1 (U 338-E) 2018 General Rate Case A Workpapers T&D- Grid Modernization SCE-02 Volume 10 September 2016

2 132 SA 3 Deployment Schedule SA 3 EPC Pilots (2017 install) * 1 new [4.0M per] * 1 conversion [4.0M per] 32 SA 3 EPC projects with New Dropin MEER (2018 install) * 10 new [3.2M per] * 22 conversion [3.2M per] 1 SA 3 EPC project without New Drop in MEER (2018 install) * 1 conversion [2.5M per] 30 SA 3 EPC projects with New Dropin MEER (2019 install) * 9 new [3.2M per] * 21 conversion [3.2M per] 29 SA 3 EPC projects with New Dropin MEER (2020 install) * 8 new [3.2M per] * 21 conversion [3.2M per] 29 SA 3 EPC projects with New Dropin MEER (2021 install) * 8 new [3.2M per] * 21 conversion [3.2M per] 25 SA 3 EPC projects with New Dropin MEER (2022 install) * 11 new [3.2M per] * 14 conversion [3.2M per] Engineer, procure materials and begin construction [58%] Job walk and scope [2%] Job walk and scope [2%] * Costs shown may not sum due to rounding Finish construction and commissioning [42%] Engineer, procure materials and begin construction [38%] Engineer, procure materials and begin construction [38%] Job walk and scope [2%] Finish construction and commissioning [60%] Finish construction and commissioning [60%] Engineer, procure materials and begin construction [38%] Job walk and scope [2%] Finish construction and commissioning [60%] Engineer, procure materials and begin construction [38%] Job walk and scope [2%] Finish construction and commissioning [60%] Engineer, procure materials and begin construction [38%] Job walk and scope [2%] Total Capital [s Millions]* Annual Deployment Targets Annual SA-3 deployment targets (see table below) are based on the Development of SA-3 and CSP Deployment Plan work paper, which describes the criteria and methodology used in developing the deployment schedule for SA-3 investments, including the strategy for deployment and how locations across the territory are prioritized for a multiyear deployment schedule. Product SA-3 EPC Pilot SA-3 w/new Drop-in MEER (EPC) SA-3 w/o New Drop-in MEER (EPC) Annual Totals (Year of Operating Date)

3 140 Common Substation Platform COTS Application Project Large COTS Project Total >5M Ongoing O&M 5% 8% 14% 36% 37% 100% COTS License - - Vendor Labor - - SCE IT Labor 6,023, , ,126 1,397,979 1,535,847 1,569,621 6,023,001 SI Labor - - Integration & Customization - - Labor Subtotal 6,023, , ,126 1,397,979 1,535,847 1,569,621 6,023,001 O&M Ongoing Labor Support - 240,920 Annual License Fees - - Total Recurring O&M - 240,920 Hardware 37,668,765 1,375,603 2,478,850 4,917,512 14,291,263 14,605,537 37,668,765 OS and DB Licenses - - Total HW & OS and DB Lic. 37,668,765 1,375,603 2,478,850 4,917,512 14,291,263 14,605,537 37,668,765 Total Project Cost 43,691,766 2,068,032 3,305,976 6,315,491 15,827,110 16,175,158 43,691,766 Contingency 8,738, , ,195 1,263,098 3,165,422 3,235,032 8,738,353 TOTAL 52,430,120 2,481,638 3,967,172 7,578,589 18,992,532 19,410,189 52,430,120 Assumptions: SCE will procure new COTS hardware and software SCE will integrate cybersecurity with CSP hardware SCE will implement NERC CIP controls on the new hardware Unit cost per site = 140k for server hardware/software, 10K for labor

4 140 Common Substation Platform COTS Application Project Large COTS Project Total >5M Ongoing O&M 5% 8% 14% 36% 37% 100% COTS License - - Vendor Labor - - SCE IT Labor 5,997, , ,944 1,385,851 1,530,745 1,572,441 5,997,960 SI Labor - - Integration & Customization - - Labor Subtotal 5,997, , ,944 1,385,851 1,530,745 1,572,441 5,997,960 O&M Ongoing Labor Support - 239,918 Annual License Fees - - Total Recurring O&M - 239,918 Hardware 37,576,494 1,368,750 2,457,324 4,874,854 14,243,789 14,631,776 37,576,494 OS and DB Licenses - - Total HW & OS and DB Lic. 37,576,494 1,368,750 2,457,324 4,874,854 14,243,789 14,631,776 37,576,494 Total Project Cost 43,574,454 2,057,729 3,277,268 6,260,705 15,774,534 16,204,217 43,574,454 Contingency 8,714, , ,454 1,252,141 3,154,907 3,240,843 8,714,891 TOTAL 52,289,344 2,469,274 3,932,722 7,512,846 18,929,441 19,445,060 52,289,344 Assumptions: SCE will procure new COTS hardware and software SCE will integrate cybersecurity with CSP hardware SCE will implement NERC CIP controls on the new hardware Unit cost per site = 140k for server hardware/software, 10K for labor

5 151 FAN Nominal Dollars Device Description Solution Definition Substation FAN Router Field FAN Router FAN Mesh Repeater Pt to Pt Wireless, or Multipoint Wireless Backhaul Existing Overhead DA Devices (Switch) Existing Overhead DA Devices (Cap Bank) Existing Underground DA Devices (Switch) New Overhead DA Devices (RFIs) New Overhead DA Devices (Cap banks) Total Unit FAN Router for every substation with Fiber (including new installs) 11,500 FAN Routers deployed throughout the distribution system. These are take out points. (ESC has 12K cell relays) 11,500 Repeaters to extend the mesh in low density areas. (10% of all mesh radios) 2,500 Support FAN Router connections to substations where fiber is not available 7,500 Switches currently connected with NETCOMM radios. These, will require a new mesh radio. 1,500 Cap banks currently connected with NETCOMM radios. These, will require a new mesh radio. 1,500 These devices will require radios that can reach underground equipment. (UG Radio) 2,100 We expect to have communications integrated into the RFIs. This will drive the cost of the radio down and will not incur any IT installation cost. 100 These devices will require radios that can be part of the mesh solution. (Mesh Radio) 1,500 Cost Unit Cost Basis Total Units Cost Units Cost Units Cost Units Cost Units Cost Engineering estimate based on manufacturer list price for equipment of comparable functional capability , ,042,039 1,549,730 Engineering estimate based on manufacturer list price for equipment of comparable functional capability ,181, ,008,935 37,193,513 Engineering estimate based on manufacturer list price for equipment of comparable functional capability ,946, ,048,357 8,997,986 Engineering estimate based on manufacturer list price for equipment of comparable functional capability ,972, ,155,088 12,128,882 from prior experience for similar equipment and installation ,489, ,529,079 3,020,658 from prior experience for similar equipment and installation ,806, ,907,646 7,719,459 from prior experience for similar equipment and installation , , ,581 Engineering cost estimate based on low complexity communications module added to the RFI. No installation cost as it is integrated at the factory , ,509 1,626,044 from prior experience for similar equipment and installation , , ,072 New Underground DA Devices (RFIs) New Repeaters for Vault based RFI's Underground Gateway (for all) New DA Devices (Switch RCS) PV/DER Systems that require direct communications (SCE owned, >100 KW) We expect to have communications integrated into the RFIs. Each vault based RFI requires one radio for all 3 phases and also requires a repeater in close proximity. 200 Install one repeater in close proximity to underground RFI (vault based) to extend signal from vault to overhead. Repeater can be 15.4g to FAN and function as a gateway to the UG portion or can be endto end 15.4g. 3,800 Current available solutions for underground communications require a gateway takeout radio. This line item covers the gateways for all UG devices. Assumption: 1 gateway for every 5 end nodes. 14,500 These devices will require radios that can reach to pad mounted equipment 1,300 These devices will require radios that can be part of the mesh solution. (Mesh Radio) 800 Engineering cost estimate based on low complexity communications module added to the RFI. No installation cost as it is integrated at the factory , , ,748 from prior experience for similar equipment and installation ,660, ,810,500 11,473,871 from prior experience for similar equipment and installation ,879, ,009,149 9,889,541 from prior experience for similar equipment and installation , , ,454 from prior experience for similar equipment and installation ,033, ,326,510 22,388,287

6 152 FAN Nominal Dollars Device Description Solution Definition SCE Owned Energy Storage Systems New Automation Switches (RIS) New NETCOMM devices Network transition costs enhance NETCOMM to maintain operational reliability as FAN is cutover (add Routing radios, headends) and applications. Antenna Monopole & Outdoor Antenna Equipment FAN Network Management System Total Unit These devices will require radios that can be part of the mesh solution. (Mesh Radio) 900 These devices will require radios that can support low latency communications. Current requirement is 100ms per hop. (LLN radio) 3,300 NETCOMM devices needed before the new FAN is available. 2,400 Packet routers will need to be added over time to keep the existing system operating and meeting reliability and availability requirements through the end of Add 40' monopole for the Pt Multipoint Radio Base stations at 400 locations. Locations may be substations or nonelectric facilities such as service centers. 50,000 Configuration management, network performance analysis, configuration discrepancy, overall radio management, testing, project management, deployment and operational readiness. Cost Unit Cost Basis Total Units Cost Units Cost Units Cost Units Cost Units Cost from prior experience for similar equipment and installation , , ,671 from prior experience for similar equipment and installation ,096, ,204,967 8,303,790 Engineering estimate based on prior years' recorded costs per radio for NetComm radio installations , ,573, ,412, ,372,430 from prior experience for similar structures ,527 2,027,445 3,014,973 from prior experience for similar structures ,151, ,413, ,530,604 11,095,552 from prior experience for similar structures 460,796 6,583,629 6,749,377 7,723, ,517,480 Capital Cost Total: Contingency Architecture / PMO / Other Support Costs Grand Total 844, , ,080 1,418,591 8,157,405 11,313,570 65,769,326 80,787,468 1,593,297 2,329,243 14,903,042 18,680,268 2,049,130 1,135,577 2,300,940 2,001,860 11,799,832 14,778,389 82,973, ,469, ,872,561 37,632,569 7,934, ,439,718 Assumptions: Capital Estimate Breakdown SCE Labor Allocation: 5%; Material: 67%; Vendor: 28%

7 FAN Nominal Dollars Device Description Substation FAN Router Field FAN Router FAN Mesh Repeater Pt to Pt Wireless, or Multipoint Wireless Backhaul Existing Overhead DA Devices (Switch) Existing Overhead DA Devices (Cap Bank) Existing Underground DA Devices (Switch) New Overhead DA Devices (RFIs) New Overhead DA Devices (Cap banks) New Underground DA Devices (RFIs) Solution Definition Total Unit Cost Unit Cost Basis Total Units Cost Units Cost Units Cost Units Cost Units Cost Engineering estimate based on manufacturer FAN Router for every substation with list price for equipment of comparable Fiber (including new installs) 11,500 functional capability , ,043,911 1,549,916 FAN Routers deployed throughout the Engineering estimate based on manufacturer distribution system. These are take out list price for equipment of comparable points. (ESC has 12K cell relays) 11,500 functional capability ,140, ,053,864 37,197,978 Engineering estimate based on manufacturer Repeaters to extend the mesh in low list price for equipment of comparable density areas. (10% of all mesh radios) 2,500 functional capability ,936, ,059,223 8,999,066 Engineering estimate based on manufacturer Support FAN Router connections to list price for equipment of comparable substations where fiber is not available 7,500 functional capability ,958, ,169,738 12,130,338 Switches currently connected with NETCOMM radios. These, will require a from prior experience for similar equipment new mesh radio. 1,500 and installation ,484, ,531,826 3,018,455 Cap banks currently connected with NETCOMM radios. These, will require a from prior experience for similar equipment new mesh radio. 1,500 and installation ,794, ,914,666 7,713,830 These devices will require radios that can reach underground equipment. (UG from prior experience for similar equipment Radio) 2,100 and installation , , ,896 We expect to have communications Engineering cost estimate based on low integrated into the RFIs. This will drive complexity communications module added to the cost of the radio down and will not the RFI. No installation cost as it is integrated incur any IT installation cost. 100 at the factory , ,974 1,624,858 These devices will require radios that can be part of the mesh solution. (Mesh Radio) from prior experience for similar equipment 1,500 and installation , , ,460 We expect to have communications integrated into the RFIs. Each vault Engineering cost estimate based on low based RFI requires one radio for all 3 complexity communications module added to phases and also requires a repeater in the RFI. No installation cost as it is integrated close proximity. 200 at the factory , , ,305 Install one repeater in close proximity to underground RFI (vault based) to extend signal from vault to overhead. New Repeaters for Vault based RFI's Repeater can be 15.4g to FAN and function as a gateway to the UG portion or can be end-to-end 15.4g. from prior experience for similar equipment 3,800 and installation ,641, ,820,939 11,465,505 Underground Gateway (for all) Current available solutions for underground communications require a gateway takeout radio. This line item covers the gateways for all UG devices. Assumption: 1 gateway for every 5 end nodes. from prior experience for similar equipment 14,500 and installation ,863, ,018,148 9,882,330 New DA Devices (Switch RCS) These devices will require radios that can reach to pad mounted equipment from prior experience for similar equipment 1,300 and installation , , ,348 PV/DER Systems that require direct communications (SCE owned, >100 KW) These devices will require radios that can be part of the mesh solution. (Mesh Radio) from prior experience for similar equipment 800 and installation ,997, ,346,859 22,371,

8 152 FAN Nominal Dollars Device Description SCE Owned Energy Storage Systems Solution Definition Total Unit Cost Unit Cost Basis Total Units Cost Units Cost Units Cost Units Cost Units Cost These devices will require radios that can be part of the mesh solution. (Mesh from prior experience for similar equipment Radio) 900 and installation , , ,737 These devices will require radios that New Automation Switches (RIS) can support low latency communications. Current requirement is 100ms per hop. (LLN radio) from prior experience for similar equipment 3,300 and installation ,082, ,212,521 8,297,736 New NETCOMM devices NETCOMM devices needed before the new FAN is available. Engineering estimate based on prior years' recorded costs per radio for NetComm radio 2,400 installations , ,560, ,392, ,335,904 Network transition costs - enhance NETCOMM to maintain operational reliability as FAN is cutover (add Routing radios, headends) and applications. Packet routers will need to be added over time to keep the existing system operating and meeting reliability and availability requirements through the end of from prior experience for similar structures ,247 2,031,088 3,015,335 Antenna Monopole & Outdoor Antenna Equipment FAN Network Management System Add 40' monopole for the Pt-Multipoint Radio Base stations at 400 locations. Locations may be substations or nonelectric facilities such as service centers. 50,000 from prior experience for similar structures ,132, ,398, ,538,744 11,070,369 Configuration management, network performance analysis, configuration discrepancy, overall radio management, testing, project management, deployment and operational readiness. from prior experience for similar structures 458,500 6,526,459 6,690,828 7,698, ,373,808 Capital Cost Total: Contingency Architecture / PMO / Other Support Costs Grand Total Assumptions: Capital Estimate Breakdown SCE Labor Allocation: 5%; Material: 67%; Vendor: 28% 840, , ,853 1,411,523 8,086,568 1,579,461 2,031,335 11,697,365 11,215,427 2,309,037 1,125,726 14,650,190 65,550,850 14,853,537 2,293,297 82,697,684 80,932,605 18,713,828 2,005, ,651, ,626,034 37,581,950 7,900, ,108,652

9 170 Wide Area Network Nominal Description Unit Cost Unit Cost Basis Total a Fiber Miles - Units Engineering estimate based on past recorded costs per mile of fiber Fiber Miles - Total Cost 100, ,995 2,754,108 16,176,994 16,594,874 17,035,072 53,073,042 Fiber Optic Terminal - Units Engineering estimate based on past recorded costs per fiber terminal for two terminals (A and Z connections) for each Fiber Optic Terminal - Total Cost 160,000 unit (substation) 0 183,607 10,906,563 11,188,300 11,485,082 33,763,552 Data/Switching - Units Engineering estimate based on past recorded costs per location for data Data/Switching - Total Cost 75,000 network connection 0 734,429 4,980,019 5,108,661 5,244,174 16,067,283 Total Wired Connectivity Improvements Contingency Total Costs Plus Contingency Architecture / PMO / Other Support Costs GRAND TOTAL 511,995 3,672,144 32,063,576 32,891,835 33,764, ,903,877 76, ,344 3,960,758 4,471,888 4,684,341 13,624, ,794 4,102,488 36,024,333 37,363,723 38,448, ,528, , ,643 2,960,852 1,058, ,725 5,908, ,752 4,951,130 38,985,186 38,422,386 39,218, ,436,848 Assumptions: Capital Estimate Breakdown SCE Labor Allocation: 6%; Material: 45%; Vendor: 45% Escalation Rates

10 170 Wide Area Network Nominal Description Unit Cost Unit Cost Basis Total Fiber Miles - Units Engineering estimate based on past recorded Fiber Miles - Total Cost 100,000 costs per mile of fiber 509,444 2,730,192 16,036,661 16,539,749 17,065,676 52,881,722 Fiber Optic Terminal - Units Engineering estimate based on past recorded costs per fiber terminal Fiber Optic Terminal - Total Cost 160,000 for two terminals (A and Z connections) for each unit (substation) 0 182,013 10,811,951 11,151,134 11,505,715 33,650,813 Data/Switching - Units Engineering estimate based on past recorded Data/Switching - Total Cost 75,000 costs per location for data network connection 0 728,051 4,936,818 5,091,691 5,253,596 16,010,156 Total Wired Connectivity Improvements 509,444 3,640,256 31,785,431 32,782,573 33,824, ,542,690 Contingency 76, ,607 3,926,399 4,457,033 4,692,756 13,579,211 Total Costs Plus Contingency 585,861 4,066,863 35,711,829 37,239,606 38,517, ,121,902 Architecture / PMO / Other Support Costs 269, ,273 2,935,168 1,055, ,108 5,872,303 GRAND TOTAL 855,469 4,908,136 38,646,997 38,294,753 39,288, ,994,205 Escalation Rates Assumptions: Capital Estimate Breakdown SCE Labor Allocation: 6%; Material: 45%; Vendor: 45%

11 181 System Modeling Tool Total Ongoing O&M 32% 50% 19% 0% 0% 100% COTS License 1,150, , , , ,150,771 Vendor Labor 2,301, ,179 1,139, , ,301,543 SCE IT Labor 3,507,112 1,106,559 1,736, , ,507,112 SI Labor 657, , , , ,584 Integration & Customization 1,753, , , , ,753,556 Labor Subtotal 9,370,566 2,956,587 4,640,982 1,772, ,370,566 O&M Ongoing Labor Support - 302,488 Annual License Fees - 207,139 Total Recurring O&M - 509,627 Hardware 1,095, , , , ,095,973 OS and DB Licenses 493, , ,262 93, ,188 Total HW & OS and DB Lic. 1,589, , , , ,589,160 Total Project Cost 10,959,726 3,457,996 5,428,049 2,073, ,959,726 Contingency 2,191, ,599 1,085, , ,191,945 TOTAL 13,151,671 4,149,595 6,513,659 2,488, ,151,671 Testimony* 4,150,000 6,514,000 2,488, ,152,000 Assumptions: *Cost estimates are rounded for forecasting purposes. SCE will procure COTS products SCE will implement in phases (compliance and new capabilities) Hardware: Hardware components for SMT include application servers, database servers and web servers. Oracle Exadata is the SCE enterprise standard for database servers. Application servers needed to host the CYME Gateway, Integration Capacity Analysis Servers and Modeling Servers will be based on Windows 2012 server. SMT will also require storage to maintain various studies performed for different projects for historical analysis. SMT is planning to procure additional storage capacity to meet the proposed growth.

12 System Modeling Tool COTS Application Project Large COTS Project Total >5M Ongoing O&M 32% 49% 19% 0% 0% 100% COTS License 1,142, , , , ,142,124 Vendor Labor 2,284, ,561 1,129, , ,284,249 SCE IT Labor 3,480,760 1,101,046 1,721, , ,480,760 SI Labor 652, , , , ,642 Integration & Customization 1,740, , , , ,740,380 Labor Subtotal 9,300,155 2,941,857 4,600,681 1,757, ,300,155 O&M Ongoing Labor Support - 300,216 Annual License Fees - 205,582 Total Recurring O&M - 505,798 Hardware 1,087, , , , ,087,737 OS and DB Licenses 489, , ,141 92, ,482 Total HW & OS and DB Lic. 1,577, , , , ,577,219 Total Project Cost 10,877,374 3,440,768 5,380,914 2,055, ,877,374 Contingency 2,175, ,154 1,076, , ,175,475 TOTAL 13,052,849 4,128,922 6,457,096 2,466, ,052,849 Assumptions: *Cost estimates are rounded for forecasting purposes. SCE will procure COTS products SCE will implement in phases (compliance and new capabilities) Hardware: Hardware components for SMT include application servers, database servers and web servers. Oracle Exadata is the SCE enterprise standard for database servers. Application servers needed to host the CYME Gateway, Integration Capacity Analysis Servers and Modeling Servers will be based on Windows 2012 server. SMT will also require storage to maintain various studies performed for different projects for historical analysis. SMT is planning to procure additional storage capacity to meet the proposed growth. 181

13 187 DRP External Portal Application Development Project Total Cost of Project Total FTE Estimation Ongoing O&M 6% 31% 62% 0% 0% 100% Project Duration 2000 hours FTE SCE FTE (70) 11 1,572,047 98, , , ,572,047 Business Consultants (200) 1 316,866 19,874 99, , ,866 Technical Consultants (200) 4 1,795, , ,244 1,118, ,795,572 Labor Subtotal 3,684, ,090 1,157,819 2,295, ,684,485 Labor Support Cost 4% - 62,882 Annual License Fees - 92,849 Total Recurring O&M - 155,731 Hardware 491,265 30, , , ,265 Embedded COTS License 515,828 32, , , ,828 OS and DB Licenses 221,069 13,865 69, , ,069 Total HW & OS and DB Lic. 1,228,162 77, , , ,228,162 Total Project Cost 4,912, ,120 1,543,759 3,060, ,912,646 Contingency 20% 982,529 61, , , ,529 TOTAL REQUEST 5,895, ,744 1,852,510 3,672, ,895,175 Testimony* 370,000 1,853,000 3,673, ,896,000 Assumptions: *Cost estimates are rounded for forecasting purposes. SCE will develop DER external portal based on standard enterprise portal (similar to what is used for SCE.com) SCE will enhance the existing DERIM web portal for initial release SCE will implement DER Portal in multiple phases Embedded COTS license: SCE will procure map software and commercially available visualization software to present the calculated information for users. Hardware: Hardware components for DRPEP includes Application Servers, Web Servers, and Database Servers. pplication servers will be a combination of Windows and Linux servers. Web servers will be TOMCAT/IIS servers. Database servers will be Oracle Exadata servers.

14 DRP External Portal Application Development Project Total Cost of Project Total FTE Estimation Ongoing O&M 6% 31% 62% 0% 0% 100% Project Duration 2000 hours FTE SCE FTE (70) 11 1,558,769 98, , , ,558,769 Business Consultants (200) 1 314,189 19,775 98, , ,189 Technical Consultants (200) 4 1,780, , ,344 1,109, ,780,407 Labor Subtotal 3,653, ,939 1,147,765 2,275, ,653,366 Labor Support Cost 4% - 62,351 Annual License Fees - 92,065 Total Recurring O&M - 154,416 Hardware 487,115 30, , , ,115 Embedded COTS License 511,471 32, , , ,471 OS and DB Licenses 219,202 13,796 68, , ,202 Total HW & OS and DB Lic. 1,217,789 76, , , ,217,789 Total Project Cost 4,871, ,585 1,530,353 3,034, ,871,154 Contingency 20% 974,231 61, , , ,231 TOTAL REQUEST 5,845, ,902 1,836,424 3,641, ,845,385 Assumptions: *Cost estimates are rounded for forecasting purposes. SCE will develop DER external portal based on standard enterprise portal (similar to what is used for SCE.com) SCE will enhance the existing DERIM web portal for initial release SCE will implement DER Portal in multiple phases Embedded COTS license: SCE will procure map software and commercially available visualization software to present the calculated information for users. Hardware: Hardware components for DRPEP includes Application Servers, Web Servers, and Database Servers. pplication servers will be a combination of Windows and Linux servers. Web servers will be TOMCAT/IIS servers. Database servers will be Oracle Exadata servers. 187

15 189 Cost Estimate: Grid Management System (GMS) Cost Basis By Functionality 45,850,000 Base Platform 10,750,000 Base Platform +SCADA 6,000,000 Historian/Data Store 2,750,000 Visualization Reliability Functions 19,550,000 Distribution Management: 5,150,000 Fault Detection & Location 2,400,000 Switching Management 2,300,000 Distribution State Estimation 450,000 Outage Management: 8,400,000 Crew Management Outage Notification 1,000,000 Outage Reporting Storm Management Call Management 1,400,000 Advanced Reliability Functions 4,000,000 Reconfigurable Protection Microgrid Management DER Management DER Management Operational Planning Functions 4,050,000 Load & DER Forecasting Peak Load Management 1,750, ,000 Simulation/Study Mode Infrastructure Management Functions Infrastructure Management Optimization Functions 6,500,000 DER Assisted VVC DER Assisted network Reliability Optmization Economic Optimization 1,500,000 Training Simulator Training Simulator *Estimates above based on engineering judgment, verbal vendor quotes, and past project costs.

16 Labor Estimates Total Labor Percentage 20% Vendor Labor 0% MSP Labor 2% 2,139,801 3, , , , ,938 2,139,801 SCE IT Labor 4% 4,279,603 7, ,007 1,262,396 1,566,257 1,047,877 4,279,603 BU Labor 4% 4,279,603 7, ,007 1,262,396 1,566,257 1,047,877 4,279,603 Testing & QA 3% 3,209,702 5, , ,797 1,174, ,908 3,209,702 Interface Development 5% 5,349,503 8, ,009 1,577,995 1,957,821 1,309,846 5,349,503 Training 1% 1,069,901 1,766 99, , , ,969 1,069,901 Travel 1% 1,069,901 1,766 99, , , ,969 1,069,901 OCM 0% Customization 0% Total Est. Project Labor Cost 21,398,014 35,328 1,980,037 6,311,981 7,831,284 5,239,383 21,398,014 Infrastructure Estimates Total Hardware (Material) 13% 13,908,709 22,963 1,287,024 4,102,788 5,090,335 3,405,599 13,908,709 Server Cost 5% 5,349,503 8, ,009 1,577,995 1,957,821 1,309,846 5,349,503 Client Hardware Cost 0% Storage Cost 3% 3,209,702 5, , ,797 1,174, ,908 3,209,702 Network Costs 0% OS and DB Licenses 5% 5,349,503 8, ,009 1,577,995 1,957,821 1,309,846 5,349,503 Total Est. HW & OS and DB 13,908,709 22,963 1,287,024 4,102,788 5,090,335 3,405,599 13,908,709 Year 1 Year 2 Year 3 Year 4 Year 5 Check Sums Total Costs Est. % Total Proj. Costs Total Project Labor 22% 21,398,014 35,328 1,980,037 6,311,981 7,831,284 5,239,383 21,398,014 Total Infrastructure 14% 13,908,709 22,963 1,287,024 4,102,788 5,090,335 3,405,599 13,908,709 COTS Product License 52% 50,285,332 83,020 4,653,087 14,833,155 18,403,518 12,312,551 50,285,332 Total Costs w/ Contingency Contingency 25% Total Project Labor w/ Contingency 44,160 2,475,046 7,889,976 9,789,105 6,549,229 26,747,517 Total Infrastructure w/ Contingency 28,704 1,608,780 5,128,485 6,362,919 4,256,999 17,385,886 Total COTS Product License w/ Contingency 103,775 5,816,359 18,541,444 23,004,398 15,390,689 62,856,665 Total Base Project Cost w/ Contingency 106,990, ,638 9,900,186 31,559,905 39,156,422 26,196, ,990,068 Architecture / PMO / Other Support Costs 28,105,503 87,166 2,510,055 8,241,228 9,670,685 7,596,368 28,105,503 GRAND TOTAL 135,095, ,804 12,410,241 39,801,133 48,827,107 33,793, ,095,571

17 191 Cost Estimate: Grid Management System (GMS) Cost Basis By Functionality 45,850,000 Base Platform 9,200,000 Base Platform +SCADA 6,000,000 Distribution State Estimation 450,000 Historian 2,750,000 Dispatch Training Simulator Dispatch Training Simulator Integrated Switching Management: 4,700,000 Fault Detection & Location 2,400,000 Switching Management (OMS) 2,300,000 Optimization: 6,500,000 DER Assisted VVC DER Assisted network Reliability Optmization Economic Optimization 1,500,000 Outage Management: 8,400,000 Crew Management (OMS) Outage Notification (OMS) 1,000,000 Outage Reporting (ODRM/OMS) Storm Management (CGI) Call Management (OMS) 1,400,000 Forecasting: 1,750,000 Load & DER Forecasting (LOADSEER model) 1,750,000 Advanced Analysis: 2,300,000 Peak Load Management 300,000 Simulation/Study Mode (EMS/DMS) Protection Coordination Infrastructure Management - PSC, Device Registration Visualization Microgrid Management Market Dispatch

18 Labor Estimates Total Labor Percentage 20% Vendor Labor 0% MSP Labor 2% 1,951,336 3, , , , ,577 1,951,336 SCE IT Labor 4% 3,902,671 6, ,443 1,173,669 1,419, ,154 3,902,671 BU Labor 4% 3,902,671 6, ,443 1,173,669 1,419, ,154 3,902,671 Testing & QA 3% 2,927,003 5, , ,252 1,064, ,866 2,927,003 Interface Development 5% 4,878,339 8, ,804 1,467,086 1,774,381 1,156,443 4,878,339 Training 1% 975,668 1,725 94, , , , ,668 Travel 1% 975,668 1,725 94, , , , ,668 OCM 0% Customization 0% Total Est. Project Labor Cost 19,513,357 34,500 1,887,216 5,868,346 7,097,524 4,625,770 19,513,357 Infrastructure Estimates Total Hardware (Material) 13% 12,683,682 22,425 1,226,691 3,814,425 4,613,391 3,006,751 12,683,682 Server Cost 5% 4,878,339 8, ,804 1,467,086 1,774,381 1,156,443 4,878,339 Client Hardware Cost 0% Storage Cost 3% 2,927,003 5, , ,252 1,064, ,866 2,927,003 Network Costs 0% OS and DB Licenses 5% 4,878,339 8, ,804 1,467,086 1,774,381 1,156,443 4,878,339 Total Est. HW & OS and DB 12,683,682 22,425 1,226,691 3,814,425 4,613,391 3,006,751 12,683,682 Year 1 Year 2 Year 3 Year 4 Year 5 Check Sums Total Costs Est. % Total Proj. Costs Total Project Labor 20% 19,513,357 34,500 1,887,216 5,868,346 7,097,524 4,625,770 19,513,357 Total Infrastructure 13% 12,683,682 22,425 1,226,691 3,814,425 4,613,391 3,006,751 12,683,682 COTS Product License 47% 45,856,388 81,075 4,434,959 13,790,613 16,679,181 10,870,560 45,856,388 Total Costs w/ Contingency Contingency 25% Total Project Labor w/ Contingency 43,125 2,359,021 7,335,432 8,871,905 5,782,213 24,391,696 Total Infrastructure w/ Contingency 28,031 1,533,363 4,768,031 5,766,738 3,758,438 15,854,602 Total COTS Product License w/ Contingency 101,344 5,543,698 17,238,266 20,848,977 13,588,200 57,320,485 Total Project Cost - Cap. Plus O&M 97,566, ,500 9,436,082 29,341,730 35,487,620 23,128,851 97,566,783 Architecture / PMO / Other Support Costs 25,610,804 85,124 2,392,388 7,661,997 8,764,580 6,706,716 Total Capital Costs 123,177, ,624 11,828,471 37,003,726 44,252,200 29,835, ,177,587

19 Cost Estimate: Grid Management System (GMS) Cost Basis By Functionality 45,850,000 Base Platform 10,750,000 Base Platform +SCADA 6,000,000 Historian/Data Store 2,750,000 Visualization Reliability Functions 19,550,000 Distribution Management: 5,150,000 Fault Detection & Location 2,400,000 Switching Management 2,300,000 Distribution State Estimation 450,000 Outage Management: 8,400,000 Crew Management Outage Notification 1,000,000 Outage Reporting Storm Management Call Management 1,400,000 Advanced Reliability Functions 4,000,000 Reconfigurable Protection Microgrid Management DER Management DER Management Operational Planning Functions 4,050,000 Load & DER Forecasting 1,750,000 Peak Load Management 300,000 Simulation/Study Mode Infrastructure Management Functions Infrastructure Management Optimization Functions 6,500,000 DER Assisted VVC DER Assisted network Reliability Optmization Economic Optimization 1,500,000 Training Simulator Training Simulator *Estimates above based on engineering judgment, verbal vendor quotes, and past project co 189

20 Labor Estimates Total Labor Percentage 20% Vendor Labor 0% MSP Labor 2% 2,130,929 3, , , , ,880 2,130,929 SCE IT Labor 4% 4,261,857 7, ,569 1,251,445 1,561,054 1,049,759 4,261,857 BU Labor 4% 4,261,857 7, ,569 1,251,445 1,561,054 1,049,759 4,261,857 Testing & QA 3% 3,196,393 5, , ,584 1,170, ,319 3,196,393 Interface Development 5% 5,327,322 8, ,711 1,564,306 1,951,318 1,312,199 5,327,322 Training 1% 1,065,464 1,758 98, , , ,440 1,065,464 Travel 1% 1,065,464 1,758 98, , , ,440 1,065,464 OCM 0% Customization 0% Total Est. Project Labor Cost 21,309,287 35,152 1,962,843 6,257,226 7,805,270 5,248,796 21,309,287 Infrastructure Estimates Total Hardware (Material) 13% 13,851,036 22,849 1,275,848 4,067,197 5,073,426 3,411,718 13,851,036 Server Cost 5% 5,327,322 8, ,711 1,564,306 1,951,318 1,312,199 5,327,322 Client Hardware Cost 0% Storage Cost 3% 3,196,393 5, , ,584 1,170, ,319 3,196,393 Network Costs 0% OS and DB Licenses 5% 5,327,322 8, ,711 1,564,306 1,951,318 1,312,199 5,327,322 Total Est. HW & OS and DB 13,851,036 22,849 1,275,848 4,067,197 5,073,426 3,411,718 13,851,036 Year 1 Year 2 Year 3 Year 4 Year 5 Check Sums Total Costs Est. % Total Proj. Costs Total Project Labor 22% 21,309,287 35,152 1,962,843 6,257,226 7,805,270 5,248,796 21,309,287 Total Infrastructure 14% 13,851,036 22,849 1,275,848 4,067,197 5,073,426 3,411,718 13,851,036 COTS Product License 51% 50,076,824 82,606 4,612,681 14,704,481 18,342,385 12,334,671 50,076,824 Total Costs w/ Contingency Contingency 25% Total Project Labor w/ Contingency 43,940 2,453,554 7,821,532 9,756,588 6,560,995 26,636,608 Total Infrastructure w/ Contingency 28,561 1,594,810 5,083,996 6,341,782 4,264,647 17,313,795 Total COTS Product License w/ Contingency 103,258 5,765,851 18,380,601 22,927,981 15,418,339 62,596,030 Total Base Project Cost w/ Contingency 106,546, ,758 9,814,215 31,286,129 39,026,350 26,243, ,546,434 Architecture / PMO / Other Support Costs 27,993,303 86,732 2,488,259 8,169,737 9,638,560 7,610,016 27,993,303 GRAND TOTAL 134,539, ,490 12,302,474 39,455,866 48,664,910 33,853, ,539,

Evolving Grid 700 MHz Field Area Network (FAN) Case Study. April 2018

Evolving Grid 700 MHz Field Area Network (FAN) Case Study. April 2018 Evolving Grid 700 MHz Field Area Network (FAN) Case Study April 2018 Communication System Overview 877 Managed IP Devices 899 Miles of microwave links (29 link total) 21 are 2 x 180 Mbps microwave links

More information

Distribution Automation Smart Feeders in a Smart Grid World Quanta Technology LLC

Distribution Automation Smart Feeders in a Smart Grid World Quanta Technology LLC Distribution Automation Smart Feeders in a Smart Grid World DA Communications Telecommunications Services This diagram depicts the typical telecommunications services used to interconnect a Utility s customers,

More information

A Performance Study of Deployment Factors in Wireless Mesh

A Performance Study of Deployment Factors in Wireless Mesh A Performance Study of Deployment Factors in Wireless Mesh Networks Joshua Robinson and Edward Knightly Rice University Rice Networks Group networks.rice.edu City-wide Wireless Deployments Many new city-wide

More information

Wireless InterOp Architecture and Design. Robert Burchard

Wireless InterOp Architecture and Design. Robert Burchard Wireless InterOp Architecture and Design Robert Burchard Agenda Smart Grid Concepts Use Cases Architectural & Design Overview & Considerations Network Overview (BH, WWAN, WLAN, WHAN) Coverage and Capacity

More information

THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF RUSSEL D. JOHNSON

THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF RUSSEL D. JOHNSON THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF RUSSEL D. JOHNSON PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE d/b/a EVERSOURCE ENERGY RELIABILITY ENHANCEMENT

More information

CDMA2000 Network Repeater Deployment Experience

CDMA2000 Network Repeater Deployment Experience CDMA2000 Network Repeater Deployment Experience IEEE 802.16 Presentation Submission Template (Rev. 8.3) Document Number: IEEE C802.16mmr-05/031 Date Submitted: 2005-11-11 Source: D. J. Shyy Voice: +1-703-983-6515

More information

Connecting the automated field Building blocks for the modern field network

Connecting the automated field Building blocks for the modern field network WELL SITE AUTOMATION, JANUARY 2017 Connecting the automated field Building blocks for the modern field network Renner Vaughn, Global Program Lead Show me the data! Great crew change continues That mindset

More information

Next Generation AMI. Reji Kumar Pillai President India Smart Grid Forum (ISGF)

Next Generation AMI. Reji Kumar Pillai President India Smart Grid Forum (ISGF) Next Generation AMI Reji Kumar Pillai President India Smart Grid Forum (ISGF) Introduction Electromechanical Meters Electronic Meters AMR and Prepaid Meters Smart Meters Today s scenario: Gateways/DCU/Aggregators

More information

Premier Event Sponsor 4RF Gold Sponsor ECI The Elastic Network

Premier Event Sponsor 4RF Gold Sponsor ECI The Elastic Network REGION 10 2018 TECHNICAL CONFERENCE October 11 & 12, 2018 Courtyard Sacramento Cal Expo Sacramento, CA Premier Event Sponsor 4RF Gold Sponsor ECI The Elastic Network Thursday, October 11, 2018 7:00AM 5:00PM

More information

Optimize Outage Management and Improve Underground System Reliability

Optimize Outage Management and Improve Underground System Reliability SEL-8301 Underground Distribution Sensor Optimize Outage Management and Improve Underground System Reliability Line current measurement accuracy of 1.5 percent allows for more effective switching decisions

More information

**REDACTED, PUBLIC VERSION**

**REDACTED, PUBLIC VERSION** Application No.: A.0-0-0 Exhibit No.: SCG -A Date: February, 00 Witness: Edward Fong SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE SUPPLEMENTAL TESTIMONY **REDACTED, PUBLIC VERSION**

More information

SEATTLE CITY LIGHT DISTRIBUTION AUTOMATION

SEATTLE CITY LIGHT DISTRIBUTION AUTOMATION SEATTLE CITY LIGHT DISTRIBUTION AUTOMATION Ryan Pham Project manager 0/27/206 AGENDA. Distribution automation background 2. Seattle City Light pilot project 3. System performance windstorm 08/29/5 4. Lessons

More information

Workpaper Southern California Edison / A GS&RP. Scope Covered Conductor Support for Section (IV)(B)(1)(e)

Workpaper Southern California Edison / A GS&RP. Scope Covered Conductor Support for Section (IV)(B)(1)(e) Objective Summary Scope Covered Conductor Support for Section (IV)(B)()(e) This work paper describes the forecasting methodology used to determine the proposed scope estimate of 9 miles of replacement

More information

Measurement Driven Deployment of a Two-Tier Urban Mesh Access Network

Measurement Driven Deployment of a Two-Tier Urban Mesh Access Network Measurement Driven Deployment of a Two-Tier Urban Mesh Access Network J. Camp, J. Robinson, C. Steger, E. Knightly Rice Networks Group MobiSys 2006 6/20/06 Two-Tier Mesh Architecture Limited Gateway Nodes

More information

ATLAS. P25 Systems. LMR communications made simple.

ATLAS. P25 Systems. LMR communications made simple. P25 Systems LMR communications made simple. We make your critical communication system safe and simple to use. IS THE MOST MODERN & FLEXIBLE P25 SYSTEM Our patented Latitude technology makes the P25 application

More information

Communicator II WIRELESS DATA TRANSCEIVER

Communicator II WIRELESS DATA TRANSCEIVER Communicator II WIRELESS DATA TRANSCEIVER C O M M U N I C A T O R I I The Communicator II is a high performance wireless data transceiver designed for industrial serial and serial to IP networks. The Communicator

More information

TRANSMISSION AND SUBSTATIONS RESEARCH AREA

TRANSMISSION AND SUBSTATIONS RESEARCH AREA TRANSMISSION AND SUBSTATIONS RESEARCH AREA VISION The core vision of the Transmission and Substations Area is: Extract the Maximum from Existing Assets and Construct High-Performance New Assets The Life

More information

Analysis of Simple Infrastructure Multihop Relay Wireless System

Analysis of Simple Infrastructure Multihop Relay Wireless System Analysis of Simple Infrastructure Multihop Relay Wireless System IEEE 802.16 Presentation Submission Template (Rev. 8.3) Document Number: Date Submitted: 2005-11-16 Source: Byoung-Jo J Kim Voice: 732-420-9028

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information

GridLiance Reliability Criteria

GridLiance Reliability Criteria GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances

More information

Southern California Edison EPIC Overview

Southern California Edison EPIC Overview EPIC Overview i-pcgrid Conference Aaron Renfro EPIC Program Administrator March 30, 2018 Summary of the EPIC Program Funding & Admin. Investment Areas Electricity System Value Chain $162M/annually in ratepayer

More information

Experiences of Using Synchrophasors at Duke Energy

Experiences of Using Synchrophasors at Duke Energy 1 Experiences of Using Synchrophasors at Duke Energy Tim Bradberry, Megan Vutsinas, Kat Sico Duke Energy IEEE PES Tutorial July 19 th, 2016 Duke Energy s Phasor Plans Carolinas West Currently have 125

More information

Commercial Deployments of Line Current Differential Protection (LCDP) Using Broadband Power Line Carrier (B-PLC) Technology

Commercial Deployments of Line Current Differential Protection (LCDP) Using Broadband Power Line Carrier (B-PLC) Technology Commercial Deployments of Line Current Differential Protection (LCDP) Using Broadband Power Line Carrier (B-PLC) Technology Nachum Sadan - Amperion Inc. Abstract Line current differential protection (LCDP)

More information

Current Systems. 1 of 6

Current Systems. 1 of 6 Current Systems Overview Radio communications within the State of California s adult correctional institutions are vital to the daily safety and security of the institution, staff, inmates, visitors, and

More information

Distribution Fault Location

Distribution Fault Location Distribution Fault Location 1. Introduction The objective of our project is to create an integrated fault locating system that accurate locates faults in real-time. The system will be available for users

More information

DAS Solutions. Delivering coverage and capacity in today s challenging environments

DAS Solutions. Delivering coverage and capacity in today s challenging environments DAS Solutions Delivering coverage and capacity in today s challenging environments Wireless subscribers expect clear coverage Partner with an industry leader With a diverse offering of communications sites

More information

t-series The Intelligent Solution for Wireless Coverage and Capacity

t-series The Intelligent Solution for Wireless Coverage and Capacity The Intelligent Solution for Wireless Coverage and Capacity All-Digital t-series - Going Beyond DAS With the increasing popularity of mobile devices, users expect to have seamless data services anywhere,

More information

Using smart grid sensors and advanced software applications as an asset management tool at Hydro Ottawa

Using smart grid sensors and advanced software applications as an asset management tool at Hydro Ottawa 24th International Conference & Exhibition on Electricity Distribution (CIRED) 12-15 June 2017 Session 1: Network components Using smart grid sensors and advanced software applications as an asset management

More information

District of Columbia Power Line Undergrounding (DC PLUG) Initiative

District of Columbia Power Line Undergrounding (DC PLUG) Initiative District of Columbia Power Line Undergrounding (DC PLUG) Initiative Community Hearing 125 Michigan Avenue, NE Washington, DC 20017 Presented by: Aaron Smith (Pepco), Ronald Williams (DDOT) and Morgan O

More information

Seeking Partnership for Pilot Test-beds for Assessing Broadband Deployment in UHF-TV White Space of India

Seeking Partnership for Pilot Test-beds for Assessing Broadband Deployment in UHF-TV White Space of India Seeking Partnership for Pilot Test-beds for Assessing Broadband Deployment in UHF-TV White Space of India Contact: Punit Rathod Project Research Scientist, Department of EE, IIT Bombay Email: punitrathod@gmail.com,

More information

Hardware-Software Co-Design Cosynthesis and Partitioning

Hardware-Software Co-Design Cosynthesis and Partitioning Hardware-Software Co-Design Cosynthesis and Partitioning EE8205: Embedded Computer Systems http://www.ee.ryerson.ca/~courses/ee8205/ Dr. Gul N. Khan http://www.ee.ryerson.ca/~gnkhan Electrical and Computer

More information

Request for Information (RFI) for the Norwegian GSM-R BSS network replacement. Part A: Scope

Request for Information (RFI) for the Norwegian GSM-R BSS network replacement. Part A: Scope Request for Information (RFI) for the Norwegian Part A: Scope 1.1 N/A 11.10.2012 1.0 N/A 04.10.2012 Revision Revision Date Issued by Controlled by Approved by history Title Number of 16 pages: Request

More information

Modelling Parameters. Affect on DER Impact Study Results

Modelling Parameters. Affect on DER Impact Study Results Modelling Parameters Affect on DER Impact Study Results Agenda Distributed Energy Resources (DER) Impact Studies DER Challenge Study Steps Lessons Learned Modeling Reverse Power Transformer Configuration

More information

Business & Technology Advisory November 2018

Business & Technology Advisory November 2018 Business & Technology Advisory November 2018 Broadband Case Study: Valley Electric Association Cooperative Profile Valley Electric Association, Inc. (VEA) supplies electricity to a population of 45,000

More information

IMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES

IMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES IMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES (Summary) N S Markushevich and A P Berman, C J Jensen, J C Clemmer Utility Consulting International, JEA, OG&E Electric Services,

More information

SALE OF UPPER 700 MHZ A BLOCK SPECTRUM

SALE OF UPPER 700 MHZ A BLOCK SPECTRUM SALE OF UPPER 700 MHZ A BLOCK SPECTRUM A Wireless Solution for Utilities and Critical Infrastructure Enterprises John Vislosky, Access Spectrum, LLC Q2 s2015 UPPER 700 MHZ A BLOCK The Upper 700 MHz A Block

More information

Optimize Cell-Site Deployments

Optimize Cell-Site Deployments Optimize Cell-Site Deployments CellAdvisor BBU Emulation Mobile operators continue to face an insatiable demand for capacity, driven by multimedia applications and the ever-increasing number of devices

More information

Self Healing Single Phase Looped Network AUTOMATED RECONFIGURATION FOR POWER OUTAGE MANAGEMENT. Team Members

Self Healing Single Phase Looped Network AUTOMATED RECONFIGURATION FOR POWER OUTAGE MANAGEMENT. Team Members Self Healing Single Phase Looped Network AUTOMATED RECONFIGURATION FOR POWER OUTAGE MANAGEMENT Team Members Lamine Bassene Damel Goddard Oluwabunkunmi Olusanya Chibuzo Ononiwu Luan Watson TABLE OF CONTENTS

More information

MEMORANDUM. Figure 1: Current Drive-By Meter Reading System. Handheld Collector Communicates with Radio Transmitter to Collect Data

MEMORANDUM. Figure 1: Current Drive-By Meter Reading System. Handheld Collector Communicates with Radio Transmitter to Collect Data MEMORANDUM TO: ROB HAYES, DPS DIRECTOR/CITY ENGINEER FROM: TIM KUHNS, WATER AND SEWER SENIOR ENGINEER SUBJECT: ADVANCED METERING INFRASTRUCTURE (AMI) SYSTEM DATE: APRIL 24, 2015 Advanced metering infrastructure

More information

Capability Statement

Capability Statement Capability Statement Who we are RCS Telecommunications (RCST) is a leading Australian telecommunications service provider for medium to large organisations. With over 35 years experience in communication

More information

NetApp Sizing Guidelines for MEDITECH Environments

NetApp Sizing Guidelines for MEDITECH Environments Technical Report NetApp Sizing Guidelines for MEDITECH Environments Brahmanna Chowdary Kodavali, NetApp March 2016 TR-4190 TABLE OF CONTENTS 1 Introduction... 4 1.1 Scope...4 1.2 Audience...5 2 MEDITECH

More information

INNOVATIVE SOLUTIONS FOR CSP CONTROLLERS

INNOVATIVE SOLUTIONS FOR CSP CONTROLLERS CSP TODAY 2015 INNOVATIVE SOLUTIONS FOR CSP CONTROLLERS 11-12 November 2015, Seville OUR PRODUCTS Local tracking Controllers With embedded SPA Algorithm for autonomous /slave tracking strategies. High

More information

Full Spectrum: Mission Critical Private Wireless Networks

Full Spectrum: Mission Critical Private Wireless Networks Full Spectrum: Mission Critical Private Wireless Networks Licensed, Point-to-Multipoint, Broadband Wireless Networks fullspectrumnet.com 1 Company Introduction fullspectrumnet.com 2 Full Spectrum Background

More information

Total DAS Portfolio Intelligent Design = Maximum Flexibility

Total DAS Portfolio Intelligent Design = Maximum Flexibility Total DAS Portfolio Intelligent Design = Maximum Flexibility Total DAS Portfolio Cutting-edge DAS design meets cabling innovation with operator-grade, enterprise-ready solutions The comprehensive Corning

More information

From: Roger Clayton Re: Notes from FERC DER Technical Conference, April Panel 4 Collection and availability of data on DER installations

From: Roger Clayton Re: Notes from FERC DER Technical Conference, April Panel 4 Collection and availability of data on DER installations Memorandum From: Roger Clayton Re: Notes from FERC DER Technical Conference, April 11 2018 Panel 4 Collection and availability of data on DER installations Q1 Type of information? Q2 Current data & sharing?

More information

SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011

SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 Baselining using large quantities of historical phasor data to identify and understand patterns in interconnection-wide grid behavior, to

More information

UPGRADE YOUR MPT NETWORK THE SMART WAY. harris.com #harriscorp

UPGRADE YOUR MPT NETWORK THE SMART WAY. harris.com #harriscorp UPGRADE YOUR MPT NETWORK THE SMART WAY harris.com #harriscorp FLEXIBLE MIGRATION Advance Business Efficiencies and Worker Safety Circuit-switched analog networks are becoming obsolete as agencies move

More information

Trio Q. Licensed UHF Ethernet and Serial data radio. QB450 Full Duplex

Trio Q. Licensed UHF Ethernet and Serial data radio. QB450 Full Duplex Trio Q Licensed UHF Ethernet and Serial data radio QB450 Full Duplex 1 Trio Q Data Radios are advanced, high-speed licensed digital data radios, providing both Ethernet and serial communications for complex

More information

Embedded Generation Information Package

Embedded Generation Information Package Embedded Generation Information Package Remote Monitoring (RM) Remote Shutdown (RS) Prepared by: Station Design and Standards Embedded Generation Revision: 1.6 December 2015 Page 1 of 10 1. Background:

More information

10-Year Technology Trends

10-Year Technology Trends SESSION 4 10-Year Technology Trends Keynote/Moderator Carole Barbeau President - Energy Advisory Americas DNV GL Ben Bixby General Manager & Director of Energy Products, Nest Joe Jankosky Director for

More information

Cisco Certification Exam

Cisco Certification Exam Cisco 642-732 Certification Exam Number: 642-732 Passing Score: 800 Time Limit: 120 min File Version: 23.4 http://www.gratisexam.com/ CISCO 642-732 EXAM QUESTIONS & ANSWERS Exam Name: CCNP Wireless - CUWSS

More information

Smart Grid System Selection: Best Practices and Lessons Learned

Smart Grid System Selection: Best Practices and Lessons Learned Smart Grid System Selection: Best Practices and Lessons Learned WHITE PAPER Trilliant helps leading utilities and energy retailers achieve their smart grid visions through the Trilliant Communications

More information

Energex Smart Network Trials

Energex Smart Network Trials Energex Smart Network Trials 1 Agenda Power line carrier trials Low voltage network management trial Why did we do a PRIME trial Low cost technology Same cost as a electronic meter without communications

More information

Background. White Paper THE DESTINY OF INTELLIGENT INFRASTRUCTURE. Mark Gabriel R. W. Beck, Inc.

Background. White Paper THE DESTINY OF INTELLIGENT INFRASTRUCTURE. Mark Gabriel R. W. Beck, Inc. White Paper THE DESTINY OF INTELLIGENT INFRASTRUCTURE Mark Gabriel R. W. Beck, Inc. Background The implementation of distribution and substation automation, outage management, advanced metering infrastructure

More information

Affordable Backhaul for Rural Broadband: Opportunities in TV White Space in India

Affordable Backhaul for Rural Broadband: Opportunities in TV White Space in India Affordable Backhaul for Rural Broadband: Opportunities in TV White Space in India Abhay Karandikar Professor and Head Department of Electrical Engineering Indian Institute of Technology Bombay, Mumbai

More information

Millimetre-wave wireless backhaul in 5G networks. Mike Geen Head of Engineering Filtronic Broadband

Millimetre-wave wireless backhaul in 5G networks. Mike Geen Head of Engineering Filtronic Broadband Millimetre-wave wireless backhaul in 5G networks Mike Geen Head of Engineering Filtronic Broadband About Filtronic Filtronic was established 1977 currently ~120 employees across multiple sites in UK, US,

More information

ROSE - Real Time Analysis Tool for Enhanced Situational Awareness

ROSE - Real Time Analysis Tool for Enhanced Situational Awareness ROSE - Real Time Analysis Tool for Enhanced Situational Awareness Marianna Vaiman V&R Energy Copyright 1997-2013 V&R Energy Systems Research, Inc. All rights reserved. WECC JSIS Salt Lake City, UT October

More information

LTE femtocell density modelling. Michael Fitch Chief of wireless research Technology Services and Operations BT Adastral Park, IP5 3RE October 2014

LTE femtocell density modelling. Michael Fitch Chief of wireless research Technology Services and Operations BT Adastral Park, IP5 3RE October 2014 LTE femtocell density modelling Michael Fitch Chief of wireless research Technology Services and Operations BT Adastral Park, IP5 3RE October 2014 What is a femtocell? Internet LTE EPC Long Term Evolution

More information

2018 VA APCO-NENA SPRING CONFERENCE PUBLIC SAFETY GRADE AND COMMERCIAL BROADBAND PERFORMANCE. May 2018

2018 VA APCO-NENA SPRING CONFERENCE PUBLIC SAFETY GRADE AND COMMERCIAL BROADBAND PERFORMANCE. May 2018 2018 VA APCO-NENA May 2018 SPRING CONFERENCE ---------------------------------------------------------------- ---- PUBLIC SAFETY GRADE AND COMMERCIAL BROADBAND PERFORMANCE AGENDA TELEVATE OVERVIEW PUBLIC

More information

Industrial Wireless Training Kit

Industrial Wireless Training Kit Industrial Wireless Training Kit Global Wireless Standards IoT Focused Segments Intelligent Server group Operation, induction, comparison, analysis Information Sharing Interconnected 2G, 3G, 4G Wi-Fi Infrastructure

More information

Recommendation ITU-R F (05/2011)

Recommendation ITU-R F (05/2011) Recommendation ITU-R F.1764-1 (05/011) Methodology to evaluate interference from user links in fixed service systems using high altitude platform stations to fixed wireless systems in the bands above 3

More information

N E T W O R K UPGRADE SOLUTIONS UPGRADE YOUR MPT NETWORK YOUR WAY

N E T W O R K UPGRADE SOLUTIONS UPGRADE YOUR MPT NETWORK YOUR WAY N E T W O R K UPGRADE SOLUTIONS UPGRADE YOUR MPT NETWORK YOUR WAY It s a fact that circuit-switched analog networks are becoming obsolete, as agencies move to IP-based networks. At the same time, the very

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

Wireless Networks, EARTH research project

Wireless Networks, EARTH research project ETSI Green Agenda 26 November 2009 HOW TO REDUCE-GREEN HOUSE GAS EMISSIONS FROM ICT EQUIPMENT Wireless Networks, EARTH research project Alcatel-Lucent, Bell Labs Stuttgart Ulrich Barth Energy Usage in

More information

Remote RF is Becoming a Mainstream Solution

Remote RF is Becoming a Mainstream Solution Remote RF is Becoming a Mainstream Solution Cedric Taylor Celerica 55 Madison Avenue Morristown, NJ 07960 www.celerica.com Abstract This paper examines the technologies and applications associated with

More information

CBRS Commercial Weather RADAR Comments. Document WINNF-RC-1001 Version V1.0.0

CBRS Commercial Weather RADAR Comments. Document WINNF-RC-1001 Version V1.0.0 CBRS Commercial Weather RADAR Comments Document WINNF-RC-1001 Version V1.0.0 24 July 2017 Spectrum Sharing Committee Steering Group CBRS Commercial Weather RADAR Comments WINNF-RC-1001-V1.0.0 TERMS, CONDITIONS

More information

Advanced Modeling and Simulation of Mobile Ad-Hoc Networks

Advanced Modeling and Simulation of Mobile Ad-Hoc Networks Advanced Modeling and Simulation of Mobile Ad-Hoc Networks Prepared For: UMIACS/LTS Seminar March 3, 2004 Telcordia Contact: Stephanie Demers Robert A. Ziegler ziegler@research.telcordia.com 732.758.5494

More information

25 CORE ASTRO FLEXIBLE, SCALABLE CONFIGURATIONS

25 CORE ASTRO FLEXIBLE, SCALABLE CONFIGURATIONS FLEXIBLE, SCALABLE CONFIGURATIONS ASTRO 25 CORE Small town or major city single department or multi-agency your radio system should fit your needs and your budget. Motorola s dynamic architecture gives

More information

Journal of Telecommunications System & Management

Journal of Telecommunications System & Management njournal of Telecommunicatio s System & Management Journal of Telecommunications System & Management Uthayakumar, J Telecommun Syst Manage 2018, 7:1 DOI: 10.4172/2167-0919.1000155 Commentary Open Access

More information

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical - NA. Protection & Control - NA. \\Q 30 JuLy Transmission & Distribution - NA

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical - NA. Protection & Control - NA. \\Q 30 JuLy Transmission & Distribution - NA A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical - NA Protection & Control - NA \\Q 30 JuLy Transmission & Distribution - NA Telecontrol System Planning - NA Replace MDR-4000 Microwave

More information

Wireless Technologies Provide Effective Data Communications to the Solar Power Industry

Wireless Technologies Provide Effective Data Communications to the Solar Power Industry Wireless Technologies Provide Effective Data Communications to the Solar Power Industry Colin Lippincott General Manager, Renewable Energy Markets FreeWave Technologies, Inc. Agenda Wireless In Solar Wireless

More information

GSGF White Paper: Status and Insights on Microgrids. From Pilot to Commercial Deployment

GSGF White Paper: Status and Insights on Microgrids. From Pilot to Commercial Deployment GSGF White Paper: Status and Insights on Microgrids From Pilot to Commercial Deployment About GSGF White Paper About Microgrids Working Group Background and Scope Functions of Microgrids Global Cases on

More information

Converging Information and Technologies. By George M Belich

Converging Information and Technologies. By George M Belich Converging Information and Technologies By George M Belich Introduction The twentieth century brought about a many changes in metering and information technologies. But most of the information, although

More information

ICASA s E-Band and V-Band Proposals (September 2015)

ICASA s E-Band and V-Band Proposals (September 2015) ICASA s E-Band and V-Band Proposals (September 2015) Recognising demand for these bands, ICASA intends to regulate the E band and V band in a manner which is effective and also spectrum-efficient, keeping

More information

Trio Q. Licensed UHF Ethernet and Serial data radio. QH450 Hot Standby Full Duplex

Trio Q. Licensed UHF Ethernet and Serial data radio. QH450 Hot Standby Full Duplex Trio Q Licensed UHF Ethernet and Serial data radio QH450 Hot Standby Full Duplex 1 Trio Q Data Radios are advanced, high-speed licensed digital data radios, providing both Ethernet and serial communications

More information

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY Module 10 Initiation Code 1 M10 Initiation Code This is not the Initiating cause code The Outage Initiation Codes describe where an Automatic Outage was initiated on the power system. Element-Initiated

More information

DeskView Load - Introduction. 1 Copyright 2014 FUJITSU

DeskView Load - Introduction. 1 Copyright 2014 FUJITSU DeskView Load - Introduction 1 Copyright 2014 FUJITSU DeskView Family Manageability 2 Copyright 2014 FUJITSU Market driving forces Value add of an IT is like an iceberg visible value add invisible value

More information

Strategies for Migrating from One Way to Two Way Communicating Devices.

Strategies for Migrating from One Way to Two Way Communicating Devices. Strategies for Migrating from One Way to Two Way Communicating Devices Transition to Two Way DR Duke Energy Florida Melissa Knous Thomas Artau Duke Energy Florida (DEF) Transmitters System wide Control

More information

Advanced Cell / RF / Drone Detection & Countermeasure New Distributor Program

Advanced Cell / RF / Drone Detection & Countermeasure New Distributor Program Advanced Cell / RF / Drone Detection & Countermeasure New Distributor Program RF Detection Kit: HSS is offering a professional Detection Solution with a portable training & presentation package. 1) Vendors

More information

Training for New Technologies

Training for New Technologies Training for New Technologies Be prepared when your organization meets the pressures of implementing new technologies. Panelists will discuss lessons learned when designing, developing and implementing

More information

GIS Data Assessment for DMS and Smart Grid Implementation

GIS Data Assessment for DMS and Smart Grid Implementation GIS Data Assessment for DMS and Smart Grid Implementation John Dirkman, P.E. Telvent Esri EGUG 11 October 2011 11/3/2011 1 Agenda 1. Determining your Distribution Management System and Smart Grid Drivers

More information

Optimising a Unified Space and Ground Segment

Optimising a Unified Space and Ground Segment Optimising a Unified Space and Ground Segment GVF Connectivity 2018: Evolving the "New" New Verticals Mark Lambert Mark.lambert@kratoscomms.com VP Business Development Kratos 1 Dramatic growth in satellites

More information

Does anybody really know what 5G is? Does anybody really care?

Does anybody really know what 5G is? Does anybody really care? Does anybody really know what 5G is? Does anybody really care? Dean Mischke P.E., V.P. Finley Engineering Company, Inc. What is 5G? Salvation for Wireless Companies *Qualcomm CEO Steve Mollenkopf s keynote

More information

500 Series AP and SM CAP and CSM Licensed, Reliable Wireless Connectivity

500 Series AP and SM CAP and CSM Licensed, Reliable Wireless Connectivity 500 Series AP and SM CAP 35500 and CSM 35500 Licensed, Reliable Wireless Connectivity Reliable, Cost Effective Connectivity 3.5 GHz Licensed Band OFDM nlos and NLOS Connectivity High Downlink AND Uplink

More information

Dedicated Line: MRS Logística Brazil. Overall System Presentation

Dedicated Line: MRS Logística Brazil. Overall System Presentation Dedicated Line: MRS Logística Brazil MRS s CBTC Project SIACO (Integrated Operation Automation and Control System) Overall System Presentation Speaker: Paulo Vieira 1 MRS Logística S.A. Profile Belo Horizonte

More information

VIRTUAL SEGMENTATION. Executive summary. Online. Website: technetix.com

VIRTUAL SEGMENTATION. Executive summary. Online.   Website: technetix.com VIRTUAL SEGMENTATION Executive summary Online Email: info-usa@technetix.com Website: technetix.com Nov/2017 Introduction The steady evolution of the DOCSIS system and Hybrid Fiber Coaxial (HFC) plants

More information

B. The designated coverage areas shall include both indoor and outdoor coverage.

B. The designated coverage areas shall include both indoor and outdoor coverage. Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet

More information

CAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24

CAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24 RC0120A - RC IRO-010 Data Specification NOTE: Changes from Peak's Attachment A are highlighted in red in columns C through G Section Category Number Responsible Pa Data Item Data Transfer Method 1.1 Transmission

More information

Cambium PMP 450 Series PMP 430 / PTP 230 Series PMP/PTP 100 Series Release Notes

Cambium PMP 450 Series PMP 430 / PTP 230 Series PMP/PTP 100 Series Release Notes POINT TO POINT WIRELESS SOLUTIONS GROUP Cambium PMP 450 Series PMP 430 / PTP 230 Series PMP/PTP 100 Series Release Notes System Release 13.1.3 1 INTRODUCTION This document provides information for the

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of ) GN Docket No. 12-354 Amendment of the Commission s Rules with ) Regard to Commercial Operations in the 3550- ) 3650

More information

wireless intelligence

wireless intelligence GE Lighting wireless intelligence LightGrid outdoor wireless lighting control system measurably smarter LightGrid is a groundbreaking outdoor wireless control system for street and roadway lights. The

More information

Procedia Computer Science

Procedia Computer Science Available online at www.sciencedirect.com Procedia Computer Science 1 (2012) 2717 2722 Procedia Computer Science 00 (2009) 000 000 Procedia Computer Science www.elsevier.com/locate/procedia www.elsevier.com/locate/procedia

More information

Test Bed for a Wireless Network on Small UAVs

Test Bed for a Wireless Network on Small UAVs Test Bed for a Wireless Network on Small UAVs Timothy X Brown Interdisciplinary Telecommunications Electrical and Computer Engineering University of Colorado Presented at the AIAA 3 rd Unmanned Unlimited

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania Information Communications Technology Innovation Commonwealth of Pennsylvania Executive Summary In the mid-1990s, the Commonwealth of Pennsylvania faced the prospect of replacing an aging analog radio

More information

ēko Pro Series System

ēko Pro Series System ēko Pro Series System FOR ENVIRONMENTAL MONITORING The ACEINNA ēko Pro Series Starter Kit is a wireless agricultural and environmental sensing system for crop monitoring, microclimate studies and environmental

More information

10EC81-Wireless Communication UNIT-6

10EC81-Wireless Communication UNIT-6 UNIT-6 The first form of CDMA to be implemented is IS-95, specified a dual mode of operation in the 800Mhz cellular band for both AMPS and CDMA. IS-95 standard describes the structure of wideband 1.25Mhz

More information

GUIDELINES FOR THE APPLICATION FOR PUBLIC RADIOCOMMUNICATIONS SERVICE (PRS) LICENCES

GUIDELINES FOR THE APPLICATION FOR PUBLIC RADIOCOMMUNICATIONS SERVICE (PRS) LICENCES GN-35/2012 GUIDELINES FOR THE APPLICATION FOR PUBLIC RADIOCOMMUNICATIONS SERVICE (PRS) LICENCES Office of the Communications Authority Hong Kong August 2012 CONTENTS SECTION 1 The regulatory framework

More information

Business Plan Summary

Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Mike Bushby Division Manager Fleet Services and

More information

Smart Meter connectivity solutions

Smart Meter connectivity solutions Smart Meter connectivity solutions BEREC Workshop Enabling the Internet of Things Brussels, 1 February 2017 Vincenzo Lobianco AGCOM Chief Technological & Innovation Officer A Case Study Italian NRAs cooperation

More information