1 ADDENDUM # 02 Date: April 6, 2017 Reference: Network Electronics RFP Number: The following questions were submitted for clarification and/or to request additional information. All questions that were submitted are listed below, along with the response and/or information requested. Effective this date, this addendum forms part of the contract documents and modifies the original RFP. Question # 1: Response # 1: Would it be possible to get a diagram of the proposed WAN solution which would include the 4 rings, 4 Sub Ring Nodes, the Super Ring for Pickens Data Center WAN Equipment and the Super Ring for the Internet Point of Presence WAN Equipment? A diagram showing the connectivity between these devices would be very helpful. A graphic will not be provided. Use the section and the detailed specifications outlined in the RFP for your design guide. Question #2: Response #2: Can we get a breakdown by location and by TR of the number of switches per closet connecting back to the Core Layer 3 Switch so we can determine the length of stacking cables and the number of SR SFPs that will be needed at each location? See attached. Question #3: Response #3: For each of the Layer 3 switches at the Elementary School, Middle School, High School and District Facilities, it appears that the RFP is requesting a specific number of SR SFP+ for closet connectivity. Should we stick with the number requested or should we only specify the SR SFP+ that are necessary based upon our design? Submit as specified for selection committee comparison. Provide modifications or alternate submission on separate submission forms / spreadsheets for selection committee review. 1

2 ADDENDUM # 02 Date: April 6, 2017 Reference: Network Electronics RFP Number: Question #4: No. Section Page Questions 1 General Can we use our typical response document to submit the RFP response? Response: We don t know what your typical response document is. Please meet the proposal submission requirements. 2 General Once selected, what is the process and schedule to validate assumptions and clarify scope and design? Response: Timeline will be defined after the district receives a Funding Commitment Decision Letter (FCDL). If funded, a kickoff meeting will be scheduled with the awarded vendor to define processes and schedules Are we to assume no WLAN gear is being quoted. It is just referenced as requirements for the Layer 2 connectivity. Response: Correct, No Wireless Local Area Network (WLAN) equipment is requested in this RFP What cables will be required? Just patching? If not, we'll need to get BT engaged. Response: Yes, just patching. Existing inventory will be utilized first "All systems must run a standard OS" - Does this include the 10G and 40G solution switches? (The 40G density of some of the components may require a Nexus) Response: Document any exception to utilizing standard OS in your proposal "Must be able to upgrade from 10G-40G without adding a module." Are we to add the 40GB module in the response even though they are not currently required? Response: Proposal as a separate added value line item for reference "The LAN solution should provide the ability to stack switches up to 10 high." - Max switches for a Cisco stack is 9? Are we to quote two stacks if over nine switches are required? Response: Yes "Ability to create a virtual chassis in geographically diverse locations." Is this for all switches? (This requires Nexus or VSS both of which will increase the cost dramatically if it is a requirement for everywhere) Response: No. Virtual Chassis is for the Support Center and Carrier Neutral Data Center Locations "Estimated calendar for procurement and installation Are there specific phases? Response: Provide vendor projected procurement and installation timelines in days Where "limited lifetime/enhanced limited lifetime" warranty from Cisco is not available are we safe to assume that SMARTnet up to maximum offer period prior to EOL of the product is sufficient? Response: Yes. Document ERate Eligibility percentage of each line item. 2

3 ADDENDUM # 02 Date: April 6, 2017 Reference: Network Electronics RFP Number: No. Section Page Questions Operational Support Cost - Are we to quote monitoring and management of the in-scope equipment? Response: This is vendor defined optional added value services for district consideration Is a fixed price quote an option for configuration and install? Versus hourly rate. Response: Yes, Fixed Price. Further delineation by unit can be provided in Is it acceptable to combine Configuration Price and Installation price? Response: No. The district may optionally leverage district resources for installation and/or configuration Once hardware is delivered to District location (FOB), will Contractor be responsible for inventory pickup/movement between District sites for installation? Does District require use of District inventory system, or should Contractor plan to use Contractor's inventory system, with District's site configured as a consigned inventory location? Response: Vendor is responsible for all equipment management until district signoff. Vendor will use district inventory system and naming conventions. Question # 5: Response #5: Can you please clarify the District s request in Table: Design Guide for Network Electronics on pages 9 and 10? What is the design requirement driving the use of (2) Layer 3 12 port switches vs (1) 24 port fiber switch (for example Ambler Elementary)? Will the District accept bids for switching only without the Integrated Services Router Voice Equipment in 4.4.4? What model handsets does the District use? Two 12 port Layer 3 fiber switches are preferred. 24 port add alternate line items for district consideration can be proposed. This is not an all or none RFP. Proposals without are acceptable. Handsets used: Cisco CP-6921, CP-7921G, CP-7925G, CP-7942G, CP-7962G, CP-9971 Question #6: For section 4.4.1, can SDPC please provide a Proposed WAN Diagram to include Super Ring and Sub Ring elements? For section 4.4.1, Super Ring for Pickens Data Center WAN Equipment, can this solution be accomplished with a multi switch solution running VSS or Stacking? Response #6: A graphic will not be provided. Use the section and the detailed specifications outlined in the RFP for your design guide All other requirements and provisions of the Request for Proposals remain unchanged. 3

4 1 AITS IDF1 "1" "WS C PS" V AITS IDF2 "1" "WS C PS" V AITS IDF3 "1" "WS C PS" V AITS IDF4 "1" "WS C PS" V AITS IDF5 "1" "WS C3560G 48PS" V Central Services MDF Stack "1" "WS C P" V Central Services MDF Stack "2" "WS C P" V Central Services MDF Stack "3" "WS C P" V Central Services IDF1 "1" "WS C TS" V Central Services IDF2 "1" "WS C TS" V Central Services IDF3 "1" "WS C3560CG 8PC S" V Career & Technology Center MDF "1" "WS C3750G 12S E" Career & Technology Center MDF "1" "WS C2960S 48FPS L" V Career & Technology Center MDF "1" "WS C2960S 48FPS L" V Career & Technology Center MDF "1" "WS C2960S 48FPS L" V Career & Technology Center MDF "1" "WS C2960S 24PS L" V Career & Technology Center IDF1 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF1 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF1 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF1 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF2 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF2 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF3 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF3 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF3 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF3 "1" "WS C2960S 24PS L" V Career & Technology Center IDF4 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF4 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF4 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF4 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF4 "1" "WS C2960S 48FPS L" V Career & Technology Center IDF4 "1" "WS C2960S 48FPS L" V Ambler Elementary MDF "1" "WS C3750X 12S" V Ambler Elementary MDF "1" "WS C2960S 48FPS L" V Ambler Elementary MDF "1" "WS C2960S 48FPS L" V Ambler Elementary MDF "1" "WS C2960S 24PS L" V Ambler Elementary MDF "1" "WS C PS" V Ambler Elementary IDF1 "1" "WS C2960S 48FPS L" V Ambler Elementary IDF1 "1" "WS C2960S 24PS L" V Ambler Elementary IDF2 "1" "WS C2960S 24PS L" V Central Elementary MDF "1" "WS C3750X 12S" V Central Elementary MDF "1" "WS C2960S 48FPS L" V Central Elementary MDF "1" "WS C2960S 48FPS L" V Central Elementary MDF "1" "WS C2960S 48FPS L" V Central Elementary IDF1 "1" "WS C2960S 48FPS L" V03 48

5 50 Central Elementary IDF1 "1" "WS C2960S 24PS L" V Central Elementary IDF1 "1" "WS C2960S 24PS L" V Central Elementary IDF2 "1" "WS C2960S 48FPS L" V Central Elementary IDF2 "1" "WS C2960S 24PS L" V Crosswell Elementary MDF Stack "1" "WS C P" V Crosswell Elementary MDF Stack "2" "WS C P" V Crosswell Elementary MDF Stack "3" "WS C P" V Crosswell Elementary IDF1 "1" "WS C PS" V Crosswell Elementary IDF1 "1" "WS C2960X 48FPS L" V Crosswell Elementary IDF2 "1" "WS C PS" V Crosswell Elementary IDF2 "1" "WS C2960X 48FPS L" V Crosswell Elementary IDF4 "1" "WS C2960X 48FPS L" V Dacsusville Elementary MDF "1" "WS C3750G 12S" V Dacsusville Elementary MDF "1" "WS C2960S 48FPS L" V Dacsusville Elementary MDF "1" "WS C2960S 48FPS L" V Dacsusville Elementary MDF "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF1 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF1 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF1 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF1 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF2 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF3 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF3 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF3 "1" "WS C2960S 24PS L" V Dacsusville Elementary IDF4 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF4 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF4 "1" "WS C2960S 48FPS L" V Dacsusville Elementary IDF4 "1" "WS C2960S 24PS L" V Dacsusville Elementary IDF4 "1" "WS C2960S 48FPS L" V East End Elementary MDF Stack "1" "WS C P" V East End Elementary MDF Stack "2" "WS C P" V East End Elementary MDF "1" "WS C2960X 48FPS L" V East End Elementary IDF1 "1" "WS C PS" V East End Elementary IDF1 "1" "WS C2960X 48FPS L" V East End Elementary IDF2 "1" "WS C PS" V East End Elementary IDF2 "1" "WS C2960X 48FPS L" V East End Elementary IDF3 "1" "WS C PS" V East End Elementary IDF3 "1" "WS C2960X 48FPS L" V East End Elementary IDF4 "1" "WS C PS" V East End Elementary IDF4 "1" "WS C PS" V East End Elementary IDF4 "1" "WS C2960X 48FPS L" V Forest Acres Elementary MDF Stack "1" "WS C P" V Forest Acres Elementary MDF Stack "2" "WS C P" V Forest Acres Elementary MDF "1" "WS C3560 8PC" V Forest Acres Elementary MDF "1" "WS C2960X 48FPS L" V01 48

6 99 Forest Acres Elementary IDF1 "1" "WS C PS" V Forest Acres Elementary IDF1 "1" "WS C3560 8PC" V Forest Acres Elementary IDF1 "1" "WS C2960X 48FPS L" V Forest Acres Elementary IDF2 "1" "WS C PS" V Forest Acres Elementary IDF2 "1" "WS C2960X 48FPS L" V Forest Acres Elementary IDF3 "1" "WS C PS" V Forest Acres Elementary IDF3 "1" "WS C PS" V Forest Acres Elementary IDF3 "1" "WS C2960X 48FPS L" V Hagood Elementary MDF "1" "WS C3750X 12S" V Hagood Elementary MDF "1" "WS C2960S 48FPS L" V Hagood Elementary MDF "1" "WS C2960S 48FPS L" V Hagood Elementary MDF "1" "WS C2960S 48FPS L" V Hagood Elementary MDF "1" "WS C2960S 48FPS L" V Hagood Elementary IDF1 "1" "WS C2960S 48FPS L" V Hagood Elementary IDF2 "1" "WS C2960S 48FPS L" V Liberty Elementary MDF "1" "WS C3750X 12S" V Liberty Elementary MDF "1" "WS C2960S 48FPS L" V Liberty Elementary MDF "1" "WS C2960S 48FPS L" V Liberty Elementary MDF "1" "WS C2960S 48FPS L" V Liberty Elementary MDF "1" "WS C2960S 48FPS L" V Liberty Elementary MDF "1" "WS C2960S 24PS L" V Liberty Elementary IDF1 "1" "WS C2960S 48FPS L" V Liberty Elementary IDF1 "1" "WS C2960S 48FPS L" V Liberty Elementary IDF1 "1" "WS C2960S 48FPS L" V Liberty Elementary IDF1 "1" "WS C2960S 24PS L" V Liberty Elementary IDF1 "1" "WS C PS" V Liberty Elementary IDF2 "1" "WS C2960S 48FPS L" V McKissick Elementary MDF Stack "1" "WS C P" V McKissick Elementary MDF Stack "2" "WS C P" V McKissick Elementary MDF "1" "WS C2960S 48FPS L" V McKissick Elementary MDF "1" "WS C2960S 48FPS L" V McKissick Elementary IDF1 "1" "WS C2960S 48FPS L" V McKissick Elementary IDF2 "1" "WS C2960S 48LPS L" V McKissick Elementary IDF2 "1" "WS C2960S 48LPS L" V McKissick Elementary IDF2 "1" "WS C2960S 24PS L" V McKissick Elementary IDF4 "1" "WS C2960S 48FPS L" V McKissick Elementary IDF4 "1" "WS C2960S 48FPS L" V McKissick Elementary IDF6 "1" "WS C2960S 48FPS L" V McKissick Elementary IDF6 "1" "WS C2960S 48FPS L" V McKissick Elementary IDF6 "1" "WS C2960S 48FPS L" V Clemson Elementary MDF Stack "1" "WS C P" V Clemson Elementary MDF Stack "2" "WS C P" V Clemson Elementary MDF "1" "WS C2960X 48FPS L" V Clemson Elementary IDF1 "1" "WS C PS" V Clemson Elementary IDF1 "1" "WS C2960X 48FPS L" V01 48

7 148 Clemson Elementary IDF2 "1" "WS C PS" V Clemson Elementary IDF2 "1" "WS C PS" V Clemson Elementary IDF2 "1" "WS C2960X 48FPS L" V Clemson Elementary IDF3 "1" "WS C PS" V Clemson Elementary IDF3 "1" "WS C PS" V Clemson Elementary IDF3 "1" "WS C2960X 48FPS L" V Clemson Elementary IDF4 "1" "WS C PS" V Clemson Elementary IDF4 "1" "WS C PS" V Clemson Elementary IDF4 "1" "WS C2960X 48FPS L" V Clemson Elementary IDF5 "1" "WS C2960X 24PS L" V Pickens Elementary MDF "1" "WS C3750X 48P" V Pickens Elementary MDF "1" "WS C2960S 48FPS L" V Pickens Elementary MDF "1" "WS C2960S 24PS L" V Pickens Elementary IDF1 "1" "WS C2960S 48FPS L" V Pickens Elementary IDF1 "1" "WS C2960S 48FPS L" V Pickens Elementary IDF2 "1" "WS C2960S 48FPS L" V Pickens Elementary IDF2 "1" "WS C2960S 48FPS L" V Six Mile Elementary MDF Stack "1" "WS C P" V Six Mile Elementary MDF Stack "2" "WS C P" V Six Mile Elementary MDF Stack "3" "WS C P" V Six Mile Elementary MDF "1" "WS C2960X 48FPS L" V Six Mile Elementary IDF1 "1" "WS C PS" V Six Mile Elementary IDF1 "1" "WS C2960X 48FPS L" V Six Mile Elementary IDF2 "1" "WS C PS" V Six Mile Elementary IDF2 "1" "WS C2960X 48FPS L" V West End Elementary MDF "1" "WS C3750X 12S" V West End Elementary MDF "1" "WS C2960S 48FPS L" V West End Elementary MDF "1" "WS C2960S 48FPS L" V West End Elementary MDF "1" "WS C2960S 48FPS L" V West End Elementary MDF "1" "WS C2960S 48FPS L" V West End Elementary MDF "1" "WS C2960S 24PS L" V West End Elementary IDF1 "1" "WS C2960S 48FPS L" V West End Elementary IDF1 "1" "WS C2960S 24PS L" V West End Elementary IDF2 "1" "WS C2960S 48FPS L" V West End Elementary IDF2 "1" "WS C2960S 24PS L" V West End Elementary IDF3 "1" "WS C2960S 48FPS L" V Dacusville Middle MDF "1" "WS C3750G 48PS" V Dacusville Middle MDF "1" "WS C3560G 48PS" V Dacusville Middle MDF "1" "WS C3560G 48PS" V Dacusville Middle MDF "1" "WS C3560G 48PS" V Dacusville Middle IDF1 "1" "WS C3560G 48PS" V Dacusville Middle IDF1 "1" "WS C PS" V Dacusville Middle IDF2 "1" "WS C3560G 48PS" V Dacusville Middle IDF2 "1" "WS C3560G 48PS" V Dacusville Middle IDF2 "1" "WS C3560G 24PS" V08 24

8 197 Dacusville Middle IDF3 "1" "WS C3560G 24PS" V Edwards Middle MDF Stack "1" "WS C3750G 48PS" V Edwards Middle MDF Stack "2" "WS C3750G 48PS" V Edwards Middle MDF "1" "WS C3560G 48PS" V Edwards Middle MDF "1" "WS C3560G 48PS" V Edwards Middle MDF "1" "WS C3560G 48PS" V Edwards Middle MDF "1" "WS C2960S 48FPS L" V Edwards Middle MDF "1" "WS C2960S 48FPS L" V Edwards Middle IDF1 "1" "WS C3560G 48PS" V Edwards Middle IDF1 "1" "WS C3560G 48PS" V Edwards Middle IDF1 "1" "WS C3560G 24PS" V Edwards Middle IDF2 "1" "WS C3560G 48PS" V Edwards Middle IDF2 "1" "WS C3560G 24PS" V Edwards Middle IDF2 "1" "WS C2960S 48FPS L" V Edwards Middle IDF2 "1" "WS C2960S 48FPS L" V Edwards Middle IDF3 "1" "WS C2960S 48FPS L" V Edwards Middle IDF3 "1" "WS C2960S 48FPS L" V Edwards Middle IDF4 "1" "WS C2960S 48FPS L" V Edwards Middle IDF4 "1" "WS C2960S 48FPS L" V Edwards Middle IDF4 "1" "WS C2960S 48FPS L" V Gettys Middle MDF "1" "WS C3750G 12S" V Gettys Middle MDF "1" "WS C3750X 48P" V Gettys Middle MDF "1" "WS C3750X 48P" V Gettys Middle MDF "1" "WS C P" V Gettys Middle IDF1 "1" "WS C2960S 48FPS L" V Gettys Middle IDF1 "1" "WS C P" V Gettys Middle IDF1 "1" "WS C P" V Gettys Middle IDF1 "1" "WS C P" V Gettys Middle IDF1 "1" "WS C PS" V Gettys Middle IDF1 "1" "WS C PS" V Gettys Middle IDF2 "1" "WS C2960S 48FPS L" V Gettys Middle IDF2 "1" "WS C P" V Gettys Middle IDF2 "1" "WS C PS" V Gettys Middle IDF2 "1" "WS C2960S 48FPS L" V Gettys Middle IDF3 "1" "WS C2960S 48FPS L" V Gettys Middle IDF3 "1" "WS C P" V Gettys Middle IDF3 "1" "WS C P" V Gettys Middle IDF3 "1" "WS C2960S 48FPS L" V Gettys Middle IDF4 "1" "WS C2960S 48FPS L" V Gettys Middle IDF4 "1" "WS C P" V Gettys Middle IDF4 "1" "WS C P" V Gettys Middle IDF5 "1" "WS C2960S 48FPS L" V Gettys Middle IDF5 "1" "WS C2960S 24PS L" V Gettys Middle IDF6 Stack "1" "WS C P" V Gettys Middle IDF6 Stack "2" "WS C P" V Gettys Middle IDF6 "1" "WS C2960S 24PS L" V Gettys Middle IDF7 "1" "WS C2960S 24PS L" V02 24

9 246 Gettys Middle IDF7 "1" "WS C PS" V Gettys Middle IDF8 "1" "WS C2960X 24PS L" V Liberty Middle MDF "1" "WS C3750X 48P" V Liberty Middle MDF "1" "WS C2960S 48FPS L" V Liberty Middle MDF "1" "WS C2960S 48FPS L" V Liberty Middle MDF "1" "WS C2960S 48FPS L" V Liberty Middle MDF "1" "WS C2960S 48FPS L" V Liberty Middle MDF "1" "WS C2960S 48FPS L" V Liberty Middle MDF "1" "WS C2960S 48FPS L" V Liberty Middle IDF1 "1" "WS C2960S 48FPS L" V Liberty Middle IDF1 "1" "WS C2960S 48FPS L" V Liberty Middle IDF1 "1" "WS C2960S 48FPS L" V Liberty Middle IDF1 "1" "WS C2960S 24PS L" V Liberty Middle IDF2 "1" "WS C2960S 48FPS L" V Liberty Middle IDF8 "1" "WS C2960S 24PS L" V Liberty Middle IDF3 "1" "WS C2960S 48FPS L" V Liberty Middle IDF3 "1" "WS C2960S 48FPS L" V Pickens Middle MDF "1" "WS C3750X 12S" V Pickens Middle MDF "1" "WS C2960S 48FPS L" V Pickens Middle MDF "1" "WS C2960S 48FPS L" V Pickens Middle MDF "1" "WS C2960S 48FPS L" V Pickens Middle MDF "1" "WS C2960S 48FPS L" V Pickens Middle IDF1 "1" "WS C2960S 48FPS L" V Pickens Middle IDF1 "1" "WS C2960S 48FPS L" V Pickens Middle IDF2 "1" "WS C2960S 48FPS L" V Pickens Middle IDF2 "1" "WS C2960S 48FPS L" V Pickens Middle IDF2 "1" "WS C2960S 48FPS L" V Pickens Middle IDF2 "1" "WS C2960S 48FPS L" V Pickens Middle IDF2 "1" "WS C2960S 48FPS L" V Pickens Middle IDF3 "1" "WS C2960S 48FPS L" V Pickens Middle IDF3 "1" "WS C2960S 48FPS L" V Pickens Middle IDF3 "1" "WS C2960S 24PS L" V Pickens Middle IDF4 "1" "WS C2960S 48FPS L" V Pickens Middle IDF4 "1" "WS C2960S 48FPS L" V Pickens Middle IDF4 "1" "WS C2960S 48FPS L" V Pickens Middle IDF5 "1" "WS C2960S 48FPS L" V Pickens Middle IDF5 "1" "WS C2960S 48FPS L" V Daniel High MDF "1" "WS C3750X 24S" V Daniel High MDF "1" "WS C2960S 48FPS L" V Daniel High MDF "1" "WS C2960S 48FPS L" V Daniel High MDF "1" "WS C2960S 48FPS L" V Daniel High MDF "1" "WS C2960S 48FPS L" V Daniel High MDF "1" "WS C2960S 24PS L" V Daniel High IDF1 "1" "WS C2960S 48FPS L" V Daniel High IDF1 "1" "WS C2960S 48FPS L" V Daniel High IDF1 "1" "WS C2960S 48FPS L" V03 48

10 295 Daniel High IDF2 "1" "WS C2960S 48FPS L" V Daniel High IDF5 "1" "WS C2960S 48FPS L" V Daniel High IDF5 "1" "WS C2960S 48FPS L" V Daniel High IDF3 "1" "WS C2960S 48FPS L" V Daniel High IDF3 "1" "WS C2960S 24PS L" V Daniel High IDF4 "1" "WS C2960S 48FPS L" V Daniel High IDF4 "1" "WS C2960S 48FPS L" V Daniel High IDF4 "1" "WS C2960S 48FPS L" V Daniel High IDF4 "1" "WS C2960S 24PS L" V Daniel High IDF5 "1" "WS C2960S 48FPS L" V Daniel High IDF5 "1" "WS C2960S 48FPS L" V Daniel High IDF5 "1" "WS C2960S 48FPS L" V Daniel High IDF5 "1" "WS C2960S 48FPS L" V Daniel High IDF5 "1" "WS C2960S 24PS L" V Daniel High IDF6 "1" "WS C2960S 48FPS L" V Daniel High IDF6 "1" "WS C2960S 48FPS L" V Daniel High IDF6 "1" "WS C2960S 48FPS L" V Daniel High IDF6 "1" "WS C2960S 24PS L" V Daniel High IDF7 "1" "WS C2960S 48FPS L" V Daniel High IDF7 "1" "WS C2960S 48FPS L" V Daniel High IDF7 "1" "WS C2960S 48FPS L" V Daniel High IDF7 "1" "WS C2960S 24PS L" V Daniel High IDF8 "1" "WS C2960S 48FPS L" V Daniel High IDF9 "1" "WS C PS" V Daniel High IDF10 "1" "WS C3560CG 8PC S" V Daniel High IDF11 "1" "WS C3560CG 8PC S" V Liberty High MDF Stack "1" "WS C3750G 12S" V Liberty High MDF Stack "2" "WS C3750G 12S" V Liberty High MDF "1" "WS C2960S 48FPS L" V Liberty High MDF "1" "WS C2960S 48FPS L" V Liberty High MDF "1" "WS C2960S 48FPS L" V Liberty High MDF "1" "WS C2960S 48FPS L" V Liberty High MDF "1" "WS C2960S 48FPS L" V Liberty High IDF1 "1" "WS C2960S 48FPS L" V Liberty High IDF1 "1" "WS C2960S 48FPS L" V Liberty High IDF1 "1" "WS C2960S 48FPS L" V Liberty High IDF1 "1" "WS C2960S 48FPS L" V Liberty High IDF1 "1" "WS C2960S 48FPS L" V Liberty High IDF1 "1" "WS C2960S 24PS L" V Liberty High IDF2 "1" "WS C2960S 48FPS L" V Liberty High IDF2 "1" "WS C2960S 48FPS L" V Liberty High IDF2 "1" "WS C2960S 48FPS L" V Liberty High IDF2 "1" "WS C2960S 48FPS L" V Liberty High IDF3 "1" "WS C2960S 48FPS L" V Liberty High IDF3 "1" "WS C2960S 48FPS L" V Liberty High IDF3 "1" "WS C2960S 24PS L" V Liberty High IDF4 "1" "WS C2960S 48FPS L" V Liberty High IDF5 "1" "WS C2960S 48FPS L" V02 48

11 344 Liberty High IDF6 "1" "WS C2960S 48FPS L" V Liberty High IDF6 "1" "WS C2960S 48FPS L" V Liberty High IDF7 "1" "WS C2960S 48FPS L" V Liberty High IDF7 "1" "WS C2960S 48FPS L" V Liberty High IDF8 "1" "WS C2960S 48FPS L" V Liberty High IDF9 "1" "WS C3560CG 8PC S" V Liberty High IDF10 "1" "WS C PS" V Liberty High IDF11 "1" "WS C3560CG 8PC S" V Pickens High MDF Stack "1" "WS C3750G 12S" V Pickens High MDF Stack "2" "WS C3750G 12S" V Pickens High MDF "1" "WS C2960S 48FPS L" V Pickens High MDF "1" "WS C2960S 48FPS L" V Pickens High MDF "1" "WS C2960S 48FPS L" V Pickens High MDF "1" "WS C2960S 48FPS L" V Pickens High MDF "1" "WS C2960S 48FPS L" V Pickens High MDF "1" "WS C2960S 48FPS L" V Pickens High MDF "1" "WS C2960S 48FPS L" V Pickens High MDF "1" "WS C3560CG 8PC S" V Pickens High MDF "1" "WS C3560CG 8PC S" V Pickens High IDF1 "1" "WS C2960S 48FPS L" V Pickens High IDF1 "1" "WS C2960S 48FPS L" V Pickens High IDF1 "1" "WS C2960S 48FPS L" V Pickens High IDF1 "1" "WS C2960S 24PS L" V Pickens High IDF2 "1" "WS C2960S 48FPS L" V Pickens High IDF2 "1" "WS C2960S 48FPS L" V Pickens High IDF2 "1" "WS C2960S 48FPS L" V Pickens High IDF2 "1" "WS C PS" V Pickens High IDF3 "1" "WS C2960S 48FPS L" V Pickens High IDF3 "1" "WS C2960S 48FPS L" V Pickens High IDF3 "1" "WS C2960S 48FPS L" V Pickens High IDF3 "1" "WS C2960S 48FPS L" V Pickens High IDF3 "1" "WS C2960S 24PS L" V Pickens High IDF4 "1" "WS C2960S 48FPS L" V Pickens High IDF4 "1" "WS C2960S 48FPS L" V Pickens High IDF4 "1" "WS C2960S 48FPS L" V Pickens High IDF4 "1" "WS C2960S 48FPS L" V Pickens High IDF4 "1" "WS C2960S 48FPS L" V Pickens High IDF5 "1" "WS C2960S 48FPS L" V Pickens High IDF5 "1" "WS C2960S 24PS L" V Pickens High IDF6 "1" "WS C2960S 48FPS L" V Pickens High IDF6 "1" "WS C2960S 48FPS L" V Pickens High IDF7 "1" "WS C2960S 48FPS L" V Pickens High IDF7 "1" "WS C2960S 48FPS L" V Pickens High IDF8 "1" "WS C2960S 48FPS L" V Pickens High IDF8 "1" "WS C2960S 24PS L" V Pickens High IDF9 "1" "WS C2960S 48FPS L" V Pickens High IDF9 "1" "WS C2960S 48FPS L" V Pickens High IDF9 "1" "WS C2960S 48FPS L" V02 48

12 393 Pickens High IDF10 "1" "WS C2960S 48FPS L" V Pickens High IDF11 "1" "WS C3560CG 8PC S" V Pickens High IDF12 "1" "WS C PS" V Northside Center MDF "1" "WS C PS" V Northside Center MDF "1" "WS C PS" V Northside Center MDF "1" "WS C PS" V Skelton Center MDF "1" "WS C2960S 24PS L" V Skelton Center MDF "1" "WS C PS" V Chastain Road MDF "1" "WS C3750G 12S" V Chastain Road MDF "1" "WS C2960S 48FPS L" V Chastain Road MDF "1" "WS C2960S 48FPS L" V Chastain Road MDF "1" "WS C2960S 24PS L" V Chastain Road MDF "1" "WS C2960S 24PS L" V Chastain Road IDF1 "1" "WS C2960S 48FPS L" V Chastain Road IDF1 "1" "WS C2960S 48FPS L" V Chastain Road IDF1 "1" "WS C2960S 48FPS L" V Chastain Road IDF1 "1" "WS C2960S 24PS L" V Chastain Road IDF2 "1" "WS C2960S 48FPS L" V Chastain Road IDF3 "1" "WS C2960S 48FPS L" V Chastain Road IDF3 "1" "WS C2960S 48FPS L" V Chastain Road IDF3 "1" "WS C2960S 24PS L" V Chastain Road IDF4 "1" "WS C2960S 48FPS L" V Chastain Road IDF4 "1" "WS C2960S 48FPS L" V Chastain Road IDF4 "1" "WS C2960S 48FPS L" V Chastain Road IDF4 "1" "WS C2960S 24PS L" V Easley High MDF "1" "WS C3750X 24S" V Easley High MDF "1" "WS C2960S 48FPS L" V Easley High MDF "1" "WS C2960S 48FPS L" V Easley High MDF "1" "WS C2960S 48FPS L" V Easley High MDF "1" "WS C2960S 48FPS L" V Easley High MDF "1" "WS C2960S 48FPS L" V Easley High MDF "1" "WS C2960S 48FPS L" V Easley High IDF1 "1" "WS C2960S 48FPS L" V Easley High IDF1 "1" "WS C2960S 48FPS L" V Easley High IDF1 "1" "WS C2960S 48FPS L" V Easley High IDF1 "1" "WS C2960S 48FPS L" V Easley High IDF2 "1" "WS C2960S 48FPS L" V Easley High IDF2 "1" "WS C2960S 48FPS L" V Easley High IDF2 "1" "WS C2960S 48FPS L" V Easley High IDF2 "1" "WS C2960S 48FPS L" V Easley High IDF3 "1" "WS C2960S 48FPS L" V Easley High IDF4 "1" "WS C2960S 48FPS L" V Easley High IDF4 "1" "WS C2960S 48FPS L" V Easley High IDF4 "1" "WS C2960S 48FPS L" V Easley High IDF4 "1" "WS C2960S 48FPS L" V02 48

13 442 Easley High IDF4 "1" "WS C2960S 48FPS L" V Easley High IDF4 "1" "WS C2960S 48FPS L" V Easley High IDF4 "1" "WS C2960S 48FPS L" V Easley High IDF4 "1" "WS C2960S 24PS L" V Easley High IDF5 "1" "WS C2960S 48FPS L" V Easley High IDF5 "1" "WS C2960S 48FPS L" V Easley High IDF6 "1" "WS C2960S 48FPS L" V Easley High IDF6 "1" "WS C2960S 48FPS L" V Easley High IDF6 "1" "WS C2960S 24PS L" V Easley High IDF7 "1" "WS C PS" V Easley High IDF8 "1" "WS C2960S 48FPS L" V Easley High IDF9 "1" "WS C2960S 48FPS L" V Easley High IDF9 "1" "WS C2960S 48FPS L" V Easley High IDF9 "1" "WS C2960S 48FPS L" V Easley High IDF10 "1" "WS C2960S 48FPS L" V Easley High IDF11 "1" "WS C3560CG 8PC S" V Easley High IDF12 "1" "WS C3560CG 8PC S" V01 8

ADDENDUM # 01. Date: March 16, District- Wide Grease Trap Pumping Services. RFQ Number:

ADDENDUM # 01. Date: March 16, District- Wide Grease Trap Pumping Services. RFQ Number: ADDENDUM # 01 Date: March 16, 2017 Reference: District- Wide Grease Trap Pumping Services RFQ Number: 117-22-3-29 The following questions were submitted for clarification and/or to request additional information.

More information

CITY OF JOLIET ADDENDUM NO. 1 LOCAL AREA NETWORK (LAN) HARDWARE RFP

CITY OF JOLIET ADDENDUM NO. 1 LOCAL AREA NETWORK (LAN) HARDWARE RFP DEPARTMENT OF FINANCE PURCHASING DIVISION MARGARET E. MCEVILLY PHONE: 815/724-3925 FAX: 815/724-3929 mmcevilly@jolietcity.org CITY OF JOLIET ADDENDUM NO. 1 LOCAL AREA NETWORK (LAN) HARDWARE RFP 2215-1216

More information

COMMONWEALTH OF KENTUCKY DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

COMMONWEALTH OF KENTUCKY DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION COMMONWEALTH OF KENTUCKY DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION INVITATION TO BID NO: RFB-220-15 FOR: Upgrade to the Fiber Optic Network Western

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions RFP #1587 - CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions 1. Question: Spec requires connects to bitrans, are you going to modify the specs? Answer: City of Culver City s ATCS

More information

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement Following are the questions submitted on or before September 29, 2017, in accordance with RFP specifications. Responses to questions, clarifications of material, or corrections are indicated in green after

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 Piedmont Road San Jose, CA (408) (ph) (408) (fax) ADDENDUM #1

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 Piedmont Road San Jose, CA (408) (ph) (408) (fax) ADDENDUM #1 BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 Piedmont Road San Jose, CA 95132 (408) 923-1871 (ph) (408) 926-8329 (fax) ADDENDUM #1 BID PROPOSAL BID B-02-2014-15 WIFI EQUIPMENT FOR CATEGORY

More information

Solicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project.

Solicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project. Date: June 30, 2017 Project: Ketchikan Shipyard Transfer Carts Solicitation No.: 18002 Addendum No. One TO ALL PLANHOLDERS: The enclosed addendum amends the proposal documents for the above referenced

More information

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m. ADDENDUM No. 1 RFP No. 933 Gallup Park Custom Playground Equipment Design Due: Tuesday, August 4, 2015 by 10:00 a.m. The following changes, additions, and/or deletions shall be made to the Request for

More information

School City of Hobart

School City of Hobart School City of Hobart Request for Proposal Inter-Building Connectivity Base Bid 1: only Layer-2 services I. Request Overview and Definition of Terms We are requesting proposals for LAN connectivity between

More information

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR RFQ/RFP 15P40 Campus Center East HVAC Unit Replacement CHAFFEY COMMUNITY COLLEGE DISTRICT February 26, 2015 CHAFFEY COMMUNITY

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

Pickens. High School. SDPC Building Futures. School District of Pickens County

Pickens. High School. SDPC Building Futures. School District of Pickens County SDPC Building Futures Pickens High School 150 Blue Flame Drive Pickens, South Carolina 29671 phs.pickens.k12.sc.us School District of Pickens County In November 2006, the SDPC Board of Trustees approved

More information

REQUEST FOR QUOTATION INVITATION

REQUEST FOR QUOTATION INVITATION REQUEST FOR QUOTATION INVITATION DATE: July 15, 2010 DPS: REQUIREMENT: SUBJECT: Patricia Farina DPS Contract Administrator Email: Patricia.Farina@cityofchicago.org Telephone: 312-744-7660 Silver Halide

More information

Brian Swords, Mr. Phillip Bowers, Mrs. Judy Edwards, Mr. Alex Saitta and Dr. Henry

Brian Swords, Mr. Phillip Bowers, Mrs. Judy Edwards, Mr. Alex Saitta and Dr. Henry School District of Pickens County Minutes of Board of Trustees Called Board Meeting /Committee of the Whole Administrative Office Pickens County, South Carolina February 8, 2016 These minutes are not official

More information

DCC Trunked Radio System Proposer Questions and Answers, rev 2 September 28, 2011

DCC Trunked Radio System Proposer Questions and Answers, rev 2 September 28, 2011 Proposer questions are in Times New Roman plain text. Answers to proposer questions are in Times New Roman italics. General Q1. RFP Extension. Due to the large number of Buildings requiring In-Building

More information

Cisco Certification Exam

Cisco Certification Exam Cisco 642-732 Certification Exam Number: 642-732 Passing Score: 800 Time Limit: 120 min File Version: 23.4 http://www.gratisexam.com/ CISCO 642-732 EXAM QUESTIONS & ANSWERS Exam Name: CCNP Wireless - CUWSS

More information

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR ADDENDUM NO. 1 November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR North District Pre-Development Studies Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting

More information

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

B. Division-16 Basic Materials and Methods section apply to work specified in this section. Section 16745 PREMISE CABLING SYSTEMS PART ONE GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification

More information

Office of Naval Research. BAA , Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3

Office of Naval Research. BAA , Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3 Office of Naval Research BAA 07-028, Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3 The following questions and answers are provided for all potential respondents in the interest of procurement

More information

REVISIONS TO SPECIFICATION SECTIONS: Section Allowances: 12. Replace paragraphs 1.05, A and B with the following:

REVISIONS TO SPECIFICATION SECTIONS: Section Allowances: 12. Replace paragraphs 1.05, A and B with the following: b. Lithonia Lighting LP6FN 42TRT 6O9A 120 ECOS TRW 9. Luminaire Schedule L-18D: a. Lithonia Lighting LP6FN 42TRT 6O9A MVOLT ECOS TRW b. Lithonia Lighting LP6FN 42TRT 6O9A 120 ADEZ TRW 10. Luminaire Schedule

More information

McKenzie County Healthcare Systems

McKenzie County Healthcare Systems McKenzie County Healthcare Systems Hospital Replacement and Long-Term Care Replacement Watford City, North Dakota Request for Proposal (RFP) for Distributed Antenna System Table of Contents Introducti

More information

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade LAKE COUNTY SCHOOLS Leading our Children to Success Procurement Services 29529 CR 561 Tavares FL 32778 (352) 253-6760 Fax: (352) 253-6761 http://lake.k12.fl.us Superintendent: School Board Members: Susan

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:

More information

tech_project_template

tech_project_template tech_project_template Velstar TPM - Project Template 2016 TASK Responsible Party Start Date End Date Complete Status Comments Column6 1 Project start 07/04/16 09/30/16 2 Office Visit To Be Determined 3

More information

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017 #Question & Answer: #1 The RFP states that there is one week to complete all survey work. Please confirm this duration and that no other time will be allowed for survey work. The week identified in the

More information

Sheboygan County, WI Public Safety Radio System. Request for Proposals for a County-Wide Simulcast 800 MHz P25 Trunked Radio System

Sheboygan County, WI Public Safety Radio System. Request for Proposals for a County-Wide Simulcast 800 MHz P25 Trunked Radio System Sheboygan County, WI Public Safety Radio System Request for Proposals for a County-Wide Simulcast 800 MHz P25 Trunked Radio System ADDENDUM 1 And Response to Questions Submitted October 20, 2014 Issued

More information

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

RFP for Operation, Maintenance and Upgrade of Wireless-Fidelity (Wi-Fi) System at the San Francisco International Airport.

RFP for Operation, Maintenance and Upgrade of Wireless-Fidelity (Wi-Fi) System at the San Francisco International Airport. RFP for Operation, Maintenance and Upgrade of Wireless-Fidelity (Wi-Fi) System at the San Francisco International Airport Appendix I Information about Design of Public Wi-Fi System Terminal This appendix

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly: MINUTES OF MEETING Meeting Date : July 15, 2014 Place : Greenwood Shop Main Conference Room Contract Title : Supply of Reworked T1 Trip Switch Brackets Proposal No. : T31BG14139 Present : TTC - A. Mckay

More information

Special Notice # N R-S002 - Frequently Asked Questions #1

Special Notice # N R-S002 - Frequently Asked Questions #1 Special Notice # N00014-19-R-S002 - Frequently Asked Questions #1 General and Contracting Questions 1. Q: Would you please describe CONOPS more? A: The CONOPS described in the Special Notice and at the

More information

Trends in Optical Transceivers:

Trends in Optical Transceivers: Trends in Optical Transceivers: Light sources for premises networks Peter Ronco Corning Optical Fiber Asst. Product Line Manager Premises Fibers January 24, 2006 Outline: Introduction: Transceivers and

More information

Request for Information (RFI) for the Norwegian GSM-R BSS network replacement. Part A: Scope

Request for Information (RFI) for the Norwegian GSM-R BSS network replacement. Part A: Scope Request for Information (RFI) for the Norwegian Part A: Scope 1.1 N/A 11.10.2012 1.0 N/A 04.10.2012 Revision Revision Date Issued by Controlled by Approved by history Title Number of 16 pages: Request

More information

NOTICE OF REQUEST FOR PROPOSALS (RFP) RFP ADDENDUM 1 NORTH SAN JOSE STREET LIGHT CONVERSION TO LED

NOTICE OF REQUEST FOR PROPOSALS (RFP) RFP ADDENDUM 1 NORTH SAN JOSE STREET LIGHT CONVERSION TO LED NOTICE OF REQUEST FOR PROPOSALS (RFP) ADDENDUM 1 NORTH SAN JOSE STREET LIGHT CONVERSION TO LED JULY 28, 2009 INSTRUCTIONS: The purpose of this Addendum is to update information concerning the Mandatory

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

In-Building Wireless Solutions. Bob Kostash Channel Manager June 28, 2012

In-Building Wireless Solutions. Bob Kostash Channel Manager June 28, 2012 In-Building Wireless Solutions Bob Kostash Channel Manager June 28, 2012 IBW (In-Building Wireless) What IS It? IB = In-Building. Enhancement of Cellular and Public Safety signals inside a building/structure.

More information

SECTION 2. Computer Applications Technology

SECTION 2. Computer Applications Technology SECTION 2 Computer Applications Technology 2.1 What is Computer Applications Technology? Computer Applications Technology is the study of the integrated components of a computer system (such as hardware,

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the

More information

Total DAS Portfolio Intelligent Design = Maximum Flexibility

Total DAS Portfolio Intelligent Design = Maximum Flexibility Total DAS Portfolio Intelligent Design = Maximum Flexibility Total DAS Portfolio Cutting-edge DAS design meets cabling innovation with operator-grade, enterprise-ready solutions The comprehensive Corning

More information

The attached information contains mandatory requirements and a submission form.

The attached information contains mandatory requirements and a submission form. The Municipality of Greenstone Greenstone Fire Department REQUEST FOR PROPOSAL (RFP) Fire Department VHF Digital Radio Communication System The Municipality of Greenstone seeks Requests for Proposals (RFP

More information

Radio Communications. Recommendation. Executive summary. Strategic context

Radio Communications. Recommendation. Executive summary. Strategic context Radio Communications Recommendation That the Board: I. Note that AT has renewed its TeamTalk contract for another 12 months to ensure continuity of services for radio communications, within its existing

More information

8 th April 2018 ADDENDUM NO. 1

8 th April 2018 ADDENDUM NO. 1 PACIFIC AVIATION INVESTMENT PROGRAM TONGA AVIATION INVESTMENT PROJECT PROCUREMENT OF AIR TRAFFIC CONTROL (ATC) EQUIPMENT AND AIR TRAFFIC CONTROL TRAINING SIMULATOR FOR THE NEW ATC TOWER BUILDING OF FUA

More information

BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE.

BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE. OMB Approval Number 2700-0085 Broad Agency Announcement NNM12ZZP03K BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE April 30, 2012

More information

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R. ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings

More information

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.

More information

BCSD TECHNOLOGY DEPARTMENT

BCSD TECHNOLOGY DEPARTMENT BCSD TECHNOLOGY DEPARTMENT Tim Facchin Director of Technology Beacon City School District facchin.t@beaconk12.org February 13th, 2017 PROPOSED 2017-18 TECHNOLOGY BUDGET and NYS SMART SCHOOLS BOND OVERVIEW

More information

10930 W. Sam Houston Parkway N., Suite 900

10930 W. Sam Houston Parkway N., Suite 900 ADDENDUM NO. 1 10930 W Sam Houston Pkwy. North Suite 900 Houston, Texas 77064 281.664.1900 281.664.1912 (f) www.salasobrien.com March 21, 2018 Project: Prepared by: Taylor Career Center Welding Labs Beaumont

More information

ADDENDUM NUMBER ONE (1) For. Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation

ADDENDUM NUMBER ONE (1) For. Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation ADDENDUM NUMBER ONE (1) For Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation Addendum Date: Thursday, May 4, 2017 GENERAL: A. This addendum is hereby made a part

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

TELEPHONE: (215) Addendum No. 1

TELEPHONE: (215) Addendum No. 1 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY SECTION 280553-IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION A. This specification section covers the furnishing and installation of nameplates, labels, wire markers,

More information

JOB ANNOUNCEMENT. Whitman County Communications Systems Manager

JOB ANNOUNCEMENT. Whitman County Communications Systems Manager JOB ANNOUNCEMENT POSITION: Department: Whitman County Communications Systems Manager Emergency Management Salary Range: $60,000 to 99,000 DOQ : plus Benefits (medical, vision, and dental, PERS) TO APPLY

More information

TRANSBAY JOINT POWERS AUTHORITY. REQUEST FOR PROPOSALS No TWO-WAY RADIO SYSTEM

TRANSBAY JOINT POWERS AUTHORITY. REQUEST FOR PROPOSALS No TWO-WAY RADIO SYSTEM RANBAY JOIN POWR AUHORIY RQU FOR PROPOAL No. 18-02 WO-WAY RADIO YM QUION & ANWR: et No. 2 A participant in the May 8 Webx and site walk provided the attached signal strength readings from tests conducted

More information

(U 338-E) 2018 General Rate Case A Workpapers. T&D- Grid Modernization SCE-02 Volume 10

(U 338-E) 2018 General Rate Case A Workpapers. T&D- Grid Modernization SCE-02 Volume 10 (U 338-E) 2018 General Rate Case A.16-09- Workpapers T&D- Grid Modernization SCE-02 Volume 10 September 2016 132 SA 3 Deployment Schedule 2016 2017 2018 2019 2020 2 SA 3 EPC Pilots (2017 install) * 1 new

More information

Radio Technology Overview. January 2011

Radio Technology Overview. January 2011 Radio Technology Overview January 2011 Presentation Objectives The objective of this presentation is to: Review terms as related to radio technology Review the challenges facing the City o FCC mandate

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK SIG:EMS 1 of 6 APPR:LWB:DBP:07-14-15 FHWA:APPR:07-28-15 a. Description. This work consists of site

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK SIG:CJS 1 of 6 APPR:EMS:DBP:06-29-17 FHWA:APPR:08-14-17 a. Description. This work consists of completing

More information

LICENCE CLASSIFICATION AND LICENCE FEES

LICENCE CLASSIFICATION AND LICENCE FEES 1. Network Facilities LICENCE CLASSIFICATION AND LICENCE FEES Category Service description Sub categories Application fee (US$) 1 (payable when submitting Network Facilities Covers all network infrastructure

More information

CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM

CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM City of Brooklyn Park 5200 85 th Avenue N. Brooklyn Park, MN 55443-1825 Permit #: CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM Site Name & Address: (existing

More information

INVITATION FOR QUOTATION. TEQIP-II/2017/btec/Shopping/2

INVITATION FOR QUOTATION. TEQIP-II/2017/btec/Shopping/2 INVITATION FOR QUOTATION TEQIP-II/2017/btec/Shopping/2 12-Oct-2017 To, Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for the

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

Three Year Technology Plan Williston School District #

Three Year Technology Plan Williston School District # Three Year Technology Plan Williston School District #29 2016-2019 Williston School District #29 is committed to providing students, teachers, staff and administration with the most advanced technology

More information

Incognito Software Inc.

Incognito Software Inc. Incognito Software Inc. Corporate Profile DHCP-IPAM solutions overview In c o g n it o S o f t w are In c. - C o m p an y C o n f id en t ial 1 C o r p ora t e O v e r v ie w Who is.incognito Software

More information

Cisco Enhanced Digital Return (EDR) 85 System Compact Segmentable Nodes

Cisco Enhanced Digital Return (EDR) 85 System Compact Segmentable Nodes Cisco Enhanced Digital Return (EDR) 85 System Compact Segmentable Nodes The Cisco Enhanced Digital Return (EDR) 85 System expands the functionality of Compact Segmentable Nodes by increasing the performance,

More information

INDIAN INSTITUTE OF SCIENCE EDUCATION AND RESEARCH PUNE

INDIAN INSTITUTE OF SCIENCE EDUCATION AND RESEARCH PUNE INDIAN INSTITUTE OF SCIENCE EDUCATION AND RESEARCH PUNE CLARIFICATION ON TENDER NUMBER - IISER-PUR-1107-18 ITEM DESCRIPTION- PROCUREMENT OF WHOLE ANIMAL IMAGING SYSTEM Refer our Press Tender Notice No.IISER/S&P/13/18

More information

DAS Solutions. Delivering coverage and capacity in today s challenging environments

DAS Solutions. Delivering coverage and capacity in today s challenging environments DAS Solutions Delivering coverage and capacity in today s challenging environments Wireless subscribers expect clear coverage Partner with an industry leader With a diverse offering of communications sites

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

Cellular Infrastructure and Standards while deploying an RDA

Cellular Infrastructure and Standards while deploying an RDA Cellular Infrastructure and Standards while deploying an RDA Overview This whitepaper discusses the methods used while deploying an RDA into a field environment and dives into the standards used to judge

More information

Cisco Prisma II Quad Optical Input Enhanced Digital Return (EDR) Receiver for Compact Segmentable Nodes

Cisco Prisma II Quad Optical Input Enhanced Digital Return (EDR) Receiver for Compact Segmentable Nodes Data Sheet Cisco Prisma II Quad Optical Input Enhanced Digital Return (EDR) Receiver for Compact Segmentable Nodes The Cisco Quad Optical Input Enhanced Digital Return (Q-EDR) 85 Receiver expands the Cisco

More information

Monitoring Cable Technologies

Monitoring Cable Technologies 27 CHAPTER Cable broadband communication operates in compliance with the Data Over Cable Service Interface Specification (DOCSIS) standard which prescribes multivendor interoperability and promotes a retail

More information

SARASOTA COUNTY GOVERNMENT

SARASOTA COUNTY GOVERNMENT SARASOTA COUNTY GOVERNMENT Emergency Services TO: Sarasota County Commission THROUGH: Thomas A. Harmer, County Administrator FROM: Richard Collins, Director of Emergency Services Jerry Wheeler, Manager,

More information

Tomorrow s Technology and You

Tomorrow s Technology and You Tomorrow s Technology and You Chapter 3 Hardware - Peripherals Slide 1 Chapter 3 What can we learn from Microsoft? What are the possible health risks of extensive computer use and how can we minimize them?

More information

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package CITY OF RICHMOND CITY OF RICHMOND Notice of Public Opening Contract T.3263 Contract: Richmond Speed Skating Interior/ Exterior Signage Package Tenders have been issued for the Richmond Speed Skating Interior/

More information

GLYNN COUNTY INFORMATION TECHNOLOGY DEPARTMENT 1725 Reynolds Street, Suite 301 Brunswick, Georgia Phone: (912)

GLYNN COUNTY INFORMATION TECHNOLOGY DEPARTMENT 1725 Reynolds Street, Suite 301 Brunswick, Georgia Phone: (912) GLYNN COUNTY INFORMATION TECHNOLOGY DEPARTMENT 1725 Reynolds Street, Suite 301 Brunswick, Georgia 31520 Phone: (912) 554-7153 MEMORANDUM To: Via: From: Subject: Board of Commissioners Finance Committee

More information

Frontier Telephone Companies TARIFF FCC NO. 4 Original Page 23-1 ACCESS SERVICE

Frontier Telephone Companies TARIFF FCC NO. 4 Original Page 23-1 ACCESS SERVICE Original Page 23-1 23. Dedicated Ring and Optical Services 23.1 Dedicated SONET Ring# (A) General (1) Dedicated SONET Ring (DSR) provides a customer a dedicated high capacity customized network. The network

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

BUTLER COUNTY RADIO RFP RESPONSES TO VENDOR QUESTIONS. Butler County 700 MHz, P25 Public Safety Radio Network Issued July 8, 2016

BUTLER COUNTY RADIO RFP RESPONSES TO VENDOR QUESTIONS. Butler County 700 MHz, P25 Public Safety Radio Network Issued July 8, 2016 County of Butler, Pennsylvania Request for Proposals 700 MHz, Project 25 Public Safety Radio Network BUTLER COUNTY RADIO RFP RESPONSES TO VENDOR QUESTIONS Request for Proposal: Butler County 700 MHz, P25

More information

NOTICE TO ALL PROSPECTIVE RESPONDENTS RFP 16-AHR/GP. Addendum No. 6 issued April 18, Request for Interpretation Responses

NOTICE TO ALL PROSPECTIVE RESPONDENTS RFP 16-AHR/GP. Addendum No. 6 issued April 18, Request for Interpretation Responses DEDICATED TO THE HEALTH OF OUR COMMUNITY www.hcdpbc.org NOTICE TO ALL PROSPECTIVE RESPONDENTS RFP 16-AHR/GP Addendum No. 6 issued April 18, 2016 Request for Interpretation Responses RFI 1: RFI 2: RFI 3:

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

CISCO DWDM GBICS. Figure 1. Cisco DWDM GBICs. Main features of the Cisco DWDM GBICs:

CISCO DWDM GBICS. Figure 1. Cisco DWDM GBICs. Main features of the Cisco DWDM GBICs: DATA SHEET CISCO DWDM GBICS The Cisco Dense Wavelength-Division Multiplexing (DWDM) Gigabit Interface Converter (GBIC) pluggables allow enterprise companies and service providers to provide scalable and

More information

... Application Note

... Application Note ... Application Note iconverter Managed Fiber Media Converter Product Family iconverter XG, XG+ and XGT+ Product Selection Guidelines Document Number: 002-A0007 Version D June 2018 Omnitron Systems Technology,

More information

MOTOBRIDGE IP INTEROPERABILITY SOLUTION

MOTOBRIDGE IP INTEROPERABILITY SOLUTION MOTOBRIDGE IP INTEROPERABILITY SOLUTION PROVEN MISSION CRITICAL PERFORMANCE YOU CAN COUNT ON MOTOROLA MOTOBRIDGE SOLUTION THE PROVEN AND AFFORDABLE WAY TO BRIDGE THE GAPS IN YOUR COMMUNICATIONS Interoperability

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

WELCOME. C P S E n e r g y Q u a r t erly P o l e At t a c h m e n t Wo r k s hop. J a n u a ry 2 5,

WELCOME. C P S E n e r g y Q u a r t erly P o l e At t a c h m e n t Wo r k s hop. J a n u a ry 2 5, WELCOME C P S E n e r g y Q u a r t erly P o l e At t a c h m e n t Wo r k s hop J a n u a ry 2 5, 2 0 1 8 1 H O U S E K EEPING Sign-up Sheets Restrooms Evacuation / Staging Introductions in the room 2

More information

Section 12 Original Contents Sheet 1. B. Conditions and Limitations. C. Regulations. 1. Concurrence 2. Exceptions. D. Specific Company Services

Section 12 Original Contents Sheet 1. B. Conditions and Limitations. C. Regulations. 1. Concurrence 2. Exceptions. D. Specific Company Services d/b/a TDS TELECOM Original Contents Sheet 1 Contents A. General B. Conditions and Limitations C. Regulations 1. Concurrence 2. Exceptions D. Specific Company Services 1. Voice Grade Circuits (Grandfathered

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

Fabrication and Supply of Cable Tray. CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna

Fabrication and Supply of Cable Tray. CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna Fabrication and Supply of Cable Tray at CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna BROADCAST ENGINEERING CONSULTANTS INDIALIMITED 14-B, I. P. Estate, Ring Road, New Delhi CONTENTS Sr. No Title

More information

Pluggable Transceivers

Pluggable Transceivers DATA SHEET Pluggable Transceivers Industry-Standard Pluggable Transceivers and Direct Attach Cables BENEFITS BUSINESS ALIGNMENT Standards-based technology. Flexible interface options for 100Mbs, 1Gbps,10Gbps,

More information

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at Aetna Information Services (AIS) http://ot.aetna.com March 16, 2016 Ver 21 Design Phase / Process This sequence of eight design weeks DW s leads the project team from project kickoff through to construction