1 Kameo 75 - a 75mm radius edge trim system in a stee stud and pasterboard construction with pre-assembed window frames Kameo 75 Method of Buid Love the space you re in.

2 Kameo-75 - partitioning system Method of Buid Note: For carity the cavity infi has not been shown mm Pasterboard M14 M mm Pasterboard 6mm or 6.4mm Gass M52 M mm Stee stud system with radius auminium cover trims

3 1.0 Soid Modue 1.1 Set out the partitioning run on the foor and mirror its ength on the ceiing using a pumb and chak ines. Aternativey, set out the partitioning run on the ceiing and mirror its ength on the foor using the same method. 1.2 Locate a ength of 835 stee track into the inside of an 821 or 867 head channe by driing and using two pop rivets. Ensure that the rivet heads are on the outside of the head channe's abutment face. If more than one ength of head channe is to be used in the partitioning run, position the interna 835 stee track inside the head channe so that it overaps by a minimum of 200mm into the next ength of head channe. 1.3 Aong the ength of the head channe abutment face appy two strips of 342 foam, 6mm in from each edge. 1.4 According to the requirement fit the jointing ceats into the ends of the head channe (884 for a straight joint, 886 for a 135" corner joint, 885 for a 90" corner joint or an 811 for a horizonta to vertica joint). 1.5 Aong the centre of the head channe, dri the fixing cearance hoes (diameter 3.2mm), at 600mm centres through both the stee and the auminium. 1.6 If required, acoustic seaant 924 may be appied to the abutment face of the head channe between the foam strips. 1.7 Fix the 821 or 867 head channe assemby, using suitabe screws and pastic pugs (if required), at a maximum of 600mm centres to the ceiing. Fix in a simiar fashion when used as the vertica abutment to was, coumns or muions. 1.8 Fix the 835 stee track to the foor by using suitabe screws and pastic pugs (if required), at a maximum of 600mm centres. 1.9 To obtain the height of each 853 vertica stee stud, measure the distance between the foor and the ceiing at each proposed position, and then deduct 18mm Using the dimension obtained in stage 1.9, measure and cut the 853 studs to ength, and ensure that a the studs are cut to size at the same end Insert the cut studs between the head channe and stee foor track at 600mm centres. Twist them into pace making sure that a the studs have the cut end, to the bottom, and are facing in the same direction (except for the door frame studs which are detaied in stage 3.6). Pumb in both vertica panes and adjust the setting out if necessary It is now possibe, if desired, to fix the vertica stee studs to the foor track by using 298 pop rivets. Using tinsnips, nick and deform the fanges of the stee head track inwards to hod the stud into pace To improve the acoustic performance, fit either the mm thick fibre gass quit or, aternativey, the mm thick Rockwoo R2/33 sab into the cavity. Pease note that it is possibe to enhance the acoustic performance of these materias by upgrading their density. The thickness, however, shoud not be increased The 880 fibre gass quit is hed in pace by cutting three tabs, each 25mm wide, into the stee head track. Press them back to retain the insuation. Aternativey, use a Corman insuhod strip. 887 Rockwoo sabs may just be stacked carefuy into pace. Care shoud be taken to ensure that a the acoustic materias are tucked into the open faces of the vertica studs to ensure a cavities are competey fied Measure the foor to ceiing height of the first and third studs and deduct 10mm to obtain the pane height When the pre-decorated panes are being used estabish the top and bottom of the panes from the hanging instructions and decoration used. Using the dimensions obtained in stage 1.15 use a sharp knife to cut away the waste materia with the pre-decorated or white face of the panes being cut first. Ensure that a cean cut and finish is produced, by removing a the oose partices of the pane or wa covering.

4 1.17 If the 837 auminium cip-on skirting is to be used, position three 832 skirting cips onto the bottom of the pane, two approximatey 200mm in from each edge and one centray Waboard adhesive 846 shoud now be iberay appied to the centre stud face of the modue The pre-decorated or unfinished pane can now be fixed into position Offer the prepared pane into the head channe cavity then, by ifting upwards, swing the bottom of the pane against the stee framework Check that the first pane in each run is centra and pumb to the outer studs. Then press the centre of the board firmy onto the adhesive, which has been appied to the centra stud (stage 1.18). By using the 319 drywa screws, fix the ong edges of the pane to the outer studs positioning the screws approximatey 6mm in from each edge and at a maximum of 300mm centres If unfinished panes are being used, they shoud now be decorated with the seected 1370mm wide viny or paper backed fabric, and trimmed to the pane butt joint (making sure manufacturer's hanging instructions are foowed and a excess adhesive is wiped away) Ony after the seected skirting has been fitted (see appropriate section) shoud the M14 cover trims finay be instaed The butt joint between the panes can now be conceaed with the M14 cover trim Before fitting the M14 vertica cover trim, measure the distance between the head channe and the skirting. Add 25mm to its ength and cut to size Carefuy offer the preiminary ength of cover trim into position against the pane. To one side of the two boards butt joint unti the top of the cover trim touches the underside of the head channe. Now mark ighty in penci the point at which the trim intersects with the top of skirting From the measurement obtained, cut the trim to the fina ength and insta by screw fixing at 600mm centres using 351 fange head screws (do not use drywa screws) The pastic cooured infi M15 shoud now be cut to size using the same method as in stages 1.25 to Using a rubber hammer ighty tap it into pace by starting from the head channe and moving downwards into the M14. This masks the screw fixings and competes the trim instaation. Finay, wipe both the trim and infi to cean any working marks. 2.0 Skirting 2.1 Measure, or preferaby if the ength of the partition run wi aow, take a ength of seected skirting and hod into the position required, mark ighty in penci where the cut is required. 2.2 When cip-on skirting is being used, hod the cut ength against the pane above the skirting cips (instaed at stage 1.17), and then side it downwards over the cips. Finay tap home using either a rubber hammer or timber bock and hammer. 2.3 Aways ensure that the straight butt joints of the cip-on skirting are in the centre of a singe cip. 2.4 Aways ensure that a skirting cip is positioned either side of the other 90 and 135 joints. For additiona fixing ocations insert the pastic joint ceats, used in the head channe, into the skirting.

5 2.5 Shoud an additiona skirting cip be required once the panes have been fixed, then the 829 masonry fixing cip may be used. This is screw fixed onto the face of the pane ensuring that the screws enter the foor track through the pane. 2.6 If secret fix skirting is being appied (having cut it to ength in stage 1.28) open up the skirting using the two inside horizonta parae ines for guidance, dri the fixing cearance hoes (diameter 3.2mm) into the pocket. The skirting is fixed through the pasterboard into the 853 stee studs. 2.7 Offer the skirting into position, check its fit and adjust if necessary. Then using the 351 fange head screws fix into pace. Cose up the skirting and wipe away any working marks. 3.0 Door frame 3.1 At the position where the door frame is required, measure the distance between the foor and the ceiing. Then cut two engths of the 853 vertica stee stud to ength (as in stages 1.9 and 1.10 for soid). 3.2 Cut the 835 foor track to the same ength and push it over the open edge of the 835 studs to form a box section. Rivet these two sections together using the 293 pop rivets. 3.3 The 331 timber infi is then inserted over the tota ength of the stud and track box assemby. 3.4 From the site pan, estabish the size of the door which is to be instaed and seect (if required) the correct size of 854 pre-bracketed door head transom. 3.5 To cacuate the dimension, between the inside of the door opening's stud faces, measure the door eaf and add 18mm for both non fire rated and fire rated frames. DIMENSION 'Z' = DOOR WIDTH + 18mm (non fire rated) + 18mm (fire rated) 3.6 With the dimension estabished, insert the prepared stud assembies between the head and foor tracks and twist them into pace. Ensure that the track faces of each boxed stud are facing each other. 3.7 Check they are accuratey set out and pumb in both vertica panes. Rivet the bottom of the stud assemby to the foor track and, by using tinsnips, nick and deform inwards the fanges of the stee head track to hod the stud into pace. 3.8 If an 854 transom is to be fitted, mark ighty in penci the top position for the transom on the vertica studs, using dimension 'T'. (DIMENSION 'T' = DOOR HEIGHT + 51mm). (Remember that the setting out detais eave a 2.5mm gap under the door. Some adjustment may be required to dimension 'T', to accommodate the different types/thickness of foor covering being aid, either prior to or after instaation of the partition.) 3.9 Having marked the transom position on the vertica studs, take the seected 854 pre-bracketed transom. Box it with an 835 stee track and infi it with 331 timber. Then, with the brackets pointing upwards, screw fix or rivet the transom onto the vertica stud ensuring that it is eve If a soid pane is required above the door this shoud now be measured. Make sure that the width is equa to the door frame's vertica stud centres and that the height is equa to the distance between the ceiing and the bottom edge of the transom minus 5mm.

6 3.11 Once the acoustic infi has been instaed (as at stage 1.14), the cut pane shoud be pushed as far as possibe into the head channe so that the pane is positioned back from the bottom edge of the transom. Fix it into pace using 319 drywa screws The fu height pane, adjacent to the door frame, shoud be fitted onto the door frame studs so that they are positioned back from the edge of the studs opening by 3 to 5mm If gazing adjacent to a door frame pease see the appropriate instructions After the panes or the gazing is instaed, unwrap the M58 door frame kit. A three parts shoud be aid fat, in a safe area, unti required Pick up the door head (without the rubber sea) and offer it up to the transom. Ensure that the door stop is in the correct direction and screw-fix it into position using the 311 door frame screws. Take care so that the dri and screwdriver chucks do not damage the door frame stop To obtain the ength of the door frame egs pace a piece of packing materia (1 mm thick maximum) onto the foor next to the door frame's vertica stud. Invert the door frame eg so that the mitre is carefuy paced on the packer and against the upright stud. Now mark ighty in penci, the bottom of the door frame eg where it intersects the top of the door head mitre From the measurement obtained, trim the bottom of the door frame eg to size (fire rated door frames do not require interna stee iner) Offer the trimmed door fame eg, at an ange of approximatey 30, to the mitre ceat which protrudes from the door head. By pushing upwards swing it towards and over the vertica stud Check that the door frame eg is positioned against and centra to the vertica stud Using a boster chise, wedge the door frame eg upwards to cose the mitre. Before removing the wedge screw, fix the door frame eg into pace using the 311 door frame screws Take the short ength of the 868 rubber sea and square cut it to suit the door head size. Then press fit it into pace so that the ongest soft eg is positioned on the door stop side The onger engths of the 868 rubber sea shoud then be square cut at the bottom and beak cut at the top to suit the ength of the door frame the eg. Pressing them into pace The door frame is now ready for the chosen door to be hung (do not forget to remove penci markings). Note: Shoud the instaed partitioning be erected directy onto a carpet or raised foor, with a construction of doors hanging either side of an office dividing wa, the resuting compression may require the use of additiona shims, at the junction, to maintain the partitioning's horizonta eve. 4.0 Gazing 4.1 In the same way as for a soid partitioning modue (stages 1.1 to 1.8) insta the head channe, abutments and foor track. 4.2 Carefuy measure and cut the 853 vertica studs to ength (as stages 1.9 and 1.10). Insert the first stud into pace making sure it is the correct way up and pumb in both vertica panes. 4.3 Now fix the stud into the foor track by using the 298 pop rivets. Using tinsnips, nick and deform the fanges of the stee head track inwards, to hod the stud into pace.

7 4.4 Ascertain from the site pan and by checking the pre-assembed windows suppied, the actua gazed eevation to be instaed. 4.5 Unwrap the seected pre-assembed window frame carefuy removing the screws and gazing cover trims. These have been pre-cut to size and packaged inside the frame ready for insertion after the gazing. 4.6 The pre-cut gazing trims and screws shoud now be aid fat in a safe area unti required (if more than one window frame is being instaed it is recommended that the gazing beads are kept and identified in sets). 4.7 To obtain the dimension between the studs' inside upright faces, seect the window frame and measure the horizonta interna frame size and add 18mm. 4.8 Once the distance between the stud faces has been estabished and by referring to the setting out detais, seect the correct size of 854 pre-bracketed transom. 4.9 The second vertica stud may now be positioned, but not fixed into pace Estabish the vertica size of the frame, and refer to the setting out detais to determine the correct position for the bottom transom On the first vertica stud, mark the position of the top of this ower transom. Then by using a suitabe eve transfer the mark to the second stud Having determined the position of the transom, cut a piece of 835 foor track section equa in ength to the interna height of the window frame. Position this over the open edge of the 853 stud to form a box section to the window aperture. Rivet it into pace using the 298 pop rivets Take the seected 854 pre-bracketed transom. With brackets pointing downwards, pace it inside the foor track between vertica studs. This is for safe-keeping and ease of assemby ater If erecting fu height, haf or top gazed eevations, insta a suitabe ength of 853 stud into the head track and between the vertica studs Where a mid gazed or gazed to door head eevation is required, take the seected 854 pre-bracketed transom stored in the foor track (stage 4.13). Using 302 pan head screws, oosey fix it at the marked positions (stage 4.11) between the vertica studs Take the unwrapped pre-assembed window frame, ensuring that the factory fixed gazing beads on the singe offset and centre gazed frames are to the inside of the office being constructed. Offer the assemby between the vertica studs and, if required, side it upwards into the head channe On fu height, haf or mid gazed eevations hod the frame into position, pick up the transom stored inside the foor track and butt it to the underside of the window frame assemby. Screw fix it into pace using the 302 pan head screws. If mid gazed or gazed to door head are required the transom security screws shoud be fuy tightened The second vertica stud shoud now be pushed tighty onto the window frame and ocked into pace in the same manner as the first stud (stage 4.2). Make sure it is aso pumb in both vertica panes Subject to the gazing eevation seected, fix the securing transom on top of the window assemby with both brackets pointing upwards Repeat this window insertion process progressivey aong the partitioning run. Insert the 836 pasterboard packing strips verticay between stud and the window frame. At the same time cut and insert suitabe size pasterboard strips between the stee head track and the window frames as shown in the detais.

8 4.21 Instaing fu height or banded gazing. Before fitting the gazing cover strip M25, measure the distance between the underside of the head channe and the foor and deduct 75mm. Cut the section to size Take a fu ength of M27 skirting and ay it in position against the window frame. (It is important that a fu ength of skirting is used, as the use of a sma off cut wi not aow for the foor runout.) 4.23 Carefuy offer the preiminary cut ength (stage 4.21) of gazing cover strip against the window frame ensuring the top is touching the underside of the head channe. Mark, ighty in penci, the point at which the trim intersects the top of the skirting From the measurement obtained cut the strip to the fina ength Insta the cover strip by pushing it over the edge of the window frame, working from the head channe downwards For haf and mid gazed eevations use the M14 cover trim and M15 pastic infi (do not use the M25 gazing cover strip as the pane joint must aso be masked) Prepare and insta the M15 and M14 sections using the same method as for soid partition modues (stages 1.23 to 1.28) Where required (haf and mid gazed), cut and fit a the intermediate studs above and beow the window frames To improve the acoustic performance above and beow the gazing, fit either the mm thick fibregass quit or the mm thick Rockwoo R2/33 sab (as at stage 1.14) When gazing at dado height, estabish the size of the pre-decorated or unfinished pasterboards for fitting beow the window frames. This is cacuated by measuring the distance between the foor and the dado eve and deducting 5mm. DIMENSION 'W' = DADO HEIGHT - 5mm 4.31 To estabish the size of panes above the gazing, measure the distance between the top of the window frame and the ceiing and deduct 5mm. Note: If pre-decorated panes are to be used above and beow the gazing, it is recommended that they shoud be cut from the same board and used in a singe modue to keep continuity in pattern, coour and pane ine If the 837 cip on skirting is being used, the bottom panes shoud be fitted with 832 skirting cips (as at stage 1.17) Insta pre-decorated or unfinished panes using the same method as for soid partitioning modues (see stages 1.18 to 1.27) The skirting shoud now be fitted (see stages 1.28 to 2.6) Unscrew and remove the oose fixed stee gazing retainer from the window frame ready to insert the gass. For non-fire rated appications the system wi accept 6mm toughened or 6.4mm aminated gass. For fire rated appications any of the approved fire safety gasses detaied in the Gazed Fire Resistance Summary of Performance may be used. A appications of gazing must conform to British Standard 6262:1982 and be instaed in accordance with Document 'N' of the Buiding Reguations Offer the bottom edge of the sheet of gass into the window frame against the factory pre-fitted stee gazing retaining bead. Ensure that the bottom edge of the gass remains hard against the pre-fitted bead whist pushing the gass into pace With assistance, hod the gass in pace and using suitabe gazing packing shims, adjust the gass verticay and horizontay so that it is equay positioned within the window frame aperture.

9 4.38 Take the stee gazing retaining bead removed at stage 4.35 and repace it into the iner to retain the gass. It is important that the stee retaining bead is sitting square into the ocation groove. Each ength must be secured using 301 no.6 x 5/16" sef tapping screws, with one screw in every fourth hoe pus one at each end The pastic gazing cover bead removed at stage 4.5 shoud now be retrieved from safe storage. Seect the required pre-cut ength and pace the edge of the bead in the pre-mouded sot of the window frame. Aow the bead to fa at an ange onto the stee gazing retainer. Starting from one corner push the pastic gazing bead pip into the stee retaining bead to secure Finay, cean a the partition meta work by wiping down using a damp coth with a soution of washing up iquid and warm water. Make sure that a penci marks are removed. (Pease do not use abrasive ceaning creams, papers or akaine substances. 5.0 Other Instaation Instructions The foowing additiona instaation instruction are avaiabe on Document M Guidance Note M4a - Coour Contrast. Document M Guidance Note M13 - Gazed Screen Manifestation. Document M Guidance Note M28 - Doorset Effective Cear Opening. Document M Guidance Note M32 - Coour Contrast for Door Leading Edge. komfort.com Nationa Certificate No FM25967 Specifier Support Line Te: E-mai: tech@komfort.com

KOMFORT. Klassic - a radius edge veneered trim system in a steel stud and plasterboard construction with glazing options. Klassic.

KOMFORT. Klassic - a radius edge veneered trim system in a steel stud and plasterboard construction with glazing options. Klassic. KOMFORT Kassic - a radius edge veneered trim system in a stee stud and pasterboard construction with gazing options Kassic Method of Buid Love the space you re in. February 2013 Kassic - partitioning system

More information

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT 821 811 342 821 835 853 863 840 12.5mm Plasterboard 837 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims Note: For clarity the cavity infill has not been shown 854 342

More information

Method of Build. ORBIS Single Glazed. Komfort Installation KOMFORT

Method of Build. ORBIS Single Glazed. Komfort Installation KOMFORT KOMFORT WORKSPACE Orbis singe gazed - a muion free crysta cear dry vertica jointed system with square auminium sections Method of Buid Komfort Instaation Love the space you re in. June 2012 Index Section

More information

Slim-line Aluminium Roofs Assembly Guide

Slim-line Aluminium Roofs Assembly Guide Sim-ine Auminium Roofs Assemby Guide Contents Bonded fush gazed roofs Page 3 Singe section of gass Page 4 Singe square with opener Page 5 Mutipe gass panes Page 6 Instaing Openers Page 10 Timber Kerb For

More information

7 DO NOT run down shade cloth outside of the Side Channels. Headbox Height + Hembar** ¼ (6mm) on Both Sides. 2¼ (57mm)

7 DO NOT run down shade cloth outside of the Side Channels. Headbox Height + Hembar** ¼ (6mm) on Both Sides. 2¼ (57mm) Instaation Instructions Futureguard FexShade Zip by Draper READ BEFORE YOU BEGIN Inspect a boxes to make sure you have received the proper parts. 2 Open cartons engthwise. 3 A hardware must be instaed

More information

Racks and Cable Management Products

Racks and Cable Management Products Racks and Cabe Management Products 79 Wire Management Brackets HeermannTyton provides the most adaptabe and systematic approach for cabe management on reay racks. Offering a compete ine of versatie products,

More information

Method of Build 1. Fire. Sound

Method of Build 1. Fire. Sound Method of Build 1 General Viso Fire & Acoustic in the solid form differs from most other systems as it can be erected using 12.5mm & 15.0mm boards within the same Aluminium framework. Also hidden fix board

More information

Method of Build 1. General

Method of Build 1. General Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed

More information

Altro Transport. Installation and maintenance Guide. Installation. Contents. Cleaning

Altro Transport. Installation and maintenance Guide. Installation. Contents. Cleaning Atro Transport Instaation and maintenance Guide June 2017 Contents Atro Transport products are designed for a ong, troube-free ife, providing a higher degree of comfort and safety for your customers, easier

More information

Insulation. First Issue August See rear cover for applicable countries. Phenolic System PRODUCT CATALOGUE. Low Energy Low Carbon Buildings

Insulation. First Issue August See rear cover for applicable countries. Phenolic System PRODUCT CATALOGUE. Low Energy Low Carbon Buildings Insuation First Issue August 2017 See rear cover for appicabe countries PRODUCT CATALOGUE Phenoic System Low Energy Low Carbon Buidings Introduction Overview The heating, ventiation and air conditioning

More information

CURRIES Tech Data Frame Section. Revised Oct., 2018

CURRIES Tech Data Frame Section. Revised Oct., 2018 CURRIES Tech Data Frame Section Revised Oct., 2018 i Index August, 2017 DESCRIPTION PAGE(S) Anchors Drywall Frame Base Anchor...35 Compression Anchor...34, 36, 39 Multipurpose Anchor Installation...17

More information

The Royale Door Technical Manual

The Royale Door Technical Manual V: 1.1 300713 The Royae Door Technica Manua T: 01268 681612 E: saes@duration.co.uk W: www.duration.co.uk Contents System Specifications 3 Profie Identification Outer Frames, Sash & Bead 4 Other Key Profies

More information

CHANNEL LETTER LIGHTING

CHANNEL LETTER LIGHTING LIGHTING UNIQUE LIGHTING SOLUTIONS WARNING Instaation must ony be performed by a icensed eectrician. To prevent death, injury or damage to property this product must be instaed in accordance to Nationa

More information

TECHNICAL DATA DOORS

TECHNICAL DATA DOORS TECHNICA DATA DOORS GENERA ENGINEERING DETAIS for DOOR EDGE and MEETING STIES Note: Edge designs, shown as pairs of doors may in some cases be used in single door applications. Dimensions shown are standard

More information

CruzPro FU60. Intelligent Digital Fuel Gauge/w Alarms & Consumption Calculator

CruzPro FU60. Intelligent Digital Fuel Gauge/w Alarms & Consumption Calculator Other CruzPro Products Depthsounders & Speed/Temperature/Logs PC Based Fishfinders and Active Depth Transducers DC Vots/Amps/Amp-Hour Monitor AC Vots/Amps/Freq/kW Monitor LPG/Petro Gas Detectors/Aarms

More information

Installation Guide for PermaSnap Coping & PermaSnap Plus Coping

Installation Guide for PermaSnap Coping & PermaSnap Plus Coping Installation Guide for PermaSnap Coping & PermaSnap Plus Coping 4 COMMERCE WAY, ARDEN, NC 8704 USA 800.89.9173 88.676.1700 OMGEDGESYSTEMS.COM Installation Guide for PermaSnap & PermaSnap Plus Coping FM

More information

Assembly Instructions. JPM-1 Just Pure Magic Adjustable Printer Stand

Assembly Instructions. JPM-1 Just Pure Magic Adjustable Printer Stand Assemby Instructions JPM-1 Just Pure Magic Adjustabe Printer Stand Just Pure Magic Printer Stand JPM-1 Part Drawing Description Qty Leg Frame 2 EA Part Drawing Description Qty Hardware List A Fat Head

More information

Installation Guide Index

Installation Guide Index Installation Guide for FlintEdge Coping & Coping+ Straight Parapets 6" through Wide ANSI/SPRI ES-1 TESTE Also included: Installation Guides for Radius Parapets 6" through Wide Vaulted Parapets 6" through

More information

The name 'Lethaby' has been associated with umbrellas since The current George M Lethaby Ltd was formed by a family member in 1947.

The name 'Lethaby' has been associated with umbrellas since The current George M Lethaby Ltd was formed by a family member in 1947. The name 'Lethaby' has been associated with umbreas since 1871. The current George M Lethaby Ltd was formed by a famiy member in 1947. Over the years 'Lethaby's' has cemented its pace as a major suppier

More information

RED LION CONTROLS MODEL IFMA - DIN-RAIL FREQUENCY TO ANALOG CONVERTER

RED LION CONTROLS MODEL IFMA - DIN-RAIL FREQUENCY TO ANALOG CONVERTER RED LION CONTROLS INTERNATIONAL HEADQUARTERS EUROPEAN HEADQUARTERS 20 Wiow Springs Circe, York, Pa. 17402, (717) 767-6511 FAX: (717) 764-0839 892 Pymouth Road, Sough, Berkshire SL1 4LP Web site- http://www.redion-contros.com

More information

Tidiness is child s play.

Tidiness is child s play. Customer information www.banco-germany.com Tidiness is chid s pay. Waste and organisation systems for the kitchen base cabinet. Inteigent waste and organisation systems for the base cabinet provide the

More information

Dubnium 11 Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.

More information

Rectangular-shaped Inductive Proximity Sensor. website

Rectangular-shaped Inductive Proximity Sensor. website 785 Rectanguar-shaped Inductive Proximity Sensor SERIES Reated Information Genera terms and conditions... F-3 Gossary of terms... P.157~ guide... P.781~ Genera precautions... P.1579~ PHOTO PHOTO IGHT FOW

More information

Product Photography Guide. Woolworths Digital V1.0

Product Photography Guide. Woolworths Digital V1.0 Product Photography Guide Wooworths Digita V1.0 CONTENT 2.0 1. OVERVIEW 2. IMAGE SPECIFICATIONS & NAMING CONVENTION REQUIREMENTS 3. FRESH, NON PACKAGED IMAGE GUIDE 4. PACKAGED IMAGE GUIDE 5. BUNDLE/GROUP

More information

CertainTeed. Soffit and Vertical Siding

CertainTeed. Soffit and Vertical Siding CertainTeed Soffit and Vertica Siding Tripe 3-1/3" InvisiVent has the highest ventiation performance of any viny soffit avaiabe today. TRIPLE 3-1/3" INVISIVENT AND SOLID S Siding: Cedar Impressions Doube

More information

CruzPro VAH-65. Advanced 3 BankVolts, 1 Bank Amps/Amp-Hour Monitor/w Alarms & NMEA 0183

CruzPro VAH-65. Advanced 3 BankVolts, 1 Bank Amps/Amp-Hour Monitor/w Alarms & NMEA 0183 Other CruzPro Products Depthsounders, Fishfinder & Speed/Temperature/Log DC Vots/Amps/Amp-Hour Monitors AC Vots/Amps/Freq/kW Monitor LPG/Petro Gas Detectors/Aarms Bige Water Aarms & Bige Pump Controers

More information

ASS 70 FD folding / sliding door. Installation Guide

ASS 70 FD folding / sliding door. Installation Guide ASS 70 FD folding / sliding door Installation Guide IMPORTANT! These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the installation.

More information

Innova. Concealed frame doorsets. Installation instructions

Innova. Concealed frame doorsets. Installation instructions Innova Concealed frame doorsets 1 2 Installation instructions 3 Thank you for choosing Innova To ensure the installation process is simple and efficient we recommended you read this guide in full before

More information

Arriva. Concealed frame doorsets. Installation instructions

Arriva. Concealed frame doorsets. Installation instructions Arriva Concealed frame doorsets 1 2 Installation instructions 3 Thank you for choosing Arriva To ensure the installation process is simple and efficient we recommended you read this guide in full before

More information

Rectangular-shaped Inductive Proximity Sensor GX-F/H SERIES

Rectangular-shaped Inductive Proximity Sensor GX-F/H SERIES 87 PHOTO PHOTO IGHT FOW PARTICUAR Rectanguar-shaped Inductive Proximity Sensor SERIES Reated Information Genera terms and conditions... F-7 Gossary of terms... P.18~ Sensor seection guide... P.83~ Genera

More information

Comparison of One- and Two-Way Slab Minimum Thickness Provisions in Building Codes and Standards

Comparison of One- and Two-Way Slab Minimum Thickness Provisions in Building Codes and Standards ACI STRUCTURAL JOURNAL Tite no. 107-S15 TECHNICAL PAPER Comparison of One- and Two-Way Sab Minimum Thickness Provisions in Buiding Codes and Standards by Young Hak Lee and Andrew Scanon Minimum thickness

More information

Xenon 05 Installation Instructions & Parts List

Xenon 05 Installation Instructions & Parts List Xenon 05 Installation Instructions & Parts List Illustration Xenon 05, H1 Handle Left Hand: Open Out 26/05/2016 Revision 2.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed by suitably

More information

Australia Edition. CI/SfB (29) Et6. February Reinforcing Bar Couplers. for the Construction Industry

Australia Edition. CI/SfB (29) Et6. February Reinforcing Bar Couplers. for the Construction Industry Austraia Edition CI/SfB (29) Et6 February 2019 Reinforcing Bar Coupers for the Construction Industry Reinforcing Bar Coupers Simpify the design and construction of concrete Lapped joints are not aways

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B P7001 Standard Kit Glass Door FITTING INSTRUCTIONS SUGGESTED TOOLS DRILL MITRE/CHOP SAW TAPE MEASURE (Image for reference only) HACKSAW POCKER DOOR KIT SHORT / LONG Z SECTION LONG Z SECTION

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 SG Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors SUGGESTED TOOLS DRILL G-CLAMP TAPE MEASURE (Image for reference only) HACKSAW POCKET

More information

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02 GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.

More information

262-EN SLIDE DOWN DOOR INSTALLATION GUIDE 262-EN. Guide No.

262-EN SLIDE DOWN DOOR INSTALLATION GUIDE 262-EN. Guide No. Contents. FORWARD. EEVATOR CONTRACTOR RESPONSIBIITIES 3. BEFORE STARTING INSTAATION 4. JOB NUMBER IDENTIFICATION 5. HANDING 6. SIDE DOWN ANDING DOOR INSTAATION 3 6.. GENERA 3 6.. DOOR GUIDE RAI TYPES 3

More information

ASS 70 FD folding/sliding door installation guide

ASS 70 FD folding/sliding door installation guide ASS 70 FD folding/sliding door installation guide 2 Preparation IMPORTANT These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the

More information

NX5 SERIES. Compact Multi-voltage Photoelectric Sensor Power Supply Built-in. Multi-voltage photoelectric sensor usable worldwide.

NX5 SERIES. Compact Multi-voltage Photoelectric Sensor Power Supply Built-in. Multi-voltage photoelectric sensor usable worldwide. 7 Compact Muti-votage Photoeectric SERIES Reated Information Genera terms and conditions... F-17 Gossary of terms / Genera precautions...p.139~ / P.1 seection guide... P.23~ China s CCC mark... P.19 PHOTO

More information

Perfect Fit blinds. Preparation. Measuring Instructions. Step 1 - Measure glass size. Step 2 - Measure window depth

Perfect Fit blinds. Preparation. Measuring Instructions. Step 1 - Measure glass size. Step 2 - Measure window depth Preparation Before you begin, ensure there is a 6mm clearance all around the outside of your window beading to allow enough room for the Perfect Fit framework. Also check that the seals of your window

More information

Trim type: Shadow gap. Fire rating: FD30. Enigma. Pocket sliding door systems. Installation instructions FD30 S

Trim type: Shadow gap. Fire rating: FD30. Enigma. Pocket sliding door systems. Installation instructions FD30 S Trim type: Shadow gap Fire rating: FD0 Enigma Pocket sliding door systems 1 2 FD0 S Installation instructions Thank you for choosing Enigma To ensure the installation process is simple and efficient we

More information

Series. Quite simply, the best in insulation! C.A 6521 C.A 6523 C.A 6525 C.A 6531 C.A Megohmmeters

Series. Quite simply, the best in insulation! C.A 6521 C.A 6523 C.A 6525 C.A 6531 C.A Megohmmeters Quite simpy, the best in insuation! Series C.A 6521 C.A 6523 C.A 6525 C.A 6531 C.A 6533 Megohmmeters Twin digita-anaogue dispay Giant back-it screen Battery powered for hours Programmabe threshod aarms

More information

Liniar Window. installation guide

Liniar Window. installation guide Liniar Window installation guide This installation guide is designed to show you the best way to fit Liniar windows, and covers all styles of window made from Liniar s lead-free 70mm PVCu profile. Not

More information

Universal pliers. Flat-bladed pliers. Semi-round-bladed pliers. Pliers with curved semi-round blades PLIERS TOOLS. L mm DESC. CODE.

Universal pliers. Flat-bladed pliers. Semi-round-bladed pliers. Pliers with curved semi-round blades PLIERS TOOLS. L mm DESC. CODE. PIERS TOOS Universal pliers HANDES IN BICOMPONENT PASTIC MATERIA (TPE). MODE FOR SOFT AND HARD WIRE. ESPECIAY ONG CUTTING EDGE FOR ROUND AND FAT CABES WITH SUPPEMENTARY TEMPERING UP TO 60HRC. SPECIA CARBON

More information

Pilkington K Glass Range Pilkington K Glass Pilkington K Glass OW Pilkington K Glass OW on Surface 4 Pilkington K Glass S

Pilkington K Glass Range Pilkington K Glass Pilkington K Glass OW Pilkington K Glass OW on Surface 4 Pilkington K Glass S Pikington K Gass Range Pikington K Gass Pikington K Gass OW Pikington K Gass OW on Surface 4 Pikington K Gass S Upstairs windows using energy-efficient gazing. Downstairs windows using origina singe gazing.

More information

Fire rating: NFR/FD30. Una. Riser door systems. Installation instructions

Fire rating: NFR/FD30. Una. Riser door systems. Installation instructions Fire rating: NFR/FD30 Una Riser door systems 1 2 Installation instructions 3 Thank you for choosing Una To ensure the installation process is simple and efficient we recommended you read this guide in

More information

Radon 07 Installation Instructions & Parts List

Radon 07 Installation Instructions & Parts List Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by

More information

Gallium 03 Installation Instructions & Parts List

Gallium 03 Installation Instructions & Parts List Gallium 03 Installation Instructions & Parts List Illustration Gallium 03, H1 Handle Left Hand: Open Out 04/05/2016 Revision 1.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST

More information

Rectangular-shaped Inductive Proximity Sensor.

Rectangular-shaped Inductive Proximity Sensor. 71 PHOTOEECTRIC PHOTOEECTRIC IGHT FOW PARTICUAR USE SIMPE MEASUREMENT STATIC CONTRO Rectanguar-shaped Inductive Proximity Sensor SERIES Reated Information Genera terms and conditions... F-17 Gossary of

More information

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height INSTALLATION GUIDE Please take a few minutes to read through this guide before getting started. 1. Overview A Typical Sliding Wardrobe Door Layout A Frame - Top Liner (optional) B Top Track C Frame - Strike

More information

Spare Bits and Bit Holders for Circle Cutters

Spare Bits and Bit Holders for Circle Cutters 19015 Adjustabe Circe Cutters Cutting Toos Circe cutter with 1 obique bit HSS-E and additiona bit hoders for straight bits (no draw cuts), cutting speed for HSS-E bits approx. 8-25 m/min. (stee and iron

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B P7001 Standard Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST

More information

Curium 19.4H Installation Instructions & Parts List

Curium 19.4H Installation Instructions & Parts List Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

LIGHTNING PROTECTION OF MEDIUM VOLTAGE OVERHEAD LINES WITH COVERED CONDUCTORS BY ANTENNA-TYPE LONG FLASHOVER ARRESTERS

LIGHTNING PROTECTION OF MEDIUM VOLTAGE OVERHEAD LINES WITH COVERED CONDUCTORS BY ANTENNA-TYPE LONG FLASHOVER ARRESTERS C I R E D 17 th Internationa Conference on Eectricity Distribution Barceona, 12-15 May 23 LIGHTNING PROTECTION OF MEDIUM VOLTAGE OVERHEAD LINES WITH COVERED CONDUCTORS BY ANTENNA-TYPE LONG FLASHOVER ARRESTERS

More information

Curium 19H Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

CX-400 SERIES. Compact Photoelectric Sensor. World standard photoelectric sensors Full line up 116 models! Strong against oil and coolant liquids

CX-400 SERIES. Compact Photoelectric Sensor. World standard photoelectric sensors Full line up 116 models! Strong against oil and coolant liquids Compact Photoeectric CX- SERIES Reated Information Ampifi er Genera terms and conditions... P. seection guide...p.~ / P.9~ MS-AJ / CHX-SC...P.799 / P.8 Gossary of terms / Genera precautions... P.98 ~ /

More information

GT3D Digital Timers. 100 to 240V AC (50/60Hz), 24V AC (50/60Hz)/24V DC

GT3D Digital Timers. 100 to 240V AC (50/60Hz), 24V AC (50/60Hz)/24V DC rs G3D Series G3D rs Key features of the G3D series incude: Precise time setting using digita thumbwhee switches Eapsed or time remaining LCD dispay 6 time ranges, 16 timing functions deays up to 99.9

More information

Electronic circuit protector ESX10-Sxxx-DC24V-1A-10A

Electronic circuit protector ESX10-Sxxx-DC24V-1A-10A Eectronic circuit protector ESX10-Sxxx-DC2V-1A-10A Description The mode ESX10-Sxxx extends our product group of eectronic overcurrent protection devices for DC 2 V appications. At a width of ony 12.5mm

More information

SLEEK, SIMPLE, SMART TRACK LIGHTING SOLUTION

SLEEK, SIMPLE, SMART TRACK LIGHTING SOLUTION 1 SLEEK, SIMPLE, SMART TRACK LIGHTING SOLUTION INTRODUCTION DESIGN SYSTEM OPTIONS INSTALLATION SOLUTIONS ORDERING Introduction to Zipine The Zipine is a sef-contained pre-wired trunking and LED ighting

More information

Gyproc Proflex Access Panels - Installation Guidance Notes

Gyproc Proflex Access Panels - Installation Guidance Notes Gyproc Proflex ccess Panels - Installation Guidance Notes The following notes are intended as guidance only, depicting the basic sequence of installation. In practice, consideration should be given to

More information

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door ROCKWE 4-IN-1 DOOR Two Panel Door Half X Door Double X Door Z Combination Door Choose between four door styles with this Door Kit. Our versatile Rockwell Door Kit is very easy to assemble. All materials

More information

Wall Specialty Cabinets

Wall Specialty Cabinets Wa Speciaty Cabinets WMSP 36 36 code width height Construction Options and Modifications - - - - Aaiabe with an upcharge - - - - Incuded as standard (Bank) - Not aaiabe Materia dimensions may be nomina

More information

Communication Systems

Communication Systems Communication Systems 1. A basic communication system consists of (1) receiver () information source (3) user of information (4) transmitter (5) channe Choose the correct sequence in which these are arranged

More information

FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF75H

FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF75H FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF75H 01603 424434 Please refer to your order or detailed sectional drawing (if requested) to assist you with the configuration of the system supplied

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

MODEL: M5CTC SEN TRONIC AG

MODEL: M5CTC SEN TRONIC AG MODE: M5CTC Super-mini Termina Boc Signa Conditioners M5-UNIT CT TRANSMITTER (camp-on current sensor) Functions & Features Converts an aternating current into a standard process signa Easy-to-insta camp-on

More information

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST Set A Set B PFD60 Fire Door Kit FITTING INSTRUCTIONS IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST SUGGESTED

More information

05/11. CI/SfB (22) fire & sound. tenon. A cost effective performer.

05/11. CI/SfB (22) fire & sound. tenon. A cost effective performer. CI/SfB 05/11 (22) fire & sound tenon A cost effective performer fire & sound tenon fire & sound at a glance BOARD ROOMS EXECUTIVE OFFICE SUITES CONFERENCE SUITES GENERAL OFFICE CLEAN ROOMS LIGHT INDUSTRIAL

More information

19.1 Cross Sections and Solids of Rotation

19.1 Cross Sections and Solids of Rotation Name ass Date 19.1 ross Sections and Soids of Rotation Essentia Question: What toos can you use to visuaize soid figures accuratey? Resource Locker Expore Exporing Nets net is a diagram of the surfaces

More information

POST TENDER ADDENDUM #1

POST TENDER ADDENDUM #1 POST TENDER ADDENDUM #1 Date: January 31, 2017 Project: #4171 Calgary- Human Services East Consolidation To: Cody Brown, Govan Brown Construction Managers CC: From: No. Pages: Tim Hollis, Elevate Development

More information

CTC CT TRANSMITTER. (clamp-on current sensor) BEFORE USE... POINTS OF CAUTION INSTRUCTION MANUAL MODEL CTC

CTC CT TRANSMITTER. (clamp-on current sensor) BEFORE USE... POINTS OF CAUTION INSTRUCTION MANUAL MODEL CTC INSTRUCTION MANUA CT TRANSMITTER (camp-on current sensor) MODE CTC CTC BEFORE USE... Than you for choosing M-System. Before use, chec the contents of the pacage you received as outined beow. If you have

More information

European Technical Assessment. ETA-11/0190 of 23 July English translation prepared by DIBt - Original version in German language.

European Technical Assessment. ETA-11/0190 of 23 July English translation prepared by DIBt - Original version in German language. European Technica Assessment ETA-11/0190 of 23 Juy 2018 - Origina version in German anguage Genera Part Technica Assessment Body issuing the European Technica Assessment: Trade name of the construction

More information

C-Series & S-Series Classic Frame with Transom (Single or Pair)

C-Series & S-Series Classic Frame with Transom (Single or Pair) 1. TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Safety Glasses Screw gun #2 Screwdriver tip #3 Screwdriver tip Philips Head screwdriver (Used to move frame on wall using oval slots on

More information

BFR2. 5-axis machining center a system developed for high performance MACHINE TOOL MANUFACTURER

BFR2. 5-axis machining center a system developed for high performance MACHINE TOOL MANUFACTURER e BFR2 5-axis machining center a system deveoped for high performance MACHINE TOOL MANUFACTURER Cross side The high stabiity of the cross side is characterised by the minima distance between the cross

More information

Tech Sheet. T4 Interior conversion kit how to - fitting instructions. 1. Rear seat belts. 2.

Tech Sheet. T4 Interior conversion kit how to - fitting instructions. 1. Rear seat belts. 2. Page 1 of 8 T4 Interior conversion kit how to - fitting instructions Thank you for purchasing our T4 interior conversion kit. This kit will enable you to convert any SWB left hand loading door T4 into

More information

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns

More information

Yongxiang Zhao Brookhaven National Laboratory Upton, NY, July 1998 CENTER FOR ACCELERATOR PHYSICS

Yongxiang Zhao Brookhaven National Laboratory Upton, NY, July 1998 CENTER FOR ACCELERATOR PHYSICS BNL CAP CCII, 65685 225-MUON-98C A NEW STRUCTURE OF LINEAR COLLIDER * Yongxiang Zhao Brookhaven Nationa Laboratory Upton, NY, 11973 RECEIVED AIK 1 7 1998 OSTI *This work was supported by the US Department

More information

MI CASA ES TU CASA. Lesson Plan #17. Creating Small, Animated Houses. by Carolina Pedraza

MI CASA ES TU CASA. Lesson Plan #17. Creating Small, Animated Houses. by Carolina Pedraza Lesson Pan #17 MI CASA ES TU CASA Creating Sma, Animated Houses by Caroina Pedraza There s no pace ike home! For centuries, the idea of home has been a source of inspiration for numerous artists. The most

More information

A F LCON PANEL PRODUCTS LTD

A F LCON PANEL PRODUCTS LTD FA LCON PANEL PRODUCTS LTD Experience suggests that the coordination of doorsets with floor levels can be particularly difficult when considering regulations relating to threshold gaps and the possibility

More information

Electronic Circuit Protector ESX10-T.-DC 24 V

Electronic Circuit Protector ESX10-T.-DC 24 V Eectronic Circuit Protector ESX0-T.-DC 2 V Description The mode ESX0-T extends our product group of eectronic overcurrent protection devices for DC 2 V appications. At a width of ony 2.5 mm it provides

More information

In this chapter, I explain the essentials that you need to start drawings. After a

In this chapter, I explain the essentials that you need to start drawings. After a CHAPTER Starting to Draw In this chapter, I expain the essentias that you need to start drawings. After a itte background, I discuss the basics of the screen that you see when you open AutoCAD or AutoCAD

More information

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

Operating Instructions VEGAPULS 66 Foundation Fieldbus

Operating Instructions VEGAPULS 66 Foundation Fieldbus Operating Instructions VEGAPULS 66 Foundation Fiedbus Contents Contents 1 About this document 1.1 Function... 5 1.2 Target group... 5 1.3 Symboism used... 5 2 For your safety 2.1 Authorised personne...

More information

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents. Pocket Door Kit PD1 / PD2 Installation Instructions Kit Contents. 1, Create Rough Opening In Stud Wall Construct rough opening ensuring all sides are square and level. Rough opening should be; Height =

More information

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED ALCOVE SHOWER Your shower can be installed to open Left hand or Right hand by rotating

More information

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT

More information

Firefighter Switch with Arc Fault Detection PVSEC-...-AF1

Firefighter Switch with Arc Fault Detection PVSEC-...-AF1 Firefighter Switch with Arc Faut Detection PVSEC... Description The term firefighter switch indicates a remotey controabe DC Disconnect with which the DC side of a photovotaic system in proximity of the

More information

INOVO 2-LITE SLIDING PATIO DOOR

INOVO 2-LITE SLIDING PATIO DOOR INOVO 2-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

Installation - Sub Cills

Installation - Sub Cills Installation - Sub Cills Fitting of Subcill Drainage paths through the sub-cill can be seen on the illustration alongside so care must be taken to ensure they are not obstructed and that screw fixings

More information

Firefighter Switch with Arc Fault Detection PVSEC-...-AF...

Firefighter Switch with Arc Fault Detection PVSEC-...-AF... Firefighter Switch with Arc Faut Detection PVSEC... Description The term firefighter switch indicates a remotey controabe DC Disconnect with which the DC side of a photovotaic system in proximity of the

More information

Mount to the Wall INSTALLATION MANUAL

Mount to the Wall INSTALLATION MANUAL Mount to the Wall 15 Locate the Wooden Studs This step applies to wooden stud wall installation only. Determine and mark the exact locations of two stud centers on the wall. Wooden studs should be spaced

More information

CI/SfB 11/12 (22) fire & sound A cost effective performer fire & sound Areas of use L IA L IN IGH DU T ST R G OF EN FI ERA CE L fire & sound at a glance E OF XEC FI UT CE IV SU E IT ES CO SU N IT FER ES

More information

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel - by KUDOS INSTALLATION INSTRUCTIONS SLIDING DOOR for CORNER installation ONLY - this door closes to side panel - Please read these instructions throughout before installing as incorrect fitting will invalidate

More information

Commercial roller shade selection guide

Commercial roller shade selection guide Commercia roer shade seection guide Introduction Lutron offers the most advanced shading soutions for commercia spaces, with a arge variety of product options and features. From individua eectronicay controed

More information

How To Create An Entertainment Unit

How To Create An Entertainment Unit How To Create An Entertainment Unit Materials required: 2 x Pine Panels - 1800mm x 450mm x 18mm 4 x Pine Panels - 310mm x 450mm x 18mm 1 x Pine Panels - 650mm x 450mm x 18mm 6 x Bun feet (your choice of

More information

9.1. Door Assembly Coordination. Ÿ Architrave is not described in

9.1. Door Assembly Coordination. Ÿ Architrave is not described in 9.1 Introduction: This document provides for general guidance with regard to the coordination of bespoke door assemblies. The document includes recommendations with regard to the reference points generally

More information

Understanding The HA2500 Horizontal Output Load Test

Understanding The HA2500 Horizontal Output Load Test Understanding The HA2500 Horizonta Output Load Test Horizonta output stages are part of every CRT video dispay incuding cosed circuit monitors, computer monitors, video games, medica monitors, TVs. HDTVs,

More information

UNION SPECIAL CORPORATION SMALL FRAME HIGH SPEED FOUR AND FIVE THREAD VERTICAL NEEDLE DIFFERENTIAL FEED WITH QUICK STITCH CHANGE MECHANISM. No.

UNION SPECIAL CORPORATION SMALL FRAME HIGH SPEED FOUR AND FIVE THREAD VERTICAL NEEDLE DIFFERENTIAL FEED WITH QUICK STITCH CHANGE MECHANISM. No. F NEST O UALITY C O L U M B I A INDUSTRIAL SEWING MACHINES STYLES 39800A A 39800AB 39800AL 39800AN 39800AP 39800AQ 39800AT 39800AW 39800AX 39800AY 39800VAL 39800VAN 39800VAQ 39800VAW 39800VAX 39800VAY

More information

KW8M. Toward energy savings. Visualization. Makes us more ecological! Eco-POWER METER 1A/5A CT Input type

KW8M. Toward energy savings. Visualization. Makes us more ecological! Eco-POWER METER 1A/5A CT Input type WM co-powr MTR A/A CT Input type Visuaization Toward energy savings Maes us more ecoogica! Direct input of secondary side A/A CT Direct input from secondary side A/A type domestic and overseas CTs. Dedicated

More information