1 IMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES (Summary) N S Markushevich and A P Berman, C J Jensen, J C Clemmer Utility Consulting International, JEA, OG&E Electric Services, U.S.A. Advanced Distribution Automation implies data preparation, decision making, and control of field devices automatically adjusted to real-time changes of the operating conditions of the power system. Automation of data preparation includes real-time data acquisition, automated data retrieving from various utility databases and other automated systems, and realtime comprehensive modeling of the distribution operations. Automated decision making means real-time adaptive optimization procedures. Automated control of devices in distribution systems means execution of the recommendations of the optimization algorithms by using closed-loop control of switching devices, voltage controllers, and capacitor. Advanced Distribution Automation Systems with realtime closed-loop applications are in different stages of implementation in several U.S.A. utilities. The real-time Distribution Operation Model and Analysis (RTDM), the Fault Location, Isolation, and Service Restoration (FLIR), and the coordinated Voltage and Var Control (VVC) functions are the most effective DA applications. The RTDM application periodically runs in the background and performs the following actions: topology modeling and connectivity checking; load modeling and balancing; capacitor state estimation; facility modeling; modeling of immediate transmission; power flow modeling; voltage related contingency analysis; voltage quality checking; loss analysis; report preparation, including reporting to the operator the summaries of the analysis. The field tests of the accuracy of distribution operation models show satisfactory results. The FLIR function monitors the SCADA statuses of the automated switching devices, the statuses of the fault indicators, and the commanded/uncommanded switching operations of the circuit breakers and automated switching devices along the feeders. It also monitors the pseudo-statuses of other switching devices represented in SCADA and performs the following actions: checks the circuit connectivity and changes the connectivity model in accordance with the real-time situation; checks the loading of the circuits under normal conditions for a given look-ahead time interval; recommends feeder reconfiguration to eliminate overload in case of an existing or a possible near future overload under normal conditions; analyzes the combination of fault indications, switch statuses, and lockout conditions to determine the most likely fault location; recommends operation sequences to the operator after a fault occurs; executes the switching operations via SCADA in closed-loop mode if authorized by the operator. The function selects the optimal reconfiguration based on the following criteria: Minimum unserved kws; no overloads; no voltages beyond the emergency limits; minimum switching operations; preferable use of switching devices which are closer to the faulted feeder; minimum losses. The field test of the Fault Location, Isolation, and Service Restoration application demonstrated satisfactory fault location and optimal service restoration under different load, connectivity, and switch availability conditions. The optimal solutions included simple as well as cascading transfers of loads. The Voltage and Var Control application calculates and executes the optimal voltage controller settings and capacitor statuses while meeting one or a combination of the following objectives: maximize the kwhs supplied within the standard (or better) voltage quality; reduce the peak load while keeping the voltages within either standard limits or emergency limits; minimize the utility production (purchase) cost under conditions of high real-time energy prices; eliminate or reduce feeder segment overloads; eliminate or reduce transmission line overloads; eliminate or reduce under/over voltages in transmission; provide reactive power support in transmission. The field test of the Voltage and Var Control application demonstrated that a significant improvement in the voltage quality and load management could be obtained by using coordinated closed-loop voltage and var control. The integrated field test of advanced DA demonstrated a rapid adjustment of the VVC and RTDM applications to the feeder connectivity changes. Effective utilization of advanced DA requires a significant change of the paradigm in the area of distribution operation control.

2 IMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES N S Markushevich and A P Berman, C J Jensen, J C Clemmer Utility Consulting International, JEA, OG&E Electric Services, U.S.A. 1. INTRODUCTION Advanced Distribution Automation (ADA) implies data preparation, decision making, and control of field devices automatically adjusted to real-time changes of the operating conditions of the power system (1). Automation of data preparation includes real-time data acquisition, automated data retrieving from various utility databases and other automated systems, and realtime comprehensive modeling of the distribution operations. Automated decision making means real-time adaptive optimization procedures. Automated control of devices in distribution systems means execution of the recommendations of the optimization algorithms by using closed-loop control of switching devices, voltage controllers, and capacitors. The stages of implementation of advanced DA are as follows (2): 1. Determine via study the utility readiness for ADA by examining existence of sufficient room for optimization; 2. Determine the feasible upgrade of the distribution system needed for effective ADA; 3. Determine the feasible degree of automation of the particular distribution system; 4. Prove the practicality and acceptability of the recommended automation; 5. Specify the system-wide integrated automated system; 6. Conduct implementation of ADA in phases. The main methodologies of the first three stages of implementation of advanced DA are comprehensive computer-aided simulation of utility-specific distribution operations with and without ADA (3), optimization procedures for selection of automated normally open points, automated sectionalizing switching devices, feeder capacitors and voltage regulators either with local or with central control (4,5), and economic analysis of the expected benefits and cost of ADA (6). The proof of the recommended concept of ADA is provided by conducting a pilot project where the main modeling and optimization algorithms are implemented under typical conditions of the particular utility, and by studying the behavior, the benefits, and the acceptance of the trial functions by utility personnel and by utility customers (7). The specification of the system-wide automation is based on the specific operational and business requirements of the utility, on the results of the feasibility study, on the experience derived from the pilot project, on the availability of the automated systems and utility resources. The advanced DA is specified as an integrated part of the overall automation of the power system (8). The description of the experience with the ADA implementation in the utilities will mainly address the following three applications: the real-time Distribution Operation Model and Analysis (RTDM); the Fault Location, Isolation, and Service Restoration (FLIR); and the Optimal Voltage and Var Control (VVC). Several North American utilities are in different stages of implementation of advanced Distribution Automation. The main characteristics of these applications and the implementation results based on the experience of two US utilities: Jacksonville Electric Authority (JEA) and OG&E Electric Services (OG&E) are briefly described in the following sections. 2. DISTRIBUTION OPERATION MODEL AND ANALYSIS The RTDM application periodically runs in the background and performs the following actions: a. Topology modeling and connectivity checking; b. Load modeling and state estimation; c. Capacitor status estimation; d. Facility modeling; e. Modeling of immediate transmission; f. Power flow modeling; g. Voltage related contingency analysis; h. Voltage quality checking; i. Loss analysis; j. Report preparation, including reporting to the operator the summaries of the analysis, such as: load and voltage violations distances to the limits available change of loads due to voltage change

3 The real-time Distribution Operation Model is the background sub-function of all advanced DA applications. The accuracy of the model impacts the accuracy of the distribution operation analyses, the correctness of voltage and var optimization, and of the recommendations for post-contingency configurations. The most critical parameters for the objectives of the advanced applications are the voltages in the sites where the voltage limits are checked and the amperes in the most loaded segments of the circuit mains. The accuracy of the modeled voltages depends on the accuracy of the measurement of the substation bus voltage, which is the reference voltage for the distribution operation model, on the correctness of the model of the circuit connectivity and parameters, on the accuracy of the nodal load models, and on the accuracy of the power flow program used as the background of the model. The accuracy of the results produced by the RTMD application was tested by comparing the model results with the output of digital measurement devices placed in the primaries and in secondaries. The manufacturers of these devices guarantee an accuracy of 0.4% for voltage measurements. Typical results of this comparison are presented in Figures 1 (for the primaries) and in Fig 2 (for the secondaries). As seen in the figures, the difference in the model and measurement outputs is very much within the ±0.5% range for the primaries and ±1% for the secondaries. 3. FAULT LOCATION, ISOLATION, AND SERVICE RESTORATION The Fault Location, Isolation, and Service Restoration function monitors the SCADA statuses of the automated switching devices, the statuses of the fault indicators, and the commanded/uncommanded switching operations of the circuit breakers and automated switching devices along the feeders. It also monitors the pseudo-statuses of other switching devices represented in SCADA and performs the following actions: 1. Checks the circuit connectivity and changes the connectivity model in accordance with the real-time situation 2. Checks the loading of the circuits under normal conditions for a given look-ahead time interval (e.g., three hours) 3. Recommends feeder reconfiguration to eliminate overload in case of an existing or a possible near future overload under normal conditions 4. Analyzes the combination of fault indications, switch statuses, and recloser lockout conditions to determine the most likely fault location 5. Recommends operation sequences to the operator after a fault occurs 6. Executes the switching operations via SCADA in closed-loop mode if authorized by the operator. The function selects the optimal reconfiguration based on the following criteria: FREQUENCY (%) DISTRIBUTION OF DIFFERENCES BETWEEN MEASURED AND MODELED VOLTAGES IN PRIMARIES 25% 20% 15% 10% 5% 1. Minimum unserved kws 2. No overloads 3. Minimum voltages below voltage limits 4. Minimum switching operations 5. Preferable use of switching devices which are closer to the faulted feeder 6. Minimum losses. 0% POWER AVE SOUTHPOINT SAN SOUCI -5% CB517 CB540 CB543 CB503 DIFFERENCES (%) Fig.1 Modeling accuracy in primaries AR156 AR154 AR155 AR104 AR101 AR103 FREQUENCY (%) DISTRIBUTION OF THE DIFFERENCES BETWEEN MEASURED AND MODELED VOLTAGES IN SECONDARIES PHILLIPS CB525 CB527 AR113 AR 106 AR110 AR102 AR107 AR112 AR109 AR115 AR100 AR105 AR114 AR111 CB589 CB572 AR108 CB546 CB547 CB545 BAYMEADOWS 10 GRAVEN SOUTHEAST JAX DIFFERENCES (%) Fig.2 Modeling accuracy in secondaries 0 Fig. 3 FLIR test circuit at JEA The performance of the FLIR function was tested at JEA for the distribution circuits comprising eleven

4 interconnected 26.4 kv feeders with 25 remotely controlled circuit breakers and automated reclosers, 16 normally closed and 9 normally open (Fig.3), and at OG&E for a circuit comprising three interconnected 12.5 kv feeders with six remotely controlled circuit breakers and feeder sectionalizing switches, four normally closed and two normally open. Several faults were simulated in a section under different load and switch availability conditions. There were eight possible configurations for service restoration at JEA and three at OG&E. The application selected the best solutions in accordance with the criteria mentioned above. In some cases the solution required only two switching operations, and in other cases four switching operations with cascading load transfer. The average time for the closed-loop execution of the recommended switching order was as follows: 1. At JEA, in the two-operation case 90 seconds and in the four-operation case 100 seconds. 2. At OG&E, in the two-operation case 110 seconds and in the four-operation case 170 seconds. These times included time taken by the operator to authorize the switching order. In some instances the service restoration solution was different from the solution expected by the utility personnel and, in the beginning, it raised suspicions that the application did not recommend the correct switching order. The analysis of the situations showed that the application solutions were different mostly because more information was available to the application than to the personnel. In some cases the application took into account that the quality of data exchange with a particular switching device was unsatisfactory, considered the device unavailable, and recommended an alternative solution. In other cases the real-time load flow analysis performed by the application led to a different solution. At JEA, all normally closed sectionalizing switching devices along the feeders as well as the normally open tie devices are protective devices with reclosing and fault interrupting ratings. These devices are remotely monitored and controlled from a central SCADA master computer. In addition to collecting data gathered by the recloser microprocessor (including fault detection), SCADA is able to control the status of the reclosers, change the mode of operations from recloser mode to load-switch mode and vice versa, and change the settings of the relay protection and reclosing cycles. The average number of reclosers (AR) per automated feeder is about three. This number of in-series AR units creates protective zone coordination problems. The configuration of the distribution circuits is frequently changed due to maintenance, load balancing, fault isolation and service restoration. When multiple ARs are installed in many feeders, almost every change of the circuit configuration changes the relative allocation of the protective devices, and the coordination can be lost. A re-coordination procedure following the realtime field reconfiguration is imperative when implementing feeder automation by using multiple protective devices. The procedure should cover all cases of feeder reconfiguration, including maintenance and load balancing schemes created by using both automated and manual switches, paralleling, and restoration schemes following contingencies. 4. VOLTAGE AND VAR CONTROL The Voltage and Var Control application calculates and executes the optimal voltage controller settings and capacitor statuses while meeting one or a combination of the following objectives (1): 1. Maximize the kwhs supplied within the standard (or better) voltage quality 2. Reduce the peak load while keeping the voltages within either standard limits or emergency limits. 3. Minimize the utility production (purchase) cost under conditions of high real-time energy prices 4. Eliminate or reduce feeder segment overloads within either standard or emergency voltage limits 5. Eliminate or reduce transmission line overloads within either standard or emergency voltage limits 6. Eliminate or reduce under/over voltages in transmission within either standard or emergency voltage limits 7. Reactive power support in transmission within either standard or emergency voltage limits. The effectiveness of the Volt/Var Control application depends very much on the actual long-term load-tovoltage sensitivities. Field tests were conducted in several North American utilities at different times of year (9,10). The results of the field test at OG&E did not differ much from the average data from other utilities and were as follows: for real load 0.8% change in kw per percent in voltage change, and for reactive load 4.7% change in kvar per percent change in voltage. The performance of the VVC function in closed-loop mode was evaluated for the nominal voltage objective (provide better than standard voltage maximize the consumption with close to nominal voltage) and for the load reduction objective. The daily ranges of voltage deviations in representative secondary nodes were compared with the daily ranges of voltage deviations with a standard voltage objective. The range was about ± 1% in the first case and about ±2% in the latter case. The load reduction objective was evaluated by comparing measurements of the substation bus load for days with VVC in load reduction mode with the measurements for days with standard voltages (no load reduction). Typical results of these comparisons are presented in Figures 4 and 5. As seen in figure 4, the voltage without DA has been kept close to the upper voltage limit. Implementation of the VVC application in the Nominal Voltage objective resulted in a voltage profile on a lower level, which provided some load reduction. The Peak Load Reduction mode of VVC was

5 applied for four hours, when the voltage was reduced to the minimum limit. As seen in Fig. 5 the load profile measured during hours with VVC in the load reduction mode is lower than the load profiles measured during hours with VVC in the Nominal Voltage mode. The load reduction effect is in the range of 1% in kw reduction per percent in voltage reduction. V Bus Voltage in 120-Volt scale Fig. 4 Substation bus voltage profiles Real load (% of daily average) Bus Voltages Profile, 7/14-9/14 0:00 0:55 1:50 2:45 3:40 4:35 5:30 6:25 7:20 8:15 9:10 10:05 11:00 11:55 12:50 13:45 14:40 15:35 16:30 17:25 18:20 19:15 20:10 21:05 22:00 22:55 23:50 Time of the day Average Real Load Profile, 7/14-9/14 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 Time of the day Fig. 5 Substation load profile 1.9% of Peak Nominal Voltage Objective Load Reduction Objective Voltage without DA Nominal Voltage Objective Load Reduction The VVC application can switch from one mode of operations to another mode either following a prepared daily scenario with different modes of operations at different times or on the demand of the operator, who has the options for changing the modes of the application. The performance of the applications can change automatically depending on the change of the real-time input data, e.g., the cost of generation. When the cost of generation exceeds the customer rates, and if the VVC application is in the real-time pricing mode, then the function will automatically switch to load reduction within the standard voltage limits. The closed-loop execution of the optimal solution derived by VVC is arranged in stages in a way, which minimizes limit violations during the transition from one intermediate stage to another and allows enough flexibility for re-optimization in the case of unsuccessful execution. The centralized voltage and var control system adjusts the settings of the controllers and the states of the capacitors to the changing objectives and operating conditions optimizing the operations within the operational tolerances. In many cases the operating conditions are driven by the application close to the operational limits to obtain maximum benefits. If for some reasons the central control is lost, and the voltage settings and the states of capacitors are frozen, then in a short period of time the operations can be beyond the acceptable range. A concept of backing up the centralized control with local controllers was introduced. According to this concept, if the centralized control is disabled, the local controllers with the technically acceptable settings should automatically be enabled. When the centralized control is restored, the local controllers should automatically switch back to the remotely controlled mode. When all three applications are in service, they perform in a coordinated manner: the VVC runs right after the FLIR finishes the service restoration and adjusts the voltages in accordance with the new configuration. RTDM models and analyzes the new operating condition and informs the personnel about the performance of the newly reconfigured distribution system. 5. NEW PARADIGM IN CONTROL OF DISTRIBUTION OPERATIONS Implementation of the advanced Distribution Automation requires a significant change in the utility operator s control patterns. The traditional rules for controlling the distribution operations are based on the results of off-line studies performed by the planning engineers for a selected set of representative operating conditions and on near to real-time operator s estimates based on available realtime measurements from the distribution system. For instance, the acceptance of the voltages in distribution is evaluated by comparing the substation bus voltages with limits derived for typical conditions. The real-time operating condition can be very different from the typical one. Consider the following examples: The RTDM application models the operating conditions down to the secondaries and calculates the real-time substation voltage limits based on respecting the voltage limits in the secondaries and on actual connectivity and loading of the distribution circuits. The operators should first pay the attention to the model output regarding the voltages in the secondaries. If these voltages are within the limits, then the substation bus voltage may be satisfactory even if it is beyond the traditional range. An overload of a non-monitored by telemetry feeder segment can be determined by the model, while SCADA does not report load limit violations in the

6 monitored sections. The operator should relay on the model output. Another example is the capacitor control in distribution. Many utility personnel believe that the closer the power factor is to unity the better. However, under some power system conditions and objectives it is more efficient to switch some capacitors off even under peak load conditions. For instance, if there is no overload when the capacitor is turned off, and the loss increase is smaller than the load reduction due to voltage reduction, then the total peak load will be reduced. The FLIR application recommends switching orders based on the current loading, connectivity, switch control availability, and multi-level reconfiguration. The solution can look very different from the ones expected by the operator. The coordination of distribution and transmission capacitors recommended by VVC can be different from the traditionally used by the operators because the advanced application considers many more factors in its optimization procedure. 6. CONCLUSIONS. 1. Advanced Distribution Automation Systems with real-time closed-loop applications are in different stages of implementation in several U.S.A. utilities. 2. The real-time Distribution Operation Model and Analysis, the Fault Location, Isolation, and Service Restoration, and the coordinated Voltage and Var Control functions are the most effective DA applications. 3. Field test results for the accuracy of the distribution operation model are satisfactory. 4. The field test of the Fault Location, Isolation, and Service Restoration application demonstrated satisfactory fault location and optimal service restoration under different load, connectivity, and switch availability conditions. The optimal solutions included simple as well as cascading transfers of loads. 5. The field test of the Voltage and Var Control application demonstrated that a significant improvement in the voltage quality and load management could be obtained by using coordinated closed-loop voltage and var control. 6. The field test of Advance DA demonstrated a rapid adjustment of the VVC and RTDM applications to the feeder connectivity changes. 7. Experience with the advanced DA shows that the requirements for reliability, accuracy and the capacity of the IEDs, along with the requirements placed on communications systems are much more demanding with real-time closed-loop control of distribution operations than with local and supervisory control of operations. 8. Effective utilization of advanced DA requires a significant change of the paradigm in the distribution operation control area. Intensive personnel training is a critical component of successful implementation of advanced DA applications. 7. REFERENCES. 1. Markushevich N, 1993, Voltage and VAR Control in Automated Distribution Systems, 3 rd International Symposium on DA/DSM, Chan E and Markushevich N, 1996, Justification And Planning Of Distribution Automation, 11CEPSI, 1, Markushevich N, 1994, "Modeling Distribution Automation", 4 th International Symposium on DA/DSM, pp Jensen C, Markushevich N, Berman A, 1998, Optimizing Feeder Sectionalizing Points for Distribution Automation, DistribuTech 98, Markushevich N, Clemmer J, Berman A, Royz A, 1998, Analysis of Capacitor Control Under Conditions of Distribution Automation at OG&E, DistribuTech 98, Markushevich N, Herejk I, Nielsen R, 1994, "Functional Requirements and Cost-Benefit Study For Distribution Automation At B.C. Hydro", IEEE, Vol. 9, No. 2, Markushevich N, Nielsen R, 1995, Update on DA Pilot Project at B.C. Hydro, 5 th International Symposium on DA/DSM 8. Chan E, Markushevich N, 1994, "Integration of Distribution Automation into Power System Operations 4 th International Symposium on DA/DSM, Markushevich N, Nielsen R, Dwyer A, Stangl J, 1994, "Load to Voltage Dependency Tests at B.C. Hydro", IEEE, Vol. 10, No. 2, Markushevich N, Nielsen R, Hall J, Nakamura A, Nuelk R, 1996, "Impact of Automated Voltage/Var Control in Distribution on Power System Operations", 6 th International Symposium on DA/DSM,

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Alexander Apostolov AREVA T&D Automation I. INTRODUCTION The electric utilities industry is going through significant

More information

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

IMPLEMENTATION OF NETWORK RECONFIGURATION TECHNIQUE FOR LOSS MINIMIZATION ON A 11KV DISTRIBUTION SYSTEM OF MRS SHIMOGA-A CASE STUDY

IMPLEMENTATION OF NETWORK RECONFIGURATION TECHNIQUE FOR LOSS MINIMIZATION ON A 11KV DISTRIBUTION SYSTEM OF MRS SHIMOGA-A CASE STUDY IMPLEMENTATION OF NETWORK RECONFIGURATION TECHNIQUE FOR LOSS MINIMIZATION ON A 11KV DISTRIBUTION SYSTEM OF MRS SHIMOGA-A CASE STUDY PROJECT REFERENCE NO. : 37S0848 COLLEGE : PES INSTITUTE OF TECHNOLOGY

More information

Reliability and Power Quality Indices for Premium Power Contracts

Reliability and Power Quality Indices for Premium Power Contracts Mark McGranaghan Daniel Brooks Electrotek Concepts, Inc. Phone 423-470-9222, Fax 423-470-9223, email markm@electrotek.com 408 North Cedar Bluff Road, Suite 500 Knoxville, Tennessee 37923 Abstract Deregulation

More information

Canadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles involving

More information

PLAN... RESPOND... RESTORE! Utility Automation & Information Technology... Automation Rising

PLAN... RESPOND... RESTORE! Utility Automation & Information Technology... Automation Rising Automation Rising Q U A R T E R LY First Quarter 2013 The Digital Magazine of Automation & Information Technology for Electric, Gas and Water Utilities Utility Automation & Information Technology... PLAN...

More information

Notes 1: Introduction to Distribution Systems

Notes 1: Introduction to Distribution Systems Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND

More information

No. SSIEC-PRC SHINSUNG. Polymer Recloser SIREC SERIES 15kV, 27kV, 38kV 400A, 630A, 800A

No. SSIEC-PRC SHINSUNG. Polymer Recloser SIREC SERIES 15kV, 27kV, 38kV 400A, 630A, 800A No. SSIEC-PRC-00803-1 SHINSUNG Polymer Recloser SIREC SERIES 15kV, 27kV, 38kV 400A, 630A, 800A Introduction SIREC(Solid Insulated Recloser) is designed for outdoor application with lightweight, longlife,

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Utility Interconnection and System Protection

Utility Interconnection and System Protection Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

GridLiance Reliability Criteria

GridLiance Reliability Criteria GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances

More information

Unit 2. Single Line Diagram of Substations

Unit 2. Single Line Diagram of Substations Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission

More information

CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS

CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS 84 CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS 4.1 INTRODUCTION Now a days, the growth of digital economy implies a widespread use of electronic equipment not only in the industrial

More information

Appendix C-1. Protection Requirements & Guidelines Non-Utility Generator Connection to Okanogan PUD

Appendix C-1. Protection Requirements & Guidelines Non-Utility Generator Connection to Okanogan PUD A. Introduction Appendix C-1 Protection Requirements & Guidelines to Okanogan PUD The protection requirements identified in this document apply to Non-Utility Generating (NUG) facilities, Independent Power

More information

Parallel tap-changer controllers under varying load conditions (Part 1)

Parallel tap-changer controllers under varying load conditions (Part 1) Parallel tap-changer controllers under varying load conditions (Part 1) by Prof. B S Rigby, T Modisane, University of KwaZulu-Natal This paper investigates the performance of voltage regulating relays

More information

E S C R I P T I V E B U L L E T I N .,.,.,. Bulletin DB-106. October, Square D Company Power System Studies ---1 I SQU ARED COMPANY --

E S C R I P T I V E B U L L E T I N .,.,.,. Bulletin DB-106. October, Square D Company Power System Studies ---1 I SQU ARED COMPANY -- D.,.,.,. E S C R I P T I V E B U L L E T I N Bulletin DB-106 Square D Company October, 1990 ---1 I SQU ARED COMPANY -- Electrical Power Distribution System - The Heart of the Business From small commercial

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

Modelling Parameters. Affect on DER Impact Study Results

Modelling Parameters. Affect on DER Impact Study Results Modelling Parameters Affect on DER Impact Study Results Agenda Distributed Energy Resources (DER) Impact Studies DER Challenge Study Steps Lessons Learned Modeling Reverse Power Transformer Configuration

More information

UNIT-4 POWER QUALITY MONITORING

UNIT-4 POWER QUALITY MONITORING UNIT-4 POWER QUALITY MONITORING Terms and Definitions Spectrum analyzer Swept heterodyne technique FFT (or) digital technique tracking generator harmonic analyzer An instrument used for the analysis and

More information

Generation Interconnection Requirements at Voltages 34.5 kv and Below

Generation Interconnection Requirements at Voltages 34.5 kv and Below Generation Interconnection Requirements at Voltages 34.5 kv and Below 2005 March GENERATION INTERCONNECTION REQUIREMENTS AT 34.5 KV AND BELOW PAGE 1 OF 36 TABLE OF CONTENTS 1. INTRODUCTION 5 1.1. Intent

More information

SEATTLE CITY LIGHT DISTRIBUTION AUTOMATION

SEATTLE CITY LIGHT DISTRIBUTION AUTOMATION SEATTLE CITY LIGHT DISTRIBUTION AUTOMATION Ryan Pham Project manager 0/27/206 AGENDA. Distribution automation background 2. Seattle City Light pilot project 3. System performance windstorm 08/29/5 4. Lessons

More information

ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN

ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN Renato CESPEDES I. Roytelman, A.Ilo P.Parra,L.Rodriguez,H.Socorro,T. Romero KEMA Consulting Colombia SIEMENS USA,Austria ENELVEN

More information

Hamdy Faramawy Senior Application Specialist ABB Sweden

Hamdy Faramawy Senior Application Specialist ABB Sweden Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy

More information

CHAPTER 4 PV-UPQC BASED HARMONICS REDUCTION IN POWER DISTRIBUTION SYSTEMS

CHAPTER 4 PV-UPQC BASED HARMONICS REDUCTION IN POWER DISTRIBUTION SYSTEMS 66 CHAPTER 4 PV-UPQC BASED HARMONICS REDUCTION IN POWER DISTRIBUTION SYSTEMS INTRODUCTION The use of electronic controllers in the electric power supply system has become very common. These electronic

More information

The Connecticut Light and Power Company

The Connecticut Light and Power Company The Connecticut Light and Power Company and The United Illuminating Company Exhibit B - Generator Interconnection Technical Requirements May 12, 2010 Page 1 of 26 Table of Contents 1. SCOPE... 3 2. GENERAL

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE

METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE Author: AXLIU Origination Date: 05/07/2010 Version: 8.3 Revised By: Approver s Name: OXPAIS REROMAK REROMAK 1 PURPOSE Revision Date: 9/12/2016

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

No. SSIEC-SEW SHINSUNG. Solid Insulation Eco Load Break Switch (SILO) SILO SERIES 15kV, 27kV 400A, 630A

No. SSIEC-SEW SHINSUNG. Solid Insulation Eco Load Break Switch (SILO) SILO SERIES 15kV, 27kV 400A, 630A SHINSUNG Solid Insulation Eco Load Break Switch (SILO) SILO SERIES 15kV, 27kV 400A, 630A Enhanced Self Healing System General SILO is 3 phase, solid insulated load break switch (LBS) and vacuum interruption

More information

University of Nevada, Reno. Smart Meter Data-Driven Fault Location Algorithm in Distribution Systems

University of Nevada, Reno. Smart Meter Data-Driven Fault Location Algorithm in Distribution Systems University of Nevada, Reno Smart Meter Data-Driven Fault Location Algorithm in Distribution Systems A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science in

More information

ELECTRICAL POWER ENGINEERING

ELECTRICAL POWER ENGINEERING Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

Fault Location Using Sparse Wide Area Measurements

Fault Location Using Sparse Wide Area Measurements 319 Study Committee B5 Colloquium October 19-24, 2009 Jeju Island, Korea Fault Location Using Sparse Wide Area Measurements KEZUNOVIC, M., DUTTA, P. (Texas A & M University, USA) Summary Transmission line

More information

CHAPTER 5 POWER QUALITY IMPROVEMENT BY USING POWER ACTIVE FILTERS

CHAPTER 5 POWER QUALITY IMPROVEMENT BY USING POWER ACTIVE FILTERS 86 CHAPTER 5 POWER QUALITY IMPROVEMENT BY USING POWER ACTIVE FILTERS 5.1 POWER QUALITY IMPROVEMENT This chapter deals with the harmonic elimination in Power System by adopting various methods. Due to the

More information

An Adaptive Protection Scheme for Optimal Overcurrent Relay Coordination in Interconnected Power Systems

An Adaptive Protection Scheme for Optimal Overcurrent Relay Coordination in Interconnected Power Systems From the SelectedWorks of Almoataz Youssef Abdelaziz March, 2000 An Adaptive Protection Scheme for Optimal Overcurrent Relay Coordination in Interconnected Power Systems Almoataz Youssef Abdelaziz Available

More information

Experiences of Using Synchrophasors at Duke Energy

Experiences of Using Synchrophasors at Duke Energy 1 Experiences of Using Synchrophasors at Duke Energy Tim Bradberry, Megan Vutsinas, Kat Sico Duke Energy IEEE PES Tutorial July 19 th, 2016 Duke Energy s Phasor Plans Carolinas West Currently have 125

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS

GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS Hannu LAAKSONEN ABB Oy Finland hannu.laaksonen@fi.abb.com ABSTRACT Medium-voltage (MV) network short-circuit protection operation time delays have

More information

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines David K Olson Xcel Energy Minneapolis, MN Paul Nyombi Xcel Energy Minneapolis, MN Pratap G Mysore Pratap Consulting Services,

More information

Dynamic Grid Edge Control

Dynamic Grid Edge Control Dynamic Grid Edge Control Visibility, Action & Analytics at the Grid Edge to Maximize Grid Modernization Benefits The existence of greater volatility at the grid edge creates a set of problems that require

More information

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul

More information

A New Use for Fault Indicators SEL Revolutionizes Distribution System Protection. Steve T. Watt, Shankar V. Achanta, and Peter Selejan

A New Use for Fault Indicators SEL Revolutionizes Distribution System Protection. Steve T. Watt, Shankar V. Achanta, and Peter Selejan A New Use for Fault Indicators SEL Revolutionizes Distribution System Protection Steve T. Watt, Shankar V. Achanta, and Peter Selejan 2017 by Schweitzer Engineering Laboratories, Inc. All rights reserved.

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the Board of Trustees. Description

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

Advanced Paralleling of LTC Transformers by VAR TM Method

Advanced Paralleling of LTC Transformers by VAR TM Method TAPCHANGER CONTROLS Application Note #24 Advanced Paralleling of LTC Transformers by VAR TM Method 1.0 ABSTRACT Beckwith Electric Company Application Note #11, Introduction of Paralleling of LTC Transformers

More information

AC Power Monitoring Application Brief

AC Power Monitoring Application Brief AC Power Monitoring Application Brief APPLICATION NOTE Managing and monitoring AC power usage at remote sites (cell sites, communication huts, controlled environment vaults {CEVs}, substations, cabinets,

More information

Babak Enayati National Grid Thursday, April 17

Babak Enayati National Grid Thursday, April 17 2014 IEEE PES Transmission & Distribution Conference & Exposition Impacts of the Distribution System Renewable Energy Resources on the Power System Protection Babak Enayati National Grid Thursday, April

More information

FACILITY RATINGS METHOD TABLE OF CONTENTS

FACILITY RATINGS METHOD TABLE OF CONTENTS FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5

More information

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Mark Hackney October 5-8, 2009 Amman, Jordan Energy Control Center Layout 2 Energy Control

More information

Comparison of recloser and breaker standards

Comparison of recloser and breaker standards s Technical Data TD280024EN Supersedes February 1994 (R280-90-5) COOPER POWER SERIES Comparison of recloser and breaker standards Technical Data TD280024EN Comparison of recloser and breaker standards

More information

2015 Relay School Bus Protection Mike Kockott March, 2015

2015 Relay School Bus Protection Mike Kockott March, 2015 2015 Relay School Bus Protection Mike Kockott March, 2015 History of Bus Protection Circulating current differential (1900s) High impedance differential (1940s) Percentage restrained differential (1960s)

More information

System Protection Schemes in Power Network based on New Principles

System Protection Schemes in Power Network based on New Principles System Protection Schemes in Power Network based on New Principles Daniel Karlsson, ABB Automation Products AB S-721 59 Västerås, SWDN daniel.h.karlsson@se.abb.com Abstract This report describes how a

More information

Voltage and Reactive Procedures CMP-VAR-01

Voltage and Reactive Procedures CMP-VAR-01 Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes

More information

Optimizing HV Capacitor-Bank Design Protection & Testing

Optimizing HV Capacitor-Bank Design Protection & Testing Optimizing HV Capacitor-Bank Design Protection & Testing Benton Vandiver III ABB Inc. 71st Annual Conference for Protective Relay Engineers Texas A&M University Introduction Shunt Capacitor Bank Considerations

More information

E N G I N E E R I N G M A N U A L

E N G I N E E R I N G M A N U A L 1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

Technical Requirements For Generation Connected to The ODEC System

Technical Requirements For Generation Connected to The ODEC System Old Dominion Electric Cooperative Technical Requirements For Generation Connected to The ODEC System March 30, 2010 1 2 Table of Contents Topics Page Number Disclaimer.. 3 Perquisites.. 3 Applicability..

More information

Islanding and Detection of Distributed Generation Islanding using Negative Sequence Component of Current

Islanding and Detection of Distributed Generation Islanding using Negative Sequence Component of Current http:// and Detection of Distributed Generation using Negative Sequence Component of Current Doan Van Dong Danang College of Technology, Danang, Vietnam Abstract - There is a renewed interest in the distributed

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

A short introduction to Protection and Automation Philosophy

A short introduction to Protection and Automation Philosophy Training Center A short introduction to Protection and Automation Philosophy Philippe Goossens & Cédric Moors Training Center Contents Definitions and basic concepts Differential and distance protection

More information

Automated Power System Waveform Analytics for Improved Visibility, Situational Awareness, and Operational Efficiency

Automated Power System Waveform Analytics for Improved Visibility, Situational Awareness, and Operational Efficiency Automated Power System Waveform Analytics for Improved Visibility, Situational Awareness, and Operational Efficiency B. Don Russell (Presenter) Carl L. Benner Jeffrey Wischkaemper Karthick Muthu Manivannan

More information

Deployment of Real-time State Estimator and Load Flow in BC Hydro DMS - Challenges and Opportunities

Deployment of Real-time State Estimator and Load Flow in BC Hydro DMS - Challenges and Opportunities IEEE PES General Meeting, Vancouver, Canada, July 2013 Deployment of Real-time State Estimator and Load Flow in BC Hydro DMS - Challenges and Opportunities Djordje Atanackovic, BC Hydro Valentina Dabic,

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering

Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering Expo - Nov. 3, 2014 Index Normal Distribution System

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS Puget Sound Energy, Inc. PSE-ET-160.60 October 30, 2007 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 GENERAL

More information

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng.

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng. Distance Protection for Distribution Feeders Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng. Why use distance protection for distribution feeders? Distance protection is mainly used for protecting

More information

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY Module 9 Fault Type Form 4.X 1 M9 Fault Type The descriptor of the fault, if any, associated with each Automatic Outage of an Element. 1. No fault 2. Phase-to-phase fault (P-P) 3. Single phase-to-ground

More information

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-3 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Phasor Measurements for Blackout Prevention

Phasor Measurements for Blackout Prevention Phasor Measurements for Blackout Prevention Anjan Bose Washington State University Pullman, WA, USA i-pcgrid 2013 San Francisco, CA March 26-28, 2013 Monitoring the Power Grid (SCADA) Visualization Tables

More information

CHAPTER 8 Effect of HT Distribution Feeder Voltage on Distribution Transformer Losses

CHAPTER 8 Effect of HT Distribution Feeder Voltage on Distribution Transformer Losses CHAPTER 8 Effect of HT Distribution Feeder Voltage on Distribution Transformer Losses 8.1 Introduction The present level of Transmission and Distribution (T & D) losses in Indian power system is estimated

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods

Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods Proceedings of the th WSEAS International Conference on Power Systems, Beijing, China, September -, 200 Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing

More information

Compensation of Distribution Feeder Loading With Power Factor Correction by Using D-STATCOM

Compensation of Distribution Feeder Loading With Power Factor Correction by Using D-STATCOM Compensation of Distribution Feeder Loading With Power Factor Correction by Using D-STATCOM N.Shakeela Begum M.Tech Student P.V.K.K Institute of Technology. Abstract This paper presents a modified instantaneous

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION Document 9022 Puget Sound Energy, Inc. PSE-TC-160.70 December

More information

P5 Policy 5: Emergency Operations

P5 Policy 5: Emergency Operations RG CE OH Policy 5: Emergency Operations V 3.1 Page 1 of 18 P5 Policy 5: Emergency Operations Document Control Version Number: V 3.1 Approved By: RG CE Plenary Date Approved: 43 rd RG CE Plenary Meeting

More information

Case Study: Using Distribution Automation to Build the Next Generation Utility in the City of Wadsworth

Case Study: Using Distribution Automation to Build the Next Generation Utility in the City of Wadsworth Case Study: Using Distribution Automation to Build the Next Generation Utility in the City of Wadsworth Mark Feller, P.E. City of Wadsworth Bryan Fazzari, obert Van Singel, and William C. Edwards Jr. Schweitzer

More information

Tampa Electric Company Facility Rating Methodology Approved 11/20/2018

Tampa Electric Company Facility Rating Methodology Approved 11/20/2018 Tampa Electric Company Facility Rating Methodology Approved 11/20/2018 Effective Date: 12/01/2018 Responsible Department: System Planning Review Cycle: 3 Years Last Date Reviewed: 11/16/2018 Next Planned

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated

More information

A NEW METHOD FOR ISLANDING DETECTION IN DISTRIBUTED GENERATION

A NEW METHOD FOR ISLANDING DETECTION IN DISTRIBUTED GENERATION A NEW METHOD FOR ISLANDING DETECTION IN DISTRIBUTED GENERATION Eugeniusz Rosolowski Arkadiusz Burek Leszek Jedut e-mail: rose@pwr.wroc.pl e-mail: arkadiusz.burek@pwr.wroc.pl e-mail: leszek.jedut@pwr.wroc.pl

More information

Using a Multiple Analog Input Distance Relay as a DFR

Using a Multiple Analog Input Distance Relay as a DFR Using a Multiple Analog Input Distance Relay as a DFR Dennis Denison Senior Transmission Specialist Entergy Rich Hunt, M.S., P.E. Senior Field Application Engineer NxtPhase T&D Corporation Presented at

More information

Protective Relaying for DER

Protective Relaying for DER Protective Relaying for DER Rogerio Scharlach Schweitzer Engineering Laboratories, Inc. Basking Ridge, NJ Overview IEEE 1547 general requirements to be met at point of common coupling (PCC) Distributed

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Remedial Action Scheme Definition Development Background and Frequently Asked Questions

Remedial Action Scheme Definition Development Background and Frequently Asked Questions Remedial Action Scheme Definition Development Background and Frequently Asked Questions Project 2010-05.2 Special Protection Systems October 2014 1 3353 Peachtree Road NE Suite 600, North Tower Atlanta,

More information