52E18SW SHOAL LAKE 010 REPORT ON THE HELICOPTER - BDRNE EM AND MAGNETOMETER SURVEY ON BEHALF OF CONSOLIDATED PROFESSOR MINES LIMITED

Size: px
Start display at page:

Download "52E18SW SHOAL LAKE 010 REPORT ON THE HELICOPTER - BDRNE EM AND MAGNETOMETER SURVEY ON BEHALF OF CONSOLIDATED PROFESSOR MINES LIMITED"

Transcription

1 52E18SW SHAL LAKE 010 REPRT N THE HELICPTER - BDRNE EM AND MAGNETMETER SURVEY N BEHALF F CNSLIDATED PRFESSR MINES LIMITED IN THE SHAL LAKE AREA, DISTRICT F KENRA NTARI APPRXIMATELY 49 34' N., 95 0' W. BY GERGE W. SANDER, Ph.D., P.Eng. AND FRANK KISS, B.Sc. SANDER GEPHYSICS LIMITED KANATA, NTARI. May 10, 1974.

2 SUMMARY A helicpter-brne cmbined EM and Magnetmeter survey was cnducted n behalf f Cnslidated Prfessr Mines Limited n Shal Lake. Mst f the area f the survey lies under the lake. The survey was cnducted t aid in the further develpment f the area in which ur clients are currently develpping a gld mine. Several EM anmalies were fund. These shuld be investigated.

3 INTRDUCTIN A helicpter-brne cmbined EM and Magnetmeter survey was cnducted n the prperty f Cnslidated Prfessr Mines Limited n Shal Lake. District f Kenra, ntari. Mst f the surveyed area lies under Shal Lake. It was the purpse f the survey t lcate sulphide cnductrs under the lake r in the area f the islands and t gain gelgical and structural infrmatin frm bth the magnetmeter and electrmagnetic survey. ACCESS & TPGRAPHY The area lies t the suth f the Twn f Kenra in Western ntari and can be reached frm there by bush rad and by winter rad acrss Shal Lake. GELGY The gelgy f the area is described n the Nrth Shal Lake Area (East Sheet) Map f the ntari Department f Mines. The area is part f the Superir Prvince f the Canadian Shield and is underlain by mafic intrusive rcks and by metavlcanics. Because much f the survey was flwn ver the lake, gelgical infrmatin is nt cntinuus and it might well be that the rcks which utcrp in the islands are nt representative fr the lake bttm. Gld was discvered t the nrtheast f the area at Bag Bay as early as 1893 and sme gld prductin has cme frm this area. Cnslidated Prfessr Mines Ltd. has \ been successful in develpping a gld depsit in the area and is actively explring this depsit.

4 Ill It was the purpse f the survey t help in this explratin and in prviding infrmatin cncerning sulphide depsits and cncerning the distributin f basic rcks in the area.

5 IV INSTRUMENTS A) EM Instrumentatin - The instruments used fr the gephysical survey are described n the enclsed data sheet included with this reprt. The survey was cnducted with a Bell 47G 3-B2 helicpter, wned and perated by Sander Gephysics Limited. The electrmagnetic system cnsists f tw c-axial cils munted n either side f the 'Bird at a separatin f 23 ft. frm each ther. The axis f the cil system mves in the directin f flight. The system wrks n a frequency f l& Hz and measures the in-phase and ut-f-phase^respnse f cnductrs belw the survey system. The system is calibrated in parts per millin f the primary field present at the lcatin f the receiving cil. B) Magnetmeter Survey - The magnetic data were btained with a.sander NPM-4 Nuclear Precessin Magnetmeter recrding the ttal magnetic field. The magnetmeter has an accuracy and reslutin f apprximately 1 gamma.

6 TECHNICAL DATA Lines were flwn almst in the east-west directin at X. " ~ """ a spacing f 1/8 f a mile. Navigatin was accmplished by y fllwing aerial phtgraphy. Flight elevatin was 120 ft. " "^ nminally. Since mst f the area lies tinder the water f Shal Lake, it was pssible t keep the flight elevatin very cnstant and quite lw. RESULTS The results f the survey are shwn n tw maps designated as EM Anmaly Map and Ttal Magnetic Intensity map. Because f its relatinship t the gelgy, the magnetic map will be discussed first. Magnetic anmalies are seen t trend thrugh the area in the nrtheastern directin and these magnetic anmalies might either reflect basic intrusive rcks r irn frmatin. irregularly shaped bdy which has all the appearances f a basic intrusive is fund t the nrthwest f Stevens Island while a linear trend fllws the nrtheast shre f Shal Lake where this shre frms the bundary f the surveyed area. Bth magnetic trends cincide with electrmagnetic anmalies. These anmalies shw generally a phase relatinship in which the in-phase prtin is apprximately equivalent t the ut-f- phase respnse. depsits. Such phase relatinship is cmmn in sulphide It seems likely that these anmalies are due t sulphide znes in the area f high cncentratin f magnetite. Tw ther electrmagnetic trends are shwn in the suthwestern and in the nrtheastern prtin f the surveyed area. An Bth lie

7 VI t the west f the base line and the anmalies are nt particularly cnfirmed by the magnetic trend. These anmalies might be related t sulphide depsits r graphite znes. Because f the imprtance f sulphides in the area, they shuld be made the subject f an investigatin.

8 VII RECMMENDATINS: anmalies. It is recmmended t investigate the electrmagnetic PERSNNEL The survey was cnducted by the fllwing persnnel emplyed by Sander Gephysics Ltd.: - Frank Kiss, B.Sc., Gelgist, - Ray Garbutt, Gephysical Technlgist, - Brian Wilsn, B.A., Helicpter Pilt. Interpretatin was under the supervisin f Gerge W. Sander, Ph.D., P.Eng., Gephysicist and Thmas Mre,B.Sc.,Gephysicist. Sander, Ph.D., P.Eng.

9 VIII TECHNICAL DATA EM, MAGNETMETER AND GAMMA RAY SPECTRMETER SYSTEM Weight: Instrumentatin inside helicpter Gamma Ray Spectrmeter 16 mm Camera Magnetic Tape Recrder 160 Ibs 40 Ibs 50 Ibs 20 Ibs 10 Ibs 280 Ibs SEPT EM INSTRUMENT: SANDER HELICPTER EM-3A Frequency 1,000 Hz Cil separatin 23 ft. Cils Vertical and c-axial Measured unit Parts per millin f the primary field, in-phase and ut-f-phase cmpnent. Nise + 1 ppm ut-f-phase + 2 ppm in-phase MAGNETMETER: SANDER NPM-4 Type Nuclear Precessin magnetmeter Measuring interval 1 secnd Reslutin 1 gamma Stability Better than 1 gamma +40 C t -40 C GAMMA RAY SPECTRMETER: SANDER SPM-10 4 trace Ttal, K, U, Th. Crystal size 8" x 4" Crystal temperature stabilized CAMERA; Type SANDER CM mm very wide angle Electrnic picture marking and fiducial system RECRDER; CENTURY trace ptical galvanmeter, time sharing resulting in up t 12 channels. DIGITAL MAGNETIC TAPE RECRDER; SANDER ADR II Digital recrding f up t 16 analgue channels n cassette tape Cycling rate 5 times per secnd r better A t D cnversin 11 binary bit reslutin Crystal cntrlled clck RADI ALTIMETER: BNZER SANDER GEPHYSICS LIMITED 250 HERZBERG RAD P.. BX 1770 KANATA, NTARI KA 2C INSTRUMENT DESIGN

10 2. 52EieSW SHAL LAKE 300 T BE ATTACHED AS AN APPENDIX T TECHNICAL REPRT FACTS SHWN HERE NEED NT BE REPEATED IN REPRT TECHNICAL REPRT MUST CNTAIN INTERPRETATIN, CNCLUSINS ETC. Type f Survey E.MjMagnetmeter & Gamma Ray Spectrmeter Twnship r Area Shal Lake & Snwshe Bay (Shal Lake) Are* Claim hlder(s) Duprt Mining C.Ltd., K.Razingf. t Authr f Reprt. Address Cvering Dates f Ttal Miles f Line cut Le Mrrin. E.Gibbns. A.Hpkins. Ge. W. Sander Ph.D. & Frank Kiss B.Sc.. Kanata. ntari 1974 (linccutting t ffice) MINING CLAIMS TRAVERSED List numerically (prefix) (number) SPECIAL PRVISINS CREDITS REQUESTED ENTER 40 days (includes line cutting) fr first survey. ENTER 20 days fr each additinal survey using same grid. Gephysical Electrmagnetic. Magnetmeter Radimetric ther Gelgical. Gechemical. DAYS per claim AIRBRNE CREDITS (Special prvisin credk!*d"snt apply t airbrne surveys) f \ Magnetmeter_4_27.JJLjtlectrmagnetic-L27<JL-<Radimetric, -"i ^ (enter days per ajbl) tlt^tr-7 DATE: PRJECTS SECTIN Res. Gel. SIGNATUR Authr f Reprt r Agent a B Checked by_.date. GELGICAL BRANCH, Apprved by_.date. GELGICAL BRANCH. Apprved by_ -date. TTAL CLAIMS

11 Shw instrument technical data in each space fr type f survey submitted r indicate "nt applicable" GEPHYSICAL TECHNICAL DATA GRUND SURVEYS Number f Statins Number f Readings. Statin interval Line spacing Prfile scale r Cntur intervals (specify fr each type f survey) MAGNETIC Instrument : Accuracy - Scale cnstant Diurnal crrectin methd. Base statin lcatin ELECTRMAGNETIC Instrument Cil cnfiguratin. Cil separatin Accuracy Methd: EH Fixed transmitter Sht back D In line D Parallel line Frequency (specify V.L.F. statin) Parameters measured, GRAVITY Instrument. Scale cnstant. Crrectins made. Base statin value and lcatin. Elevatin accuracy ' INDUCED PLARIZATIN - RESISTIVITY Instrument Time dmain Frequency dmain. Frequency Range Pwer Electrde array_ Electrde spacing. Type f electrde.

12 SELF PTENTIAL Instrument Range. Survey Methd Crrectins made. RADIQMETRIC Instrument Values measured. Energy windws (levels) Height f instrument Backgrund Cunt. Size f detectr verburden (type, depth include utcrp map) THERS (SEISMIC, DRILL WELL LGGING ETC.) Type f survey Instrument Accuracy Parameters measured. Additinal infrmatin {fr understanding results). AIRBRNE SURVEYS Type f g..rvpy(«) Electrmagnetic, Magnetmeter & Gamma Rav Spectrmeter Instrument(s) E.M.-Sander Helicpter EM.3A; Mng.Snndpr NPM^j Spact.Sander SPM-10 (specify fr each type f survey) Arnirary E.M.+ Ippm /phase + 2ppm /phaap; Mag. 1 gammq ( Spanf.Cryiital 9" K /i" (specify fr each type f survey) Aircraft used Helicpter Bell &7R 3B2 Sensr altitude. Navigatin and flight path recvery methd bserver t camera Aircraft altitude 120' Line Sparing f\ I r\ Miles flwn ver ttal area * ver claims nly. ^ 400 ftj

13 GECHEMICAL SURVEY - PRCEDURE RECRD Numbers f claims frm which samples taken. Ttal Number f Samples. Type f Sample. (Nature f Material) Average Sample Weight Methd f Cllectin Values expressed in: Cu, Pb, ANALYTICAL METHDS per cent p. p.m. p. p. b. Zn, Ni, C, Ag, M, n n As,-(circle) Sil Hrizn Sampled- Hrizn Develpment. Sample Depth Terrain Drainage Develpment Estimated Range f verburden Thickness. thers_ Field Analysis Extractin Methd. Analytical Methd- Reagents Used Field Labratry Analysis N. ( Extractin Methd. Analytical Methd - Reagents Used.tests).tests) SAMPLE PREPARATIN (Includes drying, screening, crushing, ashing) Mesh size f fractin used fr analysis Cmmercial Labratry (_ Name f Labratry_ Extractin Methd Analytical Methd Reagents Used -tests) General. General.

14 SCHEDULE F CLAIMS K K K K

15 - 2 - (Schedule f claims - cnt'd. ) K K

16 I5' E W A R T T P. and INDIAN BAY M_I 975 SHAL LAKE INDIAN RESERVE N. 39A 95 00' 49 37' 30" AREA F SNWSHE BAY SHAL LAKE DISTRICT F KENRA Lng Island 37ae ^13T X L$fcMJ47, 3728B2, KENRA MINING DIVISIN SCALE: 1~INCH = 4 CHAINS L f^_. J K K LEGEND ) Snwshe Bay MM 7 6/T\ K «, K I 0 \ I I ; j_.. -i Y n* - i * B752, I cn r r J I PATENTED LAND CRWN LAND SALE LEASES LCATED LAND LICENSE F CCUPATIN MINING RIGHTS NLY SURFACE RIGHTS NLY RADS IMPRVED RADS KING'S H IGHWAYS RAILWAYS PWER LINES MARSH R MUSKEG MINES CANCELLED NTES C.S Lc. L, MR. S.R. C, 400' surface rights reservatin alng the shres f all lakes and rivers. Flding rights reserved up t 1064* abve sea level. Scale: I INCH = 20 CHAINS. UJ cr Shal Lake UJ Stevens Island. i C/) " i MINING LA*iDi V"" DATE F ISSUE JUN14I ' MINISTRY F NATURAL RESURCES S Z82ad [ l T I J ^ ^7282, 4 I I I I 7 j 37Z8I ' 95 15' 14 13' ' 49 30* NTARI MINISTRY F NATURAL RESURCES SURVEYS AND MAPPING BRANCH Dle 17th. JAN Natinal Tpgraphic Series 52E-II Plan N. M E10SW91C SHAL LAKE 00

17 E W A R T T P. N DIAN M_I 975 AREA F ' SHAL LAKE INDIAN RESERVE N. 39A 99C5 I fcj^ SNWSHE BAY SHAL -*" ~ * " T"" ~~ " I ^.., DISTRICT F KENRA / KENRA MINING DIVISIN SCALE: 1-INCH = 4 CHAINS Snwshe Bay K, K 10 PATENTED L AND J.0f l74 " K. K ,364404,, M.H46 "'-.-- 'l6^.4.!0-, I K ~^K CRWN LAND SALE LEASES LCATED LAND LEGEND LICENSE F CCUPATIN MINING RIGHTS NLY SURFACE RIGHTS NLY RADS IMPRVED RADS KING'S H IGHWAYS RAILWAYS PWER LINES MARSH R MUSKEG MINES CANCELLED 400 surface r ights reservatin alng the shres f a ll l akes and rivers. Flding rights reserved up t 1064 abve sea level. Scale: I INCH = 20 CHAINS. - MINING LANDS - DATE F ISSUE MAY MINISTRY F NATURAL RESURCES NTARI MINISTRY F NATURAL RESURCES SURVEYS AND MAPPING BRANCH 52E10SW9I SHAL LAKE 17th. JAN Ntinal Tpgraphic Series M.2704

18 n> n> 0 CJ P 3) > < rn m H X ( > 0) CD CD Ifl t rr en CD CD Z Hm 0) ^ ) ( ) -1 PRVINCE F MANITBA Z \ v \ s fe^v^vs^^-^^ m C -< C r- m r Ul ECH BAY (LAKE F THE WDS) M ft. l C/) c CD 05 0) 0) - c 2 c - ^ <: «CD 1- c 2, ( m Z 03 r-tc 17 C m X I U) U) i 1 33 m > rn m 33 m z* 33 rn r i > z 8 m ± n c"d C z Ed m > C C C <= c C t/) c 33 m 5 V) c 33 2 SP IH ) c/) "D z ~n > Z - > z 3J m c/> c CD Crt «g 2 > 2 a r- c 33 H < m C x z m m U) CD t m x m ^ > 33 < c H m rn m 2

19 NTES 400 surface rights reservatin alng the shres f all lakes and rivers. BRDERICK TP M GIDLEY TR M. I960 Reserve flding rights t abve mean sea level n all lands brdering n Lake f the Wds 49 45'- tndprtge REFER 6 M T : MINING UNbJ i1"" DATE F ISSUE JUN14S74 MINISTRY f NATURAL RESURCES BYS LEGEND SAND and GRAVEL HIGHWAY AND RUTE N, TYPE FILE THER RADS M T.C. Grvel M.T.C. M.T C M.T.C. M. N.R M.T.C, M.T.C. M.T.C l N ! - FRGIE MZ640, 5S2647, TRAILS SURVEYED LINES: TWNSHIPS, BASE LINES, ETC. LTS,MINING CLAIMS, PARCELS.ETC. UNSURVEYED LINES! LT LINES PARCEL BUNDARY MINING CLAIMS ETC. RAILWAY AND RIGHT F WAY UTILITY LINES NN-PERENNIAL STREAM FLDING R FLDING RIGHTS SUBDIVISIN RIGINAL SHRELINE MARSH R MUSKEG MINES M.T.C, 533 M N.R M.T.C i22650 i63688 LJ DISPSITIN F CRWN LANDS Grvel M T C. Grvel M.T.C. M.T.C MT.C M TC M.T.C. M.T C X C < ' ' K, K T k", *..-- J ~- b M9 3$ TYPE F DCUMENT PATENT, SURFACE a MINING RIGHTS SURFACE R IGHTS NLY... MINING RIGHTS NLY LEASE, SURFACE BMINING RIGHTS SURFACE RIGHTS NLY MINING RIGHTS NLY... LICENCE F CCUPATIN. CRWN LAND SALE... RDER-IN-CUNCIL RESERVATIN.. CANCELLED SAND & GRAVEL SYMBL..H a T c.s. c M.T.C M.T C Grvel SCALE : I INCH = 40 CHAINS ) M N R I 2000 FEET METRES B t KM. RESERVES ) M N R Vl. 5 ACRES HECTARES Crwn ReservefS.R..) M.T.C. 838M 3750V Crwn Reserve Public Reserve Crwn Reservs Crwn Reserve Crwn Reserve Public Use Reserve Twer Reserve Vl Vl. I Vl gem Bay a AREA ECH BAY a BYS TP DISTRICT. i in KEN RA MINING DIVISIN KENRA 49 37'30" SHAL LAKE M EiaSW9l SHAL LAKE NTARI MINISTRY F NATURAL RESURCES SURVEYS AND MAPPING BRANCH DATE 6th. SEPTEMBER 1973 NATINAL TPGRAPHIC 52EI SERIES PLAN N. M.I949

20 NTES 400 surface rights reservatin alng the shres f all lakes and rivers ' ECH BAY nd BYS TR M.I '00" 49 37'3C" i 49 37'30" Flding Rights reserved t 1064 mean sea level. C/yfte Bay. Islands in Shal Lake and inlets theret d nt frm part f Glass Twnship * MINING UNDS * DATE F ISSUE JUM MINISTRY F NATURAL RISURS _~_-_I I 274i\87 1* X. -{- _ i ' " J.E.S.73!K«te LEGEND HIGHWAY AND RUTE N THER RADS N J I 675 ] j 352S90 '352 % 3 I I I I I I352S53 } j , 35270(1 3527i2 I ' ' ," TRAILS SURVEYED LINES: TWNSHIPS, BASE LINES, ETC. LTS,MINING CLAIMS, PARCELS,ETC. UNSURVEYED LINES! LT LINES PARCEL BUNDARY MINING CLAIMS ETC. RAILWAY AND RIGHT F WAY UTILITY LINES NN-PERENNIAL STREAM FLDING R FLDING RIGHTS SUBDIVISIN RIGINAL SHRELINE MARSH R MUSKEG MINES LU DISPSITIN F CRWN LANDS Me. Lauchin Lake TYPE F DCUMENT PATENT, SURFACE ft MINING RIGHTS SYMBL C SURFACE R IGHTS NLY.. MINIWG RIGHTS NLY LEASE, SURFACE a MINING RIGHTS SURFACE RIGHTS NLY MINING RIGHTS NLY LICENCE F CCUPATIN CRWN LAND SALE RDER-IN-CUNCIL... RESERVATIN. CANCELLED SAND 8 GRAVEL... -B a T cs c UJ X V) 2 C/) SCALE : I INCH = 40 CHAINS FEET I W ^IC^^^"^^^^^-^^^^^^^"^^^^^^^^» I METRES ^^^f^f^s^^fahe!^^^^^^^^^^^^^^ 0 Z B I KM. 2 KM ACRES HECTARES AREA SHAL LAKE DISTRICT KENRA MINING DIVISIN KENRA ' 95 00' 58' 57' MNUMENT BAY (Lake f the Wds) M E10SW SHAL LAKE NTARI MINISTRY F NATURAL RESURCES SURVEYS AND MAPPING BRANCH DATE 1 0th. SEPTEMBER/73 NATINAL TPGRAPHIC 52E 10 SERIES PLAN N. M IVI _ 2339 C~ \J \*S*~S

21 s^y 0 A U s ^ s^j J C^l3 U fa I III! //// CNSLIDATED PRFESSR MINES UMITED TTAL MAGNETIC INTENSITY 500 GAMMAS 100 GAMMAS MAGNETIC LW FIDUCIAL PINTS SHAL L AKE A REA DISTRICT F KENRA NTARI FLWN AND CMPILED BY SANDER GEPHYSICS LIMITED TTAWA 1974 SCALE IN FEET 52E10SW91CI SHAL LAKE 250

22 CNSLIDATED PRFESSR MINES LIMITED EM ANMALY MAP 1 IN PHASE NLY 2 MSTLY IN PHASE b 3 IN PHASE ft UT F PHASE C 4 MSTLY UT F PHASE d UT F PHASE NLY M PSITIVE IN PHASE EXCELLENT GD FAIR QUESTINABLE MAGNETIC SHAL LAKE AREA DISTRICT F K ENRA, NTARI FLWN AND CMPILED BY \ SANDER GEPHYSICS LIMITED TTAWA 1974 SCALE IN FEET I E10SW SHAL LAKE 260

r r"~' m ' r r t o l f 1984 MINING D.A. MCCOMBE TENOGA CONSULTANTS INC.

r r~' m ' r r t o l f 1984 MINING D.A. MCCOMBE TENOGA CONSULTANTS INC. 58A12SWW87 2.6398 DAWSN RAD LTS 010 REPRT N ELECTRMAGNETIC AND MAGNETIC SURVEYS GLDIE TWNSHIP AND DAWSN RAD LTS DISTRICT F THUNDER BAY, NTARI FR ABITIBI-PRTCE INC. MINERAL RESURCES DIVISIN MINING r r"~'

More information

k i:\ l, i V L,; ij i/iny M.I 198-1

k i:\ l, i V L,; ij i/iny M.I 198-1 42H03SW0013 2.6806 LENNOX 010 KIDD CREEK MINES LTD. GEOPHYSICAL REPORT ON LENNOX 55 (NORTH EXTENSION) f -, i "-!"' ; t, r r- '--\ k i:\ l, i V L,; ij i/iny M.I 198-1 APRIL, 1984 D. LONDRY SUMMARY AND RECOMMENDATIONS

More information

MINING LANDS St.TION

MINING LANDS St.TION sage3seeei6 2,4029 R ICHARDSN 010 RED PAINT LAKE PRJECT MINING NRTH EXPLRATINS LTD. MAGNETMETER AND ELECTRMAGNETIC SURVEYS DISTRICT F KENRA-RAINY RIVER THUNDER BAY MINING DIVISIN NTARI DISTRIBUTIN (2 cpies)

More information

RECEIVED. 5.p MINING LANDS SECTION GEOPHYSICAL REPORT HEYSON TWONSHIP CLAIMS RED LAKE MINING DIVISION ONTARIO FOR PENWAY EXPLORERS LTD

RECEIVED. 5.p MINING LANDS SECTION GEOPHYSICAL REPORT HEYSON TWONSHIP CLAIMS RED LAKE MINING DIVISION ONTARIO FOR PENWAY EXPLORERS LTD 52K13NW00ai 2.11635 HEYSN 010 GEPHYSICAL REPRT N HEYSN TWNSHIP CLAIMS RED LAKE MINING DIVISIN NTARI FR PENWAY EXPLRERS LTD BY C.D. HUSTN, P.ENG SEPT. 15,1988 RECEIVED 5.p 20 1988 MINING LANDS SECTIN GEPHYSICAL

More information

HUDSON BAY EXPLORATION AND DEVELOPMENT COMPANY LIMITED ELECTROMAGNETIC SURVEY OF GROUP "B" INTRODUCTION JaiSSi*T.^ SSS? 010

HUDSON BAY EXPLORATION AND DEVELOPMENT COMPANY LIMITED ELECTROMAGNETIC SURVEY OF GROUP B INTRODUCTION JaiSSi*T.^ SSS? 010 HUDSON BAY EXPLORATION AND DEVELOPMENT COMPANY LIMITED ELECTROMAGNETIC SURVEY OF GROUP "B" BLAKELOCK TOWNSHIP INTRODUCTION JaiSSi*T.^ SSS? 010 A grund electrmagnetic survey was perfrmed n Grup "B" in Blakelck

More information

The Corporation of Delta COUNCIL REPORT Regular Meeting. File No.:

The Corporation of Delta COUNCIL REPORT Regular Meeting. File No.: The Crpratin f Delta COUNCIL REPORT Regular Meeting F. 11 T: Mayr and Cuncil File N.: LU007147 Frm: Cmmunity Planning & Develpment Department Date: June 10, 2014 Develpment Permit Amendment fr the Prperty

More information

TOTAL FIELD MAGNETOMETER SURVEY RIVER VALLEY PGE PROPERTY CENTRAL GRID DISTRICT OF NIPISSING SUDBURY MINING DIVISION FOR MUSTANG MINERALS CORP.

TOTAL FIELD MAGNETOMETER SURVEY RIVER VALLEY PGE PROPERTY CENTRAL GRID DISTRICT OF NIPISSING SUDBURY MINING DIVISION FOR MUSTANG MINERALS CORP. H H C H TTAL FIELD MAGNETMETER SURVEY N THE l RIVER VALLEY PGE PRPERTY CENTRAL GRID H1 DISTRICT F NIPISSING SUDBURY MINING DIVISIN FR MUSTANG MINERALS CRP. BY Dan Patrie \ l l R ECEIVED DEC 2 2 20C Dan

More information

NAREX Ore Search Consultants Inc.

NAREX Ore Search Consultants Inc. NAREX Ore Search Cnsultants Inc. 4900 Sheppard Avenue East, Suite 208, Scarbrugh Ontari. Canada MIS 4A7 Tel. (416)293-2990 41PHSW0016 2.6478 CHURCHILL NRX-84-17 010 T.G.R. RESOURCES LTD. GEOPHYSICAL SURVEYS

More information

Orion 3d resistivity imaging at the Phoenix Uranium deposit

Orion 3d resistivity imaging at the Phoenix Uranium deposit Orin 3d resistivity imaging at the Phenix Uranium depsit Larry Petrie Jimmy Stephen Rger Sharpe* Denisn Mines Crp. Quantec Gescience Quantec Gescience Saskatchewan Gelgical Open Huse December 1, 2015 Presentatin

More information

Spring Exploration Bolsters Copper-Silver-Gold Targets at Junction Property, Nevada

Spring Exploration Bolsters Copper-Silver-Gold Targets at Junction Property, Nevada Vancuver, BC, Canada, V6C 1G8 Tel: 604-262-1104; inf@vrr.ca Spring Explratin Blsters Cpper-Silver-Gld Targets at Junctin Prperty, Nevada NR-18-12 July 11, 2018, Vancuver, B.C.: VR Resurces Ltd. (TSX.V:

More information

SEISMOELECTRIC LABORATORY MEASUREMENTS IN A BOREHOLE. Zhenya Zhu and M. Nafi Toksoz

SEISMOELECTRIC LABORATORY MEASUREMENTS IN A BOREHOLE. Zhenya Zhu and M. Nafi Toksoz SEISMOELECTRIC LABORATORY MEASUREMENTS IN A BOREHOLE Zhenya Zhu and M. Nafi Tksz Earth Resurces Labratry Department f Earth, Atmspheric, and Planetary Sciences Massachusetts Institute f Technlgy Cambridge,

More information

Lightning Protection. Study/Report UMKC Substation. Kansas City, Missouri. Burns & McDonnell. University of Missouri - Kansas City.

Lightning Protection. Study/Report UMKC Substation. Kansas City, Missouri. Burns & McDonnell. University of Missouri - Kansas City. Lightning Prtectin Study/Reprt UMKC Substatin Kansas City, Missuri Burns & McDnnell University f Missuri - Kansas City By: Rbert Biggs The fllwing lightning prtectin study, with its assciated drawings,

More information

Standard Operating Procedure for SEM3 (ThermoFisher / FEI Apreo)

Standard Operating Procedure for SEM3 (ThermoFisher / FEI Apreo) Standard Operating Prcedure fr SEM3 (ThermFisher / FEI Apre) Befre beginning, ensure yu have an active reservatin fr SEM3 in CreResearch@Duke Lading a Sample: If Sample Exchange Windw is nt pen, click

More information

FIELD INTENSITY EFFICIENCY OF VEHICULAR ANTENNA AT-912(XE-2)/VRC" WATSJN P. CZERWINSKI MARCH 1964

FIELD INTENSITY EFFICIENCY OF VEHICULAR ANTENNA AT-912(XE-2)/VRC WATSJN P. CZERWINSKI MARCH 1964 USAELRDL Test R«f> r-i FIELD INTENSITY EFFICIENCY OF VEHICULAR ANTENNA AT-912(XE-2)/VRC" WATSJN P. CZERWINSKI PY HARD PY I MICROFICht r v MARCH 1964 UNITED STATES ARMY ELECTRONICS RESEARCH AND DEVELOPMENT

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

EE 3323 Electromagnetics Laboratory

EE 3323 Electromagnetics Laboratory EE 3323 Electrmagnetics Labratry Experiment #1 Waveguides and Waveguide Measurements 1. Objective The bjective f Experiment #1 is t investigate waveguides and their use in micrwave systems. Yu will use

More information

Desktop Teller Exception User Guide

Desktop Teller Exception User Guide Desktp Teller Exceptin User Guide Jammed Dcuments If a dcument jams during the scanning prcess, the scanner will stp, and a message bx will display a Device Errr Message, as shwn belw: Click OK t allw

More information

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE COMPONENT USING ELECTRIC CURRENT PERTURBATION Gary L. Burkhardt and R.E. Beissner Suthwest Research Institute 6220 CUlebra Rad San Antni, Texas

More information

PhotoVu Digital Picture Frame Service & Repair Guide

PhotoVu Digital Picture Frame Service & Repair Guide PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

DEVELOPMENT APPLICATION

DEVELOPMENT APPLICATION DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept

More information

W.O.Karvinen S Associates Ltd. RECEIVED. ?, o t^bb. on the. Report on a VLF Electromagnetic Survey. Brightwest Resource Explorations Inc.

W.O.Karvinen S Associates Ltd. RECEIVED. ?, o t^bb. on the. Report on a VLF Electromagnetic Survey. Brightwest Resource Explorations Inc. ^1?A1SW13 2.11354 STCK 1 Reprt n a VLF Electrmagnetic Survey n the Brightwest Resurce Explratins Inc. Prperty Stck Twnship, ntari by William. Karvinen, Ph. D. May 3, 1988?, t^bb RECEIVED JUM '/ W..Karvinen

More information

GEOPHYSICAL SURVEYS fc DIAMOND DRILLING on the property of

GEOPHYSICAL SURVEYS fc DIAMOND DRILLING on the property of Z. 134H TANNAHILL 010 GEPHYSICAL SURVEYS fc DIAMND DRILLING n the prperty f GWEST AMALGAMATED RESURCES LTD, JNPL EXPLRATINS LIMITED Ben Nevis and Tannahill Twnships, ntari May 4, 1990 Meafrd, ntari R,J.

More information

Automated Meters Frequently Asked Questions

Automated Meters Frequently Asked Questions Autmated Metering Prject Utilities Divisin Phne: 403.529.8111 Autmated Meters Frequently Asked Questins Intrductin The City f Medicine Hat has cmpleted its prject t install autmated meters fr all electric,

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

3G Coverage Obligation Verification Methodology

3G Coverage Obligation Verification Methodology 3G Cverage Obligatin Verificatin Methdlgy Statement Publicatin date: 9 May 2012 Main Heading Cntents Sectin Page 1 Intrductin 1 2 Summary f apprach 2 3 Key parameters t be used in the SINR calculatin

More information

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT)

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT) Meterlgical Satellites (MetSat) Overview f the glbal netwrk f Meterlgical Satellites Speaker: Markus Dreis (EUMETSAT) Secnd ITU/WMO Seminar "Use f Radi Spectrum fr Meterlgy: Weather, Water and Climate

More information

IA CERTIFICATE (Revision 3 Revised for Annual review)

IA CERTIFICATE (Revision 3 Revised for Annual review) Certificate Number: MASC M/11-376X Issue: 22 September 2014 Expire: 22 September 2015 Page: 1 f 5 IA CERTIFICATE (Revisin 3 Revised fr Annual review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS ACT

More information

The demand for a successful flaw analysis is that the test equipment produces no distortion on the echos no noise. I _... I i.j J...

The demand for a successful flaw analysis is that the test equipment produces no distortion on the echos no noise. I _... I i.j J... SYSTEM ANALYSIS FOR WIDE BAND ULTRASONIC TEST SET-UPS Ulrich Opara Krautkramer GmbH Clgne, West Germany INTRODUCTION In the last years, the discussins abut ultrasnic test equipment fcussed n amplifier

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

5. Experimental Results

5. Experimental Results 5. xperimental Results Prttype mdels f the duble spherical helix the hemispherical helix studied in Sectins 4.3.2 4.4 were cnstructed measured. Fabricatin f these antennas measurement f their radiatin

More information

Excel Step by Step Instructions Creating Lists and Charts. Microsoft

Excel Step by Step Instructions Creating Lists and Charts. Microsoft Infrmatin Yu Can Enter in a Wrksheet: Labels: Any type f text r infrmatin nt used in any calculatins. Labels are used fr wrksheet headings and make wrksheets easy t read and understand. Labels can als

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

Bronco Billy s Expansion: Investor Highlights November 2017 FULL HOUSE RESORTS 1

Bronco Billy s Expansion: Investor Highlights November 2017 FULL HOUSE RESORTS 1 Brnc Billy s Expansin: Investr Highlights Nvember 2017 FULL HOUSE RESORTS 1 Frward-lking Statements This presentatin may cntain statements that are "frward-lking statements" within the meaning f the safe

More information

Porcupine Mining Division

Porcupine Mining Division 42A87NW8812 S.4224 MACKLEM 010 McGill Explrati ~. - Reprt f Gephysical Wrk R ECEIVED Mackle Twnship CT^ 61981 Prcupine Mining Divisin MINING LANDS SECTIN INTRDUCTIN: A prgra f linecutting and grund gephysical

More information

APPLICATION NOTE Sales & Application DEWESoft Slovenia

APPLICATION NOTE Sales & Application DEWESoft Slovenia Sales & Applicatin DEWESft Slvenia Abstract: This applicatin nte shws a measurement with DEWESft sund pwer measurement system and GRAS 67HA Hemisphere. The bject under test was a standard ntebk, the measurement

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

42A81SEei76 2.ie7l1 EBY REPORT ON THE MAGNETOMETER SURVEY EAST EBY PROPERTY, EBY TOWNSHIP NTS 42A/1 PREPARED FOR BUTTE CANYON RESOURCES INCORPORATED

42A81SEei76 2.ie7l1 EBY REPORT ON THE MAGNETOMETER SURVEY EAST EBY PROPERTY, EBY TOWNSHIP NTS 42A/1 PREPARED FOR BUTTE CANYON RESOURCES INCORPORATED 42A81SEei76 2.ie7l1 EBY 010 REPRT N THE MAGNETMETER SURVEY EAST EBY PRPERTY, EBY TWNSHIP NTS 42A/1 PREPARED FR BUTTE CANYN RESURCES INCRPRATED RECEIVED TAN s MINittuLANDSStCriN DERRY, MICHENER, BTH fc

More information

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet Twnship f Derry Dauphin Cunty, Pennsylvania Residential Deck Additin Submittal Guide and Cnstructin Fact Sheet The text and illustratins included in this guide represent tables and illustratins frm the

More information

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Streamer AG INMR Wrld Cngress 2017 EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Authrs: Jens Bthe, Etienne Cuisinier SUMMARY: Fr nw mre than 20 years, Streamer has dedicated its

More information

From Perspectivities to Perspective Collineations

From Perspectivities to Perspective Collineations Frm erspectivities t erspective Cllineatins Given distinct planes π and π 0 in extended Euclidean space E3, and a pint n neither plane, the assciated ne-pint prjectin with center maps π bijectively nt

More information

VLBA Electronics Memo No. 737

VLBA Electronics Memo No. 737 VLBA Electrnics Mem N. 737 U S I N G PULSECAL A M P L I T U D E S TO D E T E R M I N E SYSTEM T E M P E R A T U R E D.S.Bagri 1993Mar05 INTRODUCTION System temperature is nrmally measured using mdulated

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

P ^ DETERMINATION OF. Part I. Doner, W3FAL. maximum ratings and typical operating conditions. service are given below. This procedure may

P ^ DETERMINATION OF. Part I. Doner, W3FAL. maximum ratings and typical operating conditions. service are given below. This procedure may 1 AT P ^ -, r A PUBLICATION OF THE RCA ELECTRON TUBE DIVISION VOL., NO. 1, RADIO CORPORATION OF AMERICA DECEMBER, 1 DETERMINATION OF TYPICAL OPERATING CONDITIONS Fr RCA Tubes Used as Linear RF Pwer Amplifiers

More information

CANADIAN NICKEL COMPANY LIMITED GEOPHYSICAL ASSESSMENT REPORT CONGLOMERATE LAKE PROPERTY, ONTARIO MAGNETIC AND ELECTROMAGNETIC SURVEYS

CANADIAN NICKEL COMPANY LIMITED GEOPHYSICAL ASSESSMENT REPORT CONGLOMERATE LAKE PROPERTY, ONTARIO MAGNETIC AND ELECTROMAGNETIC SURVEYS 4ENE887.790 CASTLEWOOD LAKE 00 CANADIAN NICKEL COMPANY LIMITED GEOPHYSICAL ASSESSMENT REPORT CONGLOMERATE LAKE PROPERTY, ONTARIO MAGNETIC AND ELECTROMAGNETIC SURVEYS THUNDER BAY MINING DIVISION NTS: 4-E-

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

EEEE 381 Electronics I

EEEE 381 Electronics I EEEE 381 Electrnics I Lab #4: MOSFET Differential Pair with Active Lad Overview The differential amplifier is a fundamental building blck in electrnic design. The bjective f this lab is t examine the vltage

More information

Spatial Coherence of Nonlinear, Nonstationary, Non-gaussian Ocean Waves On a One-mile Scale from Scanning Radar Altimeter Data

Spatial Coherence of Nonlinear, Nonstationary, Non-gaussian Ocean Waves On a One-mile Scale from Scanning Radar Altimeter Data Spatial Cherence f Nnlinear, Nnstatinary, Nn-gaussian Ocean Waves On a One-mile Scale frm Scanning Radar Altimeter Data Edward J. Walsh, Cde 972 NASA Gddard Space Flight Center Labratry fr Hydrspheric

More information

What your Board Should look like!

What your Board Should look like! What yur Bard Shuld lk like! Fr almst every science fair prject, yu need t prepare a display bard t cmmunicate yur wrk t thers. In mst cases yu will use a standard, three-panel display bard that unflds

More information

MAGNETOMETER and HLEM SURVEY TALBOTT GRID. Talbott and Scholfield Townships Porcupine Mining Division Diatreme Explorations Inc.

MAGNETOMETER and HLEM SURVEY TALBOTT GRID. Talbott and Scholfield Townships Porcupine Mining Division Diatreme Explorations Inc. NTS: 42G/4 MAGNETMETER and HLEM SURVEY TALBTT GRID Talbtt and Schlfield Twnships Prcupine Mining Divisin Diatreme Explratins Inc. March 200 -f /r f*, 4* j[ Q f; 42G04NW2003 2.2506 SCHLFIELD 00 David Larnde

More information

CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT

CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI 600 025 GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT (Prescribed Frmat and Specificatin) 1. GENERAL: The guideline is intended t prvide brad guidelines

More information

IEEE C802.16h-06/029

IEEE C802.16h-06/029 Prject Title IEEE 802.16 Bradband Wireless Access Wrking Grup Timing fr sending messages using the frequency dmain energy pulses Date Submitted Surce(s) Re: Abstract Purpse Ntice

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6. Operational Amplifiers II

ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6. Operational Amplifiers II ADANA SCIENCE AND TECHNOLOGY UNIVERSITY ELECTRICAL ELECTRONICS ENGINEERING DEPARTMENT ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6 Operatinal Amplifiers II OPERATIONAL AMPLIFIERS Objectives The

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1 SUBMITTAL GUIDELINES FOR SITE PLAN & BUILDING ELEVATIONS APPROVAL Planning Department City f Cedar Hill Zning Regulatins requires a SITE PLAN and BUILDING ELEVATIONS t be apprved by the City Cuncil befre

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE 23rd Wrld Gas Cnference, Amsterdam 2006 MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE B. KORTTE USA ABSTRACT This paper details the features, functins and benefits f the Mueller C. MAGIC

More information

YOUR FUTURE STARTS AT IMEC

YOUR FUTURE STARTS AT IMEC IMEC IN NUMBERS YOUR FUTURE STARTS AT IMEC Last year, mre than 300 Ph.D. researchers cntributed with their wrk t imec s lng-term research. 2,300 Mre than peple wrk at imec, 36% f which are guest researchers

More information

Foam Rocket. Rocket Activity. Objective Students will learn about rocket stability and trajectory with rubber band-powered foam rockets.

Foam Rocket. Rocket Activity. Objective Students will learn about rocket stability and trajectory with rubber band-powered foam rockets. Rcket Activity Fam Rcket Objective Students will learn abut rcket stability and trajectry with rubber band-pwered fam rckets. Descriptin Students will cnstruct rckets made frm pipe insulating fam and use

More information

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS Carsn City Building Divisin 108 E. Prctr Street Carsn City, Nevada 89701 (775) 887-2310 Hearing Impaired: 711 bldgdiv@carsn.rg www.carsn.rg/building MANUFACTURED HOME New Hmes, Replacements, and Additins

More information

Power Splitters & Dividers

Power Splitters & Dividers Pwer Splitters & Dividers Bradband Frequency Range - dc t 40 GHz Widest Selectin f cnnectr types & Frequency xpress shipment available n select mdels. 4-Way Designs Available High Quality Cnstructin &

More information

Application Note: Conducted Immunity: Quick Guide

Application Note: Conducted Immunity: Quick Guide icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas

More information

PRINTING WORKPAPERS MODULE. Introduction. Objectives

PRINTING WORKPAPERS MODULE. Introduction. Objectives MODULE 3 PRINTING WORKPAPERS Intrductin Several reprts are created in the WrkPapers mdule. Thrugh the print screen the user can preview and print hardcpies f the varius reprts. Preview and print, as necessary,

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Experiment 6 Electronic Switching

Experiment 6 Electronic Switching Experiment 6 Electrnic Switching Purpse: In this experiment we will discuss ways in which analg devices can be used t create binary signals. Binary signals can take n nly tw states: high and lw. The activities

More information

536055*5838 W KIPPEN LAKE. ONTARIO l ', l type of work to b* THE MINING ACT REPORT OF WORK recorded.

536055*5838 W KIPPEN LAKE. ONTARIO l ', l type of work to b* THE MINING ACT REPORT OF WORK recorded. n 536055*5838 W7102-00109 KIPPEN LAKE ONTARIO l ', l type f wrk t b* THE MINING ACT REPORT OF WORK recrded. 010 T the Recrder f...rsd. JL-AK&,...Mining Divisin.0*3.10^.8.^..^^ name f Recrded Hlder Miner's

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

A4: Color. Light: You can usually any lighting that you wish.

A4: Color. Light: You can usually any lighting that you wish. Art 205 A4: Clr Original RAW Shts Due: Crit Date: Requires 2 Ink Jet Prints Munting Crrectly can btain 5 pints extra credit. (50 pints) Objectives: 1. Learn basic clr schemes fr design and aesthetics.

More information

CHAPTER SIX GLOBAL POSITIONING SYSTEM (GPS)

CHAPTER SIX GLOBAL POSITIONING SYSTEM (GPS) CHAPTER SIX GLOBAL POSITIONING SYSTEM (GPS) 6 GLOBAL POSITIONING SYSTEM (GPS) 6 OVERVIEW Glbal Psitining System (GPS) is a tl that the cnstructin industry has adpted frm the United States Military. It

More information

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017 Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

Machine Shop Lab Manual GENERAL INSTRUCTION

Machine Shop Lab Manual GENERAL INSTRUCTION Machine Shp Lab Manual GENERAL INSTRUCTION 1. Every student shuld btain a set f instructin sheets entitled manufacturing prcesses Labratry. 2. Fr reasns f safety, every student must cme t the labratry

More information

A Report on Geophysical Survey on the Property, of EAST WEST RESOURCE CORPORATION/ CANADIAN GOLDEN DRAGON RESOURCES LTD Norton Lake Area

A Report on Geophysical Survey on the Property, of EAST WEST RESOURCE CORPORATION/ CANADIAN GOLDEN DRAGON RESOURCES LTD Norton Lake Area 42M14NE2001 2.28797 EAST OF NORTON LAKE Q10 A Reprt n Gephysical Survey n the Prperty, f EAST WEST RESOURCE CORPORATION/ CANADIAN GOLDEN DRAGON RESOURCES LTD Nrtn Lake Area Thunder Bay Mining Divisin,

More information

Modelling of Land Subsidence & Sea level rise in Semarang city, Indonesia

Modelling of Land Subsidence & Sea level rise in Semarang city, Indonesia Sessin 3.3.C Task 10 Mdelling f Land Subsidence & Sea level rise in Semarang city, Indnesia Expected time: 2.5 hur Data: Objectives: Data file: Sessin 3-3-C Task X MdellingSubsidenceSemarang After this

More information

TROUBLESHOOTING GUIDE

TROUBLESHOOTING GUIDE TROUBLESHOOTING GUIDE Dcument revisin 1.3 Last revised: December 6, 2017 Recn Wireless Blckage and Flw Mnitr Trubleshting Guide 2014-2017 Intelligent Agricultural Slutins All Rights Reserved. Recn Wireless

More information

Experiment 2 Complex Impedance, Steady State Analysis, and Filters

Experiment 2 Complex Impedance, Steady State Analysis, and Filters Experiment 2 Cmplex Impedance, Steady State Analysis, and Filters Purpse: The bjective f this experiment is t learn abut steady state analysis and basic filters. Backgrund: Befre ding this experiment,

More information

WiFi Lab C. Equipment Needs:

WiFi Lab C. Equipment Needs: WiFi Lab C Event Objective: Teams will cnstruct an antenna prir t the turnament that is designed t transmit a signal at 2.4 GHz and cmplete a written test n the principles f electrmagnetic wave prpagatin.

More information

Producing Research Posters

Producing Research Posters Dr Keith E. Fildes 21/23 Octber 2014 (with acknwledgments t Dr Lyuba Albul, CARR) Objectives This sessin will cver: The purpse f psters What shuld be included Design cnsideratins Getting started The fllw-up

More information

Radiated Susceptibility Investigation of Electronic Board from Near Field Scan Method

Radiated Susceptibility Investigation of Electronic Board from Near Field Scan Method Radiated Susceptibility Investigatin f Electrnic Bard frm Near Field Scan Methd Niclas LACRAMPE Wrk supprted by EFT SAFE3A research prject (Prject reference : ANR-14-CE22-0022) July, 6th 2017 Outline 1

More information

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start: Claim Amalgamatin Amalgamate means t jin 2 r mre cell claims int ne cell claim. Befre yu start: Yu will need t knw the title numbers f the cell titles fr amalgamatin. If yu are acting as an agent, yu must

More information

CPC1025NTR. 4 Pin SOP OptoMOS Relay

CPC1025NTR. 4 Pin SOP OptoMOS Relay 4 Pin SOP OptMOS Relay Units Lad Vltage 4 V Lad Current 12 ma Typ. R ON 2 Ω Features Small 4 Pin SOP Package Lw Drive Pwer Requirements (TTL/CMOS Cmpatible) N Mving Parts High Reliability Arc-Free With

More information

Study of Dipole Antenna Height for Radio Telescope According to Baghdad Location

Study of Dipole Antenna Height for Radio Telescope According to Baghdad Location Study f Diple Antenna Height fr Radi Telescpe Accrding t Baghdad Lcatin Kamal M. Abd 1, Mretadha J. Kadhim and Zinah F. Kadhim 3 1 Department f Astrnmy and Space, Cllege f Science, University f Baghdad,

More information

CUSTOMER PORTAL. Floorplan Management

CUSTOMER PORTAL. Floorplan Management CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm

More information

Investigating Dominant Scatterers in Urban Street Microcell Propagation Channel

Investigating Dominant Scatterers in Urban Street Microcell Propagation Channel EUROPEAN COOPERATION IN THE FIELD OF SCIENTIFIC AND TECHNICAL RESEARCH EURO-COST SOURCE: Tky Institute f Technlgy, Japan COST 7 TD(04) 54 Duisburg, Germany 004/Sep./0- Investigating Dminant Scatterers

More information

PRELIMINARY CPC1017NTR. 4 Pin SOP OptoMOS Relays

PRELIMINARY CPC1017NTR. 4 Pin SOP OptoMOS Relays 4 Pin SOP OptMOS Relays Units Lad Vltage 6 V Lad Current 1 ma Max R ON 16 Ω Current t perate 1. ma eatures Design fr use in security systems cmplying with EN13-4 Only 1mA f LED curent required t perate

More information

Radiofrequency Radiation Assessment Report

Radiofrequency Radiation Assessment Report Radifrequency Radiatin Assessment Reprt Cathlic Schls Office Lismre Xavier Cathlic Cllege and Hly Family Primary Schl July 2014 Reference: C109995:J123349 Nel Arnld & Assciates Pty Ltd Level 1, 2 Mayneview

More information

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...

More information

z. 131 a? PETAWANGA LAKE .1310? GEOPHYSICAL REPORT ON THE RYLEY CORMAC PROPERTY PETAWANGA LAKE AREA DISTRICT OF THUNDER BAY ONTARIO

z. 131 a? PETAWANGA LAKE .1310? GEOPHYSICAL REPORT ON THE RYLEY CORMAC PROPERTY PETAWANGA LAKE AREA DISTRICT OF THUNDER BAY ONTARIO z. 131 a? PETAWANGA LAKE 010 RECEIVED.1310? MINING LANDS SECTIN GEPYSICAL REPRT N TE RYLEY CRMAC PRPERTY PETAWANGA LAKE AREA DISTRICT F TUNDER BAY NTARI BY ALPAMAY EXPLRATIN AND ADVENTURE SERVICES (^PRDUCTIN-

More information

King Saud University. College of Engineering. IE 341: Human Factors Engineering

King Saud University. College of Engineering. IE 341: Human Factors Engineering King Saud University Cllege f Engineering IE 341: Human Factrs Engineering Fall 2016 (1 st Sem. 1437-8H) Chapter 10. Human Cntrl f Systems Tracking (Part 1) Prepared by: Ahmed M. El-Sherbeeny, PhD 1 PART

More information

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1 Altis Flight Manager PC applicatin fr AerbTec devices AerbTec Altis v3 User Manual 1 Table f Cntents Intrductin...3 Requirements...3 Installatin...3 Applicatin...3 USB Driver fr Altis v3 interface ALink...4.NET

More information

CPC1030NTR. 4 Pin SOP OptoMOS Relay

CPC1030NTR. 4 Pin SOP OptoMOS Relay 4 Pin SOP OptMOS Relay Units Lad Vltage 3 V Lad Current 1 ma Max R ON Ω Features Small 4 Pin SOP Package Lw Drive Pwer Requirements (TTL/CMOS Cmpatible) N Mving Parts High Reliability Arc-Free With N Snubbing

More information

Guide for ESP32-Sense Development Kit

Guide for ESP32-Sense Development Kit Guide fr ESP32-Sense Develpment Kit 1. Overview The ESP32 tuch sensr develpment kit, ESP32-Sense Kit, is used fr evaluating and develping ESP32 tuch sensr system. ESP32-Sense Kit cnsists f ne mtherbard

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE First Meeting f the AFI VSAT Netwrks Managers (AFI VSAT/1) (Kwa-Zulu Natal, Suth Africa, 13 t 15 June 2011) Agenda Item 6: Need fr

More information

Multistate Mobility Performance Monitoring

Multistate Mobility Performance Monitoring Great Lakes Reginal Operatins Calitin (GLRTOC) Multistate Mbility Perfrmance Mnitring September 2015 GLRTOC Members The Great Lakes Reginal Transprtatin Operatins Calitin was funded in May 2010, and was

More information

THE PORT HUENEME EARTHQUAKE OF MARCH 18, 1957 By G. W. HOUSNER and D. E. HUDSON

THE PORT HUENEME EARTHQUAKE OF MARCH 18, 1957 By G. W. HOUSNER and D. E. HUDSON Bulletin f the Seismlgical Sciety f America. Vl. 48, pp. 163-168. April 1958 THE PORT HUENEME EARTHQUAKE OF MARCH 18, 1957 By G. W. HOUSNER and D. E. HUDSON ABSTRACT The Prt Hueneme earthquake f March

More information

A LOGISTICAL AND INTERPRETIVE REPORT SPECTRAL IP, RESISTIVITY, HLEM AND MAGNETOMETER SURVEYS CONDUCTED ON THE SUNSHINE LAKE PROPERTY DRYDEN, ONTARIO

A LOGISTICAL AND INTERPRETIVE REPORT SPECTRAL IP, RESISTIVITY, HLEM AND MAGNETOMETER SURVEYS CONDUCTED ON THE SUNSHINE LAKE PROPERTY DRYDEN, ONTARIO A LGISTICAL AND INTERPRETIVE REPRT N SPECTRAL IP, RESISTIVITY, HLEM AND MAGNETMETER SURVEYS CNDUCTED N THE SUNSHINE LAKE PRPERTY DRYDEN, NTARI FR BLACK PEARL MINERALS BY JVX LTD. RECEIVED JAN 17 1997 MINING

More information

Property Address/Location: Case No.: (to be completed by Staff)

Property Address/Location: Case No.: (to be completed by Staff) Site Develpment Plan Applicatin Checklist City f Greenwd Village Cmmunity Develpment Department 6060 S. Quebec Street Greenwd Village, CO 80111-4591 (303) 486-5783; FAX (303) 773-1238 Prperty Address/Lcatin:

More information