Draft AMI Use Case: D2 - Distribution Engineering or Operations optimize network based on data collected by the AMI system 04/13/06

Size: px
Start display at page:

Download "Draft AMI Use Case: D2 - Distribution Engineering or Operations optimize network based on data collected by the AMI system 04/13/06"

Transcription

1 Draft AMI Use Case: D2 - Distributin Engineering r Operatins ptimize netwrk based n data cllected by the AMI system 04/13/06 Authr: Bb Yinger Authr: Standard Cnfig Page 1 f 35

2 Cntents Advanced Metering Infrastructure (AMI) Prgram 1. Use Case Descriptin Use Case Title Use Case Summary Use Case Detailed Narrative Business Rules and Assumptins Actrs Step by Step analysis f each Scenari Primary Scenari: Distributin Engineering r Operatins ptimize netwrk based n vltage Rt Mean Square (RMS) Variatin infrmatin at the custmer site Steps fr this scenari Primary Scenari: Distributin Engineering r Operatins ptimize netwrk based n harmnics data cllected by the AMI system Steps fr this scenari Primary Scenari: Capacitr Bank Cntrller (CBC) uses the AMI infrastructure t ptimize custmer vltage/pwer Steps fr this scenari Primary Scenari: Distributin Cntrl and Mnitring System (DCMS) recnfigures feeder after a fault. (Refer Diagram) Steps fr this scenari Alternate Scenari Steps fr this scenari Requirements Functinal Requirements Nn-functinal Requirements Authr: Standard Cnfig Page 2 f 35

3 4.3 Business Requirements Use Case Mdels (ptinal) Infrmatin Exchange Diagrams Use Case Issues Glssary References Bibligraphy (ptinal) Authr: Standard Cnfig Page 3 f 35

4 1. Use Case Descriptin 1.1 Use Case Title Distributin Engineering r Operatins ptimize netwrk based n data cllected by the AMI system 1.2 Use Case Summary Optimizing the netwrk invlves issues with feeder lading, vltage prfile, efficiency, reliability and quality. The utility uses feedback frm the AMI system t bth imprve custmer pwer quality and reduce distributin csts t the utility. Pssible AMI utputs include average vltage at custmer site, vltage variatins seen by the custmer, pwer cnsumptin by time interval, harmnics (vltage and/r current), pwer prductin by custmer-supplied distributed generatin, and custmer pwer factr. Pssible uses fr this data include warning letter issued t custmers (if they are adversely impacting the netwrk), feeder capacitr bank switching, transfrmer vltage tap switching, input t lad frecasting mdels (bth shrt- and lng-term), feeder harmnic filter cntrllers, and feeder switching decisins. This scenari als includes addressing pwer quality cntract cmpliance as a sub-scenari. This scenari includes ptins fr bth real-time mnitring & cntrl, and ff-line analysis f histrical data t determine system ptimizatin ptins as sub-scenaris. This scenari als includes using the AMI cmmunicatins netwrk t prvide cnnectivity t distributin system devices (e.g. IEDs / RTUs, sensrs, fault indicatrs, etc.) in additin t, r instead f the measurement infrmatin frm the custmer meter as a sub-scenari. The ubiquitus nature and lw cst f an AMI system prvide many pprtunities fr autmatin within the distributin grid that are nt ecnmically feasible with bespke systems. The revenue meters in an AMI slutin can be cnfigured t cllect infrmatin at a detail level and at a scale nt currently feasible. Signature analysis dne n cllected Pwer Quality Data culd help detect grid prblems befre they becme acute and result in utages r equipment failure. By mving intelligence ut int the grid enabled with AMI cmmunicatins and the ability t interact with AMI devices, the netwrk can practively ptimize it self. An example f this is the Capacitr Bank cntrl. Existing systems are triggered by the vltage at the CBC and are set by experience t activate based n a best guess f endpint vltage frm surveys and histry. The reality is that the level f respnse is highly dependent n the characteristics f the lad and the distance f the lad frm the feeder riginatin. Feeder recnfiguratin, variances f lad surce (e.g. time f day n a feeder that services a mixed residential and light industrial custmer base) and ther factrs can make these preset respnse values less than ptimal. Using AMI, CBC s can either query a subset f bellwether meters based n trigger vltages at the bank, r they can be set up t receive vltage levels frm thse meter peridically during the day. The CBC can base it decisins n the endpint vltage. This ffers the benefit f enhanced vltage cntrl resulting in: Imprved circuit efficiency Lss reductin Authr: Standard Cnfig Page 4 f 35

5 Energy savings By pushing the intelligence even further ut in the netwrk and leveraging the AMI cmmunicatin netwrk, the system is capable f being even mre respnsive. The scenari chsen fr this shwcases Remte Circuit switches interacting with Remte Fault Indicatrs t recnfigure the feeder in respnse t a nn transient fault. This enhanced capability brings with it the need t cmmunicate with elements f the system when their assciated grid cmpnents may be de-energized, but withut the nging cmmunicatins thrughut the fault, the cmplexities f srting ut reclser, sectinalizer and fuse timings becmes cnsiderably mre cmplex. With cmmunicatins between energized and nn energized elements the system culd try several slutins befre giving up, thereby reducing the number f custmers affected and reducing the labr required t restre service. On a brader scale, there are a number f places in the distributin system where mnitring infrmatin will allw fr cnditin based maintenance (e.g. transfrmers, switches, capacitrs). Only maintaining equipment when it is needed will result in lwer capital expenditures fr equipment replacement and will imprve system reliability by aviding unexpected failures. Tday, the cst f cmmunicatins keeps this frm happening t any large extent. Implementatin f a cmmunicatins system fr AMI will put in place a lw-cst path fr btaining this infrmatin. 1.3 Use Case Detailed Narrative When measuring vltage and current at a custmer site these base measurements can be used t calculate many relevant pwer system data values that can serve as input t existing and new pwer system applicatins. Optimizing the behavir f the pwer system invlves many issues related t feeder lading, vltage prfiles, efficiency, reliability, quality and thers. Using the infrmatin that an AMI system can prvide, in additin t already existing systems, may imprve the quality and efficiency f netwrk ptimizatin. These cases shall be investigated and defined as part f this use case. Pwer system applicatins exist in many varieties. The mst imprtant nes that can benefit frm infrmatin prvided by the AMI system and that can use the AMI system t imprve their perfrmance include: Lss Analysis Fault Lcatin, Islatin and Service Restratin Cntingency Analysis Feeder Recnfiguratin Lad shedding and lad curtailment Prtectin Re-crdinatin Vltage and VAR Cntrl Pre-arming f Remedial Actin Schemes Intelligent Alarm Prcessing Transfrmer vltage regulatin Authr: Standard Cnfig Page 5 f 35

6 Lad frecasting and state estimatin Autmatic feeder and capacitr bank switching Pwer Quality Mnitring and Reprting Pwer Quality Cntract Cmpliance Pssible AMI utputs n behalf f these functins include: real time vltage real time current pwer cnsumptin by time interval average vltage at custmer site vltage variatins seen by the custmer harmnics (vltage and/r current) pwer prductin by custmer-supplied distributed generatin custmer pwer factr These applicatins can be separated int tw categries n-line and ff-line. The n-line categry can be cnsidered a classificatin f real-time mnitring and cntrl. Examples f this categry include alarming, vlt/var cntrl, and fault lcatin. The ff-line categry invlves evaluatin f infrmatin gathered by the AMI system frm a histrical perspective. Applicatins f this type generally retrieve data frm a data histrian that is peridically ppulated with new data frm the AMI system. Examples f this categry include feeder ptimizatin, lad frecasting, and pwer quality cntract cmpliance. Bth categries include tw alternate sub-scenaris ne where the AMI cmmunicatins infrastructure is utilized t cmmunicate with equipment ther than the custmer s smart meter (i.e. distributin autmatin and substatin equipment), and the ther where the functins f this use case are implemented slely frm data captured by the smart meters and ptinally augmented by infrmatin captured by a parallel distributin autmatin system (the likely scenari). 1.4 Business Rules and Assumptins Custmer in the sense f this Use Case is a custmer with a grid cnnectin < 200 kw The meter cllects and prcesses usage / pwer quality / sensr data Advanced Distributin Autmatin and / r netwrk ptimizatin functins are viewed as "black bxes". The Use Case will fcus n the infrmatin t prvide n behalf f these functins and the infrmatin t receive frm them The AMI system will nt replace the SCADA / DMS system, it shall add n t these existing systems. Authr: Standard Cnfig Page 6 f 35

7 Using the infrmatin frm the AMI system shall imprve the existing pwer system applicatins and facilitate the creatin f new nes Distributin peratins ptimizes netwrk based n cnsumer metering data, and ther data cllected by the AMI system netwrk Authr: Standard Cnfig Page 7 f 35

8 2. Actrs Advanced Metering Infrastructure (AMI) Prgram Describe the primary and secndary actrs invlved in the use case. This might include all the peple (their jb), systems, databases, rganizatins, and devices invlved in r affected by the Functin (e.g. peratrs, system administratrs, custmer, end users, service persnnel, executives, meter, real-time database, ISO, pwer system). Actrs listed fr this use case shuld be cpied frm the glbal actrs list t ensure cnsistency acrss all use cases. Actr Name Actr Type (persn, device, system etc.) Actr Descriptin Meter Device Used as sensr fr vltage, current and harmnics Pwer Quality Event Cllectr (PQEC) Authrized Distributin Persnnel (ADP) System Persn Pwer Quality Analyst Persn Reviews PQ data Cllects PQ infrmatin frm multiple surces, including the AMI system ADP reviews and makes decisins based n the cllected data Pwer Quality Histrian System Database t stre Cllected Pwer Quality Data and prvide intelligent access t it. Capacitr Bank Cntrller (CBC) Distributin Cntrl and Mnitring System (DCMS) Device System Device t cntrl capacitr bank SCE system that is used t perate switches n distributin lines Remte Fault Indicatr (RFI) Device A device that determines if fault current has passed it and sends ntice f this fault current passage t a central system Reclser Device A prgrammable circuit breaker designed t clear transient faults by pening n vercurrent and attempting ne r mre times t clse, each time delaying fr prgressively lnger. The prgrammed delays are a balance between minimizing utages and prviding adequate time fr the fault path t reacquire adequate dialectic strength, thus the prgressive nature. Pwer Quality Analysis System System A System used by the Pwer Quality Analyst, that can display Pwer quality infrmatin held by the PQEC in varius frmats and crrelate it with similar data frm the PQEC and ther systems. A PQAS shuld maintain a database f cmmn signatures that can be cmpared t data pulled frm the AMI system and Authr: Standard Cnfig Page 8 f 35

9 Actr Name Advanced Metering Infrastructure (AMI) Prgram Actr Type (persn, device, system etc.) aid in prblem determinatin. Actr Descriptin Remte Circuit Switch (RCS) Device A distributin switch that is perable frm a remte lcatin Gegraphic Infrmatin System(GIS) System System that maintains infrmatin abut the pwer grid (amng ther things). System will maintain nt nly lcatinal infrmatin abut grid assets, but als capabilities and relatinships between assets. Fr example, the system wuld maintain capacitr banks assciated with a particular meter given a particular feeder cnfiguratin. Authr: Standard Cnfig Page 9 f 35

10 3. Step by Step analysis f each Scenari Describe steps that implement the scenari. The first scenari shuld be classified as either a Primary Scenari r an Alternate Scenari by starting the title f the scenari with either the wrk Primary r Alternate. A scenari that successfully cmpletes withut exceptin r relying heavily n steps frm anther scenari shuld be classified as Primary; all ther scenaris shuld be classified as Alternate. If there is mre than ne scenari (set f steps) that is relevant, make a cpy f the fllwing sectin (all f 3.1, including and tables) and fill ut the additinal scenaris. 3.1 Primary Scenari: Distributin Engineering r Operatins ptimize netwrk based n vltage Rt Mean Square (RMS) Variatin infrmatin at the custmer site. Triggering Event Primary Actr Pre-Cnditin Pst-Cnditin (Identify the name f the event that start the scenari) (Identify the actr whse pint-f-view is primarily used t describe the steps) (Identify any pre-cnditins r actr states necessary fr the scenari t start) (Identify the pst-cnditins r significant results required t cnsider the scenari cmplete) Occurrence f vltage sag Authrized Distributin Persnnel (ADP) Vltage is within tlerance levels Vltage is within tlerance levels Steps fr this scenari Describe the nrmal sequence f events that is required t cmplete the scenari. Step # Actr Descriptin f the Step Additinal Ntes # What actr, either primary r secndary is respnsible fr the activity in this step? Describe the actins that take place in this step. The step shuld be described in active, present tense. Elabrate n any additinal descriptin r value f the step t help supprt the descriptins. Shrt ntes n architecture challenges, etc. may als be nted in this clumn.. Authr: Standard Cnfig Page 10 f 35

11 Step # Actr Descriptin f the Step Additinal Ntes 1 RMS Vltage Variatin (e.g. a sag in this scenari) ccurs at the custmer site. 2 Meter Meter detects that vltage has gne belw threshld (90 %) fr a certain perid f time. 3 Meter Meter will reprt basic RMS Variatin infrmatin t the Pwer Quality Event Cllectr(PQEC) (within certain perid f time) 4 PQEC PQEC sends ntificatin t Authrized Distributin Persnnel (ADP) depending n the type f event. 5 ADP ADP queries meter t extract detailed infrmatin abut the RMS Variatin. 6 PQEC PQEC retrieves stred RMS Variatin infrmatin frm the meter befre its memry is full. 7 Pwer Quality analyst Peridically a Pwer Quality analyst will cmpare the recrded data t the reference r baseline.. 8 ADP Based n the analysis f the data, the distributin peratins can ptimize the netwrk. Triggering event 3.2 Primary Scenari: Distributin Engineering r Operatins ptimize netwrk based n harmnics data cllected by the AMI system. Authr: Standard Cnfig Page 11 f 35

12 Triggering Event Primary Actr Pre-Cnditin Pst-Cnditin (Identify the name f the event that start the scenari) (Identify the actr whse pint-f-view is primarily used t describe the steps) (Identify any pre-cnditins r actr states necessary fr the scenari t start) (Identify the pst-cnditins r significant results required t cnsider the scenari cmplete) Occurrence f high harmnic level (vltage r current) Authrized Distributin Persnnel (ADP) Harmnic level (vltage r current are under alert threshld Harmnic level (vltage r current are under alert threshld Steps fr this scenari Describe the nrmal sequence f events that is required t cmplete the scenari. Step # Actr Descriptin f the Step Additinal Ntes # What actr, either primary r secndary is respnsible fr the activity in this step? Describe the actins that take place in this step. The step shuld be described in active, present tense. Elabrate n any additinal descriptin r value f the step t help supprt the descriptins. Shrt ntes n architecture challenges, etc. may als be nted in this clumn.. 1 High Harmnic vltage / current level present at the custmer site. 2 Meter Meter detects harmnics in vltage/current at the custmer site. 3 ADP Authrized Distributin Persnnel (ADP) queries meter t extract detailed harmnics infrmatin. 4 PQEC PQEC retrieves stred harmnic infrmatin frm the meter befre its memry is full. 5 Pwer Quality analyst Peridically a Pwer Quality analyst will cmpare the recrded data t the reference r baseline. Triggering event Authr: Standard Cnfig Page 12 f 35

13 Step # Actr Descriptin f the Step Additinal Ntes 6 ADP Based n the analysis f the data, the distributin peratins can ptimize the netwrk. 3.3 Primary Scenari: Capacitr Bank Cntrller (CBC) uses the AMI infrastructure t ptimize custmer vltage/pwer Triggering Event Primary Actr Pre-Cnditin Pst-Cnditin (Identify the name f the event that start the scenari) (Identify the actr whse pint-f-view is primarily used t describe the steps) (Identify any pre-cnditins r actr states necessary fr the scenari t start) (Identify the pst-cnditins r significant results required t cnsider the scenari cmplete) Vltage n distributin feeder varies as the day prgresses Cap Bank Cntrller (CBC) Vltage variatins n distributin feeder are within acceptable limits Vltage variatins n distributin feeder are within acceptable limits Steps fr this scenari Describe the nrmal sequence f events that is required t cmplete the scenari. Authr: Standard Cnfig Page 13 f 35

14 Step # Actr Descriptin f the Step Additinal Ntes # What actr, either primary r secndary is respnsible fr the activity in this step? Describe the actins that take place in this step. The step shuld be described in active, present tense. Elabrate n any additinal descriptin r value f the step t help supprt the descriptins. Shrt ntes n architecture challenges, etc. may als be nted in this clumn.. 1 CBC CBC queries assciated (frm enterprise r AMI system) custmer meters fr present vltage. 2 Meter Assciated Meters respnd with vltage 3 CBC CBC evaluates received infrmatin and makes decisin n required actin. 4 CBC CBC turns n / ff capacitrs as required by the decisin 3.4 Primary Scenari: Distributin Cntrl and Mnitring System (DCMS) recnfigures feeder after a fault. (Refer Diagram) Triggering Event Primary Actr Pre-Cnditin Pst-Cnditin (Identify the name f the event that start the scenari) (Identify the actr whse pint-f-view is primarily used t describe the steps) (Identify any pre-cnditins r actr states necessary fr the scenari t start) (Identify the pst-cnditins r significant results required t cnsider the scenari cmplete) Fault ccurs n a feeder requiring feeder switching t restre pwer t mst custmers Distributin Cntrl and Mnitring System (DCMS) N faults detected Pwer restred t all nn-faulted circuit sectins Steps fr this scenari Describe the nrmal sequence f events that is required t cmplete the scenari. Authr: Standard Cnfig Page 14 f 35

15 Step # Actr Descriptin f the Step Additinal Ntes # What actr, either primary r secndary is respnsible fr the activity in this step? Describe the actins that take place in this step. The step shuld be described in active, present tense. Elabrate n any additinal descriptin r value f the step t help supprt the descriptins. Shrt ntes n architecture challenges, etc. may als be nted in this clumn.. 1 Fault n Feeder between RFI 1 and RFI 2 Triggering event 2 RFI RFI 1 reprts fault t DCMS. DCMS actr 3 Reclser Statin reclser 2 pens. 4 RCS RCS 2 reprts lss f vltage t DCMS 5 Reclser 1 st reclse n reclser 2 ccurs after 15 sec and pens 6 RFI RFI 1 reprts fault (again) 7 RCS RCS 2 pens after 30 sec and reprts status. 8 Reclser Reclser 2 clses after 40 sec (55 sec after fault) and pens again and lcks ut. 9 ADP Operatr at DCMS decides t clse RCS3 (direct perate) based n Histrical lading (pre fault cnditins) Expected lad after restratin Als DCMS is an actr Authr: Standard Cnfig Page 15 f 35

16 Feeder 2 Substatin Feeder 1 Reclser 1 Reclser 2 Ple switch - PS RFI 1 RCS 1 A RFI 4 PS RCS 2 A RFI 2 PS RFI 3 RCS 3 N Authr: Standard Cnfig Page 16 f 35

17 3.5 Alternate Scenari RCS devices autnmusly recnfigure after a fault. (Refer Diagram) Triggering Event Primary Actr Pre-Cnditin Pst-Cnditin (Identify the name f the event that start the scenari) (Identify the actr whse pint-f-view is primarily used t describe the steps) (Identify any pre-cnditins r actr states necessary fr the scenari t start) (Identify the pst-cnditins r significant results required t cnsider the scenari cmplete) Feeder recnfiguratin des nt require interventin f DCMS but can be accmplished autmatically by switches in the area using the AMI cmmunicatins system Reclser N fault detected RCS,RFI devices require cincident grid tplgy and assciated devices RCS devices are prgrammed t insure fault free vltage n bth sides Scenari des nt assume new intelligence r cmmunicatin capability in reclser Feeder recnfiguratin cmplete Steps fr this scenari Describe the nrmal sequence f events that is required t cmplete the scenari. Step # Actr Descriptin f the Step Additinal Ntes # What actr, either primary r secndary is respnsible fr the activity in this step? Describe the actins that take place in this step. The step shuld be described in active, present tense. Elabrate n any additinal descriptin r value f the step t help supprt the descriptins. Shrt ntes n architecture challenges, etc. may als be nted in this clumn.. Authr: Standard Cnfig Page 17 f 35

18 Step # Actr Descriptin f the Step Additinal Ntes RCS 1, 2 and 3 exchange infrmatin and autmatically decide n recnfiguratin. 1 Fault n Feeder between RFI 1 and RFI 2 Triggering event 2 RFI RFI 1 reprts fault t RCS 1,RCS 2 and RCS 3. 3 Reclser Statin reclser pens. 4 RCS RCS 2 reprts lss f vltage t RCS-1 and RCS-3 5 Reclser 1 st reclse ccurs after 15 sec and pens 6 RFI RFI 1 reprts fault (again) t RCS1, RCS 2 and RCS 3 7 RCS RCS 2 pens after 30 sec and reprts status. 8 Reclser Reclser clses after 40 sec (55 sec after fault), pens and then lcks ut. Refer t diagram and scenari The cllabrative nature f the scenari makes it difficult t lay ut in a stepwise fashin with any definitive precedence f peratins r certain assignment f respnsibilities. This particular sequence nly represents ne f many pssible. Fr example, this scenari assumes the reclser cntinues t perate in a dumb fashin with n crdinatin with ther system elements. The particular sequence chsen here assumes each RCS respnds t requests frm ther devices, but nly initiates actin based n self interest (in ther wrds, t maintain its desired state f energized, fault free n bth sides) Authr: Standard Cnfig Page 18 f 35

19 Step # Actr Descriptin f the Step Additinal Ntes 9 RCS RCS 3 senses lss f vltage n RCS 2 segment side, requests status f RFI RFI RFI 3 respnds with n vltage/ n fault 11 RCS RCS 3 clses and bradcasts status 12 RFI RFI 3 annunces vltage/ n fault t RCS 1, RCS 2, and RCS 3 13 RCS RCS 3 reprts cnfiguratin t DCMS Authr: Standard Cnfig Page 19 f 35

20 4. Requirements Advanced Metering Infrastructure (AMI) Prgram Detail the Functinal, Nn-functinal and Business Requirements generated frm the wrkshp in the tables belw. If applicable list the assciated use case scenari and step. 4.1 Functinal Requirements Functinal Requirements The meter shall prvide the vltage and lad reading at the custmer site t the Pwer Quality Event Cllectr. Meter shall mnitr the vltage cntinuusly in rder t detect an RMS variatin accrding t parameters specified in standard IEEE Assciated Scenari # Assciated Step # Meter shall prvide detailed RMS Variatin event data fr query n demand. (See NFR 2) 1 5,6 Autmatic event driven reprting f the basic RMS variatin data as defined in IEEE 1159, t the Pwer Quality Event Cllectr shall be based n magnitude, duratin, and directin. (per phase, aggregate) RMS variatin event data captured by the meter shall be retrievable frm the meter even if there is a cmmunicatins utage befre, during, and after the event. This FR states that n data will be lst, but it des nt have t be retrieved during the utage. The Pwer Quality Event Cllectr shall have the capability t send ntificatins t Authrized Distributin Persnnel (ADP) based n event type as defined in IEEE These ntificatins are hwever nt cnsidered t be critical. Authrized Distributin Persnnel (ADP) shall have the capability t query the meter and retrieve detailed RMS Variatin infrmatin, as defined in IEEE 1159, bth lcally and frm remte. Lcal cmmunicatin has pririty ver remte Authrized Distributin Persnnel (ADP) shall have the capability t query the meter and retrieve detailed harmnic infrmatin as defined in IEEE 1159, bth lcally and frm remte. Lcal cmmunicatin has pririty ver remte Authr: Standard Cnfig Page 20 f 35

21 Functinal Requirements Authrized Distributin Persnnel (ADP) shall have the capability t retrieve histrical RMS Variatin data frm the PQ histrian. The PQ Histrian is the strage place fr the RMS variatin data (and als the harmnic data). The data shuld be actively available fr at least 1 year and archived after that (but nt lst). The data shuld nt be destryed until it is at least 10 years ld. Authrized Distributin Persnnel (ADP) shall have the capability t retrieve histrical harmnic data frm the PQ histrian Meter shall measure harmnics data accrding t IEC and IEEE 519 fr vltage and current. The Pwer Quality Analysis System shall be capable f summing up the individual harmnic measurements. (Magnitude + Phase angle [sample]) The Pwer Quality Analysis System shall supprt analysis f harmnics data t build a histrical baseline f harmnics Assciated Scenari # Assciated Step # Meter shall recrd the harmnics data accrding t IEC and IEEE The data retrieval fr harmnics data shall be peridic 2 4 The data retrieval perid fr the Pwer Quality Event Cntrller (PQEC) shall be less than the histry available in the meter (n lst data) Capacitr Bank Cntrller btains a list f assciated meters and their cmmunicatins address frm an external surce fr the purpse f establishing cmmunicatins with these meters. The external surce fr this infrmatin can be: - Gegraphic Infrmatin System (GIS) - The Meters - Manual Cnfiguratin f the Capacitr Bank Cntrller Capacitr Bank Cntrller shall btain the present value f vltage frm the assciated meters 3 1 Capacitr Bank Cntrller shall btain the Substatin Capacitr Bank status fr its cntrl algrithm frm an external surce (mst likely SCADA) 3 1 Meter shall be capable f respnding t a request frm an external surce fr present vltage 3 1 Authr: Standard Cnfig Page 21 f 35

22 Functinal Requirements Meter shall reprt the fllwing infrmatin t the Capacitr Bank Cntrller: Assciated Scenari # Assciated Step # 3 1 Timestamp Vltage The capacitr bank cntrl functin shall nt perate during pwer utages 3 1 Fault reprt frm the Remte Fault Indicatr (RFI) t the DCMS shall include : ID Time Fault indicatin Fault magnitude Cmmunicatins frm field devices (e.g. Remte Circuit Switches and Remte Fault Indicatrs) t the Distributin Cntrl and Mnitring System shall be available when the pwer ut. This cmmunicatins will allw nrmal functins f the device t be perfrmed. An example f why this is needed wuld be in the case f a remte switch used t islate a fault at the end f a feeder after the reclser had given up n a persistent fault. Using the diagram abve, this wuld be the case if RFI 3 had signaled and Reclser 2 had tripped. Befre RCS 3 culd clse, RCS 2 wuld have t pen. Withut the nging cmmunicatins with pwer ut at sme cmpnents because f the fault, the cmplexities f srting ut reclser, sectinalizer and fuse timings becme cnsiderably mre cmplex. With cmmunicatins between energized and nn energized elements, the prper recnfiguratin wuld be pssible. Remte Cntrlled Switch reprts : ID Time All f its status pints including status f A/C (alternating current) pwer n bth sides f the switch Remte Cntrlled Switch shall be able t receive cntrl frm DCMS and acknwledge See NFR 14 The reference design f the AMI System shall be mdular enugh t interface with devices ther than meters (e.g. RFI s, RCS s) The meter shall be cnfigurable s that RMS variatin events can be reprted with an unslicited message, with a daily read r nt at all (this FR is related t FR3 and FR4) ,5 4, ,4,6,7, Authr: Standard Cnfig Page 22 f 35

23 Functinal Requirements Reprting f Pwer Quality Events by the meter can be turned On r Off lcally and frm remte by Pwer Quality Event Cllectr The meter shall be cnfigurable lcally and frm remte t specify which harmnic cmpnents and summary quantities (THD, HRMS, TIF) shall be stred in the meter and which nes shall be retrieved by the Pwer Quality Event Cllectr Data fr signature analysis shall be prvided n demand at chsen meters and ther AMI enabled data cllectin pints See BR1 Assciated Scenari # 1 2 Assciated Step # ,4,6,8 4.2 Nn-functinal Requirements Nn-Functinal Requirements Assciated Scenari # Assciated Step # RMS Variatin detectin shall fllw the IEC and IEEE 1159 standards 1 2 The meter shall be capable f retaining and returning event based pwer quality infrmatin upn query fr a minimum f 60 days after the data is captured even if there is n cmmunicatins with the meter ver the 60 day perid. The EPRI Distributin Pwer Quality Reprt, defines the statistics fr the number f events within this perid. Infrmatin will nt autmatically be retrieved frm each meter installed s having 60 days f detailed histry available within the AMI system will allw sufficient time fr it t be retrieved if it is required. This data wuld be required if there was a custmer cmplaint r ther system prblems bserved. Once the data has been retrieved frm the meter, the meter can delete the data frm its memry. 1 6 Harmnics data cllectin shall fllw IEC (Class B and IEEE 519) standards 2 2 Authr: Standard Cnfig Page 23 f 35

24 Nn-Functinal Requirements Assciated Scenari # Assciated Step # Harmnic level t be measured and stred shall range up t the 9 th r 15 th 2 2 Meter shall stre the harmnics data fr a perid ranging frm 1 7 days. This strage perid is related t the data retrieval perid (NFR6). If the data retrieval perid is daily, data nly needs t be stred fr 1 day. If the retrieval perid is lnger, the strage needs t be lnger. Once the data has been retrieved frm the meter, the meter can delete the data frm its memry. The data retrieval perid fr the Pwer Quality Event Cntrller (PQEC) shall be less than the histry available in the meter Present vltage f selected meters assciated with the CBC is needed (at the CBC) every 15 min All meters assciated with a CBC will send present vltage with a timestamp spread f n mre than 5 secnds between the reads. (System remains in knwn state during this cycle) Timestamp difference between reprts frm different meters shall be less than 5 sec. (system remains in knwn state during this cycle) The system will supprt up t 100 meters per Capacitr Bank Cntrller (typically less than 10) 3 1 At least 50% f the meters assciated with a CBC shall respnd 3 1 The AMI system shall supprt Capacitr Bank Cntrllers 3 1 Security f the cmmunicatins shall be at a level cnsistent with cntrl (switch peratin) 3 4 Fault reprt frm the meter shall be at DCMS in less than 5 sec (time f fault t annunciatin) 4 2,4,6,8 Cmmunicatin t DCMS shall be available fr at least 8 hrs with pwer ut. 4 2,4,6,8,9 Messages frm the meter t the Pwer Quality Event Cllectr shall be delivered at least 99.9% f the time ver the curse f a year. Lss f a message will result in reduced functinality. Number f devices cmmunicating fr the purpse f carrying ut scenari 4 is 6-8 per circuit ,6 4 Authr: Standard Cnfig Page 24 f 35

25 Nn-Functinal Requirements Assciated Scenari # The AMI System shall be able t handle up t 12 circuits exercising scenari 4 simultaneusly 4 The message latency fr unslicited messages sent frm the meter t the Pwer Quality Event Cllectr shall be better than 5 minutes Assciated Step # Business Requirements Business Requirement Signature analysis cllected frm Pwer Quality Data (scillgraphy frm RMS variatins) culd help detect a prblem befre it ccurs. See FR33 The RMS variatin data cllected by the meter at the custmer site shall be used t detect the rigin f an RMS variatin (Custmer side r Netwrk side). Replacing the existing cmmunicatins infrastructure fr distributin autmatin with an AMI infrastructure allws fr the integratin f multiple cmmunicatin infrastructures int a single ne and aviding parallel peratin f varius cmmunicatins infrastructures avids cst. Use f Service Pint present vltage fr the purpse f enhanced vltage cntrl culd result in Imprved circuit efficiency Lss reductin Energy savings Replacing the existing radi (Utilinet) cmmunicatin netwrk implies replacing prcessing functins in the present radis which will add cst Lw cst RFIs wuld facilitate deplyment f mre RFIs. This wuld reduce restratin time which imprves reliability statistics. Reductin in cst is als envisined by sending peple t the right lcatin mre quickly. 1,2 1 Assciated Scenari # 3, 4, 5 3 3, 4, 5 3 Assciated Step # Authr: Standard Cnfig Page 25 f 35

26 Business Requirement The AMI cmmunicatins architecture can be used fr asset management and mnitring infrmatin frm the distributin system. This allws fr the implementatin f Cnditin Based Maintenance which will result in lwer capital expenditures fr equipment replacement and it imprves system reliability by aviding unexpected failures Assciated Scenari # 1, 2, 3, 4, 5 Assciated Step # Authr: Standard Cnfig Page 26 f 35

27 5. Use Case Mdels (ptinal) This sectin is used by the architecture team t detail infrmatin exchange, actr interactins and sequence diagrams 5.1 Infrmatin Exchange Fr each scenari detail the infrmatin exchanged in each step This infrmatin exchange matrix supprts scenari 3.1. It may be applied t ther RMS variatin scenaris as well. Scenari # Step #, Step Name Infrmatin Prducer # Name f the step fr this scenari. What actrs are primarily respnsible fr Prducing the infrmatin? Infrmatin Receiver What actrs are primarily respnsible fr Receiving the infrmatin? Name f infrmatin exchanged Describe the infrmatin being exchanged Meter PQEC Basic RMS Variatin Infrmatin PQEC ADP Variatin event ntificatin Meter ADP Detailed RMS variatin infrmatin Meter PQEC RMS variatin histry infrmatin PQEC Pwer Quality Analyst Recrded PQ data ADP DCMS Optimizatin cmmands RFI RCS (multiple) Fault indicatin RCS RCS (multiple) Lss f Vltage Indicatin Authr: Standard Cnfig Page 27 f 35

28 Scenari # Step #, Step Name Infrmatin Prducer Infrmatin Receiver Name f infrmatin exchanged RFI RCS(multiple) Fault Indicatin RCS RCS(multiple) De Energized Status RCS RFI Status Request RFI RCS Status Fault(Y/N) Vltage(v) RCS DCMS,RCS(multiple) Status Open/Clse RFI DCMS,RCS(multiple) Status Fault(Y/N) Vltage(v) RCS DCMS Status Vltage Open/Clse Vltage Authr: Standard Cnfig Page 28 f 35

29 5.2 Diagrams The architecture team shall use this sectin t develp an interactin diagram that graphically describes the step-by-step actr-system interactins fr all scenaris. The diagrams shall use standard UML ntatin. Additinally, sequence diagrams may be develped t help describe cmplex event flws. The fllwing sequence diagram supprts RMS variatin scenaris and Authr: Standard Cnfig Page 29 f 35

30 6. Use Case Issues Advanced Metering Infrastructure (AMI) Prgram Capture any issues with the use case. Specifically, these are issues that are nt reslved and help the use case reader understand the cnstraints r unreslved factrs that have an impact f the use case scenaris and their realizatin. Issue Describe the issue as well as any ptential impacts t the use case. D the security, availability, and reliability requirements (NERC/CIP) differ fr Distributin Autmatin and AMI? Authr: Standard Cnfig Page 30 f 35

31 7. Glssary Advanced Metering Infrastructure (AMI) Prgram Insert the terms and definitins relevant t this use case. Please ensure that any glssary item added t this list shuld be included in the glbal glssary t ensure cnsistency between use cases. Term RMS Variatin Basic RMS Variatin infrmatin Detailed RMS Variatin infrmatin Definitin Glssary As defined in IEEE 1159 and IEC A change in the instantaneus RMS vltage (1 cycle windw calculated at least twice per cycle) utside f established nminal bundaries (specified by default as +/- 10% f declared nminal). Include vltage sags, swells, and mmentary interruptins up t 1 minute in duratin. time f event, magnitude, duratin as defined in IEC Optinally includes RMS Variatin directinality. The instantaneus wavefrm during the RMS variatin event and the instantaneus (1 cycle windw with a 0.5 cycle update rate) RMS value fr each vltage phase/leg. An example can be fund in IEEE std and is shwn graphically in the fllwing figure. Basic harmnic infrmatin Vltage Ttal Harmnic Distrtin (THD) in percent as defined in IEEE 519. Als may include the RMS value f the harmnic cmpnents f the current in amps. These values shuld be available as minimum, maximum, average, Authr: Standard Cnfig Page 31 f 35

32 and CPF 95 values every 10 minutes. Detailed harmnic infrmatin Magnitude f all harmnic cmpnents up t the 50th harmnic f the vltage and current. These values shuld be available as minimum, maximum, average, and CPF 95 values every 10 minutes. Optinally may include magnitude and phase angle f the raw 5 Hz spectral cmpnents f single samples (200 ms windw). Required if harmnic summatin is t be perfrmed. Authr: Standard Cnfig Page 32 f 35

33 8. References Intelligrid Use Cases D 11.2 OpenAMI Use Case #6 Advanced Metering Infrastructure (AMI) Prgram Authr: Standard Cnfig Page 33 f 35

34 9. Bibligraphy (ptinal) Prvide a list f related reading, standards, etc. that the use case reader may find helpful. Paper reference frm Cyrus and Thsar University f Texas at Hustn. Utilities Implement Intelligent Mnitring Applicatins t Imprve Reliability --Transmissin and Distributin Wrld 2005, Mark McGranaghan, EPRI Slutins, Sctt Peele, Prgress Energy, and Marek Waclawiak, United Illuminating IEEE Recmmended Practices and Requirements fr Harmnic Cntrl in Electrical Pwer Systems. IEEE 1159:Mnitring Electric Pwer Quality IEEE : Guide Fr Recrder and Data Acquisitin Requirements IEEE : Pwer Quality Event Characterizatin IEEE P1564:Vltage Sag Indices IEEE 1433: Pwer Quality Definitins IEEE P1453: Vltage flicker IEC Electrmagnetic cmpatibility (EMC) IEC : Guide t electrmagnetic envirnment fr lw-frequency cnducted disturbances and signalling in public pwer supply systems IEC : Envirnment - Lw frequency magnetic fields in varius envirnments IEC : Envirnment - Descriptin f HEMP envirnment. Radiated disturbance. Basic EMC publicatin IEC : Envirnment - Descriptin f HEMP envirnment. Cnducted disturbance IEC : Limits - Limits fr harmnic current emissins (equipment input current up t and including 16 A per phase) IEC : Limits - Limitatin f vltage changes, vltage fluctuatins and flicker in public lw-vltage supply systems, fr equipment with rated current 16 A per phase and nt subject t cnditinal cnnectin IEC : Limits - Limitatin f emissin f harmnic currents in lw-vltage pwer supply systems fr equipment with rated current greater than 16 A IEC : Testing and measurement techniques - Overview f IEC series IEC : Testing and measurement techniques - Electrstatic discharge immunity tests. Basic EMC publicatin IEC : Testing and measurement techniques - Radiated, radi-frequency, electrmagnetic field immunity test IEC : Testing and measurement techniques - Electrical fast transient/burst immunity test. Basic EMC publicatin Authr: Standard Cnfig Page 34 f 35

35 IEC : Testing and measurement techniques - Surge immunity test IEC : Testing and measurement techniques - Immunity t cnducted disturbances, induced by radi-frequency fields IEC : Testing and measurement techniques - Pwer frequency magnetic field immunity test. Basic EMC publicatin IEC : Testing and measurement techniques - Pulse magnetic field immunity test. Basic EMC publicatin IEC : Testing and measurement techniques - Damped scillatry magnetic field immunity test. Basic EMC publicatin IEC : Testing and measurement techniques - Oscillatry waves immunity test. Basic EMC publicatin IEC : Testing and measurement techniques - Harmnics and interharmnics including mains signalling at A.C. pwer prt, lw frequency immunity tests IEC : Testing and measurement techniques - Vltage fluctuatin immunity test IEC : Testing and measurement techniques - Flickermeter. Functinal and design specificatins. Basic EMC publicatin IEC : Testing and measurement techniques - Test fr immunity t cnducted, cmmn mde disturbances in the frequency range 0 Hz t 150 khz IEC : Testing and measurement techniques - Ripple n d.c. input pwer prt immunity test IEC : Testing and measurement techniques - Test methds fr prtective devices fr HEMP and ther radiated disturbances IEC : Testing and measurement techniques - Test methds fr prtective devices fr HEMP cnducted disturbance. Basic EMC publicatin IEC : Testing and measurement techniques - HEMP immunity test methds fr equipment and systems IEC : Testing and measurement techniques - Unbalance, immunity test IEC : Testing and measurement techniques - Variatin f pwer frequency, immunity test IEC : Testing and measurement techniques - Testing and measurement techniques. Vltage dips, shrt interruptins and vltage variatins n d.c. input pwer prt immunity tests Authr: Standard Cnfig Page 35 f 35

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014 1 Wide-Area Vltage and VAR Cntrl f SCE Transmissin Netwrk i-pcgrid 2014 March 26-28, 2014 CONTRIBUTORS SCE Team Frank Ashrafi Armand Salazar Backer Abu-Jaradeh WSU Team Mani Vekatasubramanian Hung Chun

More information

GE Multilin 339 Motor Protection Specifications

GE Multilin 339 Motor Protection Specifications GE Multilin 339 Mtr Prtectin Specificatins The mtr prtectin relay shall prvide primary prtectin fr medium vltage mtrs. The relay shall be equipped with the fllwing prtectin functins. Mtr Thermal Overlad

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada Wide Area Synchrnized Frequency Measurement System Architecture with Secure Cmmunicatin fr 500kV/220kV Egyptian Grid M M Eissa (SIEEE), Egypt Mahmud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hssam Gabbar,

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

Dry Contact Sensor

Dry Contact Sensor www.akcp.cm Dry Cntact Sensr Intrductin The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments PID Cntrl with ADwin Prcessrs with Sub-Micrsecnd Respnse Times Cntrl a Variety f I/O CHESTERLAND OH March 9, 2015 *Adapted frm PID Cntrl with ADwin, by Dug Rathburn, Keithley Instruments By Terry Nagy,

More information

Operating Process for Access to Gas Insulated Switchgear

Operating Process for Access to Gas Insulated Switchgear Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic RAILCOM Final Reprting Interactive Cnference Electrmagnetic cmpatibility at train-track track interface - lw frequency dmain Karel Beneš Ntified Bdy Office, VUZ a.s. Nvdvrská 1698, 142 01 Praha 4, Czech

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

Universal input/output controller

Universal input/output controller Embedded autmatin equipment (Shanghai) Limited Rm 305. Twer B.NO.18Talin rad Pudng District, Shanghai Phne: +86-21-51090839/50750355, fax: +86-21-50758598, e-mail: sales@stammkn.cm Universal input/utput

More information

Hospital Task Scheduling using Constraint Programming

Hospital Task Scheduling using Constraint Programming Hspital Task Scheduling using Cnstraint Prgramming Authr: Chaman Chahal Supervisr: Dr. P. Bse, Schl f Cmputer Science Organizatin: Carletn University Curse: COMP4905 Date: Dec. 11, 2012 1 Abstract Hspitals

More information

Experion MX Formation Measurement

Experion MX Formation Measurement Experin MX Frmatin Measurement Experin MX will help imprve yur business perfrmance in tday s challenging ecnmic envirnment. This fully integrated quality cntrl and prcess knwledge system prvides superir

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

Damocles 1208 MANUAL. Damocles Damocles 1208 Manual. Input status LED indicators. Inputs Not connected

Damocles 1208 MANUAL. Damocles Damocles 1208 Manual. Input status LED indicators. Inputs Not connected Damcles 1208 Damcles 1208 MANUAL Input status LED indicatrs Inputs 5 12 Nt cnnected DIP settings Default: DIP1:SETUP = Off DIP2:SAFE = Off Inputs 1 4 Output activatin LED indicatrs Outputs 1 8 (pen cllectrs)

More information

GE Multilin 369 LV & MV Motor Management Relay Specifications

GE Multilin 369 LV & MV Motor Management Relay Specifications GE Multilin 369 LV & MV Mtr Management Relay Specificatins The mtr management relay shall prvide primary prtectin and management t medium vltage mtrs. The relay shall be equipped with the fllwing prtectin

More information

Reliability Coordinator Area Restoration Plan

Reliability Coordinator Area Restoration Plan Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure APPLICABILITY: Reliability Crdinatr I. Purpse Transmissin Operatr Prepare Reliability Crdinatr (RC) System Operatrs and Transmissin

More information

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications CATA Cmpser R2016 Fact Sheet Add a New Dimensin t Yur Prduct Cmmunicatins Versin 1.0-8/11/2015 Table f Cntents 1. CATIA Cmpser: VALUE AT A GLANCE... 3 2. CATIA Cmpser: Overview... 4 2.1. Immediate Prductivity

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure N. Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 3. Detail... 2 3.1. Capacity and Energy Emergencies... 2 3.1.1. EEA 1 All Available Generatin in Use... 3 3.1.2. EEA 2

More information

Damocles 2404i Manual

Damocles 2404i Manual Damcles 2404i Inputs 1 8 Each blue terminal is shared by tw inputs. POWER 12V supply (+U / GND) ETHERNET Link & Activity Inputs 17 24 Each blue terminal is shared by tw inputs. Cnfiguratin Default: DIP1=

More information

PJM Protection Standards

PJM Protection Standards PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010

More information

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1 Altis Flight Manager PC applicatin fr AerbTec devices AerbTec Altis v3 User Manual 1 Table f Cntents Intrductin...3 Requirements...3 Installatin...3 Applicatin...3 USB Driver fr Altis v3 interface ALink...4.NET

More information

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6 SlarEdge Immersin Heater Cntrller Installatin Guide Fr Eurpe, APAC & Suth Africa Versin 1.6 Cntents Cntents HANDLING AND SAFETY INSTRUCTIONS 2 Safety Symbls Infrmatin 2 Immersin Heater Cntrller Installatin

More information

Application Note: Conducted Immunity: Quick Guide

Application Note: Conducted Immunity: Quick Guide icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas

More information

APPLICATION NOTE Sales & Application DEWESoft Slovenia

APPLICATION NOTE Sales & Application DEWESoft Slovenia Sales & Applicatin DEWESft Slvenia Abstract: This applicatin nte shws a measurement with DEWESft sund pwer measurement system and GRAS 67HA Hemisphere. The bject under test was a standard ntebk, the measurement

More information

SENSOR AND MEASUREMENT TECHNOLOGY

SENSOR AND MEASUREMENT TECHNOLOGY SENSOR AND MEASUREMENT TECHNOLOGY FOR SENSOR MANUFACTURERS The perfect wireless system FOR MACHINE MANUFACTURERS Transferring sensr data directly int the cntrl unit Using the Wireless Sensr Gateway DATAEAGLE

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12 (DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Cmmunicatins Plan ECERT Cmmunicatins Plan Rev. 0.2 Page 1 f 12 Table f Cntents OBJECTIVES:... 3 GENERAL:... 3 FAMILY COMMUNICATION:... 3 Designated

More information

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT)

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT) Meterlgical Satellites (MetSat) Overview f the glbal netwrk f Meterlgical Satellites Speaker: Markus Dreis (EUMETSAT) Secnd ITU/WMO Seminar "Use f Radi Spectrum fr Meterlgy: Weather, Water and Climate

More information

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

A_LT-2W & B_LT-2W Series 2W, FIXED INPUT, ISOLATED & UNREGULATED DUAL/SINGLE OUTPUT DC-DC CONVERTER

A_LT-2W & B_LT-2W Series 2W, FIXED INPUT, ISOLATED & UNREGULATED DUAL/SINGLE OUTPUT DC-DC CONVERTER A_LT-2W & B_LT-2W Series 2W, FIXED INPUT, ISOLATED & UNULATED DUAL/SINGLE OUTPUT - CONVERTER FEATURES Efficiency up t 85% Lw Temperature rise 1KV Islatin SMD Package Operating Temperature Range: - C ~

More information

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter .,Plc..d,~t l~ucji PA300 DIGITAL BASS PROCESSOR Cngratulatins n yur purchase f a Planet Audi signal prcessr. It has been designed, engineered and manufactured t bring yu the highest level f perfrmance

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY A. Sudrià 1, E. Jaureguialz 2, A. Sumper 1, R. Villafáfila 1 and J. Rull 1 1 Centre fr Technlgical Innvatin

More information

CURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI)

CURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI) CURRENT AND VOLTAGE SENSORS General Infrmatin Overhead Current and Vltage Mnitring Insulatrs (CVMI) Many electric utilities are using Distributin Autmatin (DA) fr bth verhead and undergrund systems. DA

More information

SFDMDA4108F. Specifications and Applications Information. orce LED Driver. Mass: 9 grams typ. 03/30/11. Package Configuration

SFDMDA4108F. Specifications and Applications Information. orce LED Driver. Mass: 9 grams typ. 03/30/11. Package Configuration 03/30/11 Specificatins and Applicatins Infrmatin Smart Fr rce LED Driver The ERG Smart Frce Series f LED Drivers are specifically designed fr applicatins which require high efficiency, small ftprt and

More information

1300 S. Interocean Ave. Holyoke, CO

1300 S. Interocean Ave. Holyoke, CO 1300 S. Intercean Ave. Hlyke, CO Intercnnectin Standard fr Small Generating Facilities N Larger Than 25kW and 600VAC Intrductin This dcument prvides a standard fr intercnnectin f distributed resurces within

More information

User Guide. ACC Mobile 3 Preview App for ios

User Guide. ACC Mobile 3 Preview App for ios User Guide ACC Mbile 3 Preview App fr ios 2017, Avigiln Crpratin. All rights reserved. AVIGILON, the AVIGILON lg, AVIGILON CONTROL CENTER, ACC, and TRUSTED SECURITY SOLUTIONS are trademarks f Avigiln Crpratin.

More information

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord High Level Design Circuit CitEE Irere Kwihangana Lauren Mahle Jaclyn Nrd 12/16/2013 Table f Cntents 1 Intrductin. 3 2 Prblem Statement and Prpsed Slutin. 3 3 Requirements. 3 4 System Blck Diagram 4.1 Overall

More information

Creating Gift Card Batches

Creating Gift Card Batches Every active custmer gift card issued is a part f a batch f gift cards. Prir t activating any individual gift card, yu must define a batch f gift cards and any accmpanying rules that apply t each batch.

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System VIP-200 Vide ver IP Extender and Matrix System Pint t Pint Extensin Cnfiguratin Quick Start Guide PureLink TM 535 East Crescent Avenue Ramsey, NJ 07446 USA Cntents What is in the bx... 3 Transmitter kit

More information

Hands-Free Music Tablet

Hands-Free Music Tablet Hands-Free Music Tablet Steven Tmer Nate Decker Grup Website: steve@wasatch.cm milamberftheassembly@yah.cm http://www.cs.utah.edu/~ndecker/ce3992/ Abstract The typical musician handles a great deal f sheet

More information

2016 Operations Stay Treat Improving System Reliability. A Case Study of Accelerator UPSs. Anthony Cuffe

2016 Operations Stay Treat Improving System Reliability. A Case Study of Accelerator UPSs. Anthony Cuffe 2016 Operatins Stay Treat Imprving System Reliability A Case Study f Acceleratr UPSs Anthny Cuffe Summary A Case Study f Imprving UPS Reliability Typical UPS Usage Backstry Initial Status and Analysis

More information

DISTRIBUTION IMPACT STUDY (DIS) GUIDELINE Guideline for Studying the Impact of Rooftop PV-Systems on Distribution Networks in the Philippines

DISTRIBUTION IMPACT STUDY (DIS) GUIDELINE Guideline for Studying the Impact of Rooftop PV-Systems on Distribution Networks in the Philippines DISTRIBUTION IMPACT STUDY (DIS) GUIDELINE Guideline fr Studying the Impact f Rftp PV-Systems n Distributin Netwrks in the Philippines www.renewables-made-in-germany.cm Imprint Authrs Meller & Peller Engineering

More information

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared

More information

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E AIR CONDITER REMOTE CONTROLLER ILLUSTRAT CS406-R5E 00550905 0009 Thank yu very much fr purchasing ur air cnditiner. Please read this wner's manual carefully befre using yur air cnditiner. CONTENTS Handling

More information

Generating Facility Interconnection Guide. Revision 5.0

Generating Facility Interconnection Guide. Revision 5.0 Generating Facility Intercnnectin Guide Revisin 5.0 AMERICAN TRANSMISSION COMPANY Generating Facility Intercnnectin Guide (An ATC Business Practice) Revisin 5.0 April 2014 American Transmissin Cmpany W234

More information

FIRMWARE RELEASE NOTES. Versions V2.0.0 to V Model HDL-32E. High Definition LiDAR Sensor

FIRMWARE RELEASE NOTES. Versions V2.0.0 to V Model HDL-32E. High Definition LiDAR Sensor FIRMWARE RELEASE NOTES Versins V2.0.0 t V2.2.21.0 Mdel HDL-32E High Definitin LiDAR Sensr HDL-32E Firmware Release Ntes Page 2 Fr all new features and changes, refer t the dcumentatin that accmpanies the

More information

Maxon Motor & Motor Controller Manual

Maxon Motor & Motor Controller Manual Maxn Mtr & Mtr Cntrller Manual Nte: This manual is nly fr use fr the Maxn mtr and cntrller utlined belw. This infrmatin is based upn the tutrial vides fund nline and thrugh testing. NOTE: Maximum Permitted

More information

CM5530 GENERAL DESCRIPTION APPLICATIONS TYPICAL APPLICATION CIRCU. Rev.1.0 0

CM5530 GENERAL DESCRIPTION APPLICATIONS TYPICAL APPLICATION CIRCU.  Rev.1.0 0 FEATURES Quasi-Resnant Primary Side Regulatin (QR-PSR) Cntrl with High Efficiency Multi-Mde PSR Cntrl Fast Dynamic Respnse Built-in Dynamic Base Drive Audi Nise Free Operatin ±4% CC and C Regulatin Lw

More information

Xerox 8160/8142 Wide Format Color

Xerox 8160/8142 Wide Format Color PRODUCT RANGE / POSITIONING The Xerx 8142/8160 Slutin Printer is a thermal inkjet printing system intended fr use in a prductin envirnment prducing graphical cntent, including Psters, POP, signage, etc.

More information

Automated Meters Frequently Asked Questions

Automated Meters Frequently Asked Questions Autmated Metering Prject Utilities Divisin Phne: 403.529.8111 Autmated Meters Frequently Asked Questins Intrductin The City f Medicine Hat has cmpleted its prject t install autmated meters fr all electric,

More information

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256)

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256) ADS ECHO Qstart Quick Reference Guide December 2016 QR 775033 A0 340 The Bridge Street, Suite 204 Huntsville, Alabama 35806 (256) 430-3366 www.adsenv.cm 2 ADS ECHO Qstart Quick Reference Guide 2016 ADS

More information

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE Versin 40 This is a general manual describing a series f single axis mdule Serv Amplifiers having utput capability suitable fr driving Brushless

More information

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE COMPONENT USING ELECTRIC CURRENT PERTURBATION Gary L. Burkhardt and R.E. Beissner Suthwest Research Institute 6220 CUlebra Rad San Antni, Texas

More information

D a i s y M o d e m s

D a i s y M o d e m s D a i s y M d e m s D a i s y - C h a i n i n g Y u r N e t w r k W i t h R a v e n s W i r e l e s s T e c h n l g y Using Raven s secure Daisy radi mdems t access yur data frm arund the wrld, build yur

More information

VILLAGE COORDINATOR AGREEMENT

VILLAGE COORDINATOR AGREEMENT Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR

More information

Insertion Loss (db)

Insertion Loss (db) Optical Interleavers Optplex s Optical Interleaver prducts are based n ur patented Step-Phase Interfermeter design. Used as a DeMux (r Mux) device, an ptical interleaver separates (r cmbines) the Even

More information

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

Fig 1 System architecture. As shown in Figure 1, AUV system could be separated in 3 main blocks:

Fig 1 System architecture. As shown in Figure 1, AUV system could be separated in 3 main blocks: AUV System Descriptin Railway usage authrizatin system (called AUV, by its abbreviatin in Spanish) is a Safe Train Cntrl (STC) system prvided by Alta Rail Technlgy (ART). AUV system s structure is based

More information

A Basis for LDO and It s Thermal Design

A Basis for LDO and It s Thermal Design A Basis fr LDO and It s Thermal Design Hawk Chen Intrductin The AIC LDO family device, a 3-terminal regulatr, can be easily used with all prtectin features that are expected in high perfrmance vltage regulatin

More information

CAR ASYST - Quick Start Guide MAIN MENU

CAR ASYST - Quick Start Guide MAIN MENU fficially apprved by CAR ASYST - Quick Start Guide MAIN MENU Main menu The main menu f ur CAR ASYST APP is divided int 7 menu items. Belw yu will find a list f these items including a shrt descriptin.

More information

Accurate Time & Frequency System

Accurate Time & Frequency System Mdel AR76A GPS-Disciplined Rubidium / OCXO Clck Key features: Frequency Accuracy : 1E-12 1PPS Accuracy: 20ns RMS Hldver: 1µs/24 hurs, 5E-11/mnth 20 utputs (10MHz, 1PPS, ) LAN IPV4 (NTP V3, Mnitr & Cntrl,

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. Order N. : 5323 02 Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty damage pssible. Please read

More information

EE 311: Electrical Engineering Junior Lab Phase Locked Loop

EE 311: Electrical Engineering Junior Lab Phase Locked Loop Backgrund Thery EE 311: Electrical Engineering Junir Lab Phase Lcked Lp A phase lcked lp is a cntrlled scillatr whse instantaneus frequency is dynamically adjusted thrugh multiplicative feedback and lw

More information

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Streamer AG INMR Wrld Cngress 2017 EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Authrs: Jens Bthe, Etienne Cuisinier SUMMARY: Fr nw mre than 20 years, Streamer has dedicated its

More information

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005 Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION PS 430 FOUR CHANNEL REMOTE SPEAKER STATION USER MANUAL August 2016 This prduct is designed and manufactured by: ASL Intercm BV Znnebaan 42 3542 EG Utrecht The Netherlands Phne: +31 (0)30 2411901 Fax: +31

More information

Composite Materials with Self-Contained Wireless Sensing Networks

Composite Materials with Self-Contained Wireless Sensing Networks Cmpsite Materials with Self-Cntained Wireless Sensing Netwrks Kristin Schaaf, Rbert Kim, and Sia Nemat-Nasser Department f Mechanical and Aerspace Engineering, Center f Excellence fr Advanced Materials,

More information

NanoScan v2 Readme Version 2.7. Change log. v2.7 - Added information for new product Pyro/9/5-MIR.

NanoScan v2 Readme Version 2.7. Change log. v2.7 - Added information for new product Pyro/9/5-MIR. NanScan v2 Readme Versin 2.7 Change lg v2.7 - Added infrmatin fr new prduct Pyr/9/5-MIR. v2.6 - Redesigned Messages windw. Imprved readability and ease f use. Mves almst all pp up message bxes int the

More information

XDSL/TELEPHONE CABLE MEASUREMENT

XDSL/TELEPHONE CABLE MEASUREMENT XDSL/TELEPHONE CABLE MEASUREMENT Phenix 10056 Cmplete Slutin fr xdsl Cables Cat 3, 4, 5 and 5e DESCRIPTION Custmer requirements can vary cnsiderably in terms f size and design f cnnecting frames depending

More information

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions TC 60 prg start stp THERMOCOMPUTER TC 60 h C/h C Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE

TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE Cadence Virtus Schematic editing prvides a design envirnment cmprising tls t create schematics, symbls and run simulatins. This tutrial will

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

Why Kodak CTP is best for process free plates

Why Kodak CTP is best for process free plates Eastman Kdak Cmpany 343 State Street Rchester, NY 14650-0238 USA Revised: April 11, 2017 White Paper Cntact Name Nathanael Eijbersen Wrldwide Prduct Manager, Output Devices nathanael.eijbersen@kdak.cm

More information

A c r o s s t h e S k y l i n e

A c r o s s t h e S k y l i n e A c r s s t h e S k y l i n e D a i s y - C h a i n i n g Y u r N e t w r k W i t h R a v e n s W i r e l e s s T e c h n l g y Using Raven s secure Daisy radi mdems and Skyline System t wirelessly access

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

XGS2 Chassis Platform

XGS2 Chassis Platform XGS2 Chassis Platfrm Highlights Supprts Ixia applicatins fr perfrmance, functinal, cnfrmance, and security testing Ixia test systems deliver the industry s mst cmprehensive slutins fr the security, perfrmance,

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

Pulse Width Modulation (PWM) Cornerstone Electronics Technology and Robotics II

Pulse Width Modulation (PWM) Cornerstone Electronics Technology and Robotics II Pulse Width Mdulatin (PWM) Crnerstne Electrnics Technlgy and Rbtics II Administratin: Prayer PicBasic Pr Prgrams Used in This Lessn: General PicBasic Pr Prgram Listing: http://www.crnerstnerbtics.rg/picbasic.php

More information