. for an interior design project THE DESIGN PROCESS for an interior design project STAGE 1 Preliminary meeting The client brief The business proposal and client s agreement to proposal THE DESIGN PROCESS for an interior design project

More information

The RSM shall be extensively used in field & laboratory for verification of the accuracy of all types of single-phase energy meters.

The RSM shall be extensively used in field & laboratory for verification of the accuracy of all types of single-phase energy meters. TECHNICAL SPECIFICATION FOR PORTABLE ELECTRONIC REFERENCE STANDARD METER (ERS) FOR TESTING OF SINGLE PHASE KILOWATT HOUR ENERGY METERS (ACCURACY CLASS 0. 2) 1. SCOPE: The specification covers the requirement

More information

SPECIFICATIONS FOR TENDER # SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH

SPECIFICATIONS FOR TENDER # SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH SPECIFICATIONS FOR TENDER # 0171-0838 SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH CLOSING DATE: 21 March 2008 CLOSING TIME: 11:00 AM (Newfoundland Time) Invitation to

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

New Mexico Lottery Authority MY REWARDS PROGRAM DRAWING PROCEDURES v1.0

New Mexico Lottery Authority MY REWARDS PROGRAM DRAWING PROCEDURES v1.0 New Mexico Lottery Authority MY REWARDS PROGRAM DRAWING PROCEDURES v1.0 1.0 PURPOSE This document establishes the MY REWARDS Program (the Program ) Drawing Procedures utilized by the NEW MEXICO LOTTERY

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

Case studies on specific organizations will include, but are not limited to, the following elements:

Case studies on specific organizations will include, but are not limited to, the following elements: Issued on: January 5, 2018 Submit by: On a rolling basis (Schedule explained below in Section VII) For: Digital Development for Feed the Future Case Study Writers Period of Performance: Approximately 2-4

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

Tender Ref: ELCOT/Proc/OT/32954/Multimedia Projectors/

Tender Ref: ELCOT/Proc/OT/32954/Multimedia Projectors/ Tender Ref: ELCOT/Proc/OT/32954/Multimedia Projectors/2017-18 Electronics Corporation of Tamil Nadu Limited Rate Contract Tender S u p p l y, i n s t a l l a t i o n a n d c o m m i s s i o n i n g o f

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Corporate Office, Sardar Patel Vidyut Bhavan, Race Course, VADODARA 390 007. TECHNICAL SPECIFICATIONS OF CVT / COUPLING CAPACITOR STRUCTURE SPECIAL INSTRUCTIONS

More information

Dedicated Line: MRS Logística Brazil. Overall System Presentation

Dedicated Line: MRS Logística Brazil. Overall System Presentation Dedicated Line: MRS Logística Brazil MRS s CBTC Project SIACO (Integrated Operation Automation and Control System) Overall System Presentation Speaker: Paulo Vieira 1 MRS Logística S.A. Profile Belo Horizonte

More information

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced To: Prospective Vendor(s) Date: October 25, 2016 Subject: Solicitation Number: DHSMV-RFI-007-16 Cameras and Related Accessories Addendum No. 1 The enclosed information is provided for consideration in

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

PROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS 2019 LEGISLATIVE SESSION

PROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS 2019 LEGISLATIVE SESSION State of Nevada Legislative Counsel Bureau 401 S. Carson Street Carson City, NV 89701 775.684.6800 (Phone) 775.684.6600 (Fax) REQUEST FOR PROPOSAL for: PROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS

More information

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the

More information

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement Following are the questions submitted on or before September 29, 2017, in accordance with RFP specifications. Responses to questions, clarifications of material, or corrections are indicated in green after

More information

WP197 Capacity Market Metering Test

WP197 Capacity Market Metering Test WP197 Capacity Market Metering Test EMRS Working Practice Public Version: 4.0 Date: 20 July 2018 Table of Contents Change Amendment Record 4 1. Introduction 5 1.1 Scope and Purpose 5 1.2 Main Users and

More information

BROOKINGS municipal utilities

BROOKINGS municipal utilities BROOKINGS municipal utilities 525 Western Ave., P.O. Box 588 Brookings, SD 57006-0588 (605) 692-6325 voice (605) 697-8485 fax March 28, 2016 Re: Request for Submittals Map Conversion Project Brookings,

More information

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015 ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the

More information

Warwickshire County Council. Recycling Centre s and Reuse Shops Tender Information Day 2 nd June Glenn Fleet Group Manager Waste Management

Warwickshire County Council. Recycling Centre s and Reuse Shops Tender Information Day 2 nd June Glenn Fleet Group Manager Waste Management Recycling Centre s and Reuse Shops Tender Information Day 2 nd June 2014 Glenn Fleet Group Manager Waste Management Tender Service Summary The management and operation of: 2 x household waste recycling

More information

INSTRUCTION FOR BIDDERS FOR PROVIDING ARCHITECTURAL CONSULTANCY SERVICES FOR THE UPGRADATION OF A GOVERNMENT HOSPITAL IN KERALA

INSTRUCTION FOR BIDDERS FOR PROVIDING ARCHITECTURAL CONSULTANCY SERVICES FOR THE UPGRADATION OF A GOVERNMENT HOSPITAL IN KERALA INSTRUCTION FOR BIDDERS FOR PROVIDING ARCHITECTURAL CONSULTANCY SERVICES FOR THE UPGRADATION OF A GOVERNMENT HOSPITAL IN KERALA JANUARY 2019 HITES (A FULLY OWNED SUBSIDIARY OF HLL LIFECARE LTD, A GOVERNMENT

More information

TOURISM CORPORATION OF GUJARAT LIMITED

TOURISM CORPORATION OF GUJARAT LIMITED TOURISM CORPORATION OF GUJARAT LTD. Block No.16/17, 4th Floor, UdyogBhavan, Sector 11, Gandhinagar(Gujarat) Phone : (079) 23222645 / 23220002 Fax: (079) 23238908 TENDER NOTICE Offers are invited from reputed

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

State College of Florida, Manatee-Sarasota

State College of Florida, Manatee-Sarasota State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE

More information

School of Community Science and Technology Indian Institute of Engineering Science and Technology, Shibpur Howrah

School of Community Science and Technology Indian Institute of Engineering Science and Technology, Shibpur Howrah Indian Institute of Engineering Science and Technology, Shibpur Howrah-711 103 Project Code: DRC/GRSE-OTH/SOCSAT/SKM/002/14-15 Notice Inviting Quotations Sealed quotations are invited for the supply of

More information

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES KP/3CB/TSP/0/00 04-09-9 Page of 9 TABLE OF CONTENTS 0. Circulation List 0. Amendment Record FOREWORD. SCOPE. REFERENCES 3. TERMS AND DEFINITIONS 4. REQUIREMENTS 5. TESTS AND INSPECTION 6. MARKING, LABELLING

More information

E-5 PROCUREMENT OF GOODS UNDER NATIONAL SHOPPING PROCEDURES

E-5 PROCUREMENT OF GOODS UNDER NATIONAL SHOPPING PROCEDURES E-5 PROCUREMENT OF GOODS UNDER NATIONAL SHOPPING PROCEDURES (For Contracts valued less than the equivalent of US $30,000 each) INVITATION FOR QUOTATIONS FOR SUPPLY OF EQUIPMENT UNDER NATIONAL SHOPPING

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Geoff Brown & Associates Ltd

Geoff Brown & Associates Ltd Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared

More information