7 DO NOT run down shade cloth outside of the Side Channels. Headbox Height + Hembar** ¼ (6mm) on Both Sides. 2¼ (57mm)
|
|
- Angel Barrett
- 5 years ago
- Views:
Transcription
1 Instaation Instructions Futureguard FexShade Zip by Draper READ BEFORE YOU BEGIN Inspect a boxes to make sure you have received the proper parts. 2 Open cartons engthwise. 3 A hardware must be instaed eve. Shades must be eve d square. 4 Fasters are not suppied by Futureguard. It is the responsibiity of the instaer to make sure that appropriate os for the mounting surface are used. For Jamb Mounting, Futureguard recommends the use of ow profie head screws to aow the zippers to easiy pass through the s. 5 For instaing units in recessed areas where there isn t room to mount the Headbox to the s, pease see note on page 6. 6 FexShade Zip is desigd to operate ony when the fabric pe is instaed verticay, perpendicuar to the ground. Anged instaations, where the s are NOT instaed verticay, may prevent the unit from cosing. 7 DO NOT run down shade coth outside of the s. 8 Pease read the foowing instaation guideis thoroughy d foow them carefuy. Faiure to do so may cause product to fa or otherwise fai, d invaidates the warrty. PREPARATION FOR INSTALLATION Make sure the mounting surface is strong enough to hod the FexShade Zip. PLEASE NOTE: It is the responsibiity of the instaer to use appropriate fasters for the mounting surface. 2 Verify unit measurements d make sure it wi fit in the desired ocation. PLEASE NOTE: The Hembar does not retract into the Headbox. This wi ed to be accounted for if mounting over a swinging window or door. 3 Mounting Brackets MUST be instaed with a gap of ¾ (45mm) between the d the Mounting Bracket edge (See Fig. ). ¾ (45mm) END CAP Figure MOUNTING BRACKET ASSEMBLED DIMENSIONS (SIDE VIEW) (FRONT VIEW) exshade FexShade Zip 92 Zip /8 (48mm) 5 7 /8 (48mm) Fexshade Fexshade Zip 27Zip 27 7¼ (83mm) 7¼ (83mm) Shade Width 3 /6 (30mm) Fabric Width Headbox Height + Hembar** 3 /6 (30mm) Headbox Height* 2¼ E HT SHADE HEIGHT 5 /8 Top View Down 5 /8 Top View Down SHADE HEIGHT SHADE HEIGHT 5 /8 5 /8 Gap between Hembar & HEADBOX HEIGHT W/O HEMBAR * Large: Zip 27 = 5 Sma: Zip 92 = 3 5 / 8 HEADBOX HEIGHT WITH HEMBAR ** Large: Zip 27 = 7¼ (83mm) Sma: Zip 92 = 5 7 / 8 (48mm) Length Shade Height /8 Zip 92 Curved Headbox (/Jamb Mount shown) /8 / 8 / 8 Top View Down 5 / 6 (33mm) Top View Down 5 / 6 (33mm) Zip 27 Curved Headbox (Surface/Wa Mount Shown) ¼ (6mm) on Both s 2¼ 5 /8 Hembar Length 5 /8 Futureguard FexShade Zip by Draper Copyright 204 Draper Inc. / Printed in U.S.A.
2 Futureguard FexShade Zip by Draper page 2 DIMENSIONS HEADBOX STYLES 3 5 / / / / 8 FexShade Zip 92 Square Headbox FexShade Zip 27 Square Headbox FexShade Zip 27 Anged Headbox FexShade Zip 27 Curved Headbox FexShade Zip 92 Curved Headbox HARDWARE DIMENSIONS 4 (02mm) 4 (02mm) 3 / 8 (0mm) ¾ (8mm) 5 /8 5 /8 (26mm) 2 (50mm) 4 (02mm) ¾ (25mm) (45mm) 7 ¾ /8 (22mm) (45mm) 7 /8 (22mm) (25mm) 4 (02mm) (25mm) ¾ (25mm) (45mm) ¾ (45mm) Dimensions Hembar Dimensions Zip 92 Mounting Bracket Zip 27 Mounting Bracket CABLE EXIT The FexShade Zip c be ordered with a cabe exit pre-dried in the top or back of the Headbox. If there is no cabe exit provided, you must dri o. Before driing out a cabe exit, remove the Roer Assemby from the Headbox. (See Removing Roer Assemby section on Page 3) Remove the 3 screws d the on the motor side of the Headbox d dri a 5 6 diameter hoe in o of the 3 suggested ocations (See Fig. 2). After driing, repace the d return the Roer Assemby. FexShade Zip 92 FexShade Zip 27 9 /6 3 /8 9 /6 ¾ 3 /8 Figure 2 25 /32 ¾ Figure Remove Three Screws from Endcap ¾ Cabe Exit Hoe Ø: 5/6 (8mm) TOP SIDE BACK TOP SIDE BACK ATTACHING ANTI-INSECT BRUSH SEALS (OPTIONAL) The FexShade Zip has optiona Anti-Insect Brush Seas pre-instaed aong the width of the Headbox Fascia Cover. There are aso brush seas suppied for each of the s that wi ed to be inserted before instaing the s. After the screen is instaed d before the Headbox Fascia Cover is instaed, remove the doube-sided tape d appy the sma brush seas to the face of the s as shown in (Fig. 3). Insect Barrier Brush Sea Figure Figure 3
3 Futureguard FexShade Zip by Draper page 3 Instaing Curved, Square or Anged Headbox Zip 92 d Zip 27 Screens With Mounting Brackets or directy to wa If instaing Zip 27 Anged Headbox supported by s, go to that section on page 5. A MOUNTING HEADBOX WITH BRACKETS Attaching Mounting Brackets Attach Mounting Brackets to the wa using fat head screws instaed fush with the bracket. Be sure to use AT LEAST 2 of the top mounting hoes (See Fig. 4). 2 Pace the Headbox onto the brackets d tighten Set Screws (See Fig 5). Figure 4 Figure 5 3 You are now ready to mount the s (See Mounting section on page 4). Tighten Set Screws B MOUNTING HEADBOX PERMANENTLY TO CEILING OR WITH SCREWS Attaching Mounting Brackets to Headbox Attach Mounting brackets to the Headbox as a spacer between the Headbox d the wa. Leave a ¾ (45mm) gap between d Mounting Bracket (See Fig. 6), d tighten set screws. 2 Removing Roer Assemby (See Fig. 7) A. Remove screws from bottom of Headbox, remove Fascia d set aside. B. Remove Quick Reease Pin from Ider End of Roer Assemby. Figure 6 Leave a ¾ (45mm) GAP for -s REMOVE FASCIA REMOVE QUICK RELEASE PIN Attach Mounting Bracket as spacer d Tighten Set Screws REMOVE ROLLER ASSEMBLY 3 Mounting to Ceing/Wa Using the mounting hoes in the s as a guide (See Fig. 8), dri piot hoes on both ends of the Headbox. Attach to mounting surface using appropriate fasters. PLEASE NOTE: It is the responsibiity of the instaer to use appropriate fasters for the mounting surface. Figure 8 ALSO NOTE: If there is no cabe exit provided, you must dri o before re-instaing Roer Assemby. See Cabe Exit section on page 2 CEILING MOUNT HOLES MOUNT HOLES 4 Once the Headbox is secured to the mounting surface, re-insta Roer Assemby*, Quick Reease Pin d Fascia. 5 You are now ready to mount the s (See Mounting section on page 4). C. Remove Roer Assemby incuding motor Ider End first, d set aside. Figure 7 Remove screws from bottom of Headbox
4 Futureguard FexShade Zip by Draper page 4 Instaing s on previousy mounted Headbox If instaing Zip 27 Anged Headbox, go to that section on page 5. Preparation Use 3mm Hex Wrench to remove Screws from s d set aside (See Fig. 9A). t un Mo e a o W ot H Pi Ch Ch 3 For Jamb Mounting, aso remove the Zip Fabric Retair Strip d set aside. Figure 9A Ja m Pi b M ot ou Ho nt e Jamb Mounting Wa Mounting Jamb Mounting Front of Shade TO MOUNTED HEADBOX SURFACE MOUTED SIDE CHANNELS See Step 6b on page 5 for Jamb Mounted s. 6a Insert the pastic Top d Fabric Retairs into s (See Fig. 0). Anged eg of FABRIC RETAINER STRIP must be oriented towards back Insert Top 0a Repeat Steps 7a-9a for the other. a Re-attach Covers using the screws removed in Step under Preparation. ZIPPER S Ch ide Figure 0 Cross Section 7a Side the first d Zipper Retair onto o side of the Hembar, guiding the Zipper into the Fabric Retair in the s (See Fig. ). 9a Attach to the mounting surface using appropriate fasters. IMPORTANT: s MUST be instaed parae d square with a toerce of +/- 8. 8a With the Zipper engaged in Fabric Retair, insert guide into bottom of the Headbox or over the Peg, depending on the Headbox stye (See Fig. 2). HEMBAR PLEASE NOTE: Faiure to use provided fasters to re-attach Covers may resut in product Figure faiure in high wind. e Chn Figure 2 FABRIC RETAINER STRIP S Ch ide ATTACHING SIDE CHANNELS S Ch ide m Pi b M ot ou Ho nt e Wa Mounting Front of Shade UP Ja Neopre cushions on the retair strip (shown in back) ARE NOT TO Figure 9B BE REMOVED. If they come off, repace using doube-sided tape. 2 Remove Covers. PLEASE NOTE: Do NOT remove the Bottom Caps from s. 4 Pre-dri through s in at east three mounting points (See Fig. 9B). t un Mo e a t Ho W o Pi Propery Engaged in Headbox
5 Futureguard FexShade Zip by Draper page 5 ATTACHING SIDE CHANNELS TO MOUNTED HEADBOX JAMB MOUNTED SIDE CHANNELS 6b Insert the pastic Top into the top of the (See Fig. 3). 7b Insert into Bottom of the Headbox (See Fig. 4). Insert Top UP Figure 3 Anged eg of FABRIC RETAINER STRIP must be oriented towards back Cross Section 8b Attach to the mounting surface using appropriate fasters. IMPORTANT: s MUST be instaed parae d square with a toerce of +/- 8. Figure 4 Propery Engaged in Headbox PLEASE NOTE: Make sure Fabric Retairs go back into the s with Fabric at the top of s d ged eg oriented toward the back (See Fig. on page 4). 0b Repeat Steps 6b 9b for the other. b Re-attach Covers using the screws removed in Step under Preparation on page 4. 9b Side o Fabric Retair Strip over the Zipper on o side of the Hembar d insert into the (See Fig. on page 4). PLEASE NOTE: Faiure to use provided fasters to re-attach Covers may resut in product faiure in high wind. Instaing Zip 27 Anged Headbox Supported by s ATTACHING SIDE CHANNELS SURFACE OR JAMB MOUNTING Measure the width of the Headbox. s must be instaed to match the exact width of the Headbox d must be square d parae. Figure 5 Use 3mm Hex Wrench to remove screws from s d set aside. 2 Remove Covers. REMOVE FASCIA PLEASE NOTE: DO NOT remove the Bottom Caps from s. 3 For jamb mounting, aso remove the Zip Fabric Retair Strip d set aside. 4 Pre-dri through s in at east three mounting points (See Fig. 9 under Preparation on page 4). HEADBOX MOUNTING STUD HEADBOX MOUNTING STUD ZIPPER HEMBAR 5 Attach to the mounting surface using appropriate fasters. 6 If jamb mounted, repace the previousy removed Zipper Fabric Retair Strips, making sure the ged eg is toward the back d the Zipper fun is up (See Fig. 3 above). Figure 6 Figure FABRIC RETAINER STRIP 7 Re-attach Covers using the screws removed in Step. PLEASE NOTE: Faiure to use provided fasters to re-attach Covers may resut in product faiure in high wind. 8 Wa Mount Brackets are not used when Headbox is supported on s. 9 Remove screws from bottom of Headbox, remove Fascia d set aside (See Fig. 5). Pace Headbox onto the s whie simuteousy inserting the Zipper on each side of the Hembar into the Zipper Retair Strips in each (See Fig. 6).
6 Futureguard FexShade Zip by Draper page 6 ALTERNATE MOUNTING FOR JAMB RECESSED AND POCKET INSTALLATIONS (Zip 27 Anged Ony) If the system is instaed in a recess, it is unikey that 6¼ there (58mm) wi be sufficient space above the s to aow the Headbox 5 to be mounted onto them after the chs are instaed. In these instces, we recommend using the wa/perment mounting procedure. The minimum depth of the ceiing pocket for the Fex Shade Zip 92 is 4¾ (20mm), d for the FexShade Zip 27 is 6¼ (58mm). See Fig. 7. FexShade Zip 27 FexShade Zip ¼ (83mm) 4 ¾ (20mm) 3 5 /8 3 5 /8 5 7 /8 (48mm) FexShade Zip 27 6¼ (58mm) 5 5 7¼ (83mm) Figure 7 Figure Compete Eectrica Conction The FexShade Zip operates on 0-20V, 60 Hz. current. Shade is shipped with interna wiring compete d suppied with a 6' cabe ead (stdard). Longer ead c be substituted by removing two screws in motor end of roer, removing ead, pugging w ead in, d repacing screws. Wire to conct shade to switch(es) d switch(es) to power suppy shoud be furnished by instaer. Conctions shoud be made in accordce with attached wiring diagram, d wiring shoud compy with nationa d oca eectrica codes. DO NOT wire 4-wire motors in parae without written permission from Futureguard. A operating switches shoud be off before power is concted. Radio Technoogy 0-20V Motors Radio Technoogy 0-20V Quiet Motor Dashed wiring by eectrici To 0-20V Li Interna Shade Wiring White (Neutra) Back Green (Ground) RF Wa Switch or RF Trsmitter PROGRAMMING AND LIMIT SWITCH ADJUSTMENTS RTS ALTUS MOTORS INITIATE PROGRAMMING Conct AC to o motor at a time. Seect the trsmitter/ch you wt to use. Press d hod both the Up d Down buttons simuteousy unti the motor jogs, then reease (a jog is a short up d down movement of the motor). CHECK/CHANGE THE DIRECTION Check the direction of operation (the motor wi operate in momentary fashion). Confirm that the Up button brings the appication up or in. To chge the direction, press the Stop button for more th 5 seconds unti the motor jogs, then reease. Check the direction. SETTING THE LIMITS Start at d upper reference point (upper imit). Press both the Stop d Down buttons simuteousy unti the motor begins to rotate, then reease. Stop the motor where you wt to set the ower imit. Adjust if cessary by pressing the Up or Down buttons. Press d hod both the Stop d Up buttons simuteousy unti the motor rotates up, then reease. Stop the motor where you wt to set the upper imit (or it wi stop automaticay at the initia upper reference point). Adjust if cessary. Press the Stop for 5 seconds unti the motor jogs. The imits are now recorded. Press the Programming button for 3 seconds unti the motor jogs to record the trsmitter for user mode (the motor operates in maintaid fashion). ADD/DELETE A TRANSMITTER/CHANNEL To add a trsmitter/ch, press the programming button on aready recorded o unti the motor jogs. Seect the trsmitter/ch to add d press its programming button unti it jogs, then reease. To deete a trsmitter/ch, press the programming button on aready recorded o unti the motor jogs. Seect the trsmitter/ch to deete d press its programming button unti it jogs, then reease. SETTING THE INTERMEDIATE LIMIT Once the imits are set the motor is in user mode. Operate the motor to the ocation you woud ike as your intermediate position with d aready programmed trsmitter/ch d press the Stop. Reease d press the Stop button again for 5 seconds unti the motor jogs, then reease. Check it (to access the intermediate position press the Stop button whie the motor is at rest). RESETTING THE LIMITS To chge the ower imit: Move the motor to its current ower imit position d et it stop. Press the Up d Down buttons simuteousy unti the motor jogs, then reease. Adjust to a w ower imit position. Press the Stop unti the motor jogs, then reease. Check it. To chge the upper imit: Move the motor to its current upper imit position d et it stop. Press the Up d Down buttons simuteousy unti the motor jogs, then reease. Adjust to a w upper imit position. Press the Stop unti the motor jogs, then reease. Check it.
7 Futureguard FexShade Zip by Draper page 7 continued from previous page PROGRAMMING AND LIMIT SWITCH ADJUSTMENTS RTS ALTUS MOTORS RESETTING THE MOTOR Dua power cut: Disconct AC power for 2 seconds, reconct for 0 seconds, disconct for other 2 seconds d reconct. The motor rotates in o direction d stops on its own. Resetting to factory mode: When the motor stops, press d hod the Programming button (0 sec.) on aready programmed trsmitter/ ch unti it jogs twice, then reease. There is a pause between the jogs. Do not reease the Programming button unti the second jog is compete or you wi have to start from the dua power cut again. Ceing d Maintence Window covering products mufactured by Futureguard, when propery instaed, shoud require no operationa maintence or ubrication, except when instaed in sat air environments. Most of Futureguard's stdard fabrics may be ceed at the window by vacuuming with a soft brush attachment. They may aso be ceed by using a sponge or soft coth d mid soution of warm soapy water. A dishwashing iquid, such as Ivory iquid, is recommended. A ce dry coth is recommended for the meta finish. Sat Water Environment Care Futureguard screens are mufactured from the fist materias avaiabe based on the requirements for performce, strength d ongevity. The frame componts are mufactured with a combination of auminum, staiss stee d corrosion-resistt carbon stee where high strength is required. Screens exposed to sat air MUST be treated with the same care as woud be given to a boat or other meta equipment in order to prevent acceerated sat environment corrosion of the fasters d finish.. The screen frame d fabric shoud be washed monthy with a non-detergent soap soution to ce off sat deposits. A simpe hose end sprayer ike Soap Jet works we. 2. Rinse the frame d fabric with ce water d et the fabric dry in the down position. 3. In the spring d fa, remove the front cover from the head box. Rinse off y deposits with a mid non-detergent soap. Once dry, spray the Motor Mount Bracket, Ider End Assemby d Fabric s with siico spray to provide protection d ubrication. This simpe preventative maintence process wi significty extend the ife of your screen. Sat corrosion is not covered under y mufacturer s warrty.
Method of Build. Kameo 75. Love the space you re in.
Kameo 75 - a 75mm radius edge trim system in a stee stud and pasterboard construction with pre-assembed window frames Kameo 75 Method of Buid Love the space you re in. Kameo-75 - partitioning system Method
More informationRacks and Cable Management Products
Racks and Cabe Management Products 79 Wire Management Brackets HeermannTyton provides the most adaptabe and systematic approach for cabe management on reay racks. Offering a compete ine of versatie products,
More informationNocturne+ E INSTRUCTIONS CAUTION. Motor Operated Exterior Projection Screen. 1¾ (45mm) END CAP. Wall Mounting Bracket. Wall Mounting Bracket
Motor Operated Exterior Projection Screen Wall ing Bracket INSTRUCTIONS INSTALLATION & OPERATION CAUTION Wall ing Bracket 1. Inspect all boxes to make sure you have received the proper screen and parts.
More informationKOMFORT. Klassic - a radius edge veneered trim system in a steel stud and plasterboard construction with glazing options. Klassic.
KOMFORT Kassic - a radius edge veneered trim system in a stee stud and pasterboard construction with gazing options Kassic Method of Buid Love the space you re in. February 2013 Kassic - partitioning system
More informationSlim-line Aluminium Roofs Assembly Guide
Sim-ine Auminium Roofs Assemby Guide Contents Bonded fush gazed roofs Page 3 Singe section of gass Page 4 Singe square with opener Page 5 Mutipe gass panes Page 6 Instaing Openers Page 10 Timber Kerb For
More informationAssembly Instructions. JPM-1 Just Pure Magic Adjustable Printer Stand
Assemby Instructions JPM-1 Just Pure Magic Adjustabe Printer Stand Just Pure Magic Printer Stand JPM-1 Part Drawing Description Qty Leg Frame 2 EA Part Drawing Description Qty Hardware List A Fat Head
More informationCTC CT TRANSMITTER. (clamp-on current sensor) BEFORE USE... POINTS OF CAUTION INSTRUCTION MANUAL MODEL CTC
INSTRUCTION MANUA CT TRANSMITTER (camp-on current sensor) MODE CTC CTC BEFORE USE... Than you for choosing M-System. Before use, chec the contents of the pacage you received as outined beow. If you have
More informationCommercial roller shade selection guide
Commercia roer shade seection guide Introduction Lutron offers the most advanced shading soutions for commercia spaces, with a arge variety of product options and features. From individua eectronicay controed
More informationRectangular-shaped Inductive Proximity Sensor. website
785 Rectanguar-shaped Inductive Proximity Sensor SERIES Reated Information Genera terms and conditions... F-3 Gossary of terms... P.157~ guide... P.781~ Genera precautions... P.1579~ PHOTO PHOTO IGHT FOW
More informationCruzPro VAH-65. Advanced 3 BankVolts, 1 Bank Amps/Amp-Hour Monitor/w Alarms & NMEA 0183
Other CruzPro Products Depthsounders, Fishfinder & Speed/Temperature/Log DC Vots/Amps/Amp-Hour Monitors AC Vots/Amps/Freq/kW Monitor LPG/Petro Gas Detectors/Aarms Bige Water Aarms & Bige Pump Controers
More informationRectangular-shaped Inductive Proximity Sensor GX-F/H SERIES
87 PHOTO PHOTO IGHT FOW PARTICUAR Rectanguar-shaped Inductive Proximity Sensor SERIES Reated Information Genera terms and conditions... F-7 Gossary of terms... P.18~ Sensor seection guide... P.83~ Genera
More informationMotorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions
Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil 4 Level Phillips
More informationBe sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.
Company Name: Spike Power Sports Vehicle Name: Polaris General 2P Product Description: Soft Upper Doors Part Number: 58-1600 Revision: R01 09/19/2018 Contents: 655 Elm Ridge Ave, Canal Fulton OH, 44614
More informationRED LION CONTROLS MODEL IFMA - DIN-RAIL FREQUENCY TO ANALOG CONVERTER
RED LION CONTROLS INTERNATIONAL HEADQUARTERS EUROPEAN HEADQUARTERS 20 Wiow Springs Circe, York, Pa. 17402, (717) 767-6511 FAX: (717) 764-0839 892 Pymouth Road, Sough, Berkshire SL1 4LP Web site- http://www.redion-contros.com
More informationNX5 SERIES. Compact Multi-voltage Photoelectric Sensor Power Supply Built-in. Multi-voltage photoelectric sensor usable worldwide.
7 Compact Muti-votage Photoeectric SERIES Reated Information Genera terms and conditions... F-17 Gossary of terms / Genera precautions...p.139~ / P.1 seection guide... P.23~ China s CCC mark... P.19 PHOTO
More informationCruzPro FU60. Intelligent Digital Fuel Gauge/w Alarms & Consumption Calculator
Other CruzPro Products Depthsounders & Speed/Temperature/Logs PC Based Fishfinders and Active Depth Transducers DC Vots/Amps/Amp-Hour Monitor AC Vots/Amps/Freq/kW Monitor LPG/Petro Gas Detectors/Aarms
More informationFirefighter Switch with Arc Fault Detection PVSEC-...-AF1
Firefighter Switch with Arc Faut Detection PVSEC... Description The term firefighter switch indicates a remotey controabe DC Disconnect with which the DC side of a photovotaic system in proximity of the
More informationThe name 'Lethaby' has been associated with umbrellas since The current George M Lethaby Ltd was formed by a family member in 1947.
The name 'Lethaby' has been associated with umbreas since 1871. The current George M Lethaby Ltd was formed by a famiy member in 1947. Over the years 'Lethaby's' has cemented its pace as a major suppier
More informationCHANNEL LETTER LIGHTING
LIGHTING UNIQUE LIGHTING SOLUTIONS WARNING Instaation must ony be performed by a icensed eectrician. To prevent death, injury or damage to property this product must be instaed in accordance to Nationa
More informationMethod of Build. ORBIS Single Glazed. Komfort Installation KOMFORT
KOMFORT WORKSPACE Orbis singe gazed - a muion free crysta cear dry vertica jointed system with square auminium sections Method of Buid Komfort Instaation Love the space you re in. June 2012 Index Section
More informationAltro Transport. Installation and maintenance Guide. Installation. Contents. Cleaning
Atro Transport Instaation and maintenance Guide June 2017 Contents Atro Transport products are designed for a ong, troube-free ife, providing a higher degree of comfort and safety for your customers, easier
More informationFirefighter Switch with Arc Fault Detection PVSEC-...-AF...
Firefighter Switch with Arc Faut Detection PVSEC... Description The term firefighter switch indicates a remotey controabe DC Disconnect with which the DC side of a photovotaic system in proximity of the
More informationElectronic circuit protector ESX10-Sxxx-DC24V-1A-10A
Eectronic circuit protector ESX10-Sxxx-DC2V-1A-10A Description The mode ESX10-Sxxx extends our product group of eectronic overcurrent protection devices for DC 2 V appications. At a width of ony 12.5mm
More informationRAD250 Nothing Comes Close to a Cobra
Operating Instructions The obra ine of quaity products incudes: B Radios Dash ams Radar Detectors Marine VHF Radios Power Inverters Accessories RADAR/LASER PROTETION RAD250 Nothing omes ose to a obra Introduction
More informationUnderstanding The HA2500 Horizontal Output Load Test
Understanding The HA2500 Horizonta Output Load Test Horizonta output stages are part of every CRT video dispay incuding cosed circuit monitors, computer monitors, video games, medica monitors, TVs. HDTVs,
More informationRectangular-shaped Inductive Proximity Sensor.
71 PHOTOEECTRIC PHOTOEECTRIC IGHT FOW PARTICUAR USE SIMPE MEASUREMENT STATIC CONTRO Rectanguar-shaped Inductive Proximity Sensor SERIES Reated Information Genera terms and conditions... F-17 Gossary of
More informationROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door
ROCKWE 4-IN-1 DOOR Two Panel Door Half X Door Double X Door Z Combination Door Choose between four door styles with this Door Kit. Our versatile Rockwell Door Kit is very easy to assemble. All materials
More informationLBI Mobile Communications. EDACS TM Jessica. PBX Gateway. Operator s Manual
Mobie Communications EDACS TM Jessica PBX Gateway Operator s Manua TABLE OF CONTENTS 1. SCOPE... 3 2. QUICK USAGE GUIDE... 4 2.1. Making Phone Cas From An EDACS Radio... 4 2.2. Caing EDACS Radios From
More informationESSENCE - H SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS
ESSENCE - H SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationRoller Shades MOTORIZED SHADE. Simplicity with rechargeable motor. Installation & Care Instructions
Roller Shades MOTORIZED SHADE Simplicity with rechargeable motor Installation & Care Instructions 152709 C 4/26/2017 GETTING STARTED IMPORTANT: The remote control has not been linked to the shades. Install
More informationMIRAGE-X / BELLA. Shower Door Installation Instructions
MIRAGE-X / BELLA Shower Door Installation Instructions IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationInsolroll Clutch Operated Shades Installation Instructions Installation Instructions
All clutch operated shades are shipped fully assembled and ready for installation. Mounting screws are not provided. Screws for chain guide installation to meet the child safety standards are provided.
More informationWeatherfold 4s 50 & 100 Brio Australia P: W: brio.com.au
Codes INSTBWS2 REV J - MAR 2017 Weatherfold 4s 50 & 100 Brio Australia P: +61 2 87186718 W: brio.com.au E: brio.sales@allegion.com Brio UK P: +44 191 2291224 W: briouk.com E: brio.sales.uk@allegion.com
More informationOperation Guide
MO0907-EB Operation Guide 709 713 Getting Acquainted Congratuations upon your seection of this CASO watch. To get the most out of your purchase, be sure to read this manua carefuy. Expose the watch to
More informationESSENCE. Shower / Tub Door Installaion Instructions
ESSENCE Shower / Tub Door Installaion Instructions IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
More informationShort form Catalog Pilot devices Products for industrial environments
Short form Cataog Piot devices Products for industria environments Unique benefits from ABB piot devices L-Mark L-mark - Makes customer specific marking easy A new system for custom marking our piot devices
More informationUNIDOOR-X TUB DOOR TUB DOOR INSTALLATION NSTRUCTIONS. MODEL #s D58580-##
T F UNIDOOR-X TUB DOOR se A R a e l re TUB DOOR INSTALLATION I NSTRUCTIONS r o D ved f IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For
More informationWARNING Indicates a hazardous situation which, if not avoided, could result in death or serious injury. WARNING. Ranger XP Door Kit
REVISION 04 November, 20 2018 Ranger XP Door Kit Prior to installation, please verify if a revised version of this instruction sheet is available on Knowledge Center. The following symbols may be used
More informationCAVALIER. Shower Door Installation Instructions
CAVALIER Shower Door Installation Instructions IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
More informationWARNING WARNING. CAUTION Indicates a hazard which, if not. NOTICE Indicates an instruc on which, if not
Prior to installa on, please verify if a revised version of this instruc on sheet is available on Knowledge Center. The following symbols may be used in this document. WARNING Indicates a hazardous situa
More informationENIGMA AIR ENCLOSURE
ENIGMA AIR ENCLOSURE SHOWER ENCLOSURE INSTALLATION INSTRUCTION IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationConfiguring RolandVersaWorks to print on your HEXIS media
PRINTING DIVISION Product Buetin N 4 Configuring RoandVersaWorks to print on your HEXIS media 1. Instaing a media profie suitabe for your HEXIS printing media 1.1. Downoading the media profie 2 1.2. Importing
More informationSHOWER DOOR INSTALLATION & CARE GUIDE
SHOWER DOOR INSTALLATION & CARE GUIDE For models: SD-AZ-0 Please Note: This is a two person job. The glass doors are extremely heavy and it is highly recommended to use professional installers. For any
More informationMODEL: M5CTC SEN TRONIC AG
MODE: M5CTC Super-mini Termina Boc Signa Conditioners M5-UNIT CT TRANSMITTER (camp-on current sensor) Functions & Features Converts an aternating current into a standard process signa Easy-to-insta camp-on
More information5200 Series Door Closer Installation Instructions
5200 Series Door Closer I-C00187 R2 Regular Arm See Page 2 An incorrectly installed or improperly adjusted door closer can cause property damage or personal injury. These installation instructions should
More informationUNIDOOR/UNIDOORLUX/UNIDOOR PLUS
UNIDOOR/UNIDOORLUX/UNIDOOR PLUS SINGLE SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest
More informationWeatherfold 4s 50, 75 & 100
Codes Weatherfold 4s 50, 75 & 100 Brio Australia P: +61 2 87186718 W: brio.com.au E: sales@brio.com.au Brio RMD UK Ltd. P: +44 191 2291224 W: briouk.com E: sales@briouk.com INSTBWS1 REV D - NOV 2011 Brio
More informationCellar Hanger ASSEMBLY INSTRUCTIONS
Cellar Hanger ASSEMBLY INSTRUCTIONS CELLAR HANGER Recommended Tools Drill with 1/8 and 1/4 Drill Bits, 1-1/8 Forstner Bit or 1-1/8 Spade Bit, and Phillips Bit 9/16, 7/16, and 5/8 Combination Wrench Socket
More informationInstallation Instructions
Transitional Shades Installation Instructions Traditional, 2-On-1 Headrail & Sundown Shades Couplitaire Modernaire Visionaire *Click on any page to return to the Table of Contents* Allure Transitional,
More informationNGRM700. Neutral Grounding Resistor Monitor
M700 eutra Grounding Resistor Monitor M700_D00292_02_D_XXE/07.2018 M700 eutra Grounding Resistor Monitor Product description The M700 is ony intended for use in high-resistance grounded systems. In these
More informationRAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED
RAMPAGE P R O D U C T S 84 (+/- 1/4 ) INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO 1966-1977 TOOLS REQUIRED 3/8 WRENCH 7/16 WRENCH ½ WRENCH #2 PHILLIPS SCREWDRIVER 1/8 DRILL
More informationWS2812 Intelligent control LED integrated light source
Features and Benefits Contro circuit and RGB chip are integrated in a package of 5050 components, form a compete contro of pixe point. Buit-in signa reshaping circuit, after wave reshaping to the next
More informationUniversal pliers. Flat-bladed pliers. Semi-round-bladed pliers. Pliers with curved semi-round blades PLIERS TOOLS. L mm DESC. CODE.
PIERS TOOS Universal pliers HANDES IN BICOMPONENT PASTIC MATERIA (TPE). MODE FOR SOFT AND HARD WIRE. ESPECIAY ONG CUTTING EDGE FOR ROUND AND FAT CABES WITH SUPPEMENTARY TEMPERING UP TO 60HRC. SPECIA CARBON
More informationManual SURFACE ROUGHNESS TESTER PCE-RT 1200
PCE Americas Inc. 711 Commerce Way Suite 8 Jupiter FL-33458 USA From outside US: +1 Te: (561) 32-9162 Fax: (561) 32-9176 info@pce-americas.com PCE Instruments UK Ltd. Units 12/13 Southpoint Business Park
More informationINSTALLATION INSTRUCTIONS ROLLER SHADES
INSTALLATION INSTRUCTIONS ROLLER SHADES Tools Required: Tape measure, pencil, drill, drill bits, screw driver, step stool or ladder. Note: use a 5/64 drill bit to pre-drill the screw holes (for attachment
More informationHow To Measure Your Finished Opening
3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips
More informationINSTALLATION INSTRUCTIONS Medium Flat Panel Model MSP-SI1
INSTALLATION INSTRUCTIONS Medium Flat Panel Model MSP-SI1 IMPORTANT! : The MSP-S11 Mount is designed for use with Sharp 45" LCD displays that have a 200mm x 200mm mounting pattern. IMPORTANT! : The mount
More information4-Door EXO-Top Roof Rack System
Page 1/31 4-Door EXO-Top Roof Rack System 13516.02! WARNING The EXO-Top Roof Rack System is rated to a dynamic 300 lb, evenly distributed load. Further loading could result in serious injury or death.
More informationSHOWER ENCLOSURE INSTALLATION
T F e34 x 46 s a QUATRA LUX 32 x 46 / ele A R r r fo SHOWER ENCLOSURE INSTALLATION I NSTRUCTIONS d e D v o r p IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without
More informationhp scanjet 4400c series and 5400c series scanners user s manual
hp scanjet 4400c series and 5400c series scanners user s manua Copyright Hewett-Packard Company 2001 A rights reserved. Reproduction, adaptation, or transation without prior written permission is prohibited,
More informationConfiguring Onyx to print on your HEXIS media
Configuring Onyx to print on your HEXIS media 1. Instaing a media profie suitabe for your HEXIS printing media 1.1. Downoading the media profie 2 1.2. Importing the media profie into Onyx 3 2. Defaut setting
More informationGeneral Contractors. Installation/Facilitation Guidelines. TN 110 In-Floor Swing Door Operator. Table of Contents
General Contractors Tormax imotion T 110 In-Floor Swing Door Operator Installation/Facilitation Guidelines Offset Pivot Application eft Hand Operator w/ Flush Mounted Box Table of Contents Door Fabrication
More informationSURGE ARRESTERS FOR CABLE SHEATH PREVENTING POWER LOSSES IN M.V. NETWORKS
SURGE ARRESTERS FOR CABLE SHEATH PREVENTING POWER LOSSES IN M.V. NETWORKS A. Heiß Energie-AG (EAM), Kasse G. Bazer Darmstadt University of Technoogy O. Schmitt ABB Caor Emag Schatanagen, Mannheim B. Richter
More informationINSTALLATION INSTRUCTIONS JEEP SCRAMBLER FAST TRAC TOP PART #108-21X
INSTALLATION INSTRUCTIONS JEEP SCRAMBLER FAST TRAC TOP PART #108-21X Thank you for purchasing Specialty s Convertible Top for your Jeep vehicle. It has been designed for great fit and long wear. Please
More information2573 N.W. 74th Ave. Miami, Florida Phone: (305) /8672 Order Fax: (305)
2573 N.W. 74th Ave. Miami, Florida 33122 Phone: (305) 597-8671/8672 Order Fax: (305) 597-8673 E-mail: info@megamarinc.com www.castellanosdraperies.com M o t o r F e a t u r e s DC Power - Utilizes direct
More informationInstallation And Care Instructions. Vertical Honeycomb Shades
Installation And Care Instructions Vertical Honeycomb Shades Rev 5/2013 Table Of Contents Getting Started... 3 Parts Overview... 4 Materials Required... 5 Tools Required... 6 Outside Mount Installation...
More informationInstallation Operation Care
Installation Operation Care Designer Roller and Designer Screen Shades Standard and Cassette Cordless Lifting System CONTENTS Getting Started: Product Views... 1 Tools and Fasteners Needed... 3 Installation
More informationFLEX 28 / 32 / 42 x 72
FLEX 28 / 32 / 42 x 72 SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationPOST TENDER ADDENDUM #1
POST TENDER ADDENDUM #1 Date: January 31, 2017 Project: #4171 Calgary- Human Services East Consolidation To: Cody Brown, Govan Brown Construction Managers CC: From: No. Pages: Tim Hollis, Elevate Development
More informationPRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS
PRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationTop Mount Ultra Modern Hanger
Top Mount Ultra Modern Hanger ASSEMBLY INSTRUCTIONS TOP MOUNT ULTRA MODERN HANGER Recommended Tools Level Tape Measure Pencil Drill with 1/8, and 1/4, Drill Bits and Phillips Bit Socket Wrench with 9/16
More informationInterfold 35 With or Without Guide
INSTBWSLI2 REV G - MAR 2017 Interfold 35 With or Without Guide Codes Brio Australia P: +61 2 87186718 W: brio.com.au E: brio.sales@allegion.com Brio UK P: + 191 229122 W: briouk.com E: brio.sales.uk@allegion.com
More informationPremium Light Filtering Sheer Shade
Premium Light Filtering Sheer Shade Installation Instructions Email: customerservice@blindster.com Call us: (888) 256-8672 Mon - Fri 8am - 7pm (CT) Congratulations on purchasing a Premium Light Filtering
More informationQUATRA LUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS
QUATRA LUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationCURRIES Tech Data Frame Section. Revised Oct., 2018
CURRIES Tech Data Frame Section Revised Oct., 2018 i Index August, 2017 DESCRIPTION PAGE(S) Anchors Drywall Frame Base Anchor...35 Compression Anchor...34, 36, 39 Multipurpose Anchor Installation...17
More informationInsulation. First Issue August See rear cover for applicable countries. Phenolic System PRODUCT CATALOGUE. Low Energy Low Carbon Buildings
Insuation First Issue August 2017 See rear cover for appicabe countries PRODUCT CATALOGUE Phenoic System Low Energy Low Carbon Buidings Introduction Overview The heating, ventiation and air conditioning
More informationYongxiang Zhao Brookhaven National Laboratory Upton, NY, July 1998 CENTER FOR ACCELERATOR PHYSICS
BNL CAP CCII, 65685 225-MUON-98C A NEW STRUCTURE OF LINEAR COLLIDER * Yongxiang Zhao Brookhaven Nationa Laboratory Upton, NY, 11973 RECEIVED AIK 1 7 1998 OSTI *This work was supported by the US Department
More informationUNIDOOR LUX (STYLE E)
UNIDOOR LUX (STYLE E) SHOWER DOOR & GLASS PANEL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date
More informationAssembly & Installation Instructions
1 OF 6 Component Parts A B C Fixture Mounting Bracket Canopy D Threaded Standoffs (2) E Cap (2) F Anchors (4) G #10 Screws (4) H I J K Safety Cable #8 Screw Ground Screw Cupped Washer Socket Assembly (6)
More informationInstallation Instructions
Installation Instructions Transitional Shades Standard Transitional Shades (Small and Large Cassette) Board Mounted Transitional Shades Accu-Rise Transitional Shades Sure-Lift Transitional Shades Sundown
More informationContour Hanger ASSEMBLY INSTRUCTIONS
Contour Hanger ASSEMBLY INSTRUCTIONS CONTOUR HANGER Recommended Tools Drill with 1/8, 1/4, and 3/8 Drill Bits, 1-1/8 Forstner Bit or 1-1/8 Spade Bit, and Phillips Bit 9/16 and 5/8 Combination Wrench Socket
More informationSeries. Quite simply, the best in insulation! C.A 6521 C.A 6523 C.A 6525 C.A 6531 C.A Megohmmeters
Quite simpy, the best in insuation! Series C.A 6521 C.A 6523 C.A 6525 C.A 6531 C.A 6533 Megohmmeters Twin digita-anaogue dispay Giant back-it screen Battery powered for hours Programmabe threshod aarms
More informationRAMPAGE P R O D U C T S. BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED
RAMPAGE P R O D U C T S 84 (+/- 1/4 ) BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO 1966-1977 TOOLS REQUIRED 3/8 WRENCH 7/16 WRENCH ½ WRENCH #2 PHILLIPS SCREWDRIVER 1/8 DRILL BIT 9/64 DRILL BIT 5/32 DRILL
More informationSomfy RTS Motor Programming Instructions Motor Programming Instructions have been rewritten by
Somfy RTS Motor Programming Instructions Motor Programming Instructions have been rewritten by http://www.voutlet.com Please Read and Follow These Instructions. Please use the motor programming instructions
More informationRipple Hanger ASSEMBLY INSTRUCTIONS
Ripple Hanger ASSEMBLY INSTRUCTIONS RIPPLE HANGER Recommended Tools Drill with 1/8, 1/4, and 1/2 Drill Bits, 1-1/8 Forstner Bit or 1-1/8 Spade Bit, and Phillips Bit 9/16 and 5/8 Combination Wrench Socket
More informationModern Gatherings 60" TV Console Assembly Instructions
Parts List Page 1 of 6 No. Description Sketch Quantity A Console 1 B Door 1 Thank you for purchasing this quality product. Be sure to check all packing material carefully for small parts that may have
More informationHalf Door Installation Instructions
Half Door Installation Instructions For: CJ7, CJ8/Scrambler and Wrangler/YJ Part Number: 53028 Note: Wrangler/YJ Use of this product may not allow use of factory side mirrors. Note: Wrangler/YJ Use of
More informationFLEX ENCLOSURE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS
FLEX Enclosure manual Ver 3 Rev 06/06 FLEX ENCLOSURE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice.
More informationBFR2. 5-axis machining center a system developed for high performance MACHINE TOOL MANUFACTURER
e BFR2 5-axis machining center a system deveoped for high performance MACHINE TOOL MANUFACTURER Cross side The high stabiity of the cross side is characterised by the minima distance between the cross
More informationLineup with new energy saving and environmentally friendly features!
ineup with new energy saving and environmentay friendy features! WM Eco-POWER METER WM Eco-POWER METER (DN 9 size) RoHS Directive compatibiity information http://www.mew.co.jp/ac/e/environment/ FEATURES
More informationInstallation Operation Care
Installation Operation Care Applause Honeycomb Shades LiteRise Operating System Contents GETTING STARTED Product View...1 Tools and Fasteners Needed...2 INSTALLATION Installation Overview...3 Mount the
More informationHalf Door Installation Instructions
Half Door Installation Instructions For: CJ5 (1955-1975), CJ6 (All), M38-A1 (1955-1971) Part Number: 53025 WARNING This product is designed primarily to enhance the appearance of the vehicle and to shield
More informationCX-400 SERIES. Compact Photoelectric Sensor. World standard photoelectric sensors Full line up 116 models! Strong against oil and coolant liquids
Compact Photoeectric CX- SERIES Reated Information Ampifi er Genera terms and conditions... P. seection guide...p.~ / P.9~ MS-AJ / CHX-SC...P.799 / P.8 Gossary of terms / Genera precautions... P.98 ~ /
More informationGeneral Contractors. Installation/Facilitation Guidelines. TN 110 In-Floor Swing Door Operator. Table of Contents
General Contractors Tormax imotion T 110 In-Floor Swing Door Operator Installation/Facilitation Guidelines Offset Pivot Application eft Hand Operator w/ Surface Mounted Box Table of Contents Door Fabrication
More informationTWIG Hanger ASSEMBLY INSTRUCTIONS
TWIG Hanger ASSEMBLY INSTRUCTIONS TWIG HANGER Recommended Tools Drill with 1/8, 1/4, and 3/8 Drill Bits, 1-1/8 Forstner Bit or 1-1/8 Spade Bit, and Phillips Bit 9/16 and 5/8 Combination Wrench Socket Wrench
More informationFRENCH LINEA PANEL SHOWER PANEL INSTALLATION INSTRUCTIONS
FRENCH LINEA PANEL SHOWER PANEL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationPillar Hanger ASSEMBLY INSTRUCTIONS
Pillar Hanger ASSEMBLY INSTRUCTIONS PILLAR HANGER Recommended Tools Drill with 1/8, 1/4, and 3/8 Drill Bits, 1-1/8 Forstner Bit or 1-1/8 Spade Bit, and Phillips Bit 9/16 and 5/8 Combination Wrench Socket
More informationGT3D Digital Timers. 100 to 240V AC (50/60Hz), 24V AC (50/60Hz)/24V DC
rs G3D Series G3D rs Key features of the G3D series incude: Precise time setting using digita thumbwhee switches Eapsed or time remaining LCD dispay 6 time ranges, 16 timing functions deays up to 99.9
More informationFLEX SHOWER DOOR INSTALLATION INSTRUCTIONS
FLEX SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals
More informationElectronic Circuit Protector ESX10-T.-DC 24 V
Eectronic Circuit Protector ESX0-T.-DC 2 V Description The mode ESX0-T extends our product group of eectronic overcurrent protection devices for DC 2 V appications. At a width of ony 2.5 mm it provides
More information