1 RFI #: 01A SUBJECT: X-Ray Cabinets Drawing: A2.11E, A2.12E, A2.51, A503 A2.11E and A2.12E Equipment EQ05 xray cabinet is labeled CFCI. A2.51 Enlarged Floor Plans note EQ05 and directs me to Details 3,5, and 11 on A503. Those details on A503 label the xray cabinets at IE25 and state they are OFCI. Is EQ05 the same as IE25 and are they CFCI or OFCI?
2 RFI #: 02A SUBJECT: Dental Treatment 2 Detail Drawing: A2.11E, A2.51, A2.41 A2.11E Dental Treatment 2 is noted to see detail 1 on A2.51. That detail is the Dental Nurse Station 129. We believe the detail called out on A2.11E is in the wrong location and should be around Dental Nurse Station 129 not Dental Treatment 2. We see no enlarged detail of Dental Treatment 2 and see on A2.41 that the Dental Nurse Station 129 is noted correctly.
3 RFI #: 03A SUBJECT: Enlarged Plan designation for Room Number 125 Drawing: A2.42 A2.42 Pano 125 Room# and Enlarged Plan designation is on top of each other and is hard to read.
4 RFI #: 04A SUBJECT: Left Entrance to Dental Treatment 6 Drawing: A2.41 A2.41 Dental Treatment 6, Left entrance from corridor has dotted lines but no reference to what is wanted there.
5 RFI #: 01F SUBJECT: Food Service Equipment Drawing: We typically see plans/specs that are not in our scope stamped For information only. Should the Food Service plans/specs be marked this way or is that part of our scope to price?
6 RFI #: 05A SUBJECT: NABCO products for Automatic Entrances Drawing: Can we use NABCO for the automatic doors as a substitution? NABCO s products are comparable to the manufactures listed in the specs for the Automatic Entrances.
7 RFI #: 06A SUBJECT: Canopies vs. Sun Screens Drawing: A4.22 Please confirm that the building is just going to have regular canopies, instead of having sun screens. On A4.22, detail 8 says sun screen and detail 7 says canopy. The details are the exact same, so just want to clarify that the intent is to have canopies and not louver systems.
8 April 17, 2017 RFI #: 07A SUBJECT: Refrigerator at Staff Breakroom Drawing: A2.12E & A5.08 A2.12E Staff Breakroom 226 notes EQ-24 Refrigerator OFCI. Detail 11/A5.08 Staff Breakroom 226 notes IE-30 Refrigerator CFCI. Is this refrigerator OFCI or CFCI?
9 RFI #: 01E SUBJECT: Service Entrance Conductors Drawing: Service Entrance conductors: (3) sets of 300 MCM is rated for 855A. Should the MCB have a 850AT setting? Yes, this is correct. There will not be a 1000A main with ground fault. This will be changed on the drawings. Telios - Philip Sheffield
10 RFI #: 01P SUBJECT: Plumbing for Laundry Rm 213 Drawing: P1.03 P1.03 Laundry RM 213 There is an image drawn for a washer/dryer combo. Is a WB-2 required for this, none is shown? Specifying this equipment will require a drain (the drain is also not in the drawings), and ¾ hot and cold water. There will need to be a WB-2 with a drain and the ½ HW and ½ CW drop that is already shown. The drawings will be modified to show the WB-2. Philip Sheffield
11 RFI #: 02P SUBJECT: Sanitary Sewer Run-Out Drawing: P1.00 P1.00 Key note 2 Is this 6 Sanitary sewer run-out actually the 2 ½ domestic water underground supply feed to building? Correct, this is the 2-1/2 domestic water supply. Drawing will be modified. Philip Sheffield
12 RFI #: 03E SUBJECT: HCF Cables & MC Cables Drawing: Will Telios allow the use of HCF cable for wall partition rough-in and MC cable for fixture rough-in? Flexible conduit is to only to be used for light fixture whip connection from junction box. Telios - Philip Sheffield
13 RFI #: 04E SUBJECT: Ground Ring Drawing: Will Telios require a ground ring around the building? Yes, refer to spec section section C. Telios Philip Sheffield
The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.
ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless
More informationA/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY
A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural,
More informationWayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009
ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationELPT 1429 RESIDENTIAL WIRING
SYLLABUS ELPT 1429 RESIDENTIAL WIRING INDUSTRIAL AND COMMERCIAL ELECTRICITY BRAZOSPORT COLLEGE LAKE JACKSON TEXAS PREPARED BY: Larry Grable DATE: September 13, 2005 INSTRUCTOR RECOMMENDED BY: RECOMMENDED
More informationU of I Facilities Standards Updates for 2017
U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems
More informationSTREETSCAPE FEASIBILITY TERMS OF REFERENCE
Introduction STREETSCAPE FEASIBILITY TERMS OF REFERENCE As outlined in the Official Plan, Section 9, Build A Desirable Urban Form, Mississauga will transform the public realm to create a strong sense of
More informationCKBD Peakes Bath Scoresheet
CKBD Peakes Bath Scoresheet Part I: Graphics & Presentation Standards Each question pertains to all four drawing documents: Floor Plan, Mechanical, Construction Plan, and Elevation Drawing unless specifically
More informationTELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More information1907 Grayson Street North Charleston, SC TMS: FRANKLIN DESIGN
Metanoia Houses 1907 Grayson Street North Charleston, SC 29405 TMS: 469-12-00-090 DESIGN Chris Bonner, Architect 582 Rutledge Ave Charleston SC 29403 843.608.1858 www.bstudioarchitecture.com 1907 Grayson
More informationThis Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.
Revision No. 01 Issued February 19, 2016 Page 1 This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. This Revision
More informationEach diagram below is divided into equal sections. Shade three-quarters of each diagram. 2 marks. Page 1 of 27
1 Each diagram below is divided into equal sections. Shade three-quarters of each diagram. 2 marks Page 1 of 27 2 Here are 21 apples. Put a ring around one third of them. Page 2 of 27 3 A line starts at
More informationIntroduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products
Plumbing Plans Introduction Classifications of piping: Industrial Carries liquids and gases used in the manufacture of products Residential (i.e., plumbing) Carries fresh water, gas, liquid, solid waste
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More informationG.F.C.I. by Sam Goldwasser -- exerpts from: Sci.Electronics.Repair FAQ:
1 of 6 8/4/2007 6:52 PM This page is from the original Code Check website. To see the latest version choose "Home Page New" Code Check 1998 by Redwood Kardon Home Page New Search What is a GFCI?: G.F.C.I.
More informationPOWER TRACE TM TASCO, INC.
POWER TRACE TM Instruction Manual PTL610 TASCO, INC. HOW YOUR POWER TRACE TM OPERATES The Power Trace TM is composed of two primary components: the Receiver and the Transmitter. When the Transmitter is
More information12.6 Delta Phase versus Line Current
Unit 12 Delta/Delta and Delta/Wye Transformers Electrical NEC Exam Preparation 12.6 Delta Phase versus Line Current Since each line conductor from a delta transformer is actually connected to two transformer
More informationCITY OF COLUMBIA DEPARTMENT OF UTILITIES AND ENGINEERING WASTEWATER COMPLIANCE FATS, OILS, AND GREASE REGISTRATION APPLICATION
CITY OF COLUMBIA DEPARTMENT OF UTILITIES AND ENGINEERING WASTEWATER COMPLIANCE FATS, OILS, AND GREASE REGISTRATION APPLICATION Return form to: Stephen Sealey, Wastewater Compliance Specialist 1200 Simmon
More informationADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.
ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.
DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part
More informationMarcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationPMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education
PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does
More informationAmos Alonzo Stagg Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationHow to measure guide
How to measure guide Before we design your new IKEA kitchen, we will ask you to first provide some measurements of the kitchen space. It is not hard and it will take no more than 15 minutes. We love photos
More information1. Name the horizontal member that rests on the foundation wall to support other wood members.
Student Name: Teacher: Date: District: Rowan Assessment: 9_12 T and I IC62 - Drafting - Architr II Test 1 Description: Unit C - Floorplans - Test 3 (ALL) Form: 501 1. Name the horizontal member that rests
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection
More informationKitchen and Bath Design Planner
2017 Kitchen and Bath Design Planner How to Measure Your Kitchen or Bath for New Cabinets Measuring your space is a critical step in determining your room layout. Having accurate measurements of your kitchen
More informationPART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,
More informationProject Affordable Housing Design Rubric
Project 2.3.1 Affordable Housing Design Rubric Elements Weight 5 Points 4 Points 3 Points 2 Points 1 0 Points Title Page Table of Contents Project Description Bubble Diagrams Design Sketches The title
More informationModule 2 Unit 6, 7, 8
Module 2 Unit 6, 7, 8 1. What is the definition of an ideal conductor? Material that will carry the greatest current with the lowest temperature rise 2. How much does copper weigh compared to aluminum?
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationADDENDUM NUMBER 04 Washington & Jefferson College Rec Center Renovation and Expansion
ADDENDUM NUMBER 04 Washington & Jefferson College Rec Center Renovation and Expansion 102051 March 13, 2015 To the Bidders: The following Addendum items are to be included in the scope of work and all
More informationProject Affordable Housing Design Rubric
Project 2.3.1 Affordable Housing Design Rubric Elements Weight 5 Points 4 Points 3 Points 2 Points 1 0 Points Title Page Table of Contents Project Description Bubble Diagrams The title page includes all
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationGeorge Washington Elementary School 3611 E 114th St Chicago, IL 60617
3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting
More informationStep 1: General Customer information
Call: 877-533-5582 Fax: 732-961-5259 Email: sales@woodcabinetsonline.com Website: www.woodcabinetsonline.com Designing the perfect kitchen can be a big task! From matching colors, designing layout, and
More informationWiring Devices. Description. Lesson Outcomes. Assumptions. Electrician
Description Once a house has been roughed in and has passed an electrical inspection, it s time for the electricians to do the final job of wiring and installing devices. Most trades have a finishing process
More informationJohann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647
3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationWiring of the Main Distribution Panelboard
Job Sheet 4 Wiring of the Main Distribution Panelboard OBJECTIVE To connect the service-entrance conductors. To ground the main distribution panelboard (MDP). To wire a branch circuit supplying a three-phase
More informationPHYSICAL FACILITIES Consultant s Handbook Division 08 Openings 7400 Access Control Hardware. Page 1 of 6
1 Definitions Vending Laundry Copy Office/Retail Outlet Door Switch Controlled Door Card Reader Door LX Switch RX Switch Power Transfer Mortise Type Non- consisting of beverage and/or snack machines to
More informationIMMS-CI-HW. Communications Controller Interface. Installation Instructions IMMS. Controller. Interface. AC From Transformer 24 VAC REM 24 VAC SEN
CI 4 Comm. IMMS-CI-HW Communications Interface POWER From Transformer Ground To REM Installation Instructions To SmartPort Sensor 1 Sensor 2 Sensor 3 From Sensors Sensor Common IMMS Interface From SI or
More informationCRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9195 CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationNCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice
NCIDQ Restroom Drawing Answers to the most common questions about this drawing for the Practicum. 2016 Qpractice Table of Contents This is a summary guide of most frequently asked questions about the Practicum
More informationSkillsUSA 2013 Contest Projects Electrical Construction Wiring
SkillsUSA 2013 Contest Projects Electrical Construction Wiring Click the Print this Section button above to automatically print the specifications for this contest. Make sure your printer is turned on
More informationAcademy for Global Citizenship Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationKitchen & Bath Cabinetry Laser Measuring Guide
SEMI-CUSTOM Kitchen & Bath Cabinetry Laser Measuring Guide Dear Member, Thank you for selecting All Wood Cabinetry for your project. This package details the information our professional design staff will
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationCan you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site
CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation
More informationPROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:
DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationNew Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the
More informationAddendum Number: 1 WT White HS Additions and Renovations, Dallas ISD
Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications
More informationMorton School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationArchitecture, Construction, and Engineering Technical Charter
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT
ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:
More informationSoftware Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationCANUTILLO INDEPENDENT SCHOOL DISTRICT 7710 Cap Carter Rd. Canuillo,TX DESIGN CHECKLIST
CANUTILLO INDEPENDENT SCHOOL DISTRICT 7710 Cap Carter Rd. Canuillo,TX 79835 DESIGN CHECKLIST Reviewers should - Use Checklists when reviewing any type of CISD construction project for the following disciplines:
More informationAndrew Carnegie Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationZUCCHINI MS - LOW TO MEDIUM POWER BUSBAR
ZUCCHINI MS - LOW TO MEDIUM POWER BUSBAR The flexibility of the Zucchini MS range during planning and installation makes it ideal for frequently changing requirements in small to medium sized commercial
More informationInfinity. Surface Mounted Headwall. Installation Instructions. The.
The www.hsiheadwalls.com Infinity Surface Mounted Headwall Installation Instructions Tel: 925.427.7800 Fax: 925.427.0800 support@hsiheadwalls.com Hospital Systems Inc. 750 Garcia Avenue Pittsburg CA 94565
More informationPrintreading for Residential Construction
Printreading for Residential Construction Chapter 1 1. What are the five types of working drawings? Plot plans, floor plans, elevations, sections, and details 2. What information is typically available
More informationPhilip Rogers Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCHAPTER 29 PROJECT COMPLETION DOCUMENTS
CHAPTER 29 PROJECT COMPLETION DOCUMENTS PROJECT COMPLETION Upon completion of traffic control signal system and lighting projects, there are forms and checklists to ensure that the project is closed out
More informationET 40 - Electrician Theory Examination Marking Schedule
ET 40 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker
More information2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"
Scope.1 Precast Concrete Equipment Slab Box 8' x 10' x Pad with 4' x 7' x 3'- Box for 5-Way RAM Gas Switch, 2-Way, 3-Way, and 4-Way Pad-Mounted RAG Gas Switches, VFI 9, VFI 12, Bypass Switch, and 33 kv
More informationJonathan Burr Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the
More informationThomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608
W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationKnight Abbey ID 439 Contract Design I
Knight Abbey ID 439 Contract Design I Due: May 7 th Project Description: Students enrolled in ID-439, Contract Design I during the spring 2014 semester will be working on an office design solution for
More informationKIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRECORD GROUP NUMBER 156
DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services
More informationThermaSkirt User Manual
ThermaSkirt User Manual Step 1 Draw the Whole Room Outline Click on Start or Go to File Menu and Click on New or Open to start the program. Clicking on Start or New option from the menu will open the designer
More informationState College of Florida, Manatee-Sarasota
State College of Florida, Manatee-Sarasota State College of Florida, Audio Video Equipment for the New Library and Learning Center FAC2017-41 Project No. 5-15-1-17 ADDENDUM NUMBER #3 Date: February 23,
More informationNorth Lawndale College Prep Charter - Collins
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationRequest for Information 0026
Request for Information 0026 Detailed, RFIs Grouped by RFI Number SLAC Photon Science Lab (PSLB) Project # 02001.105960 2575 Sand Hill Road Tel: Fax: Menlo Park, CA 94025 RFI #: 0026 Date Created: 4/4/2017
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationGrounding and Bonding
Grounding and Bonding 2017 Communications Academy Joe Blaschka Jr., PE Grounding/Bonding What is it? Why do we do it? What does the National Electrical Code say? What about fixed locations? What about
More informationInde-Pendants Family. 32L Surface Mount Cylinder Plaster Trim, Grid and Drywall Ceiling Types. Document No
Inde-Pendants Family 32L Surface Mount Cylinder Plaster Trim, Grid and Drywall Ceiling Types Installation instructions for 32L-C-S-D Document No. Supplied by Litecontrol 32L Inde-Pendants: Cylinder (Surface
More informationPhilip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645
34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationFTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD
SECTION 01 10 12 DESIGN AFTER AWARD 1. DESIGN RESPONSIBILITY The Contractor shall furnish and be responsible for a complete set of design documents as called for in specification section 01 10 10 DESIGN
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More information